Text version
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
(a) By completing items 8 and 15, and returning or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE
PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment your desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
1. CONTRACT ID CODE
3. EFFECTIVE DATE 5. PROJECT NO. (If applicable)
7. ADMINISTERED BY (If other than Item 6) CODE
STANDARD FORM 30 (REV. 10-83)
Prescribed by GSA FAR (48 CFR) 53.243
FACILITY CODE
10A. MODIFICATION OF CONTRACT/ORDER NO.
10B. DATED (SEE ITEM 13)
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
is not extended.
12. ACCOUNTING AND APPROPRIATION DATA (If required) copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO.
IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
15C. DATE SIGNED
15A. NAME AND TITLE OF SIGNER (Type or print)
16C. DATE SIGNED
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
PAGE OF PAGES
6. ISSUED BY CODE
8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code) (X)
CODE
15B. CONTRACTOR/OFFEROR
(Signature of person authorized to sign)
16B. UNITED STATES OF AMERICA
(Signature of Contracting Officer)
NSN 7540-01-152-8070
Previous edition unusable
2. AMENDMENT/MODIFICATION NO.
Linda Hennequant, Contracting Officer
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
Provide and Install Antenna Tower at the Back Up Emergency Communications (BUEC) Site, Bakersville, PA.
Amendment is issued to answer vendor questions. See attached.
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
Federal Aviation Administration Eastern Acquisitions Southern Region, AAQ-510 1701 Columbia Avenue College Park, GA 30337
Federal Aviation Administration Eastern Acquisitions Southern Region, AAQ-510 1701 Columbia Avenue College Park, GA 30337
4. REQUISITION/PURCHASE REQ. NO.
See Schedule
9A. AMENDMENT OF SOLICITATION
NO.
DTFAEN-16-R-00130
1 3
11/04/2016
9B. DATED (SEE ITEM 11)
10/11/2016
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended, X
AMENDMENT 0003
Solicitation DTFAEN-16-R-00130 Provide and Install Antenna Tower at the Back Up Emergency
Communications (BUEC) Site, Bakersville, PA
THIS AMENDMENT IS BEING ISSUED TO INCORPORATE THE FOLLOWING
INFORMATION INTO THE REFERENCED SOLICITATION
QUESTIONS AND ANSWERS
1. QUESTION: Please tell us the spec you are wanting for the tower lighting at this site? Do you have a preferred lighting company? And are we to assume we will get power for it from within your existing shelter from an existing power source?
FAA ANSWER: Please reference Section 3.3 TOWER KIT SHALL INCLUDE Appendix B – TOWER DESIGN in Specification ANTENNA TOWER INSTALLATION, BUEC Site, Bakersville, PA. Also, please reference Note A SITE ELEVATION C001 from Drawing Page C-001. “INSTALL 1" GRSC WITH 3, #12
THWN FROM SHELTER AC PANEL TO PLATFORM OB-LIGHT ATTACHED TO
CABLE TRAPEZE”
2. QUESTION: Do we need to supply and install (1) Hoffman box on the tower and (1) in the existing equipment shelter?
FAA ANSWER: YES; as shown on drawings.
3. QUESTION: Do we need to put down weed barrier and rock the new expanded compound or will this be completed by others?
FAA ANSWER: NO; no such work indicated on drawings.
4. QUESTION: • The RFP calls out fab drawings. We will be more than happy to provide our standard tower erection drawings for the tower but it is company policy that we don’t release any fab drawings. Are you ok with this? In the past the FAA has come back and said that our standard erection drawings were fine. But the verbiage is in the provided SOW so I just wanted to bring this up again.
FAA ANSWER: We do need to see the shop/fabrication drawings specifically for the; platform access hatch, antenna mount swing arm locations, swing arm fabrication and Operation. If this is shown in standard erection drawings, then that is acceptable. In the past, we have had swing arms that do not pull in properly, or are very hard to manipulate, we wish to avoid this problem once fabricated and in the field, so prefer to address during design/fabrication submittal process.
AMENDMENT 0003 DTFAEN-16-R-00130
5. QUESTION: On Page 3 of the Drawings, there is a note stating that the tower should be design to be shipped in “knocked down” fashion to be assembled in the field. But in two places in the Specs, it states the tower is to be shipped in sections either 20 ft, 10 ft, etc.
sections.
FAA ANSWER: To clarify; the tower can be shipped in “knocked down” sections, which in turn would be pieces of steel members ranging in lengths of; 30ft, 20ft, 10ft, 5ft, etc… as required to obtain desired tower height once assembled. If, the tower manufacturer and the on-site contractor wish to pre-assemble the tower and ship it in “assembled” sections; that is acceptable as well.
END OF AMENDMENT 0003