561-26-104_A104_Addendum1.pdf

PDF 439 KB Posted

Attached to
Z2DA--561-26-104 Repair Operating Room (OR) & Bathroom Leaks
Solicitation number
36C24226R0128
Issued by

About this file

This document is an architectural drawing for a federal construction project. It depicts the Second Floor Flooring Layout for Building 1 at the U.S. Department of Veterans Affairs (VA) facility in East Orange, New Jersey. The project, identified as VA Form 08-6231, Project Number 561-26-104, addresses repair of floor and bathroom leaks and is classified as Design Development phase work for a fully sprinklered facility. The drawing was issued on November 6, 2026, and revised on November 9, 2026, with Addendum No. 1 adding Note 18 and callouts to the plan.

The flooring layout plan identifies designated work areas (shown with diagonal hatching), an ICM barrier (green), and relocated covered equipment with HEPA filtration exhaust. The drawing includes 18 detailed notes specifying contractor requirements for construction verification, existing conditions documentation, opening room operations, dust control measures, surface protection, moisture control, manufacturer installation compliance, floor preparation, existing repair coordination, noise mitigation, operation scheduling coordination, documentation and reporting, unforeseen conditions protocols, design storm drainage requirements, and final documentation. The Office of Construction and Facilities Management of the U.S. Department of Veterans Affairs is the contracting office for this project.

View the file

Other files

File Type Posted
36C24226R0128 0004.pdf PDF
Request for Information 561 26 104.docx DOCX document
36C24226R0128 0003.docx DOCX document
561-26-104_Tile_Room_Finish_Legend.pdf PDF
561-26-104_3rd_Floor_Bathroom_MEP_Reference_Packet.pdf PDF
561-26-104_A102_Addendum1.pdf PDF
36C24226R0128 0002.docx DOCX document
36C24226R0128 0001.docx DOCX document
Wage Determinations.pdf PDF
FAR 52.225-2 BUY AMERICAN CERTIFICATE.docx DOCX document
Drawings - Project 561-26-104.pdf PDF
Specifications - Project 561-26-104.pdf PDF
36C24226R0128_1.docx DOCX document
VAAR 852.219-75 LIMITATIONS ON SUBCONTRACTING CERTIFICATE.docx DOCX document
Show all 14

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PROVIDE SMOOTH

TRANSITION AT

ROOM INTERIOR

PROVIDE SMOOTH

TRANSITION AT

ROOM INTERIOR

PROVIDE

SMOOTH

TRANSITION

AT

ROOM

INTERIOR

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A104

SECOND FLOOR

BUILDING 1 OR FLOORING LAYOUT

A

DESIGN DEVELOPMENT

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase. STAMP.

321 4 5 6 7 8 9 10

REPAIR OR FLOOR AND

BATHROOM LEAKS

EAST ORANGE, NJ

561-26-104

BLDG 1

Project Director

11/06/2026 X CFRevisions: Date:

11/09/2026

1 ADDENDUM NO. 1 - NOTE 18 AND CALLOUTS ADDED 11/09/2026

AutoCAD SHX Text 2-304

AutoCAD SHX Text

ELECTRIC

AutoCAD SHX Text

35 SF

AutoCAD SHX Text 2-2-E107

AutoCAD SHX Text

ELCTRIC

AutoCAD SHX Text 2-274A

AutoCAD SHX Text

PEDESTRIAN BRIDGE

AutoCAD SHX Text

240 SF

AutoCAD SHX Text 2-S3

AutoCAD SHX Text

STAIR 3

AutoCAD SHX Text

135 SF

AutoCAD SHX Text

2-ELEV11

AutoCAD SHX Text

ELEVATOR

AutoCAD SHX Text

70 SF

AutoCAD SHX Text

2-SHAFT7

AutoCAD SHX Text

SHAFTWAY

AutoCAD SHX Text

50 SF

AutoCAD SHX Text 2-306

AutoCAD SHX Text

CORRIDOR

AutoCAD SHX Text

955 SF

AutoCAD SHX Text

OPERATING

AutoCAD SHX Text

ROOM #6

AutoCAD SHX Text

645 SF

AutoCAD SHX Text

2-ELEV1

AutoCAD SHX Text

ELEVATOR

AutoCAD SHX Text

70 SF

AutoCAD SHX Text

2-ELEV6

AutoCAD SHX Text

ELEVATOR

AutoCAD SHX Text

85 SF

AutoCAD SHX Text

2-ELEV5

AutoCAD SHX Text

ELEVATOR

AutoCAD SHX Text

85 SF

AutoCAD SHX Text

ELECTRIC

AutoCAD SHX Text

25 SF

AutoCAD SHX Text

ELECTRIC

AutoCAD SHX Text

25 SF

AutoCAD SHX Text

ELEVATOR

AutoCAD SHX Text

LOBBY

AutoCAD SHX Text

170 SF

AutoCAD SHX Text 2-290C

AutoCAD SHX Text

CORRIDOR

AutoCAD SHX Text

325 SF

AutoCAD SHX Text

HEAD

AutoCAD SHX Text

NURSE

AutoCAD SHX Text

255 SF

AutoCAD SHX Text 2-290

AutoCAD SHX Text

STAFF LOUNGE

AutoCAD SHX Text

300 SF

AutoCAD SHX Text

2-SHAFT1

AutoCAD SHX Text

SHAFTWAY

AutoCAD SHX Text

125 SF

AutoCAD SHX Text 2-282

AutoCAD SHX Text 2-E-110

AutoCAD SHX Text 2-E-110A

AutoCAD SHX Text 2-289

AutoCAD SHX Text

ORTHOPEDIC

AutoCAD SHX Text 2-322

AutoCAD SHX Text

OPERATING

AutoCAD SHX Text

ROOM #5

AutoCAD SHX Text

650 SF

AutoCAD SHX Text

VASCULAR

AutoCAD SHX Text 2-318

AutoCAD SHX Text

STORAGE

AutoCAD SHX Text

225 SF

AutoCAD SHX Text

EQUIPMENT

AutoCAD SHX Text 2-319

AutoCAD SHX Text

STERILE

AutoCAD SHX Text

140 SF

AutoCAD SHX Text

SUB

AutoCAD SHX Text 2-320

AutoCAD SHX Text

70 SF

AutoCAD SHX Text

DECON

AutoCAD SHX Text 2-321

AutoCAD SHX Text

SPLINT

AutoCAD SHX Text

STORAGE

AutoCAD SHX Text

110 SF

AutoCAD SHX Text

PLASTER/

AutoCAD SHX Text 2-323

AutoCAD SHX Text

615 SF

AutoCAD SHX Text

CORRIDOR

AutoCAD SHX Text 2-317

AutoCAD SHX Text

HOLDING

AutoCAD SHX Text

100 SF

AutoCAD SHX Text

SOILED

AutoCAD SHX Text 2-316

AutoCAD SHX Text

WORK RM

AutoCAD SHX Text

125 SF

AutoCAD SHX Text

CLEAN

AutoCAD SHX Text 2-315

AutoCAD SHX Text

OPERATING

AutoCAD SHX Text

ROOM #4

AutoCAD SHX Text

420 SF

AutoCAD SHX Text

CYSTOSCOPY

AutoCAD SHX Text 2-314

AutoCAD SHX Text

OPERATING

AutoCAD SHX Text

ROOM #3

AutoCAD SHX Text

465 SF

AutoCAD SHX Text

OPTHAMOLOGY

AutoCAD SHX Text 2-307

AutoCAD SHX Text 2-308

AutoCAD SHX Text

SUBSTERILE

AutoCAD SHX Text

220 SF

AutoCAD SHX Text 2-309

AutoCAD SHX Text

DECON

AutoCAD SHX Text

95 SF

AutoCAD SHX Text 2-312

AutoCAD SHX Text

SUBSTERILE

AutoCAD SHX Text

100 SF

AutoCAD SHX Text 2-313

AutoCAD SHX Text

DECON

AutoCAD SHX Text

95 SF

AutoCAD SHX Text

25 SF

AutoCAD SHX Text

CYSTO

AutoCAD SHX Text

STORAGE

AutoCAD SHX Text

60 SF

AutoCAD SHX Text 2-305

AutoCAD SHX Text

ANESTHESIA

AutoCAD SHX Text

STORAGE

AutoCAD SHX Text

230 SF

AutoCAD SHX Text 2-303

AutoCAD SHX Text 2-328

AutoCAD SHX Text

CORRIDOR

AutoCAD SHX Text

420 SF

AutoCAD SHX Text

2-ELEV2

AutoCAD SHX Text

ELEVATOR

AutoCAD SHX Text

70 SF

AutoCAD SHX Text

2-SHAFT

AutoCAD SHX Text

SHAFTWAY

AutoCAD SHX Text

25 SF

AutoCAD SHX Text

STORAGE

AutoCAD SHX Text

ROOM

AutoCAD SHX Text

265 SF

AutoCAD SHX Text 2-324

AutoCAD SHX Text

OPERATING

AutoCAD SHX Text

ROOM #2

AutoCAD SHX Text

470 SF

AutoCAD SHX Text

CYSTOSCOPY

AutoCAD SHX Text 2-311

AutoCAD SHX Text

OPERATING

AutoCAD SHX Text

ROOM #1

AutoCAD SHX Text

475 SF

AutoCAD SHX Text

OPTHAMOLOGY

AutoCAD SHX Text 2-310

AutoCAD SHX Text 2-290A

AutoCAD SHX Text

CLOSET

AutoCAD SHX Text

10 SF

AutoCAD SHX Text 2-290B

AutoCAD SHX Text

TOILET

AutoCAD SHX Text

30 SF

AutoCAD SHX Text

ANESTHESIA

AutoCAD SHX Text

WORKROOM

AutoCAD SHX Text

130 SF

AutoCAD SHX Text 2-302

AutoCAD SHX Text

ANESTHESIA

AutoCAD SHX Text

OFFICE

AutoCAD SHX Text

200 SF

AutoCAD SHX Text 2-325

AutoCAD SHX Text

HAC

AutoCAD SHX Text

35 SF

AutoCAD SHX Text

UTILITY

AutoCAD SHX Text

ROOM

AutoCAD SHX Text

110 SF

AutoCAD SHX Text 2-301

AutoCAD SHX Text 2-328A

AutoCAD SHX Text

CORRIDOR

AutoCAD SHX Text

185 SF

AutoCAD SHX Text 2-332

AutoCAD SHX Text

CORRIDOR

AutoCAD SHX Text

140 SF

AutoCAD SHX Text

CASE CART STAGING

AutoCAD SHX Text

AND DISPATCH

AutoCAD SHX Text

285 SF

AutoCAD SHX Text 2-220

AutoCAD SHX Text 2-300

AutoCAD SHX Text

RECOVERY

AutoCAD SHX Text

765 SF

AutoCAD SHX Text

2-SHAFT3

AutoCAD SHX Text

SHAFT

AutoCAD SHX Text

65 SF

AutoCAD SHX Text

HAC

AutoCAD SHX Text

CLOSET

AutoCAD SHX Text

40 SF

AutoCAD SHX Text 2-222

AutoCAD SHX Text

WOMEN'S

AutoCAD SHX Text

LOCKER

AutoCAD SHX Text

85 SF

AutoCAD SHX Text 2-213

AutoCAD SHX Text

WOMEN'S

AutoCAD SHX Text

TOILET

AutoCAD SHX Text

100 SF

AutoCAD SHX Text 2-214

AutoCAD SHX Text

STAFF

AutoCAD SHX Text

TOILET

AutoCAD SHX Text

30 SF

AutoCAD SHX Text 2-221

AutoCAD SHX Text

MEN'S

AutoCAD SHX Text

TOILET

AutoCAD SHX Text

90 SF

AutoCAD SHX Text 2-216

AutoCAD SHX Text

MEN'S

AutoCAD SHX Text

LOCKER

AutoCAD SHX Text

60 SF

AutoCAD SHX Text 2-217

AutoCAD SHX Text

CONFERENCE

AutoCAD SHX Text

ROOM

AutoCAD SHX Text

280 SF

AutoCAD SHX Text 2-218

AutoCAD SHX Text 2-219

AutoCAD SHX Text

OFFICE

AutoCAD SHX Text

155 SF

AutoCAD SHX Text 2-215

AutoCAD SHX Text

CORRIDOR

AutoCAD SHX Text

45 SF

AutoCAD SHX Text 2-326

AutoCAD SHX Text

CLOSET

AutoCAD SHX Text

20 SF

AutoCAD SHX Text 2-327

AutoCAD SHX Text

CONTROL

AutoCAD SHX Text

STATION

AutoCAD SHX Text

115 SF

AutoCAD SHX Text 2-329

AutoCAD SHX Text

AREA OF WORK

AutoCAD SHX Text

AREA OF ALL RELOCATED AND COVERED EQUIPMENT

AutoCAD SHX Text

ICRA BARRIERS /ANTEROOM

AutoCAD SHX Text

ICRA BARRIER

AutoCAD SHX Text

RELOCATED/COVERED EQUIPMENT

AutoCAD SHX Text

HEPA FILTRATION EXHAUST

AutoCAD SHX Text

PATH WALLS AND FLOOR TO BE COVERED

AutoCAD SHX Text

NOTES

AutoCAD SHX Text

1. CONTRACTOR SHALL VERIFY ALL EXISTING FIELD CONDITIONS AND DIMENSIONS PRIOR TO CONTRACTOR SHALL VERIFY ALL EXISTING FIELD CONDITIONS AND DIMENSIONS PRIOR TO STARTING WORK. REPORT ALL DISCREPANCIES TO THE COR FOR RESOLUTION BEFORE PROCEEDING. 2. ALL OPERATING ROOMS AND ADJACENT ROOMS DEMOLITION WORK SHALL BE PERFORMED ALL OPERATING ROOMS AND ADJACENT ROOMS DEMOLITION WORK SHALL BE PERFORMED AFTER HOURS ONLY, BETWEEN 6:00 PM AND 6:00 AM UNLESS OTHERWISE APPROVED BY THE COR. 3. CONTRACTOR SHALL FULLY COMPLY WITH ALL VA PCRA, ICRA, AND ILSM REQUIREMENTS. CONTRACTOR SHALL FULLY COMPLY WITH ALL VA PCRA, ICRA, AND ILSM REQUIREMENTS. COVER SUITS ARE REQUIRED WHEN ENTERING THE ICRA BARRIER AND WORK AREA. 4. DEMOLISH EXISTING OPERATING ROOMS AND ADJACENT ROOMS FLOORING AND COVE BASE DEMOLISH EXISTING OPERATING ROOMS AND ADJACENT ROOMS FLOORING AND COVE BASE COMPLETELY DOWN TO A CLEAN SUBSTRATE. REMOVE ALL ADHESIVES, COATINGS, AND SURFACE IRREGULARITIES NECESSARY FOR NEW FLOORING. 5. PROTECT ALL EXISTING WALLS, CEILINGS, DUCTWORK, FIXTURES, AND EQUIPMENT TO PROTECT ALL EXISTING WALLS, CEILINGS, DUCTWORK, FIXTURES, AND EQUIPMENT TO REMAIN FROM DAMAGE AND DUST THROUGHOUT DEMOLITION AND INSTALLATION. 6. INSTALL ALL NEW OPERATING ROOMS AND ADJACENT ROOMS FLOORING AS RES-4 INSTALL ALL NEW OPERATING ROOMS AND ADJACENT ROOMS FLOORING AS RES-4 RESINOUS FLOORING, IN FULL COMPLIANCE WITH VA MASTER SPEC 09 67 23.40 AND ALL MANUFACTURER REQUIREMENTS. 7. CONTRACTOR SHALL PROVIDE MANUFACTURER CERTIFIED INSTALLERS FOR RESINOUS CONTRACTOR SHALL PROVIDE MANUFACTURER CERTIFIED INSTALLERS FOR RESINOUS CERTIFIED INSTALLERS FOR RESINOUS FLOORING. SUBMIT CERTIFICATION DOCUMENTATION PRIOR TO INSTALLATION. 8. PERFORM MOISTURE TESTING OF ALL FLOOR AREAS AND PROVIDE DOCUMENTED RESULTS. PERFORM MOISTURE TESTING OF ALL FLOOR AREAS AND PROVIDE DOCUMENTED RESULTS. APPLY ALL REQUIRED MOISTURE CONTROL MATERIALS PER MANUFACTURER REQUIREMENTS. 9. INSTALL NEW RESINOUS FLOORING AND INTEGRATED 4 INCH COVE BASE WITH A INSTALL NEW RESINOUS FLOORING AND INTEGRATED 4 INCH COVE BASE WITH A CONTINUOUS, UNIFORM, SMOOTH, AND HOSPITAL GRADE FINISH. GRADE FINISH. 10. PROVIDE ALL PATCHING, REPAIR, AND PAINTING NECESSARY TO RESTORE ANY SURFACES PROVIDE ALL PATCHING, REPAIR, AND PAINTING NECESSARY TO RESTORE ANY SURFACES DAMAGED BY DEMOLITION OR INSTALLATION TO MATCH EXISTING CONDITIONS. 11. ALLOW VA PERSONNEL TO PERFORM ALL REQUIRED UTILITY SHUTDOWNS, INCLUDING HVAC ALLOW VA PERSONNEL TO PERFORM ALL REQUIRED UTILITY SHUTDOWNS, INCLUDING HVAC ISOLATION IN OPERATING ROOMS AND ADJACENT ROOMS AREAS. 12. REMOVE ALL DEMOLITION DEBRIS AT THE END OF EACH SHIFT AND MAINTAIN A CLEAN, REMOVE ALL DEMOLITION DEBRIS AT THE END OF EACH SHIFT AND MAINTAIN A CLEAN, SAFE, ORDERLY WORK AREA AT ALL TIMES. 13. COORDINATE ALL WORK WITH THE COR TO MINIMIZE DISRUPTION TO CLINICAL OPERATIONS. COORDINATE ALL WORK WITH THE COR TO MINIMIZE DISRUPTION TO CLINICAL OPERATIONS. 14. ALL WORK SHALL MEET OR EXCEED VA DESIGN GUIDES, VA MASTER SPECIFICATIONS, ABA ALL WORK SHALL MEET OR EXCEED VA DESIGN GUIDES, VA MASTER SPECIFICATIONS, ABA GUIDELINES, OSHA REQUIREMENTS, NJ STATE CODES, LOCAL REGULATIONS, AND ALL CONTRACT DOCUMENTS. ANY CONDITION AFFECTING COMPLIANCE SHALL BE REPORTED IMMEDIATELY TO THE COR. 15. ANY UNFORESEEN CONDITIONS, DAMAGE, INTERFERENCES, OR SYSTEM CONFLICTS ANY UNFORESEEN CONDITIONS, DAMAGE, INTERFERENCES, OR SYSTEM CONFLICTS DISCOVERED DURING WORK SHALL BE REPORTED TO THE COR PRIOR TO PROCEEDING. CONTRACTOR SHALL NOT PERFORM NON-APPROVED MODIFICATIONS THAT COULD RESULT IN LIABILITY OR DESIGN DEVIATION. 16. ALL SQUARE FOOTAGE (SQ FT) VALUES SHOWN ARE CLOSEST APPROXIMATE. FINAL ALL SQUARE FOOTAGE (SQ FT) VALUES SHOWN ARE CLOSEST APPROXIMATE. FINAL DIMENSIONS AND AREA MEASUREMENTS MAY VARY SLIGHTLY. 17. BASIS OF DESIGN: STONHARD STONRES STR RESILIENT FLOOR SYSTEM. BASIS OF DESIGN: STONHARD STONRES STR RESILIENT FLOOR SYSTEM. CONTRACTOR TO FOLLOW MANUFACTURER'S INSTALLATION REQUIREMENTS. REFER TO SPECIFICATION SECTION 09 67 23.40 FOR ADDITIONAL INFORMATION. 18. CONTRACTOR SHALL TERMINATE NEW RESINOUS FLOORING AT THE ROOM INTERIOR SIDE OF CONTRACTOR SHALL TERMINATE NEW RESINOUS FLOORING AT THE ROOM INTERIOR SIDE OF THE DOOR FRAME AT EACH DOOR WHERE NEW FLOORING MEETS EXISTING FLOORING, AND SHALL PROVIDE A SMOOTH, GAP-FREE TRANSITION BETWEEN NEW AND EXISTING FLOORING. CONTRACTOR SHALL NOT USE TRANSITION STRIPS.

Sheets and Views
1-2FLR

File details come from the government source that posted it. Updated .