Attachment 2 - CDRLs-DIDs 3-4-15.pdf

PDF 990 KB Posted

Attached to
Power Systems Installation
Solicitation number
DTFAAC-15-R-02838
Issued by

About this file

Attachment 2 - CDRLs-DIDs 3-4-15 (pdf)

View the file

Other files

File Type Posted
SIR-RFO DTFAAC-15-R-02838.pdf PDF
Attachment 6 -CAI Report Cvr Sht.xls XLS spreadsheet
Attachment 18 - Client Auth. Letter (Section J Attach.).Section J Attach. —
Attachment 4 - Perf. Bond SF 25.pdf PDF
Vendor Q A.pdf PDF
Attachment 8 - Excavation Contaminated Mat.doc DOC document
Attachment 14_FAA-D-2494b.pdf PDF
Attachment 1 - SOW (w_appendices).w_appendices —
DTFAAC-15-R-02838 A004 Conference Attendee List.pdf PDF
Attachment 19 - Business Declaration Form.pdf PDF
Attachment 9 -_FAA_ORDER_1050_10C.pdf PDF
DTFAAC-15-R-02838 A001-Apr 01.pdf PDF
Attachment 17(C) - Past Perf Quest. (Sec J Attach).C C file
Attachment 13_FAA-C-1217F.pdf PDF
Attachment 7 - Safety Health Checklist.doc DOC document
Attachment 3 - SF 25(a) Payment Bond.a A file
Attachment 10 -FAA_ORDER_6950_27.pdf PDF
DTFAAC-15-R-02838 A002-Apr 06.pdf PDF
Attachment 15_FAA_ORDER_1050_15.pdf PDF
DTFAAC-15-R-02838 A005 April 17 2015pdf.pdf PDF
DTFAAC-15-R-02838 A003 April 13 2015.pdf PDF
Attachment 11_FAA_STD_019E.pdf PDF
Attachment 12_FAA_STD_032.pdf PDF
Attachment 5 - Const Spec Template.doc DOC document
Attachment 20 - GFE.pdf PDF
DTFAAC-15-R-02838 A006 April 24 2015.pdf PDF
Attachment 16 - Past Perf History (Sec J Attach).Sec J Attach —
Attachment 7 - Safety Health Checklist.doc DOC document
Attachment 18 - Client Auth. Letter (Section J Attach.).Section J Attach. —
Attachment 13_FAA-C-1217F.pdf PDF
Attachment 10 -FAA_ORDER_6950_27.pdf PDF
DTFAAC-15-R-02838 A001-Apr 01.pdf PDF
Attachment 19 - Business Declaration Form.pdf PDF
Attachment 11_FAA_STD_019E.pdf PDF
Attachment 9 -_FAA_ORDER_1050_10C.pdf PDF
Attachment 12_FAA_STD_032.pdf PDF
SIR-RFO DTFAAC-15-R-02838.pdf PDF
Attachment 17(C) - Past Perf Quest. (Sec J Attach).C C file
Attachment 15_FAA_ORDER_1050_15.pdf PDF
Attachment 20 - GFE.pdf PDF
Attachment 14_FAA-D-2494b.pdf PDF
DTFAAC-15-R-02838 A005 April 17 2015pdf.pdf PDF
Attachment 6 -CAI Report Cvr Sht.xls XLS spreadsheet
Attachment 8 - Excavation Contaminated Mat.doc DOC document
Attachment 5 - Const Spec Template.doc DOC document
Attachment 4 - Perf. Bond SF 25.pdf PDF
Attachment 3 - SF 25(a) Payment Bond.a A file
DTFAAC-15-R-02838 A004 Conference Attendee List.pdf PDF
DTFAAC-15-R-02838 A003 April 13 2015.pdf PDF
Attachment 2 - CDRLs-DIDs 3-4-15.pdf PDF
Show 40 more

Latest 50 of 190 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

DD Form 1423-1, Jun 90

CONTRACT DATA REQUIREMENTS LIST

(1 DATA ITEM)

FORM APPROVED OMB

NO. 0704-0188

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY

0003, 1003, 2003, 3003, 4003 TDP TM OTHER ( CONTRACT BASE AWARD)

D. SYSTEM / ITEM E. CONTRACT / PR NO. F. CONTRACTOR

POWER SYSTEMS INSTALLATION

PROGRAM MANAGEMENT

CONTRACT: TDB/PR: AC-15-02838 TBD

1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE OF DATA ITEM

A001 PROGRAM PLAN M001

4. AUTHORITY (DATA ACQUISITION DOCUMENT NO.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE

N/A SECTION-C, SOW, PARA., 3.1.1 NAS POWER SERVICES GROUP,

TECHNICAL OPERATIONS SERVICE

7. DD 250 REQUIRED 8. APP CODE 9. DIST STATEMENT REQUIRED 10. FREQUENCY

N/A NONE ONE TIME

11. AS OF DATE 12. DATE OF FIRST SUBMISSION 13. DATE OF SUBSEQUENT SUBMISSION

SEE BLOCK 16 SEE BLOCK 16

D I S T R I B U T I O N

B. COPIES B. COPIES

A. ADDRESSEE FINAL A. ADDRESSEE FINAL

14. DRAFT REG REPRO DRAFT REG REPRO

AJW-22 1

AAQ - 721 1

(A) TOTAL 0 0 2 (B) TOTAL

15. TOTAL OF A & B 2

16. REMARKS:

BLOCK 12 - THE CONTRACTOR SHALL SUBMIT THE PROGRAM PLAN 10 CALENDAR DAYS FOLLOWING RECEIPT OF DELIVERY ORDER.

BLOCK 13 - THE CONTRACTOR SHALL UPDATE AND SUBMIT THE PROGRAM PLAN AS REVISIONS TO THE PROGRAM MANAGEMENT STRUCTURE OCCUR.

BLOCK 14B – REPO MEANS EMAILED SOFT COPY.

G. PREPARED BY H. DATE I. APPROVED BY J. DATE

MARILYN JARVIS, NAS

POWER SERVICES GROUP

8/7/14 BOB ENOS, NAS POWER

SERVICES GROUP

8/7/14

Kathleen D Islas Typewritten Text

DTFAAC-15-R-02838

Attachment 2

Kathleen D Islas Typewritten Text

Kathleen D Islas Typewritten Text

DATA ITEM DESCRIPTION

1. TITLE

PROGRAM PLAN

2. IDENTIFICATION NUMBER

DI-FAA-M001

3. DESCRIPTION/PURPOSE

3.1 The Program Plan describes and depicts the Contractor’s

management structure.

3.2 The Program Plan provides current information which is used to describe the approach, resources, and needs of the contractor to perform the management effort.

4. APPROVAL DATE

8/7/14

5. RESPONSIBLE OFFICE

NAS Power Services Group

6. REFERENCE

AMS

7. APPLICATION/INTERRELATIONSHIP

This Data Item Description (DID) contains the format and preparation instructions for the Data Product generated by the Specific and Discrete Task Requirements as delineated in the Contract.

10. PREPARATION INSTRUCTIONS

10.1 Format. The Program Plan format shall be contractor selected. The submission shall be 8 1/2 by 11 inch paper. One way foldouts may be used for graphic material.

Written documents shall be furnished in the following format:

a) Hard copy on 8.5” x 11” paper.

b) Hard copy drawing inserts maximum 11” x 17”.

c) Soft copy MS Word 2010 or later version.

d) Drawings could be PDF files or graphic inserts into Word documents.

10.2 Content. The Program Plan shall provide information on the contractor's organization, practices and techniques to be used in managing the Program, specifically Management of Subcontracts.

10.2.1 The Plan shall specifically contain the following:

a. A Chart showing the Structure of the Program Organization by Title and Name.

Identify the Program Office, Support contractor's, and Major Subcontractors.

b. A Chart showing the Relationship of the Program Functions to the Functional Organizations indicating Lines of Authority and Communications

Kathleen D Islas Typewritten Text

Kathleen D Islas Typewritten Text

DTFAAC-15-R-02838

Attachment 2

(1 DATA ITEM)

FORM APPROVED OMB

NO. 0704-0188

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY

0003, 1003, 2003, 3003, 4003 TDP TM OTHER ( CONTRACT BASE AWARD)

D. SYSTEM / ITEM E. CONTRACT / PR NO. F. CONTRACTOR

POWER SYSTEMS INSTALLATION

PROGRAM MANAGEMENT

1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE OF DATA ITEM

A002 PROGRAM MANAGEMENT REPORT M002

4. AUTHORITY (DATA ACQUISITION DOCUMENT NO.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE

SECTION-C, SOW, PARA. 3.1.2 NAS POWER SERVICES GROUP,

TECHNICAL OPERATIONS SERVICE

7. DD 250 REQUIRED 8. APP CODE 9. DIST STATEMENT REQUIRED 10. FREQUENCY

N/A NONE QUARTERLY

11. AS OF DATE 12. DATE OF FIRST SUBMISSION 13. DATE OF SUBSEQUENT SUBMISSION

SEE BLOCK 16 SEE BLOCK 16 SEE BLOCK 16

D I S T R I B U T I O N

B. COPIES B. COPIES

A. ADDRESSEE FINAL A. ADDRESSEE FINAL

14. DRAFT REG REPRO DRAFT REG REPRO

AJW-22 1

AAQ - 721 1

15. TOTAL OF A & B 2

16. REMARKS:

BLOCK 12 - THE CONTRACTOR SHALL SUBMIT THE PROGRAM MANAGEMENT REPORT NOT LATER THAN 30 CALENDAR DAYS FOLLOWING THE FIRST TASK OR

DELIVERY ORDER.

BLOCK 13 - THE CONTRACTOR SHALL UPDATE AND SUBMIT THE PROGRAM MANAGEMENT REPORT AT LEAST ONCE EVERY QUARTER UNLESS OTHERWISE

DIRECTED BY THE GOVERNMENR.

BLOCK 14B – REPO MEANS EMAILED SOFT COPY.

MARILYN JARVIS, NAS

POWER SERVICES GROUP

8/7/14 BOB ENOS, NAS POWER

8\7\14

Contract: TBD/PR: AC-15-02838

Kathleen D Islas Typewritten Text N/A

Kathleen D Islas Typewritten Text

Kathleen D Islas Typewritten Text

TBD

Kathleen D Islas Typewritten Text

Kathleen D Islas Typewritten Text

Kathleen D Islas Typewritten Text

DTFAAC-15-R-02838

Attachment 2

1. TITLE

PROGRAM MANAGEMENT REPORT

2. IDENTIFICATION NUMBER

DI-FAA-M002

3. DESCRIPTION/PURPOSE

Report on the status of the program projects and orders.

4. APPROVAL DATE

5. RESPONSIBLE OFFICE

NAS Power Services Group

6. REFERENCE

Acquisition Management System

7. APPLICATION/INTERRELATIONSHIP

This Data Item Description (DID) provides the format and preparation instructions for the Data Product generated by the Specific and Discrete Task Requirements as delineated in the Contract.

10. PREPARATION INSTRUCTIONS

10.1 Format. The Program Management Report template is provided in M002 Attachment 1.

The submission shall be 8 1/2 by 11-inch paper. Written documents shall be furnished in the following format:

a) Hard copy on 8.5” x 11” paper, landscape orientation.

b) Soft copy MS Excel 2010 or later.

10.2 Content. The Program Management Report shall provide information on the status of the Contractor’s installation program. The report template Attachment 1 to M002 is the approved report format.

DTFAAC-15-R-02838

Attachment 2

(1 DATA ITEM)

FORM APPROVED OMB

NO. 0704-0188

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY

0001, 1001, 2001, 3001, 4001 A TDP TM OTHER ( CONTRACT BASE AWARD)

D. SYSTEM / ITEM E. CONTRACT / PR NO. F. CONTRACTOR

Power Equipment Installation

1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE OF DATA ITEM

B001 SITE SURVEY REPORT E001

4. AUTHORITY (DATA ACQUISITION DOCUMENT NO.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE

SECTION-C, SOW, PARA. 3.2.5 NAS POWER SERVICES GROUP,

TECHNICAL OPERATIONS SERVICE

7. DD 250 REQUIRED 8. APP CODE 9. DIST STATEMENT REQUIRED 10. FREQUENCY

NONE NONE SEE BLOCK 16

11. AS OF DATE 12. DATE OF FIRST SUBMISSION 13. DATE OF SUBSEQUENT SUBMISSION

N/A SEE BLOCK 16 SEE BLOCK 16

D I S T R I B U T I O N

B. COPIES B. COPIES

A. ADDRESSEE FINAL A. ADDRESSEE FINAL

DRAFT REG REPRO DRAFT REG REPRO

AJW-22 0 1

AAQ - 721 0 1

15. TOTAL OF A & B 4

16. REMARKS:

BLOCK 10, 11, 12, 13 - THE CONTRACTOR SHALL PROVIDE SITE SURVEY REPORT FOR EACH SITE AS DIRECTED IN THE DELIVERY ORDER.

BLOCK 14B – REPO MEANS SOFT COPY “ELECTRONIC MEDIA” SENT BY EMAIL.

17. PRICE GROUP: 18. ESTIMATED TOTAL PRICE:

MARILYN JARVIS, NAS

POWER SERVICES GROUP

8\7\14 BOB ENOS, NAS POWER

8\7\14

Contract: TBD/PR: AC-15-02838

Kathleen D Islas Typewritten Text

Kathleen D Islas Typewritten Text

Kathleen D Islas Typewritten Text

TBD

Kathleen D Islas Typewritten Text N/A

Kathleen D Islas Typewritten Text

DTFAAC-15-R-02838

Attachment 2

1. TITLE

Site Survey Report

2. IDENTIFICATION NUMBER

DI-FAA-E001

3. DESCRIPTION/PURPOSE

Site investigation for power system work

4. APPROVAL DATE

5. RESPONSIBLE OFFICE

NAS Power Services Group

6. REFERENCE

7. APPLICATION/INTERRELATIONSHIP

10. PREPARATION INSTRUCTIONS

This document establishes the requirements for: Site Survey Report

10.l General. The Microsoft versions of Word, Excel, and Project and AutoCAD MicroStation will evolve with time therefore the Government reserves the right to change soft copy versions as the agency upgrades its LAN enterprise services. Provide softcopy via email and/or Compact Disc.

10.1.1 Written documents shall be furnished in the following format:

a) Hard copy on 8.5” x 11” paper.

b) Hard copy drawing inserts maximum 11” x 17”.

c) Soft copy MS Word 2010 or later.

10.1.2 Spreadsheet documents shall be delivered in the following format:

a) Hard copy on 8.5” x 11” paper.

10.1.3 Project Schedules shall be furnished in the following format:

a) Hard copy on 8.5” x 11” Portrait or Landscape.

b) Softcopy MS Project, 2010 version or later.

10.1.4 CADD drawings shall be delivered in the following format:

a) Hard copy on Drawing size “A”, “B” or “D”.

b) Softcopy provided in AutoCAD .dwg and .dxf translatable to MicroStation .dgn drawing format. AutoCAD version 13 or later

10.2 Site Survey Report. Use 8.5” x 11” paper in binder. Use 11” x 17” foldouts as necessary for larger drawings. Cost estimate shall be Construction Specification Institute’s Division 1 through 17 format.

Example: Mechanical costs are listed under Division 15, and Electrical costs are in Division 16.

10.3 TASK DELIVERABLES: Site Survey Report.

Kathleen D Islas Typewritten Text

Kathleen D Islas Typewritten Text

1CONTRACT DATA REQUIREMENTS LIST

(1 DATA ITEM)

FORM APPROVED OMB

NO. 0704-0188

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY

0001, 1001, 2001, 3001, 4001 A TDP TM OTHER ( CONTRACT BASE AWARD)

D. SYSTEM / ITEM E. CONTRACT / PR NO. F. CONTRACTOR

Power Equipment Installation

1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE OF DATA ITEM

B002 ENGINEERING DESIGN DOCUMENTS E002

4. AUTHORITY (DATA ACQUISITION DOCUMENT NO.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE

SECTION-C, SOW, PARA. 3.2.6 NAS POWER SERVICES GROUP,

TECHNICAL OPERATIONS SERVICE

7. DD 250 REQUIRED 8. APP CODE 9. DIST STATEMENT REQUIRED 10. FREQUENCY

NONE NONE SEE BLOCK 16

11. AS OF DATE 12. DATE OF FIRST SUBMISSION 13. DATE OF SUBSEQUENT SUBMISSION

N/A SEE BLOCK 16 SEE BLOCK 16

D I S T R I B U T I O N

B. COPIES B. COPIES

A. ADDRESSEE FINAL A. ADDRESSEE FINAL

DRAFT REG REPRO DRAFT REG REPRO

AJW-22 1 1

AAQ - 721 1 1

(A) TOTAL 0 2 2 (B) TOTAL

15. TOTAL OF A & B 5

16. REMARKS:

BLOCK 10, 11, 12, 13 - ENGINEERING DESIGN DOCUMENTS ARE SUBMITTED IN ACCORDANCE WITH SCHEDULE SPECIFIED IN EACH DELIVERY ORDER.

BLOCK 14B – REPO THIS BLOCK WILL BE USED TO DESIGNATE THE NUMBER OF COPIES IN “ELECTRONIC MEDIA” TO BE DELIVERED TO THE GOVERNMENT.

FURTHER REQUIREMENTS ARE CONTAINED IN THE DATA ITEM DESCRIPTION (DID) .

MARILYN JARVIS, NAS

POWER SERVICES GROUP

8/7/14 BOB ENOS, NAS POWER

Kathleen D Islas Typewritten Text Contract: TBD/PR: AC-15-02838

Kathleen D Islas Typewritten Text

TBD

Kathleen D Islas Typewritten Text N/A

Kathleen D Islas Typewritten Text

DTFAAC-15-R-02838

Attachment 2

1. TITLE

Engineering Design Documents

2. IDENTIFICATION NUMBER

DI-FAA-E002

3. DESCRIPTION/PURPOSE

Provide Engineering design services for Installation of power system equipment and any modifications necessary to support that equipment.

4. APPROVAL DATE

8/7/14

5. RESPONSIBLE OFFICE

NAS Power Services Group

6. REFERENCE

7. APPLICATION/INTERRELATIONSHIP

10. PREPARATION INSTRUCTIONS

Tasks for engineering design services: Individual Task Orders will designate actual deliverables required. Small projects will not require the same design effort as larger projects. Level of engineering effort is determined on a site-by-site basis.

DOCUMENT SUBMITTAL STANDARDS

10.l General. The Microsoft versions of Word, Excel, and Project and AutoCAD and MicroStation will evolve with time therefore the Government reserves the right to change soft copy versions as the agency upgrades its LAN enterprise services. Provide softcopy via email and/or Compact Disc.

10.1.1 Written documents shall be furnished in the following format:

a) Hard copy on 8.5” x 11” paper.

b) Hard copy drawing inserts maximum 11” x 17”.

b) Softcopy MS Project, Windows 2010 version or later.

b) Softcopy provided in AutoCAD .dwg and .dxf translatable to MicroStation .dgn drawing format. AutoCAD version 13.

10.2 ENGINEERING DESIGN DOCUMENTS.

10.2.1 Specifications. Specifications shall be prepared by the Contractor in accordance with Construction Specification Institute (CSI) three part format (PART 1-GENERAL, PART 2-PRODUCTS, PART 3-EXECUTION) performance based specifications. Division 1 of the specifications shall conform to the template found in Part III Section J Attachment J.3.

10.2.2 Drawings. The Contractor shall submit a complete set of reproducible drawings for the final designs. The designs shall be prepared on standard FAA “D” size sheets 36” by 24”. Prior to the start of work, the Contractor shall coordinate with the Contracting Officer’s Technical Representative (COTR), for CADD standards to be used in the design document deliverable drawings. This coordination will include standard symbols library, naming conventions, layering schemes, standard fonts, database setup, standard title blocks, etc.

(1 DATA ITEM)

FORM APPROVED OMB

NO. 0704-0188

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY

0002, 1002, 2002, 3002, 4002 A TDP TM OTHER ( CONTRACT BASE AWARD)

D. SYSTEM / ITEM E. CONTRACT / PR NO. F. CONTRACTOR

Power Systems Installation

1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE OF DATA ITEM

B003 GNAS AND CPDS SITE PREPARATION AND

INSTALLATION DOCUMENTS

E003

4. AUTHORITY (DATA ACQUISITION DOCUMENT NO.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE

SECTION-C, SOW, PARA 3.2.7 AND

3.2.8

NAS POWER SERVICES GROUP,

TECHNICAL OPERATIONS SERVICE

7. DD 250 REQUIRED 8. APP CODE 9. DIST STATEMENT REQUIRED 10. FREQUENCY

NONE NONE SEE BLOCK 16

11. AS OF DATE 12. DATE OF FIRST SUBMISSION 13. DATE OF SUBSEQUENT SUBMISSION

SEE BLOCK 16 SEE BLOCK 16 SEE BLOCK 16

D I S T R I B U T I O N

B. COPIES B. COPIES

A. ADDRESSEE FINAL A. ADDRESSEE FINAL

DRAFT REG REPRO DRAFT REG REPRO

AJW-22 1 1

AAQ -721 0 1

(A) TOTAL 0 2 3 (B) TOTAL

15. TOTAL OF A & B 5

16. REMARKS:

BLOCK 10, 11, 12, 13 - DOCUMENTS ARE SUBMITTED IN ACCORDANCE WITH SCHEDULE SPECIFIED IN EACH DELIVERY ORDER.

BLOCK 14B – REPO THIS BLOCK WILL BE USED TO DESIGNATE THE NUMBER OF COPIES IN “ELECTRONIC MEDIA” TO BE DELIVERED TO THE GOVERNMENT.

FURTHER REQUIREMENTS ARE CONTAINED IN THE DATA ITEM DESCRIPTION (DID) .

MARILYN JARVIS, NAS

POWER SERVICES GROUP

8/7/14 BOB ENOS, NAS POWER

Contract: TBD/PR: AC-15-02838

Kathleen D Islas Typewritten Text

TBD

Kathleen D Islas Typewritten Text N/A

Kathleen D Islas Typewritten Text

DTFAAC-15-R-02838

Attachment 2

1. TITLE

GNAS and CPDS Site Preparation and Installation Documents

2. IDENTIFICATION NUMBER

DI-FAA-E003

3. DESCRIPTION/PURPOSE

Installation of power system equipment and any modifications necessary to support that equipment.

4. APPROVAL DATE

8/7/14

5. RESPONSIBLE OFFICE

NAS Power Services Group

6. REFERENCE

7. APPLICATION/INTERRELATIONSHIP

10. DOCUMENT PREPARATION INSTRUCTIONS

10.l General. The Microsoft versions of Word, Excel, and Project and AutoCAD and MicroStation will evolve with time therefore the Government reserves the right to change soft copy versions as the agency upgrades its LAN enterprise services. Provide softcopy via email and/or Compact Disc. :

Individual Task Orders will designate actual deliverables required.

10.1.1 Written documents shall be furnished in the following format:

a) Hard copy on 8.5” x 11” paper.

b) Hard copy drawing inserts maximum 11” x 17”.

b) Softcopy MS Project 2010 or later.

b) Softcopy provided in AutoCAD .dwg and .dxf translatable to

MicroStation .dgn drawing format. AutoCAD version 13.

10.2 TASK DELIVERABLES

10.2.1 General.- The Contractor, at completion of the design task, shall deliver the following:

(a) Division 1 Specification deliverables per paragraphs 10.1.1, 10.1.2 and 10.1.3.

(b) Power cut over and outage schedule.

(c) Project Construction Schedule per paragraph 10.1.3

(d) Equipment Start-up test report.

(e) Contractor Acceptance Inspection report. The CAI report found in Section-J, Attachment J.4.

(f) As-Built Drawings per paragraph 10.1.4.

(g) FAA Pre-Construction and Maintenance Project Safety and Health Checklist. Attachment J.5.

(h) DOT F4220.3 – Pre-Construction Conference Agenda and Checklist. Attachment J.7.

10.2.2 Delivery.- The Contractor shall be responsible for the delivery of documents required by this engineering requirement to the contracting officer or his designated representative.

File details come from the government source that posted it. Updated .