Drawings - Project 561-26-104.pdf
PDF 911 KB Posted
- Solicitation number
- 36C24226R0128
About this file
These are architectural design drawings for a repair project at the U.S. Department of Veterans Affairs facility in East Orange, New Jersey. The document set comprises four detailed floor plans dated August 12, 2026 and July 1, 2026, prepared by the Office of Construction and Facilities Management for Building 1.
The project (561-26-104) addresses floor and bathroom leak repairs across multiple floors. Drawing A101 presents the Third Floor as-built bathroom layout, while A102 shows the proposed Third Floor bathroom configuration with comprehensive construction notes detailing contractor requirements. Key specifications include verifying existing conditions before work, full PCRA/ICRA/ILSM compliance for bathroom and adjacent areas, demolition of existing toilets and flooring materials, installation of new trench drains with proper pitch toward drainage, toilet venting in compliance with New Jersey plumbing codes, floor and wall penetration sealing with approved firestop systems, and new wall-hung toilet installation with proper supports and connections. Drawing A103 provides the Second Floor 2-220A Infection Control Risk Assessment (ICRA) plan with ICRA barrier and HEPA filtration specifications, and Drawing A104 presents the Second Floor flooring layout designating work areas, ICRA barriers, relocated equipment, and HEPA filtration exhaust locations. The project is classified as Design Development phase with full sprinkler system coverage required throughout all work areas.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 36C24226R0128 0001.docx | DOCX document | |
| Wage Determinations.pdf | ||
| FAR 52.225-2 BUY AMERICAN CERTIFICATE.docx | DOCX document | |
| Specifications - Project 561-26-104.pdf | ||
| 36C24226R0128_1.docx | DOCX document | |
| VAAR 852.219-75 LIMITATIONS ON SUBCONTRACTING CERTIFICATE.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
A101
THIRD FLOOR - AS-BUILT
BUILDING 1 BATHROOM LAYOUT
A
DESIGN DEVELOPMENT
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
. STAMP.
321 4 5 6 7 8 9 10
REPAIR OR FLOOR AND
BATHROOM LEAKS
EAST ORANGE, NJ
561-26-104
BLDG 1
Project Director
08/12/2026 X CFRevisions: Date:
New Updated
Piping Wall
New Wall
Mounted
Toilets
New Piping
New Trench
Drain
Icra Barrier
65 7
HEPA
FILTRATION
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
A102
THIRD FLOOR - PROPOSED
BUILDING 1 BATHROOM LAYOUT
A
DESIGN DEVELOPMENT
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
. STAMP.
321 4 5 6 7 8 9 10
REPAIR OR FLOOR AND
BATHROOM LEAKS
EAST ORANGE, NJ
561-26-104
BLDG 1
Icra Barrier
HEPA Exhaust
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
A103
SECOND FLOOR - 2-220A PROPOSED
ICRA PLAN
A
DESIGN DEVELOPMENT
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
. STAMP.
321 4 5 6 7 8 9 10
REPAIR OR FLOOR AND
BATHROOM LEAKS
EAST ORANGE, NJ
561-26-104
BLDG 1
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
A104
SECOND FLOOR
BUILDING 1 OR FLOORING LAYOUT
A
DESIGN DEVELOPMENT
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
. STAMP.
321 4 5 6 7 8 9 10
REPAIR OR FLOOR AND
BATHROOM LEAKS
EAST ORANGE, NJ
561-26-104
BLDG 1
07/01/2026 X CFRevisions: Date:
| 1-3flr Bathroom Layout-As-Built |
| 1-3flr Bathroom Layout-Proposed |
| 1-2flr Room 2-220A |
| 1-2flr OR 5 & 6 Flooring Work |
File details come from the government source that posted it. Updated .