561-26-104_A102_Addendum1.pdf
PDF 313 KB Posted
- Solicitation number
- 36C24226R0128
About this file
This document is a design development drawing for a federal construction project issued by the U.S. Department of Veterans Affairs, Office of Construction and Facilities Management. The drawing depicts the third floor bathroom layout for Building 1 at the East Orange, NJ facility (Project Number 561-26-104) and illustrates proposed modifications to repair floor and bathroom leaks.
The project scope includes installation of new wall-mounted toilets, updated piping systems, a new trench drain, ICRA barriers, and HEPA filtration components. Key requirements outlined in the notes specify that contractors must verify all field dimensions and conditions before proceeding, comply with PCRA, ICRA, and ILSM requirements, demolish existing leaking infrastructure and ceiling materials, remove and dispose of all contaminated materials, install new trench drains with proper connections and supports, and ensure smooth floor pitch for adequate drainage. Additional work includes installing new floor tiles and baseboard, sealing all floor openings and wall penetrations per VA and state requirements, reinstalling existing partitions and grab bars meeting VA/ADA standards, providing patching and finish restoration, performing required utility shutdowns, and removing demolition debris while maintaining a clean work area. All work must comply with design guides, VA master specifications, ABA guidelines, OSHA requirements, NJ state codes, local regulations, applicable NFPA and firestopping codes, and all contract documents. The drawing was issued on 11/09/2026 with Addendum No. 1 adding dimensions and revising notes.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 36C24226R0128 0004.pdf | ||
| Request for Information 561 26 104.docx | DOCX document | |
| 36C24226R0128 0003.docx | DOCX document | |
| 561-26-104_A104_Addendum1.pdf | ||
| 561-26-104_Tile_Room_Finish_Legend.pdf | ||
| 561-26-104_3rd_Floor_Bathroom_MEP_Reference_Packet.pdf | ||
| 36C24226R0128 0002.docx | DOCX document | |
| 36C24226R0128 0001.docx | DOCX document | |
| Wage Determinations.pdf | ||
| FAR 52.225-2 BUY AMERICAN CERTIFICATE.docx | DOCX document | |
| Drawings - Project 561-26-104.pdf | ||
| Specifications - Project 561-26-104.pdf | ||
| 36C24226R0128_1.docx | DOCX document | |
| VAAR 852.219-75 LIMITATIONS ON SUBCONTRACTING CERTIFICATE.docx | DOCX document |
Show all 14
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
New Updated
Piping Wall
New Wall
Mounted
Toilets
New Piping
New Trench
Drain
Icra Barrier
65 7
HEPA
FILTRATION
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A102
THIRD FLOOR - PROPOSED
BUILDING 1 BATHROOM LAYOUT
A
DESIGN DEVELOPMENT
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase. STAMP.
321 4 5 6 7 8 9 10
REPAIR OR FLOOR AND
BATHROOM LEAKS
EAST ORANGE, NJ
561-26-104
BLDG 1
Project Director
X CFRevisions: Date:
1 1
20. ALL DIMENSIONS SHOWN ARE APPROXIMATE AND SHALL BE VERIFIED IN THE FIELD. 1
11/09/2026
1 ADDENDUM NO. 1 - DIMENSIONS ADDED; NOTES 5, 7, 20 REVISED 11/09/2026 1
AutoCAD SHX Text
NOTES
AutoCAD SHX Text 10.00"
AutoCAD SHX Text
1. CONTRACTOR SHALL VERIFY ALL EXISTING FIELD CONDITIONS, DIMENSIONS, AND SYSTEM LOCATIONS CONTRACTOR SHALL VERIFY ALL EXISTING FIELD CONDITIONS, DIMENSIONS, AND SYSTEM LOCATIONS PRIOR TO STARTING WORK. REPORT ALL DISCREPANCIES TO THE COR BEFORE PROCEEDING. 2. CONTRACTOR SHALL FULLY COMPLY WITH PCRA, ICRA, AND ILSM REQUIREMENTS FOR ALL CONTRACTOR SHALL FULLY COMPLY WITH PCRA, ICRA, AND ILSM REQUIREMENTS FOR ALL BATHROOM AND ADJACENT WORK AREAS. 3. DEMOLISH EXISTING TOILETS, PARTITIONS, FLOORING, CEILING MATERIALS, AND ANY WALL SECTIONS DEMOLISH EXISTING TOILETS, PARTITIONS, FLOORING, CEILING MATERIALS, AND ANY WALL SECTIONS NECESSARY TO ACCESS REQUIRED PLUMBING. 4. DEMOLISH ALL EXISTING PIPING AND DRAIN LINES THAT ARE LEAKING OR MAY POTENTIALLY LEAK. DEMOLISH ALL EXISTING PIPING AND DRAIN LINES THAT ARE LEAKING OR MAY POTENTIALLY LEAK. PLUMBING DEMOLITION IN ROOM 2-220A CEILING SHALL BE PERFORMED AFTER HOURS ONLY. 220A CEILING SHALL BE PERFORMED AFTER HOURS ONLY. 5. DEMOLISH EXISTING FLOOR AND SUBSTRATE NECESSARY TO ACCOMMODATE THE NEW TRENCH DEMOLISH EXISTING FLOOR AND SUBSTRATE NECESSARY TO ACCOMMODATE THE NEW TRENCH DRAIN. REMOVE ALL MATERIALS REQUIRED TO CREATE NEW FLOOR PITCH (1:50) TOWARD THE DRAIN. 6. INSTALL NEW TRENCH DRAIN AS SHOWN ON DRAWINGS. ENSURE ALL CONNECTIONS, SUPPORTS, INSTALL NEW TRENCH DRAIN AS SHOWN ON DRAWINGS. ENSURE ALL CONNECTIONS, SUPPORTS, AND ALIGNMENTS COMPLY WITH MANUFACTURER REQUIREMENTS AND NJ STATE CODES. 7. PROVIDE SMOOTH, CONSISTENT FLOOR PITCH (1:50) TOWARD THE NEW TRENCH DRAIN TO ENSURE PROVIDE SMOOTH, CONSISTENT FLOOR PITCH (1:50) TOWARD THE NEW TRENCH DRAIN TO ENSURE PROPER DRAINAGE AND COMPLIANCE WITH VA AND MANUFACTURER STANDARDS. 8. TOILET VENTING SHALL BE INSTALLED OR REUSED IN FULL COMPLIANCE WITH CURRENT NJ STATE TOILET VENTING SHALL BE INSTALLED OR REUSED IN FULL COMPLIANCE WITH CURRENT NJ STATE PLUMBING CODES. 9. SEAL ALL FLOOR OPENINGS AND WALL PENETRATIONS PER VA AND STATE REQUIREMENTS. SEAL ALL FLOOR OPENINGS AND WALL PENETRATIONS PER VA AND STATE REQUIREMENTS. PROVIDE APPROVED FIRESTOP SYSTEMS FOR ALL PENETRATIONS. 10. INSTALL NEW FLOOR TILE AND BASEBOARD IN ACCORDANCE WITH MANUFACTURER SPECIFICATIONS, INSTALL NEW FLOOR TILE AND BASEBOARD IN ACCORDANCE WITH MANUFACTURER SPECIFICATIONS, INCLUDING SUBSTRATE PREPARATION, LEVELING, SPACING, AND ALIGNMENT. 11. CONSTRUCT NEW WALLS AS REQUIRED AND INSTALL NEW WALL-HUNG TOILETS WITH PROPER CONSTRUCT NEW WALLS AS REQUIRED AND INSTALL NEW WALL-HUNG TOILETS WITH PROPER HUNG TOILETS WITH PROPER SUPPORTS AND CONNECTIONS. 12. REINSTALL EXISTING PARTITIONS AND GRAB BARS AND ENSURE ALL DIMS, FASTENERS AND REINSTALL EXISTING PARTITIONS AND GRAB BARS AND ENSURE ALL DIMS, FASTENERS AND SUPPORTS MEET VA/ADA REQUIREMENTS. 13. PROVIDE PATCHING, PAINTING, AND FINISH RESTORATION TO MATCH EXISTING ADJACENT PROVIDE PATCHING, PAINTING, AND FINISH RESTORATION TO MATCH EXISTING ADJACENT CONDITIONS. 14. ALLOW VA PERSONNEL TO PERFORM ALL REQUIRED UTILITY SHUTDOWNS, INCLUDING WATER AND ALLOW VA PERSONNEL TO PERFORM ALL REQUIRED UTILITY SHUTDOWNS, INCLUDING WATER AND WASTE LINE ISOLATION. 15. REMOVE ALL DEMOLITION DEBRIS AT THE END OF EACH SHIFT AND MAINTAIN A CLEAN, SAFE REMOVE ALL DEMOLITION DEBRIS AT THE END OF EACH SHIFT AND MAINTAIN A CLEAN, SAFE WORK AREA THROUGHOUT THE PROJECT. 16. ALL WORK SHALL MEET OR EXCEED VA DESIGN GUIDES, VA MASTER SPECIFICATIONS, ABA ALL WORK SHALL MEET OR EXCEED VA DESIGN GUIDES, VA MASTER SPECIFICATIONS, ABA GUIDELINES, OSHA REQUIREMENTS, NJ STATE CODES, LOCAL REGULATIONS, AND ALL CONTRACT DOCUMENTS. ANY CONDITION IMPACTING COMPLIANCE SHALL BE REPORTED IMMEDIATELY TO THE COR. 17. ANY UNFORESEEN CONDITIONS, DAMAGE, OR SYSTEM CONFLICTS DISCOVERED DURING WORK SHALL ANY UNFORESEEN CONDITIONS, DAMAGE, OR SYSTEM CONFLICTS DISCOVERED DURING WORK SHALL BE REPORTED TO THE COR PRIOR TO CONTINUING TO ENSURE PROPER RESOLUTION AND TO AVOID CONTRACTOR LIABILITY FOR NON‑APPROVED WORK. APPROVED WORK. 18. DRAWINGS DO NOT REPRESENT THE FULL PROJECT SCOPE. CONTRACTOR SHALL REFER TO THE DRAWINGS DO NOT REPRESENT THE FULL PROJECT SCOPE. CONTRACTOR SHALL REFER TO THE STATEMENT OF WORK (SOW) FOR COMPLETE SCOPE REQUIREMENTS, INCLUDING ALL ADDITIONAL TASKS, CONDITIONS, AND CONSTRAINTS NOT ILLUSTRATED ON THE DRAWINGS. 19. ALL REPAIRS, PATCHES, AND PENETRATIONS SHALL FULLY COMPLY WITH APPLICABLE VA, NFPA, ALL REPAIRS, PATCHES, AND PENETRATIONS SHALL FULLY COMPLY WITH APPLICABLE VA, NFPA, AND STATE FIRESTOPPING CODES AND STANDARDS. CONTRACTOR SHALL INSTALL APPROVED FIRESTOP SYSTEMS AND RESTORE ALL FIRE RATED ASSEMBLIES TO THEIR ORIGINAL FIRE STOPPING RATED ASSEMBLIES TO THEIR ORIGINAL FIRE STOPPING STOPPING RATING.
AutoCAD SHX Text 3-155
AutoCAD SHX Text
CORRIDOR
AutoCAD SHX Text
905 SF
AutoCAD SHX Text
CANTEEN
AutoCAD SHX Text
OFFICE
AutoCAD SHX Text
165 SF
AutoCAD SHX Text
CANTEEN
AutoCAD SHX Text
STORAGE
AutoCAD SHX Text
ELEV 7
AutoCAD SHX Text
70 SF
AutoCAD SHX Text
FEMALE
AutoCAD SHX Text
TOILET
AutoCAD SHX Text
150 SF
AutoCAD SHX Text 3-E-106
AutoCAD SHX Text
ELECTRIC
AutoCAD SHX Text
30 SF
AutoCAD SHX Text
ELEV 8
AutoCAD SHX Text
70 SF
AutoCAD SHX Text 3-182
AutoCAD SHX Text 3-184
AutoCAD SHX Text
WAITING
AutoCAD SHX Text
AREA
AutoCAD SHX Text
3-SHAFT3
AutoCAD SHX Text
SHAFTWAY
AutoCAD SHX Text
60 SF
AutoCAD SHX Text 3-185
AutoCAD SHX Text 115.00"
AutoCAD SHX Text 107.00"
AutoCAD SHX Text 66.00"
AutoCAD SHX Text 76.50"
AutoCAD SHX Text 36.00"
AutoCAD SHX Text 174.00"
| Sheets and Views |
| 1-3FLR |
File details come from the government source that posted it. Updated .