This document is a set of construction drawings and specifications for correcting deficiencies at the Lebanon National Cemetery. The drawings contain plans, elevations, and details for renovating and constructing several buildings, including an administration building, a maintenance building, and a committal shelter. The key details include:

The solicitation number is 36C78624B0045, with the project titled "Y1FE-- Lebanon NC Correct Cemetery Facility Condition Assessment 856CM3012." The solicitation is being issued by the Department of Veterans Affairs National Cemetery Administration. The work includes repairing and renovating the existing administration and maintenance buildings, as well as constructing a new maintenance building and committal shelter. The drawings provide comprehensive details on demolition work, new construction, and renovations. Key dates include an on-site visit on October 15, with RFI questions due by November 8th and bids due at a later date. No additional information is provided on pricing, set-asides, or incumbent contractors.

View the file

Other files

File Type Posted
Wage Determination.pdf PDF
Bid Documents Ammended Drawings 11-01-24.pdf PDF
36C78624B0045 0002.docx DOCX document
Bid Documents Ammended Drawings.pdf PDF
site visit sign in sheet.pdf PDF
36C78624B0045 0001.docx DOCX document
IFB-36C78624B0045_.docx DOCX document
Drawings 56-84.pdf PDF
Lebanon NC Combined Specifications 2 of 2.pdf PDF
Drawings 4-14.pdf PDF
Drawings 1-3.pdf PDF
36C78624B0045_1.docx DOCX document
Lebanon NC Combined Specifications 1 of 2.pdf PDF
Drawings 15-29.pdf PDF
Show all 14

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

MIRROR

LINE OF REQUIRED

CLEARANCE

INSULATE HOT WATER PIPES

AND DRAIN TO PREVENT

CONTACT

A. ELEVATION B. PLAN

NOTE: LOCATE FAUCET CONTROL, SOAP AND TOWEL DISPENSERS WITHIN THE REACH RANGE.

B. PLANA. ELEVATION

O.

C.

O.C.

39" - 41"

3' - 6" 1' - 0"

3'

- 4

" M

AX

7" - 9" O.C.

2' - 0"

1 1 /2"

M

IN

TO

T

OP

3'

- 0

6" 3' - 0"

TO

H

AN

DL

E 3'

- 8

1'

- 6

T8 T9T3

T1

T2

T6T5 TYPICAL SHOWER CONTROL

WALL.

COORDINATE WITH PLUMBING

DRAWINGS

REFER TO FLOOR PLAN

3'

- 0

" 6" MAX

VE

RI

FY

W

IT

H

RE

FL

EC

TE

D

CE

ILI

NG

P

LA

N

ACCESSORY GENERAL NOTES:

1. MOUNTING HEIGHTS ARE TYPICAL AND APPLY TO ALL FIXTURES INSTALLED. VERIFY MOUNTING HEIGHTS WITH VENDOR SPECIFIC MOUNTING HEIGHTS.

2. TYPICAL MOUNTING HEIGHTS AND INTERIOR ELEVATIONS ARE FOR USE IN COORDINATION OF FIXTURES. NOTE NOT ALL FIXTURES AND ACCESSORIES ARE REPRESENTED. COORDINATE PROJECT REQUIREMENTS WITH THE FLOOR PLAN AND ENLARGED FLOOR PLANS .

3. COORDINATE INSTALLATION OF EQUIPMENT WITH PLUMBING FIXTURES AND PLUMBING DRAWINGS.

4. REFER TO CASEWORK ELEVATIONS FOR ADDITIONAL ACCESSORIES.

0"

TO

O

UT

LE

T 3'

- 8

T7

T11

SHOWER HEAD

AND

CONTROLS

T13P

7/19/24

00404366CO

LO

RADO L ICENSED

A RC H I T ECT

SE

AN

M. F ITZPATRICK

623 26TH AVENUE

QUAD CITIES, IL

61201

PH: 309.788.0673

FAX: 309.786.5967

www.imegcorp.com

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved: Project Manager/ COR Bobbie Griffin Department of Veteran Affairs, NCA

Phone: 470-998-1497 Email: Bobbie.Griffin@va.gov

VA FORM 08 - 6231

A

BID PACKAGE

NA

National Cemetery Administration

Design and Construction Service

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD A/E: Vali Cooper International

STAMPCONSULTANT

321 4 5 6 7 8 9 10

CORRECT CEMETERY FACILITY

CONDITION ASSESSMENT (FCA)

DEFICIENCIES

856CM3012

LEBANON, KY

504.684.4408; Sean Fitzpatrick 56 Louis Prima Drive, Suite B, Covington LA 70433

VCI Project ManagementProject Management Construction ManagementConstruction Management EngineeringEngineering

07/19/2024 Sheet of 84

C :\U se rs

\d an ia .h ab bo ub \V

C I\V

A N

C A

Le ba no n

N C

F C

A Im pr ov em en ts

D oc um en ts \a

W or kF ile s\ 4_

Bi d_

D oc s\ 1_

Pl an s\ C

AD

\A dm in b ui ld in g.

rv t 7/

/2

:4

2:

A M

A-001

Architectural Symbols and Abbreviations

SCALE: 1/4" = 1'-0"

TYPICAL MOUNTING LOCATIONS

GENERAL CONSTRUCTION NOTES

THE CONTRACT DOCUMENT DRAWINGS HAVE BEEN PREPARED USING REVIT®

SOFTWARE IN A MICROSOFT WINDOWS ENVIRONMENT. A BUILDING INFORMATION

MODEL (BIM) HAS BEEN DEVELOPED FOR DESIGN COMMUNICATION. THE MODEL

DOES NOT CONTAIN COMPLETE INFORMATION FOR USE IN COST ESTIMATING,

SYSTEMS PERFORMANCE, COORDINATION, SCHEDULING, OR FACILITIES

MANAGEMENT.

THE CONTRACT DOCUMENT DRAWINGS HAVE BEEN PREPARED USING THE

CONSTRUCTION SPECIFICATIONS INSTITUTE'S UNIFORM DRAWING SYSTEM AND THE

NATIONAL CAD STANDARD AS GUIDES.

DISCREPANCIES IN THE CONTRACT DOCUMENTS SHALL BE IMMEDIATELY BROUGHT

TO THE ATTENTION OF THE ARCHITECT AND OWNER ’S REPRESENTATIVE/COR.

CONTRACTOR SHALL PROVIDE THE HIGHER GRADE OF QUALITY AND/OR GREATER

QUANTITY OF WORK WHEN BIDDING IF A CLARIFICATION CAN NOT BE OBTAINED BY

THE BID DUE DATE.

CONTRACTOR IS RESPONSIBLE FOR COORDINATING SCOPE OF WORK WITH OWNER ’S

REPRESENTATIVE/COR AND VARIOUS FACILITY PERSONNEL INVOLVED WITH UTILITY

SHUT DOWN, INFECTION CONTROLS, OCCUPANT/EMPLOYEE SAFETY, ACCESS

CONTROL, ETC.

ANY INDICATION OF PROJECT LIMITS OR BOUNDARY OF DEMARCATION ARE SHOWN

FOR THE CONVENIENCE OF THE CONTRACTOR, THE FULL SCOPE OF THE PROJECT

LIMIT OF BOUNDARY REQUIRES COORDINATION WITH THE DESIGN SCOPE OF WORK

AND ACCESS TO EXISTING UTILITIES FOR TIE IN.

DRAWINGS ARE PREPARED FROM FIELD VERIFICATION, EXISTING FACILITY DRAWING

BASE FILES, AND USING DIMENSIONS, CONFIGURATIONS AND DETAILS OF SPECIFIC

MANUFACTURERS AS A BASIS OF DESIGN. CONTRACTOR IS RESPONSIBLE FOR

VERIFICATION OF ACTUAL DIMENSIONS, THE COORDINATION OF THE DETAILS WITH

THE PRODUCTS WHICH ARE PROVIDED PER THE SCOPE OF THE SPECIFICATIONS AND

THE SURROUNDING CONSTRUCTION. CONTRACTOR SHALL VERIFY DIMENSIONS,

ROUGH-IN DIMENSIONS, CONNECTIONS, AND OVERALL INSTALLATION

REQUIREMENTS.

CONTRACTOR IS RESPONSIBLE FOR THE COMPLETION OF THE ENTIRE SCOPE OF

WORK OUTLINED IN THE CONTRACT DOCUMENTS. CONTRACTOR IS RESPONSIBLE

FOR THE COORDINATION OF ALL SUB-CONTRACTORS AND THE SCOPE OF WORK

THEY PROVIDE. SUB-CONTRACTORS ARE RESPONSIBLE FOR THEIR FULL SCOPE OF

WORK WITHIN THE CONTRACT DOCUMENTS, TRADES ARE NOT SEGMENTED TO ONLY

CERTAIN SHEETS AND SPECIFICATIONS, CROSS COORDINATION IS REQUIRED.

CONTRACTOR AND SUB-CONTRACTORS ARE BOTH RESPONSIBLE FOR

UNDERSTANDING INFORMATION OUTLINED IN THE SPECIFICATIONS, KEY NOTES,

GENERAL NOTES, LEGEND, CODES, ETC., PROVIDED IN THE CONTRACT DOCUMENTS.

MECHANICAL, PLUMBING AND ELECTRICAL DRAWINGS SHOW INFORMATION IN A

DIAGRAMMATIC FASHION WITHOUT DIMENSIONING. THE GENERAL CONTRACTOR IS

TO COORDINATE THE LOCATIONS OF ALL MECHANICAL, PLUMBING AND ELECTRICAL

EQUIPMENT WITH RESPECT TO THE ARCHITECTURAL AND STRUCTURAL DETAILING

OF SHAFTS, CHASES, CEILING CONSTRUCTION, ETC.

CONTRACTOR IS RESPONSIBLE FOR VERIFYING DIMENSIONS IDENTIFIED AND NOT

IDENTIFIED IN THE CONTRACT DOCUMENTS WITH THE EXISTING AND NEW

CONSTRUCTION ELEMENTS. CONTRACTOR IS RESPONSIBLE FOR VERIFICATION

BETWEEN THE CONTRACT DOCUMENTS, INSTALLED AND UNINSTALLED

CONSTRUCTION BEFORE THE ORDERING OF MATERIALS AND EQUIPMENT. NOTIFY

ARCHITECT AND OWNER’S REPRESENTATIVE/COR OF ANY DISCREPANCIES OR

MISSING DIMENSIONS.

DO NOT SCALE THE DRAWINGS. DRAWING SCALES AS INDICATED ARE FOR GENERAL

ORIENTATION AND CONTEXT ONLY.

ALL DIMENSIONS INDICATED ARE TO FACE OF EXISTING MEMBERS, FACE OF NEW

STRUCTURAL MEMBERS, FACE OF NEW MASONRY, FACE OF NEW STUDS OR COLUMN

GRID LINES UNLESS NOTED OTHERWISE.

FLOOR ELEVATION 0 ’-0” IS EQUAL TO THE FINISH FLOOR SLAB OF THE EXISTING SLAB

FLOOR CONSTRUCTION.

ROUGH OPENINGS SHALL ALLOW FOR SHIM SPACE.

CONTRACTOR TO PROVIDE WORK WHERE DETAILS AND NOTES ARE IDENTIFIED AS

“TYPICAL” OR “SIMILAR” EACH INSTANCE THAT IS THE SAME IN NATURE TO THE

DETAIL, AREA, OR ITEM REFERENCED.

PROVIDED WORK SHALL BE FURNISHED AND INSTALLED BY THE CONTRACTOR.

CONTRACTOR IS RESPONSIBLE FOR COORDINATION OF DELIVERY, MOUNTING,

INSTALLATION AND ROUGH-IN.

FURNISHED WORK IS THE CONTRACTOR FURNISHING THE MATERIALS AND

EQUIPMENT TO THE OWNER. CONTRACTOR IS RESPONSIBLE FOR COORDINATION OF

DELIVERY AND ROUGH-IN.

ALL PROVIDED WORK SHALL BE WITH NEW MATERIALS UNLESS SPECIFICALLY CALLED

OUT AS SALVAGED OR RELOCATED WITHIN THE CONTRACT DOCUMENTS.

ALL PERSONS DIRECTLY OR INDIRECTLY ASSOCIATED WITH THE PROJECT SHALL BE

FAMILIAR WITH THE RULES AND REGULATIONS OF THE OCCUPATIONAL SAFETY AND

HEALTH ACT, AND IMPLEMENT THOSE RULES AS THEY APPLY TO THIS PROJECT.

THE CONTRACTOR SHALL BE RESPONSIBLE FOR LOCATING AND PROTECTING ALL

UTILITY LINES. LOCATIONS SHOWN ARE APPROXIMATE. REPAIR ALL DAMAGE TO

UTILITY LINES CAUSED BY CONSTRUCTION OPERATIONS AT NO COST TO THE

OWNER.

CONTRACTOR SHALL BE RESPONSIBLE FOR ALL TEMPORARY BRACING AND SHORING

REQUIRED DURING CONSTRUCTION.

CONTRACTOR SHALL BE RESPONSIBLE FOR PROTECTING ADJACENT CONSTRUCTION,

FINISHES, EQUIPMENT, AND TRAVEL ROUTE TO AND FROM THE CONSTRUCTION SITE.

ANY DAMAGE OR UNACCEPTABLE WEAR BY THE CONSTRUCTION TEAM SHALL BE

REPAIRED/REPLACED BY THE CONTRACTOR AT NO COST TO THE OWNER.

IN THE CASE OF CONFLICTS OR DISCREPANCIES WITHIN OR AMONG THE CONTRACT

DRAWINGS, THE BETTER QUALITY, MORE STRINGENT REQUIREMENTS OR GREATER

QUALITY OF WORK, AS DETERMINED BY THE GOVERNMENT, SHALL BE PROVIDED.

CONTRACTOR IS RESPONSIBLE FOR PROVIDING AND COORDINATING HARDWARE,

ACCESS CONTROL AND AUTOMATIC OPERATORS ARE PROVIDED WITH COMPLETE

AND COMPATIBLE SYSTEMS. REFER TO DOOR HARDWARE SCHEDULE, HARDWARE

SPECIFICATIONS, AUTOMATIC OPERATOR SPECIFICATIONS, ACCESS CONTROL

SPECIFICATIONS AND ELECTRICAL DRAWINGS.

A/C AIR CONDITIONING

ACOUS ACOUSTICAL

ACT ACOUSTICAL CEILING TILE

AD AREA DRAIN

ABA ARCHITECTURAL BARRIERS ACT

A&E ARCHITECT AND ENGINEERS

AFF ABOVE FINISH FLOOR

AFG ABOVE FINISHED GRADE

AHJ AUTHORITIES HAVING JURISDICTION

AHU AIR HANDLING UNIT

ALT ALTERNATIVE

ALT TRANS ALTERNATIVE TRANSPORTATION

ALUM ALUMINUM

ANOD ANODIZED

APPROX APPROXIMATE

ARCH ARCHITECTURAL

AVG AVERAGE

BB BULLETIN BOARD

BD BOARD

BG BUMPER GUARD

BLDG BUILDING

BLKG BLOCKING

BM BEAM

BO BOTTOM OF

BRG BEARING

CB CATCH BASIN

CBB CEMENTITIOUS BACKER BOARD

CER CERAMIC

CF CUBIC FEET

CFCI CONTRACTOR FURNISH CONTRACTOR INSTALL

CFM CUBIC FEET PER MINUTE

CG CORNER GUARD, CEILING GRILLE

C & G CURB & GUTTER

CI CAST IRON

CIP CAST IN PLACE

CJ CONTROL JOINT

CL CENTERLINE

CLG CEILING

CMP CORRUGATED METAL PIPE

CMU CONCRETE MASONRY UNITS

CO CLEANOUT(S)

COL COLUMN

CONC CONCRETE

CONT CONTINUOUS

COORD COORDINATE

CP CONCRETE PIPE

CPT CARPET

CRS COLD ROLLED STEEL

CS CAST STONE

CSB CONCRETE SPLASH BLOCK

CSI CONSTRUCTION SPECIFICATIONS INSTITUTE

CT CERAMIC TILE

CTR CENTER

CU FT CUBIC FEET

CUH CABINET UNIT HEATER

CY CUBIC YARD

D DRYER

DEG DEGREE

DEMO DEMOLITION

DEPT DEPARTMENT

DET DETAIL

DF DRINKING FOUNTAIN

DIA DIAMETER

DIAG DIAGONAL

DISP DISPENSER

DIV DIVISION

DN DOWN

DR DOOR

DS DOWNSPOUT

DW DISHWASHER

DWG DRAWING

E EAST

(E) EXISTING

EA EACH

EF EXHAUST FAN

EIFS EXTERIOR INSULATION AND FINISH SYSTEM

EJ EXPANSION JOINT

EL ELEVATION

ELEC ELECTRICAL

ELEV ELEVATOR

EQ EQUAL

EQUIP EQUIPMENT

EST ESTIMATED

ETS EXPOSED TO STRUCTURE

ETR EXISTING TO REMAIN

ARCHITECTURAL ABBREVIATIONS

EWC ELECTRIC WATER COOLER

EXH EXHAUST

EXIST EXISTING

EXP EXPANSION

EXT EXTERIOR

FA FIRE ALARM

FAAP FIRE ALARM ANNUNCIATOR PANEL

FACP FIRE ALARM CONTROL PANEL

FCU FAN COIL UNIT

FD FLOOR DRAIN

FDN FOUNDATION

FE FIRE EXTINGUISHER

FEC FIRE EXTINGUISHER CABINET

FF FINISH FLOOR

FF & E FURNITURE FIXTURES & EQUIPMENT

FIN FINISH

FIXT FIXTURE

FL FLOW LINE

FLR FLOOR

FLUOR FLUORESCENT

FO FINISH OPENING

FOS FACE OF STUD

FR FIRE RATED

FSP FIRE STANDPIPE

FT FOOT / FEET

FTG FOOTING

FURR FURRING

FV FIELD VERIFY

FVC FIRE VALVE CABINET

FWC FABRIC WALLCOVERING

GA GAUGE

GALV GALVANIZED

GB GRAB BAR

GC GENERAL CONTRACTOR

GD GARBAGE DISPOSAL

GF CMU GROUND FACE CMU

GFCI GROUND FAULT CIRCUIT INTERRUPTER

GI GALVANIZED IRON

GL GLASS

GL BLK GLASS BLACK

GLU LAM GLUE LAMINATED WOOD

GND GROUND

GT GROUT

GYP BD GYPSUM BOARD

HAZ MAT HAZARDOUS MATERIALS

HB HOSE BIB

HC HOLLOW CORE

HCP HANDICAPPED

HDR HEADER

HDW HARDWARE

HDWD HARDWOOD

HGT HEIGHT

HM HOLLOW METAL

HORIZ HORIZONTAL

HR HOUR, HANDRAIL

HT HEIGHT

HVAC HEATING, VENTILATING & AIR CONDITIONING

IBC INTERNATIONAL BUILDING CODE

ID INSIDE DIAMETER

IG INSULATING GLASS

IN INCH

INCAN INCANDESCENT

INFO INFORMATION

INSUL INSULATION

INT INTERIOR

INV INVERT

ITG INSULATED TEMPERED GLASS

JAN JANITOR

J-BOX JUNCTION BOX

JT JOINT

L LONG

LAV LAVATORY

LB(S) # POUND(S)

LF LINEAL FEET

LLV LONG LEG VERTICAL

LT LIGHT

LVR LOUVER

M & BH MOP AND BROOM HOLDER

MAINT MAINTENANCE

MATL MATERIAL

MAX MAXIMUM

MB MARKER BOARD

MECH MECHANICAL

MEPF MECHANICAL, ELECTRICAL, PLUMBING,

FIRE PROTECTION (CONDUIT)

MFR MANUFACTURER

MH MANHOLE

MIN MINIMUM

MIRR MIRROR

MISC MISCELLANEOUS

MO MASONRY OPENING

MSB MOP SERVICE BASIN

MTD MOUNTED

MTL METAL

N NORTH

NA NOT APPLICABLE

NECY NECESSARY

NIC NOT IN CONTRACT

NO NUMBER

NOM NOMINAL

NTS NOT TO SCALE

OC ON CENTER

OD OUTSIDE DIAMETER,

OVERFLOW DRAIN

OFCI OWNER FURNISHED

CONTRACTOR INSTALLED

OFOI OWNER FURNISHED

OWNER INSTALLED

OH OPPOSITE HAND

OPN OPENING

OPP OPPOSITE

ORD OVERFLOW ROOF DRAIN

P PLASTIC

PARTN PARTITION

PBD PARTICLE BOARD

PCC PRECAST CONCRETE

PL PLATE

PLAM PLASTIC LAMINATE

PLAS PLASTER

PLYWD PLYWOOD

PR PAIR

PRCST PRECAST

PREFAB PREFABRICATED

PROP PROPERTY

PSF POUNDS PER SQUARE FOOT

PSI POUNDS PER SQUARE INCH

PT PAINT

PT CONC POST-TENSIONED CONCRETE

PTD PAPER TOWEL DISPENSER

PTL PORCELAIN TILE

PVC POLYVINYL CHLORIDE

QA QUALITY ASSURANCE

QT QUARRY TILE

R R-VALUE (INSULATION),

RADIUS, RISER

RB RESILIENT BASE

RCP REFLECTED CEILING PLAN

RD ROOF DRAIN

RE: REFERENCE

REBAR REINFORCING BAR

REC RECESSED

RECPT RECEPTACLE

REF REFRIGERATOR

REG REGISTER

REINF REINFORCE

REQD REQUIRED

RESIL RESILIENT

REV REVISION

RH ROOF HATCH

RM ROOM

RO ROUGH OPENING

RT RUBBER STAIR TREAD

S SOUTH

SAF SEAMLESS ACRYLIC FLOORING

SAP SUSPENDED ACOUSTICAL PANELS

SAT SUSPENDED ACOUSTICAL TILE

SB SPLASHBLOCK

SC SEALED CONCRETE, SOLID CORE

SCHED SCHEDULE

SCP SCUPPER

SD SOAP DISPENSER

SEAL SEALER

SECT SECTION

SECT SECTION

SF SQUARE FOOT

SF CMU SPLIT-FACE CMU

SHR SHOWER

SHT SHEET

SHTG SHEATHING

SIM SIMILAR

SL SLOPE

SLV SHORT LEG VERTICAL

SND SANITARY NAPKIN DISPOSER

SNV SANITARY NAPKIN VENDOR

SPECS SPECIFICATIONS

SQ SQUARE

SS STAINLESS STEEL

STC SOUND TRANSMISSION CLASS

STD STANDARD

STL STEEL

STOR STORAGE

STRUC STRUCTURAL

SUSP SUSPENDED

SV SHEET VINYL

SYM SYMMETRICAL

SYS SYSTEM

T TREAD

TA TOILET ACCESSORIES

TB TACKBOARD

T&B TOP AND BOTTOM

T&G TONGUE AND GROOVE

TBD TO BE DETERMINED

TD TUBULAR DAYLIGHTING DEVICE

TEL TELEPHONE

TEMP TEMPERATURE

TG TEMPERED GLASS,

TONGUE & GROOVE,

TRANSFER GRILLE

THRU THROUGH

TO TOP OF

TOC TOP OF CONCRETE

TOM TOP OF MASONRY

TOS TOP OF STEEL

TOW TOP OF WALL

TTD TOILET TISSUE DISPENSER

TV TELEVISION

TYP TYPICAL

UGND UNDERGROUND

UL UNDERWRITERS LABORATORY

UNFIN UNFINISHED

UNO UNLESS NOTED OTHERWISE

URN URINAL

VB VINYL BASE

VCT VINYL COMPOSITION TILE

VERT VERTICAL

VIF VERIFY IN FIELD

VTR VENT THROUGH ROOF

VWC VINYL WALL COVERING

W WEST

W/ WITH

W/O WITHOUT

WC WATER CLOSET

WD WOOD

WDP WOOD PANELING

WDW WINDOW

WF WIDE FLANGE

WGL WIRED GLASS

WH WATER HEATER

WR WASTE RECEPTACLE,

WATER RESISTANT

WS WATER STOP

WSCT WAINSCOTT

WT WEIGHT

WWF WELDED WIRE FABRIC

ARCHITECTURAL SYMBOLS

X X

XXXX

SHEET LOCATION

VIEW NUMBER

X X

X

SHEET LOCATION

VIEW NUMBER

XXXX

BUILDING SECTION REFERENCE

SECTION REFERENCE

DRAWING NUMBER

SHEET LOCATION

DRAWING NUMBER

SHEET

LOCATION

DRAWING NUMBER

SHEET

LOCATION

DETAIL REFERENCE

BUILDING

OBJECT

REFERENCED

OBJECT

REFERENCED

X

XXXX

X

XXXX

ELEVATION REFERENCES

X

XXXX

X

XXXX

SCALE: ??

VIEW TITLE

HANDICAP SYMBOL

N

TRUE NORTH ARROW

ROOM

NEW WALL

NEW WALL TAG

S3.A2

INDICATES STRUCTURAL MATERIAL

INDICATES NOMINAL SIZE

INDICATES CONSTRUCTION

INDICATES TOP OF WALL CONDITION

REFER TO WALL LEGEND

FOR MORE INFORMATION

NEW DOOR101

DOOR TAG

EXISTING DOOR

101 ROOM TAG

01 DEMO KEYNOTE

NEW WORK KEYNOTE

PT-1 FINISH INDICATION

A STOREFRONT/WINDOW

T GLAZING

ITEMS TO BE DEMOLISHED

DEMOLISHED DOOR

1.

2.

3.

4.

5.

6.

7.

8.

9.

10.

12.

13.

14.

15.

16.

17.

18.

19.

20.

21.

22.

23.

24.

INCANDESCENT WALL MOUNTED LIGHTING

INCANDESCENT SURFACE MOUNT LIGHTING

SURFACE MOUNTED FLUORESCENT

RECESSED FLUORESCENT

HVAC RETURN AIR GRILLE

HVAC SUPPLY DIFFUSER

PENDANT LIGHT

ACCESS PANEL

EXIT LIGHTING

S

D

SPEAKER

SMOKE DETECTOR

INCANDESCENT RECESSED LIGHTING

A 9'-0"

CEILING TAG CEILING TYPE

FINISHED CEILING HEIGHT

REFER TO CEILING LEGEND

FOR MORE INFORMATION

EXTENT OF REVISION

REVISION SET

MECH/ELEC ITEMS: REFER TO MEP SHEETS AS APPLICABLE

101 EQUIPMENT/FURNITURE TAG

PROJECT BOUNDARY

BEYOND PROJECT BOUNDARY

REFLECTED CEILING PLAN SYMBOLS

VIEW TITLE

T# TOILET ACCESSORY TAG

F1

30Revisions: Date:

DN

DN

DN

UP

UP

UP

DN

DIRECTOR'S OFFICE

RECEPTION

KITCHEN

STAIR

ST1

WORKROOM

RESTROOM

102A

FRONT PORCH

REAR PORCH

21 23 3

C1 A-401

C3 A-401

C6 A-401

SIDE SPACE

REAR SPACE

CRAWL SPACE

FRONT SPACE

STAIR

ST2

STAIR

ST3

121212

CLOSET

203A

BEDROOM 2

BEDROOM 1

BEDROOM 3

BATHROOM

CLOSET

202A

STAIR

ST1

CORRIDOR

CLOSET

205A

C7 A-401

7/19/24

00404366CO

LO

RADO L ICENSED

A RC H I T ECT

SE

AN

M. F ITZPATRICK

623 26TH AVENUE

QUAD CITIES, IL

61201

PH: 309.788.0673

FAX: 309.786.5967

www.imegcorp.com

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved: Project Manager/ COR Bobbie Griffin Department of Veteran Affairs, NCA

Phone: 470-998-1497 Email: Bobbie.Griffin@va.gov

VA FORM 08 - 6231

A

BID PACKAGE

NA

National Cemetery Administration Design and

Construction Service U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD A/E: Vali Cooper International

STAMPCONSULTANT

321 4 5 6 7 8 9 10

CORRECT CEMETERY FACILITY

CONDITION ASSESSMENT (FCA)

DEFICIENCIES

856CM3012

LEBANON, KY

504.684.4408; Sean Fitzpatrick 56 Louis Prima Drive, Suite B, Covington LA 70433

VCI Project ManagementProject Management Construction ManagementConstruction Management EngineeringEngineering

07/19/2024 Sheet of 84

C :\U se rs

\d an ia .h ab bo ub \V

C I\V

A N

C A

Le ba no n

N C

F C

A Im pr ov em en ts

D oc um en ts \a

W or kF ile s\ 4_

Bi d_

D oc s\ 1_

Pl an s\ C

AD

\A dm in b ui ld in g.

rv t 7/

/2

1:

:5

PM

AD101

Administration Building Demo Floor Plans

1/4" = 1'-0" D1 First Floor Demo Plan

1/4" = 1'-0"

F1 BASEMENT

1/4" = 1'-0" D5 Second Floor Demo Plan

1/4" = 1'-0"

F5 ROOF LEVEL

DEMO KEYNOTESDEMO KEYNOTES

Type Mark Keynote

1 REMOVE AND DISPOSE OF EXISTING SHEET

VINYL FLOORING. PREP FLOOR FOR NEW

FLOORING

2 REMOVE AND DISPOSE OF PLUMBING FIXTURES

3 REMOVE AND DISPOSE OF CABINETS

4 REMOVE AND DISPOSE OF APPLIANCES

5 REMOVE AND DISPOSE OF WD DOOR.

PREP/REPAIR WOOD FRAME AND TRIM FOR NEW

PAINT.

6 DEMO AND REPLACE COLUMN, NEWEL POST

AND BEAM

8 REMOVE AND DISPOSE PARTITION

9 REMOVE AND DISPOSE ROOFING OVER THE

FRONT PORCH

10 REMOVE EXISTING PAINT FROM INTERIOR OF

EXTERIOR STONE WALLS

11 REMOVE EXISTING PAINT FROM ALL CONCRETE

SLABS AND RESEAL

12 DEMO AND DISPOSE ALL BASEMENT WINDOWS

AND SCREENS

13 DEMO AND DISPOSE EXTERIOR DOOR

26 REMOVE TOILET ACCESSORIES

27 DEMO EXISTING CONCRETE STAIRS

28 DEMO PORTION OF RAILING

29 DEMO EXISTING CONCRETE THRESHOLD

NN

0' 2' 4' 8' 16'

1/4"=1'-0"

31Revisions: Date:

22 23

7/19/24

00404366CO

LO

RADO L ICENSED

A RC H I T ECT

SE

AN

M. F ITZPATRICK

623 26TH AVENUE

QUAD CITIES, IL

61201

PH: 309.788.0673

FAX: 309.786.5967

www.imegcorp.com

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved: Project Manager/ COR Bobbie Griffin Department of Veteran Affairs, NCA

Phone: 470-998-1497 Email: Bobbie.Griffin@va.gov

VA FORM 08 - 6231

A

BID PACKAGE

NA

National Cemetery Administration

Design and Construction Service

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD A/E: Vali Cooper International

STAMPCONSULTANT

321 4 5 6 7 8 9 10

CORRECT CEMETERY FACILITY

CONDITION ASSESSMENT (FCA)

DEFICIENCIES

856CM3012

LEBANON, KY

504.684.4408; Sean Fitzpatrick 56 Louis Prima Drive, Suite B, Covington LA 70433

VCI Project ManagementProject Management Construction ManagementConstruction Management EngineeringEngineering

07/19/2024 Sheet of 84

C :\U se rs

\d an ia .h ab bo ub \V

C I\V

A N

C A

Le ba no n

N C

F C

A Im pr ov em en ts

D oc um en ts \a

W or kF ile s\ 4_

Bi d_

D oc s\ 1_

Pl an s\ C

AD

\A dm in b ui ld in g.

rv t 7/

/2

:4

2:

A M

AD102

Administration Building Demo Reflected Ceiling Plans

RCP DEMO KEYNOTESRCP DEMO KEYNOTES

Type Mark Keynote

22 REMOVE AND DISPOSE ALL LIGHTING FIXTURES

23 REMOVE 1'X1' CEILING TILES

24 REMOVE AND DISPOSE STANDING SEAM METAL

ROOF

1/4" = 1'-0" F1 Basement Ceiling Demo Plan

1/4" = 1'-0" D1 First Floor Ceiling Demo Plan

1/4" = 1'-0" D6 Second Floor Ceiling Demo Plan

NN

0' 2' 4' 8' 16'

Revisions: Date:

FD

R ef rig er at or

SERVICE BAYS

RESTROOM

LOCKER ROOM

005 BREAK ROOM

CORRIDOR

CLOSET

MECH/ELEC ROOM

GRAVE LOCATOR SERVICE

MEN'S RESTROOM

WOMEN'S RESTROOM

D7

AD103

E7

AD103

L1 0' - 0"

L1 0' - 0"

7/19/24

00404366CO

LO

RADO L ICENSED

A RC H I T ECT

SE

AN

M. F ITZPATRICK

623 26TH AVENUE

QUAD CITIES, IL

61201

PH: 309.788.0673

FAX: 309.786.5967

www.imegcorp.com

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved: Project Manager/ COR Bobbie Griffin Department of Veteran Affairs, NCA

Phone: 470-998-1497 Email: Bobbie.Griffin@va.gov

VA FORM 08 - 6231

A

BID PACKAGE

NA

National Cemetery Administration Design and

Construction Service U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD A/E: Vali Cooper International

STAMPCONSULTANT

321 4 5 6 7 8 9 10

CORRECT CEMETERY FACILITY

CONDITION ASSESSMENT (FCA)

DEFICIENCIES

856CM3012

LEBANON, KY

504.684.4408; Sean Fitzpatrick 56 Louis Prima Drive, Suite B, Covington LA 70433

VCI Project ManagementProject Management Construction ManagementConstruction Management EngineeringEngineering

07/19/2024 Sheet of 84

C :\U se rs

\d an ia .h ab bo ub \V

C I\V

A N

C A

Le ba no n

N C

F C

A Im pr ov em en ts

D oc um en ts \a

W or kF ile s\ 4_

Bi d_

D oc s\ 1_

Pl an s\ C

AD

\N ew M ai nt

B ui ld in g.

rv t 7/

/2

:4

3:

A M

AD103

New Maintenance Building Demo Floor Plans

DEMO KEYNOTESDEMO KEYNOTES

Type Mark Keynote

1 REMOVE PAINT, RUST AND SEALANTS FROM ALL EXTERIOR

DOOR FRAMES.

2 REMOVE AND REPLACE SEALANTS

3 REMOVE 1'X1' FLOOR TILE AND MASTIC. GRIND CONCRETE

FLOOR TO REMOVE ALL MASTIC

4 CLEAN TILE FLOORS AND GROUT AND RESEAL GROUT

5 REMOVE AND DISPOSE OF EXISTING

CABINETS,COUNTERTOP, SINK AND APPLIANCES

6 REMOVE AND DISPOSE OF SHOWER HEAD

7 REMOVE AND DISPOSE OF EXISTING LOCKERS

8 CLEAN AND REMOVE EFFLORESCENE FROM INTERIOR

BLOCK WALLS

1/4" = 1'-0" F2 Ground Floor Demo Plan

1/2" = 1'-0" D7 Break Room Demo Elevation

1/2" = 1'-0" E7 Locker RoomDemo Elevation

0' 2' 4' 8' 16'

1/4"=1'-0"

NN

4 1/2" / 1'-0"4 1/2" / 1'-0"

5"

'-0

4 1/2" / 1'-0"4 1/2" / 1'-0"

7/19/24

00404366CO

LO

RADO L ICENSED

A RC H I T ECT

SE

AN

M. F ITZPATRICK

623 26TH AVENUE

QUAD CITIES, IL

61201

PH: 309.788.0673

FAX: 309.786.5967

www.imegcorp.com

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved: Project Manager/ COR Bobbie Griffin Department of Veteran Affairs, NCA

Phone: 470-998-1497 Email: Bobbie.Griffin@va.gov

VA FORM 08 - 6231

A

BID PACKAGE

NA

National Cemetery Administration Design and

Construction Service U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD A/E: Vali Cooper International

STAMPCONSULTANT

321 4 5 6 7 8 9 10

CORRECT CEMETERY FACILITY

CONDITION ASSESSMENT (FCA)

DEFICIENCIES

856CM3012

LEBANON, KY

504.684.4408; Sean Fitzpatrick 56 Louis Prima Drive, Suite B, Covington LA 70433

VCI Project ManagementProject Management Construction ManagementConstruction Management EngineeringEngineering

07/19/2024 Sheet of 84

C :\U se rs

\d an ia .h ab bo ub \V

C I\V

A N

C A

Le ba no n

N C

F C

A Im pr ov em en ts

D oc um en ts \a

W or kF ile s\ 4_

Bi d_

D oc s\ 1_

Pl an s\ C

AD

\N ew M ai nt

B ui ld in g.

rv t 7/

/2

:4

3:

A M

AD104

New Maintenance Building RCP& Roof Demo Plans

1/4" = 1'-0" F1 Ceiling Demo Plan

1/4" = 1'-0" F6 Roof Level Demo Plan

RCP DEMO KEYNOTESRCP DEMO KEYNOTES

Type Mark Keynote

9 REMOVE AND DISPOSE OF EXISTING 2'X4' LAYIN

CEILING TILES AND GRID

10 REMOVE AND DISPOSE OF EXISTING CEILING

13 REMOVE AND REPLACE ALL LIGHTING FIXTURES

0' 2' 4' 8' 16'

1/4"=1'-0"

34Revisions: Date:

7 7

C6

AD105

C8

AD105

14 15

16 16

SERVICE BAY 1

SERVICE BAY 2

SERVICE BAY 3

WOMEN'S RESTROOM

MEN'S RESTROOM

6"

'-0

5"

'-0

6"

'-0

6"

'-0

6"

'-0

6"

'-0

8 1/2" / 1'-0"8 1/2" / 1'-0"

L1 0' - 0"

L1 0' - 0"

7/19/24

00404366CO

LO

RADO L ICENSED

A RC H I T ECT

SE

AN

M. F ITZPATRICK

623 26TH AVENUE

QUAD CITIES, IL

61201

PH: 309.788.0673

FAX: 309.786.5967

www.imegcorp.com

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved: Project Manager/ COR Bobbie Griffin Department of Veteran Affairs, NCA

Phone: 470-998-1497 Email: Bobbie.Griffin@va.gov

VA FORM 08 - 6231

A

BID PACKAGE

NA

National Cemetery Administration Design and

Construction Service U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD A/E: Vali Cooper International

STAMPCONSULTANT

321 4 5 6 7 8 9 10

CORRECT CEMETERY FACILITY

CONDITION ASSESSMENT (FCA)

DEFICIENCIES

856CM3012

HA-5

LEBANON, KY

504.684.4408; Sean Fitzpatrick 56 Louis Prima Drive, Suite B, Covington LA 70433

VCI Project ManagementProject Management Construction ManagementConstruction Management EngineeringEngineering

07/19/2024 Sheet of 84

C :\U se rs

\d an ia .h ab bo ub \V

C I\V

A N

C A

Le ba no n

N C

F C

A Im pr ov em en ts

D oc um en ts \a

W or kF ile s\ 4_

Bi d_

D oc s\ 1_

Pl an s\ C

AD

\O ld M ai nt

B ui ld in g.

rv t 7/

/2

:4

5:

A M

AD105

Old Maintenance Building Demo Floor Plans

1/4" = 1'-0" F6 Ground Floor Demo Plan

1/4" = 1'-0" C1 Roof Demo Plan

DEMO KEYNOTESDEMO KEYNOTES

Type Mark Keynote

1 REMOVE AND DISPOSE OF TOILET COMPARTMENT

2 REMOVE AND DISPOSE OF PLUMBING FIXTURES

3 REMOVE AND DISPOSE OF DOORS AND FRAMES,

5 GRIND ALL EXISTING SEALERS OFF OF CONCRETE

FLOOR AND RESEAL

6 REMOVE EXISTING GRAB BARS

7 REMOVE AND DISPOSE OF WINDOWS

10 REMOVE AND DISPOSE OF ALL GUTTERS AND

DOWNSPOUTS

12 REMOVE AND REPLACE ASPHALT SHINGLE ROOFING

14 REMOVE MIRROR, TOWEL DISPENSER, AND SOAP

DISPENSERS

15 REMOVE ALL PAINT FROM INTERIOR BRICK WALLS.

REMOVE ALL LOOSE MORTAR AND TUCK POINT AS

REQUIRED. APPROXIMATELY 50% OF BRICK

16 REMOVE AND REPLACE LOWER 24" OF OH DOOR

TRIM TO MATCH EXISTING. REMOVE ALL EXISTING

PAINT FROM REMAINING TRIM.

17 CLEAN ALL EXTERIOR BRICK. REMOVE ALL LOOSE

GROUT AND TUCKPOINT. APPROXIMATELY 90% OF

THE JOINTS.

24 REMOVE AND REPLACE ALL LIGHT FIXTURES

1/4" = 1'-0" F1 Reflected Ceiling Demo Plan

1/2" = 1'-0" C6 Men's Restroom Demo Enlarged View

1/2" = 1'-0" C8 Women's Restroom Demo Enlarged View

0' 2' 4' 8' 16'

1/4"=1'-0"

35Revisions: Date:

FIRST FLOOR

0' - 0"

SECOND FLOOR

10' - 8 1/2"

ROOF LEVEL

19' - 4 1/2"

FIRST FLOOR

0' - 0"

SECOND FLOOR

10' - 8 1/2"

ROOF LEVEL

19' - 4 1/2"

FIRST FLOOR

0' - 0"

SECOND FLOOR

10' - 8 1/2"

ROOF LEVEL

19' - 4 1/2"

FIRST FLOOR

0' - 0"

SECOND FLOOR

10' - 8 1/2"

ROOF LEVEL

19' - 4 1/2"

7/19/24

00404366CO

LO

RADO L ICENSED

A RC H I T ECT

SE

AN

M. F ITZPATRICK

623 26TH AVENUE

QUAD CITIES, IL

61201

PH: 309.788.0673

FAX: 309.786.5967

www.imegcorp.com

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved: Project Manager/ COR Bobbie Griffin Department of Veteran Affairs, NCA

Phone: 470-998-1497 Email: Bobbie.Griffin@va.gov

VA FORM 08 - 6231

A

BID PACKAGE

NA

National Cemetery Administration

Design and Construction Service

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD A/E: Vali Cooper International

STAMPCONSULTANT

321 4 5 6 7 8 9 10

CORRECT CEMETERY FACILITY

CONDITION ASSESSMENT (FCA)

DEFICIENCIES

856CM3012

LEBANON, KY

504.684.4408; Sean Fitzpatrick 56 Louis Prima Drive, Suite B, Covington LA 70433

VCI Project ManagementProject Management Construction ManagementConstruction Management EngineeringEngineering

07/19/2024 Sheet of 84

C :\U se rs

\d an ia .h ab bo ub \V

C I\V

A N

C A

Le ba no n

N C

F C

A Im pr ov em en ts

D oc um en ts \a

W or kF ile s\ 4_

Bi d_

D oc s\ 1_

Pl an s\ C

AD

\A dm in b ui ld in g.

rv t 7/

/2

:4

2:

A M

AD201

Administration Building Elevations

1/4" = 1'-0" D1 East Elevation

1/4" = 1'-0" F1 North Elevation

1/4" = 1'-0" F5 South Elevation

1/4" = 1'-0" D5 West Elevation

ELEVATIONS NEW WORK KEYNOTESELEVATIONS NEW WORK KEYNOTES

Type Mark Keynote

9 INSTALL NEW 4"X4" TREATED WOOD POST AND

4"X12" BEAM. INSTALL NEW WOOD TRIM TO

MATCH EXISTING. SEE DETAILS D/A-501.

15 REPAIR OPERATION OF ALL WINDOWS. STRIP,

REPAINT AND RESEAL ALL WINDOWS

16 CLEAN OUT GUTTERS AND DOWNSPOUTS AND

ADD GUTTER SCREENS

17 REMOVE ALL EXISTING PAINT FROM FASCIAS

AND SOFFITS. EPOXY REPAIR ALL TRIM AND

REPAINT. REPLACE WHERE REPAIR IS NOT

POSSIBLE.

18 ADD SIGN FOR "ADMINISTRATION BUILDING

2101"

26 RELOCATE PLAQUES FROM ENTRY COLUMNS

30 STRIP AND REPAINT COLUMN AND NEWEL POST

34 REPLACE PORCH ROOFING WITH NEW

STANDING SEAM METAL ROOF WITH ASPHALT

COATING

52 REPLACE ROOF JOISTS

53 REPLACE WOOD DECKING

ELEVATIONS DEMO KEYNOTESELEVATIONS DEMO KEYNOTES

Type Mark Keynote

7 DEMO AND REPLACE COLUMN, NEWEL POST

AND BEAM

14 DEMO AND REPLACE ALL BASEMENT WINDOWS,

AND REFURBISH ALL WOODEN SCREENS.

30 DEMO STAIRS AND STAIR RAILING

31 DEMO PORTION OF RAILING

B2 3D Porch View

L1

L2 12' - 0"

Roof Level 18' - 5 9/32"

L1 0' - 0"

L2 12' - 0"

Roof Level 18' - 5 9/32"

L1 0' - 0"

L2 12' - 0"

Roof Level 18' - 5 9/32"

L1 0' - 0"

L2 12' - 0"

Roof Level 18' - 5 9/32"

7/19/24

00404366CO

LO

RADO L ICENSED

A RC H I T ECT

SE

AN

M. F ITZPATRICK

623 26TH AVENUE

QUAD CITIES, IL

61201

PH: 309.788.0673

FAX: 309.786.5967

www.imegcorp.com

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved: Project Manager/ COR Bobbie Griffin Department of Veteran Affairs, NCA

Phone: 470-998-1497 Email: Bobbie.Griffin@va.gov

VA FORM 08 - 6231

A

BID PACKAGE

NA

National Cemetery Administration Design and

Construction Service U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD A/E: Vali Cooper International

STAMPCONSULTANT

321 4 5 6 7 8 9 10

CORRECT CEMETERY FACILITY

CONDITION ASSESSMENT (FCA)

DEFICIENCIES

856CM3012

LEBANON, KY

504.684.4408; Sean Fitzpatrick 56 Louis Prima Drive, Suite B, Covington LA 70433

VCI Project ManagementProject Management Construction ManagementConstruction Management EngineeringEngineering

07/19/2024 Sheet of 84

C :\U se rs

\d an ia .h ab bo ub \V

C I\V

A N

C A

Le ba no n

N C

F C

A Im pr ov em en ts

D oc um en ts \a

W or kF ile s\ 4_

Bi d_

D oc s\ 1_

Pl an s\ C

AD

\N ew M ai nt

B ui ld in g.

rv t 7/

/2

:4

3:

A M

AD202

New Maintenance Building Demo Elevations

1/4" = 1'-0" B2 North Elevation

1/4" = 1'-0" D2 East Elevation

1/4" = 1'-0" E2 South Elevation

1/4" = 1'-0" F2 West Elevation

ELEVATIONS DEMO KEYNOTESELEVATIONS DEMO KEYNOTES

Type Mark Keynote

11 REMOVE PAINT, RUST AND SEALANTS FROM ALL

EXTERIOR DOOR FRAMES.

12 REMOVE AND REPLACE SEALANTS AT WINDOW

FRAMES

0' 2' 4' 8' 16'

37Revisions: Date:

L2 12' - 0"

L1

0' - 0"

L2 12' - 0"

8 8

L1 0' - 0"

L2 12' - 0"

L1 0' - 0"

L2 12' - 0"

18 18 18

7/19/24

00404366CO

LO

RADO L ICENSED

A RC H I T ECT

SE

AN

M. F ITZPATRICK

623 26TH AVENUE

QUAD CITIES, IL

61201

PH: 309.788.0673

FAX: 309.786.5967

www.imegcorp.com

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved: Project Manager/ COR Bobbie Griffin Department of Veteran Affairs, NCA

Phone: 470-998-1497 Email: Bobbie.Griffin@va.gov

VA FORM 08 - 6231

A

BID PACKAGE

NA

National Cemetery Administration Design and

Construction Service U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD A/E: Vali Cooper International

STAMPCONSULTANT

321 4 5 6 7 8 9 10

CORRECT CEMETERY FACILITY

CONDITION ASSESSMENT (FCA)

DEFICIENCIES

856CM3012

HA-5

LEBANON, KY

504.684.4408; Sean Fitzpatrick 56 Louis Prima Drive, Suite B, Covington LA 70433

VCI Project ManagementProject Management Construction ManagementConstruction Management EngineeringEngineering

07/19/2024 Sheet of 84

C :\U se rs

\d an ia .h ab bo ub \V

C I\V

A N

C A

Le ba no n

N C

F C

A Im pr ov em en ts

D oc um en ts \a

W or kF ile s\ 4_

Bi d_

D oc s\ 1_

Pl an s\ C

AD

\O ld M ai nt

B ui ld in g.

rv t 7/

/2

:4

5:

A M

AD203

Old Maintenance Building Elevations

1/4" = 1'-0" C1 East Elevation

1/4" = 1'-0" C5 North Elevation

1/4" = 1'-0" F1 West Elevation

1/4" = 1'-0" F5 South Elevation

ELEVATION KEYNOTESELEVATION KEYNOTES

Type Mark Keynote

8 DEMO AND REPLACE WINDOWS. INSTALL NEW WOOD

WINDOWS TO MATCH HISTORIC REMOVED WINDOWS

9 DEMO AND REPLACE ALL WOOD DOORS AND STEEL

FRAMES

11 REMOVE AND REPLACE ALL GUTTERS AND

DOWNSPOUTS

13 REMOVE AND REPLACE ASPHALT SHINGLE ROOFING

18 REMOVE AND REPLACE LOWER 24" OF OH DOOR

TRIM TO MATCH EXISTING. REMOVE ALL EXISTING

PAINT FROM REMAINING TRIM. EPOXY REPAIR AS

REQUIRED ALL TRIM AND REPAINT.

19 REMOVE ALL EXISTING PAINT FROM FASCIAS AND

SOFFITS. EPOXY REPAIR ALL TRIM AND REPAINT.

REPLACE WHERE REPAIR IS NOT POSSIBLE.

20 CLEAN ALL EXTERIOR BRICK. REMOVE ALL LOOSE

GROUT, AND TUCKPOINT APPROXIMATELY 90% OF

THE JOINTS.

21 CLEAN ALL EXPOSED CONCRETE FOUNDATION

WALLS

22 NEW BUILDING SIGNAGE TO INCLUDE BUILDING

NUMBER

23 ADD MEN AND WOMEN RESTROOM SIGNAGE WITH

ABA ACCESSIBLE SYMBOL. SEE DETAIL F1/A-504

38Revisions: Date:

UP

UP

WORKROOM

KITCHEN

DIRECTOR'S OFFICE

FRONT PORCH

REAR PORCH

RESTROOM

102A

1 2 233

E1 A-401

E3 A-401

E6 A-401

12 12 12

102A

RECEPTION

F1 A-301

F1 A-301

6' - 5 7/8"6' - 5 7/8" 5' 1/ 4"

5' 1/ 4"

3' 8"

3' 8"

4' 0"

4' 0"

45 -2' - 0"

1' - 0"

4' - 0"4' - 0"

C6 A-301

C6 A-301

101A

103A

BEDROOM 2

CLOSET

203A

BATHROOM

BEDROOM 3

CORRIDOR

BEDROOM 1

STAIR

ST1

CLOSET

205A

E7 A-401

121212

203A

205A

CLOSET

202A

19 20

SIDE SPACE

REAR SPACE

CRAWL SPACE

TR

STAIR

ST3

STAIR

ST2

22 22

010203

272727

001a

33 56

7/19/24

00404366CO

LO

RADO L ICENSED

A RC H I T ECT

SE

AN

M. F ITZPATRICK

623 26TH AVENUE

QUAD CITIES, IL

61201

PH: 309.788.0673

FAX: 309.786.5967

www.imegcorp.com

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved: Project Manager/ COR Bobbie Griffin Department of Veteran Affairs, NCA

Phone: 470-998-1497 Email: Bobbie.Griffin@va.gov

VA FORM 08 - 6231

A

BID PACKAGE

NA

National Cemetery Administration

Design and Construction Service

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD A/E: Vali Cooper International

STAMPCONSULTANT

321 4 5 6 7 8 9 10

CORRECT CEMETERY FACILITY

CONDITION ASSESSMENT (FCA)

DEFICIENCIES

856CM3012

LEBANON, KY

504.684.4408; Sean Fitzpatrick 56 Louis Prima Drive, Suite B, Covington LA 70433

VCI Project ManagementProject Management Construction ManagementConstruction Management EngineeringEngineering

07/19/2024 Sheet of 84

C :\U se rs

\d an ia .h ab bo ub \V

C I\V

A N

C A

Le ba no n

N C

F C

A Im pr ov em en ts

D oc um en ts \a

W or kF ile s\ 4_

Bi d_

D oc s\ 1_

Pl an s\ C

AD

\A dm in b ui ld in g.

rv t 7/

/2

:4

2:

A M

A-101

Administration Building New Work Floor Plans

NEW WORK KEYNOTESNEW WORK KEYNOTES

Type Mark Keynote

1 INSTALL NEW RESILENT TILE FLOORING

2 INSTALL NEW PLUMBING FIXTURES. SEE PLUMBING

3 INSTALL NEW PREMANUFACTURED WOOD CABINETS

4 INSTALL NEW APPLIANCES

5 EPOXY REPAIR AND REPAINT WOOD FRAME AND

TRIM. INSTALL NEW WD DOOR AND HARDWARE

6 INSTALL NEW 4"X4" TREATED WOOD POST AND 4"X12"

BEAM. INSTALL NEW WOOD TRIM TO MATCH EXISTING.

SEE DETAILS D/A-501

7 INSTALL NEW OAK T&G WOOD FLOORING TO MATCH

EXISTING IN OTHER ROOMS

8 REPAIR CONCRETE SLAB

10 REPAINT ALL WALLS

12 REPAIR OPERATION OF ALL WINDOWS. STRIP,

REPAINT AND RESEAL ALL WINDOWS

13 REPLACE WITH 3'-0" WIDE DOOR, WIDEN THE OPENING

ACCORDINGLY

14 INSTALL ABAAS COMPLIANT GRAB BARS

19 INSTALL NEW STANDING SEAM METAL ROOFING WITH

ASPHALT COATING OVER THE FRONT PORCH

20 CLEAN OUT ALL GUTTERS AND DOWNSPOUTS AND

ADD GUTTER SCREENS

21 CLEAN AND REPAINT INTERIOR WALLS

22 REPAINT INTERIOR OF EXTERIOR STONE WALLS

25 ADD FIRE EXTINGUISHER CABINET. SEE DETAIL

D1/A-501

27 INSTALL NEW BASEMENT WINDOWS, AND REFURBISH

ALL WOODEN SCREENS

28 INSTALL NEW EXTERIOR DOOR

29 APPLY FIRE RATED PLYWOOD BACKBOARD WITH A

MINIMUM THICKNESS OF 3/4" PAINTED WITH TWO

COATS OF FIRE-RESISTANT PAINT AND HIGH GLOSS

WHITE TOP COAT. MOUNT PLYWOOD WITH BOTTOM

EDGE@ 12" AFF.

31 APPLY 3M ULTRA PRESTIGE BLAST FILM WITH

ADDITIONAL VISION OBSCRUING FILM.

32 RESEAL CONCRETE FLOOR

33 APPLY STATIC DISSIPATIVE TILE FOR TR ROOM. SEE

DETAIL E4/A-501 FOR RESILIENT-CONCRETE FLOOR

TRANSITION.

44 INSTALL 1:12 SLOPE CAST-IN-PLACE CONCRETE

RAMP, 3' WIDTH, 36" RISE WITH RAILING

45 CONNECT RAMP TO EXISTING CONCRETE SIDEWALK.

46 INSTALL NEW CAST-IN-PLACE CONCRETE STAIRS.

47 INSTALL NEW RAILING TO MATCH EXISTING

48 RAISE CONCRETE SLAB 6" OR TO ALIGN WITH

ENTRANCE LEVEL.

49 DEMO EXISITNG CONCRETE THRESHOLD.

50 PROVIDE ABA COMPLIANCE DOOR SILL.

51 INSTALL DOOR OPENER SYSTEM.

54 REPAIR CONCRETE SLAB

55 INSTALL NEW TOILET ACCESSORIES

56 INSTALL RUBBER WALL BASE. SEE DETAIL F7/A-501

58 INSTALL NEW DOOR AND FRAME

59 INSTALL CARD READER SEE ELEC.

1/4" = 1'-0"

D1 FIRST FLOOR NEW WORK PLAN

1/4" = 1'-0"

D5 SECOND FLOOR NEW WORK PLAN

1/4" = 1'-0"

F5 ROOF LEVEL NEW WORK

1/4" = 1'-0"

F1 BASEMENT NEW WORK

NN

0' 2' 4' 8' 16'

1/4"=1'-0"

82 REPLACE DOOR HARDWARE

11 11

7/19/24

00404366CO

LO

RADO L ICENSED

A RC H I T ECT

SE

AN

M. F ITZPATRICK

623 26TH AVENUE

QUAD CITIES, IL

61201

PH: 309.788.0673

FAX: 309.786.5967

www.imegcorp.com

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved: Project Manager/ COR Bobbie Griffin Department of Veteran Affairs, NCA

Phone: 470-998-1497 Email: Bobbie.Griffin@va.gov

VA FORM 08 - 6231

A

BID PACKAGE

NA

National Cemetery Administration

Design and Construction Service

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD A/E: Vali Cooper International

STAMPCONSULTANT

321 4 5 6 7 8 9 10

CORRECT CEMETERY FACILITY

CONDITION ASSESSMENT (FCA)

DEFICIENCIES

856CM3012

LEBANON, KY

504.684.4408; Sean Fitzpatrick 56 Louis Prima Drive, Suite B, Covington LA 70433

VCI Project ManagementProject Management Construction ManagementConstruction Management EngineeringEngineering

07/19/2024 Sheet of 84

C :\U se rs

\d an ia .h ab bo ub \V

C I\V

A N

C A

Le ba no n

N C

F C

A Im pr ov em en ts

D oc um en ts \a

W or kF ile s\ 4_

Bi d_

D oc s\ 1_

Pl an s\ C

AD

\A dm in b ui ld in g.

rv t 7/

/2

:4

2:

A M

A-102

Administration Building Reflected Ceiling New Work Plans

1/4" = 1'-0" D1 First Floor Ceiling New Work

1/4" = 1'-0" D6 Second Floor Ceiling New Work

1/4" = 1'-0" F1 Basement Ceiling New Work

NEW WORK KEYNOTES RCPNEW WORK KEYNOTES RCP

Type Mark Keynote

11 REPAINT CEILING AND TRIM

23 CLEAN AND SKIM COAT ALL EXISTING GYPSUM

BOARD CEILINGS AND REPAINT

24 INSTALL NEW 5/8" GYPSUM BOARD CEILING.

TAPE AND PAINT TO MATCH OTHER CEILINGS

35 INSTALL NEW STANDING SEAM METAL ROOFING

WITH ASPHALT COATING OVER THE FRONT

PORCH

42 INSTALL NEW LED LIGHT FIXTURES. SEE ELEC.

NN

0' 2' 4' 8' 16'

40Revisions: Date:

FD

R ef rig er at or

SERVICE BAYS

BREAK ROOM

RESTROOM

CORRIDOR

LOCKER ROOM

GRAVE LOCATOR SERVICE

MECH/ELEC ROOM

MEN'S RESTROOM

WOMEN'S RESTROOM

CLOSET

/1 6"

14' - 11 3/8"

4' - 0 5/16" 11' - 8 5/16"

C6 A-103

B6 A-103

F8 A-103

STORAGE

W12 011A

011B

L1 0' - 0"

L1 0' - 0"

L1 0' - 0"

L2 12' - 0"

Roof Level 18' - 5 9/32"

A-103 D8

4 1/2" / 1'-0"

A-103 C8

CIVIL FFE

806.29

2' - 0"

8"

2' - 0"

8"

2'

- 0

8"

/8

16' - 3 7/8"

/8

14' - 11 7/8"

F8 A-103

8" CMU WALL PAINTED

5/8" TYPE 'X'

GYPSUM BOARD

TREATED 2X TOP PLATE

W/ 5/2"X6" EXPANSION

ANCHORS @24" O.C.

ICE AND WATER SHIELD

STANDING SEAM METAL PANEL

12" STEEL STUD JOISTS

@24" O.C.

EDGE ATTACHMENT

CONT 43MIL BLKG W/ HILTI

X-U PAF@6" OC INTO T/O

GROUTED CELL

S/H2.5 ANCHOR AT EA STUD

ICE& WATER SHEILD

STANDING SEAM

METAL PANEL

STANDING SEAM CLIP5/8" TYPE 'X'

GYPSUM BOARD

ANCHOR

FASTENER

ZEE CLOSURE

STEP FLASHING

POP RIVET@12" O.C.

(4) PANCAKE HEAD

SCREWS EQ.

SPACED PER PANEL

7/19/24

00404366CO

LO

RADO L ICENSED

A RC H I T ECT

SE

AN

M. F ITZPATRICK

623 26TH AVENUE

QUAD CITIES, IL

61201

PH: 309.788.0673

FAX: 309.786.5967

www.imegcorp.com

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved: Project Manager/ COR Bobbie Griffin Department of Veteran Affairs, NCA

Phone: 470-998-1497 Email: Bobbie.Griffin@va.gov

VA FORM 08 - 6231

A

BID PACKAGE

NA

National Cemetery Administration Design and

Construction Service U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD A/E: Vali Cooper International

STAMPCONSULTANT

321 4 5 6 7 8 9 10

CORRECT CEMETERY FACILITY

CONDITION ASSESSMENT (FCA)

DEFICIENCIES

856CM3012

LEBANON, KY

504.684.4408; Sean Fitzpatrick 56 Louis Prima Drive, Suite B, Covington LA 70433

VCI Project ManagementProject Management Construction ManagementConstruction Management EngineeringEngineering

07/19/2024 Sheet of 84

C :\U se rs

\d an ia .h ab bo ub \V

C I\V

A N

C A

Le ba no n

N C

F C

A Im pr ov em en ts

D oc um en ts \a

W or kF ile s\ 4_

Bi d_

D oc s\ 1_

Pl an s\ C

AD

\N ew M ai nt

B ui ld in g.

rv t 7/

/2

:4

3:

A M

A-103

New Maintenance Building New Work Floor Plans

1/4" = 1'-0" F1 Ground Floor New Work Plan

NEW WORK KEYNOTESNEW WORK KEYNOTES

Type Mark Keynote

1 REPAINT AND RESEAL ALL EXTERIOR DOOR FRAMES

2 REPLACE ALL SEALANTS ON ALL EXTERIOR WINDOWS

3 RESEAL CONCRETE FLOOR

4 REPAINT ALL INTERIOR WALLS

5 INSTALL NEW APPLIANCES

6 INSTALL NEW SHOWER HEAD

7 INSTALL NEW SIX (12"X12"X6') METAL LOCKERS. SEE DETAIL F4/A-501

8 REPAIR CRACKED TILE AT WALL BASE ALONG ENTIRE LENGTH OF NORTH AND WEST

WALLS

9 CLEAN AND RESEAL ALL EXTERIOR CMU WALLS

10 NEW 10'X15' CMU BUILDING WITH A SHED ROOF

21 CLEAN AND RESEAL GROUT

22 12"X24" CONTINUOUS CONCRETE FOOTING WITH 4-#4 REBAR LONGITUDINAL & #4

REBAR AT 18" LONGITUDINAL HOOKED VERTICALLY 18" INTO FOUNDATION WALL.

23 8"X24" CONCRETE FOUNDATION WALL WITH #4 REBAR @ 18" O.C.E.W.

24 6" CONCRETE SLAB W/ #4 REBAR @ 18" O.C. WITH 12"D X 12"W THICKENED EDGE W/ 2

#4 REBAR CONTINUOUS.

25 12" STEEL STUD JOISTS @24" O.C. W/ 5/8" PLYWOOD SHEATHING, ICE AND WATER

SHIELD AND STANDING SEAM METAL ROOFING.

27 12" STEEL STUD JOISTS@ 24" O.C.

28 INSTALL NEW PREMANUFACTURED WOOD CABINETS. SEE DETAILS ON A-401

29 INSTALL NEW SOLID SURFACE COUNTER TOP. SEE DETAIL F5/A-401

30 INSTALL NEW PLUMBING FIXTURES.

32 INSTALL NEW 12"X12" LOUVERS FOR THE NEW HERBICIDE AND PESTICIDE STORAGE

34 REPAINT ALL WALLS

35 INSTALL WALL MOUNTED EQUIPMENT RACK

36 APPLY FIRE RATED PLYWOOD BACKBOARD 8 FT HIGH WITH A MINIMUM THICKNESS

OF 3/4" WITH TWO COATS OF FIRE-RESISTANT PAINT AND HIGH GLOSS WHITE TOP

COAT. MOUNT PLYWOOD WITH BOTTOM EDGE@12" AFF

37 INSTALL NEW CARD READER

38 UPGRADE THE DOOR HARDWARE TO SUPPORT NEW CARD READER.

1/2" = 1'-0" C6 Break Room New Work Elevation

1/2" = 1'-0" B6 Locker Room New Work Elevation

0' 2' 4' 8' 16'

1/4"=1'-0"

1/4" = 1'-0" F8 Section 1

1/4" = 1'-0" F6 Storage Foundation Plan

1/4" = 1'-0" D6 Structural Roof Plan

1" = 1'-0" D8 Storage Roof and Wall Connection

NN

1" = 1'-0" C8 Detail 0

4 1/2" / 1'-0"4 1/2" / 1'-0"

5"

'-0

4 1/2" / 1'-0"4 1/2" / 1'-0"

1/

2"

'-0

5"

'-0

F8 A-103

F8 A-103

7/19/24

00404366CO

LO

RADO L ICENSED

A RC H I T ECT

SE

AN

M. F ITZPATRICK

623 26TH AVENUE

QUAD CITIES, IL

61201

PH: 309.788.0673

FAX: 309.786.5967

www.imegcorp.com

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved: Project Manager/ COR Bobbie Griffin Department of Veteran Affairs, NCA

Phone: 470-998-1497 Email: Bobbie.Griffin@va.gov

VA FORM 08 - 6231

A

BID PACKAGE

NA

National Cemetery Administration Design and

Construction Service U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD A/E: Vali Cooper International

STAMPCONSULTANT

321 4 5 6 7 8 9 10

CORRECT CEMETERY FACILITY

CONDITION ASSESSMENT (FCA)

DEFICIENCIES

856CM3012

LEBANON, KY

504.684.4408; Sean Fitzpatrick 56 Louis Prima Drive, Suite B, Covington LA 70433

VCI Project ManagementProject Management Construction ManagementConstruction Management EngineeringEngineering

07/19/2024 Sheet of 84

C :\U se rs

\d an ia .h ab bo ub \V

C I\V

A N

C A

Le ba no n

N C

F C

A Im pr ov em en ts

D oc um en ts \a

W or kF ile s\ 4_

Bi d_

D oc s\ 1_

Pl an s\ C

AD

\N ew M ai nt

B ui ld in g.

rv t 7/

/2

:4

3:

A M

A-104

New Maintenance Building RCP& Roof New Work Plans

1/4" = 1'-0" F6 Roof Level New Work

1/4" = 1'-0" F1 Ceiling New Work Plan

RCP& Roof Plan NEW WORK KEYNOTESRCP& Roof Plan NEW WORK KEYNOTES

Type Mark Keynote

11 CLEAN OUT GUTTERS AND DOWNSPOUTS AND ADD

GUTTER SCREENS

12 INSTALL NEW 2'X4' CEILING TILES AND GRID. REFERENCE

A-502 FOR CEILING DETAILS.

13 INSTALL NEW CEILING. REFERENCE A-502 FOR CEILING

DETAILS.

19 ROOF SLOPE TO MATCH EXISTING

26 12" STEEL STUD JOISTS @24" O.C. W/ 5/8" PLYWOOD

SHEATHING, ICE AND WATER SHIELD AND STANDING SEAM

METAL ROOFING.

33 INSTALL NEW LED LIGHTING FIXTURES. SEE ELEC.

0' 2' 4' 8' 16'

1/4"=1'-0"

1 1

C6 A-105

B6 A-105

____ 8

9 9 9

12 12

SERVICE BAY 1

SERVICE BAY 2

SERVICE BAY 3

WOMEN'S RESTROOM

MEN'S RESTROOM

004004

131416

6"

'-0

6"

'-0

6"

'-0

6"

'-0

6"

'-0

5"

'-0

9" / 1'-0" 9" / 1'-0"

10 10

L1 0' - 0"

A6

A2

A5 A5 A7 A8

L1 0' - 0"

A1

A2

A3 A4

A5A5

1/8":12" (1.04%) SLOPE TO DRAIN

2' -1 0" T

YP

2' -1 0" T

YP

PROVIDE INSULATION

AT EXPOSED PIPE

UNDERMOUNT SINK

1/4" THICK STEEL

PLATE FASTENED TO

CMU WITH 5/8" DIA KB-3

W/4" MIN EMBED PER

ESR 1385 (4 TOTAL)

3"X3"X3/8" HSS

TUBE WELDED TO

STEEL PLATE

SEALANT

ALL AROUND

MIRROR

7/19/24

00404366CO

LO

RADO L ICENSED

A RC H I T ECT

SE

AN

M. F ITZPATRICK

623 26TH AVENUE

QUAD CITIES, IL

61201

PH: 309.788.0673

FAX: 309.786.5967

www.imegcorp.com

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved: Project Manager/ COR Bobbie Griffin Department of Veteran Affairs, NCA

Phone: 470-998-1497 Email: Bobbie.Griffin@va.gov

VA FORM 08 - 6231

A

BID PACKAGE

NA

National Cemetery Administration Design and

Construction Service U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD A/E: Vali Cooper International

STAMPCONSULTANT

321 4 5 6 7 8 9 10

CORRECT CEMETERY FACILITY

CONDITION ASSESSMENT (FCA)

DEFICIENCIES

856CM3012

HA-5

LEBANON, KY

504.684.4408; Sean Fitzpatrick 56 Louis Prima Drive, Suite B, Covington LA 70433

VCI Project ManagementProject Management Construction ManagementConstruction Management EngineeringEngineering

07/19/2024 Sheet of 84

C :\U se rs

\d an ia .h ab bo ub \V

C I\V

A N

C A

Le ba no n

N C

F C

A Im pr ov em en ts

D oc um en ts \a

W or kF ile s\ 4_

Bi d_

D oc s\ 1_

Pl an s\ C

AD

\O ld M ai nt

B ui ld in g.

rv t 7/

/2

:4

5:

A M

A-105

Old Maintenance Building New Work Floor Plans

NEW WORK KEYNOTESNEW WORK KEYNOTES

Type Mark Keynote

1 INSTALL NEW WOOD WINDOWS TO MATCH THE

HISTORIC REMOVED WINDOWS

2 INSTALL NEW PLUMBING FIXTURES. SEE PLUMBING

3 REPLACE WOOD DOORS AND STEEL FRAMES

4 SEALED CONCRETE

5 REPLACE EXISTING GRAB BARS WITH ABAAS

COMPLIANT GRAB BARS

6 INSTALL NEW GUTTERS AND DOWNSPOUTS. SEE

DETAIL B3/A-502

7 INSTALL NEW ASPHALT SHINGLE ROOFING

8 INSTALL NEW MIRROR, TOWEL DISPENSER, AND

SOAP DISPENSERS

9 CLEAN ALL CONCRETE FLOORS AND RESEAL

10 CLEAN ALL WOOD CEILING AND REPAINT

11 CLEAN ALL OPEN WOOD STRUCTURE AND RESEAL

12 REPLACE LOWER 24" OF OH DOOR TRIM TO MATCH

EXISTING. EPOXY REPAIR AS REQUIRED ALL TRIM

AND REPAINT.

13 INSTALL NEW LED LIGHT FIXTURES. SEE

ELECTRICAL

14 REMOVE PAINT AND LOOSE MORTAR FROM

INTERIOR BRICK WALLS AND TUCK POINTING

APPROXIMATELY 50% OF THE BRICK

15 REPAINT ALL WALLS

1/4" = 1'-0" F6 Ground Floor New Work Plan

1/4" = 1'-0" C1 Roof Plan

1/4" = 1'-0" F1 Reflected Ceiling Plan

1/2" = 1'-0" C6 Men's Restroom New Work Enlarged View

1/2" = 1'-0" B6 Women's Restroom NewWork Enlarged View

0' 2' 4' 8' 16'

1/4"=1'-0"

NN

RESTROOM ACCESSORIES SCHEDULE

Type Mark Description Manufacturer

A1 24"x36" RECESSED MIRROR

A2 RECESSED HAND TOWEL ROLL DISPENSER

A3 1-1/4" DIA. STAINLESS STEEL GRAB BARS, 36"

A4 1-1/4" DIA. STAINLESS STEEL GRAB BARS, 42"

A5 WALL MOUNTED SOAP DISPENSER

A6 20"X28" RECESSED MIRROR

A7 1-1/4" DIA. STAINLESS STEEL GRAB BARS, 42"

A8 1-1/4" DIA. STAINLESS STEEL GRAB BARS, 30"

12" = 1'-0" C8 Lavatory-CMU Wall Detail

BASE PLATE

POST

POST INSERT

TOP VIEW

CAP

HANDRAIL

ATTACHMENT

TO NEWEL POST

POST

BASE PLATE

CONCRETE SLAB

POST BASE CONNECTION INTO

CONCRETE W/ WEDGE ANCHORS

CAP

CAP ATTACHMENT

TO POST

#4 WEDGE ANCHORS

7/19/24

00404366CO

LO

RADO L ICENSED

A RC H I T ECT

SE

AN

M. F ITZPATRICK

623 26TH AVENUE

QUAD CITIES, IL

61201

PH: 309.788.0673

FAX: 309.786.5967

www.imegcorp.com

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved: Project Manager/ COR Bobbie Griffin Department of Veteran Affairs, NCA

Phone: 470-998-1497 Email: Bobbie.Griffin@va.gov

VA FORM 08 - 6231

A

BID PACKAGE

NA

National Cemetery Administration Design and

Construction Service U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD A/E: Vali Cooper International

STAMPCONSULTANT

321 4 5 6 7 8 9 10

CORRECT CEMETERY FACILITY

CONDITION ASSESSMENT (FCA)

DEFICIENCIES

856CM3012

4101&LEB-NEW2

LEBANON, KY

504.684.4408; Sean Fitzpatrick 56 Louis Prima Drive, Suite B, Covington LA 70433

VCI Project ManagementProject Management Construction ManagementConstruction Management EngineeringEngineering

07/19/2024 Sheet of 84

C :\U se rs

\d an ia .h ab bo ub \V

C I\V

A N

C A

Le ba no n

N C

F C

A Im pr ov em en ts

D oc um en ts \a

W or kF ile s\ 4_

Bi d_

D oc s\ 1_

Pl an s\ C

AD

\C om m itt al

S he lte r.r vt 7/

/2

:4

5:

A M

A-106

Committal Shelter and Rostrum Floor Plans

1/4" = 1'-0" F1 Ground Floor Plan

1/4" = 1'-0" F4 Roof Plan

1/4" = 1'-0" F8 Reflected Ceiling Plan

KEYNOTESKEYNOTES

Type Mark Keynote

1 CLEAN GUTTERS AND DOWNSPOUTS AND ADD

GUTTER GUARDS

2 REPAINT ALL STRUCTURAL STEEL

3 REMOVE AND REPLACE CEILING FAN. SEE MECH AND

ELECT.

4 REMOVE AND REPLACE LIGHTS. SEE ELECT.

5 STRIP AND PAINT CASKET HOLDER.

13 REPLACE HANDRAILS TO MATCH EXISTING. SEE

DETAIL C6/A-106

14 REPLACE ALL STEEL GUARDRAILS TO MATCH

EXISTING

15 CLEAN ENTIRE CONCRETE STRUCTURE. FIX ALL

CRACKS AND DAMAGED AREAS. RE-PARGE ENTIRE

STRUCTURE TO MATCH EXISTING FINISH

16 REPLACE EXISTING STEEL COLUMN TO MATCH

EXISTING. SEE DETAIL B8/A-106

17 REPLACE EXISTING STEEL COLUMN TO MATCH

EXISTING. SEE DETAIL B6/A-106

1/4" = 1'-0" C1 Ground Floor Plan

0' 2' 4' 8' 16'

1/4"=1'-0"

NN

3" = 1'-0" B8 Existing Steel Column Detail

3" = 1'-0" B6 Steel Column Detail

12" = 1'-0" C6 Post & Railing Detail

Existing Condition of the Rostrum

L2 12' - 0"

Roof Level 18' - 5 9/32"

F8 A-103

L1 0' - 0"

L2 12' - 0"

Roof Level 18' - 5 9/32"

7'

- 0

" 10

3/

"17

L1 0' - 0"

L2 12' - 0"

Roof Level 18' - 5 9/32"

14 14

F8 A-103

L1 0' - 0"

L2 12' - 0"

Roof Level 18' - 5 9/32"

7'

- 0

"10

3/

7/19/24

00404366CO

LO

RADO L ICENSED

A RC H I T ECT

SE

AN

M. F ITZPATRICK

623 26TH AVENUE

QUAD CITIES, IL

61201

PH: 309.788.0673

FAX: 309.786.5967

www.imegcorp.com

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved: Project Manager/ COR Bobbie Griffin Department of Veteran Affairs, NCA

Phone: 470-998-1497 Email: Bobbie.Griffin@va.gov

VA FORM 08 - 6231

A

BID PACKAGE

NA

National Cemetery Administration Design and

Construction Service U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD A/E: Vali Cooper International

STAMPCONSULTANT

321 4 5 6 7 8 9 10

CORRECT CEMETERY FACILITY

CONDITION ASSESSMENT (FCA)

DEFICIENCIES

856CM3012

LEBANON, KY

504.684.4408; Sean Fitzpatrick 56 Louis Prima Drive, Suite B, Covington LA 70433

VCI Project ManagementProject Management Construction ManagementConstruction Management EngineeringEngineering

07/19/2024 Sheet of 84

C :\U se rs

\d an ia .h ab bo ub \V

C I\V

A N

C A

Le ba no n

N C

F C

A Im pr ov em en ts

D oc um en ts \a

W or kF ile s\ 4_

Bi d_

D oc s\ 1_

Pl an s\ C

AD

\N ew M ai nt

B ui ld in g.

rv t 7/

/2

:4

3:

A M

A-201

New Maintenance Building New Work Elevations

1/4" = 1'-0" B2 North Elevation New Work

1/4" = 1'-0" C2 East Elevation New Work

1/4" = 1'-0" E2 South Elevation New Work

1/4" = 1'-0" F2 West Elevation New Work

ELEVATIONS NEW WORK KEYNOTESELEVATIONS NEW WORK KEYNOTES

Type Mark Keynote

14 REPAINT AND RESEAL ALL EXTERIOR DOOR FRAMES

15 REPLACE ALL SEALANTS ON ALL EXTERIOR WINDOWS

16 CLEAN OUT GUTTERS AND DOWNSPOUTS AND ADD

GUTTER SCREENS

17 NEW 10'X15' CMU BUILDING WITH A SHED ROOF

18 CLEAN AND RESEAL ALL EXTERIOR CMU WALLS

20 HAZARDOUS MATERIALS BUILDING IDENTIFICATION SIGN

31 INSTALL NEW 12"X12" LOUVERS FOR THE NEW

HERBICIDE AND PESTICIDE STORAGE

39 INSTALL NEW GUTTERS AND DOWNSPOUTS DISCHARGE

TO SPLASH BLOCK. SEE DETAIL F6/A-502

0' 2' 4' 8' 16'

45Revisions: Date:

L2 12' - 0"

L1 0' - 0"

L2 12' - 0"

L1 0' - 0"

L2 12' - 0"

19A-202 B4

L1 0' - 0"

L2 12' - 0"

L1 0' - 0"

L2 12' - 0"

L1 0' - 0"

L2 12' - 0"

L1 0' - 0"

L2 12' - 0"

L1 0' - 0"

ARMY MARINE NAVY AIR

FORCE

SPACE

FORCE

COAST

GUARD

18" 18" 18" 18" 18" 18"

1'

- 7 1/ 8"

4'

- 3 3/ 4"

EQ EQ EQ EQ EQ

B8

A-202

5 1 /2"

4" 6" 4"

1'

- 7 1/ 8"

7/19/24

00404366CO

LO

RA

DO L ICENSED

A RCH I T EC

T

SE

AN

M.

F ITZPATRICK

623 26TH AVENUE

QUAD CITIES, IL

61201

PH: 309.788.0673

FAX: 309.786.5967

www.imegcorp.com

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved: Project Manager/ COR Bobbie Griffin Department of Veteran Affairs, NCA

Phone: 470-998-1497 Email: Bobbie.Griffin@va.gov

VA FORM 08 - 6231

A

BID PACKAGE

NA

National Cemetery Administration Design and

Construction Service U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD A/E: Vali Cooper International

STAMPCONSULTANT

321 4 5 6 7 8 9 10

CORRECT CEMETERY FACILITY

CONDITION ASSESSMENT (FCA)

DEFICIENCIES

856CM3012

4101&LEB-NEW2

LEBANON, KY

504.684.4408; Sean Fitzpatrick 56 Louis Prima Drive, Suite B, Covington LA 70433

VCI Project ManagementProject Management Construction ManagementConstruction Management…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .