These are submittal transmittal documents for construction materials and samples related to the Aleda E. Lutz VA Medical Center water tower replacement project (VA Project #655-09-109) in Saginaw, Michigan. The project involves replacing a water tower and bulk oxygen tank, with work performed under Specification Section 230711 for HVAC and Plumbing Insulation.

The submissions document plumbing insulation samples for water tower pipe risers, jacketing samples, and insulation strapping materials manufactured by Trymer® & Insul-Mate®. The first submittal was transmitted by C2AE on March 27, 2012 (Submittal #53) to Kevin Russell, COTR at the medical center, requesting "For Review and Approval" with "No Exception Taken" noted. A resubmittal and sample were subsequently transmitted by Maguire Iron, Inc. on March 7, 2012, to Daniels Building Company (the contractor), addressing paint resubmittal and insulation/jacketing samples. The final approval stamp from the Department of Veterans Affairs, dated March 31, 2012, indicates the samples were "APPROVED" and retained for record, with Kevin S. Russell, PE authorizing the acceptance. All enclosures included physical samples of the specified insulation materials and jacketing for field verification and quality assurance purposes.

View the file

Other files for this federal contract opportunity

Show all 15

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

F:616.454.9415 lnfo@czae.com www,c2ae,com

Transmittal

Project #: 11-0105 Date: March 27,2012 Project: Aleda E.Lutz Medical Center CZAF, Submittal #: 53

Replace Water Tower & Bulk Oxygen Specification Section: 23071I Tank, VA Project #655-09-109 Specification Title: HVAC and Plumbing Insulation

Project Manager: Stephen Dickerson To: Kevin Russell, COTR

Aleda E.Ltttz Medical Center Distribution:

1500 Weiss St Saginaw, MI48602

Enclosures: I Attached E Change Order n Specifications fl Report r Shop Drawings E Under Separate Cover I Other

E Letter tr Submittal Review ! Plans

Ouantitv Descriotion/Document Title I Plumbing insulation for water tower pipe riser sample; plumbing jacketing sample; plumbing insulation straooins

Action Requested:

I For Review and Approval I No Exception Taken n See Comment Sheet for Notations

[J For Your Use E Exception As Noted E Resubmit _Copies for Review n As Requested I Rejected ! Submit Copies for Distribution

I Revise and Resubmit I Return Corrected Prints

! For Bids Due

Notes:

I other

Kristy P. Baisch, Administrative Assistant

C2AE

(If enclosures are not as noted, kindly notifu us at once)

IDANIETS

BUILD ING CO. INC .

Submittal Transmittal

Detailed, Grouped by Each Number

Afeda E. LUE VA Medical Genter Water Tower RelProject # 718-11 Tel: Fax:

Transmitted To: Kelly Jo Homic

C2AE

648 Monroe Ave., Ste. 210 Grand Rapids, Ml 49503 Tel: 616-454-9414 Fax:616-454-9415

Transmitted By: Lori Lenz Daniels Building Company, Inc.

24317 lndoplex Circle Farmington Hil ls, Ml 48335 Tel:248-427-8400 Fax:248-427-84O1 otv

Submittal

0 0 5 3 - - 0 Package No Description

Plumbing Insulation, Jacketing Samples & Strapping

Delivered Via

UPS

Description Notes

230711 - Plumbing Insulation For Water Tower Pipe Riser 9e!pleq 2307 1 1 - Plumbing Jacketing serple 2307 11 - Plumbing Insulation s!r:apptlg

Contact Name Copies Notes

Due Date Package Action

312812012 Review

Tracking Number

Item Action

Review

Transmitted For

Approval

Items Oty 1 1

Review

Review

Cc: Gompany Name

Remarks

1 - - / q - / \J / / ,ry '__

Signed Date

VHASAGRusseK Approved

VHASAGRusseK Text Box Approved samples as enclosed. Samples retained for record.

PO. BOX 1446

SIOUX FALLS. SD 57101

PHONE (605) 334-9749

FAX (605) 334-9752

AFTER HOURS (605) 310-7862

wwwmagulretron,com

WAf,ERTOWER SPECIALISTS - ESTABLISHED 1915

March 7,2012

LoriLenz Daniels Building Company 2843 Hubert Rd Brighton, MI48114

RE: Saginaw, MI 250,000 Gallon Elevated Wator Storage Tank Paint Resubmittal I & Insukfon and Jacketing Sample

Dear Lori, Please find enclosed the above referenced re-submittal and sample for review.

Please notify Brent Stansbury at your convenience if you have any questions or if you require any additional information at (605) 334-9749.

Project Coordinator

Enclosures

Sincerely, Jeff Hitchcock rWater Tanks and Towers . Fabricating o Erecting . Repairing o Painting r New and Used Tanks

MAGUTRE |RON, tNC

PO BOX 1446

1610 N MINNESOTA AVE

stoux FALIS, sD 57104 PHoNE: (60s1334-9749

FAX: (605)334-9752

lST SAMPLE

SAMPTE TRANSMITTAL LETTER

MEDICAL CENTER :

CONTRACTOR:

VA PROJECT:

SPECIFICATION # :

DRAWING #:

MANUFACTURER / BRAND :

RESUBMITTED SAMPTE

ATEDA E. LUTZ VA MEDICAL CENTER

DANIELS BUILDING COMPANY

655-09-109 2307 tl

NA

TRYMER* & INSUL-MATEO

X

SAMPLE DESCRIPTION

RISER PIPE INSUI.ATION AND JACKMNG

CONTMCTOR'S CERTIFICATION :

Contractor has determined or verified all quantities dimensions field construction criteria, materials catalog numbers and similar data, and has coordinated the informatlon within the submittal with the require-ments ofthe contract documents, and assumes full responsibility for so doing.

B SICfPTT{ITI AS NOTED E RTJFCTTD tl stt coMilEf\lT sllEET tm il0TATlsl$ pnhrming df Wbrk In qufe ard satislacWy fietinr

File details come from the government source that posted it. Updated .