Columbus Oil Pre-Bid Meeting.docx

DOCX document 23 KB Posted

Attached to
Columbus Oil Turn-key Well Plug. Project Cass Cty
Solicitation number
DS 761 270000000004 2
Issued by
Michigan

About this file

This document is a pre-bid meeting notice for the Columbus Oil Turn-key Well Plug project in Cass County, Michigan. The meeting was scheduled to allow prospective bidders to obtain information about the project, ask questions, and conduct site inspections. Attendees were provided with an opportunity to clarify project requirements and scope of work related to the well plugging services. The pre-bid meeting format indicates this is a competitive bidding process where potential contractors can gather technical details and assess site conditions before submitting proposals.

The document serves as notification of the bidders' conference and does not contain specific pricing terms, contract duration, award dates, or detailed financial information. No set-asides are indicated in the meeting notice. The pre-bid meeting represents a standard preliminary phase in the procurement process, allowing interested parties to develop informed bids based on direct project information and site assessment prior to proposal submission.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

COLUMBUS OIL ORPHAN WELL PLUGGING PROJECT – (CASS COUNTY)

PRE-BID MEETING CONTRACTOR SIGN IN SHEET

November 04, 2026 (Started at Noon)

NAME
COMPANY
PHONE
Jordan Birgy
EXCEL(Taplin Sub.)
231-384-2460
Mike Fritz
Plants & Goodwin
989-630-7885
Steve Minella
Taplin
269-903-5725
Chuck Pardue
Mid-State Oil Tools
989-329-8721
Mike Machuta
Mid-State Oil Tools
989-330-3106
Shannon Hein
Mid-State Oil Tools
989-630-7078
Danny Manusko
TEAM Services
231-340-6366
Clay Cochran
M&A Resources
601-323-3766
Dennis Wiles
NuPointe Energy
260-330-0289
Kevin Smith
McConnell & Scully
517-795-6539
Tim Howard
Antrim Cementers
989-370-3193
Ron Swan
TSP
248-467-4920

QUESTIONS GENERATED DURING PRE-BID MEETING

1. Can Class A or Type 1L cement be used instead of 50/50 Poz on the bottom hole plug.

Answer: Type 1L or Class A cement can be permitted for use on a bottom hole plug on a case-by-case basis. These wells have very low to non-detect levels of hydrogen sulfide.

2. Are earthen pits permitted during well plugging? Answer: Earthen pits are not permitted during well plugging activities. All fluids including well plugging fluids will be containerized in tanks (half round tanks, etc.).

3. Do all flowline stub-ups have to be removed at the well locations? Answer: The flowline network in this field is complex and is tied into common flowlines related to another active operator. As such, flow-line stub-ups will be blind flanged back at the closest master gate valve to where the line stubs up from the ground, and will also allow adequate room for installing the cellar at each well location. The blind flange must be securely bolted and be adequate to handle operating pressure from the field.

GRMD Staff Present: Keith Kidder (ran meeting), Jim Armbruster, and Tola Jolayemi.

Keith – opened meeting at 12:00 pm Noon, and covered:

1. Stated that this pre-bid was for the Columbus Oil Well Plugging Project that includes the plugging of 22 orphan wells and removal of associated electrical infrastructure at each well location using Turn-key Pricing.

2. Went over important dates when questions were to be submitted to the State, when answers to questions would be posted, and when bids were due to the State for this project. I encouraged all contractors to thoroughly review the RFP for important details related to this project. I instructed them to review the well plugging instructions as well as the Schedule B Pricing Matrix.

3. I instructed to the contractor group that this project would be “Turn-key Pricing” and to review the scope of work, collect all necessary information in the field, to provide a competitive bid on a per well price and also a total price for plugging 22 total wells. I also instructed them to fill out completely the Schedule B Pricing Matrix so that unit pricing is known in the event a change or amendment is needed in the future.

4. I informed the contractor group that this project will utilize Davis-Bacon Prevailing Wage (DBPW) requirements and that all contractors are to follow all requirements and regulations related to DBPW.

5. I strongly encouraged contractors to make sure that pay certifications are completed weekly, accurately, and correctly. I also noted that invoicing cannot be processed until Pay Certification is verified.

6. I instructed contractors to provide a project timeline and that it should be very detailed and clearly describe proposed work activities, rig availability, and personnel availability. It is a factor in determining ‘best value’ when selecting a winning vendor.

Vendors were able to observe site conditions, well locations, evaluate access to the landing area and. Vendors were off location by 1:45pm, Keith K. and GRMD staff left the Pre-Bid Meeting at 2:00 pm.

Note: only those vendors who hold a pre-qualified contract with EGLE will be eligible to submit pricing for this project.

Prequalified Vendors:

Excel Site RentalsContract# 210000000635
Antrim CementersContract# 210000000636
McConnell & ScullyContract# 210000000640
Mid-State Oil ToolsContract# 210000000641
Taplin GroupContract# 210000000642
Plants and GoodwinContract# 270000000090
Lease ManagementContract# 270000000091
NePointe EnergyContract# 270000000092
Team ServicesContract# 270000000093
M&A Energy ServicesContract# 270000000094