DS 270000000004 SCHEDULE B - PRICING MATRIX Columbus Oil Project.xlsx
XLSX spreadsheet 24 KB Posted
- Solicitation number
- DS 761 270000000004 2
- Issued by
- Michigan
About this file
This file is a pricing matrix for the Columbus Oil Turn-key Well Plug Project in Cass County, Michigan. The document appears to be Schedule B of a solicitation, presenting a detailed breakdown of pricing for well plugging services. The pricing matrix establishes unit costs and total pricing for various components associated with the turn-key well plugging project, allowing bidders to submit competitive pricing for the work required to plug and remediate oil wells within the specified county jurisdiction.
The pricing structure in the matrix provides line items with associated quantities and unit pricing fields, enabling standardized cost comparison among bidders. This approach facilitates transparent evaluation of bids based on clearly defined scope elements and their associated costs. The document serves as the basis for establishing contract pricing upon award and ensures that all bidders are quoting the same scope of work under identical pricing parameters.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Columbus Oil Pre-Bid Meeting.docx | DOCX document | |
| DS 27-0004 Q & A Columbus Oil and Gas.docx | DOCX document | |
| Revised DS 270000000004 Columbus Oil and Gas Well Plugging Project.docx | DOCX document | |
| DS 270000000004 Columbus Oil and Gas Well Plugging Project.docx | DOCX document | |
| Columbus Oil Project 36806 FY25 308 Response.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Sheet1
| SCHEDULE B - PRICING MATRIX | |
| Columbus Oil Orphan Well Plugging Project (Cass County) - 22 Wells |
| Project Resource Item | Item Description | Unit | Price | Total for Project | Vendor Item? | |
| Quantity | per | (Y/N) | ||||
| Unit | ||||||
| 1 | Contractor Site Supervisor | day | $0.00 | |||
| 2 | Contractor Site Supervisor mileage | mile | $0.00 | |||
| 3 | Per diem (meals & lodging) | day | $0.00 | |||
| 4 | Laborer (this rate is to be utilized but is not limited to Roustabout, Heavy Equipment Operator, Tool Hand, General Laborer type work. See note at bottom of Schedule B for more information.) | hour | $0.00 | |||
| 5 | Pick-up Truck mileage (all descriptions) | mile | $0.00 | |||
| 6 | Pole Rig-3 man crew | hour | $0.00 | |||
| 7 | Single Derrick Rig-3 man crew | hour | $0.00 | |||
| 8 | Double Derrick Rig-3 man crew | hour | $0.00 | |||
| 9 | Pit Liner Material (20 mil PVC) | roll | $0.00 | |||
| 10 | Rig Anchors and/or Basebeam (install/remove, includes all labor and materials) | site | $0.00 | |||
| 11 | Mobile Arc Welder (inc. ½” steel plate for capping) | hour | $0.00 | |||
| 12 | BOP Rental (hydraulic) - Includes all parts such as but not limited to accumulator, annular (hydril), pipe rams, blind rams, etc | |||||
| 12 A | 4 1/2” | day | $0.00 | |||
| 12 B | 5 1/2" | day | $0.00 | |||
| 12 C | 7” | day | $0.00 | |||
| 12 D | 7 5/8” | day | $0.00 | |||
| 12 E | 8 5/8” | day | $0.00 | |||
| 12 F | 9 5/8” | day | $0.00 | |||
| 12 G | 10 3/4" | day | $0.00 | |||
| 12H | 11 3/4” | day | $0.00 | |||
| 13 | Tubing/Workstring (rental) - rental fees to include any necessary post use pipe inspections | |||||
| 13 A | 1.9" tubing | foot | $0.00 | |||
| 13 B | 2 3/8" tubing | foot | $0.00 | |||
| 13 C | 2 7/8" tubing | foot | $0.00 | |||
| 13 D | Drill Collars | foot | $0.00 | |||
| 14 | Drill Bits (rental) | |||||
| 14 A | 3.5" - 7" | bit | $0.00 | |||
| 14 B | 7 1/8" - 11" | bit | $0.00 | |||
| 14 C | 11 1/8" - 16" | bit | $0.00 | |||
| 15 | Well Casing | |||||
| 15 A | 5 1/2" 15.5#/ft | foot | $0.00 | |||
| 15 B | 8 5/8" 24#/ft | foot | $0.00 | |||
| 15 C | 10 3/4" 32#/ft | foot | $0.00 | |||
| 15 D | 11 3/4" 42#/ft | foot | $0.00 | |||
| 15 E | 16" 75#/ft | foot | $0.00 | |||
| 16 | Power Swivel Unit | hour | $0.00 | |||
| 17 | Power Swivel Unit Operator (also can run mud pump) | hour | $0.00 | |||
| 18 | Rental 100 bbl. Half Tank | day | $0.00 | |||
| 19 | Rental - Mud Mixing System - includes mixing system and pit(s) | day | $0.00 | |||
| 20 | Mud Engineer | hour | $0.00 | |||
| 21 | Mixed Mud Drilling Fluid | bbl | $0.00 | |||
| 22 | Barite | sx | $0.00 | |||
| 23 | Shale Shaker | day | $0.00 | |||
| 24 | Rental Frac Tank (water and brine storage) | day | $0.00 | |||
| 25 | Casing Cutters (wireline) | |||||
| 25 A | (jet cutter) 4 1/2” | job | $0.00 | |||
| 25 B | (jet cutter) 5 1/2" | job | $0.00 | |||
| 25 C | (jet cutter) 7" | job | $0.00 | |||
| 25 D | (jet cutter) 8 5/8" | job | $0.00 | |||
| 25 E | Collar buster | job | $0.00 | |||
| 26 | Casing Cutters (mechanical/hydraulic) | |||||
| 26 A | 4 ½” | job | $0.00 | |||
| 26 B | 5 ½” | job | $0.00 | |||
| 26 C | 7" | job | $0.00 | |||
| 26 D | 8 5/8" | job | $0.00 | |||
| 27 | Casing Spear | |||||
| 27 A | 3.5" - 8.625" | job | $0.00 | |||
| 27 B | 9" - 14" | job | $0.00 | |||
| 28 | Mechanical/Electrical Plugs/Fishing Tools | |||||
| 28 A | 4.5” Cast Iron Bridge Plug | ea. | $0.00 | |||
| 28 B | 4.5” Cement Retainer | ea. | $0.00 | |||
| 28 C | 5.5" Cast Iron Bridge Plug | ea. | $0.00 | |||
| 28 D | 5.5” Cement Retainer | ea. | $0.00 | |||
| 28 E | 7” Cast Iron Bridge Plug | ea. | $0.00 | |||
| 28 F | 7” Cement Retainer | ea. | $0.00 | |||
| 28 G | 8 5/8” Cast Iron Bridge Plug | ea. | $0.00 | |||
| 28 H | 8 5/8” Cement Retainer | ea. | $0.00 | |||
| 28 I | 9 5/8” Cast Iron Bridge Plug | ea. | $0.00 | |||
| 28 J | 9 5/8” Cement Retainer | ea. | $0.00 | |||
| 28 K | 10” Cast Iron Bridge Plug | ea. | $0.00 | |||
| 28 L | 10” Cement Retainer | ea. | $0.00 | |||
| 29 | Wireline Services (inc. operator, and hands/riggers) | |||||
| 29 A | Electric logging (Gamma Log, CCL, Freepoint) | job | $0.00 | |||
| 29 A | Cement Bond Log | job | $0.00 | |||
| 29 C | Perforating | job | $0.00 | |||
| 29 D | Setting Mechanical Plugs | job | $0.00 | |||
| 30 | Fresh Water Charge | bbl. | $0.00 | |||
| 31 | Duplex/Triplex Mud Pump | day | $0.00 | |||
| 32 | Cementing Services | |||||
| 32 A | Cementer | hour | $0.00 | |||
| 32 B | Pump Truck Operator | hour | $0.00 | |||
| 32 C | Bulk Truck Operator | hour | $0.00 | |||
| 32 D | Cement Pump Truck OT | hour | $0.00 | |||
| 32 E | Cement Pump Truck Mileage | mile | $0.00 | |||
| 33 | Cement | |||||
| 33 A | Standard Cement (Type 1L) | sx | $0.00 | |||
| 33 B | Class H Cement | sx | $0.00 | |||
| 33 C | 50/50 Poz. Cement | sx | $0.00 | |||
| 33 D | Gas Block Additive | sx | $0.00 | |||
| 34 | Cement Handling Charge | sx | $0.00 | |||
| 35 | Cement Transportation Charge | ton/mile | $0.00 | |||
| 36 | Calcium Chloride | sx | $0.00 | |||
| 37 | Cellophane Flake (LCM) | sx | $0.00 | |||
| 38 | Bentonite | sx | $0.00 | |||
| 39 | Flare | job | $0.00 | |||
| 40 | H2S Scavenger Fluid | bbl | $0.00 | |||
| 41 | H2S Safety Company | day | $0.00 | |||
| 42 | Enclosed (sealed) frac tank for H2S | day | $0.00 | |||
| 43 | Waste Disposal Services | |||||
| 43 A | Pump, Transport, and Disposal of All Generated or Collected Liquids. Per bbl price should include all labor and equipment | bbl | $0.00 | |||
| 43 B | Excavate, Transport, and Disposal of Contaminated Soil to Landfill. Per ton price should include all labor, equipment | ton | $0.00 | |||
| 44 | Pole Truck (tandem axle) - for moving stock tanks, etc. | hour | $0.00 | |||
| 45 | Crane - for lifting large heavy tanks and equipment | hour | $0.00 | |||
| 46 | Dozer | hour | $0.00 | |||
| 46 A | Dozer - Standby Rate | hour | $0.00 | |||
| 47 | Backhoe | hour | $0.00 | |||
| 47 A | Backhoe - Standby Rate | hour | $0.00 | |||
| 48 | Excavator | hour | $0.00 | |||
| 48 A | Excavator - Standby Rate | hour | $0.00 | |||
| 49 | Skid Steer | hour | $0.00 | |||
| 49 A | Skid Steer - Standby Rate | hour | $0.00 | |||
| 50 | Tele Handler | hour | $0.00 | |||
| 50 A | Tele Handler - Standby Rate | hour | $0.00 | |||
| 51 | 10,000 Square Feet of Composite Mats | day | $0.00 | |||
| 52 | Tractor & Low Boy/Float Transportation | hour | $0.00 | |||
| 53 | Dump truck w/Operator (10cy dump) | hour | $0.00 | |||
| 54 | Dump truck w/Operator (20 cy lead dump) | hour | $0.00 | |||
| 55 | Dump truck w/Operator (30 cy dump or train) | hour | $0.00 | |||
| 56 | 70 bbl. Water Truck w/ Vac. Pump | hour | $0.00 | |||
| 57 | 120-150 bbl Water Tanker w/ Vac. Pump | hour | $0.00 | |||
| 58 | Water Truck Operator | hour | $0.00 | |||
| 59 | Vacuum Truck/Cusco | hour | $0.00 | |||
| 60 | Vacuum Truck Operator | hour | $0.00 | |||
| 61 | Hot Oiler | hour | $0.00 | |||
| 62 | Overhead % for subcontracted services, rentals, & materials | % |
Grand Total ($) $0.00
| NOTES: |
| 1. You must submit a project timeline as outlined in RFQ document. Please assume 10-hour days. |
| 2. Provide Quantity and Price/Unit for all items listed in the Bid Table, even if the item is not likely to be used for the project. We call this 'Rated Items' and have requested the unit pricing in the event |
| the Scope of Work changes, a change order is necessary, or we move to a time and materials billing. |
| 3. Bidder cannot mobilize, use, or charge for items in the pricing matrix without prior approval from EGLE Project Manager. |
| 4. Only 1 Contractor Site Supervisor can be invoiced per day of onsite work, unless authorized and/or approved by EGLE project manager. |
| 5. Rental and/or purchase of any specialized equipment, supplies, services, or materials must have prior approval from EGLE Project Manager. |
| 6. Overhead % cannot be added to the hourly or daily rates of items already included on Schedule B when invoicing. |
| 7. If a material, such as 'casing' is needed to properly plug the well and is not listed on this pricing matrix, it will be invoiced at cost plus the 'Overhead %' |
| 8. Laborer includes but is not limited to: Roustabout, Heavy Equipment Operator, Tool Hand, and other similar positions. The Laborer rate will also be used by the rig crew when they are completing work activities not assoicated |
| with the rig, including but not limited to: laying mats, moving equipment, loading/offloading equipment and supplies or other similar general labor duties. Rig crew cannot be invoiced at the Laborer and 'Rig Crew' |
| line items at the same time, as that would be double-billing. |
| 9. You may add additional lines to this pricing matrix at the BOTTOM if needed. |
File details come from the government source that posted it. Updated .