This document is a design development drawing for a federal construction project issued by the U.S. Department of Veterans Affairs, Office of Construction and Facilities Management. The drawing depicts the third floor bathroom layout for Building 1 at the East Orange, NJ facility (Project Number 561-26-104) and illustrates proposed modifications to repair floor and bathroom leaks.

The project scope includes installation of new wall-mounted toilets, updated piping systems, a new trench drain, ICRA barriers, and HEPA filtration components. Key requirements outlined in the notes specify that contractors must verify all field dimensions and conditions before proceeding, comply with PCRA, ICRA, and ILSM requirements, demolish existing leaking infrastructure and ceiling materials, remove and dispose of all contaminated materials, install new trench drains with proper connections and supports, and ensure smooth floor pitch for adequate drainage. Additional work includes installing new floor tiles and baseboard, sealing all floor openings and wall penetrations per VA and state requirements, reinstalling existing partitions and grab bars meeting VA/ADA standards, providing patching and finish restoration, performing required utility shutdowns, and removing demolition debris while maintaining a clean work area. All work must comply with design guides, VA master specifications, ABA guidelines, OSHA requirements, NJ state codes, local regulations, applicable NFPA and firestopping codes, and all contract documents. The drawing was issued on 11/09/2026 with Addendum No. 1 adding dimensions and revising notes.

View the file

Other files

File Type Posted
36C24226R0128 0004.pdf PDF
Request for Information 561 26 104.docx DOCX document
36C24226R0128 0003.docx DOCX document
561-26-104_A104_Addendum1.pdf PDF
561-26-104_Tile_Room_Finish_Legend.pdf PDF
561-26-104_3rd_Floor_Bathroom_MEP_Reference_Packet.pdf PDF
36C24226R0128 0002.docx DOCX document
36C24226R0128 0001.docx DOCX document
Wage Determinations.pdf PDF
FAR 52.225-2 BUY AMERICAN CERTIFICATE.docx DOCX document
Drawings - Project 561-26-104.pdf PDF
Specifications - Project 561-26-104.pdf PDF
36C24226R0128_1.docx DOCX document
VAAR 852.219-75 LIMITATIONS ON SUBCONTRACTING CERTIFICATE.docx DOCX document
Show all 14

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

New Updated

Piping Wall

New Wall

Mounted

Toilets

New Piping

New Trench

Drain

Icra Barrier

65 7

HEPA

FILTRATION

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A102

THIRD FLOOR - PROPOSED

BUILDING 1 BATHROOM LAYOUT

A

DESIGN DEVELOPMENT

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase. STAMP.

321 4 5 6 7 8 9 10

REPAIR OR FLOOR AND

BATHROOM LEAKS

EAST ORANGE, NJ

561-26-104

BLDG 1

Project Director

X CFRevisions: Date:

1 1

20. ALL DIMENSIONS SHOWN ARE APPROXIMATE AND SHALL BE VERIFIED IN THE FIELD. 1

11/09/2026

1 ADDENDUM NO. 1 - DIMENSIONS ADDED; NOTES 5, 7, 20 REVISED 11/09/2026 1

AutoCAD SHX Text

NOTES

AutoCAD SHX Text 10.00"

AutoCAD SHX Text

1. CONTRACTOR SHALL VERIFY ALL EXISTING FIELD CONDITIONS, DIMENSIONS, AND SYSTEM LOCATIONS CONTRACTOR SHALL VERIFY ALL EXISTING FIELD CONDITIONS, DIMENSIONS, AND SYSTEM LOCATIONS PRIOR TO STARTING WORK. REPORT ALL DISCREPANCIES TO THE COR BEFORE PROCEEDING. 2. CONTRACTOR SHALL FULLY COMPLY WITH PCRA, ICRA, AND ILSM REQUIREMENTS FOR ALL CONTRACTOR SHALL FULLY COMPLY WITH PCRA, ICRA, AND ILSM REQUIREMENTS FOR ALL BATHROOM AND ADJACENT WORK AREAS. 3. DEMOLISH EXISTING TOILETS, PARTITIONS, FLOORING, CEILING MATERIALS, AND ANY WALL SECTIONS DEMOLISH EXISTING TOILETS, PARTITIONS, FLOORING, CEILING MATERIALS, AND ANY WALL SECTIONS NECESSARY TO ACCESS REQUIRED PLUMBING. 4. DEMOLISH ALL EXISTING PIPING AND DRAIN LINES THAT ARE LEAKING OR MAY POTENTIALLY LEAK. DEMOLISH ALL EXISTING PIPING AND DRAIN LINES THAT ARE LEAKING OR MAY POTENTIALLY LEAK. PLUMBING DEMOLITION IN ROOM 2-220A CEILING SHALL BE PERFORMED AFTER HOURS ONLY. 220A CEILING SHALL BE PERFORMED AFTER HOURS ONLY. 5. DEMOLISH EXISTING FLOOR AND SUBSTRATE NECESSARY TO ACCOMMODATE THE NEW TRENCH DEMOLISH EXISTING FLOOR AND SUBSTRATE NECESSARY TO ACCOMMODATE THE NEW TRENCH DRAIN. REMOVE ALL MATERIALS REQUIRED TO CREATE NEW FLOOR PITCH (1:50) TOWARD THE DRAIN. 6. INSTALL NEW TRENCH DRAIN AS SHOWN ON DRAWINGS. ENSURE ALL CONNECTIONS, SUPPORTS, INSTALL NEW TRENCH DRAIN AS SHOWN ON DRAWINGS. ENSURE ALL CONNECTIONS, SUPPORTS, AND ALIGNMENTS COMPLY WITH MANUFACTURER REQUIREMENTS AND NJ STATE CODES. 7. PROVIDE SMOOTH, CONSISTENT FLOOR PITCH (1:50) TOWARD THE NEW TRENCH DRAIN TO ENSURE PROVIDE SMOOTH, CONSISTENT FLOOR PITCH (1:50) TOWARD THE NEW TRENCH DRAIN TO ENSURE PROPER DRAINAGE AND COMPLIANCE WITH VA AND MANUFACTURER STANDARDS. 8. TOILET VENTING SHALL BE INSTALLED OR REUSED IN FULL COMPLIANCE WITH CURRENT NJ STATE TOILET VENTING SHALL BE INSTALLED OR REUSED IN FULL COMPLIANCE WITH CURRENT NJ STATE PLUMBING CODES. 9. SEAL ALL FLOOR OPENINGS AND WALL PENETRATIONS PER VA AND STATE REQUIREMENTS. SEAL ALL FLOOR OPENINGS AND WALL PENETRATIONS PER VA AND STATE REQUIREMENTS. PROVIDE APPROVED FIRESTOP SYSTEMS FOR ALL PENETRATIONS. 10. INSTALL NEW FLOOR TILE AND BASEBOARD IN ACCORDANCE WITH MANUFACTURER SPECIFICATIONS, INSTALL NEW FLOOR TILE AND BASEBOARD IN ACCORDANCE WITH MANUFACTURER SPECIFICATIONS, INCLUDING SUBSTRATE PREPARATION, LEVELING, SPACING, AND ALIGNMENT. 11. CONSTRUCT NEW WALLS AS REQUIRED AND INSTALL NEW WALL-HUNG TOILETS WITH PROPER CONSTRUCT NEW WALLS AS REQUIRED AND INSTALL NEW WALL-HUNG TOILETS WITH PROPER HUNG TOILETS WITH PROPER SUPPORTS AND CONNECTIONS. 12. REINSTALL EXISTING PARTITIONS AND GRAB BARS AND ENSURE ALL DIMS, FASTENERS AND REINSTALL EXISTING PARTITIONS AND GRAB BARS AND ENSURE ALL DIMS, FASTENERS AND SUPPORTS MEET VA/ADA REQUIREMENTS. 13. PROVIDE PATCHING, PAINTING, AND FINISH RESTORATION TO MATCH EXISTING ADJACENT PROVIDE PATCHING, PAINTING, AND FINISH RESTORATION TO MATCH EXISTING ADJACENT CONDITIONS. 14. ALLOW VA PERSONNEL TO PERFORM ALL REQUIRED UTILITY SHUTDOWNS, INCLUDING WATER AND ALLOW VA PERSONNEL TO PERFORM ALL REQUIRED UTILITY SHUTDOWNS, INCLUDING WATER AND WASTE LINE ISOLATION. 15. REMOVE ALL DEMOLITION DEBRIS AT THE END OF EACH SHIFT AND MAINTAIN A CLEAN, SAFE REMOVE ALL DEMOLITION DEBRIS AT THE END OF EACH SHIFT AND MAINTAIN A CLEAN, SAFE WORK AREA THROUGHOUT THE PROJECT. 16. ALL WORK SHALL MEET OR EXCEED VA DESIGN GUIDES, VA MASTER SPECIFICATIONS, ABA ALL WORK SHALL MEET OR EXCEED VA DESIGN GUIDES, VA MASTER SPECIFICATIONS, ABA GUIDELINES, OSHA REQUIREMENTS, NJ STATE CODES, LOCAL REGULATIONS, AND ALL CONTRACT DOCUMENTS. ANY CONDITION IMPACTING COMPLIANCE SHALL BE REPORTED IMMEDIATELY TO THE COR. 17. ANY UNFORESEEN CONDITIONS, DAMAGE, OR SYSTEM CONFLICTS DISCOVERED DURING WORK SHALL ANY UNFORESEEN CONDITIONS, DAMAGE, OR SYSTEM CONFLICTS DISCOVERED DURING WORK SHALL BE REPORTED TO THE COR PRIOR TO CONTINUING TO ENSURE PROPER RESOLUTION AND TO AVOID CONTRACTOR LIABILITY FOR NON‑APPROVED WORK. APPROVED WORK. 18. DRAWINGS DO NOT REPRESENT THE FULL PROJECT SCOPE. CONTRACTOR SHALL REFER TO THE DRAWINGS DO NOT REPRESENT THE FULL PROJECT SCOPE. CONTRACTOR SHALL REFER TO THE STATEMENT OF WORK (SOW) FOR COMPLETE SCOPE REQUIREMENTS, INCLUDING ALL ADDITIONAL TASKS, CONDITIONS, AND CONSTRAINTS NOT ILLUSTRATED ON THE DRAWINGS. 19. ALL REPAIRS, PATCHES, AND PENETRATIONS SHALL FULLY COMPLY WITH APPLICABLE VA, NFPA, ALL REPAIRS, PATCHES, AND PENETRATIONS SHALL FULLY COMPLY WITH APPLICABLE VA, NFPA, AND STATE FIRESTOPPING CODES AND STANDARDS. CONTRACTOR SHALL INSTALL APPROVED FIRESTOP SYSTEMS AND RESTORE ALL FIRE RATED ASSEMBLIES TO THEIR ORIGINAL FIRE STOPPING RATED ASSEMBLIES TO THEIR ORIGINAL FIRE STOPPING STOPPING RATING.

AutoCAD SHX Text 3-155

AutoCAD SHX Text

CORRIDOR

AutoCAD SHX Text

905 SF

AutoCAD SHX Text

CANTEEN

AutoCAD SHX Text

OFFICE

AutoCAD SHX Text

165 SF

AutoCAD SHX Text

CANTEEN

AutoCAD SHX Text

STORAGE

AutoCAD SHX Text

ELEV 7

AutoCAD SHX Text

70 SF

AutoCAD SHX Text

FEMALE

AutoCAD SHX Text

TOILET

AutoCAD SHX Text

150 SF

AutoCAD SHX Text 3-E-106

AutoCAD SHX Text

ELECTRIC

AutoCAD SHX Text

30 SF

AutoCAD SHX Text

ELEV 8

AutoCAD SHX Text

70 SF

AutoCAD SHX Text 3-182

AutoCAD SHX Text 3-184

AutoCAD SHX Text

WAITING

AutoCAD SHX Text

AREA

AutoCAD SHX Text

3-SHAFT3

AutoCAD SHX Text

SHAFTWAY

AutoCAD SHX Text

60 SF

AutoCAD SHX Text 3-185

AutoCAD SHX Text 115.00"

AutoCAD SHX Text 107.00"

AutoCAD SHX Text 66.00"

AutoCAD SHX Text 76.50"

AutoCAD SHX Text 36.00"

AutoCAD SHX Text 174.00"

Sheets and Views
1-3FLR

File details come from the government source that posted it. Updated .