Drawings.pdf
PDF 6 MB Posted
- Solicitation number
- 140FGA26Q0029
About this file
This document is a set of site plans for the National Elk Refuge, detailing specific locations and facilities requiring fish and wildlife electrical repairs. The plans comprise four detailed maps with accompanying project notes.
The site plans identify four distinct work areas: the Elk Refuge Compound (C10), which includes quarters, refuge headquarters, and staff office locations; the Miller House and Blacksmith Shop area (C12) located on Historic Miller Ranch; the Winter Horse Shelter facility (C14) containing shelter structures and related infrastructure; and the Nowlin Shop location (C16) featuring a shop building, equipment storage, and associated structures. Each map includes aerial views with directional markers (north arrows), labeled facility locations, and road designations such as National Elk Refuge Road and Historic Miller Ranch Road. The project notes indicate work involves electrical repairs across multiple components at 2023 NEC standards, with specific references to exact locations, GPS coordinates, staff capacity notations, and refuge-related infrastructure. The scope encompasses repairs to existing electrical systems, conduit work, and related components at facilities distributed across the refuge compound and outlying ranch properties.
View the file
Other files
Show all 13
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
E L
K R
E F
U G
E S
IT
E
P
LA
N S
IT
E
M A
P F
O R
E
LK
R E
F U
G E
C O
M P
O O
U N
D C
K R
E F
U G
E S
IT
E
P
LA
N S
IT
E
M A
P F
O R
M
IL
LE
R
H O
U S
E
B
LA
C K
S M
IT
H
S H
O P C
K R
E F
U G
E S
IT
E
P
LA
N S
IT
E
M A
P F
O R
W
IN
T E
R H
O R
S E
S H
E
LT
R
C
K R
E F
U G
E S
IT
E
P
LA
N S
IT
E
M A
P F
O R
N O
W
LIN
S H
O P
C
File details come from the government source that posted it. Updated .