This document contains an asbestos and hazardous materials survey report for the planned renovation of halls and walls in the basement and first floor of Building 1 at the Fayetteville Veteran Affairs Medical Center in Fayetteville, North Carolina. The report summarizes the results of an inspection conducted on January 31, 2022, which found no asbestos-containing materials or lead-based paint in the renovation areas. A total of 240 fluorescent light tubes and 16 exit light batteries were identified as universal waste that will require proper handling and disposal. Related solicitation number 36C24623B0041 from the Department of Veterans Affairs seeks renovation services for the basement and first floor areas, with an emphasis on abatement of identified universal wastes and compliance with all applicable regulations for hazardous material handling and removal.
View the file
Other files
Show all 13
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
35% SCHEMATIC DESIGN SUBMISSION
ASBESTOS & HAZMAT MATERIALS SUMMARY
FAYETTEVILLE VA MEDICAL CENTER – FAYETTEVILLE, NC
BUILDING 1 HALLS AND WALLS PROJECT 550-21-101
Date: February 23, 2022
Items: Summary Results of Asbestos & HazMat, Site Visit, Visual Inspection, Lab Results
Site Visit: January 31, 2022
Inspectors: Brett Brumbaugh, Castle Hill Associates
Findings: Universal Wastes are present in the renovation areas No asbestos containing materials are present No lead-based paint was identified in the areas
Universal Waste Materials Summary
Hazardous Materials Locations Quantity
Fluorescent tubes & CFL Bulbs Basement and 1st floors 240 fixtures
Batteries in exit light fixtures Basement and 1st floors 16 fixtures
35% SCHEMATIC DESIGN SUBMISSION
ASBESTOS & HAZMAT MATERIALS SUMMARY
FAYETTEVILLE VA MEDICAL CENTER – FAYETTEVILLE, NC
BUILDING 1 HALLS AND WALLS PROJECT 550-21-101
Estimator: Brett Brumbaugh
Notes: Based on 2022-23 construction and bidding (normal working hours)
EXCLUDES:
• Overtime or shift work.
INCLUDES:
• Bonds, insurance, contractor overhead and profit
• Prevailing wage rates for Fayetteville, NC
Cost Index: North Carolina
Description Material Quantity Unit Cost Amount
HazMat Removal
02 84 16 Fluorescent tubes removal (EA) 240 $6.00 $1,440.00
02 84 16 Backup battery removal/disposal (EA) 16 $50.00 $800.00
TOTAL COST ESTIMATE $2,240.00
ASBESTOS & LEAD PAINT SAMPLING REPORT
for
FAYETTEVILLE VA MEDICAL CENTER
FAYETTEVILLE, NC
PROJECT:
BUILDING 1 – BASEMENT & 1st FLOOR
HALLS AND WALLS PROJECT
PROJECT 565-21-1021
INSPECTION DATE:
JANUARY 31, 2022
CONSULTANT:
CASTLE HILL ASSOCIATES, LLC
1197 FARNSWORTH RD., UNIT E
WATERVILLE, OH 43566
567-952-0212 www.CASTLEHILLASSOCIATES.com
TABLE OF CONTENTS
• ASBESTOS & LEAD PAINT SAMPLING SUMMARY
• ABESTOS BULK SAMPLING DESCRIPTIONS AND LAB RESULTS
• LEAD XRF SAMPLING RESULTS
• ASBESTOS LABORATORY REPORT
• ASBESTOS LABORATORY CERTIFICATIONS
• INSPECTOR CERTIFICATIONS
APPENDIX A – 2019 ASBESTOS REINSPECTION FOR BUILDING 1
ASBESTOS & LEAD-BASED PAINT SURVEY REPORT
PROJECT 565-21-101
ASBESTOS INSPECTION SUMMARY
On January 31, 2022, Brett Brumbaugh of Castle Hill Associates performed an asbestos survey and lead XRF testing prior to the planned renovations in Building 1 on the basement and first floors of the Fayetteville VAMC in Fayetteville, NC. Bulk samples were collected of suspect asbestos containing materials that had not been previously sampled during previous asbestos surveys in the building. There were 22 bulk samples taken as part of this survey with the materials identified in the report included in this submission.
The asbestos bulk sampling conducted as part of this project was based upon the appearance, texture, and location of the suspect materials. All bulk samples were analyzed utilizing current EPA methods for PLM (Polarized Light Microscopy) by EMSL Analytical in Plymouth, MI. EMSL is accredited by the NIST, NVLAP program (National Institute of Standards and Technology, National Voluntary Laboratory Accreditation Program) and also an American Industrial Hygiene Association (AIHA) accredited laboratory.
Prior to this sampling, Castle Hill was provided with previous sampling results conducted by the VA including the last 3-year reinspection conducted by Castle Hill Associates in 2019 which is included in Appendix A.
Lead paint testing was conducted on all painted surfaces in the renovation areas using a Viken Detection Pb200i direct read XRF analyzer. Painted components that were tested in the areas are considered to be “lead-based” paint as defined by the US EPA (greater than 1.0 mg/cm2).
The inspection was conducted and the report was prepared by Brett Brumbaugh who is licensed by the State of North Carolina as an Asbestos Inspector and is also an EPA Licensed Lead Risk Assessor. Mr. Brumbaugh has been conducting asbestos surveys and lead sampling since 1987, and is a registered environmental property assessor (REPA) and certified environmental and safety officer (CESCO) through the NREP (National Registry of Environmental Professionals)
Asbestos Materials Summary
• No asbestos containing materials were identified in the renovation areas.
Lead-Based Paint Summary As a result of the XRF testing of the building components in the work areas, there were no building components identified which contained quantities of lead above the EPA & HUD “Lead Based Paint Federal Action Level” for a painted surface containing less than 1.0 mg/cm² or greater using the XRF technology.
UNIVERSAL WASTES FINDINGS
The universal waste survey was conducted to identify all confirmed and potential universal wastes (PCB and mercury containing components, High Intensity Discharge (HID) lighting lamps, transformers, thermostats, hydraulic lifts, switches, and other suspect equipment) which may require special handling and disposal as part of renovation or demolition projects.
As a result of this inspection, the following Universal Wastes were identified in the renovation areas of the building:
Hazardous Materials Locations Quantity
Fluorescent tubes & CFL Bulbs Basement and 1st floor halls 240 fixtures
Batteries in exit light fixtures Basement and 1st floor halls 16 fixtures
CONCLUSIONS/RECOMMENDATIONS
UNIVERSAL WASTES: The identified Universal Wastes are not required to be removed prior to renovation, however if they are removed then they must be handled, transported, and disposed/recycled in an EPA approved facility by persons with proper training in the handling of Universal Wastes.
Respectfully Submitted, Brett L. Brumbaugh, REPA, CESCO State of North Carolina Asbestos Inspector, License # 12411 Lead Risk Assessor – EPA License # LBP-R-I216003-1
ASBESTOS SAMPLING PROTOCOL
The bulk samples were collected from locations that were selected to be representative of the building materials. Sampling was accomplished using the simplified sampling scheme referenced in the AHERA regulations and found in the “Pink Book”. Locations of individual samples are referenced on this report.
The samples were either collected with a coring tool designed for asbestos sampling or placed into a plastic bag for laboratory analysis. The samples were analyzed via polarized light microscopy with dispersion staining, using the “Interim method for the Determination of Asbestos in Bulk Insulation Samples” found in Appendix A to Subpart F in 40 CFR Part 763.
The regulations require specific numbers of samples be obtained per homogeneous area. For example, when sampling for joint compound or asbestos in hard plaster (sprayed-on or troweled-on surfacing materials) samples are to be taken based on the following increments: 0 to 1000 square feet of material, 3 samples are necessary. From 1001 to 5000 square feet, 5 samples are necessary, over 5000 square feet 7 samples are required. If during analysis any samples are found to contain asbestos, the entire homogeneous area is delineated as asbestos containing material. In the case of pipe insulation or other types of manufactured materials, the regulations require only enough samples to ascertain whether asbestos is present. In this case, the minimum number of samples to collect and analyze is usually three. The sampling performed in this inspection followed these sampling guidelines.
ASBESTOS GLOSSARY OF TERMS
Friable asbestos material: means any material containing more than 1 percent asbestos as determined using the method specified in appendix E, subpart E, 40 CFR part 763 section 1, Polarized Light Microscopy, that, when dry, can be crumbled, pulverized, or reduced to powder by hand pressure.
Category I Non-friable Asbestos Containing Material (ACM) means asbestos containing packings, gaskets, resilient floor coverings, and asphalt roofing products containing more that 1 percent asbestos as determined using the method specified in appendix E, subpart E, 40 CFR part 763, Section 1, Polarized Light Microscopy.
Category II Non-friable ACM means any material, excluding Category I non-friable ACM, containing more than 1 percent asbestos as determined using the method specified in appendix E, subpart E, 40 CFR part 763, section 1, Polarized Light Microscopy that when dry, cannot be crumbled, pulverized, or reduced to powder by hand pressure.
Regulated Asbestos Containing Material (RACM): means (a) Friable asbestos material, (b) Category I non-friable ACM that has become friable, (c) category I non-friable ACM that will be or has been subjected to sanding, grinding, cutting, or abrading, or (d) Category II non-friable ACM that has a high probability of becoming or has become crumbled, pulverized, or reduced to powder by the forces expected to act on the material expected in the course of demolition or renovation operations regulated by this subpart.
ASBESTOS BULK SAMPLE DESCRIPTIONS & RESULTS
Facility: Fayetteville VA Medical Center Project: Building 1 Basement & 1st Floor (Halls & Walls) Project: 565-21-101 Sampling Date: January 31, 2022 Analysis Date: February 4-7, 2022 Laboratory: EMSL Analytical, Inc. – Plymouth, MI Accreditation: NVLAP Asbestos Bulk Accredited Laboratory 101048-4 Sampler: Brett Brumbaugh License #: 12411 – N. Carolina Asbestos Inspector
SAMPLE
# MATERIAL DESCRIPTION SAMPLE LOCATION
LABORATORY ANALYSIS
RESULT
1a 12” tan floor tile Stairwell B01 No Asbestos Detected
1b Beige mastic “” No Asbestos Detected
2a 12” tan floor tile Stairwell 101 No Asbestos Detected
2b Beige mastic “” No Asbestos Detected
3 Yellow cove base mastic E. end of B. hallway by entry No Asbestos Detected
4 Yellow cove base mastic 1st floor hall by 128 No Asbestos Detected
5 Drywall joint compound Basement hallway by Dental No Asbestos Detected
6 Drywall joint compound Basement hall by B10 stairs No Asbestos Detected
7 Drywall joint compound 1st hallway by front lobby No Asbestos Detected
8 2x2 lay-in ceiling tile Basement hall by B15 No Asbestos Detected
9 2x2 lay-in ceiling tile 1st hallway E. of lobby No Asbestos Detected
10 Yellow mastic for vinyl plank flooring Basement hall by 76A No Asbestos Detected
11 Yellow mastic for vinyl plank flooring 1st hallway by 109 No Asbestos Detected
12 Yellow mastic for rubber edge guards Basement hall by 76A No Asbestos Detected
13 Yellow mastic for rubber edge guards 1st hallway by 109 No Asbestos Detected
14a Hard plaster (finish coat) Basement hall by 76A No Asbestos Detected
14b Hard plaster (base coat) “” No Asbestos Detected
15a Hard plaster (finish coat) 1st hallway by front lobby No Asbestos Detected
15b Hard plaster (base coat) “” No Asbestos Detected
16a Hard plaster (finish coat) 1st hallway by 109 No Asbestos Detected
16b Hard plaster (base coat) “” No Asbestos Detected
Notes:
• Asbestos containing materials are defined by containing greater than 1% asbestos.
• Previously tested Asbestos materials were not re-sampled as part of this project.
ASBESTOS LABORATORY REPORT
EMSL ANALYTICAL, INC.
EMSL Analytical, Inc.
15111 Northville Rd Plymouth, MI 48170
Tel/Fax: (734) 668-6810 / (734) 668-8532 http://www.EMSL.com / annarborlab@emsl.com
082200310EMSL Order:
Customer ID: CHAS42
Customer PO: FVA
Project ID:
Attention: Phone:Brett Brumbaugh (567) 952-0212
Fax:Castle Hill Associates, LLC
Received Date:218-A Mechanic St. 02/03/2022 8:00 AM
Analysis Date:Waterville, OH 43566 02/04/2022 - 02/07/2022
Collected Date:
Project: Fayetteville VAMC
Test Report: Asbestos Analysis of Bulk Materials via EPA 600/R-93/116 Method using Polarized
Light Microscopy
Sample Description Appearance % Fibrous % Non-Fibrous
Non-Asbestos Asbestos
% Type
082200310-0001
None DetectedNon-fibrous (Other)98%Cellulose2%Black
Non-Fibrous
Homogeneous
Mastic
082200310-0001A
None DetectedNon-fibrous (Other)100%Beige
Non-Fibrous
Homogeneous
Floor Tile
082200310-0001B
None DetectedNon-fibrous (Other)100%Yellow
Non-Fibrous
Homogeneous
Adhesive
082200310-0002
None DetectedNon-fibrous (Other)100%Beige
Non-Fibrous
Homogeneous
Floor Tile
082200310-0002A
None DetectedNon-fibrous (Other)100%Cellulose<1%Yellow
Non-Fibrous
Homogeneous
Adhesive
082200310-0003
None DetectedNon-fibrous (Other)100%Yellow
Non-Fibrous
Homogeneous
Mastic
082200310-0004
None DetectedNon-fibrous (Other)100%Yellow
Non-Fibrous
Homogeneous
Mastic
082200310-0005
None DetectedMica
Non-fibrous (Other)
5%
95%
White
Non-Fibrous
Homogeneous
Drywall Mud
082200310-0006
None DetectedMica
Non-fibrous (Other)
4%
96%
White
Non-Fibrous
Homogeneous
Drywall Mud
082200310-0007
None DetectedMica
Non-fibrous (Other)
3%
97%
White
Non-Fibrous
Homogeneous
Drywall Mud
082200310-0008
None DetectedPerlite
Non-fibrous (Other)
30%
10%
Cellulose
Min. Wool
30%
30%
Gray/White
Fibrous
Heterogeneous
Ceil Tile
082200310-0009
None DetectedPerlite
Non-fibrous (Other)
30%
10%
Cellulose
Min. Wool
30%
30%
Gray/White
Fibrous
Heterogeneous
Ceil Tile
082200310-0010
None DetectedNon-fibrous (Other)97%Cellulose3%Yellow
Non-Fibrous
Homogeneous
Mastic
082200310-0011
None DetectedNon-fibrous (Other)98%Cellulose2%Yellow
Non-Fibrous
Homogeneous
Mastic
082200310-0012
None DetectedNon-fibrous (Other)100%Yellow
Non-Fibrous
Homogeneous
Mastic
082200310-0013
None DetectedNon-fibrous (Other)100%Tan
Non-Fibrous
Homogeneous
Mastic
Initial report from: 02/07/2022 15:50:13
Page 1 of 2ASB_PLM_0008_0001 - 1.78 Printed: 2/7/2022 3:50 PM
Tel/Fax: (734) 668-6810 / (734) 668-8532 http://www.EMSL.com / annarborlab@emsl.com
082200310EMSL Order:
Customer ID: CHAS42
Customer PO: FVA
Project ID:
Test Report: Asbestos Analysis of Bulk Materials via EPA 600/R-93/116 Method using Polarized
Light Microscopy
Sample Description Appearance % Fibrous % Non-Fibrous
Non-Asbestos Asbestos
% Type
082200310-0014
None DetectedNon-fibrous (Other)100%White
Non-Fibrous
Homogeneous
Finish Coat
082200310-0014A
None DetectedQuartz
Non-fibrous (Other)
5%
95%
Gray
Non-Fibrous
Homogeneous
Base Coat
082200310-0015
None DetectedNon-fibrous (Other)100%White
Non-Fibrous
Homogeneous
Finish Coat
082200310-0015A
None DetectedQuartz
Non-fibrous (Other)
6%
94%
Cellulose<1%Gray
Non-Fibrous
Homogeneous
Base Coat
082200310-0016
None DetectedNon-fibrous (Other)100%White
Non-Fibrous
Homogeneous
Finish Coat
082200310-0016A
None DetectedQuartz
Non-fibrous (Other)
8%
92%
Gray
Non-Fibrous
Homogeneous
Base Coat
Analyst(s)
Ashton Bullock (18)
Waverly Ferguson (4)
Ryan Shannon, Laboratory Manager or Other Approved Signatory
EMSL maintains liability limited to cost of analysis . Interpretation and use of test results are the responsibility of the client. This report relates only to the samples reported above, and may not be reproduced, except in full, without written approval by EMSL. EMSL bears no responsibility for sample collection activities or analytical method limitations . The report reflects the samples as received.
Results are generated from the field sampling data (sampling volumes and areas, locations, etc.) provided by the client on the Chain of Custody. Samples are within quality control criteria and met method specifications unless otherwise noted. The above analyses were performed in general compliance with Appendix E to Subpart E of 40 CFR (previously EPA 600/M4-82-020 “Interim Method”) but augmented with procedures outlined in the 1993 (”final”) version of the method. This report must not be used by the client to claim product certification, approval, or endorsement by NVLAP, NIST or any agency of the federal government. Non- friable organically bound materials present a problem matrix and therefore EMSL recommends gravimetric reduction prior to analysis . Unless requested by the client, building materials manufactured with multiple layers (i.e. linoleum, wallboard, etc.) are reported as a single sample. Estimation of uncertainty is available on request.
Samples analyzed by EMSL Analytical, Inc. Plymouth, MI NVLAP Lab Code 101048-4
Initial report from: 02/07/2022 15:50:13
Page 2 of 2ASB_PLM_0008_0001 - 1.78 Printed: 2/7/2022 3:50 PM
OrderID: 082200310
OrderID: 082200310
LEAD XRF TESTING DATA
Project: Fayetteville VAMC - Bldg. 1
Project: Basement & 1st Floor Halls and Walls
Inspector: Brett Brumbaugh
Date: 1/31/2022
XRF Mfg.: Viken Detection
Model: Pb200i
Type: XRF Lead Paint Analyzer
Serial # 2757
Reading # Building Area Component Paint Color Pb Conc.
mg/cm2 Result
1 Basement hall by B39 Metal door frame Yellow 0.1 Negative
2 Basement hall by B39 Metal exit door Yellow -0.2 Negative
3 Stairwell B35 Plaster wall Yellow -0.1 Negative
4 Corridor COAN Elevator door frame White -0.2 Negative
5 Corridor COAN Plaster wall White 0.2 Negative
6 Basement hall by B36 Plaster wall Yellow 0.2 Negative
7 Basement hall by B37 Metal door frame Yellow 0.3 Negative
8 Basement hall by B38 Wood door frame White -0.1 Negative
9 Basement hall by B39 Drywall wall White 0.0 Negative
10 Basement hall by B31 Wood window sill White -0.2 Negative
11 Basement hall by B46 Wood window sill White -0.1 Negative
12 Corridor COAS Passage door frame Yellow -0.2 Negative
13 1st hall by 109 Drywall wall Yellow 0.4 Negative
14 1st hall by 113 Plaster wall Yellow 0.0 Negative
15 1st hall by 122 Plaster wall Yellow 0.1 Negative
16 1st hall by 1121 Metal door frame White -0.1 Negative
17 1st hall by 116 Plaster wall White 0.3 Negative
18 1st hall by 109 Metal door frame White -0.1 Negative
19 1st hall by 136 Metal railing White -0.4 Negative
20 Stairwell 1-01 Stair Riser White -0.1 POSITIVE
21 1st hall by 133 Plaster wall Yellow -0.1 Negative
22 1st hall by 136 Plaster wall Yellow 0.0 Negative w
LABORATORY CERTIFICATIONS
INSPECTOR CERTIFICATIONS
National Registry of Environmental Professionals
For Environmental Certifications
This is to Certify that
Brett Brumbaugh having sucessfully demonstrated to the Academic Board of this organization the required level of knowledge and ability, is here by awarded the distinction of
Registered Environmental Property Assessor together with all rights, benefits and privileges attached thereto and that the name and title of the aforementioned registrant is today placed upon the register of the organization.
Given under our hands on this 31st day of October, 1996.
Registrant Number
This Certificate is the property of the National Registry of Environmental Professionals and must, upon demand, be returned.
Powered by TCPDF (www.tcpdf.org) http://www.tcpdf.org
National Registry of Environmental Professionals
For Environmental Certifications
This is to Certify that
Brett L. Brumbaugh having sucessfully demonstrated to the Academic Board of this organization the required level of knowledge and ability, is here by awarded the distinction of
Certified Environmental and Safety Compliance Officer together with all rights, benefits and privileges attached thereto and that the name and title of the aforementioned registrant is today placed upon the register of the organization.
Given under our hands on this 15th day of September, 2016.
123337
Registrant Number
This Certificate is the property of the National Registry of Environmental Professionals and must, upon demand, be returned.
Powered by TCPDF (www.tcpdf.org) http://www.tcpdf.org
APPENDIX A
PREVIOUS INSPECTION REPORT
ASBESTOS REINSPECTION REPORT
LOCATION:
FAYETTEVILLE VA MEDICAL CENTER
2300 RAMSEY STREET
FAYETTEVILLE, NC 28301
PROJECT NO.: V06-18-102
CONTRACT: 36C24619N0872
INSPECTION DATES:
AUGUST 26-27, 2019
PRIME CONTRACTOR:
CASTLE HILL ASSOCIATES, LLC
218-A MECHANIC ST.
WATERVILLE, OH 43566
567-952-0212
FAYETTEVILLE VA MEDICAL CENTER - FAYETTEVILLE, NC
AUGUST 2019
TABLE OF CONTENTS
1.0 ASBESTOS INSPECTION REPORT
• Table 1 – List of Acronyms
• Table 2 - Removal Priority Protocols
2.0 APPENDICES
Appendix A – Asbestos Sampling Data
Appendix B – Asbestos Quantities, Assessments, & Remediation Cost Estimate
Appendix C – Photographs of Asbestos Materials
Appendix D – Asbestos Laboratory Reports
Appendix E - Inspector Certifications
Appendix F - Lab Certifications
Appendix G – Asbestos Locations and Sample Location Drawings
Appendix H – O&M Plan (Operations & Maintenance)
1.0 EXECUTIVE SUMMARY
On August 26-27, 2019, Castle Hill Associates, LLC was contracted by the US Department of Veterans Affairs (VA) to perform asbestos re-inspections of 23 buildings on the site of the Fayetteville VA Medical Center in Fayetteville, NC. The survey was performed as part of the VA Project Number V06-18-102 under Contract 36C24618Q0693. The Performance Work Statement (PWS) issued by the VA defined the scope of work for the asbestos survey. The buildings that were surveyed as part of this project included:
Building Number
Building Name/Description Total Square
Footage Year Built
1 Main Hospital 257,923 1939; Renovated 1988
3 Medical Center Ancillary Services 48,025 1939; Renovated 1976
4 Admin Education Nursing 10,100 1939
8 Health Admin Services 5,557 1939
9 Engineering Shops/Garages 6,073 1939
10 Laundry Plant/Drug Cache 7,912 1939; Renovated 1995
11 Boiler Plant 8,047 1939
15 Garage near Quarters 180 1939
16 Garage near Quarters 1,500 1939
18 Garage Storage 367 1939
20 Engineering Storage 300 1977
21 Computer Building 2,508 1986; Renovated 1994
22 Incinerator Building (no incinerator) 373 1988
24 Hazardous Waste Storage 200 1996
30 Quonset Hut Storage Building 1,300 1959
34 Generator Building 504 1973
35 Chiller Plant 2,417 1974
37 Electrical Distribution 250 1977
The inspection was conducted by Brett Brumbaugh. The project manager was Mr. Brumbaugh who has been conducting asbestos surveys, sampling, and consulting work since 1987. He is a State of North Carolina Asbestos Inspector. There was a previous asbestos reinspection and sampling conducted at the facility most recently in 2013 and those reports were reviewed and utilized by Castle Hill prior to this inspection. There were no limitations or exceptions to the PWS for the surveys conducted.
All accessible functional areas in the facilities were surveyed. All previous asbestos survey information and sampling conducted at the facilities were evaluated and incorporated into this survey. All confirmed asbestos-containing materials were verified. This report can be incorporated into the facility’s management plan for asbestos-containing materials.
2.0 STATE AND LOCAL REGULATIONS
The State of North Carolina asbestos inspection and licensing regulations are similar to the Federal regulations. State asbestos regulations include requirements for licensing and certification of personnel who will perform asbestos-related work activities. All personnel who engage in asbestos-related activities must comply with the state licensing/certification requirements as well as with all Federal requirements.
3.0 ANALYTICAL METHODS AND LIMITATIONS
3.1 Asbestos Sampling Protocol
EPA and OSHA define an ACBM as any material which contains greater than 1 percent asbestos. The ACBM inspection and bulk sampling were performed in accordance with the methods outlined in the EPA guidance document titled Guidance for Controlling Asbestos-Containing Materials in Buildings (Document No. 560/5- 85/024). In addition, bulk sampling of asbestos was performed in accordance with 40 CFR Part 763, AHERA requirements for number of samples and types of ACBM to be sampled. According to these requirements, materials are classified as either surfacing (e.g., decorative plaster, spray-applied fireproofing), thermal system insulation (e.g., pipe insulation, pipe fitting insulation, boiler insulation), or miscellaneous materials (e.g., floor tile, ceiling tile, plaster, wallboard, mastics).
The number of samples collected from each material varies based on the classification of the material and increases as the potential for a non-uniform mixture of asbestos in the material increases. Typically, regulations require a minimum number of samples to be collected from the different classifications of suspect
ACBM.
All bulk samples were analyzed utilizing current EPA methods for PLM (Polarized Light Microscopy) by EMSL Analytical in Plymouth, MI. EMSL is accredited by the NIST, NVLAP program (National Institute of Standards and Technology, National Voluntary Laboratory Accreditation Program) and also an American Industrial Hygiene Association (AIHA) accredited laboratory.
4.0 SUMMARY OF FINDINGS
4.1 Asbestos-Containing Building Materials
The following is a summary of the asbestos containing materials, locations, quantities of materials in each inspected building for this project:
Building 1 - Main Hospital
Asbestos Containing Materials Locations Quantity
12” or 9” vinyl floor tile and/or black mastic Basement, 1st, 2nd, 3rd, 4th, and 5th floors 8,620 sf Window glazing and window frame caulk Basement, 1st, 2nd, 3rd, 4th, and 5th floors All windows Pipe insulation behind walls and above ceilings
Basement, 1st, 2nd, 3rd, 4th, and 5th floors Unknown
Exterior door frame caulk Basement, 1st, and 5th floors 26 doors Exterior vent pipe caulk 5th floor 16 vents
Building 3 - Medical Center Ancillary Services
Pipe insulation on steam and domestic water lines
Mechanical Rooms 2 & 3; and assumed to be located behind plaster walls & ceilings
180 lf
12” vinyl floor tile and black mastic 1st, 2nd, 3rd, and 4th floors 820 sf
Building 4 - Admin Education Nursing lines
Inaccessible wall chases and ceiling plenums Unknown
12” vinyl floor tile and mastic Basement 140 sf
Building 8 - Health Admin Services lines
Inaccessible wall chases and ceiling plenums Unknown
12” vinyl floor tile and mastic 1st floor custodial storage closet 104 15 sf
Building 9 - Engineering Shops/Garages lines
Inaccessible wall chases and ceiling plenums Unknown
12” vinyl floor tile and mastic 103B, 104, 110, 111, and 113 1,020 sf Residual mastic under carpeting 108 and 109 1,100 sf
Building 10 - Laundry Plant/Drug Cache
• All known asbestos containing materials have been removed from this building.
Building 11 - Boiler Plant
Window glazing and caulking All windows (basement, 1st, and 2nd floors) 26 windows 12” vinyl floor tile and mastic Office, locker room, and hallway 494 sf
Building 15 - Garage near Quarters
• There are no known asbestos containing materials in this building.
Building 16 – Garage near Quarters
Building 18 – Garage Storage
Building 20 – Engineering Storage
Building 21 – Computer Building
Building 22 – Incinerator Building
Building 24 – Hazardous Waste Storage
Building 30 – Quonset Hut Storage Building lines
W. entrance and ceiling plenum 290 lf
Exterior caulking on metal roofing All seams of roofing 680 lf
Building 34 – Generator Building
Building 35 – Chiller Plant
Window glazing and caulking All windows 6 windows 12” vinyl floor tile and mastic Office 120 sf
Building 37 – Electrical Distribution
5.0 Explanation of Assessment of Asbestos Containing Materials
Re-inspection protocol is based on the Asbestos Hazard Emergency Response Act (AHERA), Environmental Protection Act’s (EPA’s) revised Asbestos Model Accreditation Plan (MAP) mandated by the Asbestos School Hazard Abatement Reauthorization Act (ASHARA), and the Department of Veterans Affairs (VA) Directive 7700. The tabular listing included in this report contains Building Number, Floor, Room Number, Material Category (i.e., TSI, SM or MM), Material Type, quantity, a numerical priority ranking, condition, potential for damage, potential for human exposure, drawing number, hazard ranking, recommended response action and associated cost estimate for implementation of those response actions.
The material assessment categories of the ACM identified in the building is formatted in the following order for the summary tables enclosed in this report:
• Material Category - Surfacing Material (SUR); Thermal System Insulation (TSI); Miscellaneous (MM)
• Material Type - Friable (F); Non-Fable (NF)
• Condition of Material - Good; Fair; Poor
• Potential for Damage - Low; Medium; High
• Physical Assessment - Low; Medium; High
• Recommended Response Action - 1 through 7
Material category is the type of material such as surfacing material (SUR), thermal system insulation (TSI), and miscellaneous (MM)
• Surfacing Material (SUR) - Surfacing ACM means surfacing material that is ACM. Surfacing material means material in a school building that is sprayed-on, troweled-on, or otherwise applied to surfaces, such as acoustical plaster on ceilings and fireproofing materials on structural members, or other materials on surfaces for acoustical, fireproofing, or other purposes.
• Thermal System Insulation (TSI) - Thermal system insulation ACM means thermal system insulation that is ACM. Thermal system insulation means material in a school building applied to pipes, fittings, boilers, breeching, tanks, ducts, or other interior structural components to prevent heat loss or gain, or water condensation, or for other purposes.
• Miscellaneous (MM) - Miscellaneous ACM means miscellaneous material that is ACM Miscellaneous material means interior building material on structural components, structural members or fixtures, such as floor and ceiling tiles, and does not include surfacing material or thermal system insulation.
Material type refers to the hardness of a material to be crumbled, pulverized, or reduced to powder by hand pressure as friable (F), and includes previously non-friable (NF) material after such previously non-friable material becomes damaged to the extent that when dry it may be crumbled, pulverized, or reduced to powder by hand pressure.
• Condition of Material - Good; Fair; Poor
• Potential for Damage - Low; Medium; High
• Physical Assessment - Low; Medium; High
Seven Categories define in the AHERA regulation one of which must be assigned to each friable surfacing and miscellaneous ACBM and each asbestos-containing TSI during the inspection/re-inspection.
1. Damaged or significantly damaged TSI ACBM - Damaged or significantly damaged thermal system insulation ACM means thermal system insulation ACM on pipes, boilers, tanks, ducts, and other thermal system insulation equipment where the insulation has lost its structural integrity, or its covering, in whole or in part, is crushed, water-stained, gouged, punctured, missing, or not intact such that it is not able to contain fibers. Damage may be further illustrated by occasional punctures, gouges or other signs of physical injury to ACM; occasional water damage on the protective coverings/jackets; or exposed ACM ends or joints. Asbestos debris originating from the ACBM in question may also indicate damage.
2. Damaged friable surfacing ACBM - Damaged friable surfacing ACM means friable surfacing ACM which has deteriorated or sustained physical injury such that the internal structure (cohesion) of the material is inadequate or which has delaminated such that its bond to the substrate (adhesion) is inadequate, or which, for any other reason, lacks fiber cohesion or adhesion qualities. Such damage or deterioration may be illustrated by the separation of ACM into layers; separation of ACM from the substrate; flaking, blistering, or crumbling of the ACM surface; water damage; significant or repeated water stains, scrapes, gouges, mars or other signs of physical injury on the ACM. Asbestos debris originating from the ACBM in question may also indicate damage.
3. Significantly damaged friable surfacing ACBM - Significantly damaged friable surfacing ACM means damaged friable surfacing ACM in a functional space where the damage is extensive and severe.
4. Damaged or significantly damaged friable miscellaneous ACBM - Damaged friable miscellaneous ACM means friable miscellaneous ACM which has deteriorated or sustained physical injury such that the internal structure (cohesion) of the material is inadequate or, if applicable, which has delaminated such that its bond to the substrate (adhesion) is inadequate or which for any other reason lacks fiber cohesion or adhesion qualities.
Such damage or deterioration may be illustrated by the separation of ACM into layers; separation of ACM from the substrate; flaking, blistering, or crumbling of the ACM surface; water damage; significant or repeated water stains, scrapes, gouges, mars or other signs of physical injury on the ACM. Asbestos debris originating from the ACBM in question may also indicate damage.
5. ACBM with Potential for Damage - Potential damage means circumstances in which:
(1) Friable ACBM is in an area regularly used by building occupants, including maintenance personnel, in the course of their normal activities.
(2) There are indications that there is a reasonable likelihood that the material or its covering will become damaged, deteriorated, or delaminated due to factors such as changes in building use, changes in operations and maintenance practices, changes in occupancy, or recurrent damage.
6. ACBM with potential for significant damaged - Potential significant damage means circumstances in which:
(1) Friable ACBM is in an area regularly used by building occupants, including maintenance personnel, in the course of their normal activities.
(2) There are indications that there is a reasonable likelihood that the material or its covering will become significantly damaged, deteriorated, or delaminated due to factors such as changes in building use, changes in operations and maintenance practices, changes in occupancy, or recurrent damage.
7. Any remaining friable ACBM or Friable Suspected ACBM
6.0 EXPLANATION OF REMEDIATION COST ESTIMATES
All remediation cost (removal and repair) estimates are based upon RS Means data. Since RS Means does not account for work in VA Medical Centers, all cost estimates are adjusted to reflect the VA specific requirements for abatement. In addition, the cost estimates reflect the quantity and location of the asbestos materials. For example, abatement work in crawl spaces is expected to be much costlier than work in more accessible areas of building. Also, the costs for each material in each building are intended to be for “stand alone” projects and the combination of areas for removal will reduce the costs due to an economy of scale.
7.0 CONCLUSION/RECOMMENDATIONS
An operations and maintenance (O&M) program has been developed by the VAMC specifically for the positively identified ACBM in the facilities. Any renovation/demolition work which may impact these positive materials should be conducted in accordance with the O&M program and all applicable Federal, state, and local regulations by appropriately trained and VA-approved personnel and contractors. Since demolition was not performed as part of the inspection work at the facilities, certain areas such as pipe chases and areas above fixed permanent ceilings, fire-door interiors, and vault/safe wall and door linings were not inspected or tested. Prior to renovation and alteration work which could impact these areas, Castle Hill recommends that exploratory demolition be performed and a qualified inspector be utilized to examine the areas and collect samples as needed. Castle Hill recommends sampling of roofing materials and electrical components (not specifically examined as part of this survey) if renovation activities are planned which may disturb these materials.
Respectfully Submitted:
Brett L. Brumbaugh, REPA, CESCO State of North Carolina Asbestos Inspector License Number 12411
TABLE 1
LIST OF ACRONYMS
ACBM Asbestos Containing Building Material ACM Asbestos Containing Material AHERA Asbestos Hazard Emergency Response Act AIHA American Industrial Hygiene Association CAA Clean Air Act CFR Code of Federal Regulations EPA United States Environmental Protection Agency HazCom Hazard Communication HEPA High Efficiency Particulate Air Filter HVAC Heating, Ventilation, and Air Conditioning MISC Miscellaneous Asbestos Containing Material NESHAP National Emission Standards for Hazardous Air Pollutants NIOSH National Institute for Occupational Safety and Health NIST National Institute of Standards and Technology NOB Non-friable Organically Bound NVLAP National Voluntary Laboratory Accreditation Program OSHA Occupational Safety and Health Administration PAT AIHA Proficiency Analytical Testing Program PCM Phase Contrast Microscopy PEL Permissible Exposure Limit PLM Polarized Light Microscopy TEM Transmission Electron Microscopy TSCA Toxic Substances Control Act TSI Thermal Systems Insulation Castle Hill Castle Hill Associates, LLC VA United States Department of Veterans Affairs VAMC VA Medical Center XRD X-Ray Diffraction
TABLE 2
ASBESTOS REMOVAL PRIORITY PROTOCOLS
HAZARD
RANK
REMOVAL
PRIORITY
AHERA
CATEGORY
RESPONSE ACTION
RECOMMENDATION
7 1 Significantly Damaged
Evacuate or isolate the area.
Remove or repair if feasible.
O&M for all friable ACM.
6 2 Damaged with potential for significant damage
Evacuate or isolate the area.
Remove, encapsulate, or repair if feasible. O&M for all friable
ACM.
5 3 Damaged with potential for damage
Remove, encapsulate, or repair. O&M for all friable ACM.
4 4 Damaged Remove, encapsulate, or repair. O&M for all friable ACM.
3 5 Potential for significant damage
Take steps to reduce potential for damage. O&M for all friable
ACM.
2 6 Potential for damage O&M for all friable ACM.
1 7 No problem O&M for all friable ACM.
APPENDIX A
ASBESTOS BULK SAMPLING DATA
AUGUST 2019
ASBESTOS BULK SAMPLING INFORMATION
Facility:
Building:
Sampling Date:
Analysis Dates:
Laboratory:
Accreditation:
Sampler:
Accreditation:
Fayetteville VA Medical Center – Fayetteville, NC Building 1 - Main Hospital August 26, 2019 September 3, 2019 EMSL Analytical - Plymouth, MI NVLAP Asbestos Bulk Accredited Laboratory # 101048-4 Brett Brumbaugh State of North Carolina – Asbestos Inspector #12411
PLM Laboratory Analysis Result
SAMPLE
NUMBER
MATERIAL SAMPLE LOCATION
LABORATORY ANALYSIS
RESULT
1 Spray-on fireproofing on column Penthouse – S. side No Asbestos Detected
2 Spray-on fireproofing on column Penthouse – Middle No Asbestos Detected
3 Spray-on fireproofing on column Penthouse – N. side No Asbestos Detected
• EPA Definition of an asbestos containing material: Greater than 1% asbestos
APPENDIX B
Asbestos Quantities, Assessments, & Remediation Cost Estimates
Fayetteville VAMC - Fayetteville, NC
Asbestos Assessments and Cost Estimates
August 2019
Asbestos Material Locations Quantity
AHERA
Category
Friability
%Damage
AHERA
Assessment Recommendation
Removal
Priority
Repair Cost
Estimate
Removal Cost
Estimate
12” or 9” vinyl floor tile and/or black mastic Basement, 1st, 2nd, 3rd, 4th, and 5th floors 8,620 sf MISC Non-friable
0% 1 O&M; Remove at renovation or demolition 7 No damage $43,100
Window glazing and window frame caulk Basement, 1st, 2nd, 3rd, 4th, and 5th floors All windows MISC Non-friable
0% 1 O&M; Remove at renovation or demolition 7 No damage $120,000
Pipe insulation behind walls and above ceilings Basement, 1st, 2nd, 3rd, 4th, and 5th floors Unknown TSI Friable 0% 1 O&M; Remove at renovation or demolition 7 No damage Unknown
Exterior door frame caulk Basement, 1st, and 5th floors 26 doors MISC Non-friable
0% 1 O&M; Remove at renovation or demolition 7 No damage $52,000
Exterior vent pipe caulk 5th floor 16 vents MISC Non-friable
0% 1 O&M; Remove at renovation or demolition 7 No damage $16,000
TOTALS 0 $231,100
Note: The start date for all response actions is October of 2019
PHOTOGRAPHS OF ASBESTOS MATERIALS
Photo 1-1 12” tan vinyl floor tile and black mastic
Photo 1-2
12” white vinyl floor tile and black mastic
Photo 1-3 9” red vinyl floor tile and black mastic
Photo 1-4 Window glazing and window frame caulk
PHOTOGRAPHS OF ASBESTOS MATERIALS
Photo 1-5 Window glazing and window frame caulk
Photo 1-6
Exterior door frame caulk
Photo 1-7
Exterior door frame caulk
APPENDIX D
ASBESTOS LABORATORY REPORTS
Tel/Fax: (734) 668-6810 / (734) 668-8532 http://www.EMSL.com / annarborlab@emsl.com
081902549EMSL Order:
Customer ID: CHAS42
Customer PO: VISN6
Project ID:
Attention: Phone:Brett Brumbaugh (567) 952-0212
Fax:Castle Hill Associates, LLC
Received Date:218-A Mechanic St. 08/30/2019 12:00 PM
Analysis Date:Waterville, OH 43566 09/03/2019
Collected Date:
Project: VISN 6 - Fayetteville VAMC
Test Report: Asbestos Analysis of Bulk Materials via EPA 600/R-93/116 Method using Polarized
Light Microscopy
Sample Description Appearance % Fibrous % Non-Fibrous
Non-Asbestos Asbestos
% Type
081902549-0001
None DetectedNon-fibrous (Other)100%Glass<1%White
Non-Fibrous
Homogeneous
081902549-0002
None DetectedNon-fibrous (Other)98%Glass2%White
Non-Fibrous
Homogeneous
081902549-0003
None DetectedNon-fibrous (Other)96%Glass4%White
Non-Fibrous
Homogeneous
081902549-0004
None DetectedNon-fibrous (Other)98%Wollastonite
Fibrous (Other)
2%
<1%
Gray/Beige
Non-Fibrous
Homogeneous
081902549-0005
None DetectedMica
Non-fibrous (Other)
<1%
100%
Wollastonite<1%Gray/White/Beige
Non-Fibrous
Homogeneous
081902549-0006
None DetectedMica
Non-fibrous (Other)
2%
98%
Wollastonite<1%Gray/White
Non-Fibrous
Homogeneous
081902549-0007
None DetectedNon-fibrous (Other)100%Wollastonite<1%Gray/White
Non-Fibrous
Homogeneous
Caulk A
081902549-0007A
2% ChrysotileQuartz
Non-fibrous (Other)
2%
96%
Gray/White/Silver
Non-Fibrous
Heterogeneous
Caulk B
Result includes a small amount of inseparable attached material
081902549-0008
None DetectedNon-fibrous (Other)100%Wollastonite<1%Gray/White
Non-Fibrous
Homogeneous
Caulk A
081902549-0008A
2% ChrysotileQuartz
Non-fibrous (Other)
4%
94%
Gray/White/Silver
Non-Fibrous
Heterogeneous
Caulk B
Result includes a small amount of inseparable attached material
081902549-0009
None DetectedNon-fibrous (Other)100%White
Non-Fibrous
Homogeneous
Caulk A
081902549-0009A
2% ChrysotileNon-fibrous (Other)96%Wollastonite2%Gray
Non-Fibrous
Homogeneous
Caulk B
Result includes a small amount of inseparable attached material
081902549-0010
2% ChrysotileNon-fibrous (Other)98%Gray/White
Non-Fibrous
Homogeneous
081902549-0011
2% ChrysotileNon-fibrous (Other)98%Gray/White/Beige
Non-Fibrous
Homogeneous
081902549-0012
2% ChrysotileQuartz
Non-fibrous (Other)
4%
94%
Gray
Non-Fibrous
Homogeneous
Initial report from: 09/04/2019 12:16:53
Page 1 of 2ASB_PLM_0008_0001 - 1.78 Printed: 9/4/2019 12:16 PM
Tel/Fax: (734) 668-6810 / (734) 668-8532 http://www.EMSL.com / annarborlab@emsl.com
081902549EMSL Order:
Customer ID: CHAS42
Customer PO: VISN6
Project ID:
Test Report: Asbestos Analysis of Bulk Materials via EPA 600/R-93/116 Method using Polarized
Light Microscopy
Sample Description Appearance % Fibrous % Non-Fibrous
Non-Asbestos Asbestos
% Type
081902549-0013
None DetectedNon-fibrous (Other)88%Cellulose
Min. Wool
3%
9%
Gray/White
Fibrous
Homogeneous
081902549-0014
<1% ChrysotileNon-fibrous (Other)100%Gray
Fibrous
Homogeneous
081902549-0015
2% ChrysotileNon-fibrous (Other)98%Gray
Non-Fibrous
Homogeneous
081902549-0016
<1% ChrysotileNon-fibrous (Other)100%Gray
Non-Fibrous
Homogeneous
081902549-0017
None DetectedNon-fibrous (Other)100%Gray
Non-Fibrous
Homogeneous
Floor Tile
081902549-0017A
None DetectedNon-fibrous (Other)100%Cellulose<1%Gray/Tan
Non-Fibrous
Homogeneous
Adhesive
081902549-0018
None DetectedNon-fibrous (Other)20%Synthetic
Min. Wool
<1%
80%
Gray
Fibrous
Homogeneous
081902549-0019
None DetectedNon-fibrous (Other)10%Cellulose
Min. Wool
<1%
90%
Gray
Fibrous
Homogeneous
081902549-0020
None DetectedNon-fibrous (Other)15%Min. Wool85%Gray
Fibrous
Homogeneous
Insulation
081902549-0020A
None DetectedQuartz
Non-fibrous (Other)
4%
96%
Gray
Non-Fibrous
Homogeneous
Concrete
081902549-0021
None DetectedNon-fibrous (Other)100%Wollastonite<1%White/Beige
Non-Fibrous
Homogeneous
081902549-0022
None DetectedNon-fibrous (Other)100%Wollastonite<1%Gray/White/Beige
Non-Fibrous
Homogeneous
081902549-0023
None DetectedNon-fibrous (Other)100%Wollastonite<1%White/Beige
Non-Fibrous
Homogeneous
081902549-0024
None DetectedNon-fibrous (Other)100%Wollastonite<1%White
Non-Fibrous
Homogeneous
Analyst(s)
Rebecca Newman (20)
Remy Sherman (9)
Ryan Shannon, Laboratory Manager or Other Approved Signatory
EMSL maintains liability limited to cost of analysis . The above analyses were performed in general compliance with Appendix E to Subpart E of 40 CFR (previously EPA 600/M4-82-020 "Interim
Method"), but augmented with procedures outlined in the 1993 ("final") version of the method. This report relates only to the samples reported above, and may not be reproduced, except in full, without written approval by EMSL. EMSL bears no responsibility for sample collection activities or analytical method limitations . Interpretation and use of test results are the responsibility of the client. All samples received in acceptable condition unless otherwise noted. This report must not be used by the client to claim product certification, approval, or endorsement by NVLAP, NIST or any agency of the federal government. EMSL recommends gravimetric reduction for all non -friable organically bound materials prior to analysis. Estimation of uncertainty is available on request.
Samples analyzed by EMSL Analytical, Inc. Plymouth, MI NVLAP Lab Code 101048-4
Initial report from: 09/04/2019 12:16:53
Page 2 of 2ASB_PLM_0008_0001 - 1.78 Printed: 9/4/2019 12:16 PM
APPENDIX G
ASBESTOS LOCATIONS & SAMPLE LOCATION DRAWINGS
CASTLE HILL ASSOCIATES, LLC.
DEPARTMENT OF VETERANS AFFAIRS
FAYETTEVILLE VA MEDICAL CENTER
FAYETTEVILLE, NORTH CAROLINA
2019 ASBESTOS REINSPECTION
VA CONTRACT NUMBER: 36C24619N0872
LEGEND
ABC
PROJECT V06-18-102 VISN ASBESTOS SURVEY
ASBESTOS CONTAINING MATERIALS NOT SHOWN ON DRAWINGS
AutoCAD SHX Text ENVIRONMENTAL CONSULTANT: 218-A MECHANIC STREET, WATERVILLE, OHIO 43566 Tel: (567) 952-0212
AutoCAD SHX Text one-quarter inch = one foot
AutoCAD SHX Text one-eighth inch = one foot
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text three-eighths inch = one foot
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text F
AutoCAD SHX Text
AutoCAD SHX Text one-half inch = one foot
AutoCAD SHX Text E
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text one and one-half inches = one foot
AutoCAD SHX Text one inch = one foot
AutoCAD SHX Text three-quarters inch = one foot
AutoCAD SHX Text D
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text C
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text B
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text three inches = one foot
AutoCAD SHX Text
AutoCAD SHX Text A
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text Drawing Title
AutoCAD SHX Text Approved : Division Chief
AutoCAD SHX Text Approved : Service Director
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text Building Number
AutoCAD SHX Text Location
AutoCAD SHX Text Project Title
AutoCAD SHX Text Checked
AutoCAD SHX Text Department of
AutoCAD SHX Text Office of Facilities
AutoCAD SHX Text
AutoCAD SHX Text Drawn
AutoCAD SHX Text Drawing No.
AutoCAD SHX Text Project No.
AutoCAD SHX Text Date
AutoCAD SHX Text Veterans Affairs
AutoCAD SHX Text F
AutoCAD SHX Text E
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text D
AutoCAD SHX Text C
AutoCAD SHX Text B
AutoCAD SHX Text
AutoCAD SHX Text A
AutoCAD SHX Text Sheet 01 of 20
AutoCAD SHX Text Revisions
AutoCAD SHX Text Professional Seal:
AutoCAD SHX Text FACILITY ASBESTOS RE-SURVEY VETERANS ADMINISTRATION MEDICAL CENTER FAYETTEVILLE, NORTH CAROLINA
AutoCAD SHX Text V06-18-102
AutoCAD SHX Text
AUGUST 2019
AutoCAD SHX Text
AFS
AutoCAD SHX Text
BLB
AutoCAD SHX Text
FAYETTEVILLE, NORTH CAROLINA
AutoCAD SHX Text Dates
AutoCAD SHX Text
AutoCAD SHX Text
TITLE SHEET
AutoCAD SHX Text North:
AutoCAD SHX Text
CS
AutoCAD SHX Text
ASBESTOS-CONTAINING PIPE INSULATION
AutoCAD SHX Text
ASBESTOS-CONTAINING WINDOW GLAZING AND WINDOW FRAME CAULK
AutoCAD SHX Text
ASBESTOS-CONTAINING 12" OR 9" VINYL FLOOR TILE AND/OR BLACK MASTIC
AutoCAD SHX Text
ASBESTOS-CONTAINING PIPE INSULATION BEHIND WALLS AND ABOVE CEILINGS
AutoCAD SHX Text
ASBESTOS-CONTAINING EXTERIOR DOOR FRAME CAULK
AutoCAD SHX Text
ASBESTOS-CONTAINING EXTERIOR VENT PIPE CAULK
AutoCAD SHX Text
ASBESTOS-CONTAINING EXTERIOR WINDOW FRAME CAULK
N
S
W
E
BUILDING #1 - BASEMENT FLOOR PLAN
LEGEND
AutoCAD SHX Text
FC
AutoCAD SHX Text
FC
AutoCAD SHX Text
FC
AutoCAD SHX Text
FC
AutoCAD SHX Text
FC
AutoCAD SHX Text
GATE
AutoCAD SHX Text
UP
AutoCAD SHX Text
UP
AutoCAD SHX Text
DN
AutoCAD SHX Text
AERATOR
AutoCAD SHX Text
STERILIZERS
AutoCAD SHX Text ENVIRONMENTAL CONSULTANT: 218-A MECHANIC STREET, WATERVILLE, OHIO 43566 Tel: (567) 952-0212
AutoCAD SHX Text one-quarter inch = one foot
AutoCAD SHX Text one-eighth inch = one foot
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text three-eighths inch = one foot
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text F
AutoCAD SHX Text
AutoCAD SHX Text one-half inch = one foot
AutoCAD SHX Text E
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text one and one-half inches = one foot
AutoCAD SHX Text one inch = one foot
AutoCAD SHX Text three-quarters inch = one foot
AutoCAD SHX Text D
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text C
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text B
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text three inches = one foot
AutoCAD SHX Text
AutoCAD SHX Text A
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text Drawing Title
AutoCAD SHX Text Approved : Division Chief
AutoCAD SHX Text Approved : Service Director
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text Building Number
AutoCAD SHX Text Location
AutoCAD SHX Text Project Title
AutoCAD SHX Text Checked
AutoCAD SHX Text Department of
AutoCAD SHX Text Office of Facilities
AutoCAD SHX Text
AutoCAD SHX Text Drawn
AutoCAD SHX Text Drawing No.
AutoCAD SHX Text Project No.
AutoCAD SHX Text Date
AutoCAD SHX Text Veterans Affairs
AutoCAD SHX Text F
AutoCAD SHX Text E
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text D
AutoCAD SHX Text C
AutoCAD SHX Text B
AutoCAD SHX Text
AutoCAD SHX Text A
AutoCAD SHX Text Sheet 02 of 00
AutoCAD SHX Text Revisions
AutoCAD SHX Text Professional Seal:
AutoCAD SHX Text FACILITY ASBESTOS RE-SURVEY VETERANS ADMINISTRATION MEDICAL CENTER FAYETTEVILLE, NORTH CAROLINA
AutoCAD SHX Text V06-18-102
AutoCAD SHX Text
JULY 2019
AutoCAD SHX Text
AFS
AutoCAD SHX Text
BLB
AutoCAD SHX Text
FAYETTEVILLE, NORTH CAROLINA
AutoCAD SHX Text Dates
AutoCAD SHX Text
AutoCAD SHX Text ARCHITECTURAL PLAN BUILDING 1 Scale: 1/16" = 1'-0"" = 1'-0"
AutoCAD SHX Text North:
AutoCAD SHX Text 1A
ASBESTOS-CONTAINING 12" OR 9" VINYL FLOOR TILE AND/OR BLACK MASTIC
S
W
E
BUILDING #1 - FIRST FLOOR PLAN
LEGEND
AutoCAD SHX Text
FC
AutoCAD SHX Text
COUNTER
AutoCAD SHX Text
FC
AutoCAD SHX Text
FC
AutoCAD SHX Text ENVIRONMENTAL CONSULTANT: 218-A MECHANIC STREET, WATERVILLE, OHIO 43566 Tel: (567) 952-0212
AutoCAD SHX Text one-quarter inch = one foot
AutoCAD SHX Text one-eighth inch = one foot
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .