Drawings 565-21-101 Halls and Walls B and 1 Floors (1).pdf
PDF 43 MB Posted
- Solicitation number
- 36C24623B0041
About this file
This document outlines a federal contract opportunity to renovate halls and walls in a Veteran Affairs medical center. The solicitation number is 36C24623B0041 and seeks to renovate the basement and first floor of the Fayetteville Veteran Affairs Medical Center located in Fayetteville, North Carolina. The work includes renovating halls and walls on these floors. The contracting agency is the Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 6. No other details are provided regarding response dates, pricing terms, or set asides.
View the file
Other files
Show all 13
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
Consultant:
B
IM
/2
.9
V
A F a y e tt e v ill e H a lls
W a lls
/2 .9
A v
.r v t
/1
/2
:5
:3
P
M
GI000
COVER SHEET
GUIDON
1221 N. PENNSYLVANIA STREET
INDIANAPOLIS, IN 46202
317.800.6388
HALLS & WALLS 1ST FLOOR
BLDG. 1
2300 RAMSEY ST.
565-21-101
BLDG 1
07/14/2022 JG LS
565-21-101
HALLS & WALLS 1ST FLOOR BLDG. 1
FAYETTEVILLE VA MEDICAL CENTER
2300 RAMSEY ST.
100% BID DOCUMENTS
100% BID DOCUMENTS
FULLY SPRINKLERED
Contact:Contact: Contact:
CHARLOTTE ENGINEERS
Esther Moallen
MEP
MECHANICAL,
ELECTRICAL &
PLUMBING
FAYETTEVILLE VA MEDICAL CENTER
Kevin Peel
Project Engineer
2300 Ramsey St.
Fayetteville, NC 28301 p: 910-488-2120 ext. 5899 e: Kevin.Peel@va.gov
OWNER
GUIDON DESIGN INC.
Lindsay Splichal
Project Manager
1221 North Pennsylvania Street Suite 200 Indianapolis, IN 46202 p: 317.800.6388 x 150 e: lsplichal@guidondesign.com
ARCHITECT
5838 Monroe Road Charlotte, NC 28212 p: 704-531-3000 x 121 e: EMoallen@CharlotteEngineers.com
AREA MAP
VICINITY MAP
CAMPUS MAP
BUILDING
LOCATION
PROJECT
LOCATION
PROJECT
LOCATION
SHEET INDEX
SHEET
NUMBER SHEET NAME
GENERAL
GI000 COVER SHEET
GI100 BASEMENT - LIFE SAFETY PLAN
GI101 FIRST LEVEL - LIFE SAFETY PLAN
GC101 INFECTION CONTROL/PHASING PLAN
ARCHITECTURE
AD101 BASEMENT - A WING - DEMOLITION PLAN
AD102 BASEMENT- B WING, MAIN, C WING - DEMOLITION PLAN
AD103 BASEMENT - D WING - DEMOLITION PLAN
AD104 FIRST LEVEL - A WING - DEMOLITION PLAN
AD105 FIRST LEVEL - B WING, MAIN, C WING - DEMOLITION PLAN
AD106 FIRST LEVEL - D WING - DEMOLITION PLAN
AD107 BASEMENT - A WING - REFLECTED CEILING DEMOLITION PLAN
AD108 BASEMENT - B WING, MAIN, D WING - REFLECTED CEILING DEMOLITION PLAN
AD109 BASEMENT - D WING - REFLECTED CEILING DEMOLITION PLAN
AD110 FIRST LEVEL - A WING - REFLECTED CEILING DEMOLITION PLAN
AD111 FIRST LEVEL - B WING, MAIN, C WING - REFLECTED CEILING DEMOLITION PLAN
AD112 FIRST LEVEL - D WING - REFLECTED CEILING DEMOLITION PLAN
AD501 DEMO BUILDING DETAILS
AE001 ARCHITECTURAL SYMBOLS AND ABBREVIATIONS
AE100 BASEMENT LEVEL FLOOR PLAN
AE101 FIRST LEVEL FLOOR PLAN
AE102 BASEMENT ENLARGED FLOOR PLANS
AE103 FIRST FLOOR ENLARGED FLOOR PLANS
AE110 BASEMENT LEVEL -A WING - REFLECTED CEILING PLAN
AE111 BASEMENT - B WING, MAIN, C WING - REFLECTED CEILING PLAN
AE112 BASEMENT - D WING - REFLECTED CEILING PLAN
AE113 FIRST LEVEL - A WING - REFLECTED CEILING PLAN
AE114 FIRST LEVEL - B WING , MAIN, C WING- REFLECTED CEILING PLAN
AE115 FIRST LEVEL - D WING - REFLECTED CEILING PLAN
AE502 BUILDING DETAILS
AE503 CEILING DETAILS
AE601 DOOR SCHEDULE
AI101 BASEMENT - A WING - FINISH WALL TREATMENT PLAN
AI102 BASEMENT - B WING, MAIN & C WING - FINISH WALL TREATMENT PLAN
AI103 BASEMENT - D WING - FINISH WALL TREATMENT PLAN
AI104 FIRST LEVEL - A WING - FINISH WALL TREATMENT PLAN
AI105 FIRST LEVEL - B WING, MAIN & C WING - FINISH WALL TREATMENT PLANS
AI106 FIRST LEVEL - D WING - FINISH WALL TREATMENT PLANS
AI107 BASEMENT - A WING - FINISH FLOOR TREATMENT PLAN
AI108 BASEMENT - B WING, MAIN, C WING - FINISH FLR TREATMENT PLAN
AI109 BASEMENT - D WING - FINISH FLOOR TREATMENT PLAN
AI110 FIRST LEVEL - A WING - FINISH FLOOR TREATMENT PLAN
AI111 FIRST LEVEL - B WING, MAIN, C WING - FINISH FLOOR TREATMENT PLAN
AI112 FIRST LEVEL - D WING - FINISH FLOOR TREATMENT PLAN
AI113 ENLARGED FLOOR FINISH PLANS
AI201 INTERIOR FINISHES ELEVATIONS
AI202 INTERIOR FINISHES ELEVATIONS
AI203 INTERIORS FINISH ELEVATIONS
AI204 INTERIORS FINISH ELEVATIONS
AI205 INTERIORS FINISH ELEVATIONS
AI206 INTERIOR FINISH ELEVATIONS
AI207 INTERIOR FINISH ELEVATIONS
AI501 INTERIOR FINISHES DETAILS AND SCHEDULE
AI911 INTERIOR RENDERINGS
AI912 INTERIOR RENDERINGS
FIRE SUPRESSION
FX001 FIRE SUPPRESSION - SYMBOLS, LEGENDS, NOTES, AND DRAWING INDEX
FX002 FIRE SUPPRESSION - DETAILS
FX003 FIRE SUPPRESSION - TEMPORARY AND IMPAIRMENT PROCEDURES
FX100A FIRE SUPRESSION - BASEMENT RENOVATION PLAN - A WING
FX100B FIRE SUPRESSION - BASEMENT RENOVATION PLAN - B & C WING
FX100C FIRE SUPPRESSION - BASEMENT RENOVATION PLAN - D WING
FX101A FIRE SUPRESSION - FIRST LEVEL RENOVATION PLAN - A WING
FX101B FIRE SUPRESSION - FIRST LEVEL RENOVATION PLAN - B & C WING
FX101C FIRE SUPPRESSION - FIRST LEVEL RENOVATION PLAN - D WING
MECHANICAL
M001 MECHANICAL - SYMBOLS, LEGENDS, NOTES, AND DRAWING INDEX
MD100A MECHANICAL - BASEMENT DEMOLITION PLAN - A WING
MD100B MECHANICAL - BASEMENT DEMOLITION PLAN - B & C WING
MD100C MECHANICAL - BASEMENT DEMOLITION PLAN - D WING
MD101A MECHANICAL - FIRST FLOOR DEMOLITION PLAN - A WING
MD101B MECHANICAL - FIRST FLOOR DEMOLITION PLAN - B & C WING
MD101C MECHANICAL - FIRST FLOOR DEMOLITION PLAN - D WING
MH100A MECHANICAL - BASEMENT RENOVATION PLAN - A WING
MH100B MECHANICAL - BASEMENT RENOVATION PLAN - B & C WING
MH100C MECHANICAL - BASEMENT RENOVATION PLAN - D WING
MH101A MECHANICAL - FIRST FLOOR RENOVATION PLAN - A WING
MH101B MECHANCAL - FIRST FLOOR RENOVATION PLAN - B & C WING
MH101C MECHANICAL - FIRST FLOOR RENOVATION PLAN - D WING
PLUMBING
P001 PLUMBING - NOTES, LEGEND AND DRAWING INDEX
PD100A PLUMBING - BASEMENT DEMOLITION PLAN - A WING
PD100B PLUMBING - BASEMENT DEMOLITION PLAN - B & C WING
PD101B PLUMBING - FIRST LEVEL DEMOLITION PLAN - B & C WING
PP100B PLUMBING - BASEMENT RENOVATION PLAN - B & C WING
PP101B PLUMBING - FIRST LEVEL RENOVATION PLAN - B & C WING
PP101C PLUMBING - FIRST FLOOR RENOVATION PLAN - D WING
ELECTRICAL
E001 ELECTRICAL - RISER, DETAILS, SCHEDULES, & DRAWING INDEX
E002 ELECTRICAL - DETAILS
E003 ELECTRICAL - DETAILS
ED100A ELECTRICAL - BASEMENT DEMOLITION PLAN - A WING
ED100B ELECTRICAL - BASEMENT DEMOLITION PLAN - B & C WING
ED100C ELECTRICAL - BASEMENT DEMOLITION PLAN - D WING
ED101A ELECTRICAL - FIRST LEVEL DEMOLITION PLAN - A WING
ED101B ELECTRICAL - FIRST LEVEL DEMOLITION PLAN - B & C WING
ED101C ELECTRICAL - FIRST LEVEL DEMOLITION PLAN - D WING
EL100A ELECTRICAL - BASEMENT RENOVATION PLAN - LIGHTING - A WING
EL100B ELECTRICAL - BASEMENT RENOVATION PLAN - LIGHTING - B & C WING
EL100C ELECTRICAL - BASEMENT RENOVATION PLAN - LIGHTING - D WING
EL101A ELECTRICAL - FIRST LEVEL RENOVATION PLAN - LIGHTING - A WING
EL101B ELECTRICAL - FIRST LEVEL RENOVATION PLAN - LIGHTING - B & C WING
EL101C ELECTRICAL - FIRST LEVEL RENOVATION PLAN - LIGHTING - D WING
EP100A ELECTRICAL - BASEMENT RENOVATION PLAN - POWER - A WING
EP100B ELECTRICAL - BASEMENT RENOVATION PLAN - POWER B & C WING
EP100C ELECTRICAL - FIRST LEVEL RENOVATION PLAN - POWER - D WING
EP101A ELECTRICAL - FIRST LEVEL RENOVATION PLAN - POWER - A WING
EP101B ELECTRICAL - FIRST LEVEL RENOVATION PLAN - POWER - B & C WING
EP101C ELECTRICAL - FIRST LEVEL RENOVATION PLAN - POWER - D WING
Revisions: Date:
DENTAL OP
DENTAL OP
DENTAL OP
DENTAL OP
DIRTY
STORAGE
MTG ROOM
DENTAL OP
DENTAL OP
SPECIAL
DENTAL OP
DENTAL OP
HC TLT
STAFF
TEAMLETS
MED EQUIP.
STORAGE
MEDICINE
STORAGE
DENTAL OP
DENTAL OP
DENTAL OP
EMPLOYEE
MULTI-PURPOSE
ROOM
HAC
0120BLOCKER
RM
0120A
CHANGING
RM
0120C
DENTAL
LAB
CERAMICS
LAB
0119A
MECHANICAL
RM
MB4
DENTAL OP
DENTAL OP
DENTAL OP
DENTAL OP
DENTAL OP
DENTAL OP
DENTAL OP
DENTAL OP
0045IT EQUIP.
CLOSET
X-RAY
DIRTY
STORAGE
STERILE
STORAGE
CLEAN
SUPPLY
RESIDENT
TEAMLETS
C O R R
ID
O R
C B
CORRIDOR
CB-10
S E C R
ETA
R Y
D E N
TA
L O P
DENTAL OP
DEPT.
CHIEF
DEPT.
CHIEF
CORRIDOR
CB-7
C O R R
ID
O R
C B
C O R R
ID
O R
C B
COPY/WORK
RM
0030A
INFUSION
AREA
ONCOLOGY
LAB
PATIENT
CONSULT
H A C
O N C O
LO
G Y
C O R R
ID
O R
C B
O N C O
LO
G Y
R E C E P
TIO
N
STOR
0071A
STOR
0071B
CORRIDOR
CB-10B
EXISTING
WAITING
E X
IS
TIN
G
C O R R
ID
O R
C B
NEW
CONFERENCE
EXISTING
CASHIER
EXISTING
EXAM RM
EXISTING
TLT.
EXISTING
EXAM RM
EXISTING
TLT.
EXISTING
STOR
EXISTING
PREP RM
CB-95
EXISTING
ANTE RM
CB-96
EXIST.
ELEC.
RES.
DIRECTOR
ACUTE
CARE
0064A
TOILET
0064B
S
TER
ILE
S
TO
R A G E
DENTAL OP
DENTAL OP
DENTAL OP
DENTAL OP
HC TLT
DENTAL OP
ONC. EXAM
RM
CORRIDOR
CB-15
CORRIDOR
CB-13
EXIST.
CANTEEN
EXIST
CANTEEN
STOR
0057A
EXIST TLT
0058 EXIST.
MENS TLT
EXIST.
WOMENS
TLT
EXIST. HAC
CB-64
EXIST
STOR
PATIENT
CHECK-IN/WAITING
0030 PATIENT
CHECK-IN
AERATOR
STERILIZERS
FEC
DENTAL SERVICE
DELTA
CLINIC
UP
UP DN
GATE
FC
FC
FC
FC
FC
FC
FC
NOURISH
COUNTER
CARRIER AND
SERVICE SINK
HOLDING
CELL
LOCKERS
STAFF
TOILET
TOILET
PROSTHETICS
OFFICE
ELECTRICAL
ELEVATOR MECH
RM
CRASH
CART
FEC
TOILET 3
MALE
TOILET
TOILET-1
COMMON
CLOSET
DUMBWAITER
UTILITY
RM
COMPRESSOR RM
ADMINISTRATION
FEC
HOUSE KEEPING
STORAGE
HOUSE
KEEPING
TELE
CLOSET
ELECTRICAL
HOUSE
KEEPING
STORAGE
CLEAN LINEN
TANGO
CLINIC
ELEVATOR
ELEVATOR
POLICE / SECURITY RM
EMERGENCY
ENTRANCE
ER PATIENT RM
AREA
BAY-10 ACUTE
RM
ER CHECK IN
BAY-1 BAY-2TRIAGE RM-1
TRIAGE
RM-2
BREAK RM
LOCKER
STORAGE
BAY 4
ISOLATION
ROOM
BAY-4
ISOLATION RM
BAY-6
SUPPLY
OFFICE
HAC
TELECOM
CLOSET
ELEVATOR
MACH RM
OFFICE-5
HSKP
BREAK RM
EMERGENCY RM
WAITING
FEMALE
TOILET
STAIR
SPD
STORAGE /
SUPPLY
OFFICE
EXAM
RM
EXAM
RM
EXAM RM
EXAM RM
EXAM
RM 2
EXAM
RM 3
EXAM
RM 4
EXAM
RM 5
SPD
EXAM
RM 6
ELECTRICAL
CLOSET
BREAK
RM
MECH /
ELECTRICAL
ELECTRICAL
MECH
MECH
MECH
DRESSING
FEMALE TOILET
HAC
CART WASH
FEMALE
LOCKER
MALE LOCKER
LOUNGE
AREA
STAIRS
DECON
CLEAN RM
CORRIDOR
TELERETINAL
IMAGING OFFICEGROUP RM
EMPTY
ELEVATOR
COOLERS
MORGUE
UNIFORM
OFFICE
UNIFORM
STORAGE
OFFICE
STAIR
ENVIRONMENTAL SVC
SUPVOFFICEOFFICE
STAIR
EXAM RM
PSA RM
EXAM RM
EXAM RM
EXAM RM
EXAM RM
EXAM RM
EXAM RM
EXAM RM
TAUGO
CLINIC
WASHING
COMMON
CLOSET
EXAM RM
ELECTRICAL RM
CORRIDOR
SOILED LINEN
LINEN
CHUTE
MALE TOILET
DENTIST
OFFICE
DENTAL
RESIDENT
DIRECTOR
OFFICE
EXAM
RM 4
MECH RM
OFFICE WORK
RM
PW OW
OFFICE
PHARMACY SVC
OFFICE
PHARMACY
TOILET
VAULT
WAITING
EXAM RM OFFICE
OFFICE
UNIT BASE AREA
STORE RM
I V RMEXAM RM
EXAM
RM
EXAM
RM
EXAM
RM
EXAM
RM
EXAM
RM
EXAM
RM
CHECK IN
OFFICE
CHIEF OF
POLICE
POLICE
OPERATIONS
ARMS
RM
OFFICE
TELEPHONE
SWITCHGEAR
PM AND R
OFFICE
DAV
OFFICE
DAV
OFFICESTORAGE
OFFICE
OFFICE
OFFICE
EXAM
RM
EXAM
RM
EXAM
RM
EXAM
RM
EXAM
RM
EXAM RM
OFFICE
OFFICE
RECEPTION
AUDIOLOGY
WAITING
PROSTHETICS
OFFICEPROSTHETICS
OFFICE
BREAK
RM
OFFICE
OFFICE
OPERATORY
OPERATORY
OPERATORY
OPERATORY
HYGIENIST
SUPPLY
FEC
RECEPTION
CHIEF OF
DENTAL
SVC
DENTAL
SVC
FEMALE
TOILET
MHSL-
MHKM
OFFICE
DENTAL
RESIDENT
OFFICE
RADIOLOGY
RM
SUPPLY
RADIOLOGY
RM
DENTAL X-RAY
ELEVATOR ELEVATOR
MECH
DENTAL
SVC
STAIR
TREATMENT
TREATMENT
RM
TREATMENT
RM
TREATMENT
RM
TREATMENT
RM
TREATMENT
RM
TREATMENT
RM
TREATMENT
RM
DENTAL LAB
CORRIDOR
BAY-3
CORRIDOR
DRY
UTILITY
NURSE STATION
PATIENT SHOWERTOILET-2
BAY-9
STAFF
TOILET
N MANAGER
BAY-8
BAY-7 OBSERVATION
RM
CLEAN UTILITY
STAFF
TOILET
STAFF TOILET
MALE
TOILET
B14B
0077-O
0026-B
B11
B21
B61-A
0068-F
0076-A
TB-1
68-6
B14-A
B47
B32
B32A
B33
B24
B35A
B40
0020 0019 0018 00210022
0026-A
EB-2
0028-A
0068-A
TB-2
0068-C
0074-H 0074-G 0074-I
0074-F
0074-E0074-D0074-C0074-B
0074-A
0074J
EB-1
0068-B
EB-1
EB-2
0076-B
0081-C
80-B
80-A
B10
B081
68-D
B09 B08
B07B06
B05
B04A
B04
B02
B01
B46B45B44
B43
B42K
B42J
B42-I
B42H
B42G
B42F
B42E
B42D
B42C
B42B
B41
B42A
B39
B85
B38
B37B36
0077-K
0077-C 0077-B
0077-A
0079-A
0079-B 0077Q
0077-D 0079-C
0077-L
0077-M
0079-D
0079-F
0079-G
0079-H
0079-I
0079-J
0079-K
B12
B13 B14
B14C
B15
B16B17B18A
B18
B18BB54A
54C
B54D
B54E
B54F
B54GB54H
B54L
B54M
B54N
54P
B19B20
B22 B23
B61
B25
B62A
B62B
B62C
B62D B62E
B62F
B62I
B62J
B62K
B62L
B63B26B27
B28
B29
B30
B72 B73
B31
B78 B34
B35
B79L
B79K
B79A
B79B B79C
B79DB79E
B79I
B79F
B79G
B79H
DENTAL OP
DENTAL OP
DENTAL OP
DENTAL OP
DIRTY
STORAGE
MTG ROOM
DENTAL OP
DENTAL OP
SPECIAL
DENTAL OP
DENTAL OP
HC TLT
STAFF
TEAMLETS
MED EQUIP.
STORAGE
MEDICINE
STORAGE
DENTAL OP
DENTAL OP
DENTAL OP
EMPLOYEE
MULTI-PURPOSE
ROOM
HAC
0120BLOCKER
RM
0120A
CHANGING
RM
0120C
DENTAL
LAB
CERAMICS
LAB
0119A
MECHANICAL
RM
MB4
DENTAL OP
DENTAL OP
DENTAL OP
DENTAL OP
DENTAL OP
DENTAL OP
DENTAL OP
DENTAL OP
0045IT EQUIP.
CLOSET
X-RAY
DIRTY
STORAGE
STERILE
STORAGE
CLEAN
SUPPLY
RESIDENT
TEAMLETS
C O R R
ID
O R
C B
CORRIDOR
CB-10
S E C R
ETA
R Y
D E N
TA
L O P
DENTAL OP
DEPT.
CHIEF
DEPT.
CHIEF
CORRIDOR
CB-7
C O R R
ID
O R
C B
C O R R
ID
O R
C B
COPY/WORK
RM
0030A
INFUSION
AREA
ONCOLOGY
LAB
PATIENT
CONSULT
H A C
O N C O
LO
G Y
C O R R
ID
O R
C B
O N C O
LO
G Y
R E C E P
TIO
N
STOR
0071A
STOR
0071B
CORRIDOR
CB-10B
EXISTING
WAITING
E X
IS
TIN
G
C O R R
ID
O R
C B
NEW
CONFERENCE
EXISTING
CASHIER
EXISTING
EXAM RM
EXISTING
TLT.
EXISTING
EXAM RM
EXISTING
TLT.
EXISTING
STOR
EXISTING
PREP RM
CB-95
EXISTING
ANTE RM
CB-96
EXIST.
ELEC.
RES.
DIRECTOR
ACUTE
CARE
0064A
TOILET
0064B
S
TER
ILE
S
TO
R A G E
DENTAL OP
DENTAL OP
DENTAL OP
DENTAL OP
HC TLT
DENTAL OP
ONC. EXAM
RM
CORRIDOR
CB-15
CORRIDOR
CB-13
EXIST.
CANTEEN
EXIST
CANTEEN
STOR
0057A
EXIST TLT
0058 EXIST.
MENS TLT
EXIST.
WOMENS
TLT
EXIST. HAC
CB-64
EXIST
STOR
PATIENT
CHECK-IN/WAITING
0030 PATIENT
CHECK-IN
AERATOR
STERILIZERS
FEC
DENTAL SERVICE
DELTA
CLINIC
UP
UP DN
GATE
FC
FC
FC
FC
FC
FC
FC
NOURISH
COUNTER
CARRIER AND
SERVICE SINK
HOLDING
CELL
LOCKERS
STAFF
TOILET
TOILET
PROSTHETICS
OFFICE
ELECTRICAL
ELEVATOR MECH
RM
CRASH
CART
FEC
TOILET 3
MALE
TOILET
TOILET-1
COMMON
CLOSET
DUMBWAITER
UTILITY
RM
COMPRESSOR RM
ADMINISTRATION
FEC
HOUSE KEEPING
STORAGE
HOUSE
KEEPING
TELE
CLOSET
ELECTRICAL
HOUSE
KEEPING
STORAGE
CLEAN LINEN
TANGO
CLINIC
ELEVATOR
ELEVATOR
POLICE / SECURITY RM
EMERGENCY
ENTRANCE
ER PATIENT RM
AREA
BAY-10 ACUTE
RM
ER CHECK IN
BAY-1 BAY-2TRIAGE RM-1
TRIAGE
RM-2
BREAK RM
LOCKER
STORAGE
BAY 4
ISOLATION
ROOM
BAY-4
ISOLATION RM
BAY-6
SUPPLY
OFFICE
HAC
TELECOM
CLOSET
ELEVATOR
MACH RM
OFFICE-5
HSKP
BREAK RM
EMERGENCY RM
WAITING
FEMALE
TOILET
STAIR
SPD
STORAGE /
SUPPLY
OFFICE
EXAM
RM
EXAM
RM
EXAM RM
EXAM RM
EXAM
RM 2
EXAM
RM 3
EXAM
RM 4
EXAM
RM 5
SPD
EXAM
RM 6
ELECTRICAL
CLOSET
BREAK
RM
MECH /
ELECTRICAL
ELECTRICAL
MECH
MECH
MECH
DRESSING
FEMALE TOILET
HAC
CART WASH
FEMALE
LOCKER
MALE LOCKER
LOUNGE
AREA
STAIRS
DECON
CLEAN RM
CORRIDOR
TELERETINAL
IMAGING OFFICEGROUP RM
EMPTY
ELEVATOR
COOLERS
MORGUE
UNIFORM
OFFICE
UNIFORM
STORAGE
OFFICE
STAIR
ENVIRONMENTAL SVC
SUPVOFFICEOFFICE
STAIR
EXAM RM
PSA RM
EXAM RM
EXAM RM
EXAM RM
EXAM RM
EXAM RM
EXAM RM
EXAM RM
TAUGO
CLINIC
WASHING
COMMON
CLOSET
EXAM RM
ELECTRICAL RM
CORRIDOR
SOILED LINEN
LINEN
CHUTE
MALE TOILET
DENTIST
OFFICE
DENTAL
RESIDENT
DIRECTOR
OFFICE
EXAM
RM 4
MECH RM
OFFICE WORK
RM
PW OW
OFFICE
PHARMACY SVC
OFFICE
PHARMACY
TOILET
VAULT
WAITING
EXAM RM OFFICE
OFFICE
UNIT BASE AREA
STORE RM
I V RMEXAM RM
EXAM
RM
EXAM
RM
EXAM
RM
EXAM
RM
EXAM
RM
EXAM
RM
CHECK IN
OFFICE
CHIEF OF
POLICE
POLICE
OPERATIONS
ARMS
RM
OFFICE
TELEPHONE
SWITCHGEAR
PM AND R
OFFICE
DAV
OFFICE
DAV
OFFICESTORAGE
OFFICE
OFFICE
OFFICE
EXAM
RM
EXAM
RM
EXAM
RM
EXAM
RM
EXAM
RM
EXAM RM
OFFICE
OFFICE
RECEPTION
AUDIOLOGY
WAITING
PROSTHETICS
OFFICEPROSTHETICS
OFFICE
BREAK
RM
OFFICE
OFFICE
OPERATORY
OPERATORY
OPERATORY
OPERATORY
HYGIENIST
SUPPLY
FEC
RECEPTION
CHIEF OF
DENTAL
SVC
DENTAL
SVC
FEMALE
TOILET
MHSL-
MHKM
OFFICE
DENTAL
RESIDENT
OFFICE
RADIOLOGY
RM
SUPPLY
RADIOLOGY
RM
DENTAL X-RAY
ELEVATOR ELEVATOR
MECH
DENTAL
SVC
STAIR
TREATMENT
TREATMENT
RM
TREATMENT
RM
TREATMENT
RM
TREATMENT
RM
TREATMENT
RM
TREATMENT
RM
TREATMENT
RM
DENTAL LAB
CORRIDOR
BAY-3
CORRIDOR
DRY
UTILITY
NURSE STATION
PATIENT SHOWERTOILET-2
BAY-9
STAFF
TOILET
N MANAGER
BAY-8
BAY-7 OBSERVATION
RM
CLEAN UTILITY
STAFF
TOILET
STAFF TOILET
MALE
TOILET
B14B
0077-O
0026-B
B11
B21
B61-A
0068-F
0076-A
TB-1
68-6
B14-A
B47
B32
B32A
B33
B24
B35A
B40
0020 0019 0018 00210022
0026-A
EB-2
0028-A
0068-A
TB-2
0068-C
0074-H 0074-G 0074-I
0074-F
0074-E0074-D0074-C0074-B
0074-A
0074J
EB-1
0068-B
EB-1
EB-2
0076-B
0081-C
80-B
80-A
B10
B081
68-D
B09 B08
B07B06
B05
B04A
B04
B02
B01
B46B45B44
B43
B42K
B42J
B42-I
B42H
B42G
B42F
B42E
B42D
B42C
B42B
B41
B42A
B39
B85
B38
B37B36
0077-K
0077-C 0077-B
0077-A
0079-A
0079-B 0077Q
0077-D 0079-C
0077-L
0077-M
0079-D
0079-F
0079-G
0079-H
0079-I
0079-J
0079-K
B12
B13 B14
B14C
B15
B16B17B18A
B18
B18BB54A
54C
B54D
B54E
B54F
B54GB54H
B54L
B54M
B54N
54P
B19B20
B22 B23
B61
B25
B62A
B62B
B62C
B62D B62E
B62F
B62I
B62J
B62K
B62L
B63B26B27
B28
B29
B30
B72 B73
B31
B78 B34
B35
B79L
B79K
B79A
B79B B79C
B79DB79E
B79I
B79F
B79G
B79H
M A
TC
H
LI
N
E
M A
TC
H
LI
N
E
OUTSIDE OF PROJECT BOUNDARY
OUTSIDE OF PROJECT BOUNDARY
WAITING
FEC
EXIT EGRESS EXIT SIGNAGE
FIRE EXTINGUISHER CABINET
2 HR - FIRE/SMOKE SEPARATION
SMOKE ZONE BARRIER
NON-RATED SMOKE ZONE PARTITION
2 HR - FIRE SEPARATION
1 HR - FIRE SEPARATION
SMOKE RESISTIVE ENCLOSURE
PARTITION LEGEND
CONSTRUCTION ACTIVITY - INFECTION RISK: TYPE C
PATIENT RISK GROUP: LOW
CLASS OF PRECAUTION MATRIX: II
1. PROVIDE TEMPORARY INFECTION CONTROL CONSTRUCTION DOOR WITH
ACCESS CONTROL. REFER TO ELEVATION 3/GC101.
2. PROVIDE TEMPORARY INFECTION CONTROL BARRIER WALL CONSTRUCTION.
REFER TO DETAIL 2/GC101.
3. PROVIDE TEMPORARY INFECTION CONTROL PLASTIC BARRIER WALL
CONSTRUCTION AS APPROVED BY VA COR.
A. REFER TO LIST OF REQUIRED INFECTION CONTROL PRECAUTIONS OUTLINED
BY CLASS IN SPECIFICATION 01 35 26 SAFETY REQUIREMENTS.
B. REFER TO DRAWINGS AND SPECIFICATIONS FOR ADDITIONAL INFORMATION.
C. EACH PHASE SHOULD COMPLETE APPROXIMATELY 500-600 SQ FT OF THE
SCOPE OF WORK AT A TIME IN ORDER FOR THE FACILITY TO REMAIN
OPERATIONAL. ONE SIDE OF CORRIDOR SHALL REMAIN ACCESSBILE AT ALL
TIMES FOR EMERGENCY PASSAGE.
D. COORDINATE FULL SCOPE OF WORK WITH ENGINEERING DRAWINGS AND
FIELD VERIFICATION. CONTRACTOR IS RESPONSIBLE FOR SCOPE OF ABOVE
CEILING WORK REQUIRED ABOVE AND BELOW THE FLOOR PLATE OF THE
PROJECT BOUNDARY.
E. COORDINATE LOCATION OF TEMPORARY INFECTION CONTROL (IC) BARRIER
WALL CONSTRUCTION AND INFECTION CONTROL (IC) MEASURES WITH COR
AND PATIENT SAFETY/ INFECTION CONTROL REPRESENTATIVE.
CONTRACTOR SHALL PROVIDE DRAWING TO COR AND PATIENT SAFETY/
INFECTION CONTROL REPRESENTATIVE ONCE ICRA PROTOCOLS AND PLAN
IS APPROVED.
F. SCHEDULE AND TIME OF CONSTRUCTION WORK TO BE APPROVED BY COR
BEFORE CONSTRUCTION MAY BEGIN. PROVIDE PHASING INFORMATION IN
THE SCHEDULE.
G. ALL WORK SHALL TAKE PLACE BETWEEN THE HOURS OF 5:00 PM AND 5:00
AM FRIDAY THROUGH SUNDAY OR AS APPROVED BY VA COR. IN AREAS THAT
REQUIRE ABOVE CEILING WORK WHERE CEILINGS ARE TO REMAIN, CEILING
TILES SHALL BE REMOVED AND STORED IN A SAFE MANNER UNTIL CEILING
TILES CAN BE REINSTALLED. DAMAGED AND BROKEN CEILING TILES SHALL
BE REPLACED BY CONTRACTOR.
H. EXIT/ACCESS FOR ADJACENT OPERATIONAL AREAS SHALL BE MAINTAINED
DURING NORMAL BUSINESS HOURS.
I. WORK REQUIRING VIBRATION OR LOUD NOISE SHALL TAKE PLACE BETWEEN
THE HOURS OF 5:00 PM AND 8:00 PM OR AS APPROVED BY VA COR. EVERY
EFFORT SHALL BE MADE TO KEEP NOISE AND VIBRATION TO A MINIMUM.
J. PROVIDE THE FOLLOWING INFECTION CONTROL MEASURES, A 24"X36"
STICKY WALK OFF MAT AND HAND SANITIZER AT EACH TEMPORARY DOOR
LOCATION. MAT SHALL BE REPLACED OR CLEANED AS NECESSARY.
K. PROVIDE THE VA AND OSHA REQUIRED TEMPORARY SIGNAGE AT EACH
TEMPORARY DOOR LOCATION.
L. CONTRACTOR SHALL SUPPLY SPILL KIT. SPILL KIT TO INCLUDE SHOP VAC,
MULTI-PURPOSE SPILL CONTROL SORBENTS TO ABSORB NON AGGRESSIVE
LIQUIDS UP TO 5 GALLONS.
M. ALL NEW MATERIAL MOVED THROUGH THE FACILITY SHALL BE COVERED
TIGHTLY WITH 4 MIL. POLY SHEET.
N. ALL DEMOLITION MATERIAL SHALL BE REMOVED FROM THE PROJECT
BOUNDARY THROUGH THE FACILITY TO DUMPSTER ALONG VA APPROVED
ROUTE IN ENCLOSED DUMPSTER CART DESIGNED FOR SUCH PURPOSED
WITH A LID.
O. ALL MATERIAL, DEBRIS AND HAZARDOUS MATERIALS SHALL BE PROPERLY
STORED IN DESIGNATED AREAS AND IN APPROVED CONTAINERS.
FLAMMABLE MATERIALS SHALL NOT BE STORED IN THE FACILITY.
P. PROVIDE CONTAINMENT CART FOR ABOVE CEILING ACCESS OUTSIDE
PROJECT BOUNDARY.
INFECTION CONTROL PLAN NOTES
INFECTION CONTROL GENERAL NOTESINFECTION CONTROL PROJECT INFORMATION
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
Consultant:
B
IM
/2
.9
V
A F a y e tt e v ill e H a lls
W a lls
/2 .9
A v
.r v t
/1
/2
:5
:3
P
M
GI100
BASEMENT - LIFE SAFETY PLAN
GUIDON
1221 N. PENNSYLVANIA STREET
INDIANAPOLIS, IN 46202
317.800.6388
HALLS & WALLS 1ST FLOOR
BLDG. 1
2300 RAMSEY ST.
565-21-101
BLDG 1
07/14/2022 JG KW
100% BID DOCUMENTS
FULLY SPRINKLERED
SCALE: 1/16" = 1'-0"GI100
1 BASEMENT - OVERALL - LIFE SAFETY PLAN
6"
(TYP.)
U.O.N.
FC
COUNTER
FC
FC
FC
FC
LO
C K E R
FC
UP
DN
UP DN
DIGITAL IMAGING
OCT OCULAR
PHOTOGRAPHIC
PODIATRY
CLINIC
TO BUILDING 03
C1-12
BULK HEAD
190-A
132-A
1046-B
1040-A
1021-C
1022-C
E-1-11006-C1006-B1006-A 1007
1007-A
1007-B 1011-B1
1011-A
1011-B
112-G
102-A
128-A
190-B1
190-B
115-A
112-K
112-J
112-I
112-H
112-F
112-A
112-B
112-C
112-D
112-E
115-C
115-D
115-F
115-G
115-H
115-I
115-J
115-K
115-L
115-M
115-N
127128
109108107
106-A
1021-F
1021-E
1021-D
1021-C11021-C
1021-B
10271026 El-2
1022-A
1021-G1022
1021-A 1021-B
1021-A
10061004
1015-C
1010-A
1015-A
1012-I
1015-B
1012-B1012-A
4-D
1013-A
1013-B
1035-A 1036-A
S-106
1051A 1050A
MER-2-1
1046-A
1043-C
1043-A
1043-B
1042 1041 1040
131132
E133
137-A
137-C137-B
181-B
181-A
180179
165-A
164-A
1021-A
115-B
115-E
1054A 1054B 1054C
1052A 1053A
C1-10 C1-11
C1-13
10551054D 1054E 1054F
HOUSE KEEPING
CLOSET
TELECOM
TOILET
SHAFT
ELECTRICAL
ELECTRICAL
MALE
LOCKER
HEMATOLOGY COAG
ANALYZERS
ANCILLARY
CO-ORDR PGM ASST
LOUNGE
STORAGE
SUPPLY
ELECTRICALDRESSINGDRESSINGTOILET TOILET
DRESSING
DRESSING
TOILET
DRESSING
TOILET
DRESSING
TOILET
EXAM RM 3
FEMALE TOILET
STORAGE
ELECTRICAL
IRM CLOSET
TELEPHONE CLOSET
CLOSET
CORRIDOR
LOBBY
WAITING
STAIR
CORRIDOR
DIABETIC CLINIC WAITING
PSA
OFFICE
MULTI
PURPOSE RM
EDUCATION
BREAK RM
TECHNICAL
WORK AREA
OFFICE
EXAM RM 2
EXAM RM 1
STAIR
RECEPTIONIST
EXAM RM
EXAM RM 8
EXAM RM 7
EXAM RM 6
EXAM RM 5
EXAM RM 4
EXAM RM 3
EXAM RM 2
EXAM RM 1
EXAM RM
ELECTRICAL
CHECK-IN
/ WAITING
OPTICAL SHOP
VISIT CO-ORDR
EXAM RMEXAM RMOFFICE
ELEVATOR
ELEVATOR
ELEVATOR
NURSE
RECRUITER
OFFICE
OFFICE
MRSA PREVENTION
CO-ORDR OFFICE
CREDIT UNION
CREDIT UNION
RETAIL OFFICE
CORRIDOR
OFFICE
NUCLEAR
MEDICINE SECY
OFFICE CHIEF
NUCLEAR
MEDICINE
PATIENT WAITING
STORAGEIV RM
HOT LAB
RELEASE OF
INFORMATION OFFICEPATIENT REP OFFCE
PATIENT
REP
OFFICE
MRI SUITE ENTRY HALL
EXAM RM /
MRI MACH
PATIENT REP
OFFICE
WAITING
CONTROL
DRESSING
EQUIPMECH
WAITING
CT
SCAN
CONTROL
CT SCAN
CORRIDOR
IMAGING RM
TECH RMMAMMOGRAPHY
SUITE
DRESSING
EXAM RM
BONE DENSIM
STUDY EXAM RM
CHECK-IN ELEVATOR ELEVATOR
BREAK RM
STAFF
RADIOLOGY
IMAGING
EXAM RMEXAM RM
STORAGE
STAFF
RADIOLOGY
VIEWING RM
EXAM RM
DARK RM
ULTRA SOUND
STORAGE
OFFICE
EXAM RMEXAM RM
STAIR - 9
X-RAY
FILM
LIBRARY
SECY
RADIOLOGY
SVC
IMAGING
SVC MGR
CHIEF RADIOLOGY SVC
MALE
TOILET
FEMALE
TOILET
STAIR
FEMALE
LOCKER
MENS
TOILET
MENS
TOILET
WAITING/RECEPTION AREA
FEMALE TOILET
MECH RM
LAB
BLOOD BANK
STORAGE
HEMATOLOGY
MICROBIOLOGY
FILE RM
PGM ASST
CHIEF
PATHOLOGIST
STORAGE
HISTOLOGY
LAB
LAB
TELE PATH BREAK RM STORAGE
CORRIDOR
ADMINISTRATIVE OFFICER
PGM
ASST
PCS
OFFICE
CBOC
CO-ORDR /
PCMM
CO-ORDR PCS
OFFICE
MALE TOILET
CHAPEL
CHAPLAIN OFFICE
CHIEF
OF
CHAPLAIN
SVC
STORAGE
TELEPHONE
CARE SVC OFFICEKITCHEN STORAGEBREAK RM
HOUSE
KEEPING
PRIMARY
CARE CHIEF
OFFICESECY
OFFICE
RAI / MDS
CO-ORDR OFFICE
COMPLAINT OFFICER
OFFICE
CONFERENCE RM
OFFICE
OFFICE
OFFICE
OFFICE
OFFICE
CHAPLAINS OFFICECHAPLAINS OFFICE
HOUSE
KEEPING
CANTEEN STORAGE
TOILET
STAIR
STORAGE
PODIATRY SUPPLY
EXAM RM
EXAM RM
CHECK-IN /
CHECK-OUT
STORAGE
EXAM RM
EXAM RM
TOILET
WAITING
MALE TOILET
BREAK RM
EMS ISSUE
RM
ELEVATORELEVATOR
TOILET
TOILET
STAIR
FEC
STORAGE
FEC
FEC
FEC
CORRIDOR
TOILET
OFFICE
OFFICE BAY-1 BAY-2 BAY-3
UNISEX
BARIATRIC
TOILET
WOMENS TOILET
CORRIDOR
CORRIDOR
CORRIDOR
OFFICE
PHLEBOTOMY STORAGE
OFFICEBAY-4 BAY-5 BAY-6
PHLEBOTOMY AREA145
CONFERENCE
ROOM
FEMALE
TOILET
IT ROOM/
MECH.
CONSULT
BREAKROOM
OFFICE
ER SUP
ST SUP
AC
CHIEF
SEC./
RECPT.
STAFF
384XXX
163XXX
108100
11480
251XXX
100100
100100
100100100100
130120 270XXX
1730XXX
6"
(TYP.)
U.O.N.
FC
COUNTER
FC
FC
FC
FC
FC
FC
LO
C K E R
FC
UP
DN
UP DN
DIGITAL IMAGING
OCT OCULAR
PHOTOGRAPHIC
PODIATRY
CLINIC
TO BUILDING 03
C1-12
BULK HEAD
TL-2
190-A
132-A
C1-2B
1046-B
1040-A
1021-C
1022-C
E-1-11006-C1006-B1006-A 1007
1007-A
1007-B 1011-B1
1011-A
1011-B
112-G
102-A
128-A
190-B1
190-B
115-A
112-K
112-J
112-I
112-H
112-F
112-A
112-B
112-C
112-D
112-E
115-C
115-D
115-F
115-G
115-H
115-I
115-J
115-K
115-L
115-M
115-N
127128
109108107
106-A
1021-F
1021-E
1021-D
1021-C11021-C
1021-B
10271026 El-2
1022-A
1021-G1022
1021-A 1021-B
1021-A
10061004
T-1-1
1015-C
1010-A
1015-A
1012-I
1015-B
1012-B1012-A
4-D
1013-A
1013-B
1035-A 1036-A
S-106
1051A 1050A
MER-2-1
1046-A
1043-C
1043-A
1043-B
1042 1041 1040
131132
E133
137-A
137-C137-B
181-B
181-A
180179
165-A
164-A
1021-A
115-B
115-E
C1-1
1054A 1054B 1054C
1052A 1053A
C1-10 C1-11
C1-13
10551054D 1054E 1054F
TELEPHONE CLOSET
HOUSE KEEPING
CLOSET
TELECOM
TOILET
SHAFT
ELECTRICAL
ELECTRICAL
MALE
LOCKER
HEMATOLOGY COAG
ANALYZERS
ANCILLARY
CO-ORDR PGM ASST
LOUNGE
STORAGE
SUPPLY
ELECTRICALDRESSINGDRESSINGTOILET TOILET
DRESSING
DRESSING
TOILET
DRESSING
TOILET
DRESSING
TOILET
EXAM RM 3
FEMALE TOILET
STORAGE
ELECTRICAL
IRM CLOSET
TELEPHONE CLOSET
CLOSET
CORRIDOR
LOBBY
WAITING
STAIR
CORRIDOR
DIABETIC CLINIC WAITING
PSA
OFFICE
MULTI
PURPOSE RM
EDUCATION
BREAK RM
TECHNICAL
WORK AREA
OFFICE
EXAM RM 2
EXAM RM 1
STAIR
RECEPTIONIST
EXAM RM
EXAM RM 8
EXAM RM 7
EXAM RM 6
EXAM RM 5
EXAM RM 4
EXAM RM 3
EXAM RM 2
EXAM RM 1
EXAM RM
ELECTRICAL
CHECK-IN
/ WAITING
OPTICAL SHOP
VISIT CO-ORDR
EXAM RMEXAM RMOFFICE
ELEVATOR
ELEVATOR
ELEVATOR
NURSE
RECRUITER
OFFICE
OFFICE
MRSA PREVENTION
CO-ORDR OFFICE
CREDIT UNION
CREDIT UNION
RETAIL OFFICE
CORRIDOR CORRIDOR
CORRIDOR
OFFICE
NUCLEAR
MEDICINE SECY
OFFICE CHIEF
NUCLEAR
MEDICINE
PATIENT WAITING
STORAGEIV RM
HOT LAB
RELEASE OF
INFORMATION OFFICEPATIENT REP OFFCE
PATIENT
REP
OFFICE
MRI SUITE ENTRY HALL
EXAM RM /
MRI MACH
PATIENT REP
OFFICE
WAITING
CONTROL
DRESSING
EQUIPMECH
WAITING
CT
SCAN
CONTROL
CT SCAN
CORRIDOR
IMAGING RM
TECH RMMAMMOGRAPHY
SUITE
DRESSING
EXAM RM
BONE DENSIM
STUDY EXAM RM
CHECK-IN ELEVATOR ELEVATOR
BREAK RM
STAFF
RADIOLOGY
IMAGING
EXAM RMEXAM RM
STORAGE
STAFF
RADIOLOGY
VIEWING RM
EXAM RM
DARK RM
ULTRA SOUND
STORAGE
OFFICE
EXAM RMEXAM RM
STAIR - 9
X-RAY
FILM
LIBRARY
SECY
RADIOLOGY
SVC
IMAGING
SVC MGR
CHIEF RADIOLOGY SVC
MALE
TOILET
FEMALE
TOILET
STAIR
FEMALE
LOCKER
MENS
TOILET
MENS
TOILET
WAITING/RECEPTION AREA
FEMALE TOILET
MALE
TOILET
MECH RM
LAB
BLOOD BANK
STORAGE
HEMATOLOGY
MICROBIOLOGY
FILE RM
PGM ASST
CHIEF
PATHOLOGIST
STORAGE
HISTOLOGY
LAB
LAB
TELE PATH BREAK RM STORAGE
CORRIDOR
ADMINISTRATIVE OFFICER
PGM
ASST
PCS
OFFICE
CBOC
CO-ORDR /
PCMM
CO-ORDR PCS
OFFICE
MALE TOILET
CHAPEL
CHAPLAIN OFFICE
CHIEF
OF
CHAPLAIN
SVC
STORAGE
TELEPHONE
CARE SVC OFFICEKITCHEN STORAGEBREAK RM
HOUSE
KEEPING
PRIMARY
CARE CHIEF
OFFICESECY
OFFICE
RAI / MDS
CO-ORDR OFFICE
COMPLAINT OFFICER
OFFICE
CONFERENCE RM
OFFICE
OFFICE
OFFICE
OFFICE
OFFICE
CHAPLAINS OFFICECHAPLAINS OFFICE
HOUSE
KEEPING
CANTEEN STORAGE
TOILET
STAIR
STORAGE
PODIATRY SUPPLY
EXAM RM
EXAM RM
CHECK-IN /
CHECK-OUT
STORAGE
EXAM RM
EXAM RM
TOILET
WAITING
MALE TOILET
BREAK RM
EMS ISSUE
RM
ELEVATORELEVATOR
TOILET
TOILET
STAIR
FEC
STORAGE
FEC
FEC
FEC
CORRIDOR
TOILET
OFFICE
OFFICE BAY-1 BAY-2 BAY-3
UNISEX
BARIATRIC
TOILET
WOMENS TOILET
CORRIDOR
CORRIDOR
CORRIDOR
OFFICE
PHLEBOTOMY STORAGE
OFFICEBAY-4 BAY-5 BAY-6
PHLEBOTOMY AREA145
CONFERENCE
ROOM
FEMALE
TOILET
IT ROOM/
MECH.
CONSULT
BREAKROOM
OFFICE
ER SUP
ST SUP
AC
CHIEF
SEC./
RECPT.
STAFF
384XXX
163XXX
108100
11480
251XXX
100100
100100
100100100100
130120 270XXX
1730XXX
DN
DN
M A
TC
H
LI
N
E
M A
TC
H
LI
N
E
OUTSIDE OF
PROJECT
BOUNDARY
OUTSIDE OF
PROJECT
BOUNDARY
4' - 0" 4' - 0"
BONE DENSIM
STUDY EXAM ROOM
IMAGING
EXAM RM
FEMALE TOILET
MALE TOILET
OFFICE
OFFICE
ELECTRICAL
EL-2
PATIENT REP
OFFICE
PATIENT REP
OFFICE
RELEASE OF
INFORMATION
OFFICE
OFFICE NUCLEAR
MEDICINE SECY
1021-1
CORRIDOR
C1-13
MENS TOILET
1035-A
FEC
EXIT EGRESS EXIT SIGNAGE
FIRE EXTINGUISHER CABINET
2 HR - FIRE/SMOKE SEPARATION
SMOKE ZONE BARRIER
NON-RATED SMOKE ZONE PARTITION
2 HR - FIRE SEPARATION
1 HR - FIRE SEPARATION
SMOKE RESISTIVE ENCLOSURE
PARTITION LEGEND
CONSTRUCTION ACTIVITY - INFECTION RISK: TYPE C
PATIENT RISK GROUP: LOW
CLASS OF PRECAUTION MATRIX: II
1. PROVIDE TEMPORARY INFECTION CONTROL CONSTRUCTION DOOR WITH
ACCESS CONTROL. REFER TO ELEVATION 3/GC101.
2. PROVIDE TEMPORARY INFECTION CONTROL BARRIER WALL CONSTRUCTION.
REFER TO DETAIL 2/GC101.
3. PROVIDE TEMPORARY INFECTION CONTROL PLASTIC BARRIER WALL
CONSTRUCTION AS APPROVED BY VA COR.
A. REFER TO LIST OF REQUIRED INFECTION CONTROL PRECAUTIONS OUTLINED
BY CLASS IN SPECIFICATION 01 35 26 SAFETY REQUIREMENTS.
B. REFER TO DRAWINGS AND SPECIFICATIONS FOR ADDITIONAL INFORMATION.
C. EACH PHASE SHOULD COMPLETE APPROXIMATELY 500-600 SQ FT OF THE
SCOPE OF WORK AT A TIME IN ORDER FOR THE FACILITY TO REMAIN
OPERATIONAL. ONE SIDE OF CORRIDOR SHALL REMAIN ACCESSBILE AT ALL
TIMES FOR EMERGENCY PASSAGE.
D. COORDINATE FULL SCOPE OF WORK WITH ENGINEERING DRAWINGS AND
FIELD VERIFICATION. CONTRACTOR IS RESPONSIBLE FOR SCOPE OF ABOVE
CEILING WORK REQUIRED ABOVE AND BELOW THE FLOOR PLATE OF THE
PROJECT BOUNDARY.
E. COORDINATE LOCATION OF TEMPORARY INFECTION CONTROL (IC) BARRIER
WALL CONSTRUCTION AND INFECTION CONTROL (IC) MEASURES WITH COR
AND PATIENT SAFETY/ INFECTION CONTROL REPRESENTATIVE.
CONTRACTOR SHALL PROVIDE DRAWING TO COR AND PATIENT SAFETY/
INFECTION CONTROL REPRESENTATIVE ONCE ICRA PROTOCOLS AND PLAN
IS APPROVED.
F. SCHEDULE AND TIME OF CONSTRUCTION WORK TO BE APPROVED BY COR
BEFORE CONSTRUCTION MAY BEGIN. PROVIDE PHASING INFORMATION IN
THE SCHEDULE.
G. ALL WORK SHALL TAKE PLACE BETWEEN THE HOURS OF 5:00 PM AND 5:00
AM FRIDAY THROUGH SUNDAY OR AS APPROVED BY VA COR. IN AREAS THAT
REQUIRE ABOVE CEILING WORK WHERE CEILINGS ARE TO REMAIN, CEILING
TILES SHALL BE REMOVED AND STORED IN A SAFE MANNER UNTIL CEILING
TILES CAN BE REINSTALLED. DAMAGED AND BROKEN CEILING TILES SHALL
BE REPLACED BY CONTRACTOR.
H. EXIT/ACCESS FOR ADJACENT OPERATIONAL AREAS SHALL BE MAINTAINED
DURING NORMAL BUSINESS HOURS.
I. WORK REQUIRING VIBRATION OR LOUD NOISE SHALL TAKE PLACE BETWEEN
THE HOURS OF 5:00 PM AND 8:00 PM OR AS APPROVED BY VA COR. EVERY
EFFORT SHALL BE MADE TO KEEP NOISE AND VIBRATION TO A MINIMUM.
J. PROVIDE THE FOLLOWING INFECTION CONTROL MEASURES, A 24"X36"
STICKY WALK OFF MAT AND HAND SANITIZER AT EACH TEMPORARY DOOR
LOCATION. MAT SHALL BE REPLACED OR CLEANED AS NECESSARY.
K. PROVIDE THE VA AND OSHA REQUIRED TEMPORARY SIGNAGE AT EACH
TEMPORARY DOOR LOCATION.
L. CONTRACTOR SHALL SUPPLY SPILL KIT. SPILL KIT TO INCLUDE SHOP VAC,
MULTI-PURPOSE SPILL CONTROL SORBENTS TO ABSORB NON AGGRESSIVE
LIQUIDS UP TO 5 GALLONS.
M. ALL NEW MATERIAL MOVED THROUGH THE FACILITY SHALL BE COVERED
TIGHTLY WITH 4 MIL. POLY SHEET.
N. ALL DEMOLITION MATERIAL SHALL BE REMOVED FROM THE PROJECT
BOUNDARY THROUGH THE FACILITY TO DUMPSTER ALONG VA APPROVED
ROUTE IN ENCLOSED DUMPSTER CART DESIGNED FOR SUCH PURPOSED
WITH A LID.
O. ALL MATERIAL, DEBRIS AND HAZARDOUS MATERIALS SHALL BE PROPERLY
STORED IN DESIGNATED AREAS AND IN APPROVED CONTAINERS.
FLAMMABLE MATERIALS SHALL NOT BE STORED IN THE FACILITY.
P. PROVIDE CONTAINMENT CART FOR ABOVE CEILING ACCESS OUTSIDE
PROJECT BOUNDARY.
INFECTION CONTROL PLAN NOTES
INFECTION CONTROL GENERAL NOTESINFECTION CONTROL PROJECT INFORMATION
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
Consultant:
B
IM
/2
.9
V
A F a y e tt e v ill e H a lls
W a lls
/2 .9
A v
.r v t
/1
/2
:5
:3
P
M
GI101
FIRST LEVEL - LIFE SAFETY PLAN
GUIDON
1221 N. PENNSYLVANIA STREET
INDIANAPOLIS, IN 46202
317.800.6388
HALLS & WALLS 1ST FLOOR
BLDG. 1
2300 RAMSEY ST.
565-21-101
BLDG 1
07/14/2022 JG KW
100% BID DOCUMENTS
FULLY SPRINKLERED
SCALE: 1/16" = 1'-0"GI101
1 LEVEL 1 - OVERALL - LIFE SAFETY PLAN
K P
C R
SS
S
K P
C R
S
PP S
KPCR
S
S
KPCR
S S
S KPCR
KPCR
KPCR
KPCR
KPCR
KPCRS
KPCR SS
KPCR
H H
DENTAL OP
DENTAL OP
DENTAL OP
DENTAL OP
DIRTY
STORAGE
MTG ROOM
DENTAL OP
DENTAL OP
SPECIAL
DENTAL OP
DENTAL OP
HC TLT
STAFF
TEAMLETS
MED EQUIP.
STORAGE
MEDICINE
STORAGE
DENTAL OP
DENTAL OP
DENTAL OP
EMPLOYEE
MULTI-PURPOSE
ROOM
HAC
0120BLOCKER
RM
0120A
CHANGING
RM
0120C
DENTAL
LAB
CERAMICS
LAB
0119A
MECHANICAL
RM
MB4
DENTAL OP
DENTAL OP
DENTAL OP
DENTAL OP
DENTAL OP
DENTAL OP
DENTAL OP
DENTAL OP
0045IT EQUIP.
CLOSET
X-RAY
DIRTY
STORAGE
STERILE
STORAGE
CLEAN
SUPPLY
RESIDENT
TEAMLETS
C O R R
ID
O R
C B
CORRIDOR
CB-10
S
EC
R E
TA
R Y
D
EN
TA
L O P
DENTAL OP
DEPT.
CHIEF
DEPT.
CHIEF
CORRIDOR
CB-7
C O R R
ID
O R
C B
C O R R
ID
O R
C B
COPY/WORK
RM
0030A
INFUSION
AREA
ONCOLOGY
LAB
PATIENT
CONSULT
H A C
O N C O
LO
G Y
C O R R
ID
O R
C B
O N C O
LO
G Y
R
EC
E P
TIO
N
STOR
0071A
STOR
0071B
CORRIDOR
CB-10B
EXISTING
WAITING
EX
IS
T
IN
G
C O R R
ID
O R
C B
NEW
CONFERENCE
EXISTING
CASHIER
EXISTING
EXAM RM
EXISTING
TLT.
EXISTING
EXAM RM
EXISTING
TLT.
EXISTING
STOR
EXISTING
PREP RM
CB-95
EXISTING
ANTE RM
CB-96
EXIST.
ELEC.
RES.
DIRECTOR
ACUTE
CARE
0064A
TOILET
0064B
S
TE
R
ILE
S
TO
R A G E
DENTAL OP
DENTAL OP
DENTAL OP
DENTAL OP
HC TLT
DENTAL OP
ONC. EXAM
RM
CORRIDOR
CB-15
CORRIDOR
CB-13
EXIST.
CANTEEN
EXIST
CANTEEN
STOR
0057A
EXIST TLT
0058 EXIST.
MENS TLT
EXIST.
WOMENS
TLT
EXIST. HAC
CB-64
EXIST
STOR
PATIENT
CHECK-IN/WAITING
0030 PATIENT
CHECK-IN
AERATOR
STERILIZERS
FEC
DENTAL SERVICE
DELTA
CLINIC
UP
UP DN
GATE
FC
FC
FC
FC
FC
FC
NOURISH
COUNTER
CARRIER AND
SERVICE SINK
HOLDING
CELL
LOCKERS
STAFF
TOILET
TOILET
PROSTHETICS
OFFICE
ELECTRICAL
ELEVATOR MECH
RM
CRASH
CART
FEC
TOILET 3
TOILET-1
DUMBWAITER
UTILITY
RM
COMPRESSOR RM
HOUSE KEEPING
HOUSE
KEEPING
TELE
CLOSET
ELECTRICAL
STORAGE
TANGO
CLINIC
ELEVATOR
ELEVATOR
POLICE / SECURITY RM
EMERGENCY
ENTRANCE
ER PATIENT RM
AREA
BAY-10 ACUTE
RM
ER CHECK IN
BAY-1 BAY-2TRIAGE RM-1
TRIAGE
RM-2
BREAK RM
LOCKER
STORAGE
BAY 4
ISOLATION
ROOM
BAY-4
ISOLATION RM
BAY-6
SUPPLY
OFFICE
HAC
TELECOM
CLOSET
ELEVATOR
MACH RM
OFFICE-5
HSKP
BREAK RM
EMERGENCY RM
WAITING
FEMALE
TOILET
STAIR
SPD
STORAGE /
SUPPLY
OFFICE
EXAM
RM
EXAM
RM
EXAM RM
EXAM RM
EXAM
RM 2
EXAM
RM 3
EXAM
RM 4
EXAM
RM 5
SPD
EXAM
RM 6
ELECTRICAL
CLOSET
BREAK
RM
MECH /
ELECTRICAL
ELECTRICAL
MECH
MECH
MECH
DRESSING
FEMALE TOILET
HAC
CART WASH
FEMALE
LOCKER
MALE LOCKER
LOUNGE
AREA
STAIRS
DECON
CLEAN RM
TELERETINAL
IMAGING OFFICEGROUP RM
EMPTY
ELEVATOR
COOLERS
MORGUE
UNIFORM
OFFICE
UNIFORM
STORAGE
OFFICE
STAIR
ENVIRONMENTAL SVC
SUPVOFFICEOFFICE
STAIR
EXAM RM
PSA RM
EXAM RM
EXAM RM
EXAM RM
EXAM RM
EXAM RM
EXAM RM
EXAM RM
TAUGO
CLINIC
WASHING
COMMON
CLOSET
EXAM RM
ELECTRICAL RM
SOILED LINEN
LINEN
CHUTE
MALE TOILET
DENTIST
OFFICE
DENTAL
RESIDENT
DIRECTOR
OFFICE
EXAM
RM 4
MECH RM
OFFICE WORK
RM
PW OWOFFICE
PHARMACY SVC
OFFICE
PHARMACY
TOILET
VAULT
WAITING
EXAM RM OFFICE
OFFICE
UNIT BASE AREA
STORE RM
I V RMEXAM RM
EXAM
RM
EXAM
RM
EXAM
RM
EXAM
RM
EXAM
RM
EXAM
RM
CHECK IN
OFFICE
CHIEF OF
POLICE
POLICE
OPERATIONS
ARMS
RM
OFFICE
TELEPHONE
SWITCHGEAR
PM AND R
OFFICE
DAV
OFFICE
DAV
OFFICESTORAGE
OFFICE
OFFICE
OFFICE
EXAM
RM
EXAM
RM
EXAM
RM
EXAM
RM
EXAM
RM
EXAM RM
OFFICE
OFFICE
RECEPTION
AUDIOLOGY
WAITING
PROSTHETICS
OFFICEPROSTHETICS
OFFICE
BREAK
RM
OFFICE
OFFICE
OPERATORY
OPERATORY
OPERATORY
OPERATORY
HYGIENIST
SUPPLY
FEC
RECEPTION
CHIEF OF
DENTAL
SVC
DENTAL
SVC
FEMALE
TOILET
MHSL-
MHKM
OFFICE
DENTAL
RESIDENT
OFFICE
RADIOLOGY
RM
SUPPLY
RADIOLOGY
RM
DENTAL X-RAY
ELEVATOR ELEVATOR
MECH
DENTAL
SVC
STAIR
TREATMENT
TREATMENT
RM
TREATMENT
RM
TREATMENT
RM
TREATMENT
RM
TREATMENT
RM
TREATMENT
RM
TREATMENT
RM
DENTAL LAB
BAY-3
CORRIDOR
DRY
UTILITY
NURSE STATION
PATIENT SHOWERTOILET-2
BAY-9
STAFF
TOILET
N MANAGER
BAY-8
BAY-7 OBSERVATION
RM
CLEAN UTILITY
STAFF
TOILET
STAFF TOILET
MALE
TOILET
B14B
0077-O
0026-B
B11
B21
B61-A
0068-F
68-6
B47
B32
B32A
B33
B35A
0020 0019 0018 00210022
0026-A
EB-2
0028-A
0068-A
TB-2
0068-C
0074-H 0074-G 0074-I
0074-F
0074-E0074-D0074-C0074-B
0074-A
0074J
EB-1
0068-B
EB-1
EB-2
0076-B
0081-C
80-B
80-A
B10
B081
68-D
B09 B08
B07B06
B05
B04A
B04
B02
B01
B46B45B44
B43
B42K
B42J
B42-I
B42H
B42G
B42F
B42E
B42D
B42C
B42B
B41
B42A
B39
B85
B38
B37B36
0077-K
0077-C 0077-B
0077-A
0079-A
0079-B 0077Q
0077-D 0079-C
0077-L
0077-M
0079-D
0079-F
0079-G
0079-H
0079-I
0079-J
0079-K
B12
B13 B14
B14C
B15
B16B17B18A
B18
B18BB54A
54C
B54D
B54E
B54F
B54GB54H
B54L
B54M
B54N
54P
B19B20
B22 B23
B61
B25
B62A
B62B
B62C
B62D B62E
B62F
B62I
B62J
B62K
B62L
B63B26B27
B28
B29
B30
B72 B73
B31
B78 B34
B35
B79L
B79K
B79A
B79B B79C
B79DB79E
B79I
B79F
B79G
B79H
PF
JT JT
DENTAL OP
DENTAL OP
DENTAL OP
DENTAL OP
DIRTY
STORAGE
MTG ROOM
DENTAL OP
DENTAL OP
SPECIAL
DENTAL OP
DENTAL OP
HC TLT
STAFF
TEAMLETS
MED EQUIP.
STORAGE
MEDICINE
STORAGE
DENTAL OP
DENTAL OP
DENTAL OP
EMPLOYEE
MULTI-PURPOSE
ROOM
HAC
0120BLOCKER
RM
0120A
CHANGING
RM
0120C
DENTAL
LAB
CERAMICS
LAB
0119A
MECHANICAL
RM
MB4
DENTAL OP
DENTAL OP
DENTAL OP
DENTAL OP
DENTAL OP
DENTAL OP
DENTAL OP
DENTAL OP
0045IT EQUIP.
CLOSET
X-RAY
DIRTY
STORAGE
STERILE
STORAGE
CLEAN
SUPPLY
RESIDENT
TEAMLETS
C O R R
ID
O R
C B
CORRIDOR
CB-10
S
EC
R E
TA
R Y
D
EN
TA
L O P
DENTAL OP
DEPT.
CHIEF
DEPT.
CHIEF
CORRIDOR
CB-7
C O R R
ID
O R
C B
C O R R
ID
O R
C B
COPY/WORK
RM
0030A
INFUSION
AREA
ONCOLOGY
LAB
PATIENT
CONSULT
H A C
O N C O
LO
G Y
C O R R
ID
O R
C B
O N C O
LO
G Y
R
EC
E P
TIO
N
STOR
0071A
STOR
0071B
CORRIDOR
CB-10B
EXISTING
WAITING
EX
IS
T
IN
G
C O R R
ID
O R
C B
NEW
CONFERENCE
EXISTING
CASHIER
EXISTING
EXAM RM
EXISTING
TLT.
EXISTING
EXAM RM
EXISTING
TLT.
EXISTING
STOR
EXISTING
PREP RM
CB-95
EXISTING
ANTE RM
CB-96
EXIST.
ELEC.
RES.
DIRECTOR
ACUTE
CARE
0064A
TOILET
0064B
S
TE
R
ILE
S
TO
R A G E
DENTAL OP
DENTAL OP
DENTAL OP
DENTAL OP
HC TLT
DENTAL OP
ONC. EXAM
RM
CORRIDOR
CB-15
CORRIDOR
CB-13
EXIST.
CANTEEN
EXIST
CANTEEN
STOR
0057A
EXIST TLT
0058 EXIST.
MENS TLT
EXIST.
WOMENS
TLT
EXIST. HAC
CB-64
EXIST
STOR
PATIENT
CHECK-IN/WAITING
0030 PATIENT
CHECK-IN
AERATOR
STERILIZERS
FEC
DENTAL SERVICE
DELTA
CLINIC
UP
UP DN
GATE
FC
FC
FC
FC
FC
FC
NOURISH
COUNTER
CARRIER AND
SERVICE SINK
HOLDING
CELL
LOCKERS
STAFF
TOILET
TOILET
PROSTHETICS
OFFICE
ELECTRICAL
ELEVATOR MECH
RM
CRASH
CART
FEC
TOILET 3
TOILET-1
DUMBWAITER
UTILITY
RM
COMPRESSOR RM
HOUSE KEEPING
HOUSE
KEEPING
TELE
CLOSET
ELECTRICAL
STORAGE
TANGO
CLINIC
ELEVATOR
ELEVATOR
POLICE / SECURITY RM
EMERGENCY
ENTRANCE
ER PATIENT RM
AREA
BAY-10 ACUTE
RM
ER CHECK IN
BAY-1 BAY-2TRIAGE RM-1
TRIAGE
RM-2
BREAK RM
LOCKER
STORAGE
BAY 4
ISOLATION
ROOM
BAY-4
ISOLATION RM
BAY-6
SUPPLY
OFFICE
HAC
TELECOM
CLOSET
ELEVATOR
MACH RM
OFFICE-5
HSKP
BREAK RM
EMERGENCY RM
WAITING
FEMALE
TOILET
STAIR
SPD
STORAGE /
SUPPLY
OFFICE
EXAM
RM
EXAM
RM
EXAM RM
EXAM RM
EXAM
RM 2
EXAM
RM 3
EXAM
RM 4
EXAM
RM 5
SPD
EXAM
RM 6
ELECTRICAL
CLOSET
BREAK
RM
MECH /
ELECTRICAL
ELECTRICAL
MECH
MECH
MECH
DRESSING
FEMALE TOILET
HAC
CART WASH
FEMALE
LOCKER
MALE LOCKER
LOUNGE
AREA
STAIRS
DECON
CLEAN RM
TELERETINAL
IMAGING OFFICEGROUP RM
EMPTY
ELEVATOR
COOLERS
MORGUE
UNIFORM
OFFICE
UNIFORM
STORAGE
OFFICE
STAIR
ENVIRONMENTAL SVC
SUPVOFFICEOFFICE
STAIR
EXAM RM
PSA RM
EXAM RM
EXAM RM
EXAM RM
EXAM RM
EXAM RM
EXAM RM
EXAM RM
TAUGO
CLINIC
WASHING
COMMON
CLOSET
EXAM RM
ELECTRICAL RM
SOILED LINEN
LINEN
CHUTE
MALE TOILET
DENTIST
OFFICE
DENTAL
RESIDENT
DIRECTOR
OFFICE
EXAM
RM 4
MECH RM
OFFICE WORK
RM
PW OWOFFICE
PHARMACY SVC
OFFICE
PHARMACY
TOILET
VAULT
WAITING
EXAM RM OFFICE
OFFICE
UNIT BASE AREA
STORE RM
I V RMEXAM RM
EXAM
RM
EXAM
RM
EXAM
RM
EXAM
RM
EXAM
RM
EXAM
RM
CHECK IN
OFFICE
CHIEF OF
POLICE
POLICE
OPERATIONS
ARMS
RM
OFFICE
TELEPHONE
SWITCHGEAR
PM AND R
OFFICE
DAV
OFFICE
DAV
OFFICESTORAGE
OFFICE
OFFICE
OFFICE
EXAM
RM
EXAM
RM
EXAM
RM
EXAM
RM
EXAM
RM
EXAM RM
OFFICE
OFFICE
RECEPTION
AUDIOLOGY
WAITING
PROSTHETICS
OFFICEPROSTHETICS
OFFICE
BREAK
RM
OFFICE
OFFICE
OPERATORY
OPERATORY
OPERATORY
OPERATORY
HYGIENIST
SUPPLY
FEC
RECEPTION
CHIEF OF
DENTAL
SVC
DENTAL
SVC
FEMALE
TOILET
MHSL-
MHKM
OFFICE
DENTAL
RESIDENT
OFFICE
RADIOLOGY
RM
SUPPLY
RADIOLOGY
RM
DENTAL X-RAY
ELEVATOR ELEVATOR
MECH
DENTAL
SVC
STAIR
TREATMENT
TREATMENT
RM
TREATMENT
RM
TREATMENT
RM
TREATMENT
RM
TREATMENT
RM
TREATMENT
RM
TREATMENT
RM
DENTAL LAB
BAY-3
CORRIDOR
DRY
UTILITY
NURSE STATION
PATIENT SHOWERTOILET-2
BAY-9
STAFF
TOILET
N MANAGER
BAY-8
BAY-7 OBSERVATION
RM
CLEAN UTILITY
STAFF
TOILET
STAFF TOILET
MALE
TOILET
B14B
0077-O
0026-B
B11
B21
B61-A
0068-F
68-6
B47
B32
B32A
B33
B35A
0020 0019 0018 00210022
0026-A
EB-2
0028-A
0068-A
TB-2
0068-C
0074-H 0074-G 0074-I
0074-F
0074-E0074-D0074-C0074-B
0074-A
0074J
EB-1
0068-B
EB-1
EB-2
0076-B
0081-C
80-B
80-A
B10
B081
68-D
B09 B08
B07B06
B05
B04A
B04
B02
B01
B46B45B44
B43
B42K
B42J
B42-I
B42H
B42G
B42F
B42E
B42D
B42C
B42B
B41
B42A
B39
B85
B38
B37B36
0077-K
0077-C 0077-B
0077-A
0079-A
0079-B 0077Q
0077-D 0079-C
0077-L
0077-M
0079-D
0079-F
0079-G
0079-H
0079-I
0079-J
0079-K
B12
B13 B14
B14C
B15
B16B17B18A
B18
B18BB54A
54C
B54D
B54E
B54F
B54GB54H
B54L
B54M
B54N
54P
B19B20
B22 B23
B61
B25
B62A
B62B
B62C
B62D B62E
B62F
B62I
B62J
B62K
B62L
B63B26B27
B28
B29
B30
B72 B73
B31
B78 B34
B35
B79L
B79K
B79A
B79B B79C
B79DB79E
B79I
B79F
B79G
B79H
SS
S SS S
H
KPCR S
T V
S
S K
P C
R
H H
S
S
H
H
H
H
H
H H
KPCR
T T
KPCR
K P
C R6"
(TYP.)
U.O.N.
FC
COUNTER
FC
FC
FC
FC
LO
C K E R
FC
UP
DN
UP DN
DIGITAL IMAGING
OCT OCULAR
PHOTOGRAPHIC
PODIATRY
CLINIC
TO BUILDING 03
C1-12
BULK HEAD
190-A
132-A
1046-B
1040-A
1021-C
1022-C
E-1-11006-C1006-B1006-A 1007
1007-A
1007-B 1011-B1
1011-A
1011-B
112-G
102-A
128-A
190-B
115-A
112-K
112-J
112-I
112-H
112-F
112-A
112-B
112-C
112-D
112-E
115-C
115-D
115-F
115-G
115-H
115-I
115-J
115-K
115-L
115-M
115-N
127128
109108107
106-A
1021-F
1021-E
1021-D
1021-C11021-C
1021-B
10271026 El-2
1022-A
1021-G1022
1021-A 1021-B
1021-A
10061004
1015-C
1010-A
1015-A
1012-I
1015-B
1012-B1012-A
4-D
1013-A
1013-B
1035-A 1036-A
S-106
1051A 1050A
MER-2-1
1046-A
1043-C
1043-A
1043-B
1042 1041 1040
131132
E133
137-A
137-C 137-B
181-B
181-A
180179
165-A
164-A
1021-A
115-B
115-E
1054A 1054B 1054C
1052A 1053A
C1-10 C1-11
C1-13
10551054D 1054E 1054F
HOUSE KEEPING
CLOSET
TOILET
ELECTRICAL
ELECTRICAL
MALE
LOCKER
HEMATOLOGY COAG
ANALYZERS
ANCILLARY
CO-ORDR PGM ASST
LOUNGE
STORAGE
SUPPLY
ELECTRICALDRESSINGDRESSINGTOILET TOILET
DRESSING
DRESSING
TOILET
DRESSING
TOILET
DRESSING
TOILET
EXAM RM 3
FEMALE TOILET
STORAGE
ELECTRICAL
TELEPHONE CLOSET
WAITING
STAIR
CORRIDOR
DIABETIC CLINIC WAITING
PSA
OFFICE
MULTI
PURPOSE RM
EDUCATION
BREAK RM
TECHNICAL
WORK AREA
OFFICE
EXAM RM 2
EXAM RM 1
STAIR
RECEPTIONIST
EXAM RM
EXAM RM 8
EXAM RM 7
EXAM RM 6
EXAM RM 5
EXAM RM 4
EXAM RM 3
EXAM RM 2
EXAM RM 1
EXAM RM
CHECK-IN
/ WAITING
OPTICAL SHOP
VISIT CO-ORDR
EXAM RMEXAM RMOFFICE
ELEVATOR
ELEVATOR
ELEVATOR
NURSE
RECRUITER
OFFICE
OFFICE
MRSA PREVENTION
CO-ORDR OFFICE
CREDIT UNION
CREDIT UNION
RETAIL OFFICE
CORRIDOR
OFFICE
NUCLEAR
MEDICINE SECY
OFFICE CHIEF
NUCLEAR
MEDICINE
PATIENT WAITING
STORAGEIV RM
HOT LAB
RELEASE OF
INFORMATION OFFICEPATIENT REP OFFCE
PATIENT
REP
OFFICE
MRI SUITE ENTRY HALL
EXAM RM /
MRI MACH
PATIENT REP
OFFICE
WAITING
CONTROL
DRESSING
EQUIPMECH
WAITING
CT
SCAN
CONTROL
CT SCAN
CORRIDOR
IMAGING RM
TECH RMMAMMOGRAPHY
SUITE
DRESSING
EXAM RM
BONE DENSIM
STUDY EXAM RM
CHECK-IN ELEVATOR ELEVATOR
BREAK RM
STAFF
RADIOLOGY
IMAGING
EXAM RMEXAM RM
STORAGE
STAFF
RADIOLOGY
VIEWING RM
EXAM RM
DARK RM
ULTRA SOUND
STORAGE
OFFICE
EXAM RMEXAM RM
STAIR - 9
X-RAY
FILM
LIBRARY
SECY
RADIOLOGY
SVC
IMAGING
SVC MGR
CHIEF RADIOLOGY SVC
MALE
TOILET
FEMALE
TOILET
STAIR
FEMALE
LOCKER
MENS
TOILET
MENS
TOILET
WAITING/RECEPTION AREA
FEMALE TOILET
MECH RM
LAB
BLOOD BANK
STORAGE
HEMATOLOGY
MICROBIOLOGY
FILE RM
PGM ASST
CHIEF
PATHOLOGIST
STORAGE
HISTOLOGY
LAB
LAB
TELE PATH BREAK RM STORAGE
ADMINISTRATIVE OFFICER
PGM
ASST
PCS
OFFICE
CBOC
CO-ORDR /
PCMM
CO-ORDR PCS
OFFICE
MALE TOILET
CHAPEL
CHAPLAIN OFFICE
CHIEF
OF
CHAPLAIN
SVC
STORAGE
TELEPHONE
CARE SVC OFFICEKITCHEN STORAGEBREAK RM
HOUSE
KEEPING
PRIMARY
CARE CHIEF
OFFICESECY
OFFICE
RAI / MDS
CO-ORDR OFFICE
COMPLAINT OFFICER
OFFICE
CONFERENCE RM
OFFICE
OFFICE
OFFICE
OFFICE
OFFICE
CHAPLAINS OFFICECHAPLAINS OFFICE
HOUSE
KEEPING
CANTEEN STORAGE
TOILET
STAIR
STORAGE
PODIATRY SUPPLY
EXAM RM
EXAM RM
CHECK-IN /
CHECK-OUT
STORAGE
EXAM RM
EXAM RM
TOILET
WAITING
MALE TOILET
BREAK RM
EMS ISSUE
RM
ELEVATORELEVATOR
TOILET
TOILET
STAIR
STORAGE
FEC
CORRIDOR
TOILET
OFFICE
OFFICE BAY-1 BAY-2 BAY-3
UNISEX
BARIATRIC
TOILET
WOMENS TOILET
CORRIDOR
CORRIDOR
CORRIDOR
OFFICE
PHLEBOTOMY STORAGE
OFFICEBAY-4 BAY-5 BAY-6
PHLEBOTOMY AREA145
CONFERENCE
ROOM
FEMALE
TOILET
IT ROOM/
MECH.
CONSULT
BREAKROOM
OFFICE
ER SUP
ST SUP
AC
CHIEF
SEC./
RECPT.
STAFF
384XXX
163XXX
108100
11480
251XXX
100100
100100
100100100100
130120 270XXX
1730XXX
6"
(TYP.)
U.O.N.
FC
COUNTER
FC
FC
FC
FC
FC
LO
C K E R
FC
UP
DN
UP DN
DIGITAL IMAGING
OCT OCULAR
PHOTOGRAPHIC
PODIATRY
CLINIC
TO BUILDING 03
C1-12
BULK HEAD
190-A
132-A
C1-2B
1046-B
1040-A
1021-C
1022-C
E-1-11006-C1006-B1006-A 1007
1007-A
1007-B 1011-B1
1011-A
1011-B
112-G
102-A
128-A
190-B
115-A
112-K
112-J
112-I
112-H
112-F
112-A
112-B
112-C
112-D
112-E
115-C
115-D
115-F
115-G
115-H
115-I
115-J
115-K
115-L
115-M
115-N
127128
109108107
106-A
1021-F
1021-E
1021-D
1021-C11021-C
1021-B
10271026 El-2
1022-A
1021-G1022
1021-A 1021-B
1021-A
10061004
1015-C
1010-A
1015-A
1012-I
1015-B
1012-B1012-A
4-D
1013-A
1013-B
1035-A 1036-A
S-106
1051A 1050A
MER-2-1
1046-A
1043-C
1043-A
1043-B
1042 1041 1040
131132
E133
137-A
137-C 137-B
181-B
181-A
180179
165-A
164-A
1021-A
115-B
115-E
1054A 1054B 1054C
1052A 1053A
C1-10 C1-11
C1-13
10551054D 1054E 1054F
HOUSE KEEPING
CLOSET
TOILET
ELECTRICAL
ELECTRICAL
MALE
LOCKER
HEMATOLOGY COAG
ANALYZERS
ANCILLARY
CO-ORDR PGM ASST
LOUNGE
STORAGE
SUPPLY
ELECTRICALDRESSINGDRESSINGTOILET TOILET
DRESSING
DRESSING
TOILET
DRESSING
TOILET
DRESSING
TOILET
EXAM RM 3
FEMALE TOILET
STORAGE
ELECTRICAL
TELEPHONE CLOSET
WAITING
STAIR
CORRIDOR
DIABETIC CLINIC WAITING
PSA
OFFICE
MULTI
PURPOSE RM
EDUCATION
BREAK RM
TECHNICAL
WORK AREA
OFFICE
EXAM RM 2
EXAM RM 1
STAIR
RECEPTIONIST
EXAM RM
EXAM RM 8
EXAM RM 7
EXAM RM 6
EXAM RM 5
EXAM RM 4
EXAM RM 3
EXAM RM 2
EXAM RM 1
EXAM RM
CHECK-IN
/ WAITING
OPTICAL SHOP
VISIT CO-ORDR
EXAM RMEXAM RMOFFICE
ELEVATOR
ELEVATOR
ELEVATOR
NURSE
RECRUITER
OFFICE
OFFICE
MRSA PREVENTION
CO-ORDR OFFICE
CREDIT UNION
CREDIT UNION
RETAIL OFFICE
CORRIDOR
CORRIDOR
OFFICE
NUCLEAR
MEDICINE SECY
OFFICE CHIEF
NUCLEAR
MEDICINE
PATIENT WAITING
STORAGEIV RM
HOT LAB
RELEASE OF
INFORMATION OFFICEPATIENT REP OFFCE
PATIENT
REP
OFFICE
MRI SUITE ENTRY HALL
EXAM RM /
MRI MACH
PATIENT REP
OFFICE
WAITING
CONTROL
DRESSING
EQUIPMECH
WAITING
CT
SCAN
CONTROL
CT SCAN
CORRIDOR
IMAGING RM
TECH RMMAMMOGRAPHY
SUITE
DRESSING
EXAM RM
BONE DENSIM
STUDY EXAM RM
CHECK-IN ELEVATOR ELEVATOR
BREAK RM
STAFF
RADIOLOGY
IMAGING
EXAM RMEXAM RM
STORAGE
STAFF
RADIOLOGY
VIEWING RM
EXAM RM
DARK RM
ULTRA SOUND
STORAGE
OFFICE
EXAM RMEXAM RM
STAIR - 9
X-RAY
FILM
LIBRARY
SECY
RADIOLOGY
SVC
IMAGING
SVC MGR
CHIEF RADIOLOGY SVC
MALE
TOILET
FEMALE
TOILET
STAIR
FEMALE
LOCKER
MENS
TOILET
MENS
TOILET
WAITING/RECEPTION AREA
FEMALE TOILET
MALE
TOILET
MECH RM
LAB
BLOOD BANK
STORAGE
HEMATOLOGY
MICROBIOLOGY
FILE RM
PGM ASST
CHIEF
PATHOLOGIST
STORAGE
HISTOLOGY
LAB
LAB
TELE PATH BREAK RM STORAGE
ADMINISTRATIVE OFFICER
PGM
ASST
PCS
OFFICE
CBOC
CO-ORDR /
PCMM
CO-ORDR PCS
OFFICE
MALE TOILET
CHAPEL
CHAPLAIN OFFICE
CHIEF
OF
CHAPLAIN
SVC
STORAGE
TELEPHONE
CARE SVC OFFICEKITCHEN STORAGEBREAK RM
HOUSE
KEEPING
PRIMARY
CARE CHIEF
OFFICESECY
OFFICE
RAI / MDS
CO-ORDR OFFICE
COMPLAINT OFFICER
OFFICE
CONFERENCE RM
OFFICE
OFFICE
OFFICE
OFFICE
OFFICE
CHAPLAINS OFFICECHAPLAINS OFFICE
HOUSE
KEEPING
CANTEEN STORAGE
TOILET
STAIR
STORAGE
PODIATRY SUPPLY
EXAM RM
EXAM RM
CHECK-IN /
CHECK-OUT
STORAGE
EXAM RM
EXAM RM
TOILET
WAITING
MALE TOILET
BREAK RM
EMS ISSUE
RM
ELEVATORELEVATOR
TOILET
TOILET
STAIR
STORAGE
FEC
CORRIDOR
TOILET
OFFICE
OFFICE BAY-1 BAY-2 BAY-3
UNISEX
BARIATRIC
TOILET
WOMENS TOILET
CORRIDOR
CORRIDOR
CORRIDOR
OFFICE
PHLEBOTOMY STORAGE
OFFICEBAY-4 BAY-5 BAY-6
PHLEBOTOMY AREA145
CONFERENCE
ROOM
FEMALE
TOILET
IT ROOM/
MECH.
CONSULT
BREAKROOM
OFFICE
ER SUP
ST SUP
AC
CHIEF
SEC./
RECPT.
STAFF
384XXX
163XXX
108100
11480
251XXX
100100
100100
100100100100
130120 270XXX
1730XXX
JT
JT
DN
A. PROJECT AREAS TO BE OCCUPIED BY STAFF AND VETERANS THROUGHOUT
CONSTRUCTION.
B. PROJECT SHALL BE COMPLETED DURING NIGHT SHIFTS, STARTING AT 5:00
PM FRIDAY TO 5:00AM ON MONDAY OR AS APPROVED BY VA COR. ALL WORK
TO BE COMPLETED AND OPEN FOR PUBLIC USE AT THE END OF EACH
NIGHT'S WORK.
C. CONSTRUCTION WORK BEHIND TEMPORARY CONSTRUCTION PARTITIONS
SHALL BE COMPLETED DURING NIGHT SHIFTS, 5:00 PM TO 5:00 AM.
PHASING GENERAL NOTES
TEMPORARY WALLS. SEE PLAN AND PLAN NOTES
TEMPORARY CONSTRUCTION ACCESS DOORS
REFERENCE AREA FOR ABOVE CEILING
WORK ON FLOOR BELOW.
RE: ENGINEERING DRAWINGS FOR FULL
SCOPE OF WORK
BEYOND PROJECT BOUNDARY
IC / PHASING LEGEND
TEMPORARY IC BARRIER WALL
CONSTRUCTION (DUST WALL)
5/8" TYPE X GYP BD
3 5/8" STEEL STUDS @ 16" O.C.
BEAD OF CONT. SEALANT
6-MIL FIRE RETARDENT POLY INTERIOR SIDE
CEILING
2" DEEP LEG 3 5/8" STEEL SLIP TRACK
3 5/8" STEEL STUD TRACK
6" M
IN
CONTINUOUSLY ADHERE 6-MIL. FIRE
RETARDANT POLY TO DECK WITH TAPE
CONTINUOUSLY ADHERE FIRE RETARDENT
POLY TO FLOOR WITH TAPE
EXISTING DECK
CONSTRUCTION
SIDE
OCCUPIED
SIDE
PUBLIC
SIDE
1 HOUR FIRE RATED METAL DOOR ASSEMBLY
AND FRAME WITH SEALS, CARD READER,
HARDWARE AND CLOSER
TRIATEK MONITOR
HAND SANITIZER
SEAL ALL EDGES WITH TAPE
SEAL ALL EDGES WITH TAPE
REFER TO TEMPORARY BARRIER TYPE FOR
REQUIRED CONDITION TO STRUCTURE ABOVE
VA / OSHA TEMPORARY SIGNAGE
OUT OF PROJECT BOUNDARY
OUT OF PROJECT BOUNDARY
EMERGENCY
PHARMACY
DENTAL
AUDIOLOGY
CLINIC
EXIT
EXIT
PHASE 1
666 SQFT PHASE 2
612 SQFT
PHASE 3
677 SQFT
PHASE 4
671 SQFT
PHASE 5
660 SQFT
PHASE 6
471 SQFT
PHASE 7
673 SQFT
PHASE 8
483 SQFT
PHASE 9
571 SQFT
PHASE 10
778 SQFT
OUT OF PROJECT BOUNDARY
OUT OF PROJECT BOUNDARY
PHASE 1
545 SQFT
PHASE 2
612 SQFT
PHASE 7
608 SQFT
PHASE 9
489 SQFT
CHAPEL
LABORATORY
RADIOLOGY
EXITEXITEXIT EXIT
EXIT
EXIT
PHASE 3
388 SQFT
PHASE 4
358 SQFT
PHASE 5
920 SQFT
PHASE 6
548 SQFT
PHASE 8
649 SQFT
PHASE 10
627 SQFT
PHASE 11
658 SQFT
A
PHASING LEGEND
TYPE GRAPHIC DESCRIPTION
B
PHASE 1
PHASE 2
PHASE 3 C
PHASE 4 D
PHASE 5 E
PHASE 6
PHASE 7
PHASE 8
PHASE 9
PHASE 10
F
G
H
I
J
PHASE 11
K
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
Consultant:
B
IM
/2
.9
V
A F a y e tt e v ill e H a lls
W a lls
/2 .9
A v
.r v t
/1
/2
:5
:3
P
M
GC101
INFECTION CONTROL/PHASING PLAN
GUIDON
1221 N. PENNSYLVANIA STREET
INDIANAPOLIS, IN 46202
317.800.6388
HALLS & WALLS 1ST FLOOR
BLDG. 1
2300 RAMSEY ST.
565-21-101
BLDG 1
07/14/2022 JG LS
100% BID DOCUMENTS
FULLY SPRINKLERED
SCALE: 1 1/2" = 1'-0"GC101
2 TEMP. INFECTION CONTROL BARRIER WALL CONSTRUCTION
SCALE: 1/4" = 1'-0"GC101
3 TEMPORARY WALL CONSTRUCTION ELEVATION
SCALE: 3/64" = 1'-0"GC101
4 BASEMENT - OVERALL - PHASING PLAN
SCALE: 3/64" = 1'-0"GC101
5 LEVEL 1 - OVERALL - PHASING PLAN
N
N
DENTAL SERVICE
FC
PROSTHETICS
OFFICE
ELECTRICAL
FEC
HOUSE
KEEPING
TELE
CLOSET
ELECTRICAL
HOUSE
KEEPING
STORAGE
CLEAN LINEN
ELECTRICAL RM
CORRIDOR
SOILED LINEN
LINEN
CHUTE
MALE TOILET
DENTIST
OFFICE
DENTAL
RESIDENT
DIRECTOR
OFFICE
PROSTHETICS
OFFICEPROSTHETICS
OFFICE
BREAK
RM
OFFICE
OFFICE
OPERATORY
OPERATORY
OPERATORY
OPERATORY
HYGIENIST
SUPPLY
FEC
RECEPTION
CHIEF OF
DENTAL
SVC
DENTAL
SVC
FEMALE
TOILET
MHSL-
MHKM
OFFICE
DENTAL
RESIDENT
OFFICE
RADIOLOGY
RM
SUPPLY
RADIOLOGY
RM
DENTAL X-RAY
ELEVATOR ELEVATOR
MECH
DENTAL
SVC
STAIR
TREATMENT
TREATMENT
RM
TREATMENT
RM
TREATMENT
RM
TREATMENT
RM
TREATMENT
RM
TREATMENT
RM
TREATMENT
RM
DENTAL LAB
STAFF
TOILET
B21
B61-A
B32
B32A
B33
B24
B35A
B40
B39
B85
B38
B37B36
B22 B23
B61
B25
B62A
B62B
B62C
B62D B62E
B62F
B62I
B62J
B62K
B62L
B63B26B27
B28
B29
B30
B72 B73
B31
B78 B34
B35
B79L
B79K
B79A
B79B B79C
B79DB79E
B79I
B79F
B79G
B79H
DENTAL SERVICE
FC
PROSTHETICS
OFFICE
ELECTRICAL
FEC
HOUSE
KEEPING
TELE
CLOSET
ELECTRICAL
HOUSE
KEEPING
STORAGE
CLEAN LINEN
ELECTRICAL RM
CORRIDOR
SOILED LINEN
LINEN
CHUTE
MALE TOILET
DENTIST
OFFICE
DENTAL
RESIDENT
DIRECTOR
OFFICE
PROSTHETICS
OFFICEPROSTHETICS
OFFICE
BREAK
RM
OFFICE
OFFICE
OPERATORY
OPERATORY
OPERATORY
OPERATORY
HYGIENIST
SUPPLY
FEC
RECEPTION
CHIEF OF
DENTAL
SVC
DENTAL
SVC
FEMALE
TOILET
MHSL-
MHKM
OFFICE
DENTAL
RESIDENT
OFFICE
RADIOLOGY
RM
SUPPLY
RADIOLOGY
RM
DENTAL X-RAY
ELEVATOR ELEVATOR
MECH
DENTAL
SVC
STAIR
TREATMENT
TREATMENT
RM
TREATMENT
RM
TREATMENT
RM
TREATMENT
RM
TREATMENT
RM
TREATMENT
RM
TREATMENT
RM
DENTAL LAB
STAFF
TOILET
B21
B61-A
B32
B32A
B33
B24
B35A
B40
B39
B85
B38
B37B36
B22 B23
B61
B25
B62A
B62B
B62C
B62D B62E
B62F
B62I
B62J
B62K
B62L
B63B26B27
B28
B29
B30
B72 B73
B31
B78 B34
B35
B79L
B79K
B79A
B79B B79C
B79DB79E
B79I
B79F
B79G
B79H
1 2
1 2
OUTSIDE OF PROJECT BOUNDARY
OUTSIDE OF PROJECT BOUNDARY
1 2 12
OUTSIDE OF PROJECT BOUNDARY
OUTSIDE OF PROJECT BOUNDARY
891 SF
A-WING CORRIDOR
A001
124 SF
A-WING CORRIDOR
A002
A. COORDINATE DEMOLITION WITH NEW CONSTRUCTION. ALL DEMOLITION AND
REPAIR NECESSARY TO COMPLETE NEW AND REMODEL CONSTRUCTION
SHALL BE PROVIDED. CONTRACTOR SHALL REMOVE EXISTING
IMPROVEMENTS WHETHER OR NOT SPECIFICALLY INDICATED ON THE
DRAWINGS TO FACILITATE THE COMPLETION OF ALL REQUIRED WORK.
CONTRACTOR SHALL VISIT THE SITE AND VERIFY ALL QUANTITIES AND
ITEMS REQUIRED TO BE REMOVED.
B. REFER TO ARCHITECTURAL SYMBOLS ON SHEET AE001 FOR DEMOLITION
SYSTEMS AND DRAWING NOMENCLATURE.
C. EXISTING STRUCTURE WITHIN THE PROJECT BOUNDARY SHALL REMAIN
UNLESS OTHERWISE NOTED.
D. SURFACES TO BE CUT AND CONDITIONS UNDER WHICH CUTTING IS TO BE
PREFORMED SHALL BE REVIEWED BY CONTRACTOR PRIOR TO CUTTING TO
VERIFY NO UNSAFE OR UNSATISFACTORY CONDITIONS EXIST. SUCH
CONDITIONS SHALL BE RECTIFIED BEFORE WORK MAY PROCEED.
E. EXTENTS OF DEMOLITION SHALL BE COORDINATED WITH THE
ARCHITECTURAL FLOOR PLAN AE100 SERIES AND ENGINEERING DRAWINGS
FOR ADDITIONAL INFORMATION.
F. DIMENSIONS SHOWN FOR EXISTING CONSTRUCTION TO BE DEMOLISHED
ARE APPROXIMATE AND ARE INTENDED TO GIVE A GENERAL SCOPE OF
WORK TO BE REMOVED OR TEMPORARILY REMOVED TO ACCOMMODATE
NEW CONSTRUCTION. COORDINATE DEMOLITION WORK WITH DESIGN
INTENT OF NEW CONSTRUCTION TO PROVIDE ADEQUATE AREA FOR THIS
WORK.
G. CONTRACTORS SHALL REMOVE INDICATED DEMOLITION OF CONSTRUCTION
ASSEMBLIES IN THEIR ENTIRETY, UNLESS OTHERWISE NOTED, TO
ACCOMMODATE NEW CONSTRUCTION.
H. MAKE ALL DEMOLITION CLEAN AND COMPLETE IN A MANNER TO RECEIVE
NEW FINISHES. DEMOLITION SHOULD BE PERFORMED IN A MANNER SUCH
THAT THE CONTRACTOR CAN SEAMLESSLY PATCH NEW WORK TO BE
SMOOTH AND UNDETECTABLE.
I. ABOVE CEILING WORK WHERE CEILINGS ARE TO REMAIN, CEILING TILES
SHALL BE REMOVED AND STORED IN A SAFE MANNER UNTIL CEILING TILES
CAN BE REINSTALLED. DAMAGED AND BROKEN CEILING TILES SHALL BE
REPLACED BY CONTRACTOR. GYPSUM BOARD CEILINGS SHALL BE PATCHED
AND PAINTED TO SEAMLESSLY MATCH EXISTING CEILING COLOR
FOLLOWING ABOVE CEILING DEMOLITION ACTIVITY. THIS SHALL INCLUDE
REPAIR TO THE CEILING GRID, SUSPENSION SYSTEM AND ALL ASSOCIATED
ASSEMBLIES AS WELL AS THE REPLACEMENT OF DAMAGED CEILING
P…