Sheet1
| CONTRACTOR ACCEPTANCE INSPECTION | Location (City/State) | ||||||||||||
| REPORT COVER SHEET | |||||||||||||
| Cost Center Code | Location Ident. | Facility Alpha Code | Facility Ident. Code | S | C | F | T | M | Runway No. | ||||
| Delivery Order No. | Contract No. | Designated Lead Project | Dates of Final CAI | ||||||||||
| Yes | No | ||||||||||||
| Engineering Plan/Project: | Dates of Commissioning/Restoration | ||||||||||||
| Brief Description of Project: | |||||||||||||
| Type of CAI | Previous Partial CAI's (Nos./Date) | ||||||||||||
| PLANTS | FINAL | ||||||||||||
| ELECTRONICS | PARTIAL NO. | ||||||||||||
| Number of Exceptions: | No. of CAI Reports Exception List and Clearances | Number of Design Deficiencies or | |||||||||||
| Major: | Record Sheets Attached: | Improvements Identified or | |||||||||||
| Minor: | Recommended: | ||||||||||||
| Documents/Records Applicable to CAI: | |||||||||||||
| FAA 6030-16 TRDR Cover/Transmittal Sheet | FAA Form 3900-1, Occupational Safety and Health | ||||||||||||
| FAA 6030-17 TRDR's; FAA 6030-15 | Inspection Report | ||||||||||||
| Fac. Gen. Ref. Data Record | |||||||||||||
| Radiation Health Hazard Survey | |||||||||||||
| Flight Inspection Reports/Results | |||||||||||||
| FAA Form 6980-4, Standby Power Survey | |||||||||||||
| Obstn. Survey and/or Hrzn Profile(new Fac.) | |||||||||||||
| Plant Equipment Performance Test Data | |||||||||||||
| Contractor Acceptance Inspection Participants (Name/Office) | |||||||||||||
| Contractor Acceptance Inspection Participants (Name/Office) | |||||||||||||
| We have reviewed the finding of this CAI Report and have determined that the facility/equipment or work | |||||||||||||
| described in this report is (__acceptable __not acceptable) for (__transfer of custodialship __maintenance | |||||||||||||
| __maintenance and operation on a commissioned bases) with (__no exceptions __exceptions) Listed on the | |||||||||||||
| CAI Exception List and Clearance Record. | |||||||||||||
| AFS Representative (Chairperson) | AFD F&E Representative | Representative | |||||||||||
| AT Facility Representative | AFD Maint Br Representative | Representative | |||||||||||
| Acceptance by Airway Facilities Sector/Sector Field Office: | |||||||||||||
| The facility/system/equipment or work described in this JAI Report was accepted for: | |||||||||||||
| custodialship | maintenance | maintenance and operation on:_________ | |||||||||||
| AFS/SFO Manager | |||||||||||||
| I have reviewed this CAI Report, and (__concur __nonconcur) with the Contractor Acceptance Inspection findings. | |||||||||||||
| (If Applicable: __A letter is attached explaining nonconcurrence.) | |||||||||||||
| AF Manager | Date |
&C&"Arial,Bold"&12PART - III SECTION J ATTACHMENT J.6 &R&9Attachment 6
DTFAAC-15-R-02838
&CPage 1 of 7 Version 1.0 5/5/08
Sheet2
| CONTRACTOR ACCEPTANCE INSPECTION REPORT CHECKLIST | Sheet 1 of 5 | |||||||
| Ident. & Fac. Alpha Code | Delivery Order No. | Date of CAI | Type of CAI: | |||||
| Plants | Final | |||||||
| Electronics | Partial no. | |||||||
| REQUIREMENTS | Exception | |||||||
| MEETS | Category | |||||||
| Item No. | REQUIREMENT | N/A | YES | NO | Major | Minor | ||
| Section A. Facility Construction and Installation Requirements | ||||||||
| 1 | Construction Standards and Specifications. | |||||||
| 2 | Construction Appearance. | |||||||
| 3 | Roads and Grounds: | |||||||
| a. Surface Condition. | ||||||||
| b. Erosion Control. | ||||||||
| c. Drainage. | ||||||||
| d. Fences/Gates/Cattleguards. | ||||||||
| e. Signs. | ||||||||
| 4 | Structures (Towers/Poles): | |||||||
| a. Tower/Pole Construction. | ||||||||
| b. Ladders, Steps. | ||||||||
| c. Guys/Anchors. | ||||||||
| d. Lightning Protection | ||||||||
| 5 | Buildings: | |||||||
| a. Roof. | ||||||||
| b. Exterior Walls. | ||||||||
| c. Foundation. | ||||||||
| d. Floors. | ||||||||
| e. Interior Walls. | ||||||||
| f. Ceiling/Lights. | ||||||||
| g. Openings. | ||||||||
| h. Plumbing, Water and Sewage Systems. | ||||||||
| 6 | Site/Facility Cleanup. |
&CPage 2 of 7 Version1.0 5/5/08
Sheet3
| CONTRACTOR ACCEPTANCE INSPECTION REPORT CHECKLIST | Sheet 2 of 5 | |||||||
| Ident. & Fac. Alpha Code | Job Order No. | Date of CAI | Type of CAI: | |||||
| Plants | ____Final | |||||||
| Electronics | ____Partial no. | |||||||
| REQUIREMENTS | Exception | |||||||
| MEETS | Category | |||||||
| Item No. | REQUIREMENT | N/A | YES | NO | Major | Minor | ||
| Section A. Facility Construction and Installation Requirements | ||||||||
| 7 | Lessor's Inspection and Letter of Release. | |||||||
| 8 | Commercial Power Service. | |||||||
| 9 | Power Transformers. | |||||||
| 10 | Facility Electrical Wiring and Lighting. | |||||||
| 11 | Facility/Structure Grounding. | |||||||
| 12 | Lightning and Surge Protection. | |||||||
| 13 | Distribution, Demarcation, and Terminal Panels, Boxes, and Cabinets. | |||||||
| 14 | Construction Inspection of Power, Control, Signal, and Coaxial Cables. | |||||||
| 15 | Underground Cables. | |||||||
| 16 | Cable Load and Voltage Drop. | |||||||
| 17 | Standby Engine Generator. | |||||||
| 18 | UPS/PCS/Battery Backup Systems. | |||||||
| 19 | Environmental Systems (HVAC). | |||||||
| 20 | Equipment Installation (Standards and Specifications). | |||||||
| 21 | Equipment Appearance. | |||||||
| 22 | Equipment Grounding, Bonding, and Shielding. | |||||||
| 23 | Equipment Ventilation. | |||||||
| 24 | Antennas and Antenna Systems. | |||||||
| 25 | Coaxial Cable Tests and Documentation. | |||||||
| 26 | Ground Check/Reference Markers. | |||||||
| 27 | Equip. Mods., CCD's, Manufacturer's Field and Factory Changes. | |||||||
| 28 | FAA/Telco Ground Rules. | |||||||
| 29 | Telco Equipment Operation. | |||||||
| 30 | Leased Telecommunications Service. | |||||||
| 31 | Occupational Safety. Battery and electrical safety equipment. |
&CPage 3 of 7 Version 1.0 5/5/08
Sheet4
| CONTRACTOR ACCEPTANCE INSPECTION REPORT CHECKLIST | Sheet 3 of 5 | |||||||
| Ident. & Fac. Alpha Code | Job Order No. | Date of CAI | Type of CAI: | |||||
| Plants | _____Final | |||||||
| Electronics | _____Partial no. | |||||||
| REQUIREMENTS | Exception | |||||||
| MEETS | Category | |||||||
| Item No. | REQUIREMENTS | N/A | YES | NO | Major | Minor | ||
| Section A. Facility Construction and Installation Requirements | ||||||||
| 32 | Radiation Health Hazard Survey. | |||||||
| 33 | Fire Protection. | |||||||
| 34 | Security. | |||||||
| 35 | Frequency Authorizations. | |||||||
| 36 | ERMS P1 and P5 panel installation. Interface connection to equipment and comminications medium. | |||||||
| 37 | UPS remote status panel installed and connected to UPS. | |||||||
| Section B. Facility/System/Equipment Performance Requirements. | ||||||||
| 1 | Systems/Equipment Adjustments and Tuneup. | |||||||
| 2 | Systems/Equipment Operation. | |||||||
| 3 | Standards and Tolerances. | |||||||
| 4 | Deviation From National Standards. | |||||||
| 5 | Special Component Selection. | |||||||
| 6 | Capability. | |||||||
| 7 | Compatibility. | |||||||
| 8 | Reliability. | |||||||
| 9 | Maintainability. | |||||||
| 10 | Electromagnetic Interference. | |||||||
| 11 | RMM software loaded on ERMS P1 and P5 CPUs. Communication to the OCC via the MPS. Test alarms and status reports. | |||||||
| 12 | UPS remote status panel operational. |
&CPage 4 of 7 Version 1.0 5/5/08
Sheet5
| CONTRACTOR ACCEPTANCE INSPECTION REPORT CHECKLIST | Sheet 4 of 5 | |||||||
| Ident. & Fac. Alpha Code | Job Order No. | Date of CAI | Type of CAI: | |||||
| Plants | _____Final | |||||||
| Electronics | _____Partial no. | |||||||
| REQUIREMENTS | Exception | |||||||
| MEETS | Category | |||||||
| Item No. | REQUIREMENTS | N/A | YES | NO | Major | Minor | ||
| Section C. Commissioning Flight Inspection Requirements. | ||||||||
| 1 | Facility/System Certification. | |||||||
| 2 | Issuance of Restrictive NOTAMS. | |||||||
| Section D. Facility Technical Performance Documentation and | ||||||||
| Maintenance Reference data Requirements. | ||||||||
| 1 | Facility Reference Data File (FRDF) | |||||||
| 2 | Facility Technical Reference Data: | |||||||
| a. FAA Form 6030-15, Facility General Reference Data Record. | ||||||||
| b. FAA Form 6030-16, Tech. Ref. Data Record Cover/Transmittal Sheets. | ||||||||
| c. FAA Form 6030-17, Technical Reference Data Records. | ||||||||
| d. Initial FAA Form (6000 Series), Performance Records. | ||||||||
| 3 | Plant Equipment Performance Test Data. | |||||||
| 4 | Engine Generator Installation: | |||||||
| a. Performance Test Data. | ||||||||
| b. FAA Form 6980-4, Standby Power System. | ||||||||
| 5 | Facility Drawings. | |||||||
| 6 | Facility Instruction Books. | |||||||
| 7 | Facility Maintenance Technical Data. | |||||||
| 8 | Facility Modification Records. | |||||||
| 9 | Facility/System/Equipment, NCP's and CCD's |
&CPage 5 of 7 Version 1.0 5/5/08
Sheet6
| CONTRACTOR ACCEPTANCE INSPECTION REPORT CHECKLIST | Sheet 5 of 5 | |||||||
| Ident. & Fac. Alpha Code | Job Order No. | Date of CAI | Type of CAI: | |||||
| Plants | ______Final | |||||||
| Electronics | ______Partial no. | |||||||
| REQUIREMENTS | Exception | |||||||
| MEETS | Category | |||||||
| Item No. | REQUIREMENTS | N/A | YES | NO | Major | Minor | ||
| Section F. Final Acceptance and Commissioning Requirements. | ||||||||
| Initial Operating Capability (IOC). | ||||||||
| 1 | (Includes operations, diagnostics, and support software). | |||||||
| 2 | Final Preparation For Facility / System / Equipment Operations. | |||||||
| 3 | Operational Readiness Date (ORD). | |||||||
| 4 | Airway Facilities Staffing. | |||||||
| 5 | Preventative Maintenance (PM). | |||||||
| 6 | Facility / System / Equipment Certification and Commissioning Statements. | |||||||
| 7 | Establishment and Scheduling of Instrument Approach Procedures (IAP's). | |||||||
| 8 | Issuance of Commissioning NOTAM. | |||||||
| 9 | Facilities Master File (FMF) Change. |
&CPage 6 of 7 Version 1.0 5/5/08
Sheet7
| CONTRACTOR ACCEPTANCE INSPECTION REPORT EXCEPTIONS LIST AND CLEARANCE RECORD | Sheet | of | |||||||||||||
| AFS/SFO CC and Location | Fac. ID & Alpha Code | Job Order No. | Dates of CAI | Type of CAI: | |||||||||||
| Plants | Final | ||||||||||||||
| Electronics | Partial no. | ||||||||||||||
| Exception Category: | Number of Sheets: | Total Number of Exceptions: | |||||||||||||
| Major | Minor | Major | Minor | Major | Minor | ||||||||||
| Sec/ Item No. | Exceptions and Actions Required | Action Office | Estimated Completion Date | Clearance Action Taken | Date Cleared | ||||||||||
| REMARKS: |
&CPage 7 of 7 Version 1.0 5/5/08