DRAWINGS_compressed_4-23-2025.pdf
PDF 41 MB Posted
- Attached to
- Granville Health System Imaging Renovation - MRI, CT, Nuc Med - General Construction/Renovation
- Solicitation number
- 373GHS00004
- Issued by
- Gates County, North Carolina
About this file
The file contains construction documents for the Granville Health System MRI, CT, and Nuclear Imaging Renovations project, prepared by Haskell Architects and Engineers, P.A. for a medical facility located at 1010 College Street in Oxford, North Carolina. The project involves renovation of existing imaging spaces, including the MRI, CT, and Nuclear Medicine suites, with construction documents dated March 6, 2025. The comprehensive document set includes architectural, structural, mechanical, electrical, plumbing, and fire protection plans, with detailed drawings covering demolition, new construction, equipment placement, life safety considerations, and technical specifications for the medical imaging renovation.
The project is classified as a renovation within an existing I-2 (institutional, hospital) occupancy, with a total building area of approximately 63,736 square feet. The renovation focuses on modernizing imaging equipment spaces, including specific areas for MRI (941 sq ft), CT (309 sq ft), and Nuclear Medicine (410 sq ft) suites. The documents indicate compliance with 2018 North Carolina building codes, NFPA 101 Life Safety Code, and Facility Guidelines Institute (FGI) standards. The project involves complex technical considerations, including RF shielding for the MRI suite, medical gas infrastructure, specialized electrical and mechanical systems, and careful integration of new imaging equipment into the existing hospital environment.
View the file
Other files
Show all 14
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
The Haskell Company l l l Riverside Avenue
Jacksonville, Florida 32202 Phone # (904) 791-4500 www.haskell.com
HASKELL ARCHITECTS AND
ENGINEERS, P.A.
NORTH CAROLINA
GRANVILLE HEALTH SYSTEM
MRI, CT, AND NUCLEAR IMAGING RENOVATIONS
CONSTRUCTION DOCUMENTS
Oxford, NC
PROJECT NO.:1785003
March 6, 2025
OWNER
Granville Health System 1010 College St.
Oxford, NC 27565 Tel. 919.690.3000 www.ghshospital.org
ARCHITECTURE
Haskell Architects and Engineers, P.A.
8845 Red Oak Blvd.
Charlotte, NC 28217 Tel. 704.523.2230 www.haskell.com
MEP ENGINEERING
Haskell Architects and Engineers, P.A.
8845 Red Oak Blvd.
Charlotte, NC 28217 Tel. 704.523.2230 www.haskell.com
INTERIOR DESIGN
Haskell Architects and Engineers, P.A.
8845 Red Oak Blvd.
Charlotte, NC 28217 Tel. 704.523.2230 www.haskell.com
STRUCTURAL ENGINEERING
Haskell Architects and Engineers, P.A.
8845 Red Oak Blvd.
Charlotte, NC 28217 Tel. 704.523.2230 www.haskell.com
DA
NI
EL
DOMINIC BRINDIS
I
A
A
14702R
C H
N
O
RT
I E G
D
T
S
ER
E
T
A
NI
LOR
H
I
RC
C E T
C H A
R L O T T E , N
C
DRAWING INDEX NOTE
IF ISSUANCE ONLY INCLUDES PARTIAL SHEETS OF THE FULL SET, THE DRAWING INDEX WILL SHOW THE SHEETS BEING SUBMITTED IN THE CURRENT ISSUANCE WITH A GRAY FILLED ON SOME CELLS
OR ENTIRE ROW.
DA
NIEL DOMINIC BRINDIS
I
A
A
14702R
C H
N
O
RT
I E G
D
T
S
ER
E
T
A
NI
LOR
H
I
RC
C E T
C H
A
R L O T T E , N
C l l l R iv e rs id e A v e n u e
J a c k s o n v il le
F lo ri d a
P h o n e
-4
H A
S K
E L
L A
R C
H
IT
E C
T S
A N
D
E
G
IN
E E
R S
P
.A
N O
R T
H C
A R
O L
IN
A
A rc h it e c tu re
E n g in e e ri n g
C -2
A
B
C
1 2 3 4 5
SHEET NUMBER
1 2 3 4 5
A
B
C
We hereby expressly reserve the property rights to this drawing and it is not to be reproduced, copied in any format or manner whatsoever without first obtaining our express written permission and consent.
AE JOB NUMBER
DRAWN CHECKED
/6
/2
:2
:2
P
M
G R
A N
V
IL
L E
H E
A L T
H S
Y S
T E
M
G ra n v il le
H e a lt h S y s te m
C o ll e g e S t, O x fo rd
N C
M R
I, C
T
A N
D N
U C
L E
A R
I M
A G
IN
G
R E
N O
V A
T
IO
N S
G-200
MFSSB
INDEX OF
DRAWINGS
1785003
March 6, 2025
G R
A N
V
IL
L E
H E
A L T
H S
Y S
T E
M
G ra n v il le
H e a lt h S y s te m
C o ll e g e S t, O x fo rd
N C
M R
I, C
T
A N
D N
U C
L E
A R
I M
A G
IN
G
R E
N O
V A
T
IO
N S
March 6, 2025
SHEET
NUMBER SHEET NAME
ISSUANCE
ID ISSUANCE DESCRIPTION
ISSUANCE
DATE
A-011 FIRST FLOOR DEMOLITION PLAN CD CONSTRUCTION DOCUMENTS 3/6/2025
A-100 BASEMENT PLAN CD CONSTRUCTION DOCUMENTS 3/6/2025
A-110 FIRST FLOOR PLAN CD CONSTRUCTION DOCUMENTS 3/6/2025
A-113 FIRST FLOOR EQUIPMENT PLAN CD CONSTRUCTION DOCUMENTS 3/6/2025
A-180 ROOF PLAN CD CONSTRUCTION DOCUMENTS 3/6/2025
AC 110 FIRST FLOOR REFLECTED CEILING PLAN CD CONSTRUCTION DOCUMENTS 3/6/2025
A-400 INTERIOR ELEVATIONS CD CONSTRUCTION DOCUMENTS 3/6/2025
A-401 INTERIOR ELEVATIONS & SECTIONS CD CONSTRUCTION DOCUMENTS 3/6/2025
A-540 FIRE, SMOKE, & MISC. DETAILS CD CONSTRUCTION DOCUMENTS 3/6/2025
A-545 CEILING DETAILS - SEISMIC CATEGORY C CD CONSTRUCTION DOCUMENTS 3/6/2025
A-555 DOOR & WINDOW SCHEDULE & DETAILS CD CONSTRUCTION DOCUMENTS 3/6/2025
A-575 MILLWORK SECTIONS & DETAILS CD CONSTRUCTION DOCUMENTS 3/6/2025
A-580 TOILET ROOM DETAILS CD CONSTRUCTION DOCUMENTS 3/6/2025
A-585 TYPICAL MOUNTING HEIGHT DETAILS CD CONSTRUCTION DOCUMENTS 3/6/2025
A-605 INTERIOR PARTITION TYPES & SCHEDULE CD CONSTRUCTION DOCUMENTS 3/6/2025
Grand total: 15
SHEET
NUMBER SHEET NAME
ISSUANCE
ID ISSUANCE DESCRIPTION
ISSUANCE
DATE
G-100 COVER SHEET CD CONSTRUCTION DOCUMENTS 3/6/2025
G-200 INDEX OF DRAWINGS CD CONSTRUCTION DOCUMENTS 3/6/2025
G-300 GENERAL NOTES, SYMBOLS, & VICINITY MAP CD CONSTRUCTION DOCUMENTS 3/6/2025
G-301 ARCHITECTURAL ABBREVIATIONS CD CONSTRUCTION DOCUMENTS 3/6/2025
G-400 CODE SUMMARY CD CONSTRUCTION DOCUMENTS 3/6/2025
G-501 ACCESSIBILTY DETAILS CD CONSTRUCTION DOCUMENTS 3/6/2025
G-800 FIRE RESISTANCE DESIGN ASSEMBLIES (V438-NGC 1 OF 1) CD CONSTRUCTION DOCUMENTS 3/6/2025
G-801 FIRE RESISTANCE DESIGN ASSEMBLIES (V438-NGC 2 OF 2) CD CONSTRUCTION DOCUMENTS 3/6/2025
G-802 FIRE RESISTANCE DESIGN ASSEMBLIES (I504 & W-L-1252) CD CONSTRUCTION DOCUMENTS 3/6/2025
G-803 FIRE RESISTANCE DESIGN ASSEMBLIES (U420) CD CONSTRUCTION DOCUMENTS 3/6/2025
GL110 FIRST FLOOR LIFE SAFETY PLAN CD CONSTRUCTION DOCUMENTS 3/6/2025
GA110 FIRST FLOOR ENLARGED LIFE SAFETY AND ACOUSTICAL PLANS CD CONSTRUCTION DOCUMENTS 3/6/2025
Grand total: 12
SHEET
NUMBER SHEET NAME
ISSUANCE
ID ISSUANCE DESCRIPTION
ISSUANCE
DATE
I-110 FIRST FLOOR FINISH PLAN CD CONSTRUCTION DOCUMENTS 3/6/2025
Grand total: 1
SHEET
NUMBER SHEET NAME
ISSUANCE
ID ISSUANCE DESCRIPTION
ISSUANCE
DATE
S-001 GENERAL NOTES CD CONSTRUCTION DOCUMENTS 2/28/2025
S-002 STATEMENT OF SPECIAL INSPECTIONS CD CONSTRUCTION DOCUMENTS 2/28/2025
S-101 (E) SLAB PLAN CD CONSTRUCTION DOCUMENTS 2/28/2025
S-102 (E) ROOF FRAMING PLAN CD CONSTRUCTION DOCUMENTS 2/28/2025
S-501 SECTIONS & DETAILS CD CONSTRUCTION DOCUMENTS 2/28/2025
Grand total: 5
SHEET
NUMBER SHEET NAME
ISSUANCE
ID ISSUANCE DESCRIPTION
ISSUANCE
DATE
P-001 PLUMBING COVER SHEET CD CONSTRUCTION DOCUMENTS 2/28/2025
P-002 PLUMBING SPECIFICATIONS CD CONSTRUCTION DOCUMENTS 2/28/2025
P-110 PLUMBING DEMOLITION PLAN CD CONSTRUCTION DOCUMENTS 2/28/2025
P-111 PLUMBING NEW WORK PLAN - WASTE & VENT CD CONSTRUCTION DOCUMENTS 2/28/2025
P-112 PLUMBING NEW WORK PLAN - MED GAS & DOMESTIC WATER CD CONSTRUCTION DOCUMENTS 2/28/2025
P-501 PLUMBING DETAILS CD CONSTRUCTION DOCUMENTS 2/28/2025
Grand total: 6
SHEET
NUMBER SHEET NAME
ISSUANCE
ID ISSUANCE DESCRIPTION
ISSUANCE
DATE
M-001 COVER SHEET CD CONSTRUCTION DOCUMENTS 2/28/2025
M-002 SPECIFICATIONS CD CONSTRUCTION DOCUMENTS 2/28/2025
M-003 SPECIFICATIONS CD CONSTRUCTION DOCUMENTS 2/28/2025
M-110 FIRST FLOOR DEMOLITION PLAN - DUCTWORK CD CONSTRUCTION DOCUMENTS 2/28/2025
M-111 FIRST FLOOR PLAN - NEW CONSTRUCTION CD CONSTRUCTION DOCUMENTS 2/28/2025
M-210 ROOF PLAN CD CONSTRUCTION DOCUMENTS 2/28/2025
M-501 MECHANICAL DETAILS CD CONSTRUCTION DOCUMENTS 2/28/2025
M-502 MECHANICAL DETAILS CD CONSTRUCTION DOCUMENTS 2/28/2025
M-601 MECHANICAL SCHEDULES CD CONSTRUCTION DOCUMENTS 2/28/2025
Grand total: 9
SHEET
NUMBER SHEET NAME
ISSUANCE
ID ISSUANCE DESCRIPTION
ISSUANCE
DATE
E-001 ELECTRICAL LEGEND AND NOTES CD CONSTRUCTION DOCUMENTS 2/28/2025
E-002 ELECTRICAL SPECIFICATIONS CD CONSTRUCTION DOCUMENTS 2/28/2025
E-003 ELECTRICAL SPECIFICATIONS CD CONSTRUCTION DOCUMENTS 2/28/2025
ED-111 FIRST FLOOR PLAN - DEMOLITION CD CONSTRUCTION DOCUMENTS 2/28/2025
E-101 BASEMENT FLOOR PLAN - ELECTRICAL CD CONSTRUCTION DOCUMENTS 2/28/2025
E-111 FIRST FLOOR PLAN - LIGHTING CD CONSTRUCTION DOCUMENTS 2/28/2025
E-112 FIRST FLOOR PLAN - LIGHTING ALT #3 CD CONSTRUCTION DOCUMENTS 2/28/2025
E-113 FIRST FLOOR PLAN - POWER /COMM CD CONSTRUCTION DOCUMENTS 2/28/2025
E-114 FIRST FLOOR PLAN - SYSTEMS CD CONSTRUCTION DOCUMENTS 2/28/2025
E-115 ROOF PLAN - CONDUIT ROUNTING CD CONSTRUCTION DOCUMENTS 2/28/2025
E-122 ROOF FLOOR PLAN - ELECTRICAL CD CONSTRUCTION DOCUMENTS 2/28/2025
E-501 ELECTRICAL DETAILS CD CONSTRUCTION DOCUMENTS 2/28/2025
E-502 ELECTRICAL DETAILS CD CONSTRUCTION DOCUMENTS 2/28/2025
E-503 ELECTRICAL DETAILS CD CONSTRUCTION DOCUMENTS 2/28/2025
E-601 POWER RISER DIAGRAM CD CONSTRUCTION DOCUMENTS 2/28/2025
E-602 LUMINAIRE AND MECH SCHEDULE CD CONSTRUCTION DOCUMENTS 2/28/2025
E-603 PANEL SCHEDULES CD CONSTRUCTION DOCUMENTS 2/28/2025
E-604 PANEL SCHEDULES CD CONSTRUCTION DOCUMENTS 2/28/2025
Grand total: 18
INDEX OF DRAWINGS
ARCHITECTURE
GENERAL
STRUCTURAL
INTERIOR DESIGN
PLUMBING
MECHANICAL
ELECTRICAL
SHEET
NUMBER SHEET NAME
ISSUANCE
ID ISSUANCE DESCRIPTION
ISSUANCE
DATE
FP-110 FIRE PROTECTION NEW WORK PLAN CD CONSTRUCTION DOCUMENTS 2/28/2025
Grand total: 1
FIRE PROTECTION
SHEET
NUMBER SHEET NAME
ISSUANCE
ID ISSUANCE DESCRIPTION
ISSUANCE
DATE
Q-100 VENDOR DRAWINGS - MRI CD CONSTRUCTION DOCUMENTS 3/6/2025
Q-101 VENDOR DRAWINGS - MRI CD CONSTRUCTION DOCUMENTS 3/6/2025
Q-102 VENDOR DRAWINGS - MRI CD CONSTRUCTION DOCUMENTS 3/6/2025
Q-103 VENDOR DRAWINGS - MRI CD CONSTRUCTION DOCUMENTS 3/6/2025
Q-104 VENDOR DRAWINGS - MRI CD CONSTRUCTION DOCUMENTS 3/6/2025
Q-105 VENDOR DRAWINGS - MRI CD CONSTRUCTION DOCUMENTS 3/6/2025
Q-106 VENDOR DRAWINGS - MRI CD CONSTRUCTION DOCUMENTS 3/6/2025
Q-107 VENDOR DRAWINGS - MRI CD CONSTRUCTION DOCUMENTS 3/6/2025
Q-108 VENDOR DRAWINGS - MRI CD CONSTRUCTION DOCUMENTS 3/6/2025
Q-109 VENDOR DRAWINGS - MRI CD CONSTRUCTION DOCUMENTS 3/6/2025
Q-200 VENDOR DRAWINGS - CT CD CONSTRUCTION DOCUMENTS 3/6/2025
Q-201 VENDOR DRAWINGS - CT CD CONSTRUCTION DOCUMENTS 3/6/2025
Q-202 VENDOR DRAWINGS - CT CD CONSTRUCTION DOCUMENTS 3/6/2025
Q-203 VENDOR DRAWINGS - CT CD CONSTRUCTION DOCUMENTS 3/6/2025
Q-204 VENDOR DRAWINGS - CT CD CONSTRUCTION DOCUMENTS 3/6/2025
Q-205 VENDOR DRAWINGS - CT CD CONSTRUCTION DOCUMENTS 3/6/2025
Q-206 VENDOR DRAWINGS - CT CD CONSTRUCTION DOCUMENTS 3/6/2025
Q-300 VENDOR DRAWINGS - SPECT CD CONSTRUCTION DOCUMENTS 3/6/2025
Q-301 VENDOR DRAWINGS - SPECT CD CONSTRUCTION DOCUMENTS 3/6/2025
Q-302 VENDOR DRAWINGS - SPECT CD CONSTRUCTION DOCUMENTS 3/6/2025
Q-303 VENDOR DRAWINGS - SPECT CD CONSTRUCTION DOCUMENTS 3/6/2025
Q-304 VENDOR DRAWINGS - SPECT CD CONSTRUCTION DOCUMENTS 3/6/2025
Q-305 VENDOR DRAWINGS - SPECT CD CONSTRUCTION DOCUMENTS 3/6/2025
Q-306 VENDOR DRAWINGS - SPECT CD CONSTRUCTION DOCUMENTS 3/6/2025
Grand total: 24
EQUIPMENT
No DESCRIPTION DATE
CD CONSTRUCTION
DOCUMENTS
3/6/2025
IBC WALL TYPES DESCRIPTION PRIMARILY FOR I-2 & AMBULATORY CARE FACILITIES
WALL TYPE DESCRIPTION USAGE
Fire Barrier, (also Rated Exterior walls)
Fire Barriers are rated walls that must extend from floor to the underside of the deck above. They are to extend through concealed spaces.
Shaft Enclosures
Exit Enclosures
Exit Passageways
Horizontal Exit
Atrium Separation
Incidental Use Areas
Mixed Occupancy Separation
Fire Area Separation
Fire Partition Fire Partitions are rated walls that extend from floor to the underside of the deck above through concealed spaces. Under certain circumstances, they are allowed to extend to the underside of a rated ceiling assembly.
Dwelling Unit Separation
Sleeping Unit Separation
Tenant Space Separation in Covered Malls
Corridor walls per table 1020.1; I-2 if sprinkled zero fire rating
Elevator Lobby Separation
Smoke Barriers are rated walls that extend from floor to underside of deck above, and through concealed spaces subdivide floors into maximum 22,500 SF compartments.
Also used for areas of refuge or elevator lobbies.
Smoke Barrier Smoke Barriers occur in I-2 and ambulatory care facilities occupancy
Smoke Partition Smoke Partitions are NON-rated walls that limit the passage of smoke.
Corridor walls in I-2 occupancies, elevator lobbies in I-2 where in a sprinklered building
Horizontal Assemblies Horizontal Assemblies are floor or roof assemblies that are fire & smoke rated and require protected penetrations with some exceptions.
Any location
HOURLY RATINGS LINE TYPE PROTECTION; PER 2018 NCBC
2 hour
3 hour
4 hour
1 hour
1 hour minimum
1 hour minimum
UNRATED
710.5 Openings: Openings in smoke partitions shall comply with 710.5.1 and 710.5.2.
710.5.1 Windows: Windows in smoke partitions shall be sealed to resist the free passage of smoke or be automatic-closing upon detection of smoke.
710.5.2 Doors: Doors in smoke partitions shall comply with Sections 710.5.2.1 thru 710.5.2.3
710.5.2.1 Louvers: Doors in smoke partitions shall not include louvers.
710.5.2.2 and 710.5.2.3 address conditions required elsewhere in the code. Refer to IBC
710.8 Ducts and Air Transfer Openings: The space around a duct penetrating a smoke partition shall be filled with an approved material to limit the free passage of smoke. Air transfer openings in a smoke partition shall be provided with a smoke damper complying with Section 717.3.2.2
By omission from this Section and unless required elsewhere in the code, Fire dampers or Smoke Dampers are not required inside duct work. Seal around openings with approved material to limit the free passage of smoke.
2 hour
3 hour
1 hour 711.2 Horizontal Assemblies:
Horizontal Assemblies shall comply with Sections 711.2.1 through 711.2.6.
Refer to Mechanical drawings for additional information.
Fire Walls separate structures into separate BUILDINGS. Must remain standing upon collapse of structure. Fire walls extend from the footing to and/or through the roof structure.
Fire Wall Separate Buildings
706.8 Openings:
Each opening through a fire wall shall be protected in accordance with Section 716.5 and shall not exceed 156 square feet (15m²). The aggregate width of openings at any floor level shall not exceed 25% of the length of the wall.
• Exception #2: Openings shall not be limited to 156 square feet (15m²) where both buildings are equipped throughout with an automatic sprinkler system installed in accordance with Section 903.3.1.1.
706.9 Penetrations:
Penetrations of fire walls shall comply with Section 714.
706.11 Ducts & air transfer openings:
Ducts and air transfer openings shall not penetrate fire walls.
• Exception: Penetrations by ducts and air transfer openings of fire walls that are not on a lot line shall be allowed provided the penetrations comply with Section
717. The size and aggregate width of all openings shall not exceed the limitations of Section 706.8.
Bearing Walls - Table 601 Bearing walls support assemblies other than their own weight. Unless otherwise prescribed in the code, bearing wall openings do not normally require a fire rating.
Any location Only where required elsewhere in the code, Fire dampers or Smoke Dampers shall be provided.
Openings through wall are allowed when structure is protected.
2 hour
3 hour
1 hour
2 hour Smoke
3 hour Smoke
4 hour Smoke
707.6 Openings: Openings in a fire barrier shall be protected in accordance with Section
716. Openings shall be limited to maximum aggregate width of 25% of the length of the wall, and the maximum area of any single opening shall not exceed 156 square feet (15m²).
Openings in enclosures for exit access stairways and ramps, interior exit stairways and ramps and exit passageways shall also comply with sections 1019, 1023.4, and 1024.5 respectively. Five (5) exceptions are permitted; see NCBC.
707.7 Penetrations: Penetrations of fire barriers shall comply with Section 714.
707.7.1 Prohibited Penetrations: Penetrations into enclosures for exit access stairways and ramps, interior exit stairways and ramps, and exit passageways shall be allowed only where permitted by Sections 1019, 1023.5 and 1024.6 respectively.
707.10 Ducts and air transfer openings:
Penetrations in a fire barrier by ducts and air transfer openings shall comply with Section 717.
708.6 Openings:
Openings in a fire partition shall be protected in accordance with Section 716.
708.7 Penetrations:
Penetrations of fire partitions shall comply with Section 714.
708.9 Ducts and air transfer openings:
Penetrations in a fire partition by ducts and air transfer openings shall comply with Section 717.
709.5 Openings:
Openings in a smoke barrier shall be protected in accordance with Section 716.
• Exception#1: In Group I-1 Condition 2, Group I-2 and ambulatory care facilities, where a pair of opposite-swinging doors are installed across a corridor in accordance with Section 709.5.1, the doors shall not be required to be protected in accordance with Section 716. The doors shall be close fitting within operational tolerances, and shall not have a center mullion or undercuts in excess of 3/4" (19.1mm), louvers or grilles. The door shall have head and jamb stops, and astragals or rabbets at meeting edges. Where permitted by the door manufacturer's listing, positive-latching devices are not required.
• Exception#2: In Group I-1 Condition 2, Group I-2 and ambulatory care facilities, horizontal sliding doors installed in accordance with Section 1010.1.4.3 and protected in accordance with Section 716.
709.5.1 Group I-2 and ambulatory care facilities:
In Group I-2 and ambulatory care facilities, where doors are installed across a corridor, the doors shall be automatic-closing by smoke detection in accordance with Section 716.5.9.3 and shall have a vision panel with fire-protection-rated glazing materials in fire-protection-rated frames, the area of which shall not exceed that tested.
709.6 Penetrations:
Penetrations of smoke barriers shall comply with Section 714.
709.8 Ducts and air transfer openings:
Penetrations in a smoke barrier by ducts and air transfer openings shall comply with Section 717.
Exit access stairways & ramps
ROOM NAMEEXAM RM
NEW
EXISTING ("e" SUFFIX)
KEYNOTE NUMBER
OPENING NUMBER
DOOR NUMBER
REVISION NUMBER
ROOM NUMBER
GRID LINE LETTER OR NUMBER
GRID LINE REFERENCE
KEYNOTE/GENERIC
ANNOTATION REFERENCE
FOR NEW WORK
X
Xe
REVISION DESIGNATION
WALL OPENING REFERENCE
(WINDOWS, STOREFRONT,
CURTAIN WALL OR LOUVERS)
DOOR SYMBOL
ROOM DESIGNATION
SHEET NUMBER
PLAN NORTH
ELEVATION DESIGNATION
CUT LINE TO ACTUAL ITEM OR
AREA BEING DETAILED
DETAIL DESIGNATOR
ELEVATION DESIGNATOR
SHEET NUMBER
DIRECTION OF ELEVATION
SECTION CUT LINE
SECTION DESIGNATOR
SHEET NUMBER
SHEET NUMBER
DETAIL REFERENCE
INTERIOR
ELEVATION
REFERENCE
SECTION REFERENCE
ORIENTATION
REFERENCE
EXTERIOR ELEVATION
REFERENCE
DOOR SYMBOL
A
A2.1
A
A7.3
TRUE NORTH
A
A11.1.6
CW-1
COMMON SYMBOLS
DIRECTION OF ELEVATION (MAY
BE MORE THAN 1 INDICATED)
A
A2.1
SHEET INFORMATION
ABBREVIATIONS: SEE SPECIFICATIONS SECTION 01 42 01
A-110A
SUB-CHAPTER/ ZONE/
QUADRANT DESIGNATOR
DISCIPLINE DESIGNATOR
SHEET SERIES/ TYPE DESIGNATOR
FLOOR/ SUB-TYPE DESIGNATOR
SPOT ELEVATION 100'-0"
PLAN
NORTH
KEYNOTE NUMBER ("D" PREFIX)
KEYNOTE/GENERIC
ANNOTATION REFERENCE
FOR DEMOLITION WORK
STC -IF NO STC REQ'D, NO LETTER WILL BE DISPLAYED- (REFER TO LEGEND IN GA SHEET SERIES)
NOTE (REFER TO SHEET SERIES A-6 FOR WALL SCHEDULE)
G04a-1SA
WALL TAG
REFERENCE
INTERIOR
WALL TYPE
STUD SIZE
RATING IN HOURS -IF NO RATING/SMOKE, NO NUMBER/"S" WILL BE DISPLAYED- (1S=1 HOUR SMOKE; NO "S"= NON-SMOKE)
E-MVa
EXTERIOR
WALL TYPE
SERIES (REFER TO ADJACENT LEGEND TO THE RIGHT AND SHEET SERIES A-6 FOR DETAILS & SCHEDULES)
NOTE (REFER TO SHEET SERIES A-6 FOR WALL SCHEDULE)
SERIES (REFER TO ADJACENT LEGEND TO THE RIGHT AND SHEET SERIES A-6 FOR DETAILS & SCHEDULES)
EXTERIOR WALL
Exterior Series Classification
MV Masonry Veneer
PC Precast Concrete
SM Stone Masonry
TC Tilt-Up Concrete
WP Wood Paneling
VS Vinyl Siding
CM Concrete Masonry
CS Cultured Stone
EF Exterior Insulated Finish System
FC Fiber Cement
IP Insulated Metal Panel
MS Manufactured Stone Masonry
ROOM NAME
# SF - # SF ACTUALPROGRAM
BENCHMARK ROOM
DESIGNATION
REVISION ID (REFER TO REVISION
NARRATIVE SPREADSHEET)
1.001
Interior Series Classification
C Concrete
F Furring
G General/Light-Gauge
M Masonry
S Shaft
W Wood
D1
GENERAL CONSTRUCTION NOTES
1. Unless otherwise noted, dimensions are to column center lines, face of gypsum board partitions, face of masonry walls and face of existing walls.
2. All cutting and patching shall be done by the General Contractor as outlined in the Project Manual. Patches in finish surfaces shall match the adjacent surfaces in material, finish, and quality.
3. New work extending existing conditions shall align with and match existing work except where otherwise dimensioned or detailed.
4. In the case of non-rated partitions, carry metal studs and gypsum board on both sides of the studs to the underside of the structure or deck above unless otherwise noted.
A. Where noted, carry metal studs to the structure above, and hold the gypsum board to 4” minimum above the finished ceiling.
B. Where noted, carry metal studs to the underside of the ceiling, with a closure gasket between the top of the partition and the ceiling.
5. Per NFPA 101 chapter 18 Health Care Occupancies, wood blocking in the interior of hospitals (IBC Occupancy I-2) shall be fire retardant treated wood.
In occupancies other than hospitals (IBC I-2), the latest editions of the International Building Code (IBC) does not require wood blocking in Type I & II construction to be fire retardant. The Contractor is to verify, prior to bidding or other pricing method used for the project, if the Authority Having Jurisdiction (AHJ) requires wood blocking for this project to be fire retardant. If fire retardant wood blocking is required the cost is to be included in the contract for construction.
6. Install 2 x 6 solid wood blocking between studs for the attachment of wall cabinets; lights or monitors with articulating arms, open knee space countertops supported by braces, grab bars or handrails to support more than 250-pound vertical load or any item more than 25 pounds. For loading greater than 250 pounds see the details included in the contract documents.
7. When an independent headwall assembly is not provided, the GC is to coordinate interior elevation dimensional layout with interior wall stud spacing to avoid device layout conflicts
8. Install continuous galvanized metal strapping for all handrails, grab bars, or other accessories, brackets and OFOI / OFCI / CFCI items or specialties up to 250-pound load unless noted otherwise. Also refer to the project manual for additional requirements.
9. Due to the manufacturer’s variation with size of equipment, casework, millwork, plumbing fixtures etc., all dimensions referring to the space where such items are to be built or installed shall be verified in the field by the Contractor with the item to be provided/ installed.
10. All construction work shall comply with the latest edition of National Fire Protection Association: Standard for Safeguarding Construction, Alteration and Demolition Operations (NFPA 241) unless there is a more stringent requirement in the Contract Documents.
11. All renovation construction areas shall be maintained with negative air pressure relative to the occupied areas of the facility. Contractor shall exhaust construction areas to the outside of the building by temporary fans or other devices approved by the Owner. Care must be used when locating the point of exhaust so as not to interfere or compromise other air intakes, patient rooms, pedestrian paths, public-way or other occupied spaces.
A. At patient care areas, a pressure differential of at least 0.03-inch water gauge (7.0 Pascals), with air flow from the hospital clean areas to the construction dirty areas. Construction barriers in high-risk areas should have visual display of airflow direction.
12. Welding inside the hospital is allowed provided the Contractor obtains prior Owner approval and proper measures are taken to prevent fumes from circulating through the hospital. A portable high-efficiency particulate air (HEPA) filtration system shall be used.
13. Duct work and piping shall be kept capped/clean during demolition and dust-generating construction.
14. Gypsum board installation shall not proceed until exterior protection against rain damage has been installed; the use of poly covering exterior openings is not acceptable.
15. Contractor shall verify the Owner’s requirements for Interim Life Safety Measures (ILSM) and Infection Control Risk Assessment (ICRA) to be enforced during construction prior to the start of construction. See Life Safety During Construction in the General Notes for the ILSM requirements. In addition, incorporate all requirements identified in the Contract Documents.
16. The Owner’s Infection Control and Safety personnel have the authority to order the work to be stopped, if in their opinion, patients, visitors or staff members are being placed at unnecessary or unacceptable risk of infections or construction hazards.
17. Any infection control or construction safety related discrepancies shall be corrected prior to the Owner’s occupancy of the project area.
18. Construction materials should be kept clean and dry as appropriate.
A. Remove any absorbent material that becomes wet, that cannot be totally dried within 24 hours of incident, and replace with new materials.
Absorbent materials include, but are not limited to, gypsum board, insulation, carpet, ceiling tile etc.
19. The preferred method for removing construction debris is an external chute. When this is not possible, debris carts must be sealed during transport through occupied areas of the hospital. Permission of the Charge Nurse or Manager/Supervisor and Infection Control staff must be obtained before transporting construction debris through occupied areas. Debris may only be transported on a specific route, including designated elevators when approved by the Owner prior to beginning these tasks.
20. The Contractor shall complete the cleaning of the project area as required by the Project Manual prior to turning the area over to the Owner.
21. Where doors and frames are indicated to be removed infill the existing opening with construction to match adjacent wall unless otherwise noted.
22. Where existing exterior windows are indicated to be removed infill existing opening with construction to match adjacent wall unless otherwise noted.
New work shall include a continuous air and water-resistive barrier that is attached to and extends the existing air and water-resistive barrier so that one continuous air and water-resistive barrier is provided.
23. Existing areas outside the limits of the work, damaged due to construction activities, shall be repaired to the satisfaction of the Owner.
DEMOLITION
1. All utility work on the existing systems must comply with the Owner’s protocol for scheduling the work, safety precautions, notice to begin the work, infection control, Owner’s staffing involvement and the completion of the work. Disconnection and reconnection of a system may be required to be completed by the Owner’s staff or vendor.
2. All demolition work shall be performed with “due care and diligence” so as to prevent the arbitrary destruction or interruption of concealed utilities which are intended to remain in use and the routing of which could not be predetermined until demolition was started. All such discoveries of utilities during the demolition process which are in a location different from that indicated, change direction from floor to floor etc. or are unidentified shall be reported to the Architect and Owner before removal. Contract amount and time shall be adjusted to reflect such repairs in accordance with the Project Manual.
3. Demolition drawings indicate the removal of items which are believed to be concealed behind existing construction. Immediately notify Architect and Owner, in writing, when conditions are discovered that are not as shown on the Drawings, do not disturb. Notify Architect and Owner if the following conditions occur:
A. Concealed or unknown conditions encountered which differ materially from those indicated or reasonably implied by the Contract
Documents.
B. Concealed physical conditions in the existing structure of an unusual nature.
4. Architectural drawings delineate the area of construction. Refer to the other disciplines documents for work that may extend or be remotely located from the main area of construction for utility points of connections or extensions of utilities to support the new construction. Cutting and then patching of existing conditions outside the area of construction for this work is to be completed by the Contractor with the patching to match the existing conditions in a new condition. The Contractor is to verify, prior to bidding or other pricing method used for the project if these conditions exist on the documents and include provisions as required.
5. Engineering systems may require above ceiling work for special systems such as smoke/fire alarm, random junction boxes and the like which may or may not have been indicated on the reflected ceiling or demolition plans. Access in occupied spaces for this work is to be coordinated with the staff of the affected area, Owner’s representative and the Owner’s infection control staff. Removal of ceiling system or the ceiling tile shall be accomplished on a daily basis with the ceiling system restored at the close of construction on a daily basis. The Contractor shall include provisions for such measures within his bidding or other pricing method used for the project.
6. Existing construction noted to be removed:
A. Remove all construction designated and or shown to be removed to accommodate new work. Use “due care and diligence” in the demolition process to protect the construction workers, occupants of the building, and the portions of the building to remain.
B. Plumbing, mechanical and electrical contractors shall remove all devices and items pertaining to their respective disciplines from all existing partitions, ceilings, etc. being removed. First right of refusal for the removed items is due the Owner. Unless noted to be abandoned, plumbing, mechanical, and electrical items which pass through or are affected by the demolition shall be maintained in a complete and fully operational condition or, where noted, be appropriately capped off. Provide temporary systems as required to maintain full operation of utilities outside the area of construction.
7. Remove portions of existing construction as designated and or shown; patch remaining surfaces to match the existing.
8. When carpet is to be removed, it shall be wetted with an Environmental Protection agency (EPA) and Owner approved germicidal agent prior to the removal of the carpet to prevent the dispersion of airborne particles.
9. Refer to the Interior series drawings and the finish legends in the documents for finishes.
10. Remove existing millwork and casework where indicated. Casework and millwork which include plumbing and other fixtures and assemblies shall have the plumbing removed back to active piping and capped at a tee. Patch disturbed wall, ceiling, and floor surfaces to maintain any required ratings and have the surfaces patched flush to match the adjacent surfaces or provide new finishes as scheduled. Refer to the engineering series drawings for more information.
11. Whenever existing equipment, piping, ducts, etc. are required to be removed, such removal shall include all anchors, hangers, foundations, housekeeping slabs, etc. After removal, any affected construction and surfaces such as floors, wall, bases, and ceilings shall be finished to match the adjacent surfaces, unless otherwise noted.
12. All equipment removed, such as plumbing fixtures, electrical fixtures and equipment, mechanical equipment, air conditioner units, etc. shall be turned over to the Owner and stored where the Owner directs them to be located. Items not turned over shall be removed from the premises.
13. Where indicated, remove the existing windows and replace with new windows as scheduled and detailed. Patch and finish the wall as detailed or patch and finish the wall to match the adjacent finish or to receive the new finishes as scheduled. In addition, provide extension of the existing air and water-resistive barrier onto the new window to provide a continuous air and water-resistive barrier.
14. During the demolition process, should the Contractor identify any material containing or suspected to contain asbestos fibers, report such findings to the Architect and the Owner immediately. Note that the Owner will contract directly with a licensed asbestos removal contractor for the necessary work involving containment and / or removal of the asbestos.
15. Temporary rated partitions shall be provided to isolate construction areas from occupied areas of the facility. Coordinate their exact location with the facility representative and the local and state AHJ. Additional temporary rated partitions over those shown on the Contract Documents shall be required as necessary to accommodate the construction process, and where applicable, to isolate different phases of the work. Costs of all temporary partitions are to be included in the Contractor’s contract.
A. Temporary partitions shall be 1-hour minimum rated construction utilizing non-combustible materials or fire retardant treated wood with gypsum board on each side, and shall extend to the underside of the structure above, unless the work is confined to an area already isolated from Owner occupied areas by an existing 1 hour rated wall. When in place for more than 14 days, all temporary partitions shall be provided with rubber or vinyl base and a washable paint or wall fabric covering on the side opposite the construction area. Adjacent ceilings shall be repaired at the junction with the temporary partitions.
B. All temporary partitions shall be dust proof and sealed at all junctions of dissimilar materials using proper materials, acoustical sealant, or firestopped. The return air ductwork in the construction area shall be capped and sealed to prevent the movement of air from the construction area into the occupied portions of the facility.
C. All temporary partitions shall be sound rated to a minimum Sound Transmission Class (STC) of 45, except when adjacent to storage, mechanical, or similar support spaces. Higher STC ratings are required when adjacent to patient care rooms; comply with the STC requirements of the current edition of the Facility Guidelines Institute (FGI).
FINISH NOTES
1. Prior to beginning renovation work verify existing substrates and finishes shown on the Drawings, report discrepancies to the Architect and Owner.
2. When partial removal of existing gypsum board or plaster ceilings or soffits is required to accommodate new work, patch the ceilings or soffits to match the existing construction. Re-paint the entire ceiling or soffit area unless otherwise noted.
3. All freestanding columns in a room are to receive the same finish as the room wall unless otherwise noted.
4. Where new finishes are applied to existing construction, the existing finishes shall be removed and / or the existing surfaces prepared as required to receive the new finishes unless otherwise noted. Where required to accommodate the new finishes the mechanical, plumbing, electrical, and all other trades shall disconnect and remove their respective devices and items from the existing wall, ceiling, millwork to remain, and floor and relocate to their final position in the new construction. Such devices shall include, but not be limited to electrical switches, outlets, panels, thermostats, grilles, plumbing fixtures, medical gas outlets, etc. The respective trade shall also be responsible for any permanent connections of those items which are relocated.
5. Where wall surfaces are patched to match the existing, the new finish shall be applied to the nearest corner or break in the wall plane unless otherwise noted.
6. When existing walls are scheduled to receive new finishes, existing items mounted within the wall surface (electrical panels, doors, frames, or the like) shall be repainted as indicated on the documents or as directed by the Architect.
7. When existing tile is indicated to be removed and replaced with resilient flooring or carpet, removal includes removing the tile, adhesive, thin-set, and mortar bed if present. Level existing floor surface with a cementitious leveling compound.
8. In areas that have an existing floor finish of resilient floor tile or carpet and are to receive a new ceramic or quarry tile floor, the adhesive shall be removed in preparation for such new tile.
9. Plaster walls in an existing building that are to receive ceramic wall tile shall have the plaster removed from the existing wall to the height of the new tile in preparation for the new setting bed.
10. Removal of vinyl wall fabric from existing plaster or gypsum board walls shall include removal of fabric adhesive. Install a new skim coat over the existing surfaces in preparation for the new finishes.
11. In existing rooms scheduled to receive new finishes or re-finished cabinetry, temporarily remove existing fixtures allowing installation of the new finishes, re-install fixtures after the new finishes have cured or dried.
RATED WALL REQUIREMENTS (FIRE, SMOKE, AND SOUND TRANSMISSION)
1. Refer to standard fire and smoke wall details in the ‘G’ series and ‘A’ series drawings and the UL details cited or included in the Contract Documents.
2. Rated walls, both fire and sound, and CMU walls shall extend to the underside of the structure or deck above unless otherwise noted. All fire-rated walls are to have the penetrations fire stopped and firestopped at the top of the walls and at end conditions per the appropriate approved tested assembly.
Sound partitions shall be completely sealed with closure gaskets and / or acoustical sealant at bottom, top, sides and where partitions intersect other partitions where a sound leak would otherwise occur. Penetrations, such as piping, conduits, ducts, electrical devices, medical gas assemblies etc. in sound partitions shall be packed and sealed along the perimeter of the penetration with acoustical material.
3. All smoke barriers shall be extended from the floor to the structural deck above and from the interior face of the exterior wall sheathing to the other exterior wall interior face of sheathing.
4. All floors and shafts shall be fire rated and smoke rated assemblies, this includes stair, elevator and mechanical shafts and the like.
5. In new construction or conditions requiring existing construction to be removed, penetrations through floor slabs and rated walls, including piping, conduits, ducts, pneumatic tubes etc. shall be sealed with a tested firestop assembly.
6. Existing barrier walls and smoke partitions to remain within the limits of construction shall be inspected by the Contractor to confirm the following items:
A. Barrier wall or smoke partition extends and is tight to and properly sealed with the required assembly to the structural slab above B. All penetrations and holes through the walls are repaired or patched in accordance with the required firestop assembly for the wall penetration.
C. All rated fire walls, fire barriers, fire partitions, smoke barriers and smoke partitions are correctly labeled.
7. Existing rated walls, required to extend to the structural deck above which do not extend to the structural deck above shall be extended as follows:
A. Document areas to be extended and upgraded. Confirm areas with the Architect and the Owner prior to beginning work. Contract amount and time shall be adjusted to reflect such repairs in accordance with the Project Manual.
B. One-hour plaster or gypsum board partitions: use appropriate width metal studs with 5/8” gypsum board on each side of the stud, total wall to comply with documented tested assembly C. Two-hour masonry or CMU partitions: use 4” solid masonry or 8” CMU to match the width of the existing condition, total wall to comply with tested assembly D. Two-hour plaster or gypsum board partitions: Use appropriate width metal studs with two layers of 5/8” gypsum board on each side of the stud, total wall to comply with tested assembly. Size of patch not to exceed 4’ x 4’; larger areas will require removal and replacement of the wall in the area of the deficiency.
E. Top of wall to terminate at the deck above with a tested fire-rated, dynamic head-of-wall design appropriate for the wall and deck above.
F. Upon completion of existing rated wall upgrade, patch and repair and install new wall, floor and ceiling finishes as indicated on Drawings
8. Existing penetrations: Existing concealed areas such as chases, underside of floors below existing toilet/bathroom facilities with hard ceilings, below existing equipment etc. and within the limits of construction shall be examined by the Contractor. Such areas having open penetrations shall be sealed with required firestop assembly for condition being penetrated. Make note where penetrations exist and verify requirements with Architect and Owner prior to beginning work. Contract amount and time shall be adjusted to reflect such repairs in accordance with the Project Manual.
9. Provide approved tested and rated putty pads on all steel boxes closer than 24” in fire and / or sound rated walls.
10. Devices contained in metallic boxes in rated wall openings of 2 hours or less not exceeding 16 square inches are permitted provided the area of such openings does not aggregate more than 100 square inches for any 100 square feet of fire resistant wall area or shaft enclosure wall area. The gypsum board face must be cut so that the clearance from the box does not exceed 1/8”. Boxes on opposite sides of the fire-resistant wall or shaft enclosure shall be separated by a horizontal distance of not less than 24” or be completely covered with putty pads per the approved tested and rated design assembly.
LIFE SAFETY DURING CONSTRUCTION
1. In a phased construction project, the Phasing Plans demonstrate the basic life safety that is to be maintained for the occupants of the building. The life safety of the occupants is not to be compromised.
2. The Contractor shall use the basic life safety requirements shown in the contract documents to develop specific Interim Life Safety Measures (ILSM) to be incorporated in the work to meet the requirements of the project. The ILSM report shall be submitted to the Owner and authority Having Jurisdiction (AHJ) for approval prior to beginning construction or a phase of construction.
3. The following shall be adhered to in the development of the phasing/interim life safety planning:
A. Travel path for occupants through a construction area inside the building is prohibited.
B. Travel path through an exterior construction area is to have a hard surface to walk on and fencing separating the travel path from the construction area that are extended to a public way and meet accessibility codes of the state and the ADA. At overhead construction, a protective tunnel for egressing occupants will be required. Contractor shall provide an 8’-0” wide by 7’-6” high (clear dimensions) passageway (tunnel) capable of supporting an 80 PSF live load. It shall be constructed of a minimum fire-retardant wood. It shall have a roof with a 90-pound mineral surfaced felt on a minimum of ¾” plywood and 3’-6” high closed sides, with a 4’-0” high opening above the closed lower area.
Construction shall be phased as required to provide the exit access and allow for construction. Passageway shall be located as identified in the ILSM report. The construction and method of phasing must be approved by the Owner and the AHJ. Electrical contractor shall provide temporary lights powered from the emergency circuits in the passageway. Other protective tunnel assemblies will be entertained as long as they have a hard walking surface, are lighted powered from the emergency circuits, and ventilated. If the alternate tunnel assemblies are metal, such as containers, they need to be grounded with a #6 green conductor from an existing building ground to the container metal. If the container spans two buildings then the container will need to be grounded at both ends to BOTH buildings. Provide fire extinguishers at 50 feet along the occupant’s travel path in the temporary tunnel.
C. Dead end corridors are limited to 20’ in I-2 occupancies and 50’ in Business occupancies as long as the building is fully sprinkled.
D. Travel distance length limit in the occupied functioning portion of the building to an exit is unchanged; 200 feet maximum, as long as the building is fully sprinkled.
E. Travel distance length limit in the occupied functioning portion of the building to a smoke barrier door is unchanged; 200 feet maximum.
F. Travel distance length limit for an exit in a construction area is to comply with the travel distance permitted for the occupied building; 200’ maximum, as long as the building is fully sprinkled.
4. Construction areas are to be separated from the occupied areas in the facility by one hour rated partitions due to the following and other concerns:
A. The sprinkler system in the construction area may be out of service due to construction activities B. The existing building may not be fully sprinkled C. Smoke detectors in the construction area are typically covered due to dust setting the alarms off; thus, the detection system of the building is compromised.
5. The temporary one hour rated partition separating occupied portions of the building from the construction areas are to extend vertically from the floor to the structural deck above and horizontally from an exterior wall to an exterior wall or to an existing rated wall that extends to the exterior wall
6. Contractor shall verify with the AHJ (at the state and local level) and the Owner whether an occupied corridor can be split with a one hour rated partition during construction; 6’ hospital width and 2’ construction width.
7. A Fire Watch is defined as a short-term compensatory measure that will allow a facility to continue to operate under an increased, supervised level of fire safety when life safety components are temporarily compromised.
A. Note: When any exits are affected during construction, regardless of whether a fire watch is being performed, the AHJ may require a program where an assigned individual of the facility walks each entire exit path at least hourly to assure the safety of the building’s occupants. The Contractor is to obtain the approval of the local and state level AHJ for a Fire Watch prior to implementing a Fire Watch. Lacking direction from the AHJ as to whom provides the Fire Watch services the Contractor shall provide the Fire Watch services.
8. Contractor is to develop an Infection Control Risk Assessment (ICRA) plan in conjunction with the Owner or if the Owner is not available develop and submit the ICRA plan to the Owner for approval prior to beginning the work.
DA
NIEL DOMINIC BRINDISI
A
A
14702R
C H
N
O
RT
I E G
D
T
S
ER
E
T
A
NI
LOR
H
I
RC
C E T
C H
A
R L O T T E , N
C l l l R iv e rs id e A v e n u e
J a c k s o n v il le
F lo ri d a
P h o n e
-4
H A
S K
E L
L A
R C
H
IT
E C
T S
A
G
IN
E E
R S
P
.A
N O
R T
H C
A R
O L
IN
A
A rc h it e c tu re
E n g in e e ri n g
C -2
A
B
C
1 2 3 4 5
SHEET NUMBER
1 2 3 4 5
A
B
C
We hereby expressly reserve the property rights to this drawing and it is not to be reproduced, copied in any format or manner whatsoever without first obtaining our express written permission and consent.
AE JOB NUMBER
DRAWN CHECKED
/6
/2
:2
:2
P
M
G R
A N
V
IL
L E
H E
A L T
H S
Y S
T E
M
G ra n v ill e H e a lt h S y s te m
C o lle g e S t, O x fo rd
N C
M R
I, C
T
A N
D N
U C
L E
A R
I M
A G
IN
G
R E
N O
V A
T
IO
N S
G-300
MFSSB
GENERAL NOTES,
SYMBOLS, &
VICINITY MAP
1785003
March 6, 2025
G R
A N
V
IL
L E
H E
A L T
H S
Y S
T E
M
G ra n v ill e H e a lt h S y s te m
C o lle g e S t, O x fo rd
N C
M R
I, C
T
A N
D N
U C
L E
A R
I M
A G
IN
G
R E
N O
V A
T
IO
N S
March 6, 2025
GENERAL NOTES
GRANVILLE HEALTH SYSTEM
VICINITY MAP
No DESCRIPTION DATE
CD CONSTRUCTION
DA
NIEL DOMINIC BRINDIS
I
A
A
14702R
C H
N
O
RT
I E G
D
T
S
ER
E
T
A
NI
LOR
H
I
RC
C E T
C H
A
R L O T T E , N
C l l l R iv e rs id e A v e n u e
J a c k s o n v il le
F lo ri d a
P h o n e
-4
H A
S K
E L
L A
R C
H
IT
E C
T S
A
G
IN
E E
R S
P
.A
N O
R T
H C
A R
O L
IN
A
A rc h it e c tu re
E n g in e e ri n g
C -2
A
B
C
1 2 3 4 5
SHEET NUMBER
1 2 3 4 5
A
B
C
We hereby expressly reserve the property rights to this drawing and it is not to be reproduced, copied in any format or manner whatsoever without first obtaining our express written permission and consent.
AE JOB NUMBER
DRAWN CHECKED
/6
/2
:2
:3
P
M
G R
A N
V
IL
L E
H E
A L T
H S
Y S
T E
M
G ra n v il le
H e a lt h S y s te m
C o ll e g e S t, O x fo rd
N C
M R
I, C
T
A N
D N
U C
L E
A R
I M
A G
IN
G
R E
N O
V A
T
IO
N S
G-301
MFSSB
ARCHITECTURAL
ABBREVIATIONS
1785003
March 6, 2025
G R
A N
V
IL
L E
H E
A L T
H S
Y S
T E
M
G ra n v il le
H e a lt h S y s te m
C o ll e g e S t, O x fo rd
N C
M R
I, C
T
A N
D N
U C
L E
A R
I M
A G
IN
G
R E
N O
V A
T
IO
N S
March 6, 2025
WWM WELDED WIRE MESH
WWF WELDED WIRE FABRIC
W/W WALL TO WALL
WT WEIGHT
WSTRI WEATHERSTRIPPING
WSSV WELDED SEAM SHEET VINYL
WSSR WELDED SEAM SHEET...
WSCT WAINSCOT
WS WALL SCONCE
WR WATER...
WPT WORK POINT
WPNL WALL PANELS
WPM WATERPROOF MEMBRANE
WP WATERPROOFING
WOM WALK OFF MAT
WI WROUGHT IRON
WH WATER HYDRANT
WH WATER HEATER
WGL WIRE GLASS
WDW WINDOW
WD WOOD
WCO WALL CLEANOUT
W/O... WITHOUR
WCJ WALL CONTROL JOINT
W WIDE
WC WALL COVERING : WATER...
W/O WITHOUT
W WIDTH : WEST : WITH
VWF VINYL WALL FABRIC
VWC VINYL WALL COVERING
VTR VENT THROUGH ROOF
VT VINYL TILE
VR VAPOR RETARDER
VPF VINYL PLANK FLOORING
VP VISION PANEL
VIN VINYL
VIF VERIFY IN FIELD
VG VERTICAL GRAIN
VEST VESTIBULE
VAC VENTILATION AND AIR CONDITIONING
VERT VERTICAL
VCT VINYL COMPOSITION TILE
VC VARIEGATED COATING
VB VAPOR BARRIER
UON UNLESS OTHERWISE NOTED
VAC VACUUM
V VENT
UL UNDERWRITERS LABORATORIES INC
UTIL UTILITY
UR URINAL
UNO UNLESS NOTED OTHERWISE
UNFIN UNFINISHED
UH UNIT HEATER
UCT UNDERCOUNTER
UC UNDERCUT
U/S UNDERSIDE
TYP TYPICAL
TWS TACKABLE WALL SYSTEM
TV TELEVISION
TS TUBE STEEL
TRTD TREATED
TRS TOOL RESISTIVE STEEL
TRANS TRANSPARENT
TRAN TRANSITION STRIP
TRACT TRACTION
TPD TOILET PAPER DISPENSER
TOW L TOP OF WALL
TOS TOP OF STEEL
TOS TOP OF SLAB
TOR TOP OF ROOF
TOP TOP OF PAVEMENT
TOM TOP OF MASONRY
TOE TOP OF EXISTING
TOC TOP OF CONCRETE
TO TOP OF
TMPD TEMPERED
TME TO MATCH EXISTING
TLT TOILET
TK BD TACKBOARD
THRU THROUGH
THRES THRESHOLD
THK THICK / THICKNESS
TGB TOGGLE BOLT
TF TEXTURE FLOOR
TER TERRAZZO
TEMP TEMPORARY
TEMP TEMPERATURE
TEL TELEPHONE
TC TOP OF CURB
TB TOWEL BAR
T/D TELEPHONE/DATA
T&G TONGUE & GROOVE
T&B TOP & BOTTOM
T TREAD
SYS SYSTEM
SYMM SYMMETRICAL
SWS SHOWER SURROUND
SWGR SWITCHGEAR
SW SWITCH
SW SOUTHWEST
SV SHEET VINYL
SUSP SUSPENDED
SUBCAT SUBCATEGORY
STS SELF TAP METAL SCREW
STRUCT STRUCTURAL
STR STRINGER
STOR STORAGE
STND STAINED
STL JST STEEL JOIST
STL STEEL
STER STERILIZER
STD STANDARD
STC SOUND TRANSMISSION CLASS/COEFFICIENT
STA STATION
SST STAINLESS STEEL
SSM SOLID SURFACE MATERIAL
SSE STRUCTURE SLAB ELEVATION
SS SERVICE SINK
SS SANITARY SEWER
SQ SQUARE
SPRH SPRINKLER HEAD
SPR SPRINKLER
SPR SOUNDPROOF
SPKR SPEAKER
SPEC SPECIFICATION
SP STANDPIPE
SOG SLAB ON GRADE
SND SANITARY NAPKIN DISPENSER
SM SHEET METAL
SLC SOLID STAVE CORE
SL SLOPE
SIM SIMILAR
SHV SHELF / SHELVING
SHTHG SHEATHING
SHT SHEET
SHR SHOWER
SFTV SAFETY RELIEF VALVE
SFPS STRETCHED FABRIC PANEL SYSTEM
SF SQUARE FOOT
SEL SELECT
SECT SECTION
SEC SECURITY
SE SOUTHEAST
SD STORM DRAIN
SD SOAP DISPENSER
SCONC SEALED CONCRETE
SCHED SCHEDULE
SCDR SOLID CORE DOOR
SC SOLID CORE
SB SPLASH BLOCK
SAN SANITARY
SAD SECURITY ACCESS DOOR
SA SUPPLY AIR
S&R SHELF AND ROD
S SOUTH
RWL RAINWATER LEADER
RUG FLOOR RUG
RUBT RUBBER TILE
RUB RUBBER
RTU ROOFTOP UNIT
RTG RATING
RTF RESILIENT TEXTILE FLOORING
RTD RATED
RT RESILIENT TILE
RST RESILIENT STAIR TREAD/ STAIRWELL TREATMENT
RS ROUGH SAWN
RS RISER
RP RISER (PIPING)
ROW RIGHT OF WAY
RO ROUGH OPENING
RM ROOM
RL ROOF LEADER
RHR RIGHT HAND REVERSE
RH ROOF HATCH
RH RIGHT HAND
RFG ROOFING
RF ROOF
REV REVISION/ REVISED
RET RETAINING
RESIL RESILIENT
REQ/REQD REQUIRE/ REQUIRED
REM REMOVABLE
REL RELOCATE
REINF REINFORCED/REINFORCING
REINF REINFORCE(D)
REG REGISTER
REFR REFRIGERATOR
REFL REFLECTED /REFLECTIVE/REFLECT
REF REFERENCE
RECPT RECEPTACLE
RECOM RECOMMENDED
REC RECESSED
RD ROOF DRAIN
RCPT RECEPTOR
RCP REINFORCED CONCRETE PIPE
RCP REFLECTED CEILING PLAN
RCB RESILIENT COVE…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .