Columbus Oil Project 36806 FY25 308 Response.pdf
PDF 252 KB Posted
- Solicitation number
- DS 761 270000000004 2
- Issued by
- Michigan
About this file
This document is a Response to SF-308 Request for Davis-Bacon Project Wage Determination issued by the U.S. Department of Labor Wage and Hour Division for the Columbus Oil and Gas Well Plugging Project in Cass County, Michigan. The project, under contract number DS270000000004, involves the plugging, abandoning, and restoration of orphan well and facility locations. Work scope includes site clearing of brush and trees, installation and management of workover rigs, tanks, flares, and specialized equipment, wellbore cleaning and electronic logging, cementing operations to seal zones and protect freshwater aquifers, decontamination and removal of abandoned tanks and vessels, and complete site remediation including removal of flowlines, electrical lines, drums, buildings, and secondary containments, followed by grading, mulching, and seeding. The wage determination was issued on May 28, 2026, and expires on November 28, 2026, with the project administered by the Michigan Department of Environment Great Lakes & Energy, Geologic Resources Management Division.
The wage determination establishes Davis-Bacon prevailing wage rates for 18 job classifications, ranging from hourly rates of $20.00 to $55.00 with fringe benefits varying from $12.00 to $69.00 per hour. Notable classifications include Crane Operator at $55.00 hourly with $30.00 fringe benefits, Welder at $41.00 hourly with $40.00 fringe benefits, and Tool Pusher at $31.00 hourly with $69.00 fringe benefits. This wage determination is specific to the Columbus Oil and Gas Well Plugging Project and cannot be used for any other contracts or projects. The determination was approved by Meghan MacLeod, Acting Branch Chief of the Branch of Construction Wage Determinations.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Columbus Oil Pre-Bid Meeting.docx | DOCX document | |
| DS 270000000004 SCHEDULE B - PRICING MATRIX Columbus Oil Project.xlsx | XLSX spreadsheet | |
| DS 27-0004 Q & A Columbus Oil and Gas.docx | DOCX document | |
| Revised DS 270000000004 Columbus Oil and Gas Well Plugging Project.docx | DOCX document | |
| DS 270000000004 Columbus Oil and Gas Well Plugging Project.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
U.S. Department of Labor Wage and Hour Division Washington, DC 20010
Response to SF-308 Request for Davis-Bacon Project Wage Determination
Project Wage Decision Number: 2026MI-36806308052826-Case
State: Michigan
County: Cass
Construction Type: Heavy
Agency: Department of Environment Great Lakes & Energy – Geologic Resources Mgmt. Div.
Contract Number: DS270000000004
Project Name: Columbus Oil and Gas Well Plugging Project
Description of Work (as clarified): Plugging, abandoning and restoring the land at orphan well/facility locations. The work includes clearing the site of brush and trees, setting up the workover rig, tanks, flares, pumps, and specialized equipment. The wellbore will need to be cleaned out and electronically logged. Cementing will start at the bottom and work upward, making sure to seal all appropriate zones and formations as well as protecting the freshwater aquifer. Any abandoned tanks or vessels will need to be pumped out, steam clean, and prepared for scrap. All associated flowlines, electric lines, drums, buildings, secondary containments, fencing and debris will be removed and the site graded for final mulching and seeding.
Date of Decision: 05/28/2026 Expires: 11/28/2026
Modification Number: N/A
Classification Hourly Rate Fringe Benefits Rig Operator $23.00 $30.00 Tool Pusher $31.00 $69.00 Floor Hand $20.00 $30.00 Derrickman $22.00 $30.00 Roustabout Laborer $20.00 $30.00 Power Swivel Operator $23.00 $69.00
Wireline Operator $29.00 $30.00 Wireline Rigger $23.00 $30.00 Cementer $39.00 $46.00 Pump Truck Operator $24.00 $30.00 Bulk Truck Operator $24.00 $30.00 Water Truck Operator $26.00 $12.00 Mud Truck Operator $26.00 $12.00 Vacuum Truck Operator $26.00 $12.00 Heavy Equipment Operator $35.00 $30.00 Crane Operator $55.00 $30.00 Electrician $35.00 $23.00 Welder $41.00 $40.00
This wage determination is specifically for the project listed above. It cannot be used for any other purpose including contracts and or project.
If you have any questions and or additional comments, please do not hesitate to contact me at macleod.meghan@dol.gov.
Approved by:
Meghan MacLeod Acting Branch Chief Branch of Construction Wage Determinations U.S. Department of Labor 402-660-0775 | macleod.meghan@dol.gov mailto:macleod.meghan@dol.gov mailto:macleod.meghan@dol.gov
File details come from the government source that posted it. Updated .