Drawings_NPS_NATC_311660_HVAC_REPLACEMENT_FINAL_CDs_9_29_21.pdf
PDF 29 MB Posted
- Attached to
- Natchez Visitor Center HVAC Systems Replacement Federal contract opportunity
- Solicitation number
- 140P5222R0003
About this file
This document outlines a federal contract opportunity for HVAC systems replacement services. The National Park Service Southeast Region is soliciting proposals under solicitation number 140P5222R0003 to replace the HVAC systems at the Natchez Visitor Center in Natchez, Mississippi. Proposals are due by the date specified in the Request for Proposal documentation posted with this summary. The work includes removing existing HVAC equipment and installing new HVAC systems at the visitor center to maintain proper temperature and airflow. The contract award date is not provided but the work is to be completed on an expedited schedule due to the critical need to condition the visitor center.
View the file
Other files for this federal contract opportunity
Show all 15
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
MEMPHISLITTLE
ROCK
NASHVILLE
TUPELO
MONTGOMERY
BIRMINGHAM
MOBILE
NEW
ORLEANS
BATON
ROUGE
GULF OF MEXICO
NATCHEZ
TRACE
PARKWAY
GREENVILLE
PINE
BLUFF
CLARKSDALE
JACKSON
10PENSACOLA
JACKSON MERIDIAN
NATCHEZ
VICKSBURG
ALABAMA
FLORIDA
M
IS
SI
SS
IP
PI
AL
AB
AM
A
ARKANSAS
LOUISANA
TENNESSEE
MISSISSIPPI
MISSOURI
ARKANSAS
ALABAMA
TUSCALOOSA
M
IS
SI
SS
IP
PI
R
TENNESSEE R.
TENNESSEE
THIS PROJECT
NATCHEZ
E. FRANKLIN ST.
S C
A N
A L S
T
MADISON ST.
HOMOCHITTO ST.
JOHN R. JUNKIN DR.
MISSISSIPPI RIVER
TO NATCHEZ TRACE
PARKWAY
MISSISSIPPI
SOUTHEAST
PROJECT
Project Manager Date
QUALITY DESIGN CERTIFICATION
OR
OR
Development (Title I)
Prepared in Accordance with Design by Design Development (Title I)
Construction Drawing Not Preceded
Approved by Superintendent on
Variance from Design Development (Title I)
Drawing No.
Date
STATEREGION COUNTY
NAME OF PARK
TITLE OF PROJECTCROFT & ASSOCIATES - P15PC00467
PRIME / ARCH / MEP:
CROFT & ASSOCIATES
KENNESAW, GEORGIA
STRUCTURAL:
PES STRUCTURAL ENGINEERS
ATLANTA, GEORGIA
SheetMark REVISION Date Initial
LOCATION WITHIN PARK
NATIONAL PARK SERVICE
DENVER SERVICE CENTER
UNITED STATES
DEPARTMENT OF THE INTERIOR
DRAWING NO.
PMIS/PKG NO.
SHEET
OF
CONSTRUCTION DOCUMENTS
/2
/2
:1
:2
P M
REPLACE / UPGRADE HVAC
SYSTEMS
NATCHEZ VISITOR CENTER
NATCHEZ NATIONAL HISTORICAL PARK
SOUTHEAST ADAMS MISSISSIPPI
1 70
175314
311660B
NATCHEZ HISTORICAL PARK
INDEX OF DRAWINGS
SHEET OF SUB SHEET TITLE OF SHEET
46 M504 DETAILS
47 M505 DETAILS
48 M601 SCHEDULES
49 M602 SCHEDULES
50 M701 VRF PIPING DIAGRAMS
51 M702 VRF PIPING DIAGRAMS
ELECTRICAL
52 E001 ELECTRICAL LEGEND
53 E002 ELECTRICAL NOTES
54 ED101 ELECTRICAL DEMO PLAN - BASE BID FIRST FLOOR
55 ED102 ELECTRICAL DEMO PLAN - BASE BID SECOND FLOOR
56 ED103 ELECTRICAL DEMO PLAN - BASE BID PART B
57 ED104 ELECTRICAL DEMO PLAN - BASE BID PART C
58 ED105 ELECTRICAL DEMO PLAN - BASE BID MEZZANINES
59 E101 ELECTRICAL FLOOR PLAN - BASE BID FIRST FLOOR
60 E102 ELECTRICAL FLOOR PLAN - BASE BID SECOND FLOOR
61 E103 ELECTRICAL FLOOR PLAN - BASE BID PART B
62 E104 ELECTRICAL FLOOR PLAN - BASE BID PART C
63 E105 ELECTRICAL FLOOR PLAN - BASE BID MEZZANINES
64 E106 ELECTICAL FLOOR PLAN - BASE BID ROOF
65 E107 ELECTRICAL FLOOR PLAN - ALT-1 BID PART B
66 E108 ELECTRICAL FLOOR PLAN - ALT-1 BID PART C
67 E109 ELECTRICAL FLOOR PLAN - ALT-1 BID MEZZANINES
68 E501 ELECTRICAL RISER
69 E601 ELECTRICAL PANEL SCHEDULES
70 E602 ELECTRICAL CONNECTIONS SCHEDULE
Grand total: 70
INDEX OF DRAWINGS
SHEET OF SUB SHEET TITLE OF SHEET
GENERAL
1 CS COVER SHEET
2 G102 GENERAL NOTES
3 G103 SITE LOGISTICS PLAN
ARCHITECTURAL
4 AD001 DEMOLITION NOTES
5 AD101 DEMOLITION RCP - BASE BID - FIRST FLOOR
6 AD102 DEMOLITION RCP - BASE BID - SECOND FLOOR
7 AD103 DEMOLITION RCP - BASE BID - PART B
8 AD104 DEMOLITION RCP - BASE BID - PART C
9 AD110 DEMOLITION - BASE BID - ROOF PLAN
10 A131 REFLECTED CEILING PLAN - BASE BID - FIRST FLOOR
11 A132 REFLECTED CEILING PLAN - BASE BID - SECOND FLOOR
12 A133 REFLECTED CEILING PLAN - BASE BID - PART B
13 A134 REFLECTED CEILING PLAN - BASE BID - PART C
14 A140 ARCHITECTURAL - BASE BID - ROOF PLAN
15 A161 ROOF DETAILS
STRUCTURAL
16 S001 GENERAL NOTES & SCHEDULES
17 S002 WIND DESIGN NOTES & SCHEDULES
18 S003 STEEL GENERAL NOTES
19 S101 PLATFORM FRAMING PLAN
20 S201 SECTIONS & DETAILS
MECHANICAL
21 M001 MECHANICAL GENERAL NOTES
22 M002 SEQUENCE OF OPERATIONS
23 M003 CONTROLS DIAGRAMS
24 MD101 MECHANICAL DEMO PLAN - BASE BID FIRST FLOOR
25 MD102 MECHANICAL DEMO PLAN - BASE BID SECOND FLOOR
26 MD103 MECHANICAL DEMO PLAN - BASE BID PART B
27 MD104 MECHANICAL DEMO PLAN - BASE BID PART C
28 MD105 MECHANICAL DEMO PLAN - BASE BID ENLARGED PLANS
29 MD106 DEMOLITION ROOF PLAN - BASE BID
30 M101 MECHANICAL PLAN - BASE BID FIRST FLOOR
31 M102 MECHANICAL PLAN - BASE BID SECOND FLOOR
32 M103 MECHANICAL PLAN - BASE BID PART B
33 M104 MECHANICAL PLAN - BASE BID PART C
34 M105 MECHANICAL PLAN - BASE BID ENLARGED PLANS
35 M106 ENLARGED PLANS - MEZZANINE 214
36 M107 MECHANICAL ROOF PLAN - BASE BID
37 M108 HVAC PIPING PLAN - BASE BID PART A
38 M109 HVAC PIPING PLAN - BASE BID PART B
39 M110 HVAC PIPING PLAN - BASE BID PART C
40 M111 ALTERNATE 1 - FLOOR PLAN PART B
41 M112 ALTERNATE 1 - FLOOR PLAN PART C
42 M113 ALTERNATE 1 - MEZZANINES
43 M501 PIPING SCHEMATICS
44 M502 DETAILS
45 M503 DETAILS
MATCH LINE MARK
KEYNOTE
DETAIL NUMBER
ELEVATION NUMBER
DRAWING NUMBER
SHEET NO. (WHERE SHOWN)
ELEVATION NUMBER
COLUMN LINE NUMBER
ROOM NUMBER AND LEVEL
SHEET NO. (WHERE SHOWN)
PARTITION TYPE
DOOR NUMBER
ELEVATION MARKS
WINDOW TYPE
GRID LINE
W1
A1
A101
A1
A101 A1
A101
LEGENDS & SYMBOLS:
SECTION NUMBER
A101
A1
A*
BUILDING SECTION
DETAIL
EXTERIOR ELEVATION
TITLES
INTERIOR ELEVATION
INDICATES WINDOW ABOVE
SHEET NO. (WHERE SHOWN)
SHEET NO. (WHERE SHOWN)
ROOM NAME NAME
SHEET NO. (WHERE SHOWN)
SECTION NUMBER
A101 A1
WALL SECTION
SHEET NO. (WHERE SHOWN)
COLUMN GRID
A101 A1
@ AT
AVG AVERAGE
AUTO AUTOMATIC
ARCH ARCHITECT (URAL)
ANOD ANODIZED
ALUM ALUMINUM
ALT ALTERNATE
A/C AIR CONDITIONING
ADMIN ADMINISTRATION
ABV ABOVE
AG AMERICANS W/ DISABILITIES
ADJ ADJUSTABLE
AFF ABOVE FINISH FLOOR
ACT ACOUSTICAL TILE
BM BEAM
BRG BEARING
BOT BOTTOM
BLDG BUILDING
CAB CABINET
CARP CARPET
CJ CONTROL JOINT
CLG CEILING
CL CENTER LINE
CLR CLEAR
CMU CONCRETE MASONRY UNIT
CNTR COUNTER
CO CONTRACTING OFFICER
COL COLUMN
CONST CONSTRUCTION
CONC CONCRETE
CONT CONTINUOUS
COR THE CONTRACTING OFFICER
REPRESENTATIVE
CW COMPOSITE WOOD
DEM DEMOLISH, DEMOLITION
DN DOWN
DBL DOUBLE
DIFF DIFFUSER
DIA DIAMETER
DIM DIMENSION
DTL DETAIL
DWG DRAWING
EA EACH
ENCL ENCLOSE (URE)
ELEC ELECTRICAL
EIFS EXTERIOR INSULATION AND FINISH
SYSTEM
EP ELECTRICAL PANEL
EL, ELEV ELEVATION
EQ EQUAL
EQUIP EQUIPMENT
EWC ELECTRICAL WATER COOLER
EXT EXTERIOR
EXIST EXISTING
EXP J EXPANSION JOINT
FD FIELD DETERMINE
FFE FINISHED FLOOR ELEVATION
FFL FINISHED FLOOR LINE
FE FIRE EXTINGUISHER
FRP FIBER REINFORCED PANEL
FT FOOT/FEET
FRT FIRE RETARDANT TREATED
FLUOR FLUORESCENT
FTG FOOTING
GEN GENERAL
GA GAUGE
GALV GALVANIZED
GC GENERAL CONTRACTOR
GWB GYPSUM WALL BOARD
HDWR HARDWARE
HVAC HEATING, VENTILATION & AIR
CONDITIONING
HC HANDICAP
HCB HANDICAP COUPON BOOTH
HGT HEIGHT
H HIGH
HM HOLLOW METAL
HORIZ HORIZONTAL
INSUL INSULATION
INT INTERIOR
ID INSIDE DIAMETER
JAN JANITOR
LBL LABEL
LAV LAVATORY
L LONG
LLH LONG LEG HORIZONTAL
LLV LONG LEG VERTICAL
LVT LUXURY VINYL TILE
MAX MAXIMUM
NIC NOT IN CONTRACT
MAINT MAINTENANCE
MAT MATERIAL
MCG METAL CORNER GUARD
MECH MECHANICAL
MEZZ MEZZANINE
MFR MANUFACTURER
MISC MISCELLANEOUS
MO MASONRY OPENING
MTD MOUNTED
MTL METAL
MIN MINIMUM
N/A NOT APPLICABLE
NIC NOT IN CONTRACT
NTS NOT TO SCALE
OC ON CENTER
OD OUTSIDE DIAMETER
OPP OPPOSITE
OS OVERFLOW SCUPPER
PREFAB PREFABRICATED
PL PLATE
PLBG PLUMBING
PLYWD PLYWOOD
PNL PANEL
PT PRESSURE TREATED
QTY QUANTITY
REINF REINFORCE (D) (ING)
R, RAD RADIUS
RCP REFLECTED CEILING
PLAN
RD ROOF DRAIN
REQD REQUIRED
REV REVISION
RM ROOM
RO ROUGH OPENING
RTU ROOF TOP UNIT
SHT SHEET
SPK SPEAKER
SIM SIMILAR
SPEC SPECIFICATION
SQ SQUARE
SS STAINLESS STEEL
STD STANDARD
STRUCT STRUCTURAL
ST STEEL TUBE
STL STEEL
STO STORAGE
SUSP SUSPENDED
TEMP TEMPERED
TE TOP ELEVATION
TEL TELEPHONE
TV TELEVISION
THK THICK
TBD TO BE DETERMINED
T & G TONGUE & GROOVE
TOB TOP OF BEAM
TOS TOP OF STEEL
TOW TOP OF WALL
TYP TYPICAL
UNFIN UNFINISHED
UNO UNLESS NOTED
OTHERWISE
VAR VARIES
VERT VERTICAL
VIF VERIFY IN FIELD
VCT VINYL COMPOSITION TILE
ABBREVIATIONS:
A. "ALIGN" MEANS (I.E.) WHERE A NEW PARTITION IS
TO BE BUILT TO ALIGN WITH ONE SIDE OF THE
COLUMN, STUDS SHALL ALIGN WITH THE COLUMN
OR EXISTING PARTITION SO THAT THE GYPSUM WALL
BOARD WILL BE CONTINUOUS ACROSS STUDS AND
FINISHED FACE OF COLUMN OR EXISTING PARTITION,
AND JOINT SHALL BE SMOOTH AND UNDETECTABLE
B. DIMENSIONS NOTED AS "CLEAR" SHALL BE FROM
FINISHED FACE TO FINISHED FACE
C. "TYPICAL" MEANS TYPICAL FOR ALL SIMILAR
CONDITIONS, UNO
D. WHEREVER THE TERM "OR EQUAL" IS USED, IT
SHALL MEAN EQUAL OR BETTER PRODUCT AS
APPROVED BY THE CONTRACTING OFFICER.
DEFINITIONS:
H. DISCUSS ALL VISIBLE EQUIPMENT: SPRINKLER
HEADS, CONNECTING PIPES, CONDUITS, ETC., W/
THE CONTRACTING OFFICER BEFORE INSTALLATION.
J. REFER TO MECHANICAL FLOOR PLANS FOR EXTENT
OF EXPOSED DUCTWORK IN EXPOSED STRUCTURE
AREAS.
K. PAINT ALL EXPOSED DUCTWORK, PIPING, HANGERS,
ETC., TO MATCH EXISTING.
L. DESIGN SUSPENDED CEILING FRAMING SYSTEM TO
RESIST LATERAL FORCE OF 20% OF THE WEIGHT OF
THE CEILING ASSEMBLY AND ANY LOADS TRIBUTARY
TO THE SYSTEM. USE A MINIMUM CEILING WEIGHT
OF 5 LBS/PSF TO DETERMINE LATERAL FORCE.
M. WHERE CEILING LOADS DO NOT EXCEED 5 LBS/PSF
AND WHERE PARTITIONS ARE NOT CONNECTED TO
THE CEILING SYSTEM, THE FOLLOWING BRACING
METHOD MAY BE USED:
a. PROVIDE LATERAL SUPPORT BY FOUR WIRES
MINIMUM NO.12 GAUGES SPLAYED IN FOUR
DIRECTIONS 90 DEGREES APART, AND
CONNECTED TO THE MAIN RUNNER WITHIN 2” OF
THE CROSS RUNNER AND TO THE STRUCTURE
ABOVE AT AN ANGLE NOT EXCEEDING 45 DEG.
FROM THE PLANE OF THE CEILING. PROVIDE
THESE LATERAL SUPPORT POINTS 12 FEET ON
CENTER IN EACH DIRECTION WITH THE FIRST
POINT WITHIN 4’ FROM EACH WALL.
N. ALLOW LATERAL MOVEMENT OF THE SYSTEM.
ATTACH MAIN RUNNERS AND CROSS RUNNERS AT
TWO ADJACENT WALLS. MAINTAIN CLEARANCE
BETWEEN THE WALL AND THE RUNNERS AT
OPPOSITE WALLS.
O. PROVIDE VERTICAL SUPPORT AS REQUIRED BY
BUILDING CODES. ADDITIONALLY, SUPPORT
VERTICALLY ENDS OF RUNNERS WITHIN 8” OF EACH
END.
A. IF THERE ARE QUESTIONS REGARDING THE ITEMS
NOTED HEREIN OR OTHER COORDINATION
PROBLEMS, THE CONTRACTOR SHALL OBTAIN A
WRITTEN CLARIFICATION FROM THE CONTRACTING
OFFICER PRIOR TO PROCEEDING WITH THE WORK.
B. VERIFY FIELD CONDITIONS AND LOCATIONS OF
ELECTRICAL, MECHANICAL, PLUMBING, FIRE
ALARM, FIRE PROTECTION, AND STRUCTURAL
ELEMENTS AND ANY OTHER APPLICABLE ITEMS.
REVIEW AND DETERMINE CEILING CAVITY
EQUIPMENT TO INSURE ADEQUATE CLEARANCES
FOR CEILING LAYOUT BEFORE RELATED ELEMENTS
ARE CONSTRUCTED.
C. DEVICES ON THIS PLAN HAVE BEEN SHOWN FOR
COORDINATION PURPOSES ONLY. ALL DEVICES
ARE NOT SHOWN. INSTALL ALL DEVICES INDICATED
ON THE MECHANICAL AND ELECTRICAL DRAWINGS
FOR ITEMS NOT SHOWN ON REFLECTED CEILING
PLANS.
D. ALL MECHANICAL WORK SHALL BE PLANNED TO
MINIMIZE THE AMOUNT OF ACCESS PANELS IN
HARD CEILINGS. COORDINATE REQUIRED PANEL
LOCATIONS W/ THE CONTRACTING OFFICER.
PANELS ARE TO BE FINISHED TO MATCH ADJACENT
SURFACE.
E. DIMENSIONS ARE FACE OF FINISH TO CENTER OF
FIXTURE UNO.
F. LOCATION OF THERMOSTATS SHALL BE VERIFIED
W/ THE CONTRACTING OFFICER PRIOR TO
INSTALLATION.
G. ALL SPRINKLER HEADS, RECESSED LIGHTS AND
SIMILAR CEILING MOUNTED EQUIPMENT TO BE
CENTERED IN CEILING TILE UNO. ALIGN MULTIPLE
ITEMS’ CENTERS OR EDGES.
GENERAL REFLECTED CEILING PLAN NOTES
P. SUPPORT LIGHT FIXTURES AND AIR DIFFUSERS
DIRECTLY BY WIRES TO THE STRUCTURE ABOVE
Q. ALL NEW CEILINGS SHOULD BE INSTALLED AT ORIGINAL
CEILING HEIGHT AND IN ORIGINAL ALIGNMENT WITH
SPRINKLER HEADS (VERIFY IN FIELD).
R. ALL GWB CEILINGS TO BE PAINTED TO MATCH
EXISTING.
S. FINISH HVAC DIFFUSERS, DRAPERY POCKETS AND S
SPEAKER GRILLES TO MATCH ADJACENT FINISH UNO
T. GENERAL CONTRACTOR SHALL SUBMIT LOCATION
PLANS FOR ALL DEVICES LOCATED WITHIN GYPSUM
BOARD CEILINGS LIKE FIRE ALARM DEVICES,
SPRINKLER HEADS, THERMOSTATS AND ANY OTHER
THAT DIFFER OR NOT SHOWN ON THIS PLAN.
U. VERIFY ALL CEILING HEIGHTS PRIOR TO REPLACEMENT.
GENERAL NOTES:
1. CONTRACTOR IS SOLELY RESPONSIBLE FOR THE
SUPERVISION AND COORDINATION OF ALL
CONSTRUCTION PROCEDURES.
2. ALL WORK SHALL BE PERFORMED IN STRICT
ACCORDANCE WITH THE APPLICABLE CODES AND
ORDINANCES IN EFFECT AT THE TIME OF
CONSTRUCTION OUTLINED ON LS001. IN THE
EVENT OF A CONFLICT, THE MORE STRINGENT
REQUIREMENT SHALL GOVERN AND BE MET.
3. ALL DIMENSIONS SHALL BE VERIFIED BY THE
CONTRACTOR AND THE CONTRACTING OFFICER
MUST BE NOTIFIED OF ANY DISCREPANCIES
BEFORE PROCEEDING WITH THE WORK.
4. COORDINATE LOCATIONS AND/OR ELEVATIONS OF
FLOOR DRAINS, REGISTERS, GRILLES, LOUVERS,
DUCTS, UNIT HEATERS, PANELS, ETC. WITH
MECHANICAL AND ELECTRICAL CONTRACTORS
AND ARCHITECTURAL DRAWINGS.
5. WHERE A DETAIL IS SHOWN FOR ONE CONDITION,
IT SHALL APPLY TO ALL LIKE OR SIMILAR
CONDITIONS, EVEN THOUGH NOT SPECIFICALLY
MARKED ON THE DRAWINGS.
6. CONTRACTOR SHALL ENSURE THAT
CONSTRUCTION ENVIRONMENT IS MAINTAINED IN
SUCH A WAY TO INHIBIT MOLD AND MILDEW
GROWTH.
7. CONTRACTOR SHALL REMOVE PROMPTLY AND
LEGALLY ALL ACCUMULATED DEBRIS, PROTECT
ALL EXPOSED PORTIONS OF WORK FROM
ELEMENTS, AVOID OVER- LOADING STRUCTURE,
AND SECURELY STORE ALL ITEMS TO BE USED
FOR CONSTRUCTION.
8. THE CONTRACTOR SHALL TAKE ALL NECESSARY
PRECAUTIONARY MEASURES TO PROTECT THE
PUBLIC AND ADJACENT PROPERTIES FROM
DAMAGE THROUGHOUT CONSTRUCTION.
9. ANY EXISTING UTILITIES TO BE ABANDONED SHALL
BE PROPERLY DISCONNECTED, PLUGGED OR
CAPPED, AS REQUIRED BY CODE OR SOUND
CONSTRUCTION PRACTICE.
10. NO CHANGES, MODIFICATIONS OR DEVIATIONS
SHALL BE MADE FROM THE DRAWINGS OR
SPECIFICATIONS WITHOUT FIRST SECURING
WRITTEN PERMISSION FROM THE CONTRACTING
OFFICER.
11. WHERE LACK OF INFORMATION, OR ANY
DISCREPANCY SHOULD APPEAR IN THE
DRAWINGS OR SPECIFICATIONS, REQUEST
WRITTEN INTERPRETATION FROM THE
CONTRACTING OFFICER BEFORE PROCEEDING
WITH THAT PORTION OF THE WORK.
12. PROVIDE ADEQUATE CONCEALED BLOCKING AND
ANCHORING FOR ALL CEILING AND WALL
MOUNTED EQUIPMENT, HARDWARE AND
ACCESSORIES.
13. WHEN A SYSTEM OR ASSEMBLY IS SPECIFIED, ALL
NECESSARY PARTS AND MATERIALS REQUIRED
FOR A COMPLETE INSTALLATION/SYSTEM SHALL
BE INSTALLED ACCORDING TO THE
MANUFACTURERS INSTRUCTIONS.
14. UNLESS OTHERWISE NOTED, ELECTRICAL
CONDUITS, PLUMBING LINES, ETC., SHALL BE RUN
CONCEALED AND FRAMING SHALL BE ADEQUATE
SIZE TO ACCOMPLISH RESULT WITHOUT CAUSING
ANY CHANGES IN THE WALL PLANE.
15. COORDINATE WITH ALL TRADES THE LOCATIONS
OF SLEEVES OR OTHER PRESET ACCESSORIES
INVOLVING OTHER TRADES.
16. THESE PLANS SHOULD BE STUDIED AND USED IN
THEIR ENTIRETY AS INFORMATION VITAL TO EACH
STAGE OF CONSTRUCTION.
17. GENERAL CONTRACTOR WILL BE HELD SOLELY
RESPONSIBLE FOR COMPLETION OF ALL WORK
SHOWN OR REASONABLY IMPLIED BY THESE
DRAWINGS AND/OR SPECIFICATIONS.
18. DETAILS TAKE PRECEDENCE OVER PLANS &
ELEVATIONS - LARGER SCALE DRAWINGS TAKE
PRECEDENCE OVER SMALLER SCALE DRAWINGS.
19. MANUFACTURERS AND MODELS REFLECTED ON
DRAWINGS ARE DESIGN BASIS ONLY UNLESS
SPECIFICALLY NOTED AS “SOLE SOURCE”. FOR
ITEMS NOT LABELED AS “SOLE SOURCE”,
EQUIVALENT PRODUCT SUBSTITUTIONS ARE
PERMITTED PROVIDED THEY OFFER THE SAME OR
BETTER PERFORMANCE AND ARE APPROVED BY
THE CONTRACTING OFFICER THROUGH FORMAL
SUBMITTAL PROCESS.
20. CONTRACTOR SHALL PROTECT ALL MATERIALS
ON THE JOBSITE FROM THE ELEMENTS AND
ENSURE MATERIALS DON’T DEVELOP MOLD
THROUGHOUT THE PROJECT.
21. THE CONTRACTOR SHALL FURNISH COPIES OF
PERMITS, INSPECTIONS, AND CERTIFICATES TO
CONTRACTING OFFICER AS REQUESTED ALONG
WITH FIRST APPLICATION FOR PAYMENT.
22. THE CONTRACTOR SHALL BE RESPONSIBLE FOR
OBTAINING ALL REQUIRED BUILDING PERMITS
PRIOR TO THE COMMENCEMENT OF ANY WORK.
23. THE CONTRACTOR SHALL PROVIDE ALL
CERTIFICATES OF OCCUPANCY, PERMITS AND
CLOSE OUT DOCUMENTS TO CONTRACTING
OFFICER UPON COMPLETION OF PROJECT.
24. ANY ITEMS NOT BEING DEMOLISHED ARE TO BE
PROTECTED DURING CONSTRUCTION. IF
DAMAGED OR DESTROYED, REPLACE OR REPAIR
DAMAGED OR DESTROYED ITEMS WITH
APPROVED ITEMS AT NO EXPENSE TO THE
NATIONAL PARK SERVICE.
25. THE DESIGN OF THIS PROJECT IS BASED UPON
INFORMATION PROVIDED BY NATIONAL PARK
SERVICE THROUGH EXISTING DRAWINGS AND ON-
SITE OBSERVATION. VERIFY ALL EXISTING
DIMENSIONS AND CONDITIONS PRIOR TO
COMMENCING WORK. IF EXISTING CONDITIONS
ARE NOT AS DEPICTED OR ANTICIPATED, NOTIFY
THE CONTRACTING OFFICER IMMEDIATELY UPON
DISCOVERY AND DO NOT PROCEED WITHOUT
APPROVAL. IF CONTRACTOR PROCEEDS WITHOUT
APPROVAL, THE CONTRACTOR ACCEPTS FULL
LIABILITY FOR THAT PORTION OF CONSTRUCTION.
DATE:
TECH REVIEW:
DESIGNED: SUB SHEET NO. DRAWING NO.
PMIS/PKG NO.
SHEET
OF
LOCATION WITHIN PARK
TITLE OF SHEET
A/E FIRM
CROFT &
ASSOCIATES
KENNESAW,
GEORGIA
/2
/2
:2
:3
P M
GENERAL NOTESG102
A.LAMB
M.LAROSA
A.LAMB
2 70
NATCHEZ VISITOR CENTER 339
175314
311660B
NATCHEZ NATIONAL HISTORICAL PARK09/29/2021
A. SITE PLAN IS PROVIDED FOR CONTEXT ONLY. THERE ARE NO
PLANNED UPGRADES TO UTILITY INFRASTRUCTURE
SYSTEMS FOR THIS PROJECT.
B. CONTRACTOR IS RESPONSIBLE FOR ANY DAMAGE TO
EXISTING CONDITIONS. DAMAGE SHALL BE RESTORED TO
MATCH EXISTING OR BETTER.
C. CONTRACTOR IS RESPONSIBLE FOR REPAIRING DAMAGE TO
EXISTING LANDSCAPING ONCE PROJECT IS COMPLETE.
COORDINATE WITH PARK TO IDENTIFY LANDSCAPE
CONDITIONS TO BE RESTORED.
GENERAL SITE NOTES:
NATCHEZ
NATIO
NAL
HIS
TO
RIC
AL P
ARK
EXIT
GATE
ENTRY
GATE
A
C
B
KEY PLAN
DATE:
TECH REVIEW:
DESIGNED: SUB SHEET NO. DRAWING NO.
PMIS/PKG NO.
SHEET
OF
LOCATION WITHIN PARK
TITLE OF SHEET
A/E FIRM
CROFT &
ASSOCIATES
KENNESAW,
GEORGIA
/2
/2
:2
:2
P M
SITE LOGISTICS PLANG103
D.Designer
A.Author
C.Checker
3 70
NATCHEZ VISITOR CENTER 339
175314
311660B
NATCHEZ NATIONAL HISTORICAL PARK09/29/2021
B L D
G
G103
1 SITE LOGISTICS PLAN
SITE LOGISTICS KEYNOTE
1 PROPOSED SITE STAGING AREA. CONTRACTOR SHALL
COORDINATE WITH THE CONTRACTING OFFICER EXACT
LOCATION AND TOTAL AREA REQUIRED. CONSTRUCTION
PARKING WILL BE LIMITED TO STAGING AREA.
2 AN OFFICE WITHIN THE FACILITY WILL BE AVAILABLE FOR
THE CONTRACTOR TO CONDUCT CONSTRUCTION
BUSINESS. CONTRACTOR WILL BE RESPONSIBLE FOR ITS
OWN INTERNET AND DATA SERVICE.
3 CONTRACTOR FENCING COORDINATE W/ CONTRACTING
OFFICER EXACT LOCATION PRIOR TO INSTALLATION. 6'
HIGH CHAIN LINK FENCE, PRIVACY MESH, LOCKING GATE.
4 CONTRACTOR ENTRANCE TO JOBSITE FOR PURPOSE OF
CONSTRUCTION.
5 CONTRACTOR DUMPSTER LOCATION FOR CONSTRUCTION
WASTE.
6 CRANE / LIFT LOCATIONS
SCALE
100 0 100
SCALE OF FEET
GENERAL DEMOLITION NOTES:
D-1. PERSONNEL PROTECTION
FURNISH AND MAINTAIN TEMPORARY TYPES OF
PROTECTION AS NECESSARY TO ADEQUATELY PROTECT
AND PREVENT ACCIDENTAL INJURY TO THE PUBLIC,
PERSONNEL VISITING AND EMPLOYED AT THE WORK
AREA. TAKE ALL NECESSARY PRECAUTIONS TO KEEP
TRESPASSERS OUT OF WORK AREAS. PROPERLY
SECURE WORK AREAS FROM ENTRY WHEN WORK IS NOT
IN PROGRESS.
D-2. EXISTING CONDITIONS
A. OBVIOUS EXISTING CONDITIONS, INSTALLATIONS AND
OBSTRUCTIONS AFFECTING THE WORK SHALL BE TAKEN
INTO CONSIDERATION AS NECESSARY WORK TO BE
DONE, THE SAME AS THOUGH THEY WERE COMPLETELY
SHOWN OR DESCRIBED.
B. ITEMS OF EXISTING CONSTRUCTION INDICATED TO
REMAIN UPON COMPLETION OF THE CONTRACT, BUT
WHICH REQUIRE REMOVAL TO COMPLETE THE WORK,
SHALL BE CAREFULLY REMOVED AND REPLACED AS
REQUIRED TO PREVENT DAMAGE. THE REPLACED WORK
SHALL MATCH ITS CONDITION AT THE START OF THE
WORK UNLESS OTHERWISE REQUIRED.
C. VISIT THE SITE TO DETERMINE BY INSPECTION ALL
EXISTING CONDITIONS, INCLUDING ACCESS TO THE SITE,
THE NATURE OF STRUCTURES, OBJECTS AND MATERIALS
TO BE ENCOUNTERED, AND ALL OTHER FACTS
CONCERNING OR AFFECTING THE WORK. INFORMATION
ON THE DRAWINGS SHOWING EXISTING CONDITIONS
DOES NOT CONSTITUTE A GUARANTEE THAT OTHER
ITEMS MAY NOT BE FOUND OR ENCOUNTERED.
D-3. PROTECTION OF WORK TO REMAIN
A. PROTECT FROM ALL DAMAGE USING BARRICADES,
TARPAULINS, TEMPORARY WALLS, PLYWOOD, PLANKING,
MASKING, OR OTHER SUITABLE MEANS AND METHODS.
B. IF WORK TO REMAIN IS DAMAGED, RESTORE TO
ORIGINAL CONDITION AT NO ADDITIONAL COST.
C. DO NOT DAMAGE OR ALTER ANY STRUCTURAL
ELEMENT OR THE EXISTING BUILDING, UNLESS SHOWN
ON STRUCTURAL DRAWINGS. WHERE LOAD BEARING
STRUCTURAL ELEMENTS SHOWN ON STRUCTURAL
DRAWINGS ARE TO BE REMOVED OR ALTERED, PROVIDE
TEMPORARY SHORING THAT CARRIES THE EXISTING
LOADS WITHOUT DAMAGE OR DEFLECTION.
D-4. CLEANING
REMOVE DEMOLITION DEBRIS AS IT IS PRODUCED. DO
NOT ALLOW DEBRIS TO ACCUMULATE ON SITE OR IN THE
BUILDING. REMOVE FROM SITE AND MAKE LEGAL
DISPOSAL. KEEP WORK AREA BROOM CLEAN.
D-5. CUTTING AND PATCHING
THE REMOVAL AND REPLACEMENT OF EXISTING
CEILINGS AND THE CUTTING AND PATCHING AND/OR
REPLACEMENT OF EXISTING WALLS, PARTITIONS AND
FLOORS AS MAY BE NECESSARY FOR ACCESS TO
VALVES, PIPING, CONDUIT AND TUBING BY MECHANICAL
AND ELECTRICAL TRADES SHALL BE INCLUDED AND
PERFORMED AS AN OBLIGATION OF, AND AS DIRECTED
BY THE CONTRACTOR AND APPROVED BY THE
CONTRACTING OFFICER. THE PATCHING AND/OR
REPLACEMENT SHALL BE PERFORMED BY THE
APPROPRIATE SUBCONTRACTOR FOR THE WORK
INVOLVED, OR BY OTHER PROPERLY QUALIFIED
SUBCONTRACTOR OR LABOR AS DETERMINED BY THE
CONTRACTOR.
D-6. MATCHING EXISTING PRODUCTS
A. WHERE NEW PRODUCTS ARE IN THE SAME VIEWING
AREA AS EXISTING ONES, EVERY EFFORT SHALL BE
MADE BY THE CONTRACTOR TO USE MATCHING
DESIGNS, PATTERNS AND FINISHES.
B. IF REASONABLY MATCHING PRODUCTS ARE NOT
OBTAINABLE, CONTRACTOR SHALL IMPROVE
APPEARANCE BY MINOR RELOCATING OF SOME EXISTING
PRODUCTS AND GROUPING NEW ONES IN A PATTERN
DETERMINED WITH THE CONTRACTING OFFICER.
D-7. SALVAGED MATERIALS
CAREFULLY REMOVE TO AVOID DAMAGE. THOROUGHLY
CLEAN, PAINT (WHERE APPLICABLE), AND REINSTALL AS
INDICATED, OR STORE AS DIRECTED. FURNISH NEW
MATERIALS IF MATERIAL CANNOT BE RELOCATED.
CONTRACTOR, AT HIS OPTION, MAY FURNISH NEW
MATERIALS (MATCH EXISTING) IN LIEU OF RELOCATING
EXISTING.
D-8. CONCEALED CONDITIONS
IF SUCH CONDITIONS CAUSE CHANGES IN THE WORK
FROM REQUIREMENTS OF THE CONTRACT DOCUMENTS,
THE CONTRACT SUM WILL BE ADJUSTED IN
ACCORDANCE WITH THE GENERAL CONDITIONS.
D-10. BUILDING RULES
MEET WITH CONTRACTING OFFICER TO DISCUSS RULES
AND PROCEDURES FOR ACCESS TO WORK AREAS,
DELIVERY AND STORING OF MATERIALS, REMOVAL OF
TRASH AND DEBRIS, TRASH DUMPSTER LOCATION AND
CONSTRUCTION PERSONNEL PARKING.
D-11. COORDINATING WITH CONTRACTING OFFICER
ACCESS TO SERVER ROOM 267 AND AV EQUIPMENT
ROOM 117. NPS PERSONNEL MUST BE PRESENT WHEN
ACCESS TO THESE ROOMS ARE NEEDED.
D-12. PRIOR TO STARTING ANY WORK ON THE ROOF
COORDINATE WITH THE CONTRACTING OFFICER FOR
ROOF MANUFACTURER'S WARRANTY. MODIFICATION TO
THE ROOF MUST BE MADE BY A CERTIFIED INSTALLER.
DEMOLITION NOTES:
NOTE:
IN EACH OFFICE/ROOM WHERE CEILING TILE AND GRID ARE TO BE REMOVED AND REPLACED,
ALL ITEMS HANGING ON THE WALLS THAT MAY BE DISTURBED DURING THIS PROCESS
SHOULD BE REMOVED, STORED SECURELY, REPLACED WHEN CEILING IS REPLACED.
ONLY CEILINGS INCLUDED IN THIS CONTRACT (HVAC REPLACEMENT) ARE TO BE
REPLACED/REPAIRED AS PART OF THIS WORK.
1. IN ALL ACOUSTICAL TILE CEILINGS SECURE ALL LIGHT FIXTURES, TIE IN PLACE FOR
REINSTALLATION IN SAME LOCATION. TAKE CARE TO NOT DAMAGE LIGHT FIXTURES DURING
CONSTRUCTION.
2. ALL SPRINKLER HEADS TO BE REMOVED FROM TILE AND REMAIN IN PLACE AND IN
WORKING ORDER DURING CONSTRUCTION. EXISTING SPRINKLER HEADS TO BE CENTERED IN
NEW ACOUSTICAL CEILING TILE.
3. CARE SHOULD BE TAKEN TO NOT DAMAGE EXISTING SECURITY EQUIPMENT IN PLACE, NOT
TO INTERRUPT THE WORKING OF THIS EQUIPMENT AT ANY TIME DURING CONSTRUCTION IF
POSSIBLE. IF THIS IS NOT POSSIBLE, NOTIFY CONTRACTING OFFICER (C.O.) IMMEDIATELY.
4. IF THERE IS A QUESTION AS TO FUNCTION OF ANY EXISTING ITEM ATTACHED TO THE
CEILING, VERIFY WITH C.O. IF ITEM IS IN USE. IF NOT IN USE, REMOVE AND DISCARD SAFELY;
IF IN USE, REMOVE, TAG LOCATION FOR REINSTALLATION IN SAME LOCATION. STORE ITEM IN
A PROTECTED AREA.
5. REMOVE ALL CEILING MOUNTED EMERGENCY EXIT SIGNS, TAG SIGN AND LOCATION FOR
REINSTALLATION IN SAME LOCATION. STORE SIGN IN A PROTECTED AREA.
6. REMOVE ALL SMOKE ALARMS, TAG ALARM AND LOCATION FOR REINSTALLATION IN SAME
LOCATION. STORE IN A PROTECTED AREA.
7. AT ALL TIMES CARE SHOULD BE TAKEN TO PROTECT ANY FURNITURE, EQUIPMENT, ETC., IN
AREAS WHERE CEILINGS ARE TO BE REMOVED. IF ANY ITEM IS DAMAGED AT ANY TIME
DURING CONSTRUCTION, SAID ITEM MUST BE REPAIRED/REPLACED AT CONTRACTOR'S
EXPENSE. IF ITEM IS REPLACE, ITEM MUST BE OF LIKE QUALITY, SIZE, AND FUNCTION.
8. IN THE EXHIBIT HALL REMOVE ALL DECORATIVE WOOD CEILINGS, STORE MATERIAL BY
LOCATION IN A DRY, PROTECTED AREA FOR REINSTALLATION IN SAME LOCATION AFTER
HVAC SYSTEMS AND DUCTWORK ARE INSTALLED.
9. IN THE EXHIBIT HALL REMOVE ALL LIGHT FIXTURES, SPEAKER RACKS, ETC. TAG FIXTURE
AND JUNCTION BOX; STORE LIGHT FIXTURE IN A PROTECTED AREA FOR REINSTALLATION IN
SAME LOCATION. TAG SPEAKER RACKS, NOTE ORIENTATION, TAG JUNCTION BOX; STORE IN A
PROTECTED AREA FOR REINSTALLATION IN SAME LOCATION.
10. IN EXHIBIT HALL REMOVE ALL EMERGENCY EXIT SIGNS AND SMOKE ALARMS, TAG
JUNCTION BOXES AND LOCATION FOR REINSTALLATION IN SAME LOCATION.
11. IN EXHIBIT HALL ALL SPRINKLER HEADS IN DECORATIVE WOOD CEILINGS ARE TO BE
REMOVED IN ORDER NOT TO DAMAGE WOOD DURING REMOVAL. HEADS ARE TO BE IN PLACE
AND IN WORKING ORDER DURING CONSTRUCTION. REPEAT PROCESS WHEN DECORATIVE
WOOD CEILINGS ARE REPLACED.
12. IN EXHIBIT HALL CARE SHOULD BE TAKEN TO NOT DAMAGE EXISTING SECURITY
EQUIPMENT IN PLACE, NOT TO INTERRUPT THE WORKING OF THIS EQUIPMENT AT ANY TIME
DURING CONSTRUCTION IF POSSIBLE. IF THIS IS NOT POSSIBLE, NOTIFY CONTRACTING
OFFICER IMMEDIATELY.
13. IN EXHIBIT HALL GREAT CARE SHOULD BE TAKEN TO PROTECT ALL MURALS, WALL
HANGINGS, FREE STANDING EXHIBITS, ETC., DURING CONSTRUCTION. ANY DAMAGE DONE IS
TO BE REPAIRED AT CONTRACTOR'S EXPENSE.
14. REMOVE, STORE, AND/OR PROTECT ALL EXHIBITS WHEN CEILING WORK IS BEING
PERFORMED IN THE EXHIBIT HALL.
15. PROTECT SURROUNDING AREA AND ITEMS FROM FIRE WHERE ANY WELDING IS
OCCURRING. SECURE HOT WORK PERMITS WHERE WELDING IS REQUIRED.
16. CONTRACTOR SHALL RECORD EXACT LOCATION OF CEILING GRIDS SO THAT SPRINKLER
HEADS ARE CENTERED ON THE NEW CEILING TILE.
17. SERVER ROOM - PROTECT IT EQUIPMENT DURING DEMOLITION AND CONSTRUCTION IN
ROOMS 267 AND 117.
1. THE EXISTING SPRINKLER SYSTEM IS INTENDED TO REMAIN IN OPERATION WHILE
CONSTRUCTION TAKES PLACE.
2. TAKE NECESSARY PRECAUTIONS IF SYSTEM OR PART OF THE SYSTEM REQUIRES TO BE
DRAINED TO FACILITATE CONSTRUCTION.
SYSTEM SHALL BE RE-CHARGED AND TESTED AS REQUIRED BY NFPA.
3. REPLACE SPRINKLER HEADS TO MATCH EXISTING IN THE EVENT THEY GET DAMAGED
DURING CONSTRUCTION. ONCE DUCTWORK
IN MECHANICAL ROOMS IS INSTALLED, PROVIDE NEW SPRINKLER HEADS AS REQUIRED
UNDER THE NEW WORK TO MEET NFPA 13.
4. THE EXISTING FIRE ALARM SYSTEM IS INTENDED TO REMAIN IN OPERATION WHILE
CONSTRUCTION TAKES PLACE.
GENERAL NOTES: FIRE SPRINKLER AND FIRE ALARM SYSTEMS:
DATE:
TECH REVIEW:
DESIGNED: SUB SHEET NO. DRAWING NO.
PMIS/PKG NO.
SHEET
OF
LOCATION WITHIN PARK
TITLE OF SHEET
A/E FIRM
CROFT &
ASSOCIATES
KENNESAW,
GEORGIA
/2
/2
:4
:4
P M
DEMOLITION NOTESAD001
A. LAMB
A. POWELL
A. LAMB
4 70
NATCHEZ VISITOR CENTER 339
175314
311660B
NATCHEZ NATIONAL HISTORICAL PARK09/29/2021
N
BCDEFGHJKLMP
D1
D4
D2
D4 A
A M
A T
C H
L
IN
E A
A M
A T
C H
L
IN
E
D1 D1 D1 D1 D1 D1 D1 D1 D1 D1 D1 D1
D1 D1 D1 D1 D1 D1
D2 D2
D2
D2
CORRIDOR
LOBBY
RECEP
CONF.
OFFICE
OFFICE
OFFICE
OFFICE
ACCOUNTING
OFFICE 7
CONFERENCE 2
OFFICE
CORRIDOR
ELEC. DIST.
CATERING STORAGE
STORAGE
WOMEN
MEN
CONF. STORAGE
DISTRIBUTION ROOM
MECH
BREAK ROOM
STORAGE
WORKROOM
STAIR 4
CORRIDOR
D4
A
C
B
KEY PLAN
DEMO LEGEND:
EXISTING WALL TO REMAIN
DEMO CEILING
DEMO LIGHT, SEE
ELECTRICAL
DEMO AIR SUPPLY,
SEE MECHANICAL
DEMO AIR RETURN,
SEE MECHANICAL
DEMO LIGHT, SEE
ELECTRICAL
GENERAL NOTE:
REFER TO ALTERNATE AND PHASING
NOTES ON DRAWING M001
DATE:
TECH REVIEW:
DESIGNED: SUB SHEET NO. DRAWING NO.
PMIS/PKG NO.
SHEET
OF
LOCATION WITHIN PARK
TITLE OF SHEET
A/E FIRM
CROFT &
ASSOCIATES
KENNESAW,
GEORGIA
/2
/2
:4
:0
P M
DEMOLITION RCP - BASE
BID - FIRST FLOORAD101
A.LAMB
M.LAROSA
A.LAMB
5 70
NATCHEZ VISITOR CENTER 339
175314
311660B
NATCHEZ NATIONAL HISTORICAL PARK09/29/2021
AD101
1 DEMOLITION RCP - BASE BID - FIRST FLOOR - PART A
8 0 8 16
SCALE OF FEET
B L D
G
DEMOLITION REFLECTED CEILING PLAN KEYNOTES
D1 2'x2' ACT CEILINGS. DEMOLISH WHERE INDICATED
D2 GWB CEILING - REMOVE ONLY AS REQUIRED TO REPLACE
MECHANICAL SYSTEM COMPONENTS.
D3 EXISTING WOOD CEILING TO BE REMOVED CAREFULLY,
PROTECTED, STORED, AND REINSTALLED.
D4 OPEN TO STRUCTURE (EXISTING TO REMAIN). REFER TO
MECHANICAL DWGS FOR SCOPE IN THIS AREA.
BCDEFGHJKLM
D1
D4
A A
M A
T C
H L
IN
E
D1 D1D1D1D1D1D1D1D1
D1 D1 D1 D1 D1
D1
A A
M A
T C
H L
IN
E
D4
D4
D4
D2
STORAGE
MEN
WOMEN
STORAGE
SERVER ROOM
MECH.
BREAK RM.
STORAGE
LOBBY
ADMIN
OFFICE
OFFICE
OFFICE
OFFICE
OFFICE
CONF.
BROCHURE
WORK RM.
BROCHURE
STORAGE
ENTRY
STAIR 4
CORRIDOR
A
C
B
KEY PLAN
DEMO LEGEND:
EXISTING WALL TO REMAIN
DEMO CEILING
DEMO LIGHT, SEE
ELECTRICAL
DEMO AIR SUPPLY,
SEE MECHANICAL
DEMO AIR RETURN,
SEE MECHANICAL
DEMO LIGHT, SEE
ELECTRICAL
GENERAL NOTE:
REFER TO ALTERNATE AND PHASING
NOTES ON DRAWING M001
DATE:
TECH REVIEW:
DESIGNED: SUB SHEET NO. DRAWING NO.
PMIS/PKG NO.
SHEET
OF
LOCATION WITHIN PARK
TITLE OF SHEET
A/E FIRM
CROFT &
ASSOCIATES
KENNESAW,
GEORGIA
/2
/2
:4
:3
P M
DEMOLITION RCP - BASE
BID - SECOND FLOORAD102
A.LAMB
M.LAROSA
A.LAMB
6 70
NATCHEZ VISITOR CENTER 339
175314
311660B
NATCHEZ NATIONAL HISTORICAL PARK09/29/2021
AD102
1 DEMO RCP - BASE BID - SECOND FLOOR - PART A
8 0 8 16
SCALE OF FEET
B L D
G
DEMOLITION REFLECTED CEILING PLAN KEYNOTES
D1 2'x2' ACT CEILINGS. DEMOLISH WHERE INDICATED
D2 GWB CEILING - REMOVE ONLY AS REQUIRED TO REPLACE
MECHANICAL SYSTEM COMPONENTS.
D3 EXISTING WOOD CEILING TO BE REMOVED CAREFULLY,
PROTECTED, STORED, AND REINSTALLED.
D4 OPEN TO STRUCTURE (EXISTING TO REMAIN). REFER TO
MECHANICAL DWGS FOR SCOPE IN THIS AREA.
PQRST
AD103
D4
DOUBLE
HEIGHT
SPACE
(REFER TO
2/AD103)
D4
S im
QUEUING
VESTIBULE
BOOKSTORE
BOOKSTORE STORAGE
CORRIDOR
CORRIDOR
STAIR 3
JAN.
CATERING STORAGE
A A
M A
T C
H L
IN
E A
A M
A T
C H
L
IN
E
D1
D2
D1
FOR DOUBLE HEIGHT SPACES BELOW -
REFER TO SECOND FLOOR PLAN
D4
D4
PQRST
AD103
D1
BB MATCHLINE
D3
D3
A A
M A
T C
H L
IN
E A
A M
A T
C H
L
IN
E
BB MATCHLINE
D1
D2
D2
D2 D2
D1 D1
D1
D1
3 Sim
D2
D4
ELEV. MACH.
STAIR 3
CORRIDOR
ELEC.
ROOM
MECH.
BOOKSTORE
BRIDGE
RAMP
PRE-SHOW
D1
D4
ACCESS DOOR
ACCESS
DOOR
A
C
B
KEY PLAN
DEMO LEGEND:
EXISTING WALL TO REMAIN
DEMO CEILING
DEMO LIGHT, SEE
ELECTRICAL
DEMO AIR SUPPLY,
SEE MECHANICAL
DEMO AIR RETURN,
SEE MECHANICAL
DEMO LIGHT, SEE
ELECTRICAL
GENERAL NOTE:
REFER TO ALTERNATE AND PHASING
NOTES ON DRAWING M001
DATE:
TECH REVIEW:
DESIGNED: SUB SHEET NO. DRAWING NO.
PMIS/PKG NO.
SHEET
OF
LOCATION WITHIN PARK
TITLE OF SHEET
A/E FIRM
CROFT &
ASSOCIATES
KENNESAW,
GEORGIA
/2
/2
:4
:3
P M
DEMOLITION RCP - BASE
BID - PART BAD103
A.LAMB
M.LAROSA
A.LAMB
7 70
NATCHEZ VISITOR CENTER 339
175314
311660B
NATCHEZ NATIONAL HISTORICAL PARK09/29/2021
8 0 8 16
SCALE OF FEET
B L D
G
AD103
1 DEMO RCP - BASE BID - FIRST FLOOR - PART B
AD103
2 DEMO RCP - BASE BID - SECOND FLOOR - PART B
AD103
4 BOOKSTORE FIRST FLOOR
AD103
3 BOOKSTORE SECOND FLOOR
DEMOLITION REFLECTED CEILING PLAN KEYNOTES
D1 2'x2' ACT CEILINGS. DEMOLISH WHERE INDICATED
D2 GWB CEILING - REMOVE ONLY AS REQUIRED TO REPLACE
MECHANICAL SYSTEM COMPONENTS.
D3 EXISTING WOOD CEILING TO BE REMOVED CAREFULLY,
PROTECTED, STORED, AND REINSTALLED.
D4 OPEN TO STRUCTURE (EXISTING TO REMAIN). REFER TO
MECHANICAL DWGS FOR SCOPE IN THIS AREA.
NOTE - FOR ALTERNATE 1 - DEDUCT
ARCHITECTURAL WORK FROM PLAN
AREA PART B AND PART C, UNO.
NPQRST
D4
D4
D1
D2
D3
D3
D3
D3
D2
D2
D2
D1
BB MATCHLINE BB MATCHLINE
D2
D2
D2
D2
D2
D2
D2
D2
D2
D2
D2
D1
D1
D1
D1
D1
D1
THEATRE
OFFICE
AV. EQUIP.
STORAGE
MECH.
FIRST AID
OFFICE
TICKETING
PRE-SHOW
VISIT PLANNING
ORIENTATION
111 ENTRY
VENDING
WOMEN
MEN
MAINT. ROOM
A
C
B
KEY PLAN
DEMO LEGEND:
EXISTING WALL TO REMAIN
DEMO CEILING
DEMO LIGHT, SEE
ELECTRICAL
DEMO AIR SUPPLY,
SEE MECHANICAL
DEMO AIR RETURN,
SEE MECHANICAL
DEMO LIGHT, SEE
ELECTRICAL
GENERAL NOTE:
REFER TO ALTERNATE AND PHASING
NOTES ON DRAWING M001
DATE:
TECH REVIEW:
DESIGNED: SUB SHEET NO. DRAWING NO.
PMIS/PKG NO.
SHEET
OF
LOCATION WITHIN PARK
TITLE OF SHEET
A/E FIRM
CROFT &
ASSOCIATES
KENNESAW,
GEORGIA
/2
/2
:4
:0
P M
DEMOLITION RCP - BASE
BID - PART CAD104
A.LAMB
M.LAROSA
A.LAMB
8 70
NATCHEZ VISITOR CENTER 339
175314
311660B
NATCHEZ NATIONAL HISTORICAL PARK09/29/2021
AD104
1 DEMO RCP - BASE BID - FIRST FLOOR - PART C
8 0 8 16
SCALE OF FEET
B L D
G
DEMOLITION REFLECTED CEILING PLAN KEYNOTES
D1 2'x2' ACT CEILINGS. DEMOLISH WHERE INDICATED
D2 GWB CEILING - REMOVE ONLY AS REQUIRED TO REPLACE
MECHANICAL SYSTEM COMPONENTS.
D3 EXISTING WOOD CEILING TO BE REMOVED CAREFULLY,
PROTECTED, STORED, AND REINSTALLED.
D4 OPEN TO STRUCTURE (EXISTING TO REMAIN). REFER TO
MECHANICAL DWGS FOR SCOPE IN THIS AREA.
NOTE - FOR ALTERNATE 1 - DEDUCT
UP
N
BCDEFGHJKLMPQRST
1" / 1'-0"
1" / 1'-0"
D6
D7 D5
D6
D8
D8
D8
D6
DATE:
TECH REVIEW:
DESIGNED: SUB SHEET NO. DRAWING NO.
PMIS/PKG NO.
SHEET
OF
LOCATION WITHIN PARK
TITLE OF SHEET
A/E FIRM
CROFT &
ASSOCIATES
KENNESAW,
GEORGIA
/2
/2
:5
:3
P M
DEMOLITION - BASE BID -
ROOF PLANAD110
Designer
Author
Checker
9 70
NATCHEZ VISITOR CENTER 339
175314
311660B
NATCHEZ NATIONAL HISTORICAL PARK09/29/2021
AD110
1 DEMO ROOF PLAN - BASE BID
DEMOLITION ROOF PLAN KEYNOTES
D5 CHILLER TO BE REMOVED. REFER TO MECHANICAL AND ELECTRICAL
DRAWINGS.
D6 DEMOLISH EXISTING MECHANICAL EQUIPMENT ON ROOF, MODIFY/REPAIR
EXISTING ROOF IN ORDER TO PERFORM WORK. PROTECT SURROUNDING
ROOF STRUCTURE AND INTERIOR OF FACILITY FROM WEATHER DURING
CONSTRUCTION. REFER TO MECHANICAL AND ELECTRICAL DRAWINGS.
D7 REMOVE EXISTING FAN IN EXTERIOR WALL, REMOVING ENOUGH OF EXISTING
EXTERIOR WALL FINISHES TO PERFORM WORK. PROTECT SURROUNDING
WALL AND INTERIOR OF FACILITY DURING CONSTRUCTION. REFER TO
MECHANICAL AND ELECTRICAL DRAWINGS. REPAIR WALL TO LIKE NEW
CONDITION.
D8 REMOVE EXISTING MECHANICAL EQUIPMENT. PROTECT SURROUNDING ROOF
STRUCTURE AND INTERIOR OF FACILITY DURING CONSTRUCTION. REFER TO
MECHANICAL AND ELECTRICAL DRAWINGS.
NOTE - FOR ALTERNATE 1 ON ROOF -
REFER TO MECHANICAL.
16 0 16 32
SCALE OF FEET
B L D
G
BCDEFGHJKLM
A A
M A
T C
H L
IN
E A
A M
A T
C H
L
IN
E
1 1 1 1 1 1 1 1 1 1 1 1
11111
2 2
CORRIDOR
LOBBY
RECEP
CONF.
OFFICE
OFFICE
OFFICE
OFFICE
ACCOUNTING
OFFICE 7
CONFERENCE 2
OFFICE
CORRIDOR
ELEC. DIST.
CATERING STORAGE
STORAGE
WOMEN
MEN
CONF. STORAGE
DISTRIBUTION ROOM
MECH
BREAK ROOM
STORAGE
WORKROOM
STAIR 4
CORRIDOR
2' x 4' LAY-IN LIGHT FIXTURE
6" RECESSED CAN LIGHT
STRIP LIGHT
RCP LEGEND:
2' x 2' ACT GRID
GWB CEILING
2' x 2' SUPPLY DIFFUSER
2' x 2' RETURN REGISTER
2' x 2' CEILING CASSETTE FAN COIL
DATE:
TECH REVIEW:
DESIGNED: SUB SHEET NO. DRAWING NO.
PMIS/PKG NO.
SHEET
OF
LOCATION WITHIN PARK
TITLE OF SHEET
A/E FIRM
CROFT &
ASSOCIATES
KENNESAW,
GEORGIA
/2
/2
:2
:3
P M
REFLECTED CEILING PLAN -
BASE BID - FIRST FLOORA131
A.LAMB
M.LAROSA
A.LAMB
10 70
NATCHEZ VISITOR CENTER 339
175314
311660B
NATCHEZ NATIONAL HISTORICAL PARK09/29/2021
A131
1 RCP - BASE BID - FIRST FLOOR - PART A
8 0 8 16
SCALE OF FEET
REFLECTED CEILING PLAN KEYNOTES
1 NEW 2'x2' TEGULAR ACT TILE AND GRID. ALL NEW TILE TO GO
BACK IN SAME LOCATION AS EXISTING TO ALIGN WITH
EXISTING CEILING COMPONENTS (I.E.: SPRINKLER HEADS,
LIGHTING, ETC.). INTENT - SPRINKLER HEADS WILL NOT BE
RELOCATED.
2 PATCH/REPAIR GWB CEILING AS REQUIRED WHERE
REMOVED FOR MECHANICAL WORK. PAINT
REPAIRED/REPLACED HORIZONTAL GWB CEILING.
COORDINATE LOCATION OF DIFFUSERS WITH MECHANICAL
DWGS. WHERE LINEAR DIFFUSERS ARE RELOCATED,
REPLACE GWB TO LIKE NEW CONDITION.
3 REINSTALL EXISTING STORED WOOD CEILING IN ORIGINAL
LOCATION. REATTACH ALL LIGHTING, SPRINKLER HEADS,
SECURITY EQUIPMENT, ETC., IN SAME LOCATIONS AS
BEFORE DEMOLITION.
B L D
G
T
TT
N
BCDEFGHJKLM
STORAGE
MEN
WOMEN
STORAGE
SERVER ROOM
MECH.
BREAK RM.
STORAGE
BROCHURE
WORK RM.
CONF.
OFFICE
OFFICE
OFFICE
OFFICE
OFFICE
ADMIN
LOBBY
STAIR 4
BROCHURE
STORAGE
AA MATCHLINE
A A
M A
T C
H L
IN
E
1 1 1 11 1 1
11111
2 2
CORRIDOR
ENTRY
A
C
B
KEY PLAN
2' x 4' LAY-IN LIGHT FIXTURE
6" RECESSED CAN LIGHT
STRIP LIGHT
RCP LEGEND:
2' x 2' ACT GRID
GWB CEILING
2' x 2' SUPPLY DIFFUSER
2' x 2' RETURN REGISTER
2' x 2' CEILING CASSETTE FAN COIL
DATE:
TECH REVIEW:
DESIGNED: SUB SHEET NO. DRAWING NO.
PMIS/PKG NO.
SHEET
OF
LOCATION WITHIN PARK
TITLE OF SHEET
A/E FIRM
CROFT &
ASSOCIATES
KENNESAW,
GEORGIA
/2
/2
:2
:4
P M
REFLECTED CEILING PLAN -
BASE BID - SECOND FLOORA132
A.LAMB
M.LAROSA
A.LAMB
11 70
NATCHEZ VISITOR CENTER 339
175314
311660B
NATCHEZ NATIONAL HISTORICAL PARK09/29/2021
A132
1 RCP - BASE BID - SECOND FLOOR - PART A
B L D
G
8 0 8 16
SCALE OF FEET
REFLECTED CEILING PLAN KEYNOTES
1 NEW 2'x2' TEGULAR ACT TILE AND GRID. ALL NEW TILE TO GO
BACK IN SAME LOCATION AS EXISTING TO ALIGN WITH
EXISTING CEILING COMPONENTS (I.E.: SPRINKLER HEADS,
LIGHTING, ETC.). INTENT - SPRINKLER HEADS WILL NOT BE
RELOCATED.
2 PATCH/REPAIR GWB CEILING AS REQUIRED WHERE
REMOVED FOR MECHANICAL WORK. PAINT
REPAIRED/REPLACED HORIZONTAL GWB CEILING.
COORDINATE LOCATION OF DIFFUSERS WITH MECHANICAL
DWGS. WHERE LINEAR DIFFUSERS ARE RELOCATED,
REPLACE GWB TO LIKE NEW CONDITION.
3 REINSTALL EXISTING STORED WOOD CEILING IN ORIGINAL
LOCATION. REATTACH ALL LIGHTING, SPRINKLER HEADS,
SECURITY EQUIPMENT, ETC., IN SAME LOCATIONS AS
BEFORE DEMOLITION.
PQ
RST
A A
M A
T C
H L
IN
E A
A M
A T
C H
L
IN
E
QUEUING
BOOKSTORE
BOOKSTORE STORAGE
CORRIDOR
STAIR 3
JAN.
CATERING STORAGE
DOUBLE
HEIGHT
SPACE
(REFER TO
2/A133)
FOR DOUBLE HEIGHT SPACES BELOW -
REFER TO SECOND FLOOR PLAN
PQ
RST
BB MATCHLINEBB MATCHLINE
A A
M A
T C
H L
IN
E A
A M
A T
C H
L
IN
E
BB MATCHLINE
1 1
THEATRE
PRE-SHOW
PROJECTION
BOOKSTORE
ELEV.
STAIR 3
ACCESS
DOOR
ACCESS DOOR
CORRIDOR
ELEV. MACH.
ELEC.
ROOM
MECH.
RAMP
2' x 4' LAY-IN LIGHT FIXTURE
6" RECESSED CAN LIGHT
STRIP LIGHT
RCP LEGEND:
2' x 2' ACT GRID
GWB CEILING
2' x 2' SUPPLY DIFFUSER
2' x 2' RETURN REGISTER
2' x 2' CEILING CASSETTE FAN COIL
A
C
B
KEY PLAN
DATE:
TECH REVIEW:
DESIGNED: SUB SHEET NO. DRAWING NO.
PMIS/PKG NO.
SHEET
OF
LOCATION WITHIN PARK
TITLE OF SHEET
A/E FIRM
CROFT &
ASSOCIATES
KENNESAW,
GEORGIA
/2
/2
:3
:2
P M
REFLECTED CEILING PLAN -
BASE BID - PART BA133
A.LAMB
M.LAROSA
A.LAMB
12 70
NATCHEZ VISITOR CENTER 339
175314
311660B
NATCHEZ NATIONAL HISTORICAL PARK09/29/2021
B L D
G
A133
1 RCP - BASE BID - FIRST FLOOR - PART B
A133
2 RCP - BASE BID - SECOND FLOOR - PART B
REFLECTED CEILING PLAN KEYNOTES
1 NEW 2'x2' TEGULAR ACT TILE AND GRID. ALL NEW TILE TO GO
BACK IN SAME LOCATION AS EXISTING TO ALIGN WITH
EXISTING CEILING COMPONENTS (I.E.: SPRINKLER HEADS,
LIGHTING, ETC.). INTENT - SPRINKLER HEADS WILL NOT BE
RELOCATED.
2 PATCH/REPAIR GWB CEILING AS REQUIRED WHERE
REMOVED FOR MECHANICAL WORK. PAINT
REPAIRED/REPLACED HORIZONTAL GWB CEILING.
COORDINATE LOCATION OF DIFFUSERS WITH MECHANICAL
DWGS. WHERE LINEAR DIFFUSERS ARE RELOCATED,
REPLACE GWB TO LIKE NEW CONDITION.
3 REINSTALL EXISTING STORED WOOD CEILING IN ORIGINAL
LOCATION. REATTACH ALL LIGHTING, SPRINKLER HEADS,
SECURITY EQUIPMENT, ETC., IN SAME LOCATIONS AS
BEFORE DEMOLITION.
8 0 8 16
SCALE OF FEET
NOTE - FOR ALTERNATE 1 - DEDUCT
NPQRST
14'-1"
BB MATCHLINE BB MATCHLINE
THEATRE
PRE-SHOW
VISIT PLANNING
OFFICE
AV. EQUIP.
STORAGE
MECH.
FIRST AID
OFFICE
ENTRY
ORIENTATION
MAINT. ROOM
MEN
WOMEN
VENDING
A
C
B
KEY PLAN
2' x 4' LAY-IN LIGHT FIXTURE
6" RECESSED CAN LIGHT
STRIP LIGHT
RCP LEGEND:
2' x 2' ACT GRID
GWB CEILING
2' x 2' SUPPLY DIFFUSER
2' x 2' RETURN REGISTER
2' x 2' CEILING CASSETTE FAN COIL
DATE:
TECH REVIEW:
DESIGNED: SUB SHEET NO. DRAWING NO.
PMIS/PKG NO.
SHEET
OF
LOCATION WITHIN PARK
TITLE OF SHEET
A/E FIRM
CROFT &
ASSOCIATES
KENNESAW,
GEORGIA
/2
/2
:3
:5
P M
REFLECTED CEILING PLAN -
BASE BID - PART CA134
A.LAMB
M.LAROSA
A.LMB
13 70
NATCHEZ VISITOR CENTER 339
175314
311660B
NATCHEZ NATIONAL HISTORICAL PARK09/29/2021
B L D
G
8 0 8 16
SCALE OF FEET
A134
1 RCP - BASE BID - FIRST FLOOR - PART C
REFLECTED CEILING PLAN KEYNOTES
1 NEW 2'x2' TEGULAR ACT TILE AND GRID. ALL NEW TILE TO GO
BACK IN SAME LOCATION AS EXISTING TO ALIGN WITH
EXISTING CEILING COMPONENTS (I.E.: SPRINKLER HEADS,
LIGHTING, ETC.). INTENT - SPRINKLER HEADS WILL NOT BE
RELOCATED.
2 PATCH/REPAIR GWB CEILING AS REQUIRED WHERE
REMOVED FOR MECHANICAL WORK. PAINT
REPAIRED/REPLACED HORIZONTAL GWB CEILING.
COORDINATE LOCATION OF DIFFUSERS WITH MECHANICAL
DWGS. WHERE LINEAR DIFFUSERS ARE RELOCATED,
REPLACE GWB TO LIKE NEW CONDITION.
3 REINSTALL EXISTING STORED WOOD CEILING IN ORIGINAL
LOCATION. REATTACH ALL LIGHTING, SPRINKLER HEADS,
SECURITY EQUIPMENT, ETC., IN SAME LOCATIONS AS
BEFORE DEMOLITION.
NOTE - FOR ALTERNATE 1 - DEDUCT
GENERAL ROOF PLAN NOTES:
A. QUANTITIES AND LOCATIONS OF ROOF TOP MECHANICAL
EQUIPMENT ARE APPROXIMATE. GENERAL CONTRACTOR
MUST COORDINATE EXACT ITEMS AND LOCATIONS FOR
STRUCTURAL SUPPORT AND ROOF PENETRATIONS.
B. CONTRACTOR TO PROVIDE POSITIVE DRAINAGE AROUND ALL
ROOF TOP EQUIPMENT AS NECESSARY.
C. CONTRACTOR TO PROVIDE POSITIVE DRAINAGE TO ALL
EXISTING SCUPPERS AND ROOF DRAINS.
D. ALL ROOF PENETRATIONS SHALL EXTEND A MINIMUM OF 8"
ABOVE FINISHED ROOF TO TOP OF CURB OR VENT.
E. DO NOT ENCROACH ON CRICKET VALLEYS WITH PLUMBING
VENTS, MECHANICAL OR ELECTRICAL PENETRATIONS.
F. PROVIDE ROOF MEMBRANE WALKPADS AT SERVICE SIDE OF
ALL ROOF TOP UNITS AND AT ALL DOWNSPOUT LOCATIONS
AT DOWNSPOUTS FROM ADJACENT HIGH ROOFS.
N
BCDEFGHJKLMPQRST
A140
7 7
PQRS PQRS
0'-0"
FIN. FL.
M
IN
DATE:
TECH REVIEW:
DESIGNED: SUB SHEET NO. DRAWING NO.
PMIS/PKG NO.
SHEET
OF
LOCATION WITHIN PARK
TITLE OF SHEET
A/E FIRM
CROFT &
ASSOCIATES
KENNESAW,
GEORGIA
/2
/2
:3
:2
P M
ARCHITECTURAL - BASE
BID - ROOF PLANA140
A.LAMB
M.LAROSA
A.LAMB
14 70
NATCHEZ VISITOR CENTER 339
175314
311660B
NATCHEZ NATIONAL HISTORICAL PARK09/29/2021
16 0 16 32
SCALE OF FEET
ROOF PLAN KEYNOTES
4 NEW DOAS MECHANICAL UNIT. REFER TO MECHANICAL.
5 NEW PLATFORM MOUNTED CONDENSING UNITS. REFER TO
MECHANICAL.
6 NEW ROOF FAN. REFER TO MECHANICAL.
7 NEW ROOF INTAKE/EXHAUST FAN. REFER TO
MECHANICAL.
8 LINE SHACK, MODEL L/S, BY SBC INDUSTRIES OR
APPROVED EQUAL, COORDINATE EXACT LOCATION WITH
MECHANICAL
9 NEW CHILLER, REFER TO MECHANICAL DRAWINGS
10 NEW STRUCTURAL STEEL PLATFORM, REFER TO
STRUCTURAL DRAWINGS
11 GUARDRAIL @ PLATFORM 30" ABOVE ROOF, 21" SPHERE
UNABLE TO PASS THROUGH HORIZONTAL BARS
12 PATH OF WALK PADS (FROM LADDER ACCESS TO
EQUIPMENT PLATFORM), ALIGN VERTICAL RUN WITH ROOF
ACCESS LADDER
B L D
G
A140
1 ROOF PLAN - BASE BID
A140
4 ROOFTOP EQUIPMENT PLATFORM
NOTE - FOR ALTERNATE 1 ON ROOF -
REFER TO MECHANICAL.
GENERAL ROOF PLAN NOTES:
A. QUANTITIES AND LOCATIONS OF ROOF TOP MECHANICAL
EQUIPMENT ARE APPROXIMATE. GENERAL CONTRACTOR
MUST COORDINATE EXACT ITEMS AND LOCATIONS FOR
STRUCTURAL SUPPORT AND ROOF PENETRATIONS.
B. CONTRACTOR TO PROVIDE POSITIVE DRAINAGE AROUND ALL
ROOF TOP EQUIPMENT AS NECESSARY.
C. CONTRACTOR TO PROVIDE POSITIVE DRAINAGE TO ALL
EXISTING SCUPPERS AND ROOF DRAINS.
D. ALL ROOF PENETRATIONS SHALL EXTEND A MINIMUM OF 8"
ABOVE FINISHED ROOF TO TOP OF CURB OR VENT.
E. DO NOT ENCROACH ON CRICKET VALLEYS WITH PLUMBING
VENTS, MECHANICAL OR ELECTRICAL PENETRATIONS.
F. PROVIDE ROOF MEMBRANE WALKPADS AT SERVICE SIDE OF
ALL ROOF TOP UNITS AND AT ALL DOWNSPOUT LOCATIONS
AT DOWNSPOUTS FROM ADJACENT HIGH ROOFS.
PLUMBING VENT STACK
SEALANT
DRAWBAND
INSTALL SEALANT
BETWEEN PIPE AND
PREFABRICATED
MEBRANE FLASHING
PREFABRICATED
MEMBRANE FLASHING
(8" [200 MM] MIN.
HEIGHT)
SEALANT (APPROVED
FOR THE SPECIFIC
SYSTEM)
BASE MEMBRANE
ATTACHEMENT
APPROVED FOR
SPECIFIC SYSTEM
ROOF MEMBRANE
COVERBOARD AND
THERMAL INSULATION
ROOF DECK
PIPE PENETRATION
SEALANT
FLASHING MEMBRANE (8"
[200 MM] MIN. HEIGHT)
SEALANT (APPROVED FOR
THE SPECIFIC SYSTEM)
ROOF MEMBRANE
COVERBOARD AND
THERMAL
INSULATION
ROOF DECK
BASE MEMBRANE
ATTACHMENT AS
REQUIRED BY
MANUFACTURER
F O
R H
E
IG
H T
O F
L E
G S
S E
E S
T R
U C
T U
R A
L
APPROPRIATE SEALANT
(E.G., POLYURETHANE)
DRAWBAND
SHEET-METAL RAIN COLLAR
OVERLAPPING FLASHING
COLLAR BY 3" TO 4"
MULTIPLE-PLY MODIFIED
BITUMEN ROOF MEMBRANE
(VERIFY IN FIELD)
MODIFIED BITUMEN
MEMBRANE STRIPPING PLY
(VERIFY IN FIELD)
SHEET-METAL FLASHING
COLLAR MINIMUM OF 8"
ABOVE ROOFING
1/4" MINIMUM CLEARANCE
BETWEEN FLASHING
COLLAR AND SUPPORT
APPROX. 4"
COMPATIBLE ROOF CEMENT
OR COMPATIBLE SEALANT
AT PENETRATION TO
MEMBRANE JUNCTURE
4" MINIMUM FLANGE SET IN
COMPATIBLE ROOF CEMENT
OVER FIELD PLIES PRIME
FLANGE BEFORE STRIPPING
COVER BOARD INSULATION
THERMAL INSULATION
ROOF DECK
FILL GAPS WITH INSULATION
BOARD TO PROVIDE EVEN
SUBSTRATE
1/4" MIN. CLEARANCE TO RAIN COLLAR
T O
T O
P O
F G
U A
R D
R A
IL
1.5" O.D. HORIZ.
RAIL @ 21" O.C.,
PAINT (BEYOND)
1.5" O.D. POST,
PAINT (BEYOND)
1.5" O.D.
GUARDRAIL,
PAINT
FLOOR OR
PLATFORM
SURFACE
A B
O V
E
R O
O F
"ATTACH TO
PLATFORM, SEE
STRUCTURAL
DATE:
TECH REVIEW:
DESIGNED: SUB SHEET NO. DRAWING NO.
PMIS/PKG NO.
SHEET
OF
LOCATION WITHIN PARK
TITLE OF SHEET
A/E FIRM
CROFT &
ASSOCIATES
KENNESAW,
GEORGIA
/2
/2
:4
:4
P M
ROOF DETAILSA161
A.LAMB
A.POWELL
A.LAMB
15 70
NATCHEZ VISITOR CENTER 339
175314
311660B
NATCHEZ NATIONAL HISTORICAL PARK09/29/2021
NOT TO SCALEA161
2 VENT - PRE-MANUFACTURED BOOT
NOT TO SCALEA161
3 ROOF PENETRATION DETAIL
NOT TO SCALEA161
1 3D STEEL PENETRATION DETAIL
NOT TO SCALEA161
4 GUARDRAIL @ PLATFORM
GENERAL
A. THE FOLLOWING NOTES APPLY TO ALL STRUCTURAL DRAWINGS.
NOTES SHALL APPLY UNLESS OTHERWISE INDICATED BY
STRUCTURAL DRAWINGS OR SPECIFICATIONS.
B. WHERE A DETAIL, TYPICAL DETAIL, SECTION, TYPICAL SECTION OR
PLAN NOTE IS SHOWN FOR ONE CONDITION, IT SHALL APPLY FOR
ALL SIMILAR OR LIKE CONDITIONS UNLESS NOTED OTHERWISE.
C. ALL DESIGN AND CONSTRUCTION IS BASED ON AND SHALL BE IN
ACCORDANCE WITH THE INTERNATIONAL BUILDING CODE, 2021
EDITION. ALL REFERENCED STANDARDS SHALL BE OF THE
EFFECTIVE DATE NOTED IN THE CONTROLLING BUILDING CODE.
D. CONSTRUCTION DOCUMENTS INCLUDE, BUT ARE NOT LIMITED TO,
THE STRUCTURAL DOCUMENTS (DRAWINGS AND SPECIFICATIONS),
BUT DO NOT INCLUDE SHOP DRAWINGS, VENDOR DRAWINGS, OR
MATERIAL PREPARED AND SUBMITTED BY THE GENERAL
CONTRACTOR.
E. CONSTRUCTION DOCUMENTS SHALL GOVERN IN THE EVENT OF A
CONFLICT WITH THE CODE OF PRACTICE OR SPECIFICATIONS OF
ACI, PCI, AISC, SJI OR OTHER STANDARDS. WHERE A CONFLICT
OCCURS WITHIN THE CONSTRUCTION DOCUMENTS, THE STRICTEST
REQUIREMENT SHALL GOVERN.
F. THE GENERAL CONTRACTOR SHALL VERIFY ALL DIMENSIONS AND
SITE CONDITIONS AND NOTIFY CONTRACTING OFFICER OF ANY
DISCREPANCIES PRIOR TO PROCEEDING WITH WORK. FOR
DIMENSIONS NOT SHOWN ON STRUCTURAL DRAWINGS, SEE
ARCHITECTURAL DRAWINGS.
G. DO NOT SCALE FOR DIMENSIONS NOT SHOWN ON DRAWINGS. SEND
WRITTEN REQUEST FOR INFORMATION TO THE CONTRACTING
OFFICER FOR DIMENSIONS NOT PROVIDED.
H. THE STRUCTURE SHOWN ON THESE DRAWINGS IS
SELF-SUPPORTING ONLY IN ITS COMPLETED FORM. THE GENERAL
CONTRACTOR SHALL BE RESPONSIBLE FOR PROVIDING THE DESIGN,
ADEQUACY, SAFETY, AND STABILITY OF TEMPORARY ERECTION
BRACING AND SHORING.
I. NO PROVISIONS HAVE BEEN MADE IN THE DESIGN FOR THE
SUPPORT OF A CONCENTRATED LOAD FROM PLUMBING,
MECHANICAL OR HVAC EXCEPT AS SHOWN ON THE DRAWINGS.
J. THE GENERAL CONTRACTOR SHALL COORDINATE ALL SIZES AND
LOCATIONS OF FLOOR, ROOF, AND WALL PENETRATIONS WITH
MECHANICAL AND ARCHITECTURAL DRAWINGS. ALL PENETRATIONS
NOT SHOWN ON STRUCTURAL DRAWINGS MUST BE APPROVED BY
THE CONTRACTING OFFICER UNLESS NOTED OTHERWISE.
K. THE GENERAL CONTRACTOR SHALL VERIFY THAT MISCELLANEOUS
FRAMING SHOWN ON THE STRUCTURAL DRAWINGS FOR
MECHANICAL EQUIPMENT, PARK-FURNISHED ITEMS, PARTITIONS,
ETC. IS CONSISTENT WITH THE REQUIREMENTS OF SUCH ITEMS.
L. ELEVATIONS SHOWN ARE TO TOP OF FOUNDATIONS, SLABS OR
STEEL BEAMS UNLESS NOTED OTHERWISE.
M. THE GENERAL CONTRACTOR SHALL BE RESPONSIBLE FOR MEANS,
METHODS, TECHNIQUES, SEQUENCES, AND PROCEDURES IN ORDER
TO COMPLY WITH THE CONSTRUCTION DOCUMENTS.
N. THE GENERAL CONTRACTOR HAS SOLE RESPONSIBILITY TO COMPLY
WITH ALL APPLICABLE OSHA REGULATIONS.
SHOP DRAWINGS
A. SHOP DRAWINGS SHALL BE PREPARED IN ACCORDANCE WITH THE
APPLICABLE PROJECT SPECIFICATIONS.
B. STRUCTURAL DRAWINGS INDICATE TYPICAL AND CERTAIN SPECIFIC
CONDITIONS ONLY. SHOP DRAWINGS SHALL DETAIL ALL CONDITIONS
IN ACCORDANCE WITH SPECIFIED STANDARDS AND THE SPECIFIC
REQUIREMENTS OF THIS PROJECT AS INDICATED IN THE
CONSTRUCTION DOCUMENTS.
DESIGN LOADS
A. DESIGN ROOF DEAD LOAD:
1. 20 PSF
B. DESIGN ROOF LIVE LOAD:
1. 20 PSF
2. REDUCTIONS APPLIED PER TRIBUTARY AREA AS PERMITTED BY
CODE
C. DESIGN ROOF RAIN LOAD
1. DESIGN RAINFALL: 3.5 "/HR (100-YEAR, 1-HOUR RAINFALL)
D. DESIGN FLOOR DEAD LOAD:
1. 10 PSF SELF-WEIGHT
2. 125 PSF MECHANICAL ALLOWANCE
E. DESIGN FLOOR LIVE LOAD:
1. 20 PSF
2. REDUCTIONS APPLIED PER TRIBUTARY AREA AS PERMITTED BY
CODE
F. DESIGN SNOW LOAD:
1. GROUND SNOW LOAD, Pg = 5 PSF
G. DESIGN WIND LOAD:
1. ULTIMATE DESIGN WIND SPEED, Vult = 109 MPH
2. NOMINAL DESIGN WIND SPEED Vasd = 85 MPH
3. RISK CATEGORY: II
4. WIND EXPOSURE CATEGORY: D
5. COMPONENTS AND CLADDING WIND PRESSURE: (SEE SCHEDULE)
6. INTERNAL PRESSURE COEFFICIENT (GCpi): +/- 0.18 (VISITOR
CENTER) 0 (NEW EQUIPMENT PLATFORM)
H. DESIGN SEISMIC INFORMATION:
1. RISK CATEGORY: III
2. MAPPED SPECTRAL RESPONSE COEFFICIENT, Ss = 0.103
3. MAPPED SPECTRAL RESPONSE COEFFICIENT, S1 = 0.068
4. SPECTRAL RESPONSE COEFFICIENT, Sds = 0.11
5. SPECTRAL RESPONSE COEFFICIENT, Sd1 = 0.109
6. SITE CLASS: D (ASSUMED)
7. BASE SEISMIC-FORCE RESISTING SYSTEM:
. STEEL NOT SPECIFICALLY DETAILED FOR SEISMIC RESITANCE
8. RESPONSE MODIFICATION FACTOR, R:
R = 3.0 (NEW EQUIPMENT PLATFORM)
9. DESIGN BASE SHEAR:
. 1 K (NEW EQUIPMENT PLATFORM)
10. ANALYSIS PROCEDURE: EQUIVALENT LATERAL FORCE (ASCE 7,
SECTION 12.8)
11. SEISMIC DESIGN CATEGORY: B
12. SEISMIC IMPORTANCE FACTOR, Ie = 1.0
13. SEISMIC RESPONSE COEFFICIENT:
. Cs = 0.037 (NEW EQUIPMENT PLATFORM)
J. NO PROVISIONS HAVE BEEN MADE FOR FUTURE HORIZONTAL OR
VERTICAL EXPANSION.
SUSPENDED LOADS AT STRUCTURE
A. ATTACHMENT TO ROOF DECK FOR ANY SUSPENDED LOADS IS
PROHIBITED WITHOUT WRITTEN APPROVAL FROM CONTRACTING
OFFICER.
B. PIPE HANGERS SHALL BE ATTACHED TO BOTTOM FLANGES OF
JOISTS OR BEAMS WITH APPROVED CLAMPS/CONNECTIONS.
C. ALL MULTIPLE TIER CABLE TRAYS, PIPE RACKS OR GROUPS OF
PIPES OR DUCTS SHALL BE SUPPORTED FROM EACH ROOF FRAMING
MEMBER WHERE THE GROUP CROSSES THE MEMBER OR AT 8'-0"
O.C. MAX. WHERE GROUP IS ORIENTED PARALLEL TO THE MEMBER,
UNLESS NOTED OTHERWISE ON DRAWINGS.
D. HANGERS SHALL BE ADDED AT ALL PIPE VALVE AND FITTING
LOCATIONS.
E. CONTRACTORS AND SUBCONTRACTORS SUSPENDING LOADS FROM
STRUCTURE SHALL ACCOUNT FOR AND PROVIDE ALL CONNECTIONS,
STRUTS, TIES AND RIGGING REQUIRED FOR COMPLETE
INSTALLATION AND SHALL FURNISH DRAWINGS SHOWING POINTS OF
SUPPORT, SUPPORT LOADS AND ALL REQUIRED SUPPLEMENTAL
BRACING. PROVIDE SUPPORTS AND HANGERS AS REQUIRED FOR
PIPING AND EQUIPMENT SO THAT ALL COMBINED LOADING SHALL
NOT EXCEED ALLOWABLE LOADINGS OF STRUCTURE AS SHOWN ON
STRUCTURAL DRAWINGS. SUPPORT LOCATIONS SHALL BE
COORDINATED WITH OTHER TRADES AND SHALL BE INSTALLED IN
ACCORDANCE WITH SPECIFICATIONS OF THE ITEMS SUPPORTED.
F. EXPENSE RESULTING FROM IMPROPER COORDINATION OR
LOCATION OF ANCHOR BOLTS, OPENINGS, SLEEVES, INSERTS,
HANGERS OR OTHER SUPPORTS REQUIRED FOR PIPING AND
EQUIPMENT SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR.
EXISTING CONDITIONS
A. THE GENERAL CONTRACTOR SHALL SURVEY THE EXISTING
STRUCTURE TO DETERMINE THAT ALL MODIFICATIONS AS INDICATED
IN THE CONSTRUCTION DOCUMENTS ARE FEASIBLE AND PRACTICAL
AND SHALL REPORT ANY DISCREPANCIES OR UNUSUAL CONDITIONS
TO THE CONTRACTING OFFICER.
B. WHEN EXISTING FRAMING IS SHOWN ON THE STRUCTURAL
DRAWINGS IT IS FOR REFERENCE ONLY AS IT RELATES TO THE
STRUCTURAL SCOPE OF WORK. THE STRUCTURAL DRAWINGS ARE
NOT INTENDED TO BE A COMPREHENSIVE REPRESENTATION OF THE
AS-BUILT EXISTING STRUCTURE.
C. WHERE PORTIONS OF THE NEW CONSTRUCTION ARE INDICATED TO
FIT TO EXISTING CONSTRUCTION, THE GENERAL CONTRACTOR
SHALL VERIFY DIMENSIONS OF EXISTING CONSTRUCTION BY FIELD
MEASUREMENTS BEFORE SUBMISSION OF SHOP DRAWINGS AND
FABRICATION.
SPECIAL INSPECTIONS
A. SPECIAL INSPECTIONS ARE REQUIRED IN ADDITION TO THE
INSPECTIONS SPECIFIED IN SECTION 110 OF THE BUILDING CODE.
B. ALL SPECIAL INSPECTIONS SHALL BE IN ACCORDANCE WITH DIVISION
01 SPECIFICATIONS AND THE STATEMENT OF STRUCTURALTESTS
AND SPECIAL INSPECTIONS.
DATE:
TECH REVIEW:
DESIGNED: SUB SHEET NO. DRAWING NO.
PMIS/PKG NO.
SHEET
OF
LOCATION WITHIN PARK
TITLE OF SHEET
A/E FIRM
CROFT &
ASSOCIATES
KENNESAW,
GEORGIA
M. PLANER
S. TATE
M. PLANER
09/29/2021
311660B
175314
/2
/2
:4
:0
P M
GENERAL NOTES &
SCHEDULES S001
NATCHEZ VISITOR CENTER
NATCHEZ NATIONAL HISTORICAL PARK 16
ABBREVIATIONS
KSF KIPS PER SQUARE FOOT
KSI KIPS PER SQUARE INCH
L LENGTH
LFH LONG FACE HORIZONTAL
LFV LONG FACE VERTICAL
LG LONG
LL LIVE LOAD
LLH LONG LEG HORIZONTAL
LLV LONG LEG VERTICAL
LO LOW
LOCS LOCATIONS
LRFD LOAD RESISTANCE FACTORED DESIGN
LSH LONG SIDE HORIZONTAL
LSV LONG SIDE VERTICAL
LW LONG WAY
LWC LIGHT WEIGHT CONCRETE
MAX MAXIMUM
MEP MECHANICAL, ELECTRICAL & PLUMBING
MEZZ MEZZANINE
MFR MANUFACTURER
MIN MINIMUM
MISC MISCELLANEOUS
MPII MANUFACTURER'S PRINTED INSTALLATION
INSTRUCTIONS
MTL METAL
NIC NOT IN CONTRACT
NS NEAR SIDE
NTS NOT TO SCALE
OC ON CENTER
OD OUTSIDE DIAMETER
OH OPPOSITE HAND
OPNG OPENING
P.T. PRESSURE TREATED
PAF POWDER ACTUATED FASTENERS
PEMB PRE-ENGINEERED METAL BUILDING
PJF PREFORMED JOINT FILLER
PL PLATE
PLF POUNDS PER LINEAR FOOT
PPHCC PRESTRESSED PRECAST HOLLOW CORE
CONCRETE
PREFAB PRE-FABRICATED
PSF POUNDS PER SQUARE FOOT
PSI POUNDS PER SQUARE INCH
PT POST…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .