INVITATION FOR BID
SOLICITATION NUMBER: DTFH6815B00019
SOLICITATION TYPE: FULL AND OPEN COMPETITION (UNRESTRICTED)
PROJECT NUMBER: CO FLAP 1099(1)
PROJECT NAME: LAKE PUEBLO ROAD & TRAIL IMPROVEMENTS
BID OPENING DATE:
See Page A-1, Item 13A
This solicitation cites
Standard Specifications for Construction of Roads And Bridges On Federal Highway Projects, FP-14
ISSUING OFFICE:
U.S. DEPARTMENT OF TRANSPORTATION
FEDERAL HIGHWAY ADMINISTRATION
CENTRAL FEDERAL LANDS HIGHWAY DIVISION
12300 W. DAKOTA AVENUE, SUITE 360
LAKEWOOD, CO 80228
Web site: www.fbo.gov e-mail: CFLContracts@dot.gov
PROJECT CO FLAP 1099(1)
LAKE PUEBLO ROAD & TRAIL
IMPROVEMENTS
LENGTH Schedule A Trail: 11.60 Miles Schedule A Road: 3.19 Miles Option X: 1.46 Miles Option Y: 0.62 Miles Option Z: 0.95 Miles
LOCATION LAKE PUEBLO STATE PARK
COUNTY PUEBLO COUNTY
STATE COLORADO
TABLE OF CONTENTS
Notice to Bidders ................................................................................................................... A-i
Solicitation, Offer, and Award .............................................................................................. A-1
Basis for Award & Bid Schedule Instructions ..................................................................... A-4
Bid Schedule ........................................................................................................................ A-6
Solicitation Provisions ...........................................................................................................B-1
Contract Clauses ....................................................................................................................C-1
Davis Bacon Wage Determination........................................................................................ D-1
Division 100 ........................................................................................................................... E-1 Division 150 ......................................................................................................................... E-16 Division 200 ......................................................................................................................... E-29 Division 300 ......................................................................................................................... E-33 Division 400 ......................................................................................................................... E-34 Division 500 ......................................................................................................................... E-37 Division 600 ......................................................................................................................... E-46 Division 700 ......................................................................................................................... E-55
APPENDICES
Appendix A .......................................................... Sample Small Business Subcontracting Plan Appendix B ............................................Union Pacific Contractor's Right of Entry Agreement
SPECIAL CONTRACT REQUIREMENTS (SCRs)
The following Special Contract Requirements amend and supplement the Standard Specifications for Construction of Roads and Bridges on Federal Highway Projects
NOTICE TO BIDDERS
A-i
NOTE TO LARGE BUSINESSES:
Due to the compressed schedule for award of this project following the bid opening, large businesses are required to submit their completed small business subcontracting plan with their bid. Failure to submit a subcontracting plan may deem your bid non-responsive.
A sample of a subcontracting plan is included as Appendix A in this solicitation.
• Prior to development of this subcontracting plan, please read FAR Clause 52.219-
9 – Small Business Subcontracting Plan (APR 2008).
• It is the Prime Contractor’s responsibility to ensure that all small business concerns included in this subcontracting plan are eligible. The System for Award Management (SAM) is the only source for certification of Small Disadvantaged Business and HUBZone Small Business concerns.
• Prime Contractors are encouraged to post sources sought notices for subcontracting opportunities on http://web.sba.gov/subnet/ Small businesses can review this web site to identify opportunities in their areas of expertise. The use of SUB-Net fulfills the requirements set forth in Federal Acquisition Regulation (FAR) 5.206, Notice of Subcontracting Opportunities, for contractors and subcontractors to post notices and thereby increase competition for subcontracts.
ELECTRONIC BIDS WILL NOT BE ACCEPTED. Submit a printed copy of your bid to the address listed on the SF-1442 (Page A-1, Item 8). Please submit the following with your bid:
Submit the following documents with your Bid Package–
• SF-1442, Solicitation, Offer & Award, Pages A-1 and A-2.
• Bid Schedule including Buy America Act & Hazardous Materials, Pages A-6 through A-29.
• Bid Guarantee (see FAR Clause 52.228-1), Pages B-1 and B-2. Bid bonds must be originals with original signatures and corporate seals. Photocopies and Faxed copies are NOT acceptable and will make your bid non-responsive.
• Completed VETS 100, Page A-ii; Bidder’s Qualifications, Pages B-3 through B-6; Annual Representations and Certifications (FAR 52.204-8), Pages B-7 through B-12 and Certification Regarding Responsibility Matters (FAR 52.209-5), Pages B-12 through B-15.
Bidders should retain all other pages for their information. Bids should be submitted in a sealed envelope and include the Contractor’s Name, Solicitation Number and the Project Number/Name.
http://web.sba.gov/subnet/
A-ii
I. PRE-BID INFORMATION
It is the responsibility of the bidder to verify that this solicitation document, including the plans, are complete as listed in the table of contents and the index to sheets. Plan sheets can be found at http://www.fbo.gov and viewed by individual sections, downloaded by individual sections, or the entire plan set downloaded in a zip file. Physical data relevant to this solicitation may also be viewed or downloaded at the above site.
This solicitation and subsequent contract are governed by the Federal Acquisition Regulations (FAR), agency supplemental regulations, and the Standard Specifications for Construction of Roads and Bridges on Federal Highway Projects, FP-14.
The FP-14 was utilized for the design of this project. Hard copies of the FP-14 will not be provided to bidders. The FP-14 is available electronically at http://flh.fhwa.dot.gov/resources/specs/ or may be purchased here http://bookstore.gpo.gov/products/sku/050-001-00346-5. Limited numbers of hard copies of the FP-14 will be provided to the awarded Prime Contractor.
Applicable FAR provisions and clauses in this IFB are incorporated by reference or full text. FAR provisions and clauses incorporated by reference can be accessed on the Internet at https://www.acquisition.gov/far/.
Notice of SAM Registration – you must register in the System for Award Management (SAM – replaced CCR) prior to award of a contract resulting from this solicitation. Failure to register prior to contract award may require award to the next successful registered offeror. See FAR Subpart 4.1103©. Register online at www.sam.gov.
Representations and Certifications – This solicitation is issued under NAICS 237310 – Highway, Street & Bridge Construction with a small business size standard of $36.5 million. If your average annual gross receipts for the past 3 years are above $36.5 million, you are a large business for this solicitation. If they are below $36.5 million you are a small business. Please complete the certification listed in paragraph (b) of FAR Provision 52.204-8 Annual Representation and Certifications on Page B-7. Your small business information is pulled into the Online Representations and Certifications Application (ORCA) website from the System for Award Management (SAM). Please include NAICS 237310 in your SAM. Before submitting bids, please ensure you have completed your annual representations and certifications electronically at the SAM website at www.sam.gov.
Vets100 Reporting: - The Contractor must complete the report if required. See reporting requirements at: www.dol.gov/vets/programs/fcp/main.htm.
• My firm had a qualifying Federal Contract in 2014 and has complied with the reporting requirements.
• My firm did not have a qualifying Federal Contract in 2014 and is therefore exempt from the reporting requirements http://www.fbo.gov/ http://flh.fhwa.dot.gov/resources/specs/ http://flh.fhwa.dot.gov/other/exit.htm?link=http://bookstore.gpo.gov/products/sku/050-001-00346-5 https://www.acquisition.gov/far/ http://www.sam.gov/ http://www.sam.gov/ http://www.dol.gov/vets/programs/fcp/main.htm
A-iii
Bid Guarantee – Follow the requirements of FAR Clause 52.228-1 Bid Guarantee and Subpart
102.03 of the FP-14.
ATTENTION: Minority, Women-owned, and Disadvantaged Business Enterprises (DBEs). The Department of Transportation (DOT), offers working capital financing and bonding assistance for transportation related contracts. DOT's Bonding Assistance Program (BAP) offers bid, performance and payment bonds on contracts up to $1,000,000. DOT's Short-Term Lending Program (STLP) offers lines of credit to finance accounts receivable. Maximum line of credit is $500,000 with interest at the prime rate. For further information, call (800) 532-1169. Internet address:
http://osdbuweb.dot.gov.
The Contractor is fully responsible to verify that all data is correct when an offer is submitted.
Failure to properly update your data may cause the offer to be rejected.
Request for Technical Information – Questions relative to the plans and SCRs for this solicitation will only be accepted in writing (see Item 9 on Page A-3).
TECHNICAL QUESTIONS REGARDING THIS SOLICITATION WILL NOT BE
ACCEPTED AFTER 4 P.M. ON SEPTEMBER 21, 2015
Questions can be submitted to CFLContracts@dot.gov. Questions and answers will be posted at http://www.fbo.gov
Modifications to Bids - Bids may be modified or withdrawn by facsimile or telegraphic notice, if such notice is received prior to the time specified for receipt of bids. The Government will not be responsible for ANY failure attributable to the transmission or receipt of telegraphic or facsimile data.
For all modifications, we STRONGLY ENCOURAGE you to resubmit the entire bid schedule with a unit price and amount for every bid item, and a Schedule Total. See FAR Provision 52.214-5, Submission of Bids. Modifications which make the bid ambiguous, indefinite, or uncertain as to any essential requirement of the contract will cause the bid to be rejected as nonresponsive.
FAX Number to submit modifications to bids for this project is (720) 963-3360
II. Post Award Information.
Insurance requirements - See Subsection 107.05 of the FP-14.
EEBACS - Contractors shall use the Government’s web-based system, Engineer’s Estimating, Bidding, Award, and Construction System (EEBACS), to prepare all “Inspector’s Daily Record of Construction Operations” (Contractors Daily Reports) and measurement notes (pay notes).
The Contractor shall be required to attend a training session on the use of EEBACS. The training session will require up to 4 hours. No more than 3 Contractor staff may attend the training unless approved by the CO. The Contractor shall be responsible for training additional staff.
http://osdbuweb.dot.gov/ mailto:CFLContracts@dot.gov
A-iv
The Contractor shall be required to submit a user account form to gain access to the EEBACS system. See Subsection 108.01.
A user guide, “EEBACS for Construction Contractors”, is available. An electronic version can be found at http://flh.fhwa.dot.gov/resources/pse/estimate/guide.htm http://flh.fhwa.dot.gov/resources/pse/estimate/guide.htm
A-1
SOLICITATION, OFFER
AND AWARD
(Construction, Alteration or Repair)
1. SOLICITATION NO.
DTFH6815B00019
2. TYPE OF SOLICITATION
SEALED BID (IFB)
NEGOTIATED (RFP)
3. DATE ISSUED
8/31/2015
IMPORTANT - THE "OFFER SECTION ON THE REVERSE MUST BE FULLY COMPLETED BY OFFEROR.
4. CONTRACT NO.
5. REQUISITION/PURCHASE REQUEST NO.
CFL15HFPM291
6. PROJECT NO.
CO FLAP 1099(1)
7. ISSUED BY:
FEDERAL HIGHWAY ADMINISTRATION
CENTRAL FEDERAL LANDS DIVISION
12300 WEST DAKOTA AVENUE, SUITE 167
LAKEWOOD, COLORADO 80228
CODE: 69050001 8. ADDRESS OFFER TO:
FEDERAL HIGHWAY ADMINISTRATION
CENTRAL FEDERAL LANDS DIVISION
ATTN: Joe Wilson
12300 WEST DAKOTA AVENUE, SUITE 167
LAKEWOOD, COLORADO 80228
9. FOR INFORMATION CALL
SEE PAGE A-3
A. NAME:
SEE PAGE A-3
B. TELEPHONE NO. (Include area code)
SEE PAGE A-3
SOLICITATION
NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder."
10. THE GOVERNMENT REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN THESE DOCUMENTS:
CONSTRUCTION OF CO FLAP 1099(1) LAKE PUEBLO ROAD & TRAIL IMPROVEMENTS, IN STRICT ACCORDANCE WITH:
1. FEDERAL ACQUISITION AND TRANSPORATION ACQUISITION REGULATIONS (FAR & TAR)
2. DEPARTMENT OF LABOR, DAVIS BACON MINIMUM WAGE RATES
3. SPECIAL CONTRACT REQUIREMENTS
4. PLANS
5. BID SCHEDULE
6. STANDARD SPECIFICATIONS FOR CONSTRUCTION OF ROADS AND BRIDGES ON FEDERAL HIGHWAY
PROJECTS
7. SMALL BUSINESS SUBCONTRACTING PLAN (IF APPLICABLE)
See Subsection 104.04 of the FP-14 for governing order of precedence
11. The Contractor shall begin performance within 10 calendar days and complete it within * calendar days after receiving award notice to proceed. The performance period is mandatory negotiable. * Refer to Subsection 108.01 as amended in the Special Contract Requirements.
12A. THE CONTRACTOR MUST FURNISH ANY REQUIRED PERFORMANCE AND PAYMENT BONDS?
(If "YES," indicate within how many calendar days after award in Item 12B.) YES NO
12B. CALENDAR DAYS
13. ADDITIONAL SOLICITATION REQUIREMENTS:
A. Sealed offers in original and 0 copies to perform the work required are due at the place specified in Item 8. by 2:00 p.m. Denver local time on 9/30/2015 . If this is a sealed bid solicitation, offers will be publicly opened at that time. Sealed envelopes containing offers shall be marked to show the offeror's name and address, the solicitation number, and the date and time offers are due.
B. An offer guarantee is is not required.
C. All offers are subject to the (1) work requirements and (2) other provisions and clauses incorporated in the solicitation in full text or by reference.
D. Offers providing less than 60 calendar days for Government acceptance after the date offers are due will not be considered and will be rejected.
NSN 7540-01-155-3212 1442-102 STANDARD FORM 1442 (REV. 4-85)
Prescribed by GSA
X
A-2
FAR (48 CFR) 53-236-1(d)
GPO: 1985 0 - 469-796 STANDARD FORM 1442 BACK (REV. 4-85)
OFFEROR (Must be fully completed by offeror)
14. NAME AND ADDRESS OF OFFEROR (Include ZIP Code)
15. TELEPHONE NO. (Include area code)
16. REMITTANCE ADDRESS (Include only if different than Item 14)
DUNS NO.
17. The offeror agrees to perform the work required at the prices specified below in strict accordance with the terms of this solicitation, if this offer is accepted by the Government in writing with calendar days after the date offers are due. (Insert any number equal to or greater than the minimum requirement stated in Item 13D. Failure to insert any number means the offeror accepts the minimum in Item 13D.)
AMOUNTS
SEE INDIVIDUAL BID SCHEDULE(S)
18. The offeror agrees to furnish any required performance and payment bonds.
19. ACKNOWLEDGMENT OF AMENDMENTS
(The offeror acknowledges receipt of amendments to the solicitation - give number and date of each)
AMENDMENT NO.
DATE
20A. NAME AND TITLE OF PERSON AUTHORIZED
TO SIGN OFFER (Type or print)
20B. SIGNATURE
20C. OFFER DATE
AWARD (To be completed by Government)
21. ITEMS ACCEPTED:
22. AMOUNT
23. ACCOUNTING AND APPROPRIATION DATA
24. SUBMIT INVOICES TO ADDRESS SHOWN IN ITEM 27
(4 copies unless otherwise specified)
25. OTHER THAN FULL AND OPEN COMPETITION PURSUANT TO
15 U.S.C. 637( ) 41 U.S.C. 253(c)(5)
26. ADMINISTERED BY CODE:
27. PAYMENT WILL BE MADE BY
CENTRAL FEDERAL LANDS HIGHWAY DIVISION
12300 W. DAKOTA AVENUE, SUITE 167
LAKEWOOD, COLORADO 80228
CONTRACTING OFFICER WILL COMPLETE ITEM 28 OR 29 AS APPLICABLE
28. NEGOTIATED AGREEMENT (Contractor is required to sign this document and return copies to issuing office.)
Contractor agrees to furnish and deliver all items or perform all work requirements identified on this form and any continuation sheets for the consideration stated in this contract. The rights and obligations of the parties to this contract shall be governed by
(a) this contract award, (b) the solicitation, and (c) the clauses, representations, certifications, and specifications incorporated by reference in or attached to this contract.
29. AWARD (Contractor is not required to sign this document.)
Your offer on this solicitation is hereby accepted as to the items listed.
This award consummates the contract, which consists of (a) the Government solicitation and your offer, and (b) this contract award.
No further contractual document is necessary.
30A. NAME AND TITLE OF CONTRACTOR OR PERSON
AUTHORIZED TO SIGN (Type or print)
31A. NAME OF CONTRACTING OFFICER (Type or print)
30B. SIGNATURE
30C. DATE 31B. UNITED STATES OF AMERICA
BY
31C. AWARD DATE
A-3
Item 9: FOR GENERAL INFORMATION: e-mail us at CFLContracts@dot.gov.
FOR TECHNICAL INFORMATION (plans and specifications): Questions must be submitted in writing by e-mail at CFLContracts@dot.gov or by facsimile to 720-963-3360.
FOR PHYSICAL DATA: The following data is available electronically at www.fbo.gov .
• Geotechnical/Pavements Design Report (6/24/15)
• Final Hydraulics Report (7/31/15)
Item 12A: PERFORMANCE AND PAYMENT BONDS: See FAR Clause 52.228-15
Performance and Payment Bonds-Construction (Clauses begin on Page C-1) and Subsection 102.06 of the FP-14.
Item 13B: BID BOND AMOUNT: See FAR Provision 52.228-1 Bid Guarantee
(Provisions begin on Page B-1) and Subsection 102.03 Bid Guarantee of the
FP-14.
Item 19: ACKNOWLEDGMENT OF AMENDMENTS: FAILURE TO ACKNOWLEDGE
AMENDMENTS BY THE DESIGNATED DATE AND HOUR SPECIFIED IN
THE SOLICITATION MAY RESULT IN REJECTION OF YOUR BID.
If amendments are issued; they will be posted to www.fbo.gov .
Item 24: SUBMITTING INVOICES: See Subsection 109.08 Progress Payments of the
FP-14.
ESTIMATED PRICE: The price range of project work is between $8,000,000 and $12,000,000.
A-4
Bid Schedule Instructions
BIDDERS, PLEASE NOTE: Before preparing the bid, carefully read the Solicitation Provisions.
This Invitation for Bid is comprised of one schedule and three options.
• Insert a numeric unit bid price for each pay item for which a quantity appears in the bid schedule. Unit bid prices should be quoted no more precisely than the nearest cent (2 decimal places). Unit bid prices quoted more precisely will be rounded up to the nearest cent by the Government.
• Multiply the unit price by the quantity for each pay item and show the amount bid. When the words “Lump Sum” appear as a unit bid price, insert an amount for each lump sum pay item.
• Total all amounts bid for each pay item and show the Construction Cost Total on the line provided at the end of each Schedule/Option and the summary page at the end of the bid schedule.
NOTE: If the amount bid for a pay item is inconsistent with the product of the unit price provided by the bidder and the quantity provided by the Government, the unit price will govern and the Government will determine a corrected amount bid for the pay item by multiplying the unit price by the quantity.
Basis for Award
To be eligible for award of contract, the offeror shall submit prices for each item in Bid Schedule A, Option X, Option Y and Option Z. Accordingly, contract award will be made to the lowest responsible bidder conforming to the solicitation, provided funds are available.
Per FAR provision 52.217-4, Evaluation of Options Exercised at Time of Contract Award, the Government will evaluate offers for award purposes by adding the total price for Schedule A together with any Option(s) exercised at the time of award, depending on funds availability. If the determination is made to exercise any of the Options, the Contracting Officer will provide the contractor with written notice no later than 60 days after contract award, per FAR clause 52.217-7, Option for Increased Quantity- Separately Priced Line Item (MAR 1989).
Pay Item 15401-0000, Contractor Testing
Bidders must provide prices on two alternative Contractor Testing pay items in two different places in each schedule’s bid tab.
On Pages A-6 (Schedule A), A-16 (Option X), A-22 (Option Y) and A-25 (Option Z) bidders must provide a price for Contractor Testing using a Contractor-furnished field laboratory. As part of Schedule A, Option X, Option Y and Option Z the price for this alternative item will be included in the "Schedule A Total", “Option X Total”, “Option Y Total” and "Option Z Total" lines and, therefore, included in the evaluation for award.
A-5
Bidders must also provide a stand-alone price on the bottom of Pages A-15 (Schedule A), A-21 (Option X), A-24 (Option Y) and A-26 (Option Z) for the alternative item, Contractor Testing using a Government-furnished field laboratory. This price will not be factored into the evaluation for award. The Government retains the discretion to award a contract which includes either of the alternative Contractor Testing items at the respective bid price.
A - 6
Contract Quantity Pay Items
20301-0400 REMOVAL OF BRIDGE
20302-0150 REMOVAL OF BRIDGE RAILING
20302-2500 REMOVAL OF HANDRAIL (PEDESTRIAN RAILING)
20303-0200 REMOVAL OF BRIDGE DECK (FULL DEPTH)
20801-0000 STRUCTURE EXCAVATION
20803-0000 STRUCTURAL BACKFILL
55201-0200 STRUCTURAL CONCRETE, CLASS A (AE)
55401-2000 REINFORCING STEEL, EPOXY COATED
55504-0000 PRE-FABRICATED STEEL BRIDGE (120 FT PEDESTRIAN BRIDGE)
55504-0000 PRE-FABRICATED STEEL BRIDGE (120 FT PEDESTRIAN BRIDGE)
55601-0500 BRIDGE RAILING, CONCRETE
56001-0000 REMOVAL OF CONCRETE BY HYDRODEMOLITION
63610-2300 CONDUIT, 3-INCH, RIGID GALVANIZED STEEL
Item No. Pay Item No. Description Quantity Unit Unit Price Amount
A1000 15101-0000 MOBILIZATION
ALL LPSM $___LPSM_____ $____________
A1010 15206-0000 SLOPE, REFERENCE, AND CLEARING AND GRUBBING STAKE
2.400 MILE $____________ $____________
A1020 15210-3000 CENTERLINE, VERIFICATION AND STAKING
11.750 MILE $____________ $____________
A1030 15214-1000 SURVEY AND STAKING, BRIDGE
ALL LPSM $___LPSM_____ $____________
A1040 15215-3000 SURVEY AND STAKING, DRAINAGE STRUCTURE
18 EACH $____________ $____________
A1050 15216-2000 SURVEY AND STAKING, GRADE FINISHING STAKES
4.790 MILE $____________ $____________
A1060 15301-0000 CONTRACTOR QUALITY CONTROL
ALL LPSM $___LPSM_____ $____________
A1070 15401-0000 CONTRACTOR TESTING
ALL LPSM $___LPSM_____ $____________
A1080 15501-0000 CONSTRUCTION SCHEDULE
ALL LPSM $___LPSM_____ $____________
Bid Schedule Schedule:A Schedule Type:Base
Project No:CO FLAP 1099(1)
Project Name:Lake Pueblo Road & Trail Imp
A - 7
A1090 15705-0100 SOIL EROSION CONTROL, SILT FENCE
11,000 LNFT $____________ $____________
A1100 15705-1400 SOIL EROSION CONTROL, FIBER ROLL
7,900 LNFT $____________ $____________
A1110 15706-0200 SOIL EROSION CONTROL, CHECK DAM (FIBER ROLL)
50 EACH $____________ $____________
A1120 15706-0200 SOIL EROSION CONTROL, CHECK DAM (GRAVEL BAG)
6 EACH $____________ $____________
A1130 15706-1000 SOIL EROSION CONTROL, INLET PROTECTION
2 EACH $____________ $____________
A1140 15706-1600 SOIL EROSION CONTROL, STABILIZED CONSTRUCTION EXIT
(TURNAROUND)
15 EACH $____________ $____________
A1150 15802-0000 WATERING FOR DUST CONTROL
ALL LPSM $___LPSM_____ $____________
A1160 20101-0000 CLEARING AND GRUBBING
30.0 ACRE $____________ $____________
A1170 20301-0100 REMOVAL OF BOLLARD
49 EACH $____________ $____________
A1180 20301-0400 REMOVAL OF BRIDGE
1 EACH $____________ $____________
A1190 20301-2000 REMOVAL OF PIPE END SECTION
2 EACH $____________ $____________
A1200 20301-2400 REMOVAL OF SIGN
48 EACH $____________ $____________
A1210 20302-0150 REMOVAL OF BRIDGE RAILING
205 LNFT $____________ $____________
Bid Schedule Schedule:A Schedule Type:Base
A - 8
A1220 20302-0500 REMOVAL OF CURB, CONCRETE
115 LNFT $____________ $____________
A1230 20302-1000 REMOVAL OF FENCE, RAIL
500 LNFT $____________ $____________
A1240 20302-1200 REMOVAL OF GUARDRAIL
7,810 LNFT $____________ $____________
A1250 20302-2500 REMOVAL OF HANDRAIL (PEDESTRIAN RAILING)
230 LNFT $____________ $____________
A1260 20303-0200 REMOVAL OF BRIDGE DECK (FULL DEPTH)
90 SQYD $____________ $____________
A1270 20303-1600 REMOVAL OF PAVEMENT, ASPHALT
1,700 SQYD $____________ $____________
A1280 20303-1900 REMOVAL OF PAVEMENT, ASPHALT, 3-INCH DEPTH
230 SQYD $____________ $____________
A1290 20304-1000 REMOVAL OF STRUCTURES AND OBSTRUCTIONS
ALL LPSM $___LPSM_____ $____________
A1300 20401-0000 ROADWAY EXCAVATION
10,200 CUYD $____________ $____________
A1310 20425-1000 DITCH, EXCAVATION
220 LNFT $____________ $____________
A1320 20435-1000 BACKFILL, SELECT GRANULAR
2,930 CUYD $____________ $____________
A1330 20801-0000 STRUCTURE EXCAVATION
450 CUYD $____________ $____________
A1340 20803-0000 STRUCTURAL BACKFILL
450 CUYD $____________ $____________
A1350 21101-2000 ROADWAY OBLITERATION, METHOD 2
2,270 SQYD $____________ $____________
Bid Schedule Schedule:A Schedule Type:Base
A - 9
A1360 25101-2200 PLACED RIPRAP, METHOD B, CLASS 2
45 CUYD $____________ $____________
A1370 25101-2300 PLACED RIPRAP, METHOD B, CLASS 3
55 CUYD $____________ $____________
A1380 25101-2400 PLACED RIPRAP, METHOD B, CLASS 4
365 CUYD $____________ $____________
A1390 30202-2000 ROADWAY AGGREGATE, METHOD 2
31,070 TON $____________ $____________
A1400 30302-1000 DITCH RECONDITIONING
1,050 LNFT $____________ $____________
A1410 30402-5100 FULL DEPTH RECLAMATION, METHOD 2, 3-INCH DEPTH
5,030 SQYD $____________ $____________
A1420 30402-5200 FULL DEPTH RECLAMATION, METHOD 2, 4-INCH DEPTH
30,000 SQYD $____________ $____________
A1430 30402-5500 FULL DEPTH RECLAMATION, METHOD 2, 8-INCH DEPTH
56,000 SQYD $____________ $____________
A1440 40101-0900 ASPHALT CONCRETE PAVEMENT, GYRATORY MIX, 3/4-INCH NOMINAL
MAXIMUM SIZE AGGREGATE, <0.3 MILLION ESAL
16,200 TON $____________ $____________
A1460 40105-3000 ANTISTRIP ADDITIVE, TYPE 3
160 TON $____________ $____________
A1480 40601-0000 FOG SEAL
26 TON $____________ $____________
A1490 41102-1000 PRIME COAT, METHOD 1
59,550 SQYD $____________ $____________
A1500 41105-0000 BLOTTER
55 TON $____________ $____________
Bid Schedule Schedule:A Schedule Type:Base
A - 10
A1510 41201-0000 TACK COAT
26 TON $____________ $____________
A1520 50101-2500 MINOR CONCRETE PAVEMENT, PLAIN, 5-INCH DEPTH
52,200 SQYD $____________ $____________
A1530 55201-0200 STRUCTURAL CONCRETE, CLASS A (AE)
105 CUYD $____________ $____________
A1540 55401-2000 REINFORCING STEEL, EPOXY COATED
12,410 LB $____________ $____________
A1550 55504-0000 PRE-FABRICATED STEEL BRIDGE (120 FT PEDESTRIAN BRIDGE)
ALL LPSM $___LPSM_____ $____________
A1560 55504-0000 PRE-FABRICATED STEEL BRIDGE (120 FT PEDESTRIAN BRIDGE)
ALL LPSM $___LPSM_____ $____________
A1570 55601-0500 BRIDGE RAILING, CONCRETE
230 LNFT $____________ $____________
A1580 56001-0000 REMOVAL OF CONCRETE BY HYDRODEMOLITION
35 SQYD $____________ $____________
A1590 60101-0000 CONCRETE (ISLAND)
64 CUYD $____________ $____________
A1600 60201-0400 12-INCH PIPE CULVERT
50 LNFT $____________ $____________
A1610 60201-0600 18-INCH PIPE CULVERT
240 LNFT $____________ $____________
A1620 60201-0800 24-INCH PIPE CULVERT
65 LNFT $____________ $____________
A1630 60201-1000 36-INCH PIPE CULVERT
8 LNFT $____________ $____________
A1640 60201-1200 48-INCH PIPE CULVERT
8 LNFT $____________ $____________
Bid Schedule Schedule:A Schedule Type:Base
A - 11
A1650 60210-0400 END SECTION FOR 12-INCH PIPE CULVERT
4 EACH $____________ $____________
A1660 60210-0600 END SECTION FOR 18-INCH PIPE CULVERT
16 EACH $____________ $____________
A1670 60210-0800 END SECTION FOR 24-INCH PIPE CULVERT
4 EACH $____________ $____________
A1680 60210-1000 END SECTION FOR 36-INCH PIPE CULVERT
1 EACH $____________ $____________
A1690 60210-1200 END SECTION FOR 48-INCH PIPE CULVERT
1 EACH $____________ $____________
A1700 60404-1000 CATCH BASIN, FLH TYPE 1
2 EACH $____________ $____________
A1710 60412-2000 REMOVE AND RESET MANHOLE FRAME AND COVER
3 EACH $____________ $____________
A1720 60704-0000 CLEANING CULVERT IN PLACE
4 EACH $____________ $____________
A1730 60901-8000 CURB, TIMBER
150 LNFT $____________ $____________
A1740 60902-1000 CURB AND GUTTER, CONCRETE, 12-INCH DEPTH (24" CATCH PAN)
4,810 LNFT $____________ $____________
A1750 60902-1000 CURB AND GUTTER, CONCRETE, 12-INCH DEPTH (12" SPILL PAN)
135 LNFT $____________ $____________
A1760 60920-0000 RESET WHEELSTOP
22 EACH $____________ $____________
A1770 61108-1000 ADJUST WATER VALVE
2 EACH $____________ $____________
A1780 61503-5000 MEDIAN, STONE (12" DEPTH)
240 SQYD $____________ $____________
Bid Schedule Schedule:A Schedule Type:Base
A - 12
A1790 61701-1200 GUARDRAIL SYSTEM G4, TYPE 2, CLASS A STEEL POSTS
6,000 LNFT $____________ $____________
A1800 61702-0600 TERMINAL SECTION, TYPE FLARED
26 EACH $____________ $____________
A1810 61707-0000 STRUCTURE TRANSITION RAILING (TYPE 3G)
43 LNFT $____________ $____________
A1820 61707-0000 STRUCTURE TRANSITION RAILING (TYPE 3G ANCHORED)
43 LNFT $____________ $____________
A1830 61904-0000 BOLLARD POST (REMOVABLE)
32 EACH $____________ $____________
A1840 61904-0000 BOLLARD POST
64 EACH $____________ $____________
A1850 62201-0250 DUMP TRUCK, 10 CUBIC YARD MINIMUM CAPACITY
80 HOUR $____________ $____________
A1860 62201-0900 WHEEL LOADER, 2 CUBIC YARD MINIMUM RATED CAPACITY
80 HOUR $____________ $____________
A1870 62201-2050 ROLLER
60 HOUR $____________ $____________
A1880 62201-2850 MOTOR GRADER, 12 FOOT MINIMUM BLADE
60 HOUR $____________ $____________
A1890 62201-3200 HYDRAULIC EXCAVATOR, CRAWLER MOUNTED, 1.5 CUBIC YARD MINIMUM
CAPACITY
40 HOUR $____________ $____________
A1900 62301-0000 GENERAL LABOR
120 HOUR $____________ $____________
A1910 62302-1000 SPECIAL LABOR, HIRED TECHNICAL SERVICES
40 HOUR $____________ $____________
Bid Schedule Schedule:A Schedule Type:Base
A - 13
A1920 62302-1100 SPECIAL LABOR, HIRED SURVEY SERVICES
40 HOUR $____________ $____________
A1930 62405-0200 PLACING CONSERVED TOPSOIL, 3-INCH DEPTH
98,900 SQYD $____________ $____________
A1940 62510-2000 SEEDING, HYDRAULIC METHOD
20.0 ACRE $____________ $____________
A1950 62515-2000 MULCHING, HYDRAULIC METHOD
20.0 ACRE $____________ $____________
A1960 62901-0300 ROLLED EROSION CONTROL PRODUCT, TYPE 1.C
8,500 SQYD $____________ $____________
A1970 63301-0000 SIGN SYSTEM
85 EACH $____________ $____________
A1980 63309-0100 DELINEATOR, TYPE 1
270 EACH $____________ $____________
A1990 63313-0000 RUMBLE STRIP
1,850 LNFT $____________ $____________
A2000 63313-1000 RUMBLE STRIP, SHOULDER
3,030 LNFT $____________ $____________
A2010 63316-1000 REMOVE AND RESET SIGN
23 EACH $____________ $____________
A2020 63401-0700 PAVEMENT MARKINGS, TYPE D, SOLID
68,950 LNFT $____________ $____________
A2030 63401-0800 PAVEMENT MARKINGS, TYPE D, BROKEN
1,960 LNFT $____________ $____________
A2040 63403-0400 PAVEMENT MARKINGS, TYPE D
1,600 SQFT $____________ $____________
A2050 63405-1300 PAVEMENT MARKINGS, TYPE D, TURN ARROW
4 EACH $____________ $____________
Bid Schedule Schedule:A Schedule Type:Base
A - 14
A2060 63405-1500 PAVEMENT MARKINGS, TYPE D, "STOP" WORD MESSAGE
14 EACH $____________ $____________
A2070 63405-1650 PAVEMENT MARKINGS, TYPE D, ACCESSIBILITY SYMBOL
2 EACH $____________ $____________
A2080 63502-0600 TEMPORARY TRAFFIC CONTROL, BARRICADE TYPE 3
4 EACH $____________ $____________
A2090 63502-0700 TEMPORARY TRAFFIC CONTROL, CONE
150 EACH $____________ $____________
A2100 63502-1300 TEMPORARY TRAFFIC CONTROL, DRUM
100 EACH $____________ $____________
A2110 63502-1500 TEMPORARY TRAFFIC CONTROL, WARNING LIGHT TYPE A
2 EACH $____________ $____________
A2120 63502-1600 TEMPORARY TRAFFIC CONTROL, WARNING LIGHT TYPE B
2 EACH $____________ $____________
A2130 63502-1700 TEMPORARY TRAFFIC CONTROL, WARNING LIGHT TYPE C
2 EACH $____________ $____________
A2140 63502-2000 TEMPORARY TRAFFIC CONTROL, PORTABLE CHANGEABLE MESSAGE SIGN
2 EACH $____________ $____________
A2150 63503-0400 TEMPORARY TRAFFIC CONTROL, CONCRETE BARRIER (STRUCTURE
MOUNTED)
200 LNFT $____________ $____________
A2160 63503-0400 TEMPORARY TRAFFIC CONTROL, CONCRETE BARRIER
250 LNFT $____________ $____________
A2170 63503-0700 TEMPORARY TRAFFIC CONTROL, PAVEMENT MARKINGS
67,500 LNFT $____________ $____________
A2180 63504-1000 TEMPORARY TRAFFIC CONTROL, CONSTRUCTION SIGN
650.0 SQFT $____________ $____________
Bid Schedule Schedule:A Schedule Type:Base
A - 15
A2190 63506-0500 TEMPORARY TRAFFIC CONTROL, FLAGGER
1,200 HOUR $____________ $____________
A2200 63610-2300 CONDUIT, 3-INCH, RIGID GALVANIZED STEEL
230 LNFT $____________ $____________
A2210 63621-2000 UTILITY BOX, TELEPHONE PULLBOX
2 EACH $____________ $____________
A2220 64604-3000 FIXTURE, PEDESTRIAN RAILING
670 LNFT $____________ $____________
Submitted by:____________________________________ Schedule Total:____________
Bid Schedule Schedule:A Schedule Type:Base
Project No:CO FLAP 1099(1)
Project Name:Lake Pueblo Road & Trail Imp
Joe.Wilson Typewritten Text
Joe.Wilson Typewritten Text
A1070 15401-0000 CONTRACTOR TESTING (GOVERNMENT-FURNISHED FIELD LABORATORY)
ALL LPSM $___LPSM_____ $____________
Joe.Wilson Typewritten Text
Joe.Wilson Typewritten Text
Joe.Wilson Typewritten Text
Joe.Wilson Typewritten Text
Joe.Wilson Typewritten Text
Joe.Wilson Typewritten Text
Joe.Wilson Typewritten Text
Joe.Wilson Typewritten Text
Joe.Wilson Typewritten Text
Joe.Wilson Typewritten Text
Joe.Wilson Typewritten Text
Joe.Wilson Typewritten Text
Joe.Wilson Typewritten Text
Joe.Wilson Typewritten Text
Joe.Wilson Typewritten Text
Joe.Wilson Typewritten Text
Joe.Wilson Typewritten Text
Joe.Wilson Typewritten Text
Joe.Wilson Typewritten Text
Joe.Wilson Typewritten Text
A - 16
Contract Quantity Pay Items
20302-2500 REMOVAL OF HANDRAIL (STEEL GUARDRAIL)
20302-2500 REMOVAL OF HANDRAIL (PEDESTRIAN RAILING)
55201-0200 STRUCTURAL CONCRETE, CLASS A (AE)
55401-2000 REINFORCING STEEL, EPOXY COATED
61901-1300 FENCE, CHAIN LINK
Item No. Pay Item No. Description Quantity Unit Unit Price Amount
X1000 15101-0000 MOBILIZATION
ALL LPSM $___LPSM_____ $____________
X1010 15206-0000 SLOPE, REFERENCE, AND CLEARING AND GRUBBING STAKE
0.160 MILE $____________ $____________
X1020 15210-3000 CENTERLINE, VERIFICATION AND STAKING
1.250 MILE $____________ $____________
X1030 15216-2000 SURVEY AND STAKING, GRADE FINISHING STAKES
0.310 MILE $____________ $____________
X1040 15301-0000 CONTRACTOR QUALITY CONTROL
ALL LPSM $___LPSM_____ $____________
X1050 15401-0000 CONTRACTOR TESTING
ALL LPSM $___LPSM_____ $____________
X1060 15501-0000 CONSTRUCTION SCHEDULE
ALL LPSM $___LPSM_____ $____________
X1070 15705-1400 SOIL EROSION CONTROL, FIBER ROLL
125 LNFT $____________ $____________
X1080 15802-0000 WATERING FOR DUST CONTROL
ALL LPSM $___LPSM_____ $____________
X1090 20102-0000 CLEARING AND GRUBBING
ALL LPSM $___LPSM_____ $____________
X1100 20301-2000 REMOVAL OF PIPE END SECTION
1 EACH $____________ $____________
Bid Schedule Schedule:X Schedule Type:Options
A - 17
X1110 20301-2400 REMOVAL OF SIGN
17 EACH $____________ $____________
X1120 20302-0400 REMOVAL OF CURB, ASPHALT
510 LNFT $____________ $____________
X1130 20302-0500 REMOVAL OF CURB, CONCRETE
30 LNFT $____________ $____________
X1140 20302-1200 REMOVAL OF GUARDRAIL
570 LNFT $____________ $____________
X1150 20302-2500 REMOVAL OF HANDRAIL (STEEL GUARDRAIL)
200 LNFT $____________ $____________
X1160 20302-2500 REMOVAL OF HANDRAIL (PEDESTRIAN RAILING)
125 LNFT $____________ $____________
X1170 20303-1900 REMOVAL OF PAVEMENT, ASPHALT, 3-INCH DEPTH
630 SQYD $____________ $____________
X1180 20401-0000 ROADWAY EXCAVATION
1,480 CUYD $____________ $____________
X1190 20402-0000 SUBEXCAVATION
1,244 CUYD $____________ $____________
X1200 21101-2000 ROADWAY OBLITERATION, METHOD 2
180 SQYD $____________ $____________
X1210 25126-0000 REMOVE AND RESET BOULDER
5 EACH $____________ $____________
X1220 30202-2000 ROADWAY AGGREGATE, METHOD 2
3,900 TON $____________ $____________
X1230 30302-1000 DITCH RECONDITIONING
200 LNFT $____________ $____________
X1240 30402-5500 FULL DEPTH RECLAMATION, METHOD 2, 8-INCH DEPTH
17,750 SQYD $____________ $____________
Bid Schedule Schedule:X Schedule Type:Options
A - 18
X1250 40101-0900 ASPHALT CONCRETE PAVEMENT, GYRATORY MIX, 3/4-INCH NOMINAL
MAXIMUM SIZE AGGREGATE, <0.3 MILLION ESAL
7,150 TON $____________ $____________
X1270 40105-3000 ANTISTRIP ADDITIVE, TYPE 3
70 TON $____________ $____________
X1290 40601-0000 FOG SEAL
11 TON $____________ $____________
X1300 41102-1000 PRIME COAT, METHOD 1
25,575 SQYD $____________ $____________
X1310 41105-0000 BLOTTER
25 TON $____________ $____________
X1320 41201-0000 TACK COAT
12 TON $____________ $____________
X1330 55201-0200 STRUCTURAL CONCRETE, CLASS A (AE)
40 CUYD $____________ $____________
X1340 55401-2000 REINFORCING STEEL, EPOXY COATED
3,225 LB $____________ $____________
X1350 60210-0800 END SECTION FOR 24-INCH PIPE CULVERT
1 EACH $____________ $____________
X1360 60901-2300 CURB, ASPHALT, 6-INCH DEPTH
610 LNFT $____________ $____________
X1370 60902-1000 CURB AND GUTTER, CONCRETE, 12-INCH DEPTH (16" SPILL PAN)
160 LNFT $____________ $____________
X1380 60902-1000 CURB AND GUTTER, CONCRETE, 12-INCH DEPTH (12" SPILL PAN)
170 LNFT $____________ $____________
X1390 60920-0000 RESET WHEELSTOP
7 EACH $____________ $____________
Bid Schedule Schedule:X Schedule Type:Options
A - 19
X1400 61503-5000 MEDIAN, STONE
100 SQYD $____________ $____________
X1410 61701-1200 GUARDRAIL SYSTEM G4, TYPE 2, CLASS A STEEL POSTS
400 LNFT $____________ $____________
X1420 61702-0600 TERMINAL SECTION, TYPE FLARED
2 EACH $____________ $____________
X1430 61707-0000 STRUCTURE TRANSITION RAILING (TYPE 3G)
82 LNFT $____________ $____________
X1440 61901-1300 FENCE, CHAIN LINK
250 LNFT $____________ $____________
X1450 62405-0200 PLACING CONSERVED TOPSOIL, 3-INCH DEPTH
15,514 SQYD $____________ $____________
X1460 62510-2000 SEEDING, HYDRAULIC METHOD
3.0 ACRE $____________ $____________
X1470 62515-2000 MULCHING, HYDRAULIC METHOD
3.0 ACRE $____________ $____________
X1480 63301-0000 SIGN SYSTEM
22 EACH $____________ $____________
X1490 63309-0100 DELINEATOR, TYPE 1
110 EACH $____________ $____________
X1500 63316-1000 REMOVE AND RESET SIGN
1 EACH $____________ $____________
X1510 63401-0700 PAVEMENT MARKINGS, TYPE D, SOLID
27,200 LNFT $____________ $____________
X1520 63401-0800 PAVEMENT MARKINGS, TYPE D, BROKEN
2,899 LNFT $____________ $____________
X1530 63403-0400 PAVEMENT MARKINGS, TYPE D
80 SQFT $____________ $____________
Bid Schedule Schedule:X Schedule Type:Options
A - 20
X1540 63405-1300 PAVEMENT MARKINGS, TYPE D, TURN ARROW
2 EACH $____________ $____________
X1550 63405-1500 PAVEMENT MARKINGS, TYPE D, "STOP" WORD MESSAGE
1 EACH $____________ $____________
X1560 63405-1650 PAVEMENT MARKINGS, TYPE D, ACCESSIBILITY SYMBOL
1 EACH $____________ $____________
X1570 63501-1000 TEMPORARY TRAFFIC CONTROL, TRAFFIC CONTROL SUPERVISOR
ALL LPSM $___LPSM_____ $____________
X1580 63502-0600 TEMPORARY TRAFFIC CONTROL, BARRICADE TYPE 3
4 EACH $____________ $____________
X1590 63502-0700 TEMPORARY TRAFFIC CONTROL, CONE
150 EACH $____________ $____________
X1600 63502-1300 TEMPORARY TRAFFIC CONTROL, DRUM
100 EACH $____________ $____________
X1610 63502-1500 TEMPORARY TRAFFIC CONTROL, WARNING LIGHT TYPE A
2 EACH $____________ $____________
X1620 63502-1600 TEMPORARY TRAFFIC CONTROL, WARNING LIGHT TYPE B
2 EACH $____________ $____________
X1630 63502-1700 TEMPORARY TRAFFIC CONTROL, WARNING LIGHT TYPE C
2 EACH $____________ $____________
X1640 63503-0700 TEMPORARY TRAFFIC CONTROL, PAVEMENT MARKINGS
30,836 LNFT $____________ $____________
X1650 63504-1000 TEMPORARY TRAFFIC CONTROL, CONSTRUCTION SIGN
500 SQFT $____________ $____________
X1660 63506-0500 TEMPORARY TRAFFIC CONTROL, FLAGGER
1,000 HOUR $____________ $____________
Bid Schedule Schedule:X Schedule Type:Options
Project No:CO FLAP 1099(1)
Project Name:Lake Pueblo Road & Trail Imp
Joe.Wilson Typewritten Text
A - 21
Submitted by:____________________________________ Schedule Total:____________
Bid Schedule Schedule:X Schedule Type:Options
Project No:CO FLAP 1099(1)
Project Name:Lake Pueblo Road & Trail Imp
Joe.Wilson Typewritten Text
X1050 15401-0000 CONTRACTOR TESTING (GOVERNMENT-FURNISHED FIELD LABORATORY)
ALL LPSM $___LPSM_____ $____________
Joe.Wilson Typewritten Text
Joe.Wilson Typewritten Text
A - 22
Item No. Pay Item No. Description Quantity Unit Unit Price Amount
Y1000 15210-3000 CENTERLINE, VERIFICATION AND STAKING
0.620 MILE $____________ $____________
Y1010 15301-0000 CONTRACTOR QUALITY CONTROL
ALL LPSM $___LPSM_____ $____________
Y1020 15401-0000 CONTRACTOR TESTING
ALL LPSM $___LPSM_____ $____________
Y1030 15501-0000 CONSTRUCTION SCHEDULE
ALL LPSM $___LPSM_____ $____________
Y1040 15802-0000 WATERING FOR DUST CONTROL
ALL LPSM $___LPSM_____ $____________
Y1050 20102-0000 CLEARING AND GRUBBING
ALL LPSM $___LPSM_____ $____________
Y1060 20301-2400 REMOVAL OF SIGN
2 EACH $____________ $____________
Y1070 30202-2000 ROADWAY AGGREGATE, METHOD 2
1,350 TON $____________ $____________
Y1080 30402-5500 FULL DEPTH RECLAMATION, METHOD 2, 8-INCH DEPTH
9,200 SQYD $____________ $____________
Y1090 40101-0900 ASPHALT CONCRETE PAVEMENT, GYRATORY MIX, 3/4-INCH NOMINAL
MAXIMUM SIZE AGGREGATE, <0.3 MILLION ESAL
3,660 TON $____________ $____________
Y1110 40105-3000 ANTISTRIP ADDITIVE, TYPE 3
36 TON $____________ $____________
Y1130 40601-0000 FOG SEAL
5.0 TON $____________ $____________
Y1140 41102-1000 PRIME COAT, METHOD 1
11,650 SQYD $____________ $____________
Bid Schedule Schedule:Y Schedule Type:Options
A - 23
Y1150 41105-0000 BLOTTER
12 TON $____________ $____________
Y1160 41201-0000 TACK COAT
5.0 TON $____________ $____________
Y1170 61920-2000 REMOVE AND RESET GATE
1 EACH $____________ $____________
Y1180 62405-0200 PLACING CONSERVED TOPSOIL, 3-INCH DEPTH
5,960 SQYD $____________ $____________
Y1190 62510-2000 SEEDING, HYDRAULIC METHOD
1.0 ACRE $____________ $____________
Y1200 62515-2000 MULCHING, HYDRAULIC METHOD
1.0 ACRE $____________ $____________
Y1210 63301-0000 SIGN SYSTEM
2 EACH $____________ $____________
Y1220 63309-0100 DELINEATOR, TYPE 1
34 EACH $____________ $____________
Y1230 63316-1000 REMOVE AND RESET SIGN
1 EACH $____________ $____________
Y1240 63401-0700 PAVEMENT MARKINGS, TYPE D, SOLID
13,800 LNFT $____________ $____________
Y1250 63403-0400 PAVEMENT MARKINGS, TYPE D
260 SQFT $____________ $____________
Y1260 63501-0000 TEMPORARY TRAFFIC CONTROL
ALL LPSM $___LPSM_____ $____________
Y1270 64620-0400 REMOVE AND RESET MAILBOX
1 EACH $____________ $____________
Bid Schedule Schedule:Y Schedule Type:Options
A - 24
Submitted by:____________________________________ Schedule Total:____________
Bid Schedule Schedule:Y Schedule Type:Options
Project No:CO FLAP 1099(1)
Project Name:Lake Pueblo Road & Trail Imp
Joe.Wilson Typewritten Text
Y1020 15401-0000 CONTRACTOR TESTING (GOVERNMENT-FURNISHED FIELD LABORATORY)
ALL LPSM $___LPSM_____ $____________
Joe.Wilson Typewritten Text
Joe.Wilson Typewritten Text
A - 25
Item No. Pay Item No. Description Quantity Unit Unit Price Amount
Z1000 15210-3000 CENTERLINE, VERIFICATION AND STAKING
0.950 MILE $____________ $____________
Z1010 15301-0000 CONTRACTOR QUALITY CONTROL
ALL LPSM $___LPSM_____ $____________
Z1020 15401-0000 CONTRACTOR TESTING
ALL LPSM $___LPSM_____ $____________
Z1030 15501-0000 CONSTRUCTION SCHEDULE
ALL LPSM $___LPSM_____ $____________
Z1040 15705-1400 SOIL EROSION CONTROL, FIBER ROLL
65 LNFT $____________ $____________
Z1050 15802-0000 WATERING FOR DUST CONTROL
ALL LPSM $___LPSM_____ $____________
Z1060 20102-0000 CLEARING AND GRUBBING
ALL LPSM $___LPSM_____ $____________
Z1070 20301-2400 REMOVAL OF SIGN
13 EACH $____________ $____________
Z1080 30202-2000 ROADWAY AGGREGATE, METHOD 2
1,240 TON $____________ $____________
Z1090 30402-5100 FULL DEPTH RECLAMATION, METHOD 2, 3-INCH DEPTH
7,780 SQYD $____________ $____________
Z1100 30402-5500 FULL DEPTH RECLAMATION, METHOD 2, 8-INCH DEPTH
5,960 SQYD $____________ $____________
Z1110 40101-0900 ASPHALT CONCRETE PAVEMENT, GYRATORY MIX, 3/4-INCH NOMINAL
MAXIMUM SIZE AGGREGATE, <0.3 MILLION ESAL
3,500 TON $____________ $____________
Z1130 40105-3000 ANTISTRIP ADDITIVE, TYPE 3
34.0 TON $____________ $____________
Bid Schedule Schedule:Z Schedule Type:Options
A - 26
Z1150 40601-0000 FOG SEAL
6.5 TON $____________ $____________
Z1160 41102-1000 PRIME COAT, METHOD 1
15,580 SQYD $____________ $____________
Z1170 41105-0000 BLOTTER
15 TON $____________ $____________
Z1180 41201-0000 TACK COAT
7.0 TON $____________ $____________
Z1190 62405-0200 PLACING CONSERVED TOPSOIL, 3-INCH DEPTH
10,660 SQYD $____________ $____________
Z1200 62510-2000 SEEDING, HYDRAULIC METHOD
2.0 ACRE $____________ $____________
Z1210 62515-2000 MULCHING, HYDRAULIC METHOD
2.0 ACRE $____________ $____________
Z1220 63301-0000 SIGN SYSTEM
13 EACH $____________ $____________
Z1230 63309-0100 DELINEATOR, TYPE 1
160 EACH $____________ $____________
Z1240 63401-0700 PAVEMENT MARKINGS, TYPE D, SOLID
19,800 LNFT $____________ $____________
Z1250 63403-0400 PAVEMENT MARKINGS, TYPE D
90 SQFT $____________ $____________
Z1260 63501-0000 TEMPORARY TRAFFIC CONTROL
ALL LPSM $___LPSM_____ $____________
Submitted by:____________________________________ Schedule Total:____________
Bid Schedule Schedule:Z Schedule Type:Options
Project No:CO FLAP 1099(1)
Project Name:Lake Pueblo Road & Trail Imp
Joe.Wilson Typewritten Text
Z1020 15401-0000 CONTRACTOR TESTING (GOVERNMENT-FURNISHED FIELD LABORATORY)
ALL LPSM $___LPSM_____ $____________
A - 27
Bid Schedule Summary
Schedule Bid Total
Schedule A - Base(A - 6)
Schedule X - Option(A - 16)
Schedule Y - Option(A - 22)
Schedule Z - Option(A - 25)
Total - Schedules
Submitted By: ________________________________
Bid Schedule
A-28
BUY AMERICAN ACT- CONSTRUCTION MATERIALS
UNDER TRADE AGREEMENTS
It is understood and agreed that the materials and components listed in Subpart 25.1 of the FAR are a part of this contract and are deemed to be Domestic Construction Material for the purposes of this contract.
NOTE TO CONTRACTOR:
The following information and any applicable supporting data is required for evaluation of requests under FAR Clause 52.225-11 Paragraph (c) & (d) and FAR Provision 52.225-12 Paragraph (b).
Material and/or Component
Construction Material Description
Unit of Measure
Quantity
*Cost Delivered to Job Site
Foreign Construction Material
Comparable Domestic Material
Material and/or Component
Construction Material Description
Unit of Measure
Quantity
*Cost Delivered to Job Site
Foreign Construction Material
Comparable Domestic Material
[* Include all delivery costs to the construction site and any applicable duty (whether or not a duty-free entry certificate is issued).] [Please include name, address, telephone number and contact for suppliers surveyed. Attach copy of response; if oral, attach summary. Include all applicable supporting information.]
A-29
HAZARDOUS MATERIALS
As required by FAR Clause 52.223-3, Hazardous Materials Identification and Safety Data - Alternate I, the apparent low bidder must submit prior to award a Material Safety Data Sheet (MSDS) for all hazardous materials that the bidder identifies in paragraph (b) of the FAR clause and defined under the latest version of Federal Standard No. 313.
Hazardous Material
Identification Number
USE OF RECOVERED MATERIALS ON FEDERAL LANDS HIGHWAY PROJECTS
Section 6002 of the Solid Waste Disposal Act, as amended by the Resource Conservation and Recovery Act (RCRA) of 1976, as amended (42 U.S.C. 6901 et seq.), requires Federal, State, and local procuring agencies using appropriated Federal funds to purchase items composed of the highest percentage of recovered materials practical. Use of recovered materials is strongly encouraged on Federal Lands Highway Projects. Highway construction items covered by the Environmental Protection Agency’s Comprehensive Guidelines for Procurement of Products Containing Recovered Materials include fly ash, ground granulated blast furnace slag, traffic barricades, traffic cones, hydraulic mulch and compost for mulch.
Use of fly ash and ground granulated blast furnace slag and construction materials containing fly ash and ground granulated blast furnace slag on Federal Lands Highway Projects:
• It is the policy of the United States Government that fly ash and ground granulated blast furnace slag and materials containing fly ash and ground granulated blast furnace slag shall have maximum practicable opportunity for incorporation into its construction projects.
• The Contractor agrees to investigate the use of fly ash and ground granulated blast furnace slag and materials containing fly ash and ground granulated blast furnace slag to the fullest extent consistent with the efficient performance of this contract. Both the contractor and the subcontractors are urged to seek out suppliers of fly ash and ground granulated blast furnace slag, cement and concrete containing fly ash and ground granulated blast furnace slag and to solicit bids for these materials.
• Names of firms that supply fly ash and ground granulated blast furnace slag and materials containing fly ash and ground granulated blast furnace slag are available from the American Coal Ash Association and the National Slag Association.
B-1
BID BOND
(See instructions on reverse)
DATE BOND EXECUTED (Must not be later than bid opening date)
OMB NO. 9000-0045
Public reporting burden for this collection of information is estimated to average 25 minutes per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to the FAR Secretariat (MVR), Federal Acquisition Policy Division, GSA, Washington, D.C. 20405.
PRINCIPAL (Legal name and business address)
TYPE OF ORGANIZATION (AX@ one)
INDIVIDUAL PARTNERSHIP
JOINT VENTURE CORPORATION
STATE OF INCORPORATION
SURETY(IES) (Name and business address)
PENAL SUM OF BOND
BID IDENTIFICATION
PERCENT OF
BID PRICE
AMOUNT NOT TO EXCEED
BID DATE
INVITATION NO.
DTFH6815B00019
20 PERCENT
MILLION(S)
THOUSAND(S)
HUNDRED(S)
CENTS
FOR (Construction, Supplies or Services)
CONSTRUCTION
OBLIGATION:
We, the Principal and Surety(ies) are firmly bound to the United States of…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .