VASWT Submittal 230711-053 Plumbing Insulation Tower Riser Approved.PDF
PDF 445 KB Posted
- Attached to
- 655-26-201 Repaint Water Tower Federal contract opportunity
- Solicitation number
- 36C25026R0062
About this file
These are submittal transmittal documents for construction materials and samples related to the Aleda E. Lutz VA Medical Center water tower replacement project (VA Project #655-09-109) in Saginaw, Michigan. The project involves replacing a water tower and bulk oxygen tank, with work performed under Specification Section 230711 for HVAC and Plumbing Insulation.
The submissions document plumbing insulation samples for water tower pipe risers, jacketing samples, and insulation strapping materials manufactured by Trymer® & Insul-Mate®. The first submittal was transmitted by C2AE on March 27, 2012 (Submittal #53) to Kevin Russell, COTR at the medical center, requesting "For Review and Approval" with "No Exception Taken" noted. A resubmittal and sample were subsequently transmitted by Maguire Iron, Inc. on March 7, 2012, to Daniels Building Company (the contractor), addressing paint resubmittal and insulation/jacketing samples. The final approval stamp from the Department of Veterans Affairs, dated March 31, 2012, indicates the samples were "APPROVED" and retained for record, with Kevin S. Russell, PE authorizing the acceptance. All enclosures included physical samples of the specified insulation materials and jacketing for field verification and quality assurance purposes.
View the file
Other files for this federal contract opportunity
Show all 15
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
F:616.454.9415 lnfo@czae.com www,c2ae,com
Transmittal
Project #: 11-0105 Date: March 27,2012 Project: Aleda E.Lutz Medical Center CZAF, Submittal #: 53
Replace Water Tower & Bulk Oxygen Specification Section: 23071I Tank, VA Project #655-09-109 Specification Title: HVAC and Plumbing Insulation
Project Manager: Stephen Dickerson To: Kevin Russell, COTR
Aleda E.Ltttz Medical Center Distribution:
1500 Weiss St Saginaw, MI48602
Enclosures: I Attached E Change Order n Specifications fl Report r Shop Drawings E Under Separate Cover I Other
E Letter tr Submittal Review ! Plans
Ouantitv Descriotion/Document Title I Plumbing insulation for water tower pipe riser sample; plumbing jacketing sample; plumbing insulation straooins
Action Requested:
I For Review and Approval I No Exception Taken n See Comment Sheet for Notations
[J For Your Use E Exception As Noted E Resubmit _Copies for Review n As Requested I Rejected ! Submit Copies for Distribution
I Revise and Resubmit I Return Corrected Prints
! For Bids Due
Notes:
I other
Kristy P. Baisch, Administrative Assistant
C2AE
(If enclosures are not as noted, kindly notifu us at once)
IDANIETS
BUILD ING CO. INC .
Submittal Transmittal
Detailed, Grouped by Each Number
Afeda E. LUE VA Medical Genter Water Tower RelProject # 718-11 Tel: Fax:
Transmitted To: Kelly Jo Homic
C2AE
648 Monroe Ave., Ste. 210 Grand Rapids, Ml 49503 Tel: 616-454-9414 Fax:616-454-9415
Transmitted By: Lori Lenz Daniels Building Company, Inc.
24317 lndoplex Circle Farmington Hil ls, Ml 48335 Tel:248-427-8400 Fax:248-427-84O1 otv
Submittal
0 0 5 3 - - 0 Package No Description
Plumbing Insulation, Jacketing Samples & Strapping
Delivered Via
UPS
Description Notes
230711 - Plumbing Insulation For Water Tower Pipe Riser 9e!pleq 2307 1 1 - Plumbing Jacketing serple 2307 11 - Plumbing Insulation s!r:apptlg
Contact Name Copies Notes
Due Date Package Action
312812012 Review
Tracking Number
Item Action
Review
Transmitted For
Approval
Items Oty 1 1
Review
Review
Cc: Gompany Name
Remarks
1 - - / q - / \J / / ,ry '__
Signed Date
VHASAGRusseK Approved
VHASAGRusseK Text Box Approved samples as enclosed. Samples retained for record.
PO. BOX 1446
SIOUX FALLS. SD 57101
PHONE (605) 334-9749
FAX (605) 334-9752
AFTER HOURS (605) 310-7862
wwwmagulretron,com
WAf,ERTOWER SPECIALISTS - ESTABLISHED 1915
March 7,2012
LoriLenz Daniels Building Company 2843 Hubert Rd Brighton, MI48114
RE: Saginaw, MI 250,000 Gallon Elevated Wator Storage Tank Paint Resubmittal I & Insukfon and Jacketing Sample
Dear Lori, Please find enclosed the above referenced re-submittal and sample for review.
Please notify Brent Stansbury at your convenience if you have any questions or if you require any additional information at (605) 334-9749.
Project Coordinator
Enclosures
Sincerely, Jeff Hitchcock rWater Tanks and Towers . Fabricating o Erecting . Repairing o Painting r New and Used Tanks
MAGUTRE |RON, tNC
PO BOX 1446
1610 N MINNESOTA AVE
stoux FALIS, sD 57104 PHoNE: (60s1334-9749
FAX: (605)334-9752
lST SAMPLE
SAMPTE TRANSMITTAL LETTER
MEDICAL CENTER :
CONTRACTOR:
VA PROJECT:
SPECIFICATION # :
DRAWING #:
MANUFACTURER / BRAND :
RESUBMITTED SAMPTE
ATEDA E. LUTZ VA MEDICAL CENTER
DANIELS BUILDING COMPANY
655-09-109 2307 tl
NA
TRYMER* & INSUL-MATEO
X
SAMPLE DESCRIPTION
RISER PIPE INSUI.ATION AND JACKMNG
CONTMCTOR'S CERTIFICATION :
Contractor has determined or verified all quantities dimensions field construction criteria, materials catalog numbers and similar data, and has coordinated the informatlon within the submittal with the require-ments ofthe contract documents, and assumes full responsibility for so doing.
B SICfPTT{ITI AS NOTED E RTJFCTTD tl stt coMilEf\lT sllEET tm il0TATlsl$ pnhrming df Wbrk In qufe ard satislacWy fietinr