Drawings - Boise AHU-2 100 Percent.pdf
PDF 1 MB Posted
- Attached to
- Z1DA--531-24-106 Replace AHU-2 Building 85 Federal contract opportunity
- Solicitation number
- 36C26026R0019
About this file
These mechanical design documents detail a project to replace the Air Handling Unit (AHU-2) at Building 85 of the Department of Veterans Affairs Boise VAMC (Veterans Affairs Medical Center), located at 500 W Fort St, Boise, ID. The 100% submittal, dated 30 April 2025, includes detailed technical drawings for a new air handling unit with specific specifications: a supply fan wall (FW-101) with 4,352 CFM airflow, a primary heating coil (PHC-101) with 1,053,066 BTUH capacity using 30% glycol, a secondary heating coil (HC-101) with 1,209,750 BTUH capacity, and a cooling coil (CC-101) with 1,079,126 BTUH capacity using water. The design includes comprehensive control schematics, sequences of operation, and electrical diagrams for the replacement of the existing air handling system, with provisions for variable frequency drives, static pressure control, and specific operational modes including occupied, unoccupied, and warm-up modes.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| 36C26026R0019 0006.docx | DOCX document | |
| 36C26026R0019 0005.docx | DOCX document | |
| 531-24-106 Spec Section 23 31 00.pdf | ||
| 531-24-106 Spec Section 23 05 93.pdf | ||
| Request for Information and Site Visit - VA Response.pdf | ||
| 36C26026R0019 0004.docx | DOCX document | |
| 36C26026R0019 0003.docx | DOCX document | |
| 36C26026R0019 0002.pdf | ||
| site visit sign in AHU_2 B.85 24OCT2025.pdf | ||
| 36C26026R0019 0001.pdf | ||
| 36C26026R0019 RFP.pdf | ||
| WD ID20250104 Building.pdf | ||
| SOW CON 531-24-106 REPLACE AHU2 B 85.pdf | ||
| 36C26026R0019.docx | DOCX document | |
| S02 EXHIBIT A Past Performance Reference Form.docx | DOCX document | |
| Specifications - Boise AHU-2 CD Set.pdf |
Show all 16
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
324 S. State St., Suite 400 Salt Lake City, UT 84111
800-678-7077 801-328-5151 fax: 801-328-5155 www.spectrum-engineers.com
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
SHEET TO BE VIEWED AND PRINTED IN COLOR
BUILDING 85
531-24-106
BOISE, ID 83702
C :\U se rs
\M ik e.
Sm ith 1\
D oc um en ts \2
5- El ec C en tra l_ M
IK
E.
SM
IT
H 3X
N 6J
.rv t
4/
/2
3:
:5
PM
G001
COVER SHEET REPLACE AHU-2 BUILDING 85
VAMC
30 APRIL 2025 WNF PMS
SHEET INDEX
SHEET NUMBER SHEET NAME
G001 COVER SHEET
M0.00 MECHANICAL COVER SHEET
M1.11 EXISTING AIR HANDLING UNIT
M1.12 EXISTING AIR HANDLING UNIT
M1.21 NEW AIR HANDLING UNIT
M1.22 NEW AIR HANDLING UNIT
M2.01 MECHANICAL SCHEDULES
E6.01 ONE-LINE DIAGRAM
DIRECTOR
ASSOCIATE DIRECTOR / ADMINISTRATIVE OPERATIONS
CHIEF OF STAFF
ASSOCIATE DIRECTOR / PATIENT SERVICES
ASSOCIATE DIRECTOR / CLINICAL OPERATIONS
FINANCIAL MANAGEMENT SERVICE
REPLACE AHU-2REPLACE AHU-2
BUILDING 85 VAMCBUILDING 85 VAMC
531-24-106531-24-106
DEPARTMENT OF VETERANS AFFAIRS BOISE VAMC
500 W FORT ST,
BOISE, ID 83702-4501
100% SUBMITTAL
30 APRIL 2025
SCALE: NTS
SITE PLAN1
Revisions: Date:
100% CONSTRUCTION
DOCUMENTS
2025.04.30
324 S. State St., Suite 400 Salt Lake City, UT 84111
800-678-7077 801-328-5151 fax: 801-328-5155 www.spectrum-engineers.com
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
BUILDING 85
531-24-106
C U s e rs
\G a b e
.B is h o p \D o c u m e n ts
\2
M e c h
C e n tr a l (R
G a b e .B is h o p
.r v t
/2
/2
:5
:3
P
M
M0.00
MECHANICAL COVER SHEET REPLACE AHU-2, BUILDING 85
VAMC
Boise, ID 83702
CLD GPB
100% CONSTRUCTION
DOCUMENTS
13 FEB 2025
1. THE MECHANICAL DRAWINGS SHOW THE GENERAL DESIGN, ARRANGEMENT,
& EXTENT OF THE MECHANICAL SYSTEM. BECAUSE OF THE SMALL SCALE OF
THE DRAWINGS, THESE DRAWINGS DO NOT SHOW ALL OFFSETS, BENDS, OR
ELBOWS NECESSARY FOR THE COMPLETE INSTALLATION IN THE SPACE
PROVIDED. CONTRACTOR SHALL MAKE ALTERATIONS AS MAY BE
NECESSARY TO MAKE THE SYSTEM COMPLETE & OPERATIONAL IN
ACCORDANCE WITH THE DESIGN INTENT.
2. MAJOR DEVIATIONS SUCH AS CHANGES IN SIZES, WEIGHTS, QUANTITIES, OR
MATERIAL REQUIRE PRIOR APPROVAL BY THE DESIGN ENGINEER AND
OWNER.
3. THE DRAWINGS & SPECIFICATIONS HAVE BEEN PREPARED TO SUPPLEMENT
EACH OTHER & SHALL BE INTERPRETED AS AN INTEGRAL UNIT WITH THE
ITEMS SHOWN ON ONE & NOT THE OTHER BEING FURNISHED & INSTALLED
AS THOUGH SHOWN AND CALLED OUT IN BOTH DOCUMENTS. THE
SPECIFICATIONS SHALL SUPERCEDE THE DRAWINGS WHEN IN CONFLICT.
4. THE ENTIRE MECHANICAL INSTALLATION SHALL CONFORM TO THE
REQUIREMENTS OF THE MOST RECENTLY ADOPTED BUILDING CODES,
MECHANICAL CODE, PLUMBING CODE, ELECTRICAL CODE, & ALL OTHER
APPLICABLE CITY, COUNTY, STATE, & FEDERAL CODES & REGULATIONS IN
EFFECT.
5. THE ENTIRE MECHANICAL INSTALLATION SHALL CONFORM TO ALL CODES,
RULES, REGULATIONS, & REQUIREMENTS OF THE BUILDING OWNER.
6. ALL MECHANICAL COMPONENTS AND EQUIPMENT SHALL BE INSTALLED TO
CONFORM WITH ANY APPLICABLE LOCAL SEISMIC REQUIREMENTS.
7. PRIOR TO FABRICATION & INSTALLATION OF ANY MECHANICAL COMPONENT
THE CONTRACTOR SHALL COORDINATE THE INSTALLATION OF ALL
MECHANICAL WORK WITH ALL OTHER BUILDING TRADES, INCLUDING
BUILDING TRADES HIRED DIRECTLY BY THE OWNER. WHERE CONFLICTS
MAY OCCUR, THEY SHALL BE RESOLVED PRIOR TO INSTALLATION.
8. VERIFY ALL REQUIRED SERVICE CONNECTIONS, INCLUDING ELECTRICAL
CHARACTERISTICS, FOR ALL EQUIPMENT PRIOR TO ORDERING OR
FABRICATING MECHANICAL EQUIPMENT AND COMPONENTS.
9. THE SPACE ABOVE CEILINGS IS LIMITED. CAREFUL COORDINATION IS
REQUIRED WITH ALL TRADES BEFORE ANY PIPE, DUCT, OR EQUIPMENT IS
ORDERED &/OR INSTALLED. ANY CONFLICTS &/OR CHANGES FOUND DURING
INSTALLATION THAT RESULTS FROM THE LACK OF COORDINATION BY THE
CONTRACTORS DURING THE SHOP DRAWING PROCESS ARE THE
RESPONSIBILITY OF THE CONTRACTOR.
10. ALL MECHANICAL INFORMATION IS NOT SHOWN ON THE MECHANICAL
DRAWINGS. THE CONTRACTOR SHALL BE RESPONSIBLE FOR COORDINATION
OF ALL INFORMATION ON ALL OTHER CONSTRUCTION DOCUMENTS.
11. THE CONTRACTOR SHALL BE RESPONSIBLE TO REVIEW & USE, WHERE
APPROPRIATE, ALL THE MECHANICAL DETAILS SHOWN ON THE DRAWINGS.
DETAILS MAY OR MAY NOT BE CALLED OUT ON THE DRAWINGS WITH
SYMBOLS OR KEYED NOTES. ANY CHANGES RESULTING FROM FAILURE TO
INSTALL THE MECHANICAL SYSTEM WITHOUT USING THE INCLUDED DETAILS
SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR.
12. ALL EQUIPMENT SHALL BE INDEPENDENTLY SUPPORTED FROM
STRUCTURAL MEMBERS. STRUCTURAL ELEMENTS SHOWN IN DETAILS MAY
OR MAY NOT PERTAIN TO ANY PORTION OF THE BUILDING. COORDINATE ALL
MOUNTING REQUIREMENTS WITH ARCHITECTURAL & STRUCTURAL
DRAWINGS AND SPECIFICATIONS.
13. ALL MECHANICAL COMPONENTS AND EQUIPMENT SHALL BE INSTALLED IN
ACCORDANCE WITH ALL MANUFACTURER RECOMMENDATIONS.
14. ALL SIMILAR EQUIPMENT SHALL BE OF THE SAME MANUFACTURER. AIR
INLETS & OUTLETS OF SIMILAR TYPES SHALL BE OF THE SAME
MANUFACTURER.
15. ANY PART OF THE MECHANICAL INSTALLATION THAT FAILS, IS DEEMED
UNFIT, OR BECOMES DAMAGED DURING CONSTRUCTION SHALL BE
REPLACED BY THE CONTRACTOR AT NO ADDITIONAL COST TO THE OWNER.
THE CONTRACTOR SHALL BE RESPONSIBLE FOR EQUIPMENT CHECK-IN,
SAFEKEEPING, & DAMAGE.
16. COORDINATE WITH ARCHITECTURAL REFLECTED CEILING PLAN FOR EXACT
LOCATION OF ALL CEILING DIFFUSERS & GRILLES.
17. CONTRACTOR SHALL OPERATE INSTALLED &/OR MODIFIED SYSTEMS &
DEMONSTRATE ALL ASPECTS OF THE SYSTEM TO THE ENGINEER &/OR
OWNER TO PROVE ALL ASSOCIATED SYSTEMS ARE OPERATIONAL.
18. DURING CONSTRUCTION THE CONTRACTOR SHALL MAINTAIN A SET OF AS-
BUILT REDLINED RECORD DRAWINGS AT THE PROJECT SITE. ALL CHANGES
OR DEVIATIONS IN LAYOUT, ROUTING, EQUIPMENT, COMPONENTS, &
ACCESSORIES SHALL BE RECORDED. THESE REDLINED DRAWINGS SHALL
BE GIVEN TO THE ARCHITECT / ENGINEER AFTER THE FINAL INSPECTION IN
ACCORDANCE WITH PROJECT SPECIFICATIONS.
19. ALL DUCT ELBOWS SHALL BE LONG RADIUS, UNLESS NOTED OTHERWISE.
MECHANICAL GENERAL NOTESABBREVIATIONS
NOTE: ALL ABBREVIATIONS MAY NOT BE USED.
(E) EXISTING
(F) FUTURE
AC AIR CONDITION(-ING,-ED)
APD AIR PRESSURE DROP
BD BALANCING DAMPER
BHP BRAKE HORSE POWER
BTU BRITISH THERMAL UNIT
BTUH BTU/HOUR
CFH CUBIC FEET PER HOUR
CFM CUBIC FEET PER MINUTE
CV CONTROL VALVE
DB DRY BULB TEMPERATURE
DCW DOMESTIC COLD WATER
DHW DOMESTIC HOT WATER
DHWR DOMESTIC HOT WATER RECIRC
DP DEPTH, DEEP, OR DROP IN PRESSURE
EA EXHAUST AIR
EER ENERGY EFFICIENCY RATIO
EFF EFFICIENCY
ELEC ELECTRIC
ELEV ELEVATION
ENT ENTERING
EVAP EVAPORAT(-E, -ING, -ED, -OR)
EWT ENTERING WATER TEMPERATURE
EXT EXTERNAL
FD FIRE DAMPER
FLA FULL LOAD AMPS
FPI FINS PER INCH
FPM FEET PER MINUTE
FPS FEET PER SECOND
FSD FIRE SMOKE DAMPER
GE GREASE EXHAUST
GPH GALLONS PER HOUR
GPM GALLONS PER MINUTE
HD HEAD
HG MERCURY
HP HORSEPOWER
HR HOUR
HTG HEATING
HZ HERTZ (FREQUENCY)
IN INCH
KW KILOWATT
LAT LEAVING AIR TEMPERATURE
LBS POUNDS
LH LATENT HEAT
LRA LOCKED ROTOR AMPS
LVG LEAVING
LWT LEAVING WATER TEMPERATURE
MBH THOUSAND BTU PER HOUR
MCA MINIMUM CIRCUIT AMPS
MFR MANUFACTUR(-ER, -ED)
NC NORMALLY CLOSED OR NOISE CRITERIA
NIC NOT IN CONTRACT
NO NORMALLY OPEN
NPSH NET POSITIVE SUCTION HEAD
NTS NOT TO SCALE
OA OUTSIDE AIR
OD OUTSIDE DIAMETER
OZ OUNCE
PD PRESSURE DROP OR DIFFERENCE
PG PROPOLENE GLYCOL
PH PHASE
PPM PARTS PER MILLION
PSF POUNDS PER SQUARE FOOT
PSI POUNDS PER SQUARE INCH
PSIA PSI ABSOLUTE
PSIG PSI GAUGE
RA RETURN AIR
RECIRC RECIRCULATE (-ER, -ED, -ING)
REFR REFRIGERATION
REQD REQUIRED
RLA RATED LOAD AMPS
RPM REVOLUTIONS PER MINUTE
SA SUPPLY AIR
SCFM STANDARD CUBIC FEET PER MINUTE
SCW SOFT COLD WATER
SH SENSIBLE HEAT
SP STATIC PRESSURE
SPEC(S) SPECIFICATION(S)
SQ SQUARE
SS SANITARY SEWER, SOIL, WASTE
STD STANDARD
TA TRANSFER AIR
TD TEMP. DROP OR DIFF.
TEMP TEMPERATURE
TOT TOTAL
TSTAT THERMOSTAT
TYP TYPICAL
V VOLT, VOLTAGE OR VENT
VAC VACUUM
VAV VARIABLE AIR VOLUME
VEL VELOCITY
VENT VENT, VENTILATION
VERT VERTICAL
VFD VARIABLE FREQUENCY DRIVE
VOL VOLUME
VTR VENT THROUGH ROOF
WB WET BULB TEMP
WC WATER COLUMN
WG WATER GAUGE
WPD WATER PRESSURE DROP
WTR WATER
PIPING LEGEND
DESCRIPTIONABBREVIATION
NOTE: ALL ABBREVIATIONS MAY NOT BE USED.
CONDENSER WATER SUPPLY
CONDENSER WATER RETURN
FIRE PROTECTION
HEATING HOT WATER SUPPLY
HEATING HOT WATER RETURN
NITROUS OXIDE
REFRIGERANT LIQUID
REFRIGERANT GAS
SNOW MELT RETURN
SNOW MELT SUPPLY
CHILLED WATER SUPPLY
CHILLED WATER RETURN
COMPRESSED AIR
CONDENSATE DRAIN
GLYCOL SUPPLY
GLYCOL RETURN
MEDICAL AIR
LIQUID PROPANE GAS
NATURAL GAS
OXYGEN
VACUUM
CHWR
CHWS
CA
CD
CWR
CWS
FP
GR
GS
HHWR
HHWS
LPG
MA
NG
NO
O
RL
RG
SMR
SMS
VAC
FUEL OIL SUPPLY
FUEL OIL RETURN
FUEL OIL VENT
FOR
FOS
FOV
MEDIUM PRESSURE CONDENSATE
HIGH PRESSURE CONDENSATEHPC
MPC
HIGH PRESSURE STEAM
LOW PRESSURE CONDENSATELPC
HPS
LOW PRESSURE STEAM
MEDIUM PRESSURE STEAMMPS
LPS
PUMPED CONDENSATEPC
C02 CARBON DIOXIDE
SQUARE OR RECTANGULAR
SUPPLY DIFFUSER
SYMBOL LEGEND - MECH
DESCRIPTIONSYMBOL
NOTE: ALL ABBREVIATIONS MAY NOT BE USED.
DUCT HIGH EFFICIENCY TAKE OFF
WITH BALANCING DAMPER
SQUARE OR RECTANGULAR
RETURN DIFFUSER
SQUARE OR RECTANGULAR
EXHAUST DIFFUSER
ROUND DIFFUSER
SIDEWALL GRILLE OR REGISTER
BALANCING DAMPER
FIRE DAMPER
FIRE / SMOKE COMBINATION
DAMPER
LINEAR SLOT GRILLE OR DIFFUSER
FLEXIBLE DUCT
T S H THERMOSTAT - SENSOR - HUMIDISTAT
SYMBOL LEGEND - MISC
DESCRIPTIONSYMBOL
VIEW OR DETAIL INDICATOR: # INDICATES DETAIL NUMBER,
SHEET INDICATES DRAWING SHEET WHERE VIEW OR DETAIL
IS SHOWN.
REFERENCE LINES AND SYMBOLS
ELEVATION OR SECTION INDICATOR: # INDICATES VIEW
NUMBER, SHEET INDICATES DRAWING SHEET WHERE VIEW IS
SHOWN.
NAME
### ROOM / SPACE INDICATOR
# KEYNOTE INDICATOR
# REVISION INDICATOR
XX-##
XX-##
TAG
CFM
PLUMBING FIXTURE INDICATOR
EQUIPMENT INDICATOR
REGISTER, GRILLE, OR DIFFUSER INDICATOR
BREAKLINE
MATCHLINE INDICATOR
CONTRACT LIMIT LINE: DASHDOT, WIDE LINE
NEW CONNECTION TO EXISTING
POINT OF DEMOLITION
OR
MATCH LINE
SEE XX/XXX
MECHANICAL SHEET INDEX
M0.00 MECHANICAL COVER SHEET
M1.11 EXISTING AIR HANDLING UNIT
M1.12 EXISTING AIR HANDLING UNIT
M1.21 NEW AIR HANDLING UNIT
M1.22 NEW AIR HANDLING UNIT
M2.01 MECHANICAL SCHEDULES
Revisions: Date:
30 APRIL 2025
PRE-FILTER RACK
PRESSURE GAUGE
PRE-HEAT COIL (116"L x 59"T x 20"D)
MIXING BOX
FILTER RACK
PRESSURE GAUGE
PRIMARY HEATING COIL
(116"L x 104"T x 6"D)
FAN SECTION
39,170 cfm @ 5.3" S.P.
HW COIL (116L x 50"T) COOLING COIL(116L x 71"T)
EXISTING
INTAKE LOUVER
EXTERIOR WALL
EXTERIOR WALL
EXISTING FLOOR DRAIN
EXISTING
EXHAUST LOUVER
E X
IS
T
IN
G
E X
H A
U S
T A
IR
E X
IS
T
IN
G
R E
T U
R N
A
IR
E X
IS
T
IN
G
R E
T U
R N
A
IR
EXISTING RETURN AIR
324 S. State St., Suite 400 Salt Lake City, UT 84111
800-678-7077 801-328-5151 fax: 801-328-5155 www.spectrum-engineers.com
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
BUILDING 85
531-24-106
C U s e rs
\G a b e
.B is h o p \D o c u m e n ts
\2
M e c h
C e n tr a l (R
G a b e .B is h o p
.r v t
/2
/2
:5
:3
P
M
M1.11
EXISTING AIR HANDLING UNIT REPLACE AHU-2, BUILDING 85
VAMC
Boise, ID 83702
CLD GPB
100% CONSTRUCTION
DOCUMENTS
13 FEB 2025
SCALE: 1/2" = 1'-0"1
EXISTING AIR HANDLING UNIT PLAN DETAIL
SHEET KEYNOTES
1 REMOVE EXISTING 60 HP MOTOR AND FAN ASSEMBLY AND ALL RELATED WIRING
AND CONTROLS. FIELD VERIFY EXISTING CONDITIONS BEFORE ANY WORK
SHOULD BEGIN.
Revisions: Date:
EXISTING DOOR
(60.5"T x 20.5"W)
EXISTING DOOR
(84.5"T x 20.5"W)
EXISTING DOOR
(62"T x 26"W)
EXISTING DOOR
("T x 26"W)
4 5 4
HOT DECK
COLD DECK
EXISTING
INTAKE LOUVER
RETURN DUCT
EXISTING DOOR
(60.5"T x 20.5"W)HOT DECK
COLD DECK
RETURN DUCT
324 S. State St., Suite 400 Salt Lake City, UT 84111
800-678-7077 801-328-5151 fax: 801-328-5155 www.spectrum-engineers.com
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
BUILDING 85
531-24-106
C U s e rs
\G a b e
.B is h o p \D o c u m e n ts
\2
M e c h
C e n tr a l (R
G a b e .B is h o p
.r v t
/2
/2
:5
:3
P
M
M1.12
EXISTING AIR HANDLING UNIT REPLACE AHU-2, BUILDING 85
VAMC
Boise, ID 83702
CLD GPB
100% CONSTRUCTION
DOCUMENTS
13 FEB 2025
SHEET KEYNOTES
1 REMOVE EXISTING PRIMARY HEATING COIL. FIELD VERIFY EXISTING CONDITIONS
BEFORE ANY WORK SHOULD BEGIN.
2 REMOVE EXISTING HEATING COIL. FIELD VERIFY EXISTING CONDITIONS BEFORE
ANY WORK SHOULD BEGIN.
3 REMOVE EXISTING COOLING COIL. FIELD VERIFY EXISTING CONDITIONS BEFORE
ANY WORK SHOULD BEGIN.
4 REMOVE EXISTING SERVICE DOOR. FIELD VERIFY EXISTING CONDITIONS AND
EXACT SIZE OF DOOR BEFORE ANY WORK SHOULD BEGIN.
5 REMOVE EXISTING SERVICE DOOR AND FILL IN WITH NEW DOUBLE WALL SHEET
METAL PANEL. FIELD VERIFY EXISTING CONDITIONS BEFORE ANY WORK SHOULD
BEGIN.
6 REMOVE EXISTING WALL INSIDE AHU BETWEEN THE FAN SECTION AND THE COIL
SECTION. FIELD VERIFY EXISTING CONDITIONS BEFORE ANY WORK SHOULD
BEGIN.
7 REMOVE EXISTING CONTROLS CABINET AND WILL BE RELOCATED. FIELD VERIFY
EXISTING CONDITIONS BEFORE ANY WORK SHOULD BEGIN.
8 REMOVE ALL EXISTING STEAM PIPING AND EQUIPMENT THAT IS IN THIS AREA TO
PERFORM NEW WORK.
Revisions: Date:
SCALE: 1/2" = 1'-0"1
EXISTING AIR HANDLING UNIT FRONT ELEVATION DETAIL
SCALE: 1/2" = 1'-0"2
EXISTING AIR HANDLING UNIT BACK ELEVATION DETAIL
PRE-FILTER RACK
PRESSURE GAUGE
PRE-HEAT COIL (116"L x 59"T x 20"D)
MIXING BOX
FILTER RACK
EXISTING
INTAKE LOUVER
EXTERIOR WALL
EXTERIOR WALL
PHC-101
HC-101
CC-101
FW-101 4
EXISTING FLOOR DRAIN
EXISTING
EXHAUST LOUVER
E X
IS
T
IN
G
E X
H A
U S
T A
IR
E X
IS
T
IN
G
R E
T U
R N
A
IR
E X
IS
T
IN
G
R E
T U
R N
A
IR
EXISTING RETURN AIR
324 S. State St., Suite 400 Salt Lake City, UT 84111
800-678-7077 801-328-5151 fax: 801-328-5155 www.spectrum-engineers.com
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
BUILDING 85
531-24-106
C U s e rs
\G a b e
.B is h o p \D o c u m e n ts
\2
M e c h
C e n tr a l (R
G a b e .B is h o p
.r v t
/2
/2
:5
:3
P
M
M1.21
NEW AIR HANDLING UNIT REPLACE AHU-2, BUILDING 85
VAMC
Boise, ID 83702
CLD GPB
100% CONSTRUCTION
DOCUMENTS
13 FEB 2025
SCALE: 1/2" = 1'-0"1
NEW AIR HANDLING UNIT TOP DETAIL
Revisions: Date:
SHEET KEYNOTES
1 NEW PRIMARY HEATING COIL. CONNECT TO EXISTING PIPING AS REQUIRED.
FIELD VERIFY EXISTING CONDITIONS AND EXACT SIZE OF COIL BEFORE ANY
WORK SHOULD BEGIN.
2 NEW HEATING COIL. CONNECT TO EXISTING PIPING AS REQUIRED. FIELD VERIFY
EXISTING CONDITIONS AND EXACT SIZE OF COIL BEFORE ANY WORK SHOULD
BEGIN.
3 NEW COOLING COIL. CONNECT TO EXISTING PIPING AS REQUIRED. FIELD VERIFY
EXISTING CONDITIONS AND EXACT SIZE OF COIL BEFORE ANY WORK SHOULD
BEGIN.
4 NEW FAN WALL. INSTALL NEW FANS AS REQUIRED PER MANUFACTURERS
RECOMMENDATIONS. FIELD VERIFY EXISTING CONDITIONS BEFORE ANY WORK
SHOULD BEGIN.
5 PROVIDE DRAIN DOWN LOW AT COIL SECTION FOR CLEANING PURPOSES. ROUTE
PIPING CLOSE TO AHU AND OVER TO FLOOR DRAIN.
6 SEAL AROUND FAN WALL AIR TIGHT TO SIDE OF INTERIOR WALL OF AHU.
7 RELOCATE EXISTING AHU CONTROLS HERE.
GENERAL SHEET NOTES
1. FIX ALL METAL ON AHU THAT IS SHOWING FATIGUE.
2. INSTALL LIGHTS IN ALL SERVICE SECTIONS INCLUDING FILTER SECTIONS. REFER
TO ELECTRICAL DRAWINGS FOR MORE INFORMATION. ALL LIGHTS NEED TO BE
WIRED TO A SINGLE CIRCUIT.
3. PROVIDE NEW FILTER SECTION DOORS, HANDLES, HINGES AND SEALS AT EXISTING
LOCATIONS.
4. DEMO ALL EXISTING STEAM PIPING ON EXTERIOR OF AHU. FIELD VERIFIY EXISTING
CONDITIONS BEFORE ANY WORK SHALL BEGIN.
5. INSTALL CLEANING SERVICE DRAIN AT EACH COIL SECTION. ROUTE PIPING FROM
COIL SECTION OVER TO FLOOR DRAIN NEXT TO AHU.
6. REPAIR OR REPLACE ANY DAMAGED INSULATION ON EXTERIOR OF AHU. REFER TO
DRAWINGS FOR AREAS.
7. AROUND EACH ACCESS DOOR REPAIR OR REPLACE INSULATION 1'-0" BEYOND
DOOR OPENING.
8. VERIFY THAT THE EXISTING DRAIN AT THE CHILLED WATER COIL FUNCTIONS
PROPERLY. REPAIR IF NEEDED TO WORKING ORDER. DEMONSTRATE WORKING
DRAINAGE TO OWNER.
NEW DOOR
(60.5"T x 20.5"W)
NEW DOOR
(84.5"T x 20.5"W)
NEW DOOR
(62"T x 26"W)
NEW DOOR
(62"T x 26"W)
PHC-101
CC-101
HC-101
FW-101
NEW DOOR
(62"T x 26"W)
RETURN DUCT
HOT DECK
COLD DECK
NEW DOOR
(49"T x 20.5"W)
NEW DOOR
(72.5"T x 20.75"W)
HOT DECK
COLD DECK
HC-101
CC-101
FW-101 PHC-101
NEW DOOR
(49"T x 20.5" W)
NEW DOOR
(72.25"T x 20.75" W)
NEW DOOR
(60.5"T x 20.5" W)
RETURN DUCT
8 8
324 S. State St., Suite 400 Salt Lake City, UT 84111
800-678-7077 801-328-5151 fax: 801-328-5155 www.spectrum-engineers.com
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
BUILDING 85
531-24-106
C U s e rs
\G a b e
.B is h o p \D o c u m e n ts
\2
M e c h
C e n tr a l (R
G a b e .B is h o p
.r v t
/2
/2
:5
:3
P
M
M1.22
NEW AIR HANDLING UNIT REPLACE AHU-2, BUILDING 85
VAMC
Boise, ID 83702
CLD GPB
100% CONSTRUCTION
DOCUMENTS
13 FEB 2025
SHEET KEYNOTES
1 PROVIDE AND INSTALL NEW SERVICE DOORS. PROVIDE WITH NEW HINGES,
LATCHES AND DOOR SEAL. FIELD VERIFY EXISTING CONDITIONS AND EXACT SIZE
OF DOOR BEFORE ANY WORK SHOULD BEGIN.
2 NEW FAN WALL. INSTALL NEW FANS AS REQUIRED PER MANUFACTURERS
RECOMMENDATIONS. FIELD VERIFY EXISTING CONDITIONS BEFORE ANY WORK
SHOULD BEGIN.
3 NEW PRIMARY HEATING COIL. CONNECT TO EXISTING PIPING AS REQUIRED.
FIELD VERIFY EXISTING CONDITIONS AND EXACT SIZE OF COIL BEFORE ANY
WORK SHOULD BEGIN.
4 NEW HEATING COIL. CONNECT TO EXISTING PIPING AS REQUIRED. FIELD VERIFY
EXISTING CONDITIONS AND EXACT SIZE OF COIL BEFORE ANY WORK SHOULD
BEGIN.
5 NEW COOLING COIL. CONNECT TO EXISTING PIPING AS REQUIRED. FIELD VERIFY
EXISTING CONDITIONS AND EXACT SIZE OF COIL BEFORE ANY WORK SHOULD
BEGIN.
6 SEAL AROUND FAN WALL AIR TIGHT TO SIDE OF INTERIOR WALL OF AHU.
7 RELOCATE EXISTING AHU CONTROLS HERE.
8 REPAIR EXISTING INSULATION SO THAT IT IS TIGHT TO AHU AROUND DOOR TO
MIN OF 12" OUT.
Revisions: Date:
SCALE: 1/2" = 1'-0"1
NEW AIR HANDLING UNIT FRONT ELEVATION DETAIL
SCALE: 1/2" = 1'-0"2
NEW AIR HANDLING UNIT BACK ELEVATION DETAIL
GENERAL SHEET NOTES
1. FIX ALL METAL ON AHU THAT IS SHOWING FATIGUE.
2. INSTALL LIGHTS IN ALL SERVICE SECTIONS INCLUDING FILTER SECTIONS. REFER
TO ELECTRICAL DRAWINGS FOR MORE INFORMATION. ALL LIGHTS NEED TO BE
WIRED TO A SINGLE CIRCUIT.
3. PROVIDE NEW FILTER SECTION DOORS, HANDLES, HINGES AND SEALS AT EXISTING
LOCATIONS.
4. DEMO ALL EXISTING STEAM PIPING ON EXTERIOR OF AHU. FIELD VERIFIY EXISTING
CONDITIONS BEFORE ANY WORK SHALL BEGIN.
5. INSTALL CLEANING SERVICE DRAIN AT EACH COIL SECTION. ROUTE PIPING FROM
COIL SECTION OVER TO FLOOR DRAIN NEXT TO AHU.
6. REPAIR OR REPLACE ANY DAMAGED INSULATION ON EXTERIOR OF AHU. REFER TO
DRAWINGS FOR AREAS.
7. AROUND EACH ACCESS DOOR REPAIR OR REPLACE INSULATION 1'-0" BEYOND
DOOR OPENING.
8. VERIFY THAT THE EXISTING DRAIN AT THE CHILLED WATER COIL FUNCTIONS
PROPERLY. REPAIR IF NEEDED TO WORKING ORDER. DEMONSTRATE WORKING
DRAINAGE TO OWNER.
AI
DI
DI AIDO AO AI AIAOAI AI
DI
DI AIDO
NC
NC
NO
CSR
CSR
OUTSIDE AIR
RELIEF AIR RETURN AIR
PT
TT
TT
D
DA
HOT DECK SUPPLY AIR
PTPDT
D
DA
D
DA
VFD
T E
M P
E R
A T
U R
E
T E
M P
E R
A T
U R
E
S T
A T
U
S PS
P R
E S
S U
R E
T E
M P
E R
A T
U R
E
M O
D U
L A
T
IN
G
M O
D U
L A
T
IN
G
P R
E S
S U
R E
A
IR
F L O
W
VFD
S T
A T
U S
RETURN AIR
SMOKE DETECTORS PROVIDED AND
WIRED BY ELECTRICAL CONTRACTOR,
INSTALLED BY MECHANICAL
CONTRACTOR
LOCATED ON SUPPLY AIR. SEE
PLANS FOR EXACT LOCATIONS.
TUBING PROVIDED WITH RTU,
INSTALLED BY THE CONTROLS
CONTRACTOR
PRESSURE TO
VFD SAFETY STRIP
T O
V F
D S
A F
E T
Y S
T R
IP
R
.A
D U
C T
S M
O K
E D
E T
E C
T O
R
AIR HANDLING UNIT SEQUENCE OF OPERATION:
1. GENERAL:
THE VARIABLE AIR VOLUME ROOFTOP UNIT SHALL CONSIST OF A MIXED AIR SECTION, RETURN FAN, MODULATING POWER EXHAUST FAN, OUTDOOR AIR MODULATING DAMPERS, FILTERS, CHILLED WATER COILS, SUPPLY AIR FAN WALL W/VFD, WATER SIDE ECONOMIZER, OSA PRE-HEAT COIL. THE ROOFTOP UNIT SHALL BE PROVIDED WITH AN INDIVIDUAL DDC CONTROLLER LOCATED AT THE UNIT.
2. OPERATION:
WARM-UP MODE OF OPERATION SHALL ALLOW THE BUILDING TO ADJUST FROM UNOCCUPIED SETPOINTS TO THE OCCUPIED SETPOINTS WITHOUT CONDITIONING THE OUTSIDE AIR. THIS WARM-UP MODE SHALL START 20 MINUTES PRIOR TO THE START OF THE OCCUPIED MODE. UNLESS ECONOMIZER COOLING IS AVAILABLE THE OUTSIDE AIR DAMPERS SHALL BE CLOSED DURING THE WARM-UP MODE.
OCCUPIED MODE OF OPERATION SHALL SEE THE SUPPLY FAN RUN CONTINUOUSLY. THE AIR HANDLING UNIT SHALL HAVE THE OUTSIDE AIR DAMPER SET TO THE MINIMUM POSITION AS NOTED IN THE AIR
HANDLING UNIT SCHEDULE.
THE FAN SHALL START AND STOP ON THE MASTER WEEKLY AND HOLIDAY SCHEDULE SET AT THE DDC SYSTEM. WHEN THE FAN IS SCHEDULED ON, ALL VAV BOXES SHALL GO TO OCCUPIED MODE. IN OTHER WORDS THE VAV BOXES SHALL HAVE THEIR OCCUPIED SCHEDULE AS A SLAVE TO THE MASTER SCHEDULE.
INTERNAL AIR HANDLING UNIT CONTROLS SHALL MODULATE TO MAINTAIN THE DESIRED SUPPLY AIR TEMPERATURE. A DISCHARGE AIR SENSOR SHALL MAINTAIN A CONSTANT DISCHARGE AIR
TEMPERATURE OF 55° F OR AS RESET BELOW (ADJUSTABLE).
WHEN ALL THE VAV BOXES ARE AT OR BELOW 75% OF THE DESIGN CFM OR ARE IN THE HEATING MODE THE SUPPLY AIR SETPOINT SHALL RESET FROM 55 F TO 58 F. WHEN THE SAME CONDITIONS NOTED ABOVE ARE MET AGAIN THE SUPPLY AIR SETPOINT SHALL BE RESET FROM 58 F TO 62 F. AS THE COOLING DEMANDS IN THE BUILDING INCREASE THE RESET SCHEDULE SHALL SEQUENCE IN REVERSE.
UNOCCUPIED MODE OF OPERATION SHALL HAVE THE FANS OFF, THE OUTSIDE AIR DAMPER SHALL BE CLOSED AND THE POWER EXHAUST FANS TURNED OFF.
IN THE UNOCCUPIED MODE THE AIR HANDLING UNIT SUPPLY FAN WILL BE STOPPED. IF SPACE TEMPERATURE WERE TO RISE ABOVE OR FALL BELOW THE UNOCCUPIED SPACE SET POINTS THE AIR HANDLING SUPPLY FAN WILL START AND HEATING OR COOLING WILL BE ENABLED TO MAINTAIN THE SPACE TEMPERATURE AT THE UNOCCUPIED SPACE TEMPERATURE SETPOINT, THE
OUTSIDE AIR DAMPERS SHALL REMAIN CLOSED.
3. STATIC PRESSURE CONTROL:
A DUCT STATIC PRESSURE DIFFERENTIAL TRANSMITTER LOCATED WHERE SHOWN ON THE PLANS, SHALL SENSE DUCT STATIC PRESSURE AND SIGNAL THE UNIT DDC CONTROLLER WHICH SHALL MODULATE THE VARIABLE FREQUENCY DRIVE (VFD) OF THE SUPPLY FAN TO MAINTAIN THE DUCT STATIC PRESSURE OF 1.0" (ADJUSTABLE, CONFIRM WITH FACILITIES
ENGINEER). THE STATIC PRESSURE SENSOR SHUT DOWN THE VFD ON HIGH PRESSURE.
THE BUILDING STATIC PRESSURE SHALL BE CONTROLLED THROUGH MODULATING POWER EXHAUST FAN TO MAINTAIN A POSITIVE ROOM STATIC PRESSURE OF 0.02" (ADJUSTABLE). THE BUILDING
STATIC PRESSURE SENSOR SHALL BE LOCATED AT THE LOBBY'S AS NOTED ON THE PLANS.
4. FAN SAFETIES:
A LOW LIMIT DUCT THERMOSTAT SHALL BE INSTALLED ON THE DISCHARGE SIDE OF THE AIR HANDLING UNIT. WHENEVER THE LOW LIMIT DUCT THERMOSTAT SENSES DISCHARGE AIR TEMPERATURES BELOW ITS 35° F SET POINT THE SUPPLY AND POWER EXHAUST FANS SHALL STOP, AND THE OUTSIDE AIR DAMPER SHALL CLOSE.
WHENEVER THE FIRE ALARM CONTROL PANEL GOES INTO ALARM ALL FANS SHALL STOP, AND THE OUTSIDE AIR DAMPER SHALL CLOSE.
THE HIGH STATIC SWITCH, LOW STATIC SWITCH, AND FREEZE STAT SHALL BE WIRED DIRECTLY INTO THE VFD TERMINAL SAFETY STRIP.
T E
M P
E R
A T
U R
E
P R
E S
S U
R E
T E
M P
E R
A T
U R
E
P R
E S
S U
R E
PDT
TT
PT PT
LOCATED ON SUPPLY AIR. SEE
PLANS FOR EXACT LOCATIONS.
TUBING PROVIDED WITH RTU,
INSTALLED BY THE CONTROLS
CONTRACTOR
COLD DECK SUPPLY AIR
HOT DECK SUPPLY AIR
COLD DECK SUPPLY AIR
AO AO AI
AO AI AI AI AI
AI
PDT
P R
E S
S U
R E
AI
PDT
P R
E S
S U
R E
M O
D U
L A
T
IN
G
DI
DI AIDO
CSR
EXHAUST AIR EXHAUST AIR
VFD
S T
A T
U S
AO
BUILDING EXHAUST FAN
324 S. State St., Suite 400 Salt Lake City, UT 84111
800-678-7077 801-328-5151 fax: 801-328-5155 www.spectrum-engineers.com
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
BUILDING 85
531-24-106
C U s e rs
\G a b e
.B is h o p \D o c u m e n ts
\2
M e c h
C e n tr a l (R
G a b e .B is h o p
.r v t
/2
/2
:5
:3
P
M
M2.01
MECHANICAL SCHEDULES REPLACE AHU-2, BUILDING 85
VAMC
Boise, ID 83702
CLD GPB
100% CONSTRUCTION
DOCUMENTS
13 FEB 2025
REMARKS: ALTERNATE MANUFACTURERS MUST BE REVIEWED BY ENGINEER BEFORE APPROVAL.
AHU HYDRONIC SECONDARY HEATING COIL SCHEDULE
LABEL
OPERATING
CONDITIONS
HYDRONIC HEATING
MANUFACTURER MODEL REMARKS
TOTAL
CAPACITY
(BTUH)
FLUID TYPE GPM
NO. OF
ROWS
MAXIMUM
AIR PD
(IN-WC)
MAXIMUM
WATER PD
(FT)
EWT
(°F)
LWT
(°F)
CONTROL
VALVE
HC-101 / 0 OSA, EDB, EWB 1,209,750 30% GLYCOL 127 3 0.28 16.1 140 120 NORTEK COIL SOLUTIONS 5WC-4-51X116X3-10AL
REMARKS: ALTERNATE MANUFACTURERS MUST BE REVIEWED BY ENGINEER BEFORE APPROVAL.
AHU SUPPLY FANS SCHEDULE
LABEL
DESCRIPTION
SUPPLY FANS
MANUFACTURER
Model REMARKS
TOTAL
AIRFLOW
(CFM)
ESP
(IN-WC)
QTY VOLTS PHASE Hz
MOTOR
HP
FLA
VFD
PROVIDED BY
(ELEC/MECH)
FW-101 SUPPLY FAN WALL 4,352 2.25 9 460 3 60 2.5 3.5 MECH NORTEK COIL SOLUTIONS 18-90-145T-32X36X26-C3
REMARKS: ALTERNATE MANUFACTURERS MUST BE REVIEWED BY ENGINEER BEFORE APPROVAL.
AHU HYDRONIC COOLING COIL SCHEDULE
LABEL
OPERATING
CONDITIONS
HYDRONIC COOLING
MANUFACTURER MODEL REMARKS
TOTAL
CAPACITY
(BTUH)
FLUID
TYPE
GPM
NO. OF
ROWS
MAXIMUM
AIR PD
(IN-WC)
MAXIMUM
WATER PD
(FT)
EWT
(°F)
LWT
(°F)
CONTROL
VALVE
CC-101 / 95 OSA, 80 EDB, 62 EWB 1,079,126 WATER 143 6 0.94 18.8 45 60 NORTEK COIL SOLUTIONS 5WC-8-72X116X6-10AL
REMARKS: ALTERNATE MANUFACTURERS MUST BE REVIEWED BY ENGINEER BEFORE APPROVAL.
AHU HYDRONIC PRIMARY HEATING COIL SCHEDULE
LABEL
OPERATING
CONDITIONS
HYDRONIC HEATING
MANUFACTURER MODEL REMARKS
TOTAL
CAPACITY
(BTUH)
FLUID TYPE GPM
NO. OF
ROWS
MAXIMUM
AIR PD
(IN-WC)
MAXIMUM
WATER PD
(FT)
EWT
(°F)
LWT
(°F)
CONTROL
VALVE
PHC-101 / 0 OSA, EDB, EWB 1,053,066 30% GLYCOL 110 2 0.12 6.3 140 120 NORTEK COIL SOLUTIONS 5WC-2-57X116X2-6AL
Revisions: Date:
SCALE: NTS1
AIR HANDLING UNIT CONTROL SCHEMATIC
13 FEB 202530 APRIL 2025
23C
VFD
5C
30/3
20A
VFD
8C
60/3
40A
23C
VFD
5C
30/3
20A
VFD
8C
60/3
40A
VFD
23C
30A/3P
FRS-30
150/3
FANWALL
(NEW)
FANWALL
23C
30A/3P
FRS-30
FANWALL
(NEW)
FANWALL
23C
30A/3P
FRS-30
FANWALL
(NEW)
FANWALL
23C
30A/3P
FRS-30
FANWALL
(NEW)
FANWALL
23C
30A/3P
FRS-30
FANWALL
(NEW)
FANWALL
23C
30A/3P
FRS-30
FANWALL
(NEW)
FANWALL
(NEW) VFD-1
60HP, 61kVA 480V, 3Ø
77A FLA
150A MOCP
5C
RF-1
(NEW)
RF-1
23C
EF-1
(NEW)
EF-1
(NEW)
(NEW) (NEW) (NEW) (NEW) (NEW) (NEW)
(NEW) (NEW) (NEW) (NEW) (NEW) (NEW) (NEW) (NEW)
TYP
(NEW) VFD-2
5HP, 6.1kVA
480V, 3Ø
7.3A FLA
20A MOCP
8C
TO
MCCB
5HP
3.7kW
480V, 3Ø
FLA: 6.80A
15HP
11kW
480V, 3Ø
FLA: 19.0A
TO
MCCB
23C
30A/3P
FRS-30
FANWALL
(NEW)
FANWALL
23C
30A/3P
FRS-30
FANWALL
(NEW)
FANWALL
23C
30A/3P
FRS-30
FANWALL
(NEW)
FANWALL
(NEW) (NEW) (NEW)
(NEW) (NEW) (NEW)
VFD
VFD
FEEDER BY DIVISION 26 FACTORY WIRING W/ EQUIP
SINGLE POINT FEED BY
DIVISION 26
AIR HANDLER WITH
FANWALL SYSTEM
MOTOR PROTECTION
BY OTHERS (TYP)
TYPICAL FANWALL, FAN QUANTITY
AS INDICATED IN SCHEDULE;
WIRING BY OTHERS
TYPICAL FANWALL, FAN QUANTITY
AS INDICATED IN SCHEDULE;
WIRING BY OTHERS
MOTOR CIRCUIT
PROTECTOR
480V/3Ø SUPPLY
BY DIVISION 26
VFD FULLY RATED FOR
ENTIRE FANWALL. VFD
SHOULD ALTERNATE
AUTOMATICALLY
BASED ON RUNTIME. IF
VFD FAILS, ALTERNATE
VFD WILL START.
CUSTOM BUILT DUAL REDUNDANT
VFD CABINET BY DIVISION 26
150/3
23C
30A/3P
FRS-30
FAN
(DEMO)
FAN
(DEMO) VFD-1
60HP, 61kVA 480V, 3Ø
77A FLA
150A MOCP
5C
RF-1
(DEMO)
RF-1
23C
EF-1
(NEW)
EF-1
(DEMO)
(DEMO)
(DEMO) (DEMO) (DEMO)
(DEMO) VFD-2
5HP, 6.1kVA
480V, 3Ø
7.3A FLA
20A MOCP
(DEMO) VFD-3
15HP, 16.7kVA
480V, 3Ø
20.1A FLA
40A MOCP
8C
TO
MCCB
5HP
3.7kW
480V, 3Ø
FLA: 6.80A
15HP
11kW
480V, 3Ø
FLA: 19.0A
TO
MCCB
324 S. State St., Suite 400 Salt Lake City, UT 84111
800-678-7077 801-328-5151 fax: 801-328-5155 www.spectrum-engineers.com
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
SHEET TO BE VIEWED AND PRINTED IN COLOR
BUILDING 85
531-24-106
BOISE, ID 83702
C :\U se rs
\M ik e.
Sm ith 1\
D oc um en ts \2
5- El ec C en tra l_ M
IK
E.
SM
IT
H 3X
N 6J
.rv t
4/
/2
3:
:5
PM
E6.01
ONE-LINE DIAGRAM REPLACE AHU-2 BUILDING 85
VAMC
30 APRIL 2025 WNF PMS
GENERAL SHEET NOTES
1 PROVIDE NEMA 3R ENCLOSURES FOR EQUIPMENT LOCATED OUTDOORS. REFER
TO PLANS FOR EQUIPMENT LOCATIONS.
2 REFER TO PLANS FOR CONSTRAINTS ON PHYSICAL DIMENSIONS AND CLEARANCE
REQUIREMENTS OF EQUIPMENT. PROVIDE EQUIPMENT DIMENSIONS THAT FALL
WITHIN THE CONSTRAINTS OF EACH SPECIFIC LOCATION.
3 ALL EQUIPMENT SHALL BE CONSTRUCTED AND BRACED FOR THE SEISMIC
CONDITIONS OF THE PROJECT. REFER TO ELECTRICAL SPECIFICATIONS FOR
REQUIREMENTS.
4 PROVIDE PERFORMANCE TESTING FOR GROUND-FAULT PROTECTION SYSTEMS ON
SITE WITH A WRITTEN RECORD OF THIS TEST SUBMITTED TO THE AUTHORITY
HAVING JURISDICTION PER NEC 230.95(C).
1. CONDUCTORS SHOWN ARE SHOWN FOR EACH CONDUIT WITH MODIFICATIONS
AS NOTED IN NOTE 5. ALL CONDUCTORS SHOWN ARE THWN UNLESS
OTHERWISE NOTED.
2. PROVIDE EQUIPMENT GROUND CONDUCTORS PER TABLE 250-122 WHEN
CIRCUIT BREAKERS ARE SIZED GREATER THAN AMPERE RATING SHOWN IN
TABLE.
3. PROVIDE #10 NEUTRALS FOR MULTIWIRE BRANCH CIRCUITS SERVING
COMPUTERS.
4. GROUND (G) CONDUCTOR MAY BE DELETED ON SERVICE ENTRANCE
CONDUCTORS.
5. SYMBOL SUBSCRIPTS:
EQUIPMENT NAMEPLATE
SCHEDULE
EQUIPMENT ID SCHEME
LABEL FORMAT [NAME]
[SYSTEM]
[VOLTAGE]
[FED FROM]
[SOURCE(S)]
LABEL EXAMPLE PANEL "4LA1"
STANDBY POWER
120/208V
FED FROM
BUS-A / XFMR 4TA
BUSWAY
OTHER
COLOR SCHEME
SYSTEM EQUIPMENT
NORMAL POWER ALL GEAR NOT INCLUDED BELOW
TEXT BACKGROUND
NAMEPLATE COLOR
STANDBY POWER
EMERGENCY POWER
LEGALLY-REQUIRED
STANDBY POWER
UPS "A" POWER
UPS "B" POWER
LABEL BUSWAY EVERY 6' WHERE EXPOSED TO VIEW AND
EVERY 15' WHERE NOT EXPOSED TO VIEW
WHITE
WHITE
WHITE
RED
WHITE
BLACK
BLACK
ORANGE
RED
WHITE
BLUE
YELLOW
MDPS1 AND ALL DOWNSTREAM GEAR,
EXCEPT UPS GEAR AS NOTED
GDP1, GDP2, ATS-E AND ALL
DOWNSTREAM GEAR
ATS-S AND ALL DOWNSTREAM
GEAR
UPSA AND ALL DOWNSTREAM
GEAR
UPSB AND ALL DOWNSTREAM
GEAR
FIRST DIGIT - BUILDING LEVEL (0, 1, 2, ETC)
SECOND DIGIT - PANEL TYPE
M - MECHANICAL
H - (277/480) L - (120/208)
E - EMERGENCY
S - STANDBY
Q - EQUIPMENT
U - UPS
K - KITCHEN (120/208)
THIRD DIGIT - BUILDING AREA (A, B, C, ETC)
FOURTH DIGIT - SEQUENCE # (1,2,3,...) SHEET KEYNOTES
1 EXISTING 60HP SUPPLY FAN TO BE REPLACED. ELECTRICAL CONTRACTOR SHALL
DEMOLISH BRANCH CIRCUIT TO SOURCE. PROVIDE NEW FEEDERS, DISCONNECTS,
AND A NEW MOTOR. COORDINATE WITH MECHANICAL CONTRACTOR PRIOR TO
ROUGH-IN.
2 PROVIDE NEW VFD FOR NEW FAN-WALL REPLACEMENT. ELECTRICAL CONTRACTOR
SHALL DEMOLISH EXISTING VARIABLE FREQUENCY DRIVES AND EXISTING
FAN-WALL TO SOURCE. COORDINATE EXACT REQUIREMENTS WITH MECHANICAL
CONTRACTOR AND OWNER PRIOR TO ROUGH-IN. VFD TO BE CONTROLLED BY PLC,
SEE MECHANICAL CONTROL DRAWINGS FOR MORE DETAIL.
CIRCUIT
AMPACITY/VOLTAGE
CIRCUIT
LENGTH
CONDUCTOR SIZE
(PHASE, NEUTRAL AND GR) CONDUIT SIZE
20A/120V 0' - 60' #12 AWG 0.75" Ø
20A/120V 60' - 95' #10 AWG 0.75" Ø
20A/120V 95' - 150' #8 AWG 1" Ø
20A/120V 150' - 240' #6 AWG 1.25" Ø
20A/277V 0' - 140' #12 AWG 0.75" Ø
20A/277V 140' - 220' #10 AWG 0.75" Ø
20A/277V 220' - 350' #8 AWG 1" Ø
20A/277V 350' - 550' #6 AWG 1.25" Ø
1.
2.
3.
NOTES:
WIRE SIZING IS BASED ON COPPER CONDUCTORS SUPPLYING A 20A, 120V
CIRCUIT AT THE INDICATED VOLTAGE, ASSUMED TO BE 80% LOADED (16A),
WITH MAXIMUM VOLTAGE DROP OF 3% AT THE LOAD.
DOWN-SIZED WIRE AT DEVICE/LOAD AS REQUIRED AND TERMINATE
CONDUCTORS IN A SAFE AND CODE COMPLIANT MANNER.
CONDUIT SIZE IS BASED ON A MAXIMUM OF 3 CIRCUITS PER CONDUIT, EACH
WITH A SEPARATE NEUTRAL CONDUCTOR.
BRANCH CIRCUIT CONDUCTOR
AND CONDUIT SIZING TABLE
SCALE: NTSF5 ONE-LINE DIAGRAM - FOR REFERENCE ONLY
6. RACEWAY ONLY. CONDUCTORS PROVIDED BY UTILITY.
IG
(E.G.)
COPPER CONDUCTOR AND
CONDUIT SCHEDULE
SUBSCRIPT (NOTE 5)
SCHEDULE NUMBER
5C
"2N": INCLUDE TWO NEUTRAL CONDUCTORS SIZED AS SCHEDULED FOR
PHASE AND NEUTRAL CONDUCTORS WHERE THE CONDUCTOR IS #1/0
OR LARGER. INCLUDE A SINGLE 200% RATED CONDUCTOR THAT IS
TWICE THE AMPACITY OF THE SCHEDULED PHASE AND NEUTRAL
CONDUCTOR WHERE THE CONDUCTOR IS BELOW #1/0 IN SIZE.
"CI": PROVIDE CIRCUIT INTEGRITY CABLE; TYPE TWO-HOUR FIRE
RESISTIVE CABLES IN CONDUIT OR PROVIDE FEEDER ENCASED IN
CONCRETE.
"FG" FULL SIZE GROUND, SIZE EQUIPMENT GROUNDING CONDUCTOR TO
BE SAME SIZE AS THE PHASE CONDUCTORS.
"HH": NEUTRAL CURRENTS EXIST DUE TO HIGH HARMONIC "NONLINEAR"
LOADS. CURRENT CARRYING CONDUCTORS DERATED
ACCORDINGLY. PROVIDE THE IG/HH SIZE FOR THE EQUIPMENT
GROUNDING CONDUCTOR.
"IG": INCLUDE IG (INSULATED/ISOLATED GROUND CONDUCTOR)
SCHEDULED ALONG WITH THE GROUND OF EQUIPMENT GROUND
CONDUCTOR.
"MC": PROVIDE FEEDER IN METAL-CLAD CABLE; TYPE MC IN PLACE OF
SINGLE CONDUCTORS IN CONDUIT.
"SE": SUBSTITUTE "SE" CONDUCTOR FOR "G" CONDUCTOR SHOWN, WHICH
IS SIZED FOR THE GROUNDING OF THE SECONDARY OF THE
SEPARATELY DERIVED SYSTEM.
"SER": PROVIDE SERVICE-ENTRANCE CABLE; TYPE SE OR SER IN PLACE OF
SINGLE CONDUCTORS IN CONDUIT.
CONDUCTOR AND CONDUIT SCHEDULE NOTES
SYM AMP
HH
AMPS
CONDUIT
SIZE
CONDCUTOR (NOTE 1)
IG/HH SE NOTESQTY SIZE G
1C 20 - 0.75 2 12 12 12 8 2 2C 20 - 0.75 3 12 12 12 8 2 3C 20 24 0.75 4 12 12 12 8 2 4C 30 - 0.75 2 10 10 10 8 2 5C 30 - 0.75 3 10 10 10 8 2 6C 30 32 0.75 4 10 10 10 8 2 7C 40 - 1 2 8 10 8 6 2 8C 40 - 1 3 8 10 8 6 2 9C 40 44 1 4 8 10 8 6 2 10C 55 - 1 2 6 10 8 4 2 11C 55 - 1 3 6 10 8 4 2 12C 55 60 1.25 4 6 10 8 4 2 13C 70 - 1 2 4 8 4 2 2 14C 70 - 1.25 3 4 8 4 2 2 15C 70 76 1.25 4 4 8 4 2 2 16C 85 - 1.25 2 3 8 3 2 2 17C 85 - 1.25 3 3 8 3 2 2 18C 85 92 1.25 4 3 8 3 2 2 19C 95 - 1.25 3 2 8 2 2 2 20C 95 104 1.5 4 2 8 2 2 2 21C 130 - 1.5 3 1 6 2 2 2 22C 130 116 1.5 4 1 6 2 2 2 23C 150 - 2 3 1/0 6 2 1/0 2 24C 150 136 2 4 1/0 6 2 1/0 2 28C 200 180 2.5 4 3/0 6 2 2/0 2 29C 230 - 2.5 3 4/0 4 2 2/0 2 30C 230 208 2.5 4 4/0 4 2 2/0 2 34C 310 280 3 4 350 3 1/0 3/0 2 35C 380 - 3.5 3 500 3 3/0 3/0 2
37C 400 - 2 EA 2 3 3/0 3 3/0 3/0 2
38C 400 360 2 EA 2.5 4 3/0 3 3/0 3/0 2
41C 620 - 2 EA 3 3 350 1/0 4/0 3/0 2
42C 620 560 2 EA 3 4 350 1/0 4/0 3/0 2
52C 1240 1120 4 EA 3 4 350 3/0 4/0 3/0 4
53C 1675 1520 5 EA 4 4 400 4/0 4/0 4/0 4
55C 2660 2408 7 EA 4 4 500 350 350 350 4
SCALE: NTS
TYPICAL DUAL REDUNDANT VFD
SCHEMATIC FOR FANWALL AIR
HANDLER SYSTEM1A5
Revisions: Date:
SCALE: NTSF1 ONE-LINE DIAGRAM - DEMOLITION - FOR REFERENCE ONLY
100% CONSTRUCTION
DOCUMENTS
| G001 - COVER SHEET |
| 100% Mechanical |
| M0.00 - MECHANICAL COVER SHEET |
| M1.11 - EXISTING AIR HANDLING UNIT |
| M1.12 - EXISTING AIR HANDLING UNIT |
| M1.21 - NEW AIR HANDLING UNIT |
| M1.22 - NEW AIR HANDLING UNIT |
| M2.01 - MECHANICAL SCHEDULES |
| 100% Electrical |
| E6.01 - ONE-LINE DIAGRAM |
File details come from the government source that posted it. Updated .