This document summarizes a solicitation for roof replacement services at the Bangor International Airport traffic control tower in Bangor, Maine. The Federal Aviation Administration Eastern Region Acquisition Service Area, Boston Acquisition Office is seeking offers for the BGR Roof project, with a performance period of 84 calendar days from notice to proceed. The solicitation is available on a full and open basis under NAICS code 238160 for roofing contractors, with an size standard of $16.5 million. Offerors should submit proposals by the closing date of June 30, 2022. The price range for this procurement is between $100,000 and $300,000. Interested parties can obtain specifications, drawings, wage determinations, and other attachments in PDF or Excel format from the solicitation posted on the FAA's acquisition system.
View the file
Other files
Show all 14
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
FOR BIDDING
FEDERAL AVIATION ADMINISTRATION
BANGOR INTERNATIONAL AIRPORT
ROOF REHABILIATION PROJECT
BASE BUILDING, LINK, TOWER CAB, E/G BUILDING, AND WORK SHOP
NOT TO SCALE
LOCUS MAP
FOR OFFICIAL USE ONLY
PUBLIC AVAILABILITY TO BE DETERMINED UNDER 5 USC 552
FEDERAL AVIATION ADMINISTRATION
DEPARTMENT OF TRANSPORTATION
REV DESCRIPTION JCN
REDLINE
DATE
APVD
SUBMITTED BY APPROVED BY
JCN
DRAWN
CHECKED
REV
ISSUED BY
H
G
F
E
D
C
B
A
8 1234567
DATE
DRAWING NO
DESIGNED
REVIEWED BY
P
M s a n t o s g e o v a n n i f a a
APPROVED
DATE
g c o v e r s h e e t d w g
8 234567
H
G
F
E
D
C
A
B
IS
SU
ED
F
OR
E D
M
ME
1401830
PROJECT ENGINEER, AJW-2E11J
G. SANTOS
THIS DRAWING PRODUCED ON THE ANE REGION AUTOCAD SYSTEM
BANGOR INTERNATIONAL AIRPORT
d e s i g n b i d d i n g
EASTERN SERVICE AREAATO - TECHNICAL OPERATIONS
TERMINAL ENG.
AJW-2E11J
S N g v e r s h e e t d w g
COVER SHEET
ROOF REHABILIATION PROJECT
BGR-TOWB
GS
GS
BGR-TOWB-1401830-G000 0
BANGOR
SB
PLATFORM MANAGER, AJW-2E11G
K. COFFEY
2021-01-22
AutoCAD SHX Text D
AutoCAD SHX Text E
AutoCAD SHX Text P
AutoCAD SHX Text A
AutoCAD SHX Text R
AutoCAD SHX Text T
AutoCAD SHX Text M
AutoCAD SHX Text F
AutoCAD SHX Text T
AutoCAD SHX Text P
AutoCAD SHX Text T
AutoCAD SHX Text O
AutoCAD SHX Text N
AutoCAD SHX Text E
AutoCAD SHX Text N
AutoCAD SHX Text T
AutoCAD SHX Text O
AutoCAD SHX Text S
AutoCAD SHX Text A
AutoCAD SHX Text R
AutoCAD SHX Text I
AutoCAD SHX Text O
AutoCAD SHX Text R
AutoCAD SHX Text N
AutoCAD SHX Text T
AutoCAD SHX Text A
AutoCAD SHX Text S
AutoCAD SHX Text T
AutoCAD SHX Text A
AutoCAD SHX Text T
AutoCAD SHX Text E
AutoCAD SHX Text S
AutoCAD SHX Text O
AutoCAD SHX Text F
AutoCAD SHX Text A
AutoCAD SHX Text M
AutoCAD SHX Text E
AutoCAD SHX Text R
AutoCAD SHX Text I
AutoCAD SHX Text C
AutoCAD SHX Text A
AutoCAD SHX Text D
AutoCAD SHX Text E
AutoCAD SHX Text T
AutoCAD SHX Text I
AutoCAD SHX Text N
AutoCAD SHX Text U
AutoCAD SHX Text F
AutoCAD SHX Text E
AutoCAD SHX Text D
AutoCAD SHX Text E
AutoCAD SHX Text R
AutoCAD SHX Text A
AutoCAD SHX Text L
AutoCAD SHX Text A
AutoCAD SHX Text I
AutoCAD SHX Text A
AutoCAD SHX Text I
AutoCAD SHX Text O
AutoCAD SHX Text N
AutoCAD SHX Text A
AutoCAD SHX Text D
AutoCAD SHX Text M
AutoCAD SHX Text N
AutoCAD SHX Text S
AutoCAD SHX Text T
AutoCAD SHX Text R
AutoCAD SHX Text A
AutoCAD SHX Text T
AutoCAD SHX Text O
AutoCAD SHX Text N
AutoCAD SHX Text V
AutoCAD SHX Text T
AutoCAD SHX Text I
AutoCAD SHX Text I
AutoCAD SHX Text I
SUMMARY OF WORK:
1. REFERENCE THE PROJECT'S SPECIFICATIONS, SECTION 01 10 00, FOR COMPLETE STATEMENT OF
WORK. THE OVERALL INTENT OF THE PROJECT IS TO REHAB THE ROOFS FOR THE BASE BUILDING, LINK, ATC TOWER, WORK SHOP AND E/G BUILDING.
1.1. ROOF OVERLAYMENT INCLUDES THE BASE BUILDING, CAB, LINK, AND E/G BUILDING
1.2. COMPLETE ROOF REMOVAL AND RESTORATION INCLUDES THE WORK SHOP, AND AREAS AS
INDICATED IN THE REPAIR PLAN.
2. ROOFING INSTALLATION AND MATERIALS SHALL COMPLY WITH THE INTERNATIONAL BUILDING
CODE, SECTION 1507.12 SINGLY-PLY ROOFING, AND MATERIAL STANDARD ASTM-D4434 -
POLYVINYL CHLORIDE (PVC).
3. THE FINAL INSTALLATION SHALL CONFORM TO MANUFACTURER'S RECOMMENDATION TO ACHIEVE
A “20 YEAR” WARRANTY, PER SECTION 01 78 36 WARRANTIES & GUARANTEES.
4. ANY SPECIFIC BRAND NAME MENTIONED IN THE CONTRACT DRAWINGS AND SPECIFICATIONS ARE
NOT REQUIRED FOR COMPLIANCE WITH THE THOSE DOCUMENTS, EXCEPT WHERE THE
DOCUMENTS PROHIBIT SUBSTITUTION. TO PROPOSE PRODUCT IDENTICAL OR EQUAL TO THOSE
SHOWN ON THE DRAWINGS AND SPECIFICATIONS, MAKE AND SUBMIT SUBMITTALS PER
SPECIFICATIONS DIVISION 1, SECTION 01 33 00.
OPERATIONAL RISK MANAGEMENT (ORM) & FACILITY COORDINATION:
1. THE BANGOR INTERNATIONAL AIRPORT TRAFFIC CONTROL TOWER (ATCT) IS A 24-HOUR ACTIVE
FACILITY, DISRUPTION TO POWER AND ITS OPERATION IS UNACCEPTABLE. WORK THAT REQUIRES
PERMANENT OR TEMPORARY OUTAGES SHALL BE SCHEDULED AND APPROVED IN WRITING A
MINIMUM OF 14 BUSINESS DAYS IN ADVANCE OF WORK, IN IT SHALL COMPLY WITH FAA ORM
PROCEDURES.
2. CONTRACTOR SHALL ABIDE BY THE PROJECT'S OPERATIONAL RISK MANAGEMENT PLAN. COR
SHALL MAINTAIN AND UPDATE PROJECT MITIGATION PLAN ON A DAILY/WEEKLY BASIS.
3. PROVIDE BASELINE SCHEDULE TO THE CONTRACTING OFFICER FOR REVIEW AND APPROVAL
BEFORE THE NOTICE TO PROCEED IS ISSUED. AT A MINIMUM, THE SCHEDULE SHALL OUTLINE THE
PHASES OF THE WORK; SUCH AS DEMOLITION, REPAIR, INSTALLATION, AND MANUFACTURER'S
INSPECTION.
4. THE CONTRACTOR SHALL COORDINATE, ON DAILY BASIS, AND FOR THE DURATION OF THE
PROJECT, ALL CONSTRUCTION RELATED ACTIVITIES WITH THE COR. THE COR, AS DELEGATED BY
THE CO, SHALL OVERSEE AND COORDINATED WITH THE FAA FACILITY ALL CONSTRUCTION
ACTIVITIES. COPIES OF THE COR DELEGATION LETTER WILL BE PROVIDED TO THE CONTRACTOR
DURING THE PRE-CONSTRUCTION MEETING.
5. AS INDICATED ON THE PLANS THERE ARE FAA NAS EQUIPMENT LOCATED ON THE CAB ROOF, UNDER NO CIRCUMSTANCES SHALL THESE FACILITIES/EQUIPMENT BE DISTURBED OR SERVICES
TO THEM DISRUPTED UNLESS APPROVED BY THE FAA.
6. CONTRACTOR TO ENSURE OBSTRUCTION EVALUATION/AIRPORT AIRSPACE ANALYSIS (OE/AAA) IS
APPROVED PRIOR TO PERFORMING ANY WORK IN THE TOWER CAB LEVEL.
CONSTRUCTION COORDINATION:
1. BEFORE STARTING THE PROJECT, THE CONTRACTOR MUST SHOW PROOF THAT THE PROJECT IS
REGISTERED WITH THE MANUFACTURER. FURNISH A COPY OF THE MANUFACTURER'S NOTICE OF
AWARD (NOA) TO THE COR. THE CONTRACTOR MUST HAVE THE MANUFACTURER
REPRESENTATIVE ON SITE THE FIRST (2) DAYS OF THE INSTALLATION OF THEIR SYSTEM, THEN
FOR (1) DAY AT 50% AND 100% ROOF COMPLETION. IT IS ALSO REQUIRED THAT ANY OFFICIAL
COMMUNICATION/REPORTS BETWEEN THE MANUFACTURER AND THE CONTRACTOR, IN REGARDS
TO THE CONDITION OF THE NEW ROOF, TO BE PROVIDED TO THE COR.
2. HOURS OF WORK - CONTRACTOR SHALL WORK A STANDARD 8-HOUR DAILY/40-HOUR WORK WEEK.
UNLESS OTHERWISE APPROVED BY THE COR AND ACCOMPLISHED BETWEEN THE HOURS OF 6AM
AND 6PM DAILY. NO WORK IS ALLOWED ON WEEKENDS AND FEDERAL HOLIDAYS UNLESS
APPROVED BY THE CO/COR IN WRITING.
2.1. CAB LEVEL INTERIOR WORK SHALL BE PERFORMED DURING LOW TRAFFIC PERIODS.
CONTRACTOR TO COORDINATE INTERIOR WORK WITH COR. TYPICAL LOW TRAFFIC IS
BETWEEN 8:30AM AND 10:00AM.
2.2. CAB ROOF WORK SHALL NOT BE PERFORMED BETWEEN MEMORIAL DAY AND SEPTEMBER 1ST.
3. ONE WEEK PRIOR TO THE INSTALLATION OF THE ROOF SYSTEM, THE CONTRACTOR IS REQUIRED
TO BUILD A MOCK-UP ROOM PROFILE SECTION OF A 4'X4' ROOF AREA AND HAVE IT TESTED. (TO
INCLUDE LAP JOINT). ADD COST TO PROPOSED BID.
4. CONTRACTOR SHALL VERIFY EXISTING DIMENSIONS AND CONDITIONS IN FIELD PRIOR TO
BEGINNING WORK. DISCREPANCIES SHALL BE BROUGHT TO THE PROJECT ENGINEER.
CONTRACTOR IS RESPONSIBLE FOR ON SITE VERIFICATION OF ANY AND ALL WORK REQUIRED
5. THE CONTRACTOR SHALL VIDEO/PHOTO RECORD AND IDENTIFY ANY DEFICIENCIES OF EXISTING
GROUND SURFACE AND LAYDOWN AREA. COPIES, PROVIDED VIA USB, SHALL BE TURNED OVER
TO THE COR PRIOR TO COMMENCEMENT OF WORK.
6. CONTRACTOR SHALL REQUEST, (5) DAYS IN ADVANCE, ANY NIGHT WORK AND OVERTIME
CONSTRUCTION CO AND/OR COR.
SITE ACCESS:
1. CONTRACTOR SITE ACCESS SHALL BE COORDINATED AT THE PRE-CONSTRUCTION MEETING. AN
ADVANCE LIST OF THE CONTRACTOR'S PERSONNEL SHALL BE PROVIDED TO THE FAA-COR.
CONTRACTOR SHALL BE RESPONSIBLE FOR THE CONDUCT OF THE CONTRACTOR'S PERSONNEL
ON SITE. CONTRACTOR VEHICLES SHALL BE IDENTIFIED AS SUCH.
2. PROPOSED LAYDOWN AREA IS AS SHOWN ON SHEET G003. THE PROJECT SITE MAY BE USED FOR
CONTRACTOR STAGING. THE CONTRACTOR SHALL RESTORE STAGING AREA, INCLUDING ANY THE
REPAIR TO EXISTING FACILITIES, AS DEEMED SATISFACTORY TO THE COR.
3. ELECTRICAL POWER MAY BE ACCESSED AT EXISTING BUILDING OUTLETS. COORDINATE WITH COR
PRIOR TO ANY WORK OCCURING.
4. CONTRACTOR SHALL PROVIDE AND MAINTAIN PORTABLE TOILET FACILITIES FOR LABORERS.
5. THE CONTRACTOR SHALL INSPECT ALL VEHICLES FOR OIL LEAKS AND REPAIR OR REMOVE FROM
WORK AREA.
6. ENCLOSED DUMPSTER FOR DISPOSAL OF CONSTRUCTION DEBRIS SHALL BE PROVIDED BY THE
CONTRACTOR WITHIN THE STAGING AREA. CONTRACTOR IS RESPONSIBLE TO REMOVE ALL
DEBRIS FROM THE ROOF AT THE END OF EACH WORK DAY.
7. CONTRACTOR SHALL BE AWARE OF APPROACHING STORMS AND HIGH WINDS, AND TAKE
PRECAUTIONS TO SECURE WORK ARE AND INCLUDING CONSTRUCTION MATERIALS. .
8. CONSTRUCTION AREAS SHALL BE CLEANED DAILY. ALL DEBRIS SHALL BE REMOVED, ALL TOOLS
SHALL BE PROPERLY STORED.
9. MEANS OF EGRESS SHALL NOT BE OBSTRUCTED FOR THE DURATION OF THE PROJECT.
10. CONTRACTOR SHALL AIM ALL CONSTRUCTION LIGHT TOWERS SO AS NOT IMPACT AIR TRAFFIC
OPERATIONS
11. FINISHES AND SURFACES DAMAGED BY THE DEMOLITION OR CONSTRUCTION SHALL BE PATCHED
AND REPAIRED TO MATCH EXISTING AS CLOSE AS POSSIBLE. ALL PENETRATIONS SHALL BE MADE
WATERTIGHT.
SAFETY PLAN:
1. CONTRACTOR SHALL SUBMIT SITE SPECIFIC SAFETY PLAN: OSHA 2202 WHICH REFERENCES 29
CFR PART 1926 "SAFETY AND HEALTH REGULATIONS FOR CONSTRUCTION" SHALL FORM A PART
OF THE OVERALL SAFETY PLAN. CONTRACTOR SHALL BE RESPONSIBLE TO ENSURE THAT HIS/HER
EMPLOYEES HAVE APPROPRIATE PERSONAL SAFETY EQUIPMENT AND PROTECTIVE CLOTHING
AND THAT APPROPRIATE EMERGENCY EQUIPMENT (INCLUDING FIRST AID KIT & MULTI-CLASS
RATED FIRE EXTINGUISHER) IS ON HAND THROUGHOUT THE COURSE OF THE PROJECT. MATERIAL
SAFETY DATA SHEETS SHALL BE MADE AVAILABLE UPON REQUEST
2. FUME MITIGATION PLAN: BEFORE THE WORK STARTS, THE CONTRACTOR SHALL PROVIDE A
“FUME/SMELL MITIGATION PLAN.” THE AIM IS TO ELIMINATE/REDUCE ALL FUME SMELLS THAT MAY
PENETRATED INTO THE FACILITIES WORK AREAS.
3. CONSTRUCTION NOISE, DUST AND DEBRIS MOST NOT INTERFERE WITH AIR TRAFFIC OPERATION.
THE CONTRACTOR SHALL AVOID PERFORMING ANY ACTIVITY THAT COULD POTENTIALLY, EITHER
VISUALLY OR AUDIBLY OBSTRUCT THE NORMAL OPERATIONS OF THE AIR TRAFFIC CONTROL
TOWER.
4. PROVIDE DETAIL FALL PROTECTION PLAN FOR ALL WORK AREAS.
5. FACILITY ACCESS SHALL BE MAINTAINED AT ALL TIMES FOR EMERGENCY VEHICLES. IN THE
EVENT OF AN UNFORESEEN FAA EMERGENCY, THE CONTRACTED WORKERS SHALL BE EXPECTED
TO IMMEDIATELY EVACUATE THE FACILITY AS DIRECTED BY THE COR.
6. PROVIDE WEATHER PROTECTION PLAN. REMOVE ONLY THAT AMOUNT OF EXISTING ROOFING AND
FLASHING WHICH CAN BE MADE WATERTIGHT WITH NEW MATERIALS DURING A ONE-MORNING
PERIOD OR ONSET OF INCLEMENT WEATHER. ALL WORK SHALL BE SCHEDULED AND EXECUTED
WITHOUT EXPOSING THE INTERIOR BUILDING AREAS TO THE EFFECTS OF INCLEMENT WEATHER, TO SMOKE, TO ODORS, OR TO FUMES. THE EXISTING BUILDING AND ITS CONTENTS SHALL BE
PROTECTED AGAINST ALL RISKS.
FOR OFFICIAL USE ONLY
PUBLIC AVAILABILITY TO BE DETERMINED UNDER 5 USC 552
SHEET LIST TABLE
SHEET TITLE SHEET NUMBER
GENERAL
COVER SHEET G000
INDEX & NOTES G001
FACILITY LAYOUT G002
SITE SURVEY, REFERENCE ONLY
G003
DEMOLITION & REPAIR PLAN
REPAIR PLAN, PG 1 - 2
D001
REPAIR PLAN, PG 2 - 2
D002
ARCH - NEW WORK
NEW WORK, BASE BUILDING
A001
NEW WORK, TOWER CAB
A002
NEW WORK, EG BUILDING
A003
NEW WORK, WORK SHOP
A004
DETAILS, SHEET 1 OF 2
A005
DETAILS, SHEET 2 OF 3
A006
DETAILS SHEET 3 OF 3 A007
SITE SURVEY PHOTOS
SITE PHOTOS, PG 1 OF 3
R001
SITE PHOTOS, PG 2 OF 3
R002
SITE PHOTOS, PG 3 OF 3
R003
IS
SU
ED
F
OR
E D
M
ME
1401830
PROJECT ENGINEER, AJW-2E11J
G. SANTOS
THIS DRAWING PRODUCED ON THE ANE REGION AUTOCAD SYSTEM
BANGOR INTERNATIONAL AIRPORT
s i g n b i d d i n g
EASTERN SERVICE AREAATO - TECHNICAL OPERATIONS
TERMINAL ENG.
AJW-2E11J
S N g i n d e x t e s d w g
INDEX & NOTES
ROOF REHABILIATION PROJECT
BGR-TOWB
GS
GS
BGR-TOWB-1401830-G001 0
BANGOR
SB
PLATFORM MANAGER, AJW-2E11G
K. COFFEY
2021-03-06
FEDERAL AVIATION ADMINISTRATION
DEPARTMENT OF TRANSPORTATION
REV DESCRIPTION JCN
REDLINE
DATE
APVD
SUBMITTED BY APPROVED BY
JCN
DRAWN
CHECKED
REV
ISSUED BY
H
G
F
E
D
C
B
A
8 1234567
DATE
DRAWING NO
DESIGNED
REVIEWED BY
P
M s a n t o s g e o v a n n i f a a
APPROVED
DATE
g d e x t e s d w g
8 234567
H
G
F
E
D
C
A
B
RADIATOR
LOAD BANK
FUEL TANK
AC UNITS
SIDEWALK
P
L
P
L
P
L
P
L
P
L
P
L
P
L
P
L
P
L
P
L
P
L
P
L
L
I
G
H
T
P
O
L
E
L
I
G
H
T
P
O
L
E
L
I
G
H
T
P
O
L
E
L
I
G
H
T
P
O
L
E
PERSONNEL GATE
SEE DWG BGR-D-ATCT-C103
X X X X X X X X
X
X
X
X
X
X
X
X
X
X
X
X
X X
X X
X X
X X
XXXXXXXXXXXX
XXXXXXXX
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X X X X X X X X X X X X X X X X
X
X
P
O
W
E
R
P
O
L
E
MAIN
ENTRANCE
HAZMAT
BLD
HVAC
CHILLER
COND.
X
X
X
X
X
X
X
X
X
X
LINK
TOWER
E/G
BLDG
BASE
BUILDING
WORK SHOP
VISITOR'S
PARKING
NEW WORK - TOTAL WORK AREA
· LINK + BASEBULDING = 6,600 SF
· TOWER CAB = 617 SF
· E/G BUILDING = 422 SF
· WORK SHOP = 1700 SF
CONTRACTOR PROPOSED LAYDOWN AREA
SCALE:
G002
EXISTING FACILITY PLAN VIEW
1" = 20'
SCALE:
G002
TOWER WEST ELEVATION
1" = 10'
30'-11"
TOWER
AIRPORT OPERATION AREA
39'-0"
LINK
67'-2"
BASE BUILDING
G002
E/G SHELTER
IS
SU
ED
F
OR
E D
M
ME
1401830
PROJECT ENGINEER, AJW-2E11J
G. SANTOS
THIS DRAWING PRODUCED ON THE ANE REGION AUTOCAD SYSTEM
BANGOR INTERNATIONAL AIRPORT
s i g n b i d d i n g
EASTERN SERVICE AREAATO - TECHNICAL OPERATIONS
TERMINAL ENG.
AJW-2E11J
S N g f a c i l i t y l a y o u t d w g
BASE BUILDING, LINK, AND CAB
WORK & LAYDOWN AREA
ROOF REHABILIATION PROJECT
BGR-TOWB
GS
GS
BGR-TOWB-1401830-G002 0
BANGOR
SB
PLATFORM MANAGER, AJW-2E11G
K. COFFEY
2021-03-06
FEDERAL AVIATION ADMINISTRATION
DEPARTMENT OF TRANSPORTATION
REV DESCRIPTION JCN
REDLINE
DATE
APVD
SUBMITTED BY APPROVED BY
JCN
DRAWN
CHECKED
REV
ISSUED BY
H
G
F
E
D
C
B
A
8 1234567
DATE
DRAWING NO
DESIGNED
REVIEWED BY
P
M s a n t o s g e o v a n n i f a a
APPROVED
DATE
g a c i l i t y l a y o u t d w g
8 234567
H
G
F
E
D
C
A
B
A022
RADAR STORAGE CLOSET
SUPERVISOR'S
OFFICE
SWITCHGEAR RADAR TECH OFFICE QATS OFFICE AUS OFFICESECRETARY'S OFFICE
FLUE
BOILER
ROOM
CONF./TRAINING
ROOM
TRACON
BREAK ROOM
STORAGE
CLOSET
AT MANAGER'S
OFFICE
RADAR
EQUIPMENT
ROOM
NAV/COMM
EQUIPMENT
ROOM
SMOKING
ROOM
VENDING
MACHINE
ROOM
CLOSET
WOMEN'S
ROOM
MEN'S ROOM
PPS OFFICE
66'-0 1/2"
84'-2"
ROOF DRAIN, (3"
ID)
CHIMNEY CAP
ROOF VENT
(~2" ID)
10" Ø BOILER BREACH,
W/ ANGLE SUPPORT
EXISTING
BOILER
OPENING
ABANDONED
HATCH
ROOF DRAIN, 3" ID
(2) ROOF DRAINS,
(~3" ID)
ROOF DRAIN,
(3" ID)
ROOF VENT,
(2" ID)
ROOF DRAINS,
(3" ID)
ROOF DRAINS, 3" ID
SCUPPERS,
(9) ON
BASEBUILDING,
TYP
SLOPE
1/2"/FT.
WALL COPING
METAL ROOFING, (EXCLUDED
FROM PROJECT)
99'-9 1/2"
CAGED LADDER
FRESH AIR INTAKE
ELEC.
DEVICES
MOUNTED ON
EXT. WALL
SLOPE
1/2"/FT.
SINGLE-PLY EPDM ROOFING ON
TAPERED RIGID INSULATION,
OVER METAL DECK
LINK-TOWER ROOF EXPANSION JOINT, GENERALLY
COMPOSED OF:
· EPDN FLASHING W/ SPLICING CEMENT
· CONTINUOUS METAL FLASHING
· ELASTOMERIC EJ ROOF SEAL
· SEALANT & BACKER ROD
COPING PANEL OVER EPDM FLASHING AND
FASTENED TO VERTICAL SUB-GIRTS,
COLOR IS DURANAR EXOTIC COATING
#UC52006 BRONZE,
(ALL AROUND)
SINGLE-PLY EPDM ROOFING ON
TAPERED RIGID INSULATION,
OVER METAL DECK
· 1" THICK ALUMINUM CLADDING PANELS
(HONEYCOMB ALUMIN CORE) OVER METAL
STUDS. SEALANT W/ BACKER ROD AT ALL
HORIZONTAL AND VERTICAL JOINTS
· ALL PANEL JOINTS 1/2 INCH WIDE BY 1 INCH
DEEP
14'-9 1/2"
9'-9 1/2"
A0281
R001
R001
R001
R001
R001
R001
R001
R001
ROOF FRAMING
BELOW
ROOF WALK-WAY PADS,
(30"X30X3/4")
REMOVE AND REPLACE
MEMBRANE ROOFING ON
TAPERED RIGID INSULATION
AIR TERMINALS
ANTENNA MOUNTS,
(12) PLACES
OBSTRUCTION LIGHT
ROOF DRAINS,
(2) PLACES
SLOPE TAPERED
RIGID INSULATION
TO DRAIN MIN 1/2"
PER FOOT
EXHAUST FAN
ROOF HATCH,
2'-6" X 3'-0"
SCUPPERS, 2 PLCS.,
SEE DETAIL 3/A005
29'-6 1/2"
16'-2"
METAL DECK
VAPOR RETARDER
4" INSULATION
ADHESIVE
FULLY ADHERED
MEMBRANE, (SARNAFIL)
FASTENER
& PLATE
5/8" GWB TYPE "X"
VAPOR BARRIER
INSULATION
1/2" RIDIG BD
SINGLE-PLY EPDM
METAL DECK
5/8" GWB TYPE "X"
VAPOR BARRIER
4" INSULATION
SINGLE-PLY EPDM
METAL DECK
SCALE:
G003
FACILITY PLAN VIEW
1/8" = 1'-0"
SCALE:
G003
CAB ROOF PLAN
1/4" = 1'-0"
R002
R002
R002
R002
R002
R003
R003
R003
R003
SCALE:
G003
BASE BUILDING - TYP. ROOF SECTION
3" = 1'-0"
SCALE:
G003
LINK - TYPICAL ROOF SECTION
3" = 1'-0"
SCALE:
G003
CAB - TYPICAL ROOF SECTION
3" = 1'-0"
NOTES:
1. THIS SHEET IS FOR REFERENCE ONLY. CONTRACTOR SHALL
VERIFY EXISTING DIMENSIONS AND CONDITIONS IN FIELD PRIOR TO
BEGINNING WORK. DISCREPANCIES SHALL BE BROUGHT TO THE
PROJECT ENGINEER. CONTRACTOR IS RESPONSIBLE FOR ON SITE
VERIFICATION OF ANY AND ALL WORK REQUIRED
2. ASBESTOS TESTING REPORT SHOWS NO ASBESTOS ON ANY OF
THE WORK AREAS. TESTING REPORT ATTACHED TO PROJECT
SPECIFICATIONS.
3. SEE SHEETS R001 THRU R003 FOR SITE SURVEY PHOTOS
FOR OFFICIAL USE ONLY
PUBLIC AVAILABILITY TO BE DETERMINED UNDER 5 USC 552
FEDERAL AVIATION ADMINISTRATION
DEPARTMENT OF TRANSPORTATION
REV DESCRIPTION JCN
REDLINE
DATE
APVD
SUBMITTED BY APPROVED BY
JCN
DRAWN
CHECKED
REV
ISSUED BY
H
G
F
E
D
C
B
A
8 1234567
DATE
DRAWING NO
DESIGNED
REVIEWED BY
P
M s a n t o s g e o v a n n i f a a
APPROVED
DATE
g s t u r v e y r e f e r e n l y d w g
8 234567
H
G
F
E
D
C
A
B
IS
SU
ED
F
OR
E D
M
ME
1401830
PROJECT ENGINEER, AJW-2E11J
G. SANTOS
THIS DRAWING PRODUCED ON THE ANE REGION AUTOCAD SYSTEM
BANGOR INTERNATIONAL AIRPORT
s i g n b i d d i n g
EASTERN SERVICE AREAATO - TECHNICAL OPERATIONS
TERMINAL ENG.
AJW-2E11J
S N g r v e y r e f e r e n l y d w g
BASE BUILDING, LINK, AND CAB
SITE SURVEY RESULTS - REFERENCE ONLY
ROOF REHABILIATION PROJECT
BGR-TOWB
GS
GS
BGR-TOWB-1401830-G003 0
BANGOR
SB
PLATFORM MANAGER, AJW-2E11G
K. COFFEY
2021-03-06
TOWER
[5.0] FULL-DEPTH ROOF
REPAIR, NOTE 2
[3.0] - DEMO HATCH,
RESTORE ROOF SYSTEM
[9.0] INSTALL BRACES TO SUPPORT
EXISTING BOILER PIPE
[1.0] DEMO CHIMNEY CAP,
RESTORE ROOF SYSTEM
[4.0] REMOVE EXISTING
COPING SYSTEM, REPLACE
NEW
[6.0] FULL-DEPTH ROOF
REPAIR, NOTE 2
[7.0] REMOVE TOWER
FLASHING, REPLACE NEW
[2.0] - DEMO HATCH
INSTALL NEW ROOF SYSTEM,
INSTALL BOILER PIPE SUPPORT
[22.0] GENERAL WORK: OVERLAY WITH PVC MEMBRANE, FULLY
ADHERED, OVER RIGID BOARD AND INSULATION. CONTRACTOR
WILL BE REQUIRED TO PROVIDE TAPERING PLAN FOR APPROVAL.
29'-6 1/2"
16'-2"
[10.0] REMOVE PLYWOOD &
REPLACE WITH RIGID BOARD,
NOTE 2
[11.0] REMOVE & REPLACE
ALUMINUM PARAPET CAP,
NOTE 2
[23.0] GENERAL WORK: OVERLAY WITH PVC
MEMBRANE OVER RIGID BOARD AND TAPERED
INSULATION, NOTE 3
[12.0] RE-ATTACH LOOSE
INTERIOR ROOF INSULATION
[8.0]REPLACE EXISTING
DOWNSPOUTS
[4.0] REMOVE EXISTING
COPING SYSTEM, REPLACE
NEW
[ITEM 20] REPLACE
WATER DAMAGE
CEILING TILES
SCALE:
D001
FACILITY PLAN VIEW
1/8" = 1'-0"
SCALE:
D001
CAB - PLAN VIEW
1/4" = 1'-0"
SCALE:
D001
SOUTH ELEVATION
1/8" = 1'-0"
NOTES:
1. ESTIMATED QUANTITIES GATHERED DURING SITE SURVEY. CONTRACTOR SHALL VERIFY EXISTING
DIMENSIONS AND CONDITIONS IN FIELD PRIOR TO BEGINNING WORK. DISCREPANCIES SHALL BE
BROUGHT TO THE PROJECT ENGINEER. CONTRACTOR IS RESPONSIBLE FOR ON SITE VERIFICATION OF
ANY AND ALL WORK REQUIRED.
2. ITEMS TO BE COMPLETELY REMOVED & REPLACED. PROVIDE DEMOLISHING PLAN IN ACCORDANCE
WITH PROJECT SPECS AND SAFETY PLAN. SUBMIT TO COR FOR APPROVAL.
3. CAB ROOF DEMOLSHING SHALL NOT OCCUR BETWEEN LABOR DAY AND SEPTEMBER 1.
SCALE:
D001
LINK INTERIOR REPAIRS
1/4" = 1'-0"
[ITEM 14] REPAIR DAMAGED
INTERIOR WALL
[ITEM 21] REPLACE
WATER DAMAGE
INSULATION
[ITEM 19] REPAIR DRY-WALL
AS DETERMINED BY COR,
ASSUME 20%
R004
R004
R004
R004
R002
R002
R002
R002
R001
FEDERAL AVIATION ADMINISTRATION
DEPARTMENT OF TRANSPORTATION
REV DESCRIPTION JCN
REDLINE
DATE
APVD
SUBMITTED BY APPROVED BY
JCN
DRAWN
CHECKED
REV
ISSUED BY
H
G
F
E
D
C
B
A
8 1234567
DATE
DRAWING NO
DESIGNED
REVIEWED BY
P
M s a n t o s g e o v a n n i f a a
APPROVED
DATE
d r p a i r p l a n p g d w g
8 234567
H
G
F
E
D
C
A
B
IS
SU
ED
F
OR
E D
M
ME
1401830
PROJECT ENGINEER, AJW-2E11J
G. SANTOS
THIS DRAWING PRODUCED ON THE ANE REGION AUTOCAD SYSTEM
BANGOR INTERNATIONAL AIRPORT
s i g n b i d d i n g
EASTERN SERVICE AREAATO - TECHNICAL OPERATIONS
TERMINAL ENG.
AJW-2E11J
S N d p a i r p l a n p d w g
PG 1 - 2
REPAIR PLAN
ROOF REHABILIATION PROJECT
BGR-TOWB
GS
GS
BGR-TOWB-1401830-D001 0
BANGOR
SB
PLATFORM MANAGER, AJW-2E11G
[25.0] GENERAL WORK: REMOVE EXISTING ROOF
SYSTEM AND INSTALL NEW PVC ROOFING
SYSTEM. PRIME EXISTING DECKING AS SHOWN
IN SHEET A004
[18] REMOVE & REPLACE COPING
[24] GENERAL WORK: OVERLAY WITH PVC
MEMBRANE OVER RIGID BOARD, TAPERED
INSULATION AS REQUIRED. RESTORE EXISTING
LIGHTING PROTECTION SYSTEM
[15] REMOVE AND REPLACE COPING
[16] RESET (4) AIR TERMINALS
[17] RE-ATTACH EQUALIZING RING
PARAPET COPING. EXOTHERMIC WELD
TO (2) DOWN-CONDUCTIOS AND AIR
TERMINAL
SCALE:
D002
EG BUILDING ROOF
1/4" = 1'-0"
SCALE:
D002
WORK SHOP ROOF
1/4" = 1'-0"
ITEM REPAIR LIST
ITEM
NUM
LOCATION DESCRIPTION
PROPOSED
REPAIR PLAN
QTY. NOTES
1.0 BASE BUILDING CHIMNEY CAP DEMO STRUCTURE & RESTORE ROOF 41.4"W X 38"L PHOTO 11/R002
2.0 BASE BUILDING BOILER OPENING
DEMO METAL CAP & RESTORE ROOF
SYSTEM, INSTALL METAL BRACING
38"W X 38"L PHOTO 10/R002
3.0 BASE BULDING ROOF HATCH DEMO & RESTORE ROOF SYSTEM 21"W X 28"L
4.0 BASE BUILDING METAL COPING
DEMO COPING & INSTALL NEW FASCIA
SYSTEM (METAL-ERA OR A.E)
319'-2" LF
5.0 BASE BUILDNG ROOF SECTION
FULL-DEPTH ROOF REPAIR. REMOVE &
REPLACE WATER-DAMAGED ROOFING
SYSTEM. RESTORE NEW.
440 SF
6.0 BASE BUILDING/LINK ROOF SECTION
FULL-DEPTH ROOF REPAIR. REMOVE &
REPLACE WATER-DAMAGED ROOFING
SYSTEM. RESTORE NEW.
33 SF
7.0 BASE BUIDLING/LINK TOWER AND LINK FLASHING
REPLACE TOWER FLASHING & INSTALL
NEW EXPANSION JOINT
22 LF PHOTO 13/R002
8.0 BASE BUIDLING DOWNSPOUTS REMOVE AND REPLACE NEW
(10) X 14'-2" EA
9.0 BASE BUILDING CHIMNEY PIPE INSTALL NEW METAL BRACES N/A PHOTO 10/R002
10.0 CAB ROOF PARAPET WALL
REPLACE PLYWOOD BOARD W/ RIGID
BOARD
228 SF
11.0 CAB ROOF PARAPET CAP REMOVE AND REPLACE NEW 91 LF
12.0 CAB LEVEL CEILING INSULATION BOARD INSPECT AND SECURE N/A SEE SHEET A002
13.0
CAB, JUNCT. LEVEL
STORM LOUVER REMOVE AND REPLACE NEW 1 EA
NOT SHOWN IN DEMO/REPAIR
SHEETS. SEE SHEET A002
N/A - - - - -
15.0 E/G BUILDING COPING REMOVE & REPLACE NEW 84 LF
16.0 E/G BUILDING AIR TERMINAL
RESTORE AIR TERMINALS, TO INCLUDE
NEW COPPER BASES, ADHERED TO
PARAPET WALL
4 EA
17.0 E/G BUILGING ROOF EQUALIZING RING
RESTORE, RE-USE EXISTING
84 LF
18.0 WORK SHOP ROOFING SYSTEM
REMOVE EXISTING ROOF AND COPING
SYSTEM. INSTALL FULLY ADHERED PVC
SYSTEM TO CONCRETE DECKING. INSTALL
NEW COPING SYSTEM
1650 SF
ROOF SUBSTRATE IS
CONCRETE DECKING
19.0
LINK, INTERIOR
WALLS
REPAIR DAMAGED DRYWALL AND
REPLACE NEW. PAINT TO MATCH
180 SF
THIS ASSUMES 20% OF
EXISTING WALL
20.0
LINK, INTERIOR
CEILING TILES
REPLACE NEW, MATCH EXISTING DIMM. &
COLOR
100 SF
21.0
LINK, INTERIOR
INTERIOR DROP CEILING
INSULATION. REPLACE
WATER-DAMAGE INSULATION
REPLACE NEW 100 SF SEE PHOTO 3/R004
NEW INSTALLATION
ITEM
NUM.
LOCATION INSTALLATION TYPE DESCRIPTION QTY. NOTES
22.0 BASE BUILDING & LINK PVC ROOF SYSTEM
OVERLAY, MECHANICALLY ATTACHED TO
EXISTING ROOF. PVC MEMBRANE FULLY
ADHERED OVER INSULATION AND RIGID
BOARD
6600 SF
23.0 TOWER CAB PVC ROOF SYSTEM
OVERLAY, MECHANICALLY ATTACHED TO
EXISTING ROOF. PVC MEMBRANE FULLY
ADHERED OVER INSULATION AND RIGID
BOARD
617 SF
24.0 E/G BUILDING PVC ROOF SYSTEM
OVERLAY, MECHANICALLY ATTACHED TO
EXISTING ROOF. PVC MEMBRANE FULLY
ADHERED OVER INSULATION AND RIGID
BOARD
422 SF
25.0 WORK SHOP PVC ROOF SYSTEM FULLY ADRED TO CONCRETE DECKING 1700 SF
26.0 BASE BUIDLING
SAFETY RAILING SYSTEM, W/
POSTS
ATTACHED TO METAL DECKING 8 LF SEE A002
27.0 BASE BUILDING FALL PROTECTION DEVICE ATTACHED TO METAL DECKING 1 EA
SEE A002 FOR APPROXIMATE
LOCATION, COORDINATE WITH
COR
NOTES:
1. ESTIMATED QUANTITIES GATHERED DURING INITAL SITE SURVEY. CONTRACTOR SHALL VERIFY
EXISTING DIMENSIONS AND CONDITIONS IN FIELD PRIOR TO BEGINNING WORK.
DISCREPANCIES SHALL BE BROUGHT TO THE PROJECT ENGINEER. CONTRACTOR IS
RESPONSIBLE FOR ON SITE VERIFICATION OF ANY AND ALL WORK REQUIRED.
FEDERAL AVIATION ADMINISTRATION
DEPARTMENT OF TRANSPORTATION
REV DESCRIPTION JCN
REDLINE
DATE
APVD
SUBMITTED BY APPROVED BY
JCN
DRAWN
CHECKED
REV
ISSUED BY
H
G
F
E
D
C
B
A
8 1234567
DATE
DRAWING NO
DESIGNED
REVIEWED BY
P
M s a n t o s g e o v a n n i f a a
APPROVED
DATE
d p a i r p l a n p d w g
8 234567
H
G
F
E
D
C
A
B
IS
SU
ED
F
OR
E D
M
ME
1401830
PROJECT ENGINEER, AJW-2E11J
G. SANTOS
THIS DRAWING PRODUCED ON THE ANE REGION AUTOCAD SYSTEM
BANGOR INTERNATIONAL AIRPORT
s i g n b i d d i n g
EASTERN SERVICE AREAATO - TECHNICAL OPERATIONS
TERMINAL ENG.
AJW-2E11J
S N d p a i r p l a n p d w g
PG 2 - 2
REPAIR PLAN (CONT.)
ROOF REHABILIATION PROJECT
BGR-TOWB
GS
GS
BGR-TOWB-1401830-D002 0
BANGOR
SB
PLATFORM MANAGER, AJW-2E11G
84'-2"
66'-0"
9'-9"
14'-10"
LINK
ATCT
INSTALL METAL BRACING
INSTALL PVC
WALKWAY TRED
INSTALL NEW ROOF
DRAINS. 9 (TYP.)
INSTALL ROOF POST,
(FALL PROTECTION DEVICE)
INSTALL RAILING
TOWER
99'-10"
99'-10"
106'-3"
SCALE:
A001
FACILITY PLAN VIEW
1/8" = 1'-0"
SCALE:
A001
EAST ELEVATION
3/32" = 1'-0"
SCALE:
A001
NORTH ELEVATION
3/32" = 1'-0"
SCALE:
A001
SOUTH ELEVATION
3/32" = 1'-0"
SCALE:
A001
WEST ELEVATION
3/32" = 1'-0"
A001
A001
A001
A001
A005
A005
A005
A005
A005
A005
INSTALL FASCIA SYSTEM,
NOTE 2.
A005
TYP.
TYP.
TYP.
TYP.
A005
TYP.
NOTES:
1. CONTRACTOR TO SUBMIT ROOF TAPERING PLAN FOR REVIW
AND APPROVAL. MAINTAIN A MINIMUM OF 1/4" SLOPE ALL
AROUND
2. SUBMIT FASCIA COLOR, (EXISTING COLOR IS PPG BRONZE,
#UC109850. METAL-ERA EQUIVALENT IS MIDNIGHT, EXTRA
DARK, BRONZE).
3. INSTALL FALL PROTECTION DEVICE, GUARDIAN PROTECTION,
PART NO.: CB-18 OR A.E.
38'-11"
LINK
15'-2"
LINK
A005
A005
A005
A005
A005
A005
A005
A005
FEDERAL AVIATION ADMINISTRATION
DEPARTMENT OF TRANSPORTATION
REV DESCRIPTION JCN
REDLINE
DATE
APVD
SUBMITTED BY APPROVED BY
JCN
DRAWN
CHECKED
REV
ISSUED BY
H
G
F
E
D
C
B
A
8 1234567
DATE
DRAWING NO
DESIGNED
REVIEWED BY
P
M s a n t o s g e o v a n n i f a a
APPROVED
DATE
a w r k b a b i l d i n g d w g
8 234567
H
G
F
E
D
C
A
B
IS
SU
ED
F
OR
E D
M
ME
1401830
PROJECT ENGINEER, AJW-2E11J
G. SANTOS
THIS DRAWING PRODUCED ON THE ANE REGION AUTOCAD SYSTEM
BANGOR INTERNATIONAL AIRPORT
s i g n b i d d i n g
EASTERN SERVICE AREAATO - TECHNICAL OPERATIONS
TERMINAL ENG.
AJW-2E11J
S N a r k b a b i l d i n g d w g
ROOF OVERLAY
NEW WORK - BASE BUILDING
ROOF REHABILIATION PROJECT
BGR-TOWB
GS
GS
BGR-TOWB-1401830-A001 0
BANGOR
SB
PLATFORM MANAGER, AJW-2E11G
OVERLAY W/ PVC ROOFING
MEMBRANE, OVER RIGID BOARD
& INSULATION AS REQUIRED
SLOPE
TAPERED, TO
MATCH 1/2"
PER FOOT
29'-6 1/2"
27'-4"
RESTORE
WALKPADS
1/2"SLOPE,
MIN.
1/2"SLOPE,
MIN.
PVC MENBRANE WRAPPED
AROUND PARAPET CAP
29'-0 1/2"
LIMITS OF WORK
REMOVE & REPLACE
PARAPET METAL CAP,
ALL AROUND.
NEW 60 MIL PVC MEMBRANE
NEW 1/2" RIGID/DENSE BOARD
ON ROOF DECK AND UP
PARAPET WALL
SECURE EXISTING ROOF
DECK INSULATION, (NOTE 3)
DROP CEILING
METAL COVER PLATE
ADJUST METAL RAILING,
(NOTE 1)
NOTE: INTENT OF THE WORK IS TO
REPLACE ALL PAPARET PLYWOOD
BOARDS, & THEN OVERLAY WITH NEW
PVC SYSTEM.
J
J
J
J
SCALE:
A002
CAB ROOF PLAN
1/4" = 1'-0"
SCALE:
A002
CAB - EAST VIEW
1/4" = 1'-0"
A006
AT SCUPPER
A005
(2) PLCS
A006
A006
A006
SCALE:
A002
TOWER - JUNCTION LEVEL
1/4" = 1'-0"
A002
NEW 36x36 STORMPROOF
LOUVER W/ BUG SCREEN,
(NOTE 4)
1. REMOVE AND RESET HANDRAIL AS REQUIRED.
1.1. SEE IMAGE 1 ON SHEET R003 FOR HANDRAIL PHOTOS.
1.2. MAINTAIN A MININUM HANDRAIL HEIGHT OF 42".
2. ROOF ANTENNAS ARE ACTIVE. THE CONTRACTOR SHALL COORDINATE
EQUIPMENT OUTAGES WITH COR PRIOR TO ANY WORK BEING
PERFORMED. PROVIDE (5) DAYS NOTICE.
3. THE CONTRACTOR SHALL INSPECT AND SECURE THE THE INTERIOR
CEILING INSULATION.
4. 36x36 STORMPROOF LOUVER W/ BUG SCREEN. ADJUSTABLE COUNTER
BALANCED SPRING LOW LEAK INSULATED BACKDRAFT DAMPER & 36X36
EG
NOTES
A006
FEDERAL AVIATION ADMINISTRATION
DEPARTMENT OF TRANSPORTATION
REV DESCRIPTION JCN
REDLINE
DATE
APVD
SUBMITTED BY APPROVED BY
JCN
DRAWN
CHECKED
REV
ISSUED BY
H
G
F
E
D
C
B
A
8 1234567
DATE
DRAWING NO
DESIGNED
REVIEWED BY
P
M s a n t o s g e o v a n n i f a a
APPROVED
DATE
a r k t o w e r c a b d w g
8 234567
H
G
F
E
D
C
A
B
IS
SU
ED
F
OR
E D
M
ME
1401830
PROJECT ENGINEER, AJW-2E11J
G. SANTOS
THIS DRAWING PRODUCED ON THE ANE REGION AUTOCAD SYSTEM
BANGOR INTERNATIONAL AIRPORT
s i g n b i d d i n g
EASTERN SERVICE AREAATO - TECHNICAL OPERATIONS
TERMINAL ENG.
AJW-2E11J
S N a r k t o w e r c a b d w g
ROOF OVERLAY
NEW WORK - TOWER CAB
ROOF REHABILIATION PROJECT
BGR-TOWB
GS
GS
BGR-TOWB-1401830-A002 0
BANGOR
SB
PLATFORM MANAGER, AJW-2E11G
K. COFFEY
2021-03-06
AutoCAD SHX Text
DN
AutoCAD SHX Text
UP
AutoCAD SHX Text P
AutoCAD SHX Text
VD
AutoCAD SHX Text D
AutoCAD SHX Text D
AutoCAD SHX Text
VD
FD
RE-ATTACH
EQUALIZING RING
COPPER CABLE HOLDER,
ADHERED, 3 FT. MAX O.C.
RE-ATTACH
AIR TERMINALS, (4) TYP
RE-USE
EXISTING
COPING
OVERLAY WITH 60 MIL PVC ROOFING
MEMBRANE, OVER 1/2" RIGID BOARD,
APPR. 400 SF
1/2" SLOPE
NEW ROOF DRAIN
COVERS
18'-4"
INSTALL EXISTING AIR
TERMINALS ON TOP OF
PARAPET WALL, (4) TYP.
RESTORE EXISTING.
DOWN CONDUCTOR
INSTALL NEW ROOF
COPING,
18'-8"
RE-ATTACH
EXISTING.
DOWN
CONDUCTOR
RE-USE ROOF
COPING
24'-0"
INSTALL EXISTING AIR
TERMINALS ON TOP OF
PARAPET WALL, (4) TYP.
18'-8"
OVERLAY WITH 60 MILL PVC
MEMBRANE, FULLY ADHERED TO
COVER BOARD
PROVIDE & INSTALL NEW DRAIN
COVERS
R003
SCALE:
A003
EG BUILDING ROOF
1/2" = 1'-0"
SCALE:
A003
EG - SOUTH ELEVATION
1/4" = 1'-0"
SCALE:
A003
EG - EAST ELEVATION
1/4" = 1'-0"
A003
A003
SCALE:
A003
EG - CROSS SECTION
1/4" = 1'-0"
A003
A007
NOTES:
1. INSTALL AIR TERMINALS ON TOP OF PARAPET WALL, NO MORE THAN 12" FROM THE ROOF
EDGE. SECURE WITH APPROVED EPOXY. SURFACE SHOULD BE MECHANICALLY SCUFFED
DIRECTLY BELOW TERMINAL BASE BEFORE APPLICATION OF EPOXY TO ENSURE PROPER
ADHESION.
2. INSTALL ROOF PERIMETER CABLE WITHIN 12" OF THE ROOF EDGE. SECURE CABLE WITH
CABLE HOLDERS EVERY 36", MAXIMUM.
3. MINIMUM BEND RADIUS ON CONDUCTORS SHALL BE 8 INCHES. PROVIDE SWEEPS IN DOWN
CONDUCTORS TO PREVENT SHARP BENDS.
4. SEAL ALL PENETRATIONS THROUGH THE SHELTER WALL WITH SILICONE SEALANT, I.E. BOLTS, SCREWS, CONDUIT, UNISTRUT, ETC, TO PREVENT WATER INTRUSION.
5. ALL CABLES CONNECTIONS SHALL BE EXOTHERMICALLY WELDED.
6. BOND METAL ROOF DRAIN TO ROOF PERIMETER CABLE. ALL METAL COMPONENTS WITHIN 6
FT. OF A DOWN CONDUCTOR SHALL BE CONNECTED TO THE DOWN CONDUCTOR AS WELL.
7. PROTECT SHELTER ROOF SURFACE FROM DAMAGE FROM EXOTHERMIC WELDING.
MECHANICALLY CLAMP EQUALIZING HALO RING FOR FITTING, THEN EXOTHERMICALLY WELD
ON THE GROUND OFF THE SHELTER SURFACE.
SCALE:
A003
AIR TERMINAL CONNECTION
NTS
SCALE:
A003
DOWN-CONDUCTOR
NTS
A003
24" SOLID COPPER
AIR TERMINAL
EXOTHERMIC
WELD
RE-ATTACH EXISTING
DOWN CONDUCTORS,
(2) TYP.
COPPER ADHESIVE
CABLE HOLDER
NEW COPPER BASE,
ADHERED TO
PARAPET COPING
AIR TERMINAL ON
VERTICAL BASE
EXOTHERMIC
WELD
INSTALL EXISTING
HALO RING
NEW COPPER BASE,
ADHERED TO
PARAPET COPING
INSTALL
EXISTING DOWN
CONDUCTORS
FEDERAL AVIATION ADMINISTRATION
DEPARTMENT OF TRANSPORTATION
REV DESCRIPTION JCN
REDLINE
DATE
APVD
SUBMITTED BY APPROVED BY
JCN
DRAWN
CHECKED
REV
ISSUED BY
H
G
F
E
D
C
B
A
8 1234567
DATE
DRAWING NO
DESIGNED
REVIEWED BY
P
M s a n t o s g e o v a n n i f a a
APPROVED
DATE
a r k e g b u i l d i n g d w g
8 234567
H
G
F
E
D
C
A
B
IS
SU
ED
F
OR
E D
M
ME
1401830
PROJECT ENGINEER, AJW-2E11J
G. SANTOS
THIS DRAWING PRODUCED ON THE ANE REGION AUTOCAD SYSTEM
BANGOR INTERNATIONAL AIRPORT
s i g n b i d d i n g
EASTERN SERVICE AREAATO - TECHNICAL OPERATIONS
TERMINAL ENG.
AJW-2E11J
S N a r k e g b u i l d i n g d w g
OVERLAY ROOF
NEW WORK - EG BUILDING
ROOF REHABILIATION PROJECT
BGR-TOWB
GS
GS
BGR-TOWB-1401830-A003 0
BANGOR
SB
PLATFORM MANAGER, AJW-2E11G
K. COFFEY
2021-03-06
AutoCAD SHX Text
T.O.WALL EL. 14'-2"
FIN. FLOOR EL. 0'-0"
53'-10 1/2"
S
L O
P E
M I N
I M
U M
S
L O
P E
M I N
I M
U M
SCALE:
A004
WORK SHOP ROOF
1/4" = 1'-0"
SCALE:
A004
WORK SHOP SOUTH ELEVATION
1/4" = 1'-0"
NOTES:
1. DEMOLISH EXISTING ROOF AND INSTALL NEW FULLY ADHERED
PVC SYSTEM.
2. GENERAL WORK SHALL CONSIST OF:
2.1. PRIME WITH VAPOR BARRIER PRIMER (VAPOR RETARDER
PRIMER VC)
2.2. INSTALL SELF-ADHERED 31 MIL VAPOR BARRIER
2.3. ADHERE HIGH DENSITY POLYSOCYANUARATE COVER
BOARD WITH INSULATION BOARD ADHESIVE
2.4. ADHERE 60 MIL PVC ROOF MEMBRANE WITH
MANUFACTURERR'S RECOMMENDED ADHESIVE.
2.5. INSTALL METAL-ERA, OR APPROVE EQUAL, TYPE EDGE.
A007
A007
FEDERAL AVIATION ADMINISTRATION
DEPARTMENT OF TRANSPORTATION
REV DESCRIPTION JCN
REDLINE
DATE
APVD
SUBMITTED BY APPROVED BY
JCN
DRAWN
CHECKED
REV
ISSUED BY
H
G
F
E
D
C
B
A
8 1234567
DATE
DRAWING NO
DESIGNED
REVIEWED BY
P
M s a n t o s g e o v a n n i f a a
APPROVED
DATE
a r k w o r k s h o p d w g
8 234567
H
G
F
E
D
C
A
B
IS
SU
ED
F
OR
E D
M
ME
1401830
PROJECT ENGINEER, AJW-2E11J
G. SANTOS
THIS DRAWING PRODUCED ON THE ANE REGION AUTOCAD SYSTEM
BANGOR INTERNATIONAL AIRPORT
s i g n b i d d i n g
EASTERN SERVICE AREAATO - TECHNICAL OPERATIONS
TERMINAL ENG.
AJW-2E11J
S N a r k w o r k s h o p d w g
NEW PVC ROOF
NEW WORK - WORK SHOP
ROOF REHABILIATION PROJECT
BGR-TOWB
GS
GS
BGR-TOWB-1401830-A004 0
BANGOR
SB
PLATFORM MANAGER, AJW-2E11G
STAINLESS STEEL FASTENER
WITH HOLD-DOWN PLATE
RIGID BOARD & INSULATION
MECHANICALLY FASTENED TO
EXISTING ROOFING SYSTEM,
TAPERED AS REQUIRED
COLD-ROLLED
SUB-GIRT, SHOP
ATTACHED TO COPING
PANEL, EXTENDED 1'-6"
PAST JT.
HIGH-WIND FASCIA
SYSTEM,
MECHANICALLY
FASTENED TO STEEL
GIRT AND WOOD
BLOCKING, NOTE 2.
FULLY ADHERED PVC
ROOF MENBRANE
HOT-AIR WELD, TYP.
NEW PERMITER
FLASHING
WOOD BLOCKING AS REQUIRED,
SECURE TO EXISTING WOOD
BLOCKING, TYP
EXTEND MENBRANE
OVER WALL AND
SECURE WIT THE
CLEAT, NOTE 3
SEAL ALL BUILDING
JOINTS
EXISTING SINGLE-PLY EPDM ROOFING
SYSTEM
· 1/2" PROTECTION BOARD
· TAPERED INSULATION
· RIGID INSULATION
· VAPOR BARRIER
· METAL DECK
FRICTION FIT BATT
INSULATION,
REPLACE ANY
DAMAGED
INSULATION
FLASHING STRIP, HOT-AIR
WELDED B.S.
S L O
P E
T O
R O
O
F
D
R A I N
SINGLE-PLY ROOFING OVER
INSULATED METAL DECK
FOAM ROAD TUBING
(COMPATIBLE)
PVC MEMBRANE
1/2" DECKING OVER
TAPERED INSULATION
1/4" SLOPE MIN.
LINK BASE BUILDING
SPECIFIED
FASTENER &
DISC
1/2" BOARD & TAPERED
INSULATION , MECHANICALLY
FASTENED (TYP.)
NEW PVC MEMBRANE,
FULLY ADHERED
EXISTING SINGLE-PLY
ROOFING MEMBRANE
OVER INSULATED
METAL DECK
HIGH-WIND FASCIA
SYSTEM,
MECHANICALLY
FASTENED TO STEEL
GIRT AND WOOD
BLOCKING, NOTE 2.
INSTALL NEW WOOD
BLOCKING, AS
REQUIRED
1/4
S
LO
P E M
IN
EXTEND MENBRANE
OVER WALL AND
SECURE WIT THE
CLEAT, NOTE 3
SEAL OF BUILDING
JOINTS
ALUMINUM WALL
PANELS, TYP.
PVC FLASHING, WELDED
1/2" RIGID BOARD OVER
TAPERED INSULATION AS
REQUIRED, PITCH ROOF TO
ROOF DRAINS
HOT-AIR WELD
PVC FLASHING
SPECIFIED SECUREMENT
MEMBRANE ADHERED TO CLEAN &
DRY SUBSTRATE
BUTYL TAPE OR SIKA A1 SEALANT
SEALANT TO CLEAN SURFACE
NEW TERMINATION BAR
FASTENED WITH APPROVED
FASTENER, 8" O.C.
PVC ROOFING
SEAL & SECURE @ 12" O.C.
SECURE ROOF MENBRANE TO
TOWER WALL @ 12" O.C.
FASTENED 12" O.C.
PROVIDE FOAM TUBE
FOR 2" EXP. JOINT.
NOTE:
1. REMOVE AND REPLACE EXISTING
FLASHING AND TERMINATION BAR
ALONG LOWER JOINT
2. SEAL ALL JOINT AND MAKE WATER
TIGHT
3. REMOVE AND REPLACE DAMAGED
BATTING JOIN INSULATION
1/4" SLOPE MIN.
REMOVE EXISTING FLASHING
SYSTEM, AND DAMAGED
INSULATION, IF ANY. CLEAN AND
INSTALL FLASHING SYTEM PER
MANUF. INSTRUCTIONS
INSTALL NEW PVC FULLY
ADHERED MEMBRANE ROOFING
OVER 1/2" RIGID BOARD, TAPERED
AT ALL ROOF DRAINS
ROOF DRAIN CAP, TYP
CLAMPING RING, TYP
NEW PVC ROOF MEMBRANE,
FULLY ADHERED
NEW TAPERED RIGID BOARD & INSULATION
LAYED N TOP OF EXISTING ROOF
EXISTING ROOFING
SYSTEM
COPING DETAIL
SCALE: XXX
COPING DETAIL
SCALE: XXX
COPING DETAIL
SCALE: XXX
ADHERED ROOF MENBRANE,
OVER 1/2" RIGID ROOF
BOARD AND INSULATION,
MECH. FASTENED
FULL ROOF
REPAIR REQ.
NEW COPING, TYP
A005
TYP.
EXISTING ROOFING SYSTEM SHOWN,
DETAILS ON SHEET C002
NEW PVC ROOFING MEMRANE,
FULLY ADHERED
HOT-AIR WELD
INSULATION FASTENED OVER EXISTING
ROOF, TAPERED AS REQUIRED.
MAINTAIN 1/4" SLOPE DRAIN
COVER BOARD
ROLLED ADHESIVE
(SARNACOL OR A.E.)
REMOVE AND REPLACE
INSULATION. RESTORE
ROOF SLOPE WITH 1/2"
RIGID BOARD. MATCH
SLOPE
RESTORE AL BACKING
PLATE, CONT. @ JOINT
NEW PVC MEMBRANE
HOT-AIR WELD
NEW PVC FLASHING
PVC METAL EDGE PIECE AT
SCUPPER, FASTENED W/ GALV.
ANNULAR RING NAILS
NEW DOWNSPOUT
(10) PLACES, INSTALL PER
MANUF. RECOMMENDATIONS
RIGID BOARD & INSULATION
MECHANICALLY FASTENED TO
EXISTING ROOFING SYSTEM,
TAPERED AS REQUIRED
1/4" SLOPE,
MIN
VENT
PENETRATION
PVC MEMBRANE
CAP
ALUMINUM TAPE
PVC FLASHING
MEMBRANE
SPECIFIEC
FASTENER & DISC
PVC BASE FLASHING,
HOT-AIR WELDED
1/2" RIGID BOARD OVER
TAPERED INSULATION AS
NEEDED. MAINTAIN 1/4"
SLOPE AWAY FROM PIPE
PENETRATION
M
I N
INSULATED
PIPE BREACH
SARNAFIL SEALANT OR
APPROVED EQUAL
SS TEEL HOSE CLAMP
ALUMINUM TAPE
PVC FLASHING
MEMBRANE
MANUF. FASTERNER
AND DISC.
BASE FLASHING, HOT
WELDED, ALL AROUND
PVC MENBRANE, FULLY
ADHERED
1/2" BOARD OVER TAPERED
INSULATION, MECHANICALLY
FASTENED
SCALE:
A005
LINK FASCIA DETAIL - TYP.
3" = 1'-0"
SCALE:
A005
LINK & BASE BUILDING EXP JT.
1 1/2" = 1'-0"
SCALE:
A005
BASE BUILDING ROOF FASCIA
1 1/2" = 1'-0"
SCALE:
A005
LINK - ROOF COUNTER FLASHING
3" = 1'-0"
SCALE:
A005
LINK - ROOF DRAIN & OVERFLOW DRAIN
1 1/2" = 1'-0"
SCALE:
A005
LINK - CANOPY CROSS SECTION
3/8" = 1'-0"
SCALE:
A005
DETAIL - ADHERED SYSTEM
3" = 1'-0"
A005
TYP.
SCALE:
A005
LINK - FULL ROOF REPAIR
3" = 1'-0"
SCALE:
A005
COPING AT DOWNSPOUT
3" = 1'-0"
A005
NOTES:
1. FLASHING SHALL BE INSTALLED IN SUCH A MANNER SO AS TO PREVENT MOISTURE ENTERING THE
WALL AND ROOF JOINTS. FLASHING SHALL BE INSTALLED AT WALL, ROOF INTERSECTIONS, AT
GUTTER, WHEREVER THERE IS A CHANGE IN ROOF SLOPE OR DIRECTION AND AROUND ROOF
OPENINGS.
2. METAL-ERA MODEL ANCHOR-TITE EXTENDED CANTED FASCIA SHOWN. PROVIDE AND INSTALL
SIMILAR OR APPROVED EQUAL. FOLLOW MANUFACTURER'S INSTALLATION INSTRUCTIONS.
3. CONTRACTOR TO ENSURE BUILDING ROOF ENVELOPE IS WATERTIGHT AND FREE OF WATER
INTRUSION.
SCALE:
A005
BASE BUILDING - VENT
3" = 1'-0" SCALE:
A005
BASEBUILDING - BOILER BREACH
3" = 1'-0"
FEDERAL AVIATION ADMINISTRATION
DEPARTMENT OF TRANSPORTATION
REV DESCRIPTION JCN
REDLINE
DATE
APVD
SUBMITTED BY APPROVED BY
JCN
DRAWN
CHECKED
REV
ISSUED BY
H
G
F
E
D
C
B
A
8 1234567
DATE
DRAWING NO
DESIGNED
REVIEWED BY
P
M s a n t o s g e o v a n n i f a a
APPROVED
DATE
a t a i l s s h e e d w g
8 234567
H
G
F
E
D
C
A
B
IS
SU
ED
F
OR
E D
M
ME
1401830
PROJECT ENGINEER, AJW-2E11J
G. SANTOS
THIS DRAWING PRODUCED ON THE ANE REGION AUTOCAD SYSTEM
BANGOR INTERNATIONAL AIRPORT
s i g n b i d d i n g
EASTERN SERVICE AREAATO - TECHNICAL OPERATIONS
TERMINAL ENG.
AJW-2E11J
S N a t a i l s s h e e d w g
BASE BUILDING & LINK
DETAILS, SHEET 1 OF 2
ROOF REHABILIATION PROJECT
BGR-TOWB
GS
GS
BGR-TOWB-1401830-A005 0
BANGOR
SB
PLATFORM MANAGER, AJW-2E11G
K. COFFEY
2021-03-06
AutoCAD SHX Text
STRUCTURAL DECK
AutoCAD SHX Text
INSULATION
AutoCAD SHX Text
EXISTING ROOFING SYSTEM
AutoCAD SHX Text
STRUCTURAL DECK
NOTES: 1) SARNAFIL MEMBRANE SHALL NOT BE IN CONTACT WITH SURFACES HAVING SUSTAINED TEMPERATURES ABOVE 160°F.2) VAPOR RETARDER SHALL BE SEALED AT EDGES.
3'
NEW PVC MEMBRANE
OVER 1/2" RIGID BOARD
& INSULATION
TERMINATION BAR FASTENED WITH
SS-GROMMETED FASTENER. APPLY
SEALANT ALL AROUND
1/2" RIGID BOARD & TAPERED
INSULATION, (1/2" SLOPE
MIN.), MECHANICALLY
FASTENED
NEW PVC MEMBRANE,
FULLY ADHERED
HOT-AIR WELD
PVC FLASHING, ALL AROUND
SPECIFIED MFR.
SECUREMENT
PAINT EXTERIOR METAL HATCH
DOOR WITH APPROVED PAINT
CAP ON ANTENNA MOUNT,
2-1/2" I.D. THREADED
TWO THREADED NUTS AND WASHER
TOP/BOTTOM
SEALANT
BRASS COVER PLATE 1/4" THICK.
SURFACE MOUNT TO COVER OPENING
IN STEEL TUBE PROVIDED FOR WIRE
PULLING. SIZE OPENING IS 10"X4".
COVER LAPS OPENING 1 INCH.
DRILLED AND TAP STEEL TUBE,
SECURE COVER WITH 1/4" BOLT, AND
BEVELLED GASKETED WASHERS.
CAP COVER - PVC COATED CLAD
METAL, 1/16" THICK, SECURE TO
STEEL TUBE WITH 1/4" SELF
TAPPING SS WITH NEOPRENE
WASHER AT 2'-0" O.C.
ALUMINUM CAP, SECURE TO TUBE W/ 1/4"
PVC MEMNBRANE, WRAPPED AROUND
PARAPET CAP
SS FASTENERS & NEOPRENE WASHER AT 2"
O.C STAGGERED
TERMINATION BAR, 3X4X1/4"
CONTINOUS, SECCURE WITH 1/4"
SELF-TAPPING SS, AND NEOPRENE
WASHERS AT 2'-0" O.C.
PVC MEMBRANE, (SECURED BY
TERMINATION BAR)
1/2" RIGID BOARD
PVC MEMBRANE
WRAPPED AROUND
PARAPET CAP
1/2" RIGID BOARD W/ TAPERED
INSULATION AS REQUIRED
NEW PVC MEMBRANE,
FULLY ADHERED
HOT-AIR WELD
PVC FLASHING, FULLY
ADHERED, UP PARAPET WALL
FASTANED TO ACCEPTABLE
SUBSTRATE
1/2" RIGID BOARD
PVC FLASHING
1/2" RIGID BOARD W/
INSULATION AS REQUIRED
M
I N
PVC COATED CLAD
METAL SLEEVE, FULLY
ADHERED
1/2" RIDGID BOARD, (REPLACES OLD)
PVC MEMBRANE, (SECURED
BY TERMINATION BAR)
FASTENER TO
ACCEPTABLE
SUBSTRATE
SLOPE
PVC FLASHING
WALL BRACKET 6" FROM EACH END
RAIL, INTERMEDIATE BRACKETS
ALIGNED WITH WELL RAIL BALUSTERS
SEALANT AND BACKER ROD, ALL
AROUND
ALUMINUM STORMPROOF LOUVER,
4" WIDE. FINISHED TO MATCH IMP
FOR PORTIONS OF LOUVER LEFT
UNUSED BY MECHANICAL DELETED
INSECT SCREEN. USED INSULATED
CLOSURE PANEL COMPOSED OF 2 INCH
RIGID INSULATION BETWEEN SHEET
METAL
WALL BRACKET 6" FROM EACH END
RAIL, INTERMEDIATE BRACKETS
ALIGNED WITH WELL RAIL BALUSTERS
SEALANT AND BACKER ROD, ALL
AROUND
ALUMINUM STORMPROOF LOUVER,
4" WIDE. FINISHED TO MATCH IMP
7/8" FURRING CHANNELRS
SEAL
3'-0"
4"
SCALE:
A006
CAB - ROOF HATCH LADDER
3/4" = 1'-0"
SCALE:
A006
CAB - ROOF HATCH
3" = 1'-0"
SCALE:
A006
CAB - PARAPET CAP
3" = 1'-0"
SCALE:
A006
CAB - PARAPET BASE (TYP.)
3" = 1'-0"
SCALE:
A006
CAB - SCUPPER
3" = 1'-0"
A006
SCALE:
A006
JUNCTION LEVEL - LOUVER HEAD
1 1/2" = 1'-0"
SCALE:
A006
JUNCTION LEVEL - LOUVER HEAD - SILL
1 1/2" = 1'-0"
SCALE:
A006
STORMPROOF LOUVER (REPLACEMENT)
1 1/2" = 1'-0"
A006
A006
FEDERAL AVIATION ADMINISTRATION
DEPARTMENT OF TRANSPORTATION
REV DESCRIPTION JCN
REDLINE
DATE
APVD
SUBMITTED BY APPROVED BY
JCN
DRAWN
CHECKED
REV
ISSUED BY
H
G
F
E
D
C
B
A
8 1234567
DATE
DRAWING NO
DESIGNED
REVIEWED BY
P
M s a n t o s g e o v a n n i f a a
APPROVED
DATE
a t a i l s s h e e d w g
8 234567
H
G
F
E
D
C
A
B
IS
SU
ED
F
OR
E D
M
ME
1401830
PROJECT ENGINEER, AJW-2E11J
G. SANTOS
THIS DRAWING PRODUCED ON THE ANE REGION AUTOCAD SYSTEM
BANGOR INTERNATIONAL AIRPORT
s i g n b i d d i n g
EASTERN SERVICE AREAATO - TECHNICAL OPERATIONS
TERMINAL ENG.
AJW-2E11J
S N a t a i l s s h e e d w g
TOWER
DETAILS, SHEET 2 OF 3
ROOF REHABILIATION PROJECT
BGR-TOWB
GS
GS
BGR-TOWB-1401830-A006 0
BANGOR
SB
PLATFORM MANAGER, AJW-2E11G
~8'-4"
1-1/2"X1-1/2"X3/16"
SS BRACE
MECHANICALLY FASTENED
TO METAL DECK
BUILDING METAL DECK
BOILER ROOM DROP
HARD-CEILING
BRACE SUPPORT ASSEMBLY,
(2) 4X8X3/16" PLATES W/
3/16" FILLET WELD TO 4"
PIPE, TOP & BOTTOM
M
I N
MASONRY BLOCKS
VAPOR BARRIER
VAPOR BARRIER PRIMER
FLASHING STRIP, HOT-AIR WELDED
INSULATION, ADHERED, R-38 MIN.
1/2" COVER BOARD
CONTINUOUS CLEAT
FASTENED 12" O.C.
EDGE METAL W/
SPILL-OUT SCUPPERS
MULTIP-PURPOSE TAPE
CONCRETE
DECKING
60 MILL PVC MEMBRANE
METAL SIDING
TERMINATION BAR,
SS-GROMMETED
FASTENED 8" OC
PVC FLASHING STRIP,
HEAD WELDED
ADHERED INSULATION
BOARD (R-30)
ADHERED COVER
BOARD
PRIME CONCRETE DECK WITH
VAPOR BARRIER PRIMER
SECURE WOOD BLOCKING. TO
MATH INSULATION
PVC MEMBRANE
BOILER BREACH
CONCRETE DECKING
MULTI-PURPOSE TAPE
SEAL ALL AROUND
FLASHING, WRAPPED AROUND
PARAPET, SECURELY FASTENED
SS-GROMMETTED FASTENER, 12" O.C.
HEAT-WELDED
1/2" RIGID BOARD
NEW COPING & METAL STRIP HOOK
FASTENED PVC MEMBRANE
TO BASE OF PARAPET
WOOD BLOCKING AS REQUIRED.
SCALE:
A007
BOILER PIPES_PLAN
1/2" = 1'-0" SCALE:
A007
BOILER PIPE - PROFILE
3/8" = 1'-0"
NOTE:
1. CONTRACTOR SHALL VERIFY FIELD
DIMENSION PRIOR TO FABRICATION &
INSTALLATION
4X8X3/16" PL, (TYP.)
1-1/2X1-1/2X3/16 TAB
(TYP.)
R
A005
A007
SCALE:
A007
WORK SHOP - FASCIA
3" = 1'-0"
SCALE:
A007
WORK-SHOP - BOILER
3" = 1'-0"
SCALE:
A007
EG BLDG CROSS SECTION
3" = 1'-0"
FEDERAL AVIATION ADMINISTRATION
DEPARTMENT OF TRANSPORTATION
REV DESCRIPTION JCN
REDLINE
DATE
APVD
SUBMITTED BY APPROVED BY
JCN
DRAWN
CHECKED
REV
ISSUED BY
H
G
F
E
D
C
B
A
8 1234567
DATE
DRAWING NO
DESIGNED
REVIEWED BY
P
M s a n t o s g e o v a n n i f a a
APPROVED
DATE
a t a i l h e e d w g
8 234567
H
G
F
E
D
C
A
B
IS
SU
ED
F
OR
E D
M
ME
1401830
PROJECT ENGINEER, AJW-2E11J
G. SANTOS
THIS DRAWING PRODUCED ON THE ANE REGION AUTOCAD SYSTEM
BANGOR INTERNATIONAL AIRPORT
s i g n b i d d i n g
EASTERN SERVICE AREAATO - TECHNICAL OPERATIONS
TERMINAL ENG.
AJW-2E11J
S N a t a i l e e d w g
DETAILS SHEET 3 OF 3
ROOF REHABILIATION PROJECT
BGR-TOWB
GS
GS
BGR-TOWB-1401830-A007 0
BANGOR
SB
PLATFORM MANAGER, AJW-2E11G
SCALE:
R001
ABOVE BASE BUILDING - LOOKING SOUTH
NTS
SCALE:
R001
ABOVE BASE BUILDING - LOOKING SOUTHWEST
NTS
SCALE:
R001
ABOVE BASE BUILDING - LOOKING NORTHEAST
NTS
SCALE:
R001
ABOVE LINK - LOOKING NORTH
NTS
SCALE:
R001
LINK VIEW
NTS
SCALE:
R001
BASE BUILDING NORTH SIDE
NTS
SCALE:
R001
BASE BUILDING SOUTH SIDE
NTS
SCALE:
R001
BASE BUILDING COPPING TIP
NTS
FEDERAL AVIATION ADMINISTRATION
DEPARTMENT OF TRANSPORTATION
REV DESCRIPTION JCN
REDLINE
DATE
APVD
SUBMITTED BY APPROVED BY
JCN
DRAWN
CHECKED
REV
ISSUED BY
H
G
F
E
D
C
B
A
8 1234567
DATE
DRAWING NO
DESIGNED
REVIEWED BY
P
M s a n t o s g e o v a n n i f a a
APPROVED
DATE
r p o t o s d w g
8 234567
H
G
F
E
D
C
A
B
IS
SU
ED
F
OR
E D
M
ME
1401830
PROJECT ENGINEER, AJW-2E11J
G. SANTOS
THIS DRAWING PRODUCED ON THE ANE REGION AUTOCAD SYSTEM
BANGOR INTERNATIONAL AIRPORT
s i g n b i d d i n g
EASTERN SERVICE AREAATO - TECHNICAL OPERATIONS
TERMINAL ENG.
AJW-2E11J
S N r o t o s d w g
SITE SURVEY
SITE PHOTOS, PG 1 OF 3
ROOF REHABILIATION PROJECT
BGR-TOWB
GS
GS
BGR-TOWB-1401830-R001 0
BANGOR
SB
PLATFORM MANAGER, AJW-2E11G
R002
ABOVE BOILER ROOM - NORTHWEST
NTS
SCALE:
R002
BOILER CAP & BREACH
NTS
SCALE:
R002
ABOVE BOILER ROOM - NORTHEST
NTS
SCALE:
R002
LINK & TOWER FLASHING
NTS
SCALE:
R002
GUTTER TYP
NTS
SCALE:
R002
DRAINS TYP
NTS
SCALE:
R002
LINK COPING TYP
NTS
SCALE:
R002
BASE BUILDING AIR VENT PIPE
NTS
FEDERAL AVIATION ADMINISTRATION
DEPARTMENT OF TRANSPORTATION
REV DESCRIPTION JCN
REDLINE
DATE
APVD
SUBMITTED BY APPROVED BY
JCN
DRAWN
CHECKED
REV
ISSUED BY
H
G
F
E
D
C
B
A
8 1234567
DATE
DRAWING NO
DESIGNED
REVIEWED BY
P
M s a n t o s g e o v a n n i f a a
APPROVED
DATE
r o t o s p g d w g
8 234567
H
G
F
E
D
C
A
B
IS
SU
ED
F
OR
E D
M
ME
1401830
PROJECT ENGINEER, AJW-2E11J
G. SANTOS
THIS DRAWING PRODUCED ON THE ANE REGION AUTOCAD SYSTEM
BANGOR INTERNATIONAL AIRPORT
s i g n b i d d i n g
EASTERN SERVICE AREAATO - TECHNICAL OPERATIONS
TERMINAL ENG.
AJW-2E11J
S N r o t o s p g d w g
SITE SURVEY
SITE PHOTOS, PG 2 OF 3
ROOF REHABILIATION PROJECT
BGR-TOWB
GS
GS
BGR-TOWB-1401830-R002 0
BANGOR
SB
PLATFORM MANAGER, AJW-2E11G
R003
CAB - PARAPET WALL & COPING
NTS
SCALE:
R003
CAB - ROOF HATCH
NTS
SCALE:
R003
CAB - ROOF TYPICAL FLASHING
NTS
SCALE:
R003
CAB - PARAPET MOUNTED EQUIPMENT
NTS
SCALE:
R003
EG BUILDING
SCALE:
R003
WORK SHOP
NTS
SCALE:
R003
CAB - REATTACH CEILING INSULATION (1)
SCALE:
R003
CAB - REATTACH CEILING INSULATION (2)
NTS
FEDERAL AVIATION ADMINISTRATION
DEPARTMENT OF TRANSPORTATION
REV DESCRIPTION JCN
REDLINE
DATE
APVD
SUBMITTED BY APPROVED BY
JCN
DRAWN
CHECKED
REV
ISSUED BY
H
G
F
E
D
C
B
A
8 1234567
DATE
DRAWING NO
DESIGNED
REVIEWED BY
P
M s a n t o s g e o v a n n i f a a
APPROVED
DATE
r o t o s p d w g
8 234567
H
G
F
E
D
C
A
B
IS
SU
ED
F
OR
E D
M
ME
1401830
PROJECT ENGINEER, AJW-2E11J
G. SANTOS
THIS DRAWING PRODUCED ON THE ANE REGION AUTOCAD SYSTEM
BANGOR INTERNATIONAL AIRPORT
s i g n b i d d i n g
EASTERN SERVICE AREAATO - TECHNICAL OPERATIONS
TERMINAL ENG.
AJW-2E11J
S N r o t o s p d w g
SITE SURVEY
SITE PHOTOS, PG 3 OF 3
ROOF REHABILIATION PROJECT
BGR-TOWB
GS
GS
BGR-TOWB-1401830-R003 0
BANGOR
SB
PLATFORM MANAGER, AJW-2E11G
R004
CEILING INSULATION
NTS
SCALE:
R004
LINK - DAMAGED CEILING TILES
NTS
SCALE:
R004
LINK - INTERIOR WATER DAMAGE
NTS
SCALE:
R004
LINK - INTERIOR WATER DAMAGE
NTS
SCALE:
R004
LINK - WALL WATER DAMAGE
NTS
SCALE:
R004
LINK - INTERIOR DRYWALL DAMAGE
NTS
FEDERAL AVIATION ADMINISTRATION
DEPARTMENT OF TRANSPORTATION
REV DESCRIPTION JCN
REDLINE
DATE
APVD
SUBMITTED BY APPROVED BY
JCN
DRAWN
CHECKED
REV
ISSUED BY
H
G
F
E
D
C
B
A
8 1234567
DATE
DRAWING NO
DESIGNED
REVIEWED BY
P
M s a n t o s g e o v a n n i f a a
APPROVED
DATE
r o t o s p d w g
8 234567
H
G
F
E
D
C
A
B
IS
SU
ED
F
OR
E D
M
ME
1401830
PROJECT ENGINEER, AJW-2E11J
G. SANTOS
THIS DRAWING PRODUCED ON THE ANE REGION AUTOCAD SYSTEM
BANGOR INTERNATIONAL AIRPORT
s i g n b i d d i n g
EASTERN SERVICE AREAATO - TECHNICAL OPERATIONS
TERMINAL ENG.
AJW-2E11J
S N r o t o s p d w g
SITE PHOTOS, PG 4 OF 4
ROOF REHABILIATION PROJECT
BGR-TOWB
GS
GS
BGR-TOWB-1401830-R004 0
BANGOR
SB
PLATFORM MANAGER, AJW-2E11G
| Sheets and Views |
| G000 COVER SHEET |
| preview |
| G001 INDEX & NOTES |
| preview |
| G002 WORK & LAYDOWN AREA |
| preview |
| SITE LAYOUT |
| WEST ELEVATION |
| G003 SITE SURVEY RESULTS - REFERENCE ONLY |
| preview |
| FACILITY PLAN VIEW |
| CAB ROOF PLAN |
| BASE BUILDING TYP. ROOF CROSS SECTION |
| LINK - TYPICAL CROSS SECTION |
| CAB - TYPICAL ROOF SECTION |
| D001 REPAIR PLAN |
| preview |
| FACILITY PLAN VIEW |
| CAB - PLAN VIEW |
| SOUTH ELEVATION |
| LINK WALL REPAIR(2) |
| D002 REPAIR PLAN (CONT.) |
| preview |
| WORK SHOP ROOF |
| EG BUILDING ROOF(2) |
| A001 NEW WORK - BASE BUILDING |
| FACILITY PLAN VIEW |
| EAST ELEVATION |
| NORTH ELEVATION |
| SOUTH ELEVATION |
| WEST ELEVATION |
| A002 NEW WORK - TOWER CAB |
| preview |
| CAB ROOF PLAN |
| CAB - EAST VIEW |
| TOWER - JUNCTION LEVEL |
| A003 NEW WORK - EG BUILDING |
| preview |
| EG BUILDING ROOF |
| EG BUILDING SOUTH ELEVATION |
| EG EAST ELEVATION |
| EG BLDG CROSS SECTION |
| DOWN-CONDUCTOR |
| AIR TERMINAL CONNECTION |
| A004 NEW WORK - WORK SHOP |
| preview |
| WORK SHOP ROOF(2) |
| WORK SHOP SOUTH ELEVATION(2) |
| A005 DETAILS, SHEET 1 OF 2 |
| preview |
| BASE BUILDING & LINK COPING(2) |
| BASE BUILDING - ROOF EXPANSION JOINT |
| BASE BUILDING - WALL SECTION |
| LINK - ROOF EXPANSION JT AT TOWER |
| LINK - ROOF DRAIN & OVERFLOW DRAIN |
| LINK - CANOPY CROSS SECTION |
| DETAIL - ADHERED SYSTEM |
| LINK FULL REPAIR(2) |
| COPPING AT SCUPPER |
| BASE BUILDING - VENT |
| BASEBUILDING - BOILER BREACH |
| A006 DETAILS, SHEET 2 OF 3 |
| preview |
| CAB - ROOF HATCH LADDER |
| CAB - ROOF HATCH(2) |
| CAB - PARAPET TOP(2) |
| CAB - PARAPET BASE(2) |
| CAB - SCUPPER(2) |
| JUNCTION LEVEL - LOUVER HEAD |
| JUNCTION LEVEL - LOUVER HEAD - SILL |
| STORMPROOF LOUVER(2) |
| A007 DETAILS SHEET 3 OF 3 |
| preview |
| BOILER PIPES_PLAN(3) |
| BOILER PIPE - PROFILE(3) |
| WORK SHOP - FASCIA |
| WORK-SHOP - BOILER |
| EG BLDG CROSS SECTION |
| R001 SITE PHOTOS, PG 1 OF 3 |
| 1 |
| 2 |
| 3 |
| 4 |
| 5 |
| 6 |
| 7 |
| BASE BUILDING SOUTH SIDE |
| R002 SITE PHOTOS, PG 2 OF 3 |
| 09 ABOVE BOILER ROOM |
| 10 BOILER BREACH AND CHIMENY CAP |
| 11 ABOVE BOILER BREACH - NORTHWEST WALL |
| 13 LINK & TOWER FLASHING |
| 12 GUTTER OPENING TYP |
| 15 BASE BUILDING AIR VENT |
| 16 DRAINS TYP |
| 14 LINK COPPING TYP |
| R003 SITE PHOTOS, PG 3 OF 3 |
| CAB - PARAPET WALL & COPING |
| CAB - ROOF HATCH |
| CAB - ROOF TYPICAL FLASHING |
| CAB - PARAPET MOUNTED EQUIPMENT |
| WORK SHOP |
| EG BUILDING |
| CAB - INTERIOR CEILING INSULATION ON DROP CEILING |
| CAB - REATTACH CEILING INSULATION |
| R004 SITE PHOTOS, PG 4 OF 4 |
| LINK - DAMAGED CEILING TILES |
| LINK - WATER DAMAGE |
| CEILING INSULATION |
| LINK - INTERIOR WALL WATER DAMAGE |
| LINK - INTERIOR WATER DAMAGE |
| LINK - INTERIOR DRYWALL DAMAGE |
File details come from the government source that posted it. Updated .