Drawings_Roof Replace_ZME CCF_10-19-2020.pdf
PDF 2 MB Posted
- Solicitation number
- 697DCK-24-R-00237
About this file
This solicitation package includes specifications, drawings, and wage determinations for a roof replacement project at the Memphis Child Care Facility in Memphis, Tennessee. The Federal Aviation Administration is seeking offers for a small business set-aside contract to replace the roof at the facility. Offerors must be registered in the System for Award Management and attend a mandatory site visit scheduled for February 28, 2024. Questions are due by February 29 and an amendment with answers will be issued on March 4. Offers are due in accordance with instructions in Sections L and M of the solicitation. The NAICS code is 238160 for roofing contractors and the size standard is $19 million. The wage determination from the Department of Labor is included.
View the file
Other files
Show all 11
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
For the best experience, open this PDF portfolio in
Acrobat X or Adobe Reader X, or later.
Get Adobe Reader Now!
http://www.adobe.com/go/reader
ENGINEERING SERVICES
ENROUTE/FSS
CHILD
ROOF PLAN
CHILD CARE FACILITY ROOF REPLACEMENT
TNMEMPHIS CENTERMEMPHIS
TJS
LC
PROJECT ENGINEER MGR: ENGINEERING - CENTER A
10/19/2020 18066754
ZME-18066754-A001
z m e -1
-a
.d g n
THIS DRAWING PRODUCED ON ASO REGION MICROSTATION SYSTEM
ATO - TECHNICAL OPERATIONS EASTERN SERVICE AREA
C O
N S
T R
U
IO
13'-0" 28'-4" 11'-4"
/2
:0
A
M P lo tt e d b y
V
-C
E
G -E
D
B
F
H
8 7 6 5 4 3 2 1
12345678
REVDRAWING NO
DATE JCN
APPROVED BY
ISSUED BY
CHECKED
DRAWN
DESIGNED
SUBMITTED BY
REVIEWED BY
FEDERAL AVIATION ADMINISTRATION
DEPARTMENT OF TRANSPORTATION
REV
DATE
APPROVED
DESCRIPTION JCN
REDLINE
APVD
A B C D E
IS
ACCORDANCE WITH PROJECT SUBMITTAL PROCEDURES.
USE. SDS AND PRODUCT DATA MUST BE REVIEWED AND APPROVED BY COR PRIOR TO USE IN
CONTRACTOR MUST COORDINATE USAGE OF ANY CHEMICALS OR SEALANTS WITH COR PRIOR TO6.
OF UNEXPECTED WEATHER. ROOF AREAS IN THE EVENT
DAY. ENSURE SUFFICIENT TEMPORARY COVERAGE MATERIALS IS AVAILABLE TO COVER OPEN
TRANSITION FROM NEW ROOF TO EXISTING ROOF MUST BE SEALED AT THE END OF EACH WORK
CONTRACTOR MUST NOT DEMOLISH MORE ROOF THAN CAN BE REPLACED IN A SINGLE SHIFT.5.
PROTECTIVE BOARD LAY PATTERNS, RIDGELINE, AND INDUCTION WELD PATTERNS.
LENGTH AND FREQUENCY FOR CORNERS, EDGES, CRICKETS AND FIELD, INSULATION AND
PROCEDURES. INCLUDE ENGINEERS REPORT DETAILING MECHANICAL FASTENER PATTERN,
SYSTEM FOR REVIEW AND APPROVAL BY COR IN ACCORDANCE WITH PROJECT SUBMITTAL
PRIOR TO COMMENCING WORK THE CONTRACTOR MUST PROVIDE SHOP DRAWINGS OF NEW ROOF4.
DUST DURING CONSTRUCTION. DEBRIS MUST BE REMOVED BY CONTRACTOR DAILY.
BY COR. AREAS AROUND DUMPSTERS MUST BE KEPT CLEAN AND FREE OF EXCESS DEBRIS AND
DEBRIS MUST BE PROVIDED BY THE CONTRACTOR. DUMPSTERS LOCATIONS TO BE DETERMINED
CONTRACTOR MUST NOT USE FAA DUMPSTERS. DUMPSTERS FOR DISPOSAL OF CONSTRUCTION3.
DUMPSTER PICKUP AT ALL TIMES. SECURE ACCESS GATES AT THE END OF WORK DAY.
DAYCARE DELIVERIES AND TRASHCONTRACTOR MUST MAINTAIN ACCESSIBILITY FOR EACH
CABLES (UNDERGROUND UTILITIES) MAY RUN THROUGH STAGING AREA AND ELSEWHERE.
CONTRACTOR MUST DO NO DIGGING WITHOUT PRIOR PERMISSION FROM THE COR. BURIED
CONSTRUCTION STAGING AREA. MATERIALS MUST BE NEATLY STORED AND PROTECTED.
STORAGE OF CONSTRUCTION MATERIALS AND TRAILERS ON SITE MUST BE LIMITED TO THE2.
ATTACHMENT AND A REPAIR COST ESTIMATE ON A SQUARE FOOT BASIS.
CONTRACTOR MUST PROVIDE SHOP DRAWINGS FOR THE CORRUGATED STEEL DECK AND
REINFORCEMENT IF REQUIRED, TO COMPLY WITH THE LATEST TENNESSEE BUILDING CODE (FBC).
THE PROFESSIONAL ENGINEER MUST MAKE RECOMMENDATIONS FOR REPAIR OR ADDITIONAL
TEK SCREWS FOR DECK ATTACHMENT. AFTER THE INSPECTION DECK, PUDDLE WELDS AND
REGISTERED STRUCTURAL ENGINEER TO INSPECT THE EXISTING CONDITION OF THE METAL
PRIOR TO REMOVING EXISTING ROOFING SYSTEM THE CONTRACTOR MUST HIRE A TENNESSEE1.
NORMAL HOURS OF OPERATION.
OPERATIONS. WORK OVER ENTRANCE MAY BE REQUIRED OUTSIDE OF FACILITY
COORDINATE WORK OVER ENTRANCE WITH COR TO MINIMIZE IMPACT TO FACILITY
NEW FINISHED SURFACE. SEE DETAIL 7/A003. (TYPICAL)
SECURE CONDENSATE DRAIN LINE SUPPORT BLOCKS TO PADS, SECURE PADS TO
REPLACE CONDENSATE DRAIN LINES FOR RTUS. (TYPICAL)
REMOVE, PROTECT, STORE AND REATTACH PARAPET CAP.
FINISHED SURFACE.
EXTEND ELECTRICAL PENETRATIONS TO MATCH PREVIOUS PROTRUSION ABOVE NEW
ABOVE NEW FINISHED SURFACE. (TYPICAL)
EXTEND DOWN-CONDUCTOR PENETRATIONS TO MATCH PREVIOUS PROTRUSION
(TYPICAL)
EXTEND VENTS TO MATCH PREVIOUS PROTRUSION ABOVE NEW FINISHED SURFACE.
PROVIDE NEW METAL COUNTER FLASHING ON CURBS. (TYPICAL)
PROVIDE TPO ROOF SYSTEM OVER INTERIOR SPACE AND FRONT ENTRANCE AWNING.
SHEET NOTES
GENERAL NOTES
SCALE: 1/8" = 1'-0"
8' 16'08'
L
RTU
KVHU
R.D. R.D. R.D.
EF-3
EF-2
EF-1
WATER HEATER VENT
RUBBER WALKBOARDS
SLOPE SLOPE SLOPE
SLOPE SLOPE SLOPESLOPE SLOPESLOPE
P. VO
OP.V
RIDGE LINE
OP.V
zme-18066754-a001
2021-04-21T06:21:34-0400
ANTONIO M COUTO
2021-04-20T14:42:48-0500
LOURI A CALL
LIGHTNING PROTECTION PLAN
FALL PROTECTION, ROOF PAD AND
ZME-18066754-A002
:1 lo tt e
A B C D E
LIGHTNING PROTECTION CONTRACTOR.
PARAPET WALL. TIE INTO NEW SYSTEM. ALL WORK TO BE PERFORMED BY QUALIFIED
NEW AIR TERMINALS ON FALL PROTECTION SYSTEM SUPERCEDE AIR TERMINALS ON
BE PERFORMED BY QUALIFIED LIGHTNING PROTECTION CONTRACTOR.
LIGHTNING GROUNDING AND BONDING SYSTEM. TIE INTO NEW SYSTEM. ALL WORK TO
REMOVE, PROTECT, STORE AND REINSTALL EXISTING EQUIPMENT AND ROOF
TYPES OF CONNECTIONS.
TERMINAL LOCATIONS. THE SHOP DRAWING SHALL ALSO HAVE DETAILS SHOWING THE DIFFERENT
SHALL INCLUDE "D" SIZE PLAN DRAWING OF ROOF TOP SHOWING PATHS OF CONDUCTORS, AND
3. PROVIDE SUBMITTAL OF LIGHTNING PROTECTION DESIGN TO FAA COR FOR APPROVAL. DESIGN
FAA COR IF DIMENSIONAL ERRORS OR DESIGN CONFLICTS OCCUR.
WORK THAT IS IMPROPERLY INSTALLED OR LOCATED. THE INSTALLER/DESIGNER SHALL NOTIFY THE
COORDINATE THE WORK SHALL TAKE RESPONSIBILITY FOR THE WORK AND ANY PORTION OF THE
CONDITIONS BEFORE THE WORK IS STARTED. INSTALLERS WHO FAIL TO VERIFY, REVIEW AND
2. THE LIGHTNING PROTECTION INSTALLER/DESIGNER IS TO CHECK AND VERIFY ALL DIMENSIONS AND
MUST BE COMPLETED BY A QUALIFIED LIGHTNING PROTECTION CONTRACTOR.
SYSTEMS. TIE NEW LIGHTNING GROUND AND BONDING SYSTEM INTO EXISTING SYSTEM. ALL WORK
CODE 780 AND THE LIGHTNING PROTECTION INSTITUTE CODE 175 FOR LIGHTNING PROTECTION
THE REQUIREMENTS OF UNDERWRITERS LABORATORY CODE 96/96A, NATIONAL FIRE PROTECTION
1. PROVIDE LIGHTING GROUNDING AND BONDING DESIGN FOR THE FALL PROTECTION THAT WILL MEET
SHEET NOTES
NOTES
KVHU
EF-3
EF-2
EF-1
WATER HEATER VENT
RUBBER WALKBOARDS
SLOPE SLOPE SLOPESLOPE SLOPESLOPE
zme-18066754-a002
2021-04-21T06:22:50-0400
ANTONIO M COUTO
2021-04-20T14:44:08-0500
LOURI A CALL
DETAILS
ZME-18066754-A003
4"4"
:2 lo tt e
TPO MEMBRANE
CLASS 1A-195, R30 RATING.
NOTE: TPO ROOF SYSTEM - 80 MIL MECHANICALLY FASTENED.
ROOF CURB
PREFABRICATED
2 PER SIDE
LAG SCREWS
ROOF OPENING
CONTINUOUS HOOK STRIP
BEAM BEYOND
CLAMPING RING
WATER CUT-OFF MASTIC
NOTES:
4"x4" FIBER CANT
PREMOLDED BOOT
CAULKING
STAINLESS STEEL CLAMP
VENT STACK
WATER BLOCK
HEAT WELDED LAP
PLATES & SCREWS 4 PER STACK
SUBSTRATE BOARD
2. REMOVE AND REINSTALL COPING CAP AS NEEDED.
1. PROVIDE SHOP DRAWINGS OF FLASHING.
NOTES:
CANT
TO OUTSIDE OF PARAPET.
AND MECHANICALLY FASTENS
EXTENDS OVER PARAPET
TPO MEMBRANE FLASHING
PARAPET CAP
SHEET METAL
ABOVE HEAD OF CANT
EXTEND TPO MEMBRANE
TO INSIDE OF CURB.
AND MECHANICALLY FASTENS
EXTENDS OVER CURB
TPO MEMBRANE FLASHING
/2" DENS DECK PROTECTION BOARD1
POLY-ISO BOARD INSULATION R-30 MIN.
EXISTING DECK
SUBSTRATE BOARD
5/8" FIREGUARD TYPE X DENS DECK
PAVING STONE
STRAP ANCHOR
CONDENSATE DRAIN
STONE AND TPO ROOF
ROOF PAD ADHERED TO PAVING
SCUPPER
DRAIN SUMP.
6. FIELD SPLICES MUST BE LOCATED AT LEAST 6 INCHES OUTSIDE THE
12 INCHES.
5. INSULATION TAPER SHALL NOT BE STEEPER THAN 6 INCHES IN
1/4" MAXIMUM.
4. HOLE IN MEMBRANE MUST EXCEED SIZE OF DRAIN PIPE BY
FROM THE ATTACHMENT POINTS OF THE DRAIN CLAMPING RING.
3. CUT THE MEMBRANE SO IT EXTENDS A MINIMUM OF 1/2 INCH (13 MM)
COMPRESSION ON WATER CUT-OFF MASTIC.
2. ALL BOLTS OR CLAMPS MUST BE IN PLACE TO PROVIDE CONSTANT
1. REMOVE ALL LEAD AND OTHER FLASHING.
COVER BOARD
POLY-ISO BOARD INSULATION
ON EQUIPMENT
METAL COUNTER FLASHING
METAL PAPAPET CAP (COPING) AND BASE FLASHING
NOT TO SCALE (TYPICAL)A003
MECHANICAL CURB DETAIL
NOT TO SCALEA003
TYPICAL ROOF SYSTEM
CONDENSATE DRAIN SUPPORT BLOCK
ROOF DRAIN
A003
PREMOLDED PENETRATION FLASHING
NOT TO SCALE
zme-18066754-a003
2021-04-21T06:23:46-0400
ANTONIO M COUTO
2021-04-20T14:47:16-0500
LOURI A CALL
ELECTRICAL DETAILS
ZME-18066754-E501
-e
:2 lo tt e
INSTALLED BY OTHERS
RAILING, PROVIDED AND
GALVANIZED STEEL PIPE
MOUNTED HORIZONTALLY
RAILING AIR TERMINAL BASE
NO. APRB1.5/2AT58 PIPE
TERMINAL WITH SAFETY TIP
CLASS II, ALUMINUM AIR
NO. 5824-ASTAT, 5/8" X 24"
- 190 LBS. PER 1000')
STRANDS OF #13AWG WIRES
LIGHTNING CONDUCTOR (37
NO. A37R, CLASS II, ALUMINUM
NOT TO SCALEE501
AIR TERMINAL DETAIL "A"
PIPE RAILING
3 PIPE RAILING CONNECTION
INSTALLED BY OTHERS
RAILING, PROVIDED AND
GALVANIZED STEEL PIPE
LBS PER 1000')
OF *13AWG WIRES -190
CONDUCTOR (37 STRANDS
ALUMINUM LIGHTNING
NO A37R CLASS 11,
BASE CONNECTION
CONNECT ABOVE
ALUMINUM PIPE CLAMP
NO APC -1/1.25
- 190 LBS. PER 1000')
STRANDS OF #13AWG WIRES
LIGHTNING CONDUCTOR (37
NO. A37R, CLASS II, ALUMINUM
TERMINAL WITH SAFETY TIP
CLASS II, ALUMINUM AIR
NO. 5824-ASTAT, 5/8"x 24"
E501
AIR TERMINAL DETAIL
FLAT SURFACE
ACCORDANCE WITH FAA-STD-019E.
THE LIGHTNING PROTECTION SYSTEM SHALL BE CLASS II, IN
4. ALL AIR TERMINALS AND CONDUCTORS (MAIN AND BONDING) USED FOR
SUBMITTAL REQUIREMENTS.
CALLED OUT TO ESTABLISH A DESIGN. SEE SPECIFICATION FOR
3. FOR THIS DRAWING HARGER LIGHTNING PROTECTION HARDWARE IS
LIGHTNING PROTECTION MANUFACTURER PRIOR TO INSTALLATION.
2. CONTRACTOR TO PROVIDE APPROVED SHOP DRAWING SUBMITTAL FROM
LABORATORIES (UL) 96A AND CONFORM TO NFPA 780.
1. ALL NEW MATERIALS SHALL BE LABELED PER UNDERWRITER'S
1 2
FASTENER, EVERY 3' MAX.
ADHESIVE CABLE
NO. A262, ALUMINUM
MOUNTED HORIZONTALLY
UNIVERSAL BASE
NO. AUBU58I, ALUMINUM
ALUM CONDUCTOR
NO.A37: BARE
CABLE HOLDER @ 3'-0" O/C
NO.A730: ALUM ADHESIVE
24" MAX NEW METAL FLASHING
PARALLEL SPLICER
NO.A423: CAST ALUMINUM
ALUM CONDUCTOR
NO.A37: BARE
CABLE SUPPORT SPACE EQUALLY
NO.A188M: ALUM PIPE RAIL
42"
AIR TERMINAL MOUNTING DETAIL
FOR ROOF N1 INSTALLATION
PIPE RAIL CLAMP
NO.A240X:
E501
H2 L
HLP
50H2
NO. A216, ALUMINUM
NO. 216, BRONZE
BONDING LUG
CONNECTOR
NO. 211XL, BI-METAL
STRAP TYPE PIPE CLAMP
NO. A231-X, ALUMINUM
NO. 231-X, TINNED COPPER
PIPE CLAMP
NO. APC-X ALUMINUM
NO. CPC-X, TINNED BRONZE
BONDING PLATE
NO. BMBP, BIMETAL
CROSS RUN CONNECTOR
NO. 210BM, BI-METAL
NO. A210, ALUMINUM
NO. 210, BRONZE
NO. A217, ALUMINUM
NO. 217, TINNED BRONZE
1 BOLT PARALLEL CLAMP
NO. BM1BC, BI-METAL
NO. A1BC, ALUMINUM
NO. B1BC, BRONZE
HEAVY DUTY BONDING LUG
NO. A222, ALUMINUM
NO. 222, BRONZE
NO. A213, ALUMINUM
NO. 213, BRONZE
50H2
HLP
UL
TYPICAL BONDING LUGS, PLATES AND CABLE CONNECTORS
zme-18066754-e501
2021-04-21T06:24:41-0400
ANTONIO M COUTO
2021-04-20T14:48:29-0500
LOURI A CALL
COVER SHEET
ZME-18066754-G001
-g
:3 lo tt e
T OF TRANSPO
T A
IC
OF
STATES
IT
TM
EN
AVIA
I
LAR
TRAT
SI
NI
CHILD CARE FACILITY (CCF)
ZME/CHILD - MEMPHIS, TENNESSEE
zme-18066754-g001
2021-04-21T06:25:52-0400
ANTONIO M COUTO
2021-04-20T14:49:31-0500
LOURI A CALL
DRAWING INDEX, ABBREVIATIONS AND SYMBOLS LEGEND
ZME-18066754-G002
:4 lo tt e
INCHIN
INSIDE DIAMETERID
MINIMUMMIN
MANUFACTURERMFG
MAXIMUMMAX
GALVENIZEDGALV
GUAGEGA
NOT TO SCALENTS
NATIONAL PIPE THREADNPT
OUTSIDE DIAMETEROD
ON CENTEROC
KITCHEN HOOD VENTILATION UNITKVHU
K
REPRESENTATIVE
CONTRACTING OFFICERS COR
PLUMBING VENTPV
POUNDS PER SQUARE INCHPSI
ROOFTOP UNITRTU
ROOF DRAINRD
REQUIREDREQ'D
REFERENCEREF
STANDARDSTD
SPECIFICATIONSSPEC
POLYOLEFIN
THERMOPLASTIC-TPO
TYPICALTYP
NOTED
UNLESS OTHERWISE UON
SCALE: 1/4" = 1'-0"
4' 8'04'
LIMIT OF DEMOLITION
CONNECT TO EXISTING
GRAPHIC SCALE
NORTH ARROW
EXISTING WORK, UON
NEW WORK, UON
CONTRACTOR, UON
DEMOLITION BY
DETAIL REFERENCE
ZME-18066754-A003
ZME-18066754-A002
ZME-18066754-A001
ZME-18066754-G003
ZME-18066754-G002
ZME-18066754-G001
DRAWING LIST
ABBREVIATIONS SYMBOLS LEGEND
DETAIL DESIGNATION
DETAIL IS DRAWN
SHEET ON WHICH
SECTION DESIGNATION
M101
A012
SECTION IS CUT
SHEET ON WHICH
DRAWING NO. REV. DATE DESCRIPTION
10/19/2020
DETAILS
FALL PROTECTION, ROOF PAD AND LIGHTNING PROTECTION PLAN
SITE LAYOUT
DRAWING INDEX, ABBREVIATIONS, AND SYMBOLS LEGEND
COVER SHEET
FEETFT
zme-18066754-g002
2021-04-21T06:27:07-0400
ANTONIO M COUTO
2021-04-20T14:50:22-0500
LOURI A CALL
SITE LAYOUT
ZME-18066754-G003
AREA OF WORK
PARKING
STAGING AND
CONTRACTOR
ENTRANCE
:5 lo tt e
0 120'60' 60'
SCALE: 1" = 60'
G003
CONSTRUCTION STAGING PLAN
W
ID
, A
IC
, P
(WIDTH VARIES, AS WIDENED)
(PUBLIC, PAVED ROAD)
DEMOCRAT ROAD
AIRPORT AUTHORITY
MEMPHIS AND SHELBY COUNTY
W
K
Y
BLDG
NCO
BLDG
SERVICE
POWER
ARTCC
ZME
HOUSE
GUARD
TOWER
FACILITY
CARE
INDEPENDENT DRIVE
EACH WORK DAY.
ACCESSIBILITY FOR DAYCARE DELIVERIES AND TRASH DUMPSTER PICKUP AT ALL TIMES. SECURE ACCESS GATES AT THE END OF
BURIED CABLES (UNDERGROUND UTILITIES) MAY RUN THROUGH STAGING AREA AND ELSEWHERE. CONTRACTOR MUST MAINTAIN
SHALL BE NEATLY STORED AND PROTECTED. CONTRACTOR SHALL DO NO DIGGING WITHOUT PRIOR PERMISSION FROM THE COR.
MATERIALS
STORAGE OF CONSTRUCTION MATERIALS AND TRAILERS ON SITE SHALL BE LIMITED TO THE CONSTRUCTION STAGING AREA.9.
VERIFY DAILY THAT THE SEVERE WEATHER PLAN CAN BE IMPLEMENTED.
WEATHER FORECAST. THE CONTRACTOR MUST NOT REMOVE MORE OF THE ROOF THAN CAN BE REPLACED IN A SINGLE SHIFT.
CONTRACTOR AND COR MUST HAVE A DAILY DISCUSSION TO DETERMINE GO/NO GO STATUS FOR ROOF TEAR OFF BASED ON LOCAL 8.
STATES, AND LOCAL CODES AND ORDINANCES DURING THE CONSTRUCTION PHASE OF THIS PROJECT.
STANDARDS OF THE INDUSTRY. IT SHALL BE THE CONTRACTOR'S RESPONSIBILITY TO MEET ALL FAA ORDERS, FEDERAL, THE CONTRACTOR OF THIS PROJECT SHALL BE QUALIFIED AND FULLY KNOWLEDGEABLE OF THE APPLICABLE CODES AND7.
SPECIFICATIONS.
ALL CONSTRUCTION SHALL BE DONE IN A NEAT AND WORKMANLIKE MANNER IN ACCORDANCE WITH THE PLANS AND6.
COORDINATION DRAWINGS.
DICTATE THE FIELD WORK. THE COR SHALL STOP WORK ACTIVITIES IF FIELD WORK DEVIATES FROM THE APPROVED
ENSURE THE COORDINATION DRAWINGS ARE APPROVED BY THE COR PRIOR TO INSTALLATION AND SHALL USE THESE TO
DEVIATION FROM THE DESIGN TO FIT THE NEW INSTALLATION TO THE ACTUAL FIELD CONDITIONS. THE CONTRACTOR SHALL
AND COMPONENTS WITHIN THE SPACE AND THE BUILDING ELEMENTS. INDICATE IN THE COORDINATION DRAWINGS ANY
COORDINATION DRAWINGS SHALL INDICATE DIMENSIONS, DISTANCES, AND ELEVATIONS THAT RELATE TO THE NEW EQUIPMENT
IF REQUESTED BY COR, THE CONTRACTOR SHALL SUBMIT COORDINATION DRAWINGS FOR THE APPROVAL OF THE COR.5.
COR AND AT NO ADDITIONAL COST TO THE FAA.
EQUIPMENT LOCATIONS AND ROUTING OF UTILITIES TO FIT THE CONDITIONS ENCOUNTERED ON SITE ONCE APPROVED BY THE
THE CONTRACTOR SHALL BE RESPONSIBLE TO FIELD VERIFY THE EXACT CONDITIONS ON SITE TO ADJUST, OR MODIFY4.
ELECTRICAL/WATER OUTAGES SHALL BE COORDINATED WITH THE COR AT LEAST 10 DAYS IN ADVANCE.
CLOSE (ENERGIZE) ANY VALVE OR CIRCUIT BREAKER AT ANY TIME. WORK REQUIRING PERMANENT, TEMPORARY, OR PARTIAL
ONLY FAA PERSONNEL MAY OPERATE CIRCUIT BREAKERS AND VALVES. THE CONTRACTOR SHALL NOT OPEN (DE-ENERGIZE) OR3.
UNAUTHORIZED OUTAGES OF UTILITY SERVICES MAY CAUSE ACCIDENTS AND/OR LOSS OF LIFE.
FIRE, OR PLUMBING). THIS FACILITY IS AN OPERATIONAL AIR ROUTE TRAFFIC CONTROL CENTER (ARTCC) AND
EXTREME CAUTION MUST BE PRACTICED WHEN WORKING ON ANY OF THE BUILDING UTILITIES (ELECTRICAL, MECHANICAL,2.
PROJECT REQUIREMENTS TO PRODUCE AN ACCEPTABLE PRODUCT FOR THE GOVERNMENT.
CONDITIONS, EQUIPMENT AND MATERIAL SUPPLIERS AND WITH ALLCONFIRM ALL INFORMATION PROVIDED HERE WITH SITE
ENCOUNTERED DURING THE CONSTRUCTION PROCESS. IT IS THE RESPONSIBILITY OF THE CONTRACTOR TO VERIFY AND
THESE CONTRACT DRAWINGS ARE SCHEMATIC IN NATURE AND ARE NOT INTENDED TO SHOW ALL POSSIBLE CONDITIONS TO BE1.
zme-18066754-g003
2021-04-21T06:28:12-0400
ANTONIO M COUTO
2021-04-20T14:51:14-0500
LOURI A CALL
File details come from the government source that posted it. Updated .