About this file

This document is a set of construction drawings for a water tower repainting project at the Aleda E. Lutz VA Medical Center in Saginaw, Michigan. The project number is 655-26-201, and the work is managed by the Office of Construction and Facilities Management under the U.S. Department of Veterans Affairs.

The project involves the repainting of a 250,000-gallon capacity spheroid-type water tank. Exterior work requires the tank to be washed and overcoated in accordance with NFPA 22 and AWWA D102 standards, with a VA logo updated per provided details. Interior tank work requires complete interior coating removal through full blasting and recoating in accordance with NFPA 22 and AWWA D102, encompassing all interior surfaces, pipes, and the exterior of the dry riser and ladder. Interior dry riser work includes spot repairs and touch-ups as necessary. The coating systems specified include an inside coating system using near-white blast surface preparation followed by Corothane Galvapak 1K at 2.5 mils dry film thickness and Duraplate UHS at 20 mils DFT, and an outer overcoat system using Macropoxy 646 Epoxy, Hi Solids Polyurethane 250, and Fluorokem HS 100. The water tower is located at 1500 Weiss Street, Saginaw, Michigan, and construction documents indicate the work is fully sprinklered.

View the file

Other files for this federal contract opportunity

Show all 15

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

WEISS STREET

EC

G1.1

COVER SHEET

CAMPUS AREA MAP

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Fi le

P at h 6/

/2

:3

9:

P M

CONSTRUCTION

DOCUMENTS

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

321 4 5 6 7 8 9 10

REPAINT WATER TOWER

ALEDA E. LUTZ MEDICAL CTR.

655-26-201

Project Director

Issue date Chkd By JAJ Revisions: Date:

PROJECT NO. 655-26-201 REPAINT WATER TOWER

ALEDA E. LUTZ VA MEDICAL CENTER

DEPARTMENT OF VETERANS AFFAIRS

1500 WEISS ST. SAGINAW, MICHIGAN

PROJECT LOCATION

WATER TOWER DRAWING INDEX

Sheet Number Sheet Title Sheet Description

1 G1.1 COVER SHEET

2 CS1.1 WATER TOWER PLANS & ELEVATIONS

SAGINAW, MICHIGAN

L O C A T I O N M A P

CS1.1

8"

PEDESPHEROID TYPE TANK (250,000 GALLON CAPACITY)

SCALE: 1"=10'

8"

ELEVATION PLAN

3'

1'

-0

TO

P

O F

FO

U

N D

AT

IO

N T

O H

IG

H

W

AT

ER

L

EV

EL

0'

-0

TO

P

O F

FO

U

N D

AT

IO

N T

O L

O W

W

AT

ER

L

EV

EL

ELEVATION 601.25

43'-8" (TANK DIAMETER)

'-0

H

EA

D R

AN

G

E)

H.W.L. ELEVATION 752.25

L.W.L. ELEVATION 721.00

CS501

A

NTS

N O

R

TH

CONCRETE FOUNDATION

PERSONNEL DOOR

CONDENSATE CEILING

9' DIA. PEDESTAL

PLATFORM

TANK ACCESS

MANHOLE

WATER TOWER

FOUNDATION

PEDESTAL

BASE CONE OVERFLOW PIPE

NOTES:

1. EXTERIOR WORK:

EXTERIOR IS TO BE WASHED AND OVERCOATED IN ACCORDANCE WITH NFPA 22 AND

AWWA D102. LOGO TO BE UPDATED PER DETAILS THIS SHEET.

2. INTERIOR TANK WORK:

INTERIOR COATING TO BE "FULL BLASTED" / COMPLETY STRIPPED AND RECOATED IN

ACCORANCE WITH NFPA 22 AND AWWA D102. TO INCLUDE ENTIRE INTERIOR, WALLS,

PIPES, EXTERIOR OF THE DRY RISER AND LADDER.

3. INTERIOR DRY RISER:

CONTRACTOR TO PROVIDE SPOT REPAIRS AND TOUCH UPS AS NECESSARY.

CONTRACTOR TO FIELD VERIFY.

COATING SYSTEMS - BASIS OF DESIGN

1. AWWA: D102 INSIDE COATING SYSTEM NO. 3

· SURFACE PREPARATION: SSPC SP 10 NEAR WHITE BLAST

· COAT 1: COROTHANE | GALVAPAK 1K @ 2.5 MILS DFT

· COAT 2: DURAPLATE UHS @ 20 MILS DFT

2. OUTER OVERCOAT SYSTEM

· SURFACE PREPARATION: SSPC SP 2-3 CLEANING AND POWER TOOL

· COAT 1: MACROPOXY 646 EPOXY @ 2 MILS DFT

· COAT 2: HI SOLIDS POLYURETHANE 250 @ 3 MILS DFT

· COAT 3 (VA LOGO LETTERING): FLUOROKEM HS 100 @ 2 MILS DFT

DETAIL - TANK LOGO PLACEMENT

SCALE: 3/16"=1'-0"

43'-8" (TANK DIAMETER)

'-0

H

EA

D

R

AN

G E)

16'-4 3 16"

'-0

NORTH & SOUTH SIDE

13'-77 8" 13'-77

8"

5' -2

'-1 0"

VA BLUE

WHITE

CS1.1

2'-51 8" 2'-41

4" 2'-107 8"

2'-63 4" 2'-33

8" 2'-43 4"

10'-5 34 " 10 '-6

7 16

8'-1"

8' -1

1 8"

'-5

1 4"

10'-5 12 "

2' -7

15 16 " 2'-8 18 "

2'-95 8"

4'-1 1316 "4' -1

9 16

2'-2"

1'-811 16"

1'-4 9 16"

CS501

DETAIL - TANK LOGO

SCALE: 1/4"=1'-0"

CS1.1

WATER TOWER PLANS & ELEVATION

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Fi le

P at h 6/

/2

:3

9:

P M

CONSTRUCTION

DOCUMENTS

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

321 4 5 6 7 8 9 10

FIRE/SMOKE DAMPER

LOCATIONS

ALEDA E. LUTZ MEDICAL CTR.

655-26-201

Project Director

Issue date Chkd By JAJ Revisions: Date: