About this file
The document is a Table of Contents (Document 00 01 10) for the MRI, CT, and Nuclear Imaging Renovations project at Granville Medical Center in Oxford, North Carolina, prepared by Haskell (Project 1785003) with an original date of March 31, 2025 and an Addendum 2 dated May 9, 2025. The comprehensive table of contents spans multiple divisions including Procurement and Contracting Requirements (Division 00), General Requirements (Division 01), Existing Conditions (Division 02), Concrete, Metals, Wood/Plastics/Composites, Thermal and Moisture Protection, Openings, Finishes, Specialties, and Special Construction. The document provides a detailed breakdown of sections and page counts for the construction documents, indicating a complex renovation project involving medical imaging facilities.
The table of contents suggests a significant healthcare renovation project with substantial technical complexity, particularly in specialized areas like RFI/EMI shielding, X-ray shielding, and modular shielding rooms. Notable sections include extensive requirements for quality control, administrative procedures, infection control, and minority business enterprise participation. The project appears to involve comprehensive renovations across multiple technical domains, with specific attention to healthcare-specific construction requirements, including specialized glazing, radiation-resistant materials, and detailed technical specifications for medical imaging infrastructure. The document indicates multiple divisions are "NOT USED", focusing the project scope on specific critical renovation elements for the medical imaging suites.
View the file
Other files
Show all 14
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
MRI, CT, and Nuclear Imaging Renovations Granville Medical Center Oxford, North Carolina
00 01 10 - Table of Contents - Page 1
Construction Documents Haskell Project 1785003
March 31, 2025 Addendum 2, May 9, 2025
DOCUMENT 00 01 10
TABLE OF CONTENTS
Division 00 – Procurement and Contracting Requirements
00 01 01 – Project Title Page
00 01 07 – Seals Page
00 01 10 – Table of Contents
00 11 13 – Advertisement for Bids
00 21 00 – Instructions
00 21 14 – Instructions to Bidders and General Conditions of the Contract
00 25 19 – Document Clarification Request (DCR)
00 26 00 – Procurement Substitution Procedures
00 31 00 – Available Project Information
00 31 02 – Shielding Report [PENDING] ................................................................................................ #
00 41 00 – Bid Form
00 42 14 – Form of Proposal
00 43 24 – Document Clarification Request (DCR) Form
00 43 25 – Substitution Request Form (During Procurement)
00 43 39 – Minority Business Enterprise Statement of Intent Form
00 43 40 – Identification of HUB Certified/Minority Business Participation
00 45 39 – Minority Business Enterprise Affidavits
00 45 41 – State of North Carolina Affidavit A – Listing of Good Faith Efforts
00 45 42 – State of North Carolina Affidavit B – Intent to Perform Contract with Own Workforce
00 45 43 – State of North Carolina Affidavit C – Portion of the Work to be Performed by HUB Certified/Minority Businesses
00 45 44 – State of North Carolina Affidavit D – Good Faith Efforts
00 52 00 – Agreement Form
00 52 01 – Construction Contract
00 61 13 – Performance and Payment Bond Forms
00 61 13.13 – Performance Bond Form
00 61 13.16 – Payment Bond Form
00 63 13 – Request for Interpretation Form (During Construction)
00 63 25 – Substitution Request Form (During Construction)
00 65 36 – General Building Guarantee
00 65 37 – Watertightness Guarantee
00 72 00 – General Conditions
00 73 39 – Minority Business Enterprise Requirements
00 73 40 – Outreach Plan for Minority Business Participation in Building Construction
Division 01 – General Requirements
01 10 00 – Summary
01 20 00 – Price and Payment Procedures
00 01 10 - Table of Contents - Page 2
Haskell Project 1785003
01 22 00 – Unit Prices
01 23 00 – Alternates
01 25 00 – Substitution Procedures
01 26 13 – Requests for Interpretation
01 26 54 – Proposal Worksheet Summaries
01 30 00 – Administrative Requirements
01 30 01 – Submittal Data Sheet
01 32 16 – Construction Progress Schedule
01 35 01 – General Project Procedures
01 35 13.19 – Special Project Procedures for Healthcare Facilities
01 35 33 – Infection Control Procedures
01 35 46 – Indoor Air Quality Procedures
01 40 00 – Quality Requirements
01 42 16 – Definitions
01 43 03 – Owner’s Quality Assurance
01 45 17 – Contractor’s Quality Control
01 45 33 – Code-Required Special Inspections and Procedures
01 45 34 – Special Inspections – Reports
01 50 00 – Temporary Facilities and Controls
01 51 00 – Temporary Utilities
01 58 13 – Temporary Project Signage
01 60 00 – Product Requirements
01 70 00 – Execution and Closeout Requirements
01 78 00 – Closeout Submittals
01 79 00 – Demonstration and Training
Division 02 – Existing Conditions
02 41 00 – Demolition
Division 03 – Concrete (SEE ALSO STRUCTURAL DRAWINGS)
03 05 16 – Underslab Vapor Retarder
03 30 00 – Cast-in-Place Concrete
03 54 00 – Cast Underlayment
Divisions 04 – Masonry (NOT USED)
Division 05 – Metals
05 45 00 – Metal Support Assemblies
Division 06 – Wood, Plastics, and Composites
06 10 00 – Rough Carpentry
06 40 00 – Architectural Woodwork
06 61 16 – Solid Surfacing Fabrications
Division 07 – Thermal and Moisture Protection
07 01 51 – Existing Roof Modifications
07 62 00 – Sheet Metal Flashing and Trim
00 01 10 - Table of Contents - Page 3
Haskell Project 1785003
07 81 00 – Applied Fireproofing
07 84 00 – Firestopping
07 92 00 – Joint Sealants
Division 08 – Openings
08 12 13 – Hollow Metal Frames
08 14 16 – Flush Wood Doors
08 14 73 – Sliding Wood Doors
08 31 00 – Access Doors and Panels
08 34 50 – Radiation Shielding Frames
08 71 00 – Door Hardware
08 80 00 – Glazing
08 88 13 – Fire-Rated Glazing
08 88 49 – Radiation-Resistant Glazing
Division 09 – Finishes
09 05 61 – Common Work Results for Flooring Preparation
09 05 63 – Relative-Humidity Checklist
09 05 64 – Relative-Humidity Report Form
09 21 16 – Gypsum Board Assemblies
09 51 00 – Suspended Acoustical Ceilings
09 54 16 – Luminous Ceilings
09 65 00 – Resilient Flooring
09 91 23 – Interior Painting
Division 10 – Specialties
10 21 23 – Cubicle Curtains
10 26 23.13 – Impact-Resistant Wall Protection
10 28 13 – Toilet Accessories
10 44 00 – Fire Protection Specialties
Divisions 11 and 12 (NOT USED)
Division 13 – Special Construction
13 49 13 – Integrated X-Ray Shielding Assemblies
13 49 23 – Integrated RFI/EMI Shielding Assemblies
13 49 26 – Modular RFI-Shielding Rooms
Divisions 14 through 20 (NOT USED)
Division 21 – Fire Suppression (NOT USED)
Division 22 – Plumbing (SEE DRAWINGS)
Division 23 – Heating, Ventilating, and Air-Conditioning (SEE DRAWINGS)
Divisions 24 and 25 (NOT USED)
Division 26 – Electrical (SEE DRAWINGS)
Divisions 27 through 49 (NOT USED)
END OF TABLE OF CONTENTS
00 01 10 - Table of Contents - Page 4
Haskell Project 1785003
This page is intentionally left blank.
File details come from the government source that posted it. Updated .