Attachment 20
DTFAAC-15-R-02838
2-11-2015
POWER SERVICES GROUP GOVERNMENT FURNISHED EQUIPMENT (GFE)
ELECTRICAL POWER DISTRIBUTION EQUIPMENT
Vendor: Schneider Electric/Square D Equipment: Switchboards, Panelboards, Circuit Breakers, Transformers, and Monitoring software and Hardware.
Lead-time: Large Switchboards 4-5 months, Panelboards 1 to 3 months, Transformers 1 to 3 months.
ENGINE GENERATOR (EG)
Vendor: Kohler Equipment: Propane engine generators 20 kW to 50 kW Diesel engine generators 15 kW to 900 kW Automatic Transfer Switches, Load Banks, and Day Tanks Voltages 480, 208, 240 three phase, 240 single phase Lead-Time: 6-months.
STATIC AUTOMATIC TRANSFER SWITCH (STS)
Vendor: L-3 Communications Equipment: 480 volt, 200 amp to 600 amp 208 volt, 3 or 4-pole, 150 amp to 600 amp Lead-Time: 158 days
TRANSIENT VOLTAGE SURGE SUPPRESSION (TVSS)
Vendor: Raycap Inc.
Equipment: Service entrance, main, and branch distribution TVSS panels.
Lead-Time: 30-days
UNINTERRUPTIBLE POWER SUPPLY (UPS)
Vendor: Eaton Electric Equipment: 480 volt 30 KVA to 825 KVA 208 volt 10 KVA to 160 kVA Battery strings, battery monitors, and bypass panels.
Lead-Time: small to medium UPSs and associated equipment 6-weeks.
DIRECT CURRENT BACK-UPS SYETSM (DC BUS)
Vendor: Ericsson Federal Equipment: 24 volt Direct Current Back-up System, and battery strings.
Lead-Time: 60-Days.