Drawings 565-21-101 Halls and Walls B and 1 Floors (4).pdf

PDF 32 MB Posted

Attached to
Z1DA--Renovate Halls and Walls Basement and First Floor
Solicitation number
36C24623B0041
Issued by

About this file

This document outlines a federal contract opportunity to renovate halls and walls in a Veteran Affairs medical center. The solicitation number is 36C24623B0041 and is being issued by the Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 6 to renovate the basement and first floor of the Fayetteville Veteran Affairs Medical Center located in Fayetteville, North Carolina. The work includes renovating the halls and walls on these floors. No further details are provided on pricing, response dates, or other requirements.

View the file

Other files

Show all 13

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

Consultant:

B

IM

/2

.9

V

A F a y e tt e v ill e H a lls

W a lls

/2 .9

A v

.r v t

/1

/2

:5

:3

P

M

AI911

INTERIOR RENDERINGS

GUIDON

1221 N. PENNSYLVANIA STREET

INDIANAPOLIS, IN 46202

317.800.6388

HALLS & WALLS 1ST FLOOR

BLDG. 1

2300 RAMSEY ST.

565-21-101

BLDG 1

07/14/2022 DB BA

100% BID DOCUMENTS

FULLY SPRINKLERED

FIRST FLOOR - MAIN ELEVATOR LOBBY

FIRST FLOOR D-WING ELEVATOR LOBBY BASEMENT A-WING ELEVATOR LOBBY

Revisions: Date:

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

Consultant:

B

IM

/2

.9

V

A F a y e tt e v ill e H a lls

W a lls

/2 .9

A v

.r v t

/1

/2

:5

:3

P

M

AI912

INTERIOR RENDERINGS

GUIDON

1221 N. PENNSYLVANIA STREET

INDIANAPOLIS, IN 46202

317.800.6388

HALLS & WALLS 1ST FLOOR

BLDG. 1

2300 RAMSEY ST.

565-21-101

BLDG 1

07/14/2022 DB BA

100% BID DOCUMENTS

FULLY SPRINKLERED

FIRST FLOOR - WAITING AREA

FIRST FLOOR - CONNECTOR

FIRE PROTECTION GENERAL NOTES

1. THE NEW SPRINKLER SYSTEM SHALL BE SIZED IN ACCORDANCE WITH NFPA 13 AND SHALL BE HYDRAULICALLY CALCULATED TO MEET THE REQUIREMENTS OF INTERNATIONAL BUILDING CODE, NFPA, AND APPROVED BY ALL AUTHORITIES HAVING JURISDICTION. THE CONTRACTOR SHALL BE RESPONSIBLE

FOR PROVIDING FLOW TEST DATA TO PERFORM AS A BASIS OF THEIR CALCULATIONS.

2. THE SYSTEM SHALL BE DESIGNED AND BUILT IN A WORKMANLIKE MANNER, IN ACCORDANCE WITH DETAILED DRAWINGS TO BE SUBMITTED FOR APPROVAL. THE WORK SHALL INCLUDE ALL COMPONENTS

REQUIRED TO PROVIDE A COMPLETE SYSTEM.

3. THE FIRE PROTECTION CONTRACTOR SHALL PROVIDE A SET OF SHOP DRAWINGS THAT INCLUDE ALL PIPE SIZES, ELEVATIONS, HEAD LOCATIONS, DIMENSIONS, VALVES, INSPECTOR TESTS, FLOW SWITCHES, TAMPER SWITCHES, ETC.

4. THE FIRE PROTECTION CONTRACTOR SHALL PROVIDE SPRINKLER LAYOUT INCLUDING LOCATION OF

PENDANT HEADS FOR ALL LOCATION IN THIS SCOPE OF WORK.

5. THE SHOP DRAWINGS AND CALCULATIONS IF REQUIRED, SHALL BE SUBMITTED TO OWNER ’ S ENGINEER

AND THESE CALCULATIONS AND DRAWINGS SHALL BE SUBMITTED TO ALL AUTHORITIES HAVING

JURISDICTIONS.

6. SPRINKLER HEADS AND ASSOCIATED MAIN/BRANCH PIPING SHALL BE PROVIDED AND LOCATED IN

ACCORDANCE WITH NFPA 13 AND ALL PREVAILING LOCAL CODES. IT IS THE CONTRACTOR ’ S

RESPONSIBILITY TO CONFIRM LOCATIONS FOR COMPLIANCE WITH THE CODE REQUIREMENTS.

7. THE FIRE PROTECTION CONTRACTOR SHALL VERIFY ALL EXISTING CONDITIONS AT THE PROJECT SITE.

8. SPRINKLER PIPING SHOULD BE ROUTED AS HIGH AS POSSIBLE WHILE STILL COORDINATING WITH OTHER

TRADES. ELEVATION OF SPRINKLER PIPING AND HEAD MUST BE DETERMINED BY PROPOSED OR

EXISTING CEILING HEIGHTS.

9. ALL MATERIAL AND ITS INSTALLATION SHALL BE IN COMPLETE COMPLIANCE WITH ALL APPLICABLE SECTIONS OF THE LATEST EDITION OF NFPA. AND FACTORY MUTUAL GUIDELINES. THE FIRE PROTECTION CONTRACTOR SHALL BE REQUIRED TO COMPLY WITH ALL SPECIAL CONDITIONS SET FORTH BY THE

INSURANCE UNDERWRITER IF AND WHEN REQUIRED BY THE OWNER.

10. THE FIRE PROTECTION CONTRACTOR SHALL FURNISH ALL LABOR, MATERIAL AND EQUIPMENT; AND, PERFORM ALL OPERATIONS NECESSARY FOR THE INSTALLATION OF A COMPLETE FIRE PROTECTION SYSTEM THAT IS READY FOR USE WITHIN THE INTENT OF AND AS INDICATED ON THE DRAWINGS, SPECIFICATIONS AND AS HEREIN SPECIFIED.

11. PROVIDE CUTTING AND PATCHING OF BUILDING AS REQUIRED TO INSTALL NEW WORK.

12. SMALL ITEMS NOT SHOWN OR SPECIFIED, BUT OBVIOUSLY REQUIRED BY GOOD GENERAL PRACTICE TO

COMPLETE THE WORK SHALL BE FURNISHED AND INSTALLED THE SAME AS IF BOTH SHOWN AND

SPECIFIED.

13. BY SUBMITTING A PROPOSAL FOR THIS WORK, THE CONTRACTOR WILL BE HELD TO HAVE EXAMINED THE SITE AND SATISFIED THEMSELVES AS TO EXISTING CONDITIONS UNDER WHICH THEY WILL BE OBLIGED

TO OPERATE OR THAT WILL IN ANY MANNER AFFECT THEIR WORK UNDER THIS CONTRACT. NO

ALLOWANCES SHALL BE MADE SUBSEQUENTLY IN THIS CONTRACT IN BEHALF OF CONTRACTOR OF ANY

ERROR OR NEGLIGENCE ON THEIR PART.

14. WHERE SO INDICATED ON THE PLANS AS PART OF THE PROJECT SCOPE OF WORK, THE FIRE PROTECTION CONTRACTOR SHALL MAKE CONNECTION INTO THE NEW/EXISTING FIRE SERVICE WATER

SYSTEM.

15. THE FIRE PROTECTION CONTRACTOR SHALL SCHEDULE WITH THE VA COR ALL TIE-INS TO EXISTING

SYSTEMS AND PERFORM REQUIRED SHUTDOWN AND RE-INITIALIZATION OF THE EXISTING FIRE

SPRINKLER SYSTEM; THESE SERVICES WILL INCLUDE DRAIN AND REFILL OF THE FIRE SPRINKLER

SYSTEMS IN THE AFFECTED AREAS OF THIS PROJECT WORK SCOPE.

16. ALL FIRE PROTECTION WORK SHALL BE MADE IN ACCORDANCE WITH RULES AND REGULATIONS OF ALL GOVERNING AUTHORITIES, THE OWNER INSURANCE UNDERWRITER AND NFPA 13 AND NFPA 25. THE ENTIRE FIRE PROTECTION SYSTEM FOR THE WORK SCOPE SHOWN ON THESE DESIGN DRAWINGS SHALL BE MADE BY THIS CONTRACTOR IN THE PRESENCE OF AN INSPECTOR FROM THE AUTHORITY HAVING JURISDICTION AND AN OWNER ’ S REPRESENTATIVE. THE FIRE PROTECTION SYSTEM SHALL BE TESTED

AS REQUIRED BY NFPA 13.

17. THROUGH PENETRATION ASSEMBLIES SHALL BE PROVIDED AT EACH OPENING WHERE EXPOSED SPRINKLER PIPING PASS THROUGH RATED WALLS, FLOORS AND PARTITIONS. ALL PIPING PENETRATIONS MUST BE SEALED IN ACCORDANCE WITH “ UL ” LISTING SEALING METHOD AND/OR AS DETAILED IN THESE

CONTRACT DRAWINGS OR SPECIFICATIONS.

18. ALL APPLIANCES AND APPURTENANCES SHALL BEAR LABEL OF UL/FM APPROVED AND LABELED FOR ITS

INTENDED USE.

19. ALL MATERIALS AND EQUIPMENT SHALL BE INSTALLED AND COMPLETED IN A FIRST-CLASS

WORKMANLIKE MANNER AND IN ACCORDANCE WITH THE BEST MODERN METHODS AND PRACTICES.

ANY MATERIALS WHICH SHALL NOT PRESENT AN ORDERLY AND REASONABLY NEAT AND/OR

WORKMANLIKE APPEARANCE SHALL BE REMOVED AND REPLACED WHEN SO DIRECTED BY THE

ARCHITECT OR ENGINEER OF RECORD. THE REMOVAL AND REPLACEMENT OF THIS WORK SHALL BE

DONE WHEN DIRECTED IN WRITING BY THE ARCHITECT, AT THE CONTRACTOR ’ S EXPENSE.

20. PIPE HANGERS SHALL BE OF TYPE FM APPROVED AND UL LISTED.

21. ALL HANGERS SHALL BE FASTENED BY MEANS OF BEAM CLAMPS, CONCRETE INSERTS OR OTHER

APPROVED DEVICES INSTALLED BY THIS CONTRACTOR.

22. SPRINKLER HEAD RATINGS, SPRAY TYPE, AND FINISH SHALL BE AS SPECIFIED ON PROJECT PLANS.

WHERE NOT SPECIFICALLY IDENTIFIED ON PLANS, SPRINKLER HEADS SHALL QUICK RESPONSE TYPE UPRIGHT PENDANT WITH PAINTED COVER PLATE OR AS REQUIRED BY THE OWNER. REGULAR PENDANT HEADS IN FINISHED SPACES SHALL BE CHROME PLATED WITH CHROME PLATED CEILING PLATES UNLESS

OTHERWISE NOTED. NEW HEADS SHALL MATCH EXISTING.

23. THE FIRE PROTECTION CONTRACTOR WILL BE REQUIRED TO COORDINATE ACCEPTANCE FOR VARIATION OF EQUIPMENT LOCATIONS AND EQUIPMENT CONFIGURATIONS WITH THE FIRE MARSHAL, THE LOCAL

JURISDICTION, THE OWNER, AND THE GENERAL CONTRACTOR.

24. THE FIRE PROTECTION CONTRACTOR IS RESPONSIBLE FOR COORDINATING CHANGES IN ELECTRICAL

REQUIREMENTS WITH THE ELECTRICAL CONTRACTOR.

25. VARIATION FROM SPECIFIED PHYSICAL EQUIPMENT APPEARANCE WILL NEED TO BE APPROVED

THROUGH THE ARCHITECT.

26. SYSTEM PIPING WILL BE SUPPORTED AND BRACED WITH HANGERS AND LISTED EARTHQUAKE BRACE ASSEMBLIES IN ACCORDANCE WITH THE INTERNATIONAL BUILDING CODE, ASCE 7 AND NFPA 13.

27. AUTOMATIC SPRINKLER SYSTEM SHALL BE SUPERVISED AND INTERFACE WITH FIRE ALARM SYSTEMS.

28. ONE SET OF STAMPED, APPROVED DRAWINGS SHALL BE ON SITE AT ALL TIMES AND MADE AVAILABLE TO

THE INSPECTOR AND/OR ARCHITECT/OWNER UPON DEMAND.

29. FIRE PROTECTION SYSTEMS SHALL BE INSTALLED BY A CONTRACTOR LICENSED TO PERFORM SUCH

WORK IN THE PROJECT JURISDICTION.

30. AVOID DAMAGING EXISTING SURFACES AND EQUIPMENT AND ASSOCIATED MATERIALS FROM THE SITE.

REPAIR ANY DAMAGE CAUSED DURING WORK AT NO EXTRA COST TO THE OWNER.

31. REPAIR FIRE AND SMOKE RATED PARTITIONS SURROUNDING FIRE ALARM WORK AS SPECIFIED. REFER

TO ARCHITECTURE PLANS FOR LOCATIONS OF SMOKE AND FIRE PARTITIONS.

32. THREADED BUSHING SHALL NOT BE USED.

33. ANY SPRINKLER REMOVED FROM SERVICE FOR ANY REASON (E.G., REMOVED, RELOCATED, ETC.) SHALL BE REPLACED WITH A NEW SPRINKLER HEAD IN ACCORDANCE WITH NFPA 25, SECTION 5.4.1.1.

34. NEW ARMOVERS SHALL BE PROVIDED TO EITHER RELOCATED OR NEW SPRINKLERS AS REQUIRED BY

NFPA 13.

35. SPRINKLER SYSTEM SHOP DRAWINGS SHALL INCLUDE ALL MATERIALS REQUIRED BY NFPA 13 CHAPTER 23.

36. CONTRACTOR SHALL BE RESPONSIBLE FOR ALL CUTTING AND PATCHING OF WALLS AND CEILING AS

MAY BE REQUIRED FOR THE INSTALLATION OF THE NEW FIRE SUPPRESSION SYSTEM.

37. INTERRUPTIONS IN OPERATION OF THE FIRE SUPPRESSION SYSTEM MUST BE SCHEDULED WITH THE OWNER AT LEAST ONE(1) WEEK IN ADVANCE; WITH PROPER NOTICE PROVIDED TO THE EMERGENCY

RESPONSE TEAMS - BOTH INSIDE AND OUTSIDE OF THE FACILITY.

38. WHEN WORK IS BEING PERFORMED IN AREAS THAT MUST CONTINUE OPERATION, CONTRACTOR SHALL KEEP THE AREAS CLEAN AND CLEAR OF OBSTRUCTIONS, AS MUCH AS POSSIBLE, PROVIDE WARNING

SIGNS AS NECESSARY FOR PROTECTION OF OCCUPANTS FROM ASSOCIATED RISKS. REMOVE ALL

DEBRIS AS WORK PROGRESSES.

39. UPON COMPLETION OF THE WORK, THE CONTRACTOR SHALL PRESENT THE OWNER WITH A REPORT CONFIRMING PROPER TESTING OF ALL NEW AND EXISTING DEVICES IN THE PROJECT ZONE; ALONG WITH APPROPRIATE SELECTED TESTING OF THE MAIN FIRE SUPPRESSION SYSTEM TO CONFIRM CONTINUED PROPER OPERATION. A CERTIFICATE OF APPROVAL FROM THE APPROPRIATE AGENCY INSPECTION

AGENT WILL BE REQUIRED PRIOR TO FINAL ACCEPTANCE OF THE PROJECT.

40. THE PIPING SCHEMATIC INDICATED BY THE DRAWINGS REPRESENTS THE SCOPE AND INTENT OF THE FIRE PROTECTION SYSTEM; HOWEVER THE SPRINKLER CONTRACTOR SHALL PROVIDE A COMPLETE SPRINKLER SYSTEM PER NFPA 13 AND LOCAL AUTHORITY HAVING JURISDICTION REQUIREMENTS.

41. LIGHT FIXTURES AND HVAC DIFFUSERS TAKE SPACE PREFERENCE, ADD ADDITIONAL SPRINKLER HEADS AS

REQUIRED TO MEET "COVERAGE REQUIREMENTS".

42. CONTRACTOR SHALL MAINTAIN A CLEAN WORK PREMISE AT ALL TIMES AND SHALL CLEAN CONSTRUCTION

SITE OF ALL HIS DEBRIS AT THE END OF THE DAY AND BEFORE FINAL PAYMENT IS MADE.

43. COORDINATE PLACEMENT OF SPRINKLER HEADS WITH ALL MECHANICAL DUCTS, DIFFUSERS AND

ELECTRICAL LIGHT FIXTURES.

44. THE FIRE PROTECTION CONTRACTOR SHALL INDICATE ON THEIR SHOP DRAWINGS; CEILING TILE

LOCATIONS WITH ALL CEILING MOUNTED FIRE PROTECTION DEVICES.

45. WALL PENETRATIONS THROUGH NON-RATED PARTITIONS SHALL BE PROVIDED WITH A NON-SHRINKING

GROUT OR CAULKING MATERIAL.

46. THE FIRE PROTECTION SYSTEM / AREA OF PROTECTION INDICATED ON THE PLANS IS FOR COORDINATION AND BIDDING PURPOSES ONLY. THE FIRE PROTECTION CONTRACTOR SHALL BE RESPONSIBLE FOR THE

COMPLETE DESIGN

47. ALL PIPING SYSTEMS THAT ARE NOT INTENDED TO BE REUSED SHALL BE REMOVED AND PIPES SHALL BE

CAPPED AS CLOSE TO MAINS AS POSSIBLE.

48. IT IS THE INTENTION OF THE SPECIFICATION AND DRAWINGS TO CALL FOR A COMPLETE AND FUNCTIONAL SYSTEM, INSTALLED AS PER THE APPLICABLE CODES WITH ALL FINISHED WORK TESTED AND READY FOR

OPERATION.

49. THE FIRE PROTECTION CONTRACTOR SHALL NOTIFY THE OWNER, OWNER’S REPRESENTATIVE, FIRE ALARM CONTRACTOR, ARCHITECT AND GENERAL CONTRACTOR ONE WEEK PRIOR TO ANY SHUTDOWN OR

INTERRUPTION OF SERVICE.

50. ALL MATERIALS, PIPING, FITTINGS, VALVES, AND APPLIANCES HEREINAFTER SPECIFIED AND THOSE WHICH ARE ESSENTIAL BUT HAVE NOT BEEN SPECIFIED SHALL BE NEW AND OF THE HIGHEST GRADE AND

QUALITY, FREE FROM DEFECTS AND SUCH AS BREAKS, FLAWS, AND IMPERFECTIONS.

51. CORE DRILL MASONRY WALLS FOR NEW PIPING. SEAL PENETRATIONS AS NECESSARY TO MAINTAIN

INTEGRITY OF EXISTING WALLS.

52. CONTRACTOR SHALL BE RESPONSIBLE FOR ALL CUTTING AND PATCHING OF WALLS AND CEILING AS MAY

BE REQUIRED FOR THE INSTALLATION OF THE NEW FIRE SUPPRESSION SYSTEM.

53. ALL APPLIANCES AND APPURTENANCES SHALL BEAR LABEL OF UL/FM APPROVED AND LABELED FOR ITS

INTENDED USE.

54. LONG RUNS OF PIPE SHALL BE PROVIDED WITH A SUITABLE MEANS TO PERMIT FREE MOVEMENT RESULTING FROM EXPANSION AND CONTRACTION OF PIPE. REDUCTION IN PIPE SIZES SHALL BE MADE

WITH ONE-PIECE REDUCTION FITTINGS.

55. THE FIRE PROTECTION CONTRACTOR IS TO MAINTAIN A SET OF UP TO DATE CONSTRUCTION DOCUMENTS AVAILABLE AT THE PROJECT SITE AT ALL TIMES DURING CONSTRUCTION. THE FIRE PROTECTION CONTRACTOR IS TO INSTRUCT THE OWNER’S REPRESENTATIVE(S) IN THE OPERATION AND MAINTENANCE REQUIREMENTS OF THE COMPLETED BUILDING FIRE PROTECTION SYSTEM AT A TIME AGREED ON BY THE OWNER. THE OWNER’S REPRESENTATIVE(S) SHALL BE PROVIDED WITH AN UP TO DATE CONSTRUCTION

DOCUMENTS AND A COPY OF NFPA 25 PRIOR TO INSTRUCTION BY THIS CONTRACTOR.

56. COORDINATE WITH OTHER WORK, INCLUDING HVAC, PLUMBING PIPING, ELECTRICAL AS NECESSARY TO INTERFACE COMPONENTS OF FIRE SPRINKLER PIPING PROPERLY WITH OTHER WORK. SYSTEM PIPING WILL BE SUPPORTED AND BRACED WITH HANGERS AND LISTED EARTHQUAKE BRACE ASSEMBLIES IN

ACCORDANCE WITH THE NORTH CAROLINA BUILDING CODE, ASCE 7 AND NFPA 13.

57. IT SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR TO REMOVE AND LEGALLY DISPOSE OF

DEMOLISHED MATERIALS UNLESS NOTED OTHERWISE IN THE DRAWINGS.

58. ALL WALL AND FLOOR PENETRATIONS SHALL BE CORE-DRILLED AND SLEEVED.

59. CONTRACTOR SHALL MAINTAIN A CLEAN WORK PREMISE AT ALL TIMES AND SHALL CLEAN CONSTRUCTION

SITE OF ALL HIS DEBRIS AT THE END OF THE DAY AND BEFORE FINAL PAYMENT IS MADE.

60. UNLESS INDICATED OTHERWISE IN THE DRAWINGS OR SPECIFICATIONS, FIRE SUPPRESSION CONTRACTOR IS RESPONSIBLE FOR SEALING ALL FIRE RATED WALL PARTITIONS WITH U.L. LISTED MATERIAL AND

METHODS.

61. WALL PENETRATIONS THROUGH NON-RATED PARTITIONS SHALL BE PROVIDED WITH A NON-SHRINKING

GROUT OR CAULKING MATERIAL AND APPROVED ASSEMBLY.

62. BEFORE SUBMITTING A PROPOSAL FOR THE WORK, EACH BIDDER WILL BE HELD RESPONSIBLE TO HAVE EXAMINED THE EXISTING SITE CONDITIONS FOR THE WORK INCLUDED UNDER THIS CONTRACT. NO ALLOWANCE WILL BE MADE SUBSEQUENTLY IN THIS CONNECTION ON BEHALF OF THE CONTRACTOR FOR

ANY ERROR OR NEGLIGENCE ON HIS PART.

63. THE FIRE SUPPRESSION CONTRACTOR SHALL BE RESPONSIBLE FOR THE COMPLETE DESIGN OF THE FIRE PROTECTION SYSTEM AND SHALL PROVIDE SEALED SHOP DRAWINGS. SPRINKLER SYSTEM PLANS AND CALCULATIONS SHALL BE SEALED BY AN PROFESSIONAL ENGINEER REGISTERED IN THE STATE WHERE THE WORK IS TO OCCUR, OR SEALED BY A NICET LEVEL III OR LEVEL IV SPRINKLER DESIGNER CERTIFIED IN "WATER BASED SYSTEMS LAYOUT". DRAWINGS SHALL BE SEALED IN ACCORDANCE WITH REQUIREMENTS

OF THE LOCAL AUTHORITY HAVING JURISDICTION.

64. ALL HANGERS MUST BE APPROVED TYPE BY NFPA 13. NO SPRINKLER PIPING IS TO BE SUPPORTED FROM ANY MECHANICAL OR ELECTRICAL DEVICES. ALL PIPE SHALL BE SUPPORTED FROM THE BUILDING STRUCTURE IN A NEAT AND WORKMANLIKE MANNER. VERTICAL RISERS SHOULD BE SUPPORTED AT EACH FLOOR LEVEL WITH STEEL PIPE CLAMPS. HANGING PIPES FROM OTHER PIPES WILL BE NOT PERMITTED.

PIPING SHALL BE CAREFULLY COORDINATED BEFORE INSTALLATION WITH OTHER SYSTEMS AND

EQUIPMENT IN CHASES AND OTHER CONGESTED AREAS.MAXIMUM DISTANCES BETWEEN PIPE SUPPORTS SHALL MEET THE REQUIREMENT STATED IN NFPA 13, SECTION 9.2.2 AND TABLE 9.2.2.1(A). TITLED "MAXIMUM

DISTANCE BETWEEN HANGERS (FT-IN)."

65. WATER FLOW IN ONE ZONE SHALL NOT CAUSE FIRE ALARMS IN OTHER ZONES. PROVIDE WATER FLOW

ALARM SWITCHES WITH RETARD MECHANISM.

66. THE CONTROL VALVE UTILIZED IN THE STAIRWELLS ON EACH FLOOR SHOULD BE OF THE INDICATING TYPE THAT IS READILY VISIBLE TO AN OBSERVER AT FLOOR LEVEL AS TO WHETHER THE VALVE IS OPEN OR

CLOSED.

67. PROVIDE A 2" TEST OUTLET ON SHOP DRAWING REMOTE AREA. SEE ENGINEERING DRAWINGS FOR

SUGGESTED LOCATION. COORDINATE EXACT LOCATION WITH FIRE MARSHALL.

68. VERIFY THAT ALL TAMPER SWITCHES AND FLOW SWITCHES ARE CONNECTED TO A U.L. APPROVED FACP

BY THE FIRE DETECTION CONTRACTOR.

69. ALL VALVES SHALL BE MADE TAMPER RESISTANT. ELECTRICAL SUPERVISION SHALL BE REQUIRED ON ALL SPRINKLER CONTROL VALVES. INDICATOR VALVES SHALL BE MADE EASILY READABLE AND READILY

ACCESSIBLE.

70. EACH SPRINKLER ZONES IS TO BE PROVIDED WITH A DEDICATED CONTROL VALVE, TAMPER SWITCH AND

AN INSPECTOR'S TEST.

71. TAMPER SWITCHES ON OS&Y TYPE VALVES MUST NOT DISTORT OR CHANGE SWITCH SETTINGS AS THEIR

BOLTS ARE SECURELY FASTENED. NO "J-BOLT" MOUNTS WILL BE PERMITTED.

72. MAINTAINABILITY

A. EXTERNAL AND INTERNAL PARTS SHALL BE ARRANGED SO THAT WHEN INSTALLED, ALL PARTS REQUIRING MANIPULATION, OBSERVATION, AND/OR MAINTENANCE ARE READILY ACCESSIBLE AND

SAFE FOR OPERATION AND MAINTENANCE PERSONNEL. WHEREVER PRACTICAL, VALVES AND

INSTRUMENTS SHALL BE LOCATED SUCH THAT THEY CAN BE OPERATED AND EASILY ACCESSED FROM

GRADE LEVEL.

B. MAINTAINABILITY SHALL BE INCORPORATED INTO THE DESIGN OF ALL CONTRACTOR SUPPLIED EQUIPMENT. THE PRIMARY MAINTAINABILITY OBJECT SHALL BE TO MINIMIZE THE COMPLEXITY AND TIME REQUIRED FOR MAINTENANCE. THE FOLLOWING GENERAL CRITERIA SHALL BE FOLLOWED TO

ACHIEVE THIS OBJECTIVE:

a. CONTRACTOR SUPPLIED EQUIPMENT SHALL BE LOW MAINTENANCE DESIGN AND SHALL BE EASILY

MAINTAINABLE.

b. CONTRACTOR SUPPLIED EQUIPMENT SHALL BE DESIGNED TO BE MAINTAINED IN PLACE, IF

POSSIBLE, WITH MINIMUM DISASSEMBLY OF SURROUNDING EQUIPMENT AND MINIMUM USAGE OF

TEMPORARY SCAFFOLDING AND HANDLING EQUIPMENT.

73. DEVICES SHOWN ON THIS PLAN ARE NEW, UNLESS OTHERWISE NOTED.

74. DRAWING ARE DIAGRAMMIC AND ARE NOT INTENDED TO SHOW EACH AND EVERY SPRINKLER HEAD, BRANCH PIPING, DEVICES, FITTINGS, VALVES OR COMPLETE DETAIL OF ALL THE WORK TO BE PERFORMED, BUT ARE FOR THE PURPOSES OF ILLUSTRATING THE TYPE OF SYSTEM AND CONDITIONS NECESSARY FOR AN EXPERIENCED TRADESMAN TO LAYOUT HIS WORK. THE CONTRACTOR SHALL BE RESPONSIBLE FOR MAKING SUCH SITE OBSERVATIONS AND MEASUREMENTS AS NECESSARY TO PROPERLY COMPLETE THE

WORK.

76. ADEQUATE HOUSING SHALL BE PROVIDED FOR ALL MATERIAL STORED ON THE JOB. ALL MATERIALS FURNISHED FOR THE PROJECT SHALL BE NEW WITH LISTINGS AND LABELS BY A TESTING AGENCY

APPROVED BY THE STATE OF WHERE THE WORK IS TO BE PERFORMED.

77. INTERRUPTIONS IN OPERATION OF THE FIRE SUPPRESSION SYSTEM MUST BE SCHEDULED WITH THE OWNER AT LEAST ONE(1) WEEK IN ADVANCE; WITH PROPER NOTICE PROVIDED TO THE EMERGENCY

RESPONSE TEAMS - BOTH INSIDE AND OUTSIDE OF THE FACILITY.

78. WHERE WORK IS BEING PERFORMED IN AREAS THAT MUST CONTINUE NORMAL OPERATION, CONTRACTOR SHALL KEEP THE AREAS CLEAN AND CLEAR OF OBSTRUCTIONS, AND AS MUCH AS POSSIBLE, PROVIDE WARNING SIGNS AS NECESSARY FOR PROTECTION OF OCCUPANTS FROM ASSOCIATED RISKS. REMOVE

ALL DEBRIS AS WORK PROGRESSES.

79. UPON COMPLETION OF THE WORK, THE CONTRACTOR SHALL PRESENT THE OWNER WITH A REPORT CONFIRMING PROPER TESTING OF ALL NEW AND EXISTING DEVICES IN THE PROJECT ZONE; ALONG WITH APPROPRIATE SELECTED TESTING OF THE MAIN FIRE SUPPRESSION SYSTEM TO CONFIRM CONTINUED PROPER OPERATION. A CERTIFICATE OF APPROVAL FROM THE APPROPRIATE AGENCY INSPECTION AGENT

WILL BE REQUIRED PRIOR TO FINAL ACCEPTANCE OF THE PROJECT.

80. THE PIPING SCHEMATIC INDICATED BY THE DRAWINGS REPRESENTS THE SCOPE AND INTENT OF THE FIRE PROTECTION SYSTEM; HOWEVER THE SPRINKLER CONTRACTOR SHALL PROVIDE A COMPLETE SPRINKLER

SYSTEM PER NFPA 13 AND LOCAL AUTHORITY HAVING JURISDICTION REQUIREMENTS.

81. REFER TO ARCHITECTURAL REFLECTED CEILING PLAN FOR COORDINATION OF SPRINKLER LOCATIONS WITH CEILING HEIGHTS AND TYPES. LOCATE SPRINKLER HEADS THROUGHOUT ALL AREAS AS REQUIRED BY NFPA 13 AND LOCAL AUTHORITY HAVING JURISDICTION. COORDINATE SPRINKLER HEAD LOCATIONS WITH ALL OTHER TRADES BUT NOT LIMITED TO THE FOLLOWING: LIGHTS, STRUCTURAL SUPPORTS, BOOM, SPECIAL SYSTEMS, SMOKE DETECTORS,FIRE ALARM INDICATION DEVICES, HVAC DIFFUSERS, ETC. OBTAIN

ARCHITECT'S, ENGINEER AND/OR APPROVAL OF ALL SPRINKLER HEAD LOCATIONS.

82. ALL SPRINKLER HEAD PIPE ROUTING AND ELEVATIONS SHALL BE COORDINATED WITH ALL OTHER TRADES INCLUDING BUT NOT LIMITED TO THE FOLLOWING: CEILINGS, STRUCTURAL STEEL AND SUPPORTS, HVAC

DUCTWORK, CABLE TRAYS, CONDUIT, SPECIAL SYSTEMS, CONTROLS, ETC.

83. THE AUTOMATIC SPRINKLER CONTRACTOR IS TO PROVIDE ALL NECESSARY OFFSETS, RISES OR DROPS IN THE PIPING AND AUXILIARY DRAINS AS REQUIRED TO INSTALL COMPLETELY COORDINATED SPRINKLER

SYSTEM.

84. HYDRAULIC CALCULATIONS SHALL BE ORIGINATED AT THE FIRE PUMP AS A MINIMUM FOR FACILITIES THAT

POSSES A FIRE PUMP OR AT LOCATION OF FIRE HYDRANT FLOW TEST.

85. SPRINKLER HEADS SHALL BE LOCATED A MINIMUM OF TWO (2) FOOT DISTANCE FROM A SIDE WALL- MOUNTED OR CEILING MOUNTED DIFFUSER USING AN ORDINARY TEMPERATURE SPRINKLER HEAD.

SPRINKLER HEADS SHALL BE LOCATED A MINIMUM OF THREE (3) FOOT DISTANCE FROM THE FRONT OF A

WALL-MOUNTED HOT AIR DIFFUSER.

86. SPRINKLER HEADS SHALL BE LOCATED A MINIMUM OF 18 INCHES FROM ANY LIGHT FIXTURE USING AN ORDINARY TEMPERATURE SPRINKLER HEAD. IT IS PREFERRED THAT THE CONTRACTOR MAINTAINS A TWO

(2) FOOT SPACING BETWEEN THE LIGHT FIXTURE AND SPRINKLER HEAD.

87. SPRINKLER PLANS AS SHOWN ARE FOR BIDDING PURPOSES ONLY. SPRINKLER CONTRACTOR IS TO OBTAIN CURRENT HYDRANT TEST DATA AND PROVIDE HYDRAULIC CALCULATIONS FOR SYSTEM PIPE SIZING IN ACCORDANCE WITH NFPA 13. CONTRACTOR IS TO SUBMIT SHOP DRAWINGS INDICATING HYDRAULIC CALCULATIONS, PIPING LAYOUT & SIZING. ALL WORK IS TO BE DONE IN ACCORDANCE WITH ALL STATE, LOCAL, GOVERNING AND APPLICABLE CODES.

88. SPRINKLER CONTRACTOR SHALL MAINTAIN SUPERVISION OF EXISTING SPRINKLER SYSTEM AT ALL TIMES

AND SHALL COORDINATE TRANSFER OF SYSTEM WITH OWNER AND ENGINEER OF RECORD.

89. THIS CONTRACTOR IS RESPONSIBLE FOR SUBMISSION OF CONTRACTOR'S MATERIAL AND TEST CERTIFICATE FOR ABOVEGROUND PIPING MEEITNG NFPA 13, FIGURE 28.1 TO THE VA COR AND THE

ENGINEER OF RECORD FOR REVIEW AND COMMENT.

90. THE FIRE PROTECTION CONTRACTOR SHALL NOTIFY THE VA FIRE MARSHAL, THE ENGINEER, THE

ARCHITECT, CONTRACTOR AND GENERAL CONTRACTOR ONE WEEK PRIOR TO ANY SHUTDOWNS OR

INTERRUPTIONS OF SERVICE.

91. THE FIRE SUPPRESSION CONTRACTOR SHALL LOCATE SPRINKLER HEADS IN CEILING AS FOLLOWS. ALL HEADS SHALL BE LOCATED IN THE CENTER OF THE TILES (2'X2') OR IN THE CENTER OF ONE QUADRANT (2'X4') IN GYP/. BOARD CEILING. SPRINKLER HEADS SHALL BE LOCATED IN SYMMETRICAL PATTERN

RELATIVE TO OTHER DEVICES LOCATED IN THE CEILING.

92. THE FIRE PROTECTION CONTRACTOR SHALL NOTIFY THE COR, COR’S REPRESENTATIVE, FIRE ALARM

CONTRACTOR, ARCHITECT AND GENERAL CONTRACTOR ONE WEEK PRIOR TO ANY SHUTDOWN OR

INTERRUPTION OF SERVICE.

93. ALL MATERIALS FURNISHED FOR THE PROJECT SHALL BE NEW WITH LISTINGS AND LABELS BY A TESTING

AGENCY APPROVED BY THE STATE OF WHERE THE WORK IS TO BE PERFORMED.

94. CONFLICTS BETWEEN NATIONALLY RECOGNIZED CODES AND THE VA DESIGN REQUIREMENTS SHOULD A CONFLICT EXIST BETWEEN THE VA REQUIREMENTS AND THE VA ADOPTED CODES, THE REQUIREMENTS OF

NFPA ARE TO BE USED AND NOT THE MOST STRINGENT.

95. ALL MAINS AND CONTROL VALVES, INCLUDING THE WATER SUPPLY CONTROL VALVES, SHALL HAVE A SIGN INDICATING THE PORTION OF THE SYSTEM THAT IS CONTROLLED BY THE VALVE AND THE VALVE SHALL HAVE A IDENTIFICATION / VALVE TAG NUMBER. ALL ISOLATION VALVES SHALL BE ELECTRONICALLY

SUPERVISED BY TAMPER/WATER FLOW SWITCHES AND THEY SHALL INTERFACE WITH THE FIRE

ALARM/FIRE DETECTION SYSTEM.

96. WET PIPE SYSTEMS SHALL MEET THE FOLLOWING REQUIREMENTS:

A. WET PIPE SYSTEM SPRINKLER PIPES SHALL BE PERMITTED TO BE INSTALLED LEVEL MEETING THE

REQUIREMENTS OF NFPA 13, 2022 EDITION, SECTION 16.10.2.

B. ANY TRAPPED PIPING WHERE THE BRANCH LINES OR MAINS ARE LOCATED AT A LEVEL THAT CAN NOT

BE DRAINED AT THE WET PIPE ASSEMBLY DRAIN VALVE(S) SHALL MEET THE REQUIREMENTS OF NFPA 13, 2022 EDITION, SECTION 16.10.5 AND VA FIRE PROTECTION DESIGN MANUAL, SECTION 6.1.P.

C. PROVIDE AUXILIARY DRAIN WITH DRUM DRIP IN AN ACCESSIBLE LOCATION; WHERE, 2-INCH MINIMUM DRAIN SHALL BE PROVIDED AND SLOPED 1/2-INCH PER 10 FEET PER NFPA 13 AND VA FIRE PROTECTION

DESIGN MANUAL REQUIREMENTS.

97. ALL SPRINKLER HEADS SHALL BE QUICK RESPONSE PENDENT TYPE HEADS AND IF IN THE EXISTING BUILDING THERE IS A DIFFERENT TYPE THEN ALL SPRINKLER HEADS SHALL BE OF QUICK RESPONSE TYPE.

CONTRACTOR SHALL VERIFY EXISTING SPRINKLER HEAD TYPE BEFORE WORK BEGINS.

98. THIS CONTRACTOR IS RESPONSIBLE FOR SUBMISSION OF CONTRACTOR'S MATERIAL AND TEST CERTIFICATE FOR ABOVEGROUND PIPING MEEITNG NFPA 13, FIGURE 28.1 TO THE VA COR AND THE

ENGINEER OF RECORD FOR REVIEW AND COMMENT.

99. THE FIRE PROTECTION CONTRACTOR SHALL NOTIFY THE VA FIRE MARSHAL, THE ENGINEER, THE

ARCHITECT, CONTRACTOR AND GENERAL CONTRACTOR ONE WEEK PRIOR TO ANY SHUTDOWNS OR

INTERRUPTIONS OF SERVICE.

100. THE FIRE SUPPRESSION CONTRACTOR SHALL LOCATE SPRINKLER HEADS IN CEILING AS FOLLOWS. ALL HEADS SHALL BE LOCATED IN THE CENTER OF THE TILES (2'X2') OR IN THE CENTER OF ONE QUADRANT (2'X4') IN GYP/. BOARD CEILING. SPRINKLER HEADS SHALL BE LOCATED IN SYMMETRICAL PATTERN

RELATIVE TO OTHER DEVICES LOCATED IN THE CEILING.

101. THE FIRE PROTECTION CONTRACTOR SHALL NOTIFY THE COR, COR’S REPRESENTATIVE, FIRE ALARM

CONTRACTOR, ARCHITECT AND GENERAL CONTRACTOR ONE WEEK PRIOR TO ANY SHUTDOWN OR

INTERRUPTION OF SERVICE.

102. ALL MATERIALS FURNISHED FOR THE PROJECT SHALL BE NEW WITH LISTINGS AND LABELS BY A TESTING

AGENCY APPROVED BY THE STATE OF WHERE THE WORK IS TO BE PERFORMED.

103. CONFLICTS BETWEEN NATIONALLY RECOGNIZED CODES AND THE VA DESIGN REQUIREMENTS SHOULD A CONFLICT EXIST BETWEEN THE VA REQUIREMENTS AND THE VA ADOPTED CODES, THE REQUIREMENTS OF

NFPA ARE TO BE USED AND NOT THE MOST STRINGENT.

104. ALL MAINS AND CONTROL VALVES, INCLUDING THE WATER SUPPLY CONTROL VALVES, SHALL HAVE A SIGN INDICATING THE PORTION OF THE SYSTEM THAT IS CONTROLLED BY THE VALVE AND THE VALVE SHALL HAVE A IDENTIFICATION / VALVE TAG NUMBER. ALL ISOLATION VALVES SHALL BE ELECTRONICALLY

SUPERVISED BY TAMPER/WATER FLOW SWITCHES AND THEY SHALL INTERFACE WITH THE FIRE

ALARM/FIRE DETECTION SYSTEM.

105. WET PIPE SYSTEMS SHALL MEET THE FOLLOWING REQUIREMENTS:

A. A.WET PIPE SYSTEM SPRINKLER PIPES SHALL BE PERMITTED TO BE INSTALLED LEVEL MEETING THE

REQUIREMENTS OF NFPA 13, 2022 EDITION, SECTION 16.10.2.

B. ANY TRAPPED PIPING WHERE THE BRANCH LINES OR MAINS ARE LOCATED AT A LEVEL THAT CAN NOT

BE DRAINED AT THE WET PIPE ASSEMBLY DRAIN VALVE(S) SHALL MEET THE REQUIREMENTS OF NFPA 13, 2022 EDITION, SECTION 16.10.5 AND VA FIRE PROTECTION DESIGN MANUAL, SECTION 6.1.P.

C. PROVIDE AUXILIARY DRAIN WITH DRUM DRIP IN AN ACCESSIBLE LOCATION; WHERE, 2-INCH MINIMUM DRAIN SHALL BE PROVIDED AND SLOPED 1/2-INCH PER 10 FEET PER NFPA 13 AND VA FIRE PROTECTION

DESIGN MANUAL REQUIREMENTS.

106. ALL SPRINKLER HEADS SHALL BE QUICK RESPONSE PENDENT TYPE HEADS AND IF IN THE EXISTING BUILDING THERE IS A DIFFERENT TYPE THEN ALL SPRINKLER HEADS SHALL BE OF QUICK RESPONSE TYPE.

CONTRACTOR SHALL VERIFY EXISTING SPRINKLER HEAD TYPE BEFORE WORK BEGINS.

FIRE PROTECTION ABBREVIATIONS

WET PIPE

WIREGUARD

WELDED

WATER FLOW SWITCH

VOLTS

VALVE

US DEPT OF VETERANS AFFAIRS

UNDERGROUND

UNLESS NOTED OTHERWISE

UPRIGHT

UNDERWRITERS LABORATORY

TO BE DETERMINED

TYPICAL

TAMPER SWITCH

THREADED

TOP OF STEEL

TOP OF CONCRETE

STEEL

SQUARE FEET

SPECIAL

SPECIFICATION

SIDEWALL

SCREWED

SCHEDULE

ROOM

RESIDUAL

REDUCER

POUNDS PER SQUARE INCH

PRESSURE SWITCH

POST INDICATING VALVE

PHASE

PLUMBING

PENDANT

PLUMBING CONTRACTOR

PRE-ACTION VALVE

PRE-ACTION

ORDINARY HAZARD 2

ORDINARY HAZARD I

OUTSIDE SCREW AND YOKE

NATIONAL PIPE THREAD

NOT TO SCALE

NON RISING STEM

NOT APPLICABLE

NOT IN CONTRACT

NORMALLY OPENED

NORMALLY CLOSED

NATIONAL FIRE PROTECTION ASSOCIATION

MALLEABLE IRON

MEZZANINE

MECHANICAL JOINT

LEVEL

LIGHT HAZARD

LIGHTING

INSPECTOR TEST CONNECTION

INSPECTOR

INTERIOR

HEATING VENTING AND AIR CONDITIONING

HOSE CABINET

HOSE VALVE

HOSE REEL

WP

WG

WLD

FS

V

VAL

VA

UNO

UPR

UL

UG

TBD

TYP

TS

THRD

TOS

TOC

STL

SF

SP

SPEC

SW

SCR

SCH

RM

RES

RED

PSI

PS

PIV

PH

PLB

PEND

PC

PAV

PA

OH2

OH1

OS&Y

NPT

NTS

NRS

NA

NIC

NO

NC

NFPA

MI

MEZZ

MJ

LVL

LH

LTG

ITC

INSP

INT

HVAC

HC

HV

HR

HORSEPOWER

HYDRANT

GROOVED

GALLONS PER MINUTE

GROUND

GRADE

GENERAL CONTRACTOR

GALVANIZED

GAUGE

GALLONS

FLOW SWITCH

FIRE PROTECTION

FLOOR

FIRE ALARM

FLANGE

FINISH

FIRE HOSE VALVE

FIRE DEPARTMENT CONNECTION

FIRE ALARM

FACTORY MUTUAL GLOBAL

EXTINGUISHER

EXTERIOR

EXISTING

EXTRA HAZARD 2

EXTRA HAZARD 1

ELEVATION

ELECTRIC

ECCENTRIC

EXTENDED COVERAGE

ELBOW

EACH

EXISTING

DUCTILE IRON

DRY PIPE

DEPT OF DEFENSE

DEPARTMENT

DRAWING

DEGREE

DIAMETER

DRY

DOWN

CONCENTRIC

CONCRETE

CONTINUATION

CHECK

CEILING

CLASS

CAST IRON

BLACK

BUILDING

BOTTOM OF BEAM

BASEMENT

BACKFLOW PREVENTER

BELOW FINISH FLOOR

BELOW

ABOVE FINISHED GRADE

ABOVE FINISHED FLOOR

ABOVE CONCRETE

AUTOMATIC

AUTHORITY HAVING JURISDICTION

AMERICANS WITH DISABILITIES ACT

ABOVE

HP

HYD

GVD

GPM

GND

GR

GC

GALV

GA

GAL

FS

FP

FL

FA

FLG

FIN

FHV

FDC

FA

FM

EXT

EX

EXIST

EH2

EH1

EL

ELEC

ECC

EC

EL

EA

(E)

DI

DP

DOD

DEPT

DWG

DEG

DIA

D

DN

CON

CR

CONT

CHK

CLG

CL

CI

BLK

BLDG

BOB

BSMT

BFP

BFF

BEL

AFG

AFF

A/CONC

AUTO

AHJ

ADA

ABV

SPRINKLER NOTE

STATE, LOCAL, GOVERNING AND APPLICABLE CODES.

ALL WORK IS TO BE DONE IN ACCORDANCE WITH ALL

CERTIFICATION IN WATER BASED SYSTEM LAYOUT.

PROFESSIONAL ENGINEER OR A NICET LEVEL III OR IV

CALCULATIONS ARE TO BE SIGNED & SEALED BY A

LAYOUT & SIZING. SHOP DRAWINGS AND

INDICATING HYDRAULIC CALCULATIONS, PIPING

CONTRACTOR IS TO SUBMIT SHOP DRAWINGS

PIPE SIZING IN ACCORDANCE WITH NFPA 13.

PROVIDE HYDRAULIC CALCULATIONS FOR SYSTEM

OBTAIN CURRENT HYDRANT TEST DATA AND

. SPRINKLER CONTRACTOR IS TOONLYPURPOSES

SPRINKLER PLANS AS SHOWN ARE FOR BIDDING

1. INTERNATIONAL BUILDING CODE, 2021 EDITION

2. NFPA 13 - STANDARD FOR THE INSTALLATION OF SPRINKLER SYSTEMS 2022 EDITION

3. NFPA 25 - STNADARD FOR THE INSPECTION, TESTING, AND MAINTENANCE OF WATER-

BASED FIRE PROTECTION SYSTEMS, 2020 EDITION

4. NFPA 72 - NATIONAL FIRE ALARM & SIGNALING CODE, 2022 EDITION

5. NFPA 101 - LIFE SAFETY CODE, 2021 EDITION

6. NFPA 241 - STANDARD FOR SAFEGAURGING CONSTRUCTION, ALTERATION AND

DEMOLITION OPERATIONS, 2022 EDITION

7. NFPA 291 - RECOMMENDED PRACTICE FOR WATER FLOW TESTING VA FIRE PROTECTION

DESIGN MANUAL, EIGHTH EDITION

8. ANSI A117.1 STANDARD, ACCESSIBLE AND USUABLE BUILDING AND FACILITIES, 2017

EDITION

9. VA FIRE PROTECTION DESIGN MANUAL, EIGHTH EDITION

10. VA FIRE SAFETY REPRESENTATIVE

11. ALL AUTHORITIES HAVING JURISDICTION

ON THIS PROJECT:

SHALL BE REFERENCED FOR THE DESIGN OF THE FIRE PROTECTION SYSTEM

THE FOLLOWING PUBLICATIONS AND AUTHORITIES HAVING JURISDICTION

DESIGN CODES, STANDARDS & PARTIES OF REFERENCE

FIRE PROTECTION DESIGN CRITERIA

LIGHT HAZARD - OFFICES, CUSTOMARY ACCESS AREAS AND

RESTROOMS, AND IT TELECOMMUNICATION ROOMS

0.10GPM/SQ.FT

HYDRAULICALLY MOST DEMANDING AREA:

1/2INCH

225SQ.FT

100GPM

DESIGN DENSITY:

1,500SQ.FT

SPRINKLER ORIFICE:

MAXIMUM COVERAGE/SPRINKLER HEAD:

HOSE STREAM ALLOWANCE INSIDE/OUTSIDE:

K FACTOR: 5.6GPM/(PSI)

½

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

Engineering Discipline:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

Consultant:

B

IM

/2

.9

V A

F a y e tt e v ill e H a lls

W a lls

/2 .9

M E

P v

.r v t

/1

/2

:1

:3

P

M

FX001

FIRE SUPPRESSION - SYMBOLS,

LEGENDS, NOTES AND DRAWING INDEX

CHARLOTTE ENGINEERS, LLP

5838 MONROE ROAD, SUITE 100

CHARLOTTE, NC 28212

704-531-3000

MICHAEL EAVES

GUIDON

1221 N. PENNSYLVANIA STREET

INDIANAPOLIS, IN 46202

HALLS & WALLS

FAYETTEVILLE, NC

565-21-101

BLDG 1

07/14/2022 JRC ERF

100% BID DOCUMENTS

FULLY SPRINKLERED

317-800-6388

FIRE SUPRESSION - DRAWING INDEX

Sheet

Number Sheet Name

FX001 FIRE SUPPRESSION - SYMBOLS, LEGENDS, NOTES AND DRAWING INDEX

FX002 FIRE SUPPRESSION - DETAILS

FX003 FIRE SUPPRESSION - TEMPORARY AND IMPAIRMENT PROCEDURES

FX100A FIRE SUPPRESSION - BASEMENT RENOVATION PLAN - A WING

FX100B FIRE SUPPRESSION - BASEMENT RENOVATION PLAN - B & C WING

FX100C FIRE SUPPRESSION - BASEMENT RENOVATION PLAN - D WING

FX101A FIRE SUPPRESSION - FIRST LEVEL RENOVATION PLAN - A WING

FX101B FIRE SUPPRESSION - FIRST LEVEL RENOVATION PLAN - B & C WING

FX101C FIRE SUPPRESSION - FIRST LEVEL RENOVATION PLAN - D WING

NOTE :

CL

SUSPENDED CEILING TILE

(TYPE & COLOR BY ARCH.)

SPRINKLER HEAD

DRY PENDENT TYPE

WET SYSTEM WITH

DRY PENDENT

BRANCH REMOVE DROP NIPPLE

AND EXISTING

SPRINKLER. REPIPE

PIPING

CONFIGURATION

TYPICAL SPRINKLER HEAD RELOCATION

PIPE

AS SHOWN

ALTERNATE

SPRINKLER HEADS

NTS

SPRINKLER HEAD LOCATION

PIPE SUPPORT AND SEISMIC RESTRAINT -

HORIZONTAL PIPING

SEISMIC RESTRAINT COMPONENTS

(TYPICAL APPLICATIONS)

LC

1'-0"

CLAMP

BAR JOISTS

(AT 45 )

SEISMIC

TRANSVERSE

BRACE

PIPE

CLEVIS HANGER

NOTE:

ON WOOD ROOF

TRUSSES - USE

A CEILING FLANGE

OR ANGLE BRACKET

PROVIDE SEISMIC RESTRAINTS FOR PIPING AS FOLLOWS:

1" & 1-1/2" PIPES: 20 FT. ON CENTER

3/8" THREADED

ROD

BAR JOISTS

2" & 2-1/2" PIPES: 30 FT. ON CENTER

3" , 4" & 6" PIPES: 40 FT. ON CENTER

8" MIN

PART'L ACOUSTIC

CEILING TILE.

PENDANT TYPE

SP. HEAD

2'x2' ACOUSTIC

CEILING TILE.

SP. HEAD

PENDANT TYPE

2'x4' ACOUSTIC

CEILING TILE.

PENDANT TYPE

SP. HEAD

SP. HEAD

PENDANT TYPE

CEILING TILE.

2'x4' ACOUSTIC

1'-0"

1'-0"

1'-0"

2'-0"

1'-0"

1'-0"

TOLCO BAND HANGERS FIG. 200, 2NFPA,

TOLCO FIG. 25 SURGE RESTRAINER

TYPE 1- FOR USE WITH 1" AND 1 1/4"

PIPE AND HANGER.

TYPE 2- FOR USE WITH 1 1/2" AND 2"

PIPE AND HANGER

TOLCO FIG. 25 IS DESIGNED TO BE USED ONLY

TO RESTRICT UPWARD MOVEMENT OF PIPE WITHIN

THE HANGER AS IT OCCURS DURING SPRINKLER

HEAD ACTIVATION OR EARTHQUAKE TYPE ACTIVITY

TOLCO FIG.

909 OR 910

TOLCO U.L. LISTED ATTACHMENTS.

TOLCO FIG. 1000 FAST CLAMPS UNDERWRITERS

LBORATORIES LISTED, MUST BE USED WITH

PROVIDE TOLCO RESTRAINTS OR APPROVED

EQUAL AS REQUIRED.

SHOWN FLAT

TORQUE-TIGHTEN HEX

MINIMUM REQUIRED

NUTS UNTIL LEAF

NOTE: TO ASSURE

SPRING IS FLAT

NOTE:

BAND HANGER

TOLCO

USED IN LONGITUDINAL BRACE

PIPE CLAMP (TOLCO FIG. 4A)

(OPTIONAL METHOD)

LATERAL (TRANSVERSE)

BRACE

TOLCO

TOLCO FIG. 1000

LEAF SPRING

FAST CLAMP

FIG. 1000

909 OR 908

TOLCO FIG.

909 OR 910

TOLCO FIG.

CONFIGURATION AND

NUTS ARE TIGHTENED

ORIENTATION BEFORE

LEAF SPRING

LATERAL (TRANSVERSE) BRACE

FAST CLAMP

TOLCO FIG. 1000

LONGITUDINAL/4 WAY BRACE

(OPTIONAL METHOD)

909 OR 910

TOLCO FIG.

TOLCO FIG. 907

MAX.

TOLCO FIG. 1000

909 OR 910

TOLCO FIG.

3"

(2) FAST CLAMP

TOLCO FIG. 1000

TOLCO FIG. 1000

FASTCLAMP RISER BRACE

TOLCO FIG.

909 OR 910

1'-0"

CLAMP

BAR JOISTS

(AT 45 )

SEISMIC

TRANSVERSE

BRACE

PIPE

CLEVIS HANGER

ON WOOD ROOF

TRUSSES - USE

A CEILING FLANGE

OR ANGLE BRACKET

PROVIDE SEISMIC RESTRAINTS FOR PIPING AS FOLLOWS:

1" & 1-1/2" PIPES: 20 FT. ON CENTER

3/8" THREADED

ROD

BAR JOISTS

2" & 2-1/2" PIPES: 30 FT. ON CENTER

3" , 4" & 6" PIPES: 40 FT. ON CENTER

8" MIN

PART'L ACOUSTIC

CEILING TILE.

PENDANT TYPE

SP. HEAD

2'x2' ACOUSTIC

CEILING TILE.

SP. HEAD

PENDANT TYPE

2'x4' ACOUSTIC

CEILING TILE.

PENDANT TYPE

SP. HEAD

SP. HEAD

PENDANT TYPE

CEILING TILE.

2'x4' ACOUSTIC

1'-0"

1'-0"

2'-0"

1'-0"

WITH TOLCO BAND HANGERS FIG. 200, 2NFPA,

TOLCO FIG. 25 SURGE RESTRAINER

TYPE 1- FOR USE WITH 1" AND 1 1/4"

PIPE AND HANGER.

TYPE 2- FOR USE WITH 1 1/2" AND 2"

PIPE AND HANGER

TO RESTRICT UPWARD MOVEMENT OF PIPE WITHIN

THE HANGER AS IT OCCURS DURING SPRINKLER

HEAD ACTIVATION OR EARTHQUAKE TYPE ACTIVITY

TOLCO FIG.

909 OR 910

TOLCO U.L. LISTED ATTACHMENTS.

TOLCO FIG. 1000 FAST CLAMPS UNDERWRITERS

LBORATORIES LISTED, MUST BE USED WITH

PROVIDE TOLCO RESTRAINTS OR APPROVED

EQUAL AS REQUIRED.

SHOWN FLAT

TORQUE-TIGHTEN HEX

BAND HANGER

TOLCO

USED IN LONGITUDINAL BRACE

PIPE CLAMP (TOLCO FIG. 4A)

(OPTIONAL METHOD)

LATERAL (TRANSVERSE)

BRACE

TOLCO

TOLCO FIG. 1000

LEAF SPRING

FAST CLAMP

FIG. 1000

909 OR 908

TOLCO FIG.

909 OR 910

TOLCO FIG.

CONFIGURATION AND

NUTS ARE TIGHTENED

ORIENTATION BEFORE

LEAF SPRING

LATERAL (TRANSVERSE) BRACE

FAST CLAMP

TOLCO FIG. 1000

LONGITUDINAL/4 WAY BRACE

(OPTIONAL METHOD)

909 OR 910

TOLCO FIG.

TOLCO FIG. 907

MAX.

TOLCO FIG. 1000

909 OR 910

TOLCO FIG.

3"

(2) FAST CLAMP

TOLCO FIG. 1000

TOLCO FIG. 1000

FASTCLAMP RISER BRACE

TOLCO FIG.

909 OR 910

BEAM PIPE HANGER

R C

A B

-1

/2

COMPONENTS:

1. HEX NUT

2. LOCK WASHER

3. HANGER ROD

4. ADJUSTABLE HANGER RING

5. STEEL BEAM OR BAR JOIST

INCHES INCHES INCHES

NOMINAL

PIPE

SIZE

MINIMUM

A DIMENSION

HANGER

TAKEOUT

ROD

DIAMETER

1/2 3 +1/4 3/8

3/4 3 +1/4 3/8

1 3 +1/4 3/8

1 1/4 3 1/4 +0 3/8

1 1/2 3 1/2 +0 3/8

2 3 3/4 -1/4 3/8

2 1/2 4 3/4 -3/4 3/8

3 5 1 3/8

4 5 3/4 -1 1/2 3/8

5 6 1/2 -2 1/4 1/2

6 7 1/2 -3 1/2

8 9 -4 1/2 1/2

DESIGN DATA FOR BEAM HANGER

NTS

NTS

NTS

NTS

STANDARD C-CLAMP PIPE HANGER

DESIGN DATA FOR C-CLAMP HANGER

A

C R

1-1/8" or Bar Joist

6. Steel Beam

Ring

5. Adjustable Hanger

4. Hanger Rod

3. Lock Nut

2. Set Screw

1. C-Clamp

Components:

1/2-69 1/48

1/2-4 1/27 3/46

1/2-3 3/46 3/45

3/8-364

3/8-2 1/25 1/23

3/8-2 1/452 1/2

3/8-1 3/44 1/42

3/8-1 1/241 1/2

3/8-1 1/23 3/41 1/4

3/8-1 1/43 1/21

3/8-1 1/43 1/23/4

3/8-1 1/43 1/21/2

Diameter

Rod

Takeout

Hanger

A Dimension

Minimum

Size

Pipe

Nominal inchesinchesinches

NTS

PIPE SUPPORT AND SEISMIC RESTRAINT -

HORIZONTAL PIPING

BEAM PIPE HANGER

DETAIL OF SPRINKLER BRANCH

PIPING MODIFICATION

CONCRETE PIPE HANGER

CLAMP

BAR JOISTS

(AT 45 )

SEISMIC

TRANSVERSE

BRACE

PIPE

CLEVIS HANGER

NOTE:

ON WOOD ROOF

TRUSSES - USE

A CEILING FLANGE

OR ANGLE BRACKET

PROVIDE SEISMIC RESTRAINTS FOR PIPING AS FOLLOWS:

1" & 1-1/2" PIPES: 20 FT. ON CENTER

3/8" THREADED

ROD

BAR JOISTS

2" & 2-1/2" PIPES: 30 FT. ON CENTER

3" , 4" & 6" PIPES: 40 FT. ON CENTER

R C

A B

-1

/2

Components:

1. Hex Nut

2. Lock Washer

3. Hanger Rod

4. Adjustable Hanger

Ring

5. Steel Beam or Bar Joist inches inches inches

Nominal

Pipe

Size

Minimum

A Dimension

Hanger

Takeout

Rod

Diameter

1/2 3 +1/4 3/8

3/4 3 +1/4 3/8

1 3 +1/4 3/8

1 1/4 3 1/4 +0 3/8

1 1/2 3 1/2 +0 3/8

2 3 3/4 -1/4 3/8

2 1/2 4 3/4 -3/4 3/8

3 5 1 3/8

4 5 3/4 -1 1/2 3/8

5 6 1/2 -2 1/4 1/2

6 7 1/2 -3 1/2

8 9 -4 1/2 1/2

DESIGN DATA FOR BEAM HANGER

BRANCH PIPE

CEILING

REMOVE EXISTING PIPING

AND REPLACE WITH NEW

OR CUT BACK OR EXTEND

PIPING AS INDICATED ON

PLAN

COMPONENTS

1. DROP-IN ANCHOR

2. SPRING CLIP CEILING

PLATE (OPTIONAL)

3. HANGER ROD

4. ADJUSTABLE HANGER RING

5. CONTRACTOR IS RESPONSIBLE

FOR OBTAINING A LICENSED

STRUCTURAL ENGINEER ON ALL

HANGERS THAT PENETRATE

CONCRETE STRUCTURES AND THIS

CONTRACTOR SHALL SUBMIT

CALCULATIONS AND COMPLIANCE

LETTER MEETING NFPA 13

REQUIREMENTS WITH THE

PROFESSIONAL ENGINEER'S SEAL,

SIGNATURE AND DATE. ENGINEER

SHALL BE LICENSED AS A

PROFESSIONAL ENGINEER IN THE

STATE WHERE THE WORK SHALL

OCCUR.

B=5/8"

A

R

C

NOMINAL

PIPE SIZE

MINIMUM A

DIMENSION

INCHES

HANGER

TAKEOUT

ROD

DIAMETER QTY ITEMS

FASTENERS

* DRILL BIT SIZES REQUIRED: 1/2" FOR THE 3/8" ANCHOR AND 5/8" FOR THE 1/2"

ANCHOR. A MINIMUM CONCRETE SLAB THICKNESS OF 4" IS RECOMMENDED.

DESIGN DATA FOR CONCRETE HANGERS

6 1/2 7 1/2

-3 -3 3/4 -5 1/4

1/2

1 1/2" DROP-IN

ANCHOR -

HILTI HDI 1/2*

1/2 3/4 1 1/4 1 1/2 2 1/2

3 1/4 3 1/2 3 3/4 4 3/4 5 3/4

-1/2 -1/2 -1/2 -3/4 -1 -1 1/4 -1 3/4 -2 -2 1/2

3/8

3/8" DROP-IN

ANCHOR -

HILTI HDI 3/8*

ARM OVER WITH RECESSED

PENDENT HEAD

TYPICAL RETURN BEND DETAIL

1"

VARIES

VARIES

VARIES

1"

PER

MANUFACTURER'S

INSTRUCTIONS

CEILING

THREADED

STEEL

PIPING

RECESSED

PENDENT

HEAD WITH CHROME

FINISH AND WHITE

ESCUTCHEON

BRANCH

MAIN

QUICK RESPONSE RECESSED DRY PENDENT FOR ALL DRY SPRINKLER

AREAS OR AS NOTED. PROVIDE CHROME HEAD AND CHROME

ESCUTCHEON.

CEILING

BRANCH PIPE

CEILING

ON PLAN

PIPING AS INDICATED

OR CUT BACK OR EXTEND

AND REPLACE WITH NEW

REMOVE EXISTING PIPING

DETAIL OF SPRINKLER BRANCH PIPING

MODIFICATION

NTS

NTS

NTS

NTS

NTS

NTS

NTS

CEILING TILE

SUSPENDED T-BAR GRID

ADJUSTABLE HUB

1" NPT THREADS TO

ANSI B1.20.1

TYPE 304 SS

SCH. 40 PIPE

TYPE 304 SS CORRUGATED

HOSE, 1" TRUE-BORE

INTERNAL DIAMETER, TYPE

304 SS BRAID SLEEVE

TYPE 304 SS OUTLET SPUD WITH

1/2" INCH THREAD FEMALE NPT

THREADS TO ANSI B1.20.1

QUICK RESPONSE TYPE

RECESSED PENDENT

FOR LAY-IN CEILINGS

TYPICAL RECESSED SPRINKLER FLEX

RETURN BEND DETAIL

BRANCH

LINE

FLEXHEAD

SPRINKLER

DROP

CEILING GRID

MOUNTING

BRACKET

NTS

BRANCH PIPE

CEILING

ON PLAN

PIPING AS INDICATED

OR CUT BACK OR EXTEND

AND REPLACE WITH NEW

REMOVE EXISTING PIPING

DETAIL OF SPRINKLER BRANCH PIPING

MODIFICATION

NTS

SPRINKLER HEAD DETAIL

REDUCER

1" DROP NIPPLE

NEW SPRINKLER HEAD

CEILING PLATE

SUSPENDED CEILING

EXISTING

BRANCH

LINE

INCREASER

REMOVE EXISTING

SPRINKLER HEAD

AND

REPIPE AS

SHOWN

NTS

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

Engineering Discipline:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

Consultant:

B

IM

/2

.9

V A

F a y e tt e v ill e H a lls

W a lls

/2 .9

M E

P v

.r v t

/1

/2

:1

:3

P

M

FX002

FIRE SUPPRESSION - DETAILS

CHARLOTTE ENGINEERS, LLP

5838 MONROE ROAD, SUITE 100

CHARLOTTE, NC 28212

704-531-3000

MICHAEL EAVES

GUIDON

1221 N. PENNSYLVANIA STREET

INDIANAPOLIS, IN 46202

HALLS & WALLS

FAYETTEVILLE, NC

565-21-101

BLDG 1

07/14/2022 JRC ERF

100% BID DOCUMENTS

FULLY SPRINKLERED

317-800-6388

PROCEDURES FOR DRAINING WET

PIPE SYSTEM

1. TO DRAIN A WET PIPE SYSTEM THE PROCEDURE TO BE PERFORMED AND

SUBMITTED TO THE ARCHITECT, ENGINEER, AND OWNER'S

REPRESENTATIVE SHOULD INCLUDE BUT NOT LIMITED TO THE

FOLLOWING.

1.1. CLOSE ALL SPRINKLER CONTROL VALVES.

1.2. TAG ALL CLOSED VALVES.

1.3. OPEN MAIN DRAIN VALVES AND AUXILIARY DRAINS ALLOWING THE

SYSTEM FOR 100% COMPLETE DRAINAGE.

1.4. WHEN THE WATER HAS BEEN COMPLETELY DRAINED, CLOSE THE

MAIN DRAIN AND AUXILIARY DRAIN VALVES. WHEN THE WATER

HAS STOPPED FLOWING, CHECK ALL CONTROL VALVES TO BE

SURE THEY ARE TIGHTLY SHUT; ANY MALFUNCTION CONTROL

VALVES SHOULD BE REPAIRED AND/OR REPLACED IMMEDIATELY

AS DEEMED APPLICABLE.

1.5. CHECK FOR WATER TRAPPED AT ALL LOW POINTS IN PIPING THAT

LACK AUXILIARY DRAINS; REMOVE DRAIN AND REPLACE SUCH

PIPING.

1.6. ONCE ABOVE ITEM ARE CONFIRMED WITH 100% CERTAINTY THE

CONTRACTOR SHALL PERFORM ALL NEW INSTALLATIONS.

1. MINIMUM REQUIREMENTS

A. THE CONTRACTOR SHALL ENACT MEASURES THAT SHALL BE TAKEN DURING THE IMPAIRMENT

TO ENSURE THAT INCREASED RISKS ARE MINIMIZED AND THE DURATION OF THE IMPAIRMENT IS

LIMITED.

B. THE CONTRACTOR SHALL NOTIFY IN WRITING TO THE ARCHITECT, ENGINEER, OWNER AND ANY

JURISDICTION HAVING AUTHORITY OF THE PLANNED IMPAIRMENT, PROCEDURES DURING THE

IMPAIRMENT, TESTING RE-COMMISSIONING OF THE PRE-ACTION FIRE PROTECTION/FIRE ALARM

SYSTEMS FOR PROTECTION OF THE AFFECTED LOCATIONS WITHIN THE SCOPE OF WORK

SUITE.

C. THE CONTRACTOR THROUGH THE OWNER SHALL PREPARE AND SUBMIT TO THE OWNER FOR

OWNER'S DISTRIBUTION TO THE EMPLOYEES IN THE AREA OF THE IMPAIRMENT SHALL BE

PROVIDED WITH INFORMATION ON ALTERNATE FIRE PROTECTION THAT WILL BE AVAILABLE.

D. THE SUSPENSION OF ALL NON-ESSENTIAL HOT WORK PERMITS UNTIL THE CONCLUSION AND

REACTIVATION OF THE PRE-ACTION FIRE SUPPRESSION SYSTEM AND INTERFACING FIRE

DETECTION SYSTEM.

2. FIRE PROTECTION IMPAIRMENT PLAN

A. A FIRE PROTECTION IMPAIRMENT PLAN SHOULD BE DEVELOPED AND IMPLEMENTED BEFORE

AUTHORIZATION IS GIVEN, THE IMPAIRMENT COORDINATOR SHOULD VERIFY THAT THE

FOLLOWING PROCEDURES HAVE BEEN IMPLEMENTED:

• THE EXTENT AND EXPECTED DURATION OF THE IMPAIRMENT THAT HAS BEEN DETERMINED.

• THE AREA OF THE BUILDING THAT WILL BE AFFECTED HAS BEEN INSPECTED AND THE

INCREASED RISKS DETERMINED.

• RECOMMENDATIONS HAVE BEEN SUBMITTED TO THE ARCHITECT, ENGINEER AND OWNER

OR OWNER'S REPRESENTATIVE TO MITIGATE ANY INCREASED RISKS.

• WHERE A REQUIRED FIRE PROTECTION SYSTEM IS OUT OF SERVICE FOR MORE THAN TEN

HOURS IN A 24 HOUR PERIOD THE CONTRACTOR & OWNER SHALL ARRANGE FOR THE

FOLLOWING:

• AN APPROVED FIRE WATCH.

• ESTABLISHMENT AND IMPLEMENTATION OF AN APPROVED PROGRAM TO ELIMINATE

POTENTIAL IGNITION SOURCES AND LIMIT OF THE AMOUNT OF COMBUSTIBLES IN THE

AREA OF CONSTRUCTION.

• ASSIGN PERSONNEL TO TRANSMIT FIRE ALARMS TO THE OWNER'S HOSPITAL

COORDINATOR WHERE THE MAIN FIRE ALARM PANEL IS BEING MONITORED FOR 24/7

COVERAGE.

3. TAG IMPAIRMENT SYSTEM

A. A TAG SHALL BE USED TO INDICATE THAT A SYSTEM OR PART THERE OF, HAS BEEN REMOVED

FROM SERVICE. THE CONTRACTOR SHALL PLACE TAGS ON ALL AFFECTED COMPONENTS, E.G.,

TAMPER SWITCHES, VALVES, FIRE ALARM ANNUNCIATOR DEVICES, ETC., PRIOR TO THE

COMMENCEMENT OF ANY WORK.

B. THE TAG SHALL BE POSTED AT EACH FIRE PROTECTION CONNECTION AND SYSTEM CONTROL

VALVE AND OTHER LOCATION REQUIRED BY THE OWNER'S REPRESENTATIVE OR ANY AND ALL

AUTHORITIES HAVING JURISDICTION, INDICATING WHICH SYSTEM, OR PART THERE OF, HAS

BEEN REMOVED FROM SERVICE.

• THE SUPERVISORS IN THE AREA TO THE AFFECTED AREA HAS BEEN NOTIFIED.

• THE FIRE DEPARTMENT HAS BEEN NOTIFIED.

• A TAG IMPAIRMENT SYSTEM HAVE BEEN IMPLEMENTED.

• ALL NECESSARY TOOLS, EQUIPMENT, MATERIAL AND APPURTENANCES ARE LOCATED AND

ASSEMBLED ON THE IMPAIRMENT SITE.

4. RESTORING SYSTEMS TO SERVICE

A. WHEN ALL IMPAIRED EQUIPMENT IS RESTORED TO NORMAL WORKING ORDER, THE ARCHITECT/

ENGINEER SHALL VERIFY THAT THE CONTRACTOR HAS IMPLEMENTED THE FOLLOWING

PROCEDURES:

• ALL NECESSARY INSPECTION HAVE BEEN CONDUCTED FOLLOWING NFPA 13, 25 AND 72

REQUIREMENTS IN ORDER TO VERIFY THAT THE AFFECTED SYSTEM ARE OPERATION.

CONTRACTOR SHALL SUBMIT ALL REQUIRED RECORDS AND RECORDS SHALL INDICATE THE

PROCEDURE PERFORMED, THE ORGANIZATION THAT PERFORMED THE WORK, RESULTS

AND THE DATE.

• OPEN ALL VALVES THAT WERE SECURED DURING THE IMPAIRMENT.

• REMOVE IMPAIRMENT TAG ONCE VALVES ARE OPEN.

• CONDUCT A DRAIN TEST IN THE WIDE OPEN POSITION.

• ENSURE THE FIRE PROTECTION SYSTEM IS PLACED BACK TO "AUTOMATIC" SERVICE.

• RESET FIRE ALARM SYSTEM AND NOTIFY OWNER'S REPRESENTATIVE AND FIRE ALARM

COMPANY THAT MONITORS THE OWNER'S MAIN FIRE ALARM PANEL ON 24/7 COVERAGE.

• ARCHITECT, ENGINEER AND OWNERS REPRESENTATIVE HAVE BEEN ADVISED THAT THE

FIRE PROTECTION AND FIRE DETECTION SYSTEM THAT WAS IMPAIRED HAS BEEN

RESTORED.

• THE OWNER'S REPRESENTATIVE OR DESIGNATED REPRESENTATIVE, FIRE ALARM COMPANY

WHO MONITORS THE MAIN FIRE ALARM PANEL FOR 24/7 COVERAGE AND ALL OTHER

JURISDICTIONS HAVE BEEN ADVISED THAT BOTH FIRE PROTECTION SYSTEMS IS RESTORED.

• THE IMPAIRMENT TAG HAS BEEN REMOVED.

PROCEDURES FOR IMPAIRMENT TO THE FIRE PROTECTION

SYSTEM

FIRE WATCH PROCEDURES AND REQUIREMENTS

A. THE FIRE WATCH PERSONNEL SHALL BE TRAINED TO UNDERSTAND THE INHERENT HAZARDS OF THE

WORK SITE AND OF THE HOT WORK TO OCCUR.

B. THE FIRE WATCH SHALL ENSURE THAT SAFE CONDITIONS ARE MAINTAINED DURING OUTAGE OF THE

FIRE ALARM/FIRE SUPPRESSION SYSTEM AND/OR DURING THE OCCURRENCE OF HOT WORK

OPERATION.

C. THE FIRE WATCH SHALL HAVE THE AUTHORITY TO STOP HOT WORK OPERATIONS IF UNSAFE

OPERATIVE DEVELOPS.

D. THE FIRE WATCH SHALL HAVE FIRE EXTINGUISHING EQUIPMENT READILY AVAILABLE AND TRAINED IN

ITS USE, E.G., FIRE EXTINGUISHERS.

E. THE FIRE WATCH SHALL BE FAMILIAR WITH OWNER'S FACILITIES AND PROCEDURES FOR SOUNDING

AN ALARM IN THE EVENT OF A FIRE.

F. THE FIRE WATCH SHALL WATCH FOR FIRES IN ALL EXPOSED AREAS AND TRY TO EXTINGUISH A FIRE ONLY WHEN THE FIRES ARE OBVIOUSLY WITHIN THE CAPACITY OF THE AVAILABLE EXTINGUISHING EQUIPMENT. IF THE FIRE WATCH DETERMINES THAT THE FIRE IS NOT WITHIN THE CAPACITY OF THE EQUIPMENT THE FIRE WATCH SHALL SOUND AN ALARM IMMEDIATELY (E.G.,INITIATE A MANUALLY ACTUATED ALARM INDICATING DEVICE THAT IS OUTSIDE OF THE CONSTRUCTION AREA DURING THE DISRUPTION OF THE FIRE ALARM/DETECTION WITHIN THE CONSTRUCTION WORK SCOPE OR WITHIN THE CONSTRUCTION WORK SCOPE IF THE FIRE ALARM/DETECTION SYSTEM HAS BEEN ACTIVATED).

G. BEFORE STARTING ANY HOT WORK, CONTRACTORS AND THEIR OWNERS SHALL DISCUSS THE

PLANNED PROJECT COMPLETELY INCLUDING THE TYPE OF HOT WORK TO BE CONDUCTED AND THE HAZARDS IN THE AREA WITH THE ASSOCIATED PLAN OF ACTION, IN ORDER, TO PROVIDE EQUIVALENT

SAFETY MEASURES TAKEN DURING THE FIRE DETECTION OR FIRE SUPPRESSION IMPAIRMENT.

FIRE PROTECTION DEMOLITION GENERAL NOTES

A. EXISTING FIRE SPRINKLERS SHALL REMAIN IN SERVICE AS LONG AS POSSIBLE, WHILE DEMOLITION WORK IS IN PROGRESS. ANY DISRUPTIONS IN THE FIRE SPRINKLER SYSTEM SERVICE SHALL BE

PROVIDED WITH AN APPROVED FIRE WATCH OR STANDBY PERSONNEL.

B. REMOVE ALL EXISTING FIRE SPRINKLERS IN THE AREAS INDICATED ON THIS SHEET AND CUT AND CAP THE PIPING BACK TO THE CONNECTION OF THE ARM OVER . FOR FLEXIBLE HOSE CONNECTIONS, REUSE OF THE FLEXIBLE HOSE IS AT THE CONTRACTOR'S RISK; CAP THE OPEN PIPE AT THE FLEXIBLE HOSE

CONNECTION TO THE SPRINKLER PIPING.

C. EXISTING FIRE SPRINKLER SYSTEM SHALL REMAIN IN SERVICE AS LONG AS POSSIBLE WHILE THE

DEMOLITION WORK IS IN PROGRESS.

D. FIRE SUPPRESSION SPRINKLERS SHALL BE REPLACED, RELOCATED AND/OR ADDED IN ACCORDANCE

WITH THE REQUIREMENTS FOR NFPA 13.

E. EXISTING FIRE SUPPRESSION SUPPLY SHALL BE DRAINED PRIOR TO ANY DEMOLITION WORK ON THE WET PIPE SPRINKLER SUPPLY FROM THE INDIVIDUAL FLOOR CONTROL VALVE TO THE MOST REMOTE

SPRINKLER HEAD.

F. EXISTING FLOOR CONTROL VALVE SHALL BE SECURED / CLOSED FOR DEMOLITION AND NEW WORK.

G. ALL WORK SHALL BE PERFORMED SO AS TO NOT INTERRUPT SERVICE TO THE ENTIRE AFFECTED FLOOR.

THE CONTRACTOR SHALL PROPERLY NOTIFY THE VA COR AS APPLICABLE A MINIMUM OF 1 WEEK IN

ADVANCE BEFORE PROCEEDING WITH THIS WORK.

H. REMOVE ALL UNUSED AND DEMOLISHED EQUIPMENT AND ASSOCIATED MATERIAL FROM THE SITE.

ABANDONING UNUSED PORTIONS WILL NOT BE ACCEPTABLE. VA COR SHALL HAVE THE RIGHT OF REFUGE OWNERSHIP OF ALL DEMOLISHED AND UNUSED PORTION OF EQUIPMENT AND MATERIALS.

I. AVOID DAMAGING EXISTING SURFACES AND EQUIPMENT AND ASSOCIATED MATERIALS FROM THE SITE.

REPAIR ANY DAMAGE CAUSED DURING WORK AT NO EXTRA COST TO THE VA COR.

J. ALL SYSTEMS ARE TO BE LEFT IN SERVICE PRIOR TO THE END OF EACH WORKDAY.

K. REMOVE ANY CEILING TILES, GRID, AND LIGHT FIXTURES REQUIRED TO ACCOMPLISH THE WORK.

REPLACE SAME AFTER THE INSTALLATION IS COMPLETE. IT IS THE CONTRACTOR’S RESPONSIBILITY TO

REPLACE ANY ITEMS DAMAGED DURING CONSTRUCTION.

L. MODIFY EXISTING SPRINKLER SYSTEM, RELOCATE AND/OR PROVIDE ADDITIONAL SPRINKLERS, PIPING, HANGERS, ETC., COORDINATE WITH WALLS, CEILINGS, LIGHTS, DIFFUSERS, STRUCTURE, OBSTRUCTIONS, ETC., IN AREAS AFFECTED BY THE SCOPE OF WORK.

M. REMOVE ALL ABANDONED PIPING, WET SPRINKLERS, FITTINGS, HANGERS, ETC., FROM THE PROJECT

LOCATION. DISPOSE OF ALL MATERIAL LEGALLY TO AN APPROVED DISPOSAL SITE.

N. THE CONTRACTOR SHALL FIELD VERIFY ALL EXISTING ELECTRICAL LINES, PLUMBING LINES, DUCTWORK OR MECHANICAL PIPING LOCATED IN THE CEILING SPACE, WALLS OR FLOOR PRIOR TO SAW CUTTING OR ANY CORE DRILLING. IT IS THE CONTRACTOR’S RESPONSIBILITY TO REPAIR SUCH ITEMS DAMAGED.

O. FIRE SPRINKLER SYSTEM(S) NOT ASSOCIATED WITH THE DEMOLITION SHALL BE LEFT IN SERVICE AS

APPLICABLE.

P. COORDINATE SPRINKLER SYSTEM MODIFICATIONS TO MINIMIZE SYSTEM IMPAIRMENT. PROVIDE FIRE WATCH AND INTERIM FIRE PROTECTION MEASURES WHERE REQUIRED BY THE AUTHORITY HAVING

JURISDICTION OR THE VA COR.

Q. ALL SHUTDOWNS SHALL BE COORDINATED AND APPROVED THROUGH THE COR'S REPRESENTATIVE AND SHALL REQUIRE A MINIMUM OF 15 DAYS ADVANCED NOTICE, THIS TIME LENGTH MAY BE LONGER OF

SHORTER FOR SOME SHUTDOWNS AND SHALL BE AT THE VA COR'S DISCRETION. DRAINING AND

REFILLING OF THE EXISTING SYSTEM IS A RESPONSIBILITY OF THE CONTRACTOR.

R. ALL DISRUPTIONS IN THE FIRE SUPPRESSION SYSTEM SHALL BE COMPENSATED WITH AN APPROVED

FIRE WATCH AND STANDBY PERSONAL.

TEMPORARY FIRE ALARM, FIRE EXTINGUISHERS AND FIRE SUPPRESSION REQUIREMENTS

A. THE CONTRACTOR SHALL BE REQUIRED TO HAVE AN OVERALL FIRE SAFETY PROGRAM THAT SHALL

INCLUDE:

B. GOOD HOUSEKEEPING

C. FIRE PROTECTION SERVICES AS FOLLOWS:

a. DURING DEMOLITION OF EXISTING SCOPE OF WORK AREA OF EXISTING SYSTEMS DURING

DEMOLITION SHALL BE KEPT FULLY OPERATIONAL AS LONG AS FEASIBLY POSSIBLE AND KEEP

DISRUPTIONS TO FIRE ALARM AND FIRE SPRINKLER SYSTEM SHALL BE KEPT TO A MINIMUM.

• COORDINATE REQUIREMENTS AND RESPONSIBILITIES WITH VA FIRE SAFETY REPRESENTATIVE ON RESPONSIBILITIES OF FIRE FIGHTING OR CONTACTING OF LOCAL FIRE…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .