Bid Documents Ammended Drawings.pdf
PDF 9 MB Posted
- Solicitation number
- 36C78624B0045
About this file
This document appears to be a set of bid documents and drawings for a construction project at the Lebanon National Cemetery. The project aims to correct deficiencies identified in a Facility Condition Assessment (FCA) for the cemetery. The key details include:
The project is solicitation number 36C78624B0045, titled "Y1FE-- Lebanon NC Correct Cemetery Facility Condition Assessment 856CM3012", issued by the Department of Veterans Affairs National Cemetery Administration. The project includes demolition, repairs, and new construction work on the administration building, maintenance buildings, and committal shelter. The bid documents provide construction drawings, specifications, and details for the required work. Key dates include a site visit on October 15, RFI questions due November 8, and the bid due date. The document also includes construction staging, access, and safety requirements for working in an active national cemetery.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Wage Determination.pdf | ||
| Bid Documents Ammended Drawings 11-01-24.pdf | ||
| 36C78624B0045 0002.docx | DOCX document | |
| site visit sign in sheet.pdf | ||
| 36C78624B0045 0001.docx | DOCX document | |
| IFB-36C78624B0045_.docx | DOCX document | |
| Drawings 56-84.pdf | ||
| Lebanon NC Combined Specifications 2 of 2.pdf | ||
| Drawings 30-55.pdf | ||
| Drawings 4-14.pdf | ||
| Drawings 1-3.pdf | ||
| 36C78624B0045_1.docx | DOCX document | |
| Lebanon NC Combined Specifications 1 of 2.pdf | ||
| Drawings 15-29.pdf |
Show all 14
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
BID PACKAGE
N/A
National Cemetery Administration
Design and Construction Service
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
56 Louis Prima Drive, Suite B, Covington LA 70433 504.684.4408; Sean Fitzpatrick
CORRECT CEMETERY FACILITY
CONDITION ASSESSMENT (FCA)
DEFICIENCIES
LEBANON, KY
856CM3012
N/A Project Manager/ COR
07/19/2024Revisions: Date:
Bobbie Griffin Department of Veterans Affairs, NCA
Phone: 470-998-1497 Email: Bobbie.Griffin@va.gov Sheet of 84
VCI Project Management Construction Management Engineering
623 26TH AVENUE
QUAD CITIES, IL
61201
PH: 309.788.0673
FAX: 309.786.5967
www.imegcorp.com
SITE LOCATION MAP
SCALE: NTS
SITE LOCATION AND ACCESS MAP
SCALE: NTS
PROJECT TEAM
FIRM PANEL
SCALE: NTS
COVERSHEET
N
SHEET INDEX
SHEET
NO.
DRAWING
NO. SHEET TITLE
1 G-001 COVERSHEET
DEPARTMENT OF VETERANS AFFAIRS
LEBANON NATIONAL CEMETERY
CORRECT CEMETERY FACILITY CONDITION ASSESSMENT (FCA) DEFICIENCIES
NCA PROJECT NO. 856CM3012
20 HWY 208, LEBANON, KY 40033
N
STANDARDS OF CONDUCT
1. THE NATIONAL CEMETERY ADMINISTRATION HONORS VETERANS WITH A FINAL RESTING PLACE AND LASTING MEMORIALS THAT COMMEMORATE THEIR SERVICE TO OUR NATION. NATIONAL CEMETERIES ARE NATIONAL SHRINES. THE STANDARDS OF WORK, APPEARANCE, AND PROCEDURES PERFORMED BY THE CONTRACTOR AT THE CEMETERY SHALL REFLECT THIS NATIONS CONCERN FOR THOSE INTERRED THERE.
DUE TO THE SENSITIVE MISSION OF THE CEMETERY, CONTRACTOR PERSONNEL MUST EXERCISE AND
EXHIBIT ABSOLUTE DECORUM, COMPOSURE, AND STABILITY AT ALL TIMES.
2. THE BURIAL ACTIVITIES AT A NATIONAL CEMETERY SHALL TAKE PRECEDENCE OVER CONSTRUCTION ACTIVITIES. THE CONTRACTOR SHALL COOPERATE AND COORDINATE WITH THE CEMETERY DIRECTOR IN ARRANGING CONSTRUCTION SCHEDULE ACTIVITIES TO CAUSE THE LEAST POSSIBLE INTERFERENCE WITH CEMETERY ACTIVITIES IN ACTUAL BURIAL AREAS. CONSTRUCTION NOISE DURING THE INTERMENT SERVICES SHALL NOT DISTURB THE SERVICE. TRUCKS AND WORKMEN SHALL NOT PASS THROUGH THE
SERVICE AREA DURING THIS PERIOD.
3. THE CONTRACTOR SHALL CEASE WORK OPERATIONS AS NECESSARY TO ENSURE THAT NO CONTRACT WORK CAUSES ANY FUNERAL, CEREMONY, PROCESSION OR VISITATION BE DELAYED, ALTERED, OR OTHERWISE IMPACTED IN SUCH A WAY THAT THE DIGNITY, SERENITY OR SECURITY OF THE EVENT IS
COMPROMISED.
4. THE CONTRACTOR IS REQUIRED TO DISCONTINUE HIS WORK SUFFICIENTLY IN ADVANCE OF EASTER SUNDAY, MOTHER'S DAY, FATHER'S DAY, MEMORIAL DAY, VETERAN'S DAY AND FEDERAL HOLIDAYS, TO PERMIT THE CONTRACTOR TO CLEAN UP ALL AREAS OF OPERATION ADJACENT TO EXISTING BURIAL PLOTS BEFORE THESE DATES. CLEANING UP SHALL INCLUDE THE REMOVAL OF ALL EQUIPMENT, TOOLS, MATERIALS AND DEBRIS AND LEAVING THE AREAS IN A CLEAN, NEAT CONDITION.
5. WORKMEN ARE SUBJECT TO RULES OF THE CEMETERY APPLICABLE TO THEIR CONDUCT. WHILE ON SITE AT THE NATIONAL CEMETERY, CONTRACTOR PERSONNEL SHALL BE REQUIRED TO ADHERE TO THE
FOLLOWING STANDARDS OF DRESS AND CONDUCT WHILE PERFORMING WORK IN THE NATIONAL
CEMETERY. THESE STANDARDS AND REGULATIONS ARE ENFORCEABLE UNDER TITLE 38, U.S.C., SECTION 218.
6. CONTRACTOR PERSONNEL APPEARANCE AND CONDUCT SHALL BE PROFESSIONAL AND UNOBTRUSIVE AT
ALL TIMES. SHIRTS AND FULL LENGTH PANTS MUST BE WORN AT ALL TIMES.
7. SMOKING IS NOT ALLOWED IN ANY BUILDING AT THE NATIONAL CEMETERY.
8. THE PLAYING OF RADIOS, CASSETTE RECORDERS, ETC., IS PROHIBITED ON SITE OR IN BUILDINGS. THE CONTRACTOR'S WORK FORCE IS GOVERNED BY THE SAME RULES GOVERNING CEMETERY EMPLOYEES.
ALL INDIVIDUALS FAILING TO COMPLY WILL BE REMOVED FROM THE SITE.
9. SEXUAL HARASSMENT WILL NOT BE TOLERATED AND THE OFFENDING INDIVIDUAL(S) WILL BE REMOVED
FROM THE SITE.
10. CONTRACTOR PERSONNEL SHALL NOT SLEEP ON CEMETERY GROUNDS, SIT OR STAND ON INSTALLED
GRAVE MARKERS, OR PUT, PLACE OR LEAN EQUIPMENT OR MATERIALS ON GRAVE MARKERS.
11. QUESTIONS FROM CEMETERY VISITORS SHALL BE POLITELY REFERRED OR DIRECTED TO CEMETERY
PERSONNEL.
12. THE CONTRACTOR SHALL ENSURE THAT ALL EMPLOYEES BEHAVE WITH APPROPRIATE DECORUM, COURTESY, AND RESPECT WHILE WITHIN THE CEMETERY OR AT ITS PERIMETER OR ENTRANCES.
SHOUTING, CURSING, ANGRY OUTBURSTS, SLEEPING, INTOXICATION, UNSAFE DRIVING OF PRIVATE OR COMPANY VEHICLES, AND VIOLENCE OR CRIMINAL ACTS OF ANY KIND WILL NOT BE TOLERATED AND IS
CAUSE FOR IMMEDIATE REMOVAL FROM THE CEMETERY.
13. THE CONTRACTOR AND SUBCONTRACTORS WILL NOT FUEL EQUIPMENT IN GRASS/TURF AREAS.
PETROLEUM BASED PRODUCTS WILL DAMAGE THE GRASS/TURF. CONTRACTOR SHALL BEAR ALL COSTS ASSOCIATED WITH REMOVING ANY CONTAMINATED SOIL AS A RESULT OF FUELING IN GRASS/TURF AREAS
AND SHALL RESOD THE AREA.
1. TOPOGRAPHIC INFORMATION PROVIDED BY SURVEY PERFORMED BY ABBIE JONES. THE GENERAL
CONTRACTOR SHALL VERIFY ALL SURVEY INFORMATION.
2. THE BASIS OF BEARINGS FOR THE SURVEY IS THE KYCORS STATE PLANE COORDINATES, KY SINGLE
DATUM, US SURVEY FOOT, GRID DISTANCES, NAD83.
3. LEBANON NATIONAL CEMETERY IS LOCATED IN ZONE X "AREA OF MINIMAL FLOODING" PER FEMA FLOOD
MAP 21155C0170D EFFECTIVE DATE MAY 23, 2023.
4. THE EXISTING UNDERGROUND UTILITIES SHOWN HEREON ARE BASED UPON AVAILABLE INFORMATION.
THE CONTRACTOR SHALL BE RESPONSIBLE FOR DETERMINING THE EXACT LOCATION OF ALL UTILITIES PRIOR TO BEGINNING ANY WORK. IF UTILITIES OTHER THAN THOSE SHOWN HEREIN ARE ENCOUNTERED, THE CONTRACTOR SHALL NOTIFY THE COR IMMEDIATELY AND TAKE APPROPRIATE MEASURES TO
PROTECT THE LINE(S) AND ENSURE CONTINUED SERVICE. DAMAGE CAUSED TO EXISTING UTILITIES BY
THE CONTRACTOR SHALL BE REPAIRED BY THE CONTRACTOR AT NO ADDITIONAL COST TO THE
CEMETERY DIRECTOR. THE CONTRACTOR SHALL VERIFY THE CONNECTION POINTS OF NEW UTILITIES TO
EXISTING UTILITIES PRIOR TO BEGINNING CONSTRUCTION.
5. THE CONTRACTOR SHALL INSTALL TREE PROTECTION BARRICADES PRIOR TO BEGINNING EARTHWORK
OPERATIONS.
6. THE CONTRACTOR SHALL NOTIFY THE COR IF UNSUITABLE MATERIAL IS DISCOVERED PRIOR TO
BEGINNING ANY REMOVAL OPERATION. (SEE SPECIFICATION SECTION 31.20.00)
7. THE CONTRACTOR SHALL STABILIZE ALL DISTURBED AREA WITH SOD OR MULCH, NOT SHOWN FOR ASPHALT OR CONCRETE, WITHIN LIMITS OF DEMOLITION AND PROPOSED WORK. THIS INCLUDES
STAGING AREA AND LAYDOWN AREAS.
8. CONTRACTOR SHALL GRADE ALL DISTURBED AREAS TO DRAIN FOR POSITIVE FLOW PRIOR TO FINAL
APPROVAL.
9. THE DESIGN ADEQUACY AND SAFETY OF ALL BRACING, SHORING AND TEMPORARY SUPPORTS, ETC. IS
THE SOLE RESPONSIBILITY OF THE CONTRACTOR.
10. IN PERFORMING CONSTRUCTION OBSERVATION VISITS TO THE JOB SITE, THE ENGINEER SHALL HAVE NEITHER CONTROL OVER NOR RESPONSIBILITY FOR THE CONTRACTOR'S MEANS, METHODS, SEQUENCE, TECHNIQUES OR PROCEDURES IN PERFORMING THE WORK.
11. THE CONTRACTOR'S MEANS, METHODS, SEQUENCE, TECHNIQUES OR PROCEDURES IN PERFORMING THE WORK IS SOLELY THE RESPONSIBILITY OF THE CONTRACTOR, WHO IS ALSO RESPONSIBLE FOR COMPLYING WITH ALL HEALTH AND SAFETY PRECAUTIONS AS REQUIRED BY ANY REGULATORY AGENCY.
12. THERE SHALL BE AT ALL TIMES, WHEN WORK IS BEING DONE, A COMPETENT PERSON WHO IS APPRISED OF THE CONDITION AND PROGRESS OF ALL AREAS OF WORK ON SITE. THIS COMPETENT PERSON SHALL BE ABLE TO SPEAK FOR AND ACT IN THE BEHALF OF THE CONTRACTOR. HE SHALL BE AWARE AND KNOWLEDGEABLE OF ALL THE SAFETY CONCERNS ON THE JOB SITE. HE SHALL BE EMPOWERED TO
IMMEDIATELY AND EFFECTIVELY MITIGATE THE ACTIONS OF ANY WORKMAN ON SITE.
13. CONTRACTOR SHALL PREPARE AND SUBMIT A WELDING PLAN TO THE COR PRIOR TO PERFORMING ANY FIELD WELDING SHOULD IT BE REQUIRED. FOLLOWING APPROVAL ALL WELDS SHALL BE PERFORMED IN
ACCORDANCE WITH THE APPROVED PLAN. WELDING PLAN SHALL LIST CERTIFIED WELDERS THE
CONTRACTOR INTENDS TO USE.
14. CONTRACTOR SHALL PREPARE AND SUBMIT A HAZARDOUS ABATEMENT PLAN TO THE COR PRIOR TO
PERFORMING ANY ABATEMENT. FOLLOWING APPROVAL ALL ABATEMENT SHALL BE PERFORMED IN
ACCORDANCE WITH THE APPROVED PLANS AND SPECIFICATIONS. ABATEMENT PLAN SHALL LIST THE
CERTIFIED CONTRACTOR.
GENERAL NOTES
ARCHITECT / ENGINEER
VALI COOPER INTERNATIONAL, LLC
CONTACT: SEAN FITZPATRICK
SEAN@VALIINT.COM
504-684-4408
SURVEYOR
ABBIE-JONES
CONTACT: ABBIE JONES
ABBIE@ABBIE-JONES.COM
859-396-3866
VA COR
CONTACT: BOB GRIFFIN
BOBBIE.GRIFFIN@VA.GOV
470-998-1497
ELECTRICAL ENGINEER
IMEG
CONTACT: MATT SNYDER
MATTHEW.D.SNYDER@IMEGCORP.COM
309-793-34304
N
G-101
V-101
C-401
CONSTRUCTION ACCESS, STAGING & FENCING PLAN
CD101
TOPOGRAPHICAL SURVEY
DEMOLITION PLAN
ENLARGED SITE PLAN - STONE WALL REPAIR & ADA PARKING
ED102
ADMIN BLDG DEMOLITION PLANS - ELECRICAL
EROSION AND SEDIMENTATION CONTROL PLAN
AD101 ADMINISTRATION BUILDING DEMOLITION FLOOR PLANS
A-101 ADMINISTRATION BUILDING NEW WORK FLOOR PLANS
GC101
ED103
LEBANON NC
AD201
A-401
AD102
AD103
A-102
ADMINISTRATION BUILDING REFLECTED CEILING PLANS
ADMINISTRATION BUILDING DEMO ELEVATIONS
ADMINISTRATION BUILDING ENLARGED VIEWS
NEW MAINTENANCE BUILDING DEMO FLOOR PLANS
NEW MAINTENANCE BUILDING RCP & ROOF DEMO PLANS
E-001 ELECTRICAL GENERAL NOTES
C-501 DETAILS - SITE
C-403
C-402 ENLARGED SITE PLAN - MAINTENANCE YARD
ED101
LEBANON NC
METTS DR
NEW
C
ALV
ARY R
D
LEBANON NC
US ROUTE 68
INDUSTRIAL DR
ADAM HUGHES MEMORIAL HWY
FRANCIS MARION DR
G-001
GEOTECHNICAL
TERRACON
CONTACT: ISAAC HARDESTY
ISAAC.HARDESTY@TERRACON.COM
859-303-9014
HAZARDOUS MATERIALS
TERRACON
CONTACT: JOSHUA VOGEL
JOSHUA.VOGEL@TERRACON.COM
513-612-9002
V-401 ENLARGED - TOPOGRAPHICAL SURVEY
V-402 ENLARGED - TOPOGRAPHICAL SURVEY
V-403 ENLARGED - TOPOGRAPHICAL SURVEY
V-404 ENLARGED - TOPOGRAPHICAL SURVEY
V-405 ENLARGED - TOPOGRAPHICAL SURVEY
V-406 ENLARGED - TOPOGRAPHICAL SURVEY
V-407 ENLARGED - TOPOGRAPHICAL SURVEY
V-408 ENLARGED - TOPOGRAPHICAL SURVEY
V-409 ENLARGED - TOPOGRAPHICAL SURVEY
V-410 ENLARGED - TOPOGRAPHICAL SURVEY
V-411 ENLARGED - TOPOGRAPHICAL SURVEY
ENLARGED GRADING PLAN & PROFILES - MAINTENANCE YARD
HD101 HAZARDOUS MATERIALS & MOLD ABATEMENT PLAN
OLD MAINT. BLDG DEMOLITION PLANS - ELECTRICAL
ED104 COMMITTAL SHELTER DEMOLITION PLANS - ELECTRICAL
E-102
ADMIN BLDG PLANS - ELECRICAL
NEW MAINT. BLDG PLANS - ELECTRICALE-103
E-101
OLD MAINT. BLDG PLANS - ELECTRICALE-104
COMMITTAL SHELTER PLANS - ELECTRICAL
E-502 TECHNOLOGY DETAILS
E-601 ELECTRICAL SCHEDULES
A-103 NEW MAINTENANCE BUILDING NEW WORK FLOOR PLANS
A-104 NEW MAINTENANCE BUILDING RCP & ROOF NEW WORK PLANS
AD202 NEW MAINTENANCE BUILDING DEMO ELEVATIONS
A-201 NEW MAINTENANCE BUILDING NEW WORK ELEVATIONS
AD104
OLD MAINTENANCE BUILDING DEMO FLOOR PLANS
A-105 OLD MAINTENANCE BUILDING NEW WORK FLOOR PLANS
AD203 OLD MAINTENANCE BUILDING DEMO ELEVATIONS
COMMITTAL SHELTER FLOOR PLANS
A-202 COMMITTAL SHELTER ELEVATIONS
A-106 COMMITTAL SHELTER FLOOR PLANS
M-001 MECHANICAL SYMBOLS & ABBREVIATIONS
MD101 MECHANICAL & PLUMBING DEMO PLANS
MD102 MECHANICAL & PLUMBING DEMO PLANS
M-501 MECHANICAL DETAILS
M-601 MECHANICAL SCHEDULES
C-101 SITE PLAN
A-001 ARCHITECTURAL SYMBOLS AND ABBREVIATIONS
A-901 ARCHITECTURAL RENDERINGS
A-501 ARCHITECTURAL DETAILS
A-601 ARCHITECTURAL SCHEDULE
M-101 MECHANICAL & PLUMBING FLOOR PLANS
M-102 MECHANICAL & PLUMBING FLOOR PLANS
HD401 HAZARDOUS MATERIALS ABATEMENT - ADMINISTRATION BUILDING
HD402 HAZARDOUS MATERIALS ABATEMENT - OLD MAINTENANCE BUILDING
C-404
ENLARGED SITE PLAN, GRADING PLAN & PROFILES - SPOILS ROAD
CD401 ENLARGED - DEMOLITION PLAN
ADMIN BLDG PLANS - ELECRICAL
E-105
ROOF NEW MAINT BLDG - ELECTRICALE-106
E-501 ELECTRICAL DETAILS
E-602 TECHNOLOGY SCHEDULES
M-002 PLUMBING SYMBOLS & ABBREVIATIONS
M-502 MECHANICAL DETAILS
M-503 PLUMBING DETAILS
A-503 SIGNAGE DETAILS
A-602 WINDOW & ROOM FINISH SCHEDULE
1. CONTRACTOR SHALL PROVIDE A DETAILED PHASING PLAN A MINIMUM OF THREE WEEKS IN ADVANCE TO ANY ROAD CLOSURES AND SHALL BE BE COORDINATED WITH THE CEMETERY DIRECTOR AND APPROVED
BY THE PM/COR PRIOR TO COMMENCING WORK AND SHALL INCLUDE THE FOLLOWING:
1.1. WORK/PHASE SEQUENCES
1.2. DETAILED SCHEDULE
1.3. ROAD CLOSURES
1.4. BUILDING CLOSURES
1.5. MAINTENANCE YARD CLOSURE
2. CONTRACTOR SHALL PROVIDE PEDESTRIAN ACCESS TO ALL BURIAL LOCATIONS AT ALL TIMES. ALL
DISRUPTIONS IN ACCESS ARE TO BE COORDINATED IN WRITING WITH THE NCA.
3. CONTRACTOR SHALL PROVIDE A TEMPORARY SHELTER FOR THE DURATION OF CONSTRUCTION
ACTIVITIES TAKING PLACE AT THE COMMITTAL SHELTER.
4. CONTRACTOR SHALL PROVIDE A MINIMUM OF ONE OPERATIONAL PUBLIC RESTROOM AT THE CEMETERY
AT ALL TIMES.
PHASING & ROAD CLOSURES
C-502 DETAILS - FLOWER WATER STATION
C-503 DETAILS - FLOWER WATER STATION
AD105
ADMINISTRATION BUILDING DEMO REFLECTED CEILING PLANS
A-502 ARCHITECTURAL DETAILS
ENLARGED SITE PLAN - CONDUIT ROUTING
C-405
A-301 RAMP AND STAIR SECTIONS, ELEVATIONS & DETAILS
E-002 SITE - ELECTRICAL-NORTH
E-003 SITE - ELECTRICAL-SOUTH
E-503 TECHNOLOGY DETAILS
E-701 PANEL SCHEDULES
A-504 SIGNAGE DETAILS
No. 44593
PROFESSIONAL
REGISTERED
JORDAN D. VANDERMEE
RENG INE ER
7/19/2024
1AMENDMENT 001 10/18/2024
G-101
CONSTRUCTION ACCESS,
STAGING & FENCING PLAN
0 0 0
ON SAFETY
ZERO
Department of Veterans Affairs
PAINTED BORDER
MEMBER BLACK ENAMEL
2" X 4" FRAME AND BRACES
IN SAME PLANE
METAL FACE
STRETCH METAL FACE
TIGHT, TURN OVER FRAME
AND SECURE WITH FLAT
HEAD DEFORMED NAILS
LETTERING TO BE
HELVETICA STYLE 5"
HIGH
METAL FACE WHITE
ENAMEL
LETTERING TO BE
HELVETICA STYLE 3"
HIGH TO BE CENTERED
HORIZONTALLY
2" X 4" FRAME AND
BRACE IN BACK
LETTERING TO BE
HELVETICA STYLE 2" HIGH
TO BE CENTERED
HORIZONTALLY
LETTERING TO BE
HELVETICA STYLE 1-1/2"
HIGH TO BE CENTERED
HORIZONTALLY
4" X 4" POSTS
PAINTED WHITE
BORDER MEMBER
PAINTED BLACK
BACKGROUND TO BE
PAINTED WHITE
LETTERING TO BE
HELVETICA STYLE 1"
HIGH TO BE CENTERED
HORIZONTALLY
LETTERING TO BE
HELVETICA STYLE 1-1/2"
HIGH TO BE CENTERED
HORIZONTALLY
SURROUNDING BORDER TO
BE BLUE
CENTER TO BE WHITE
8'-8"
6'-6"
6"
1-1/2" 3" 5" 2" 5" 5" 3" 2"
1-1/2"
4'-0" MIN.
3"
6"
9"
6"
3" 2" 3"
6"
ALL LETTERING TO BE
PAINTED BLACK WITH
EXCEPTION OF PROJECT
TITLE WHICH IS TO BE BLUE
NOTE:
ANY SEAM IN METAL TO BE
FLAT SEAM - SEAMS TO BE
HORIZONTAL AND OCCUR
BETWEEN LINES OF
LETTERING.
SECTION ON CENTER
4'-0"
BRACING SEE
CONSTRUCTION SIGN
SECTION DETAIL
C7/A-509
3'-0"
VARIES
3'-0"
BLUE
BLUE OUTLINE WITH
WHITE INTERIOR
BLUE
WHITE
RED
RED
2"
2"
PROVIDE (3) SETS OF
REMOVABLE NUMERALS
PAINTED ON 1/8" TEMPERED
HARDBOARD
2"
1-3/4"
2"
WOOD STRIPS
BRACING
4" X 4" POST IF SIGN IS
INSTALLED ON GRADE
FIN. GRADE
SCALE: NTS
SAFETY SIGNC7
SCALE: NTS
PROJECT SIGNE7
VARIES;
AVERAGE 3'-0"
LEGEND AND SYMBOLS
CONSTRUCTION STAGING AREA
CONSTRUCTION FENCE
ACCESS / HAUL ROUTE
CONSTRUCTION
FENCING WITH
LOCKABLE 20'
ACCESS GATE
40' x 50'
CONSTRUCTION
STAGING AREA
JVSF
CONCRETE WASHOUT AREA
KEYED NOTES
1. CONCRETE WASHOUT AREA, SEE DETAIL F8/GC101.
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
BID PACKAGE
N/A
National Cemetery Administration
Design and Construction Service
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
56 Louis Prima Drive, Suite B, Covington LA 70433 504.684.4408; Sean Fitzpatrick
CORRECT CEMETERY FACILITY
CONDITION ASSESSMENT (FCA)
DEFICIENCIES
LEBANON, KY
856CM3012
N/A Project Manager/ COR
07/19/2024Revisions: Date:
Bobbie Griffin Department of Veterans Affairs, NCA
Phone: 470-998-1497 Email: Bobbie.Griffin@va.gov Sheet of 84
VCI Project Management Construction Management Engineering
623 26TH AVENUE
QUAD CITIES, IL
61201
PH: 309.788.0673
FAX: 309.786.5967
www.imegcorp.com
ACCESS/HAUL
ROUTE
PROJECT SIGN; SEE
DETAIL E7 THIS SHEET
SAFETY SIGN; SEE
DETAIL C7 THIS SHEET
TEMPORARY OFFICE TRAILER NOTES:
1. ONE OFFICE TRAILER (500 SF MINIMUM) SHALL BE PROVIDED BY THE CONTRACTOR PRIOR TO CONSTRUCTION AT THE
ADMINISTRATION BUILDING.
1.1. TRAILER SHALL HAVE A MINIMUM OF TWO OFFICES WITH A COMMON SPACE.
1.2. TRAILER SHALL BE ABA ACCESSIBLE.
1.3. TRAILER SHALL HAVE A PRE-WIRED, DEDICATED ELECTRICAL PANEL.
1.4. TRAILER SHALL HAVE INTEGRATED HEATING AND COOLING.
1.5. CONTRACTOR SHALL PROVIDE POWER AND DATA TO THE TRAILER AT NO ADDITIONAL COST TO THE GOVERNMENT, SEE
ELECTRICAL PLANS.
1.6. CONTRACTOR SHALL PROVIDE ELECTRICAL SERVICE TO SUPPORT THE TRAILERS FROM THE MAINTENANCE BUILDING
ELECTRICAL PANEL, SEE ELECTRICAL PLANS.
2. OFFICE TRAILER SHALL REMAIN UNTIL THE COMPLETION AND ACCEPTANCE OF THE ADMINISTRATION BUILDING.
3. CONTRACTOR SHALL ANCHOR THE TRAILER FOR HIGH WIND CONDITIONS PER MANUFACTURES RECOMMENDATIONS.
4. CONTRACTOR SHALL PROVIDE GROUNDING IN ACCORDANCE WITH NFPA 70 AND ALL GOVERNING CODES AND STANDARDS.
5. CONTRACTOR SHALL RELOCATE STAFF FURNITURE AND EQUIPMENT FROM THE EXISTING ADMINISTRATION BUILDING.
CONTRACTOR IS NOT RESPONSIBLE FOR THE SETUP OF COMPUTERS/ELECTRONICS.
6. CONTRACTOR SHALL REPAIR/RESTORE THE SITE TO THE ORIGINAL EXISTING CONDITIONS INCLUDING BUT NOT LIMITED TO
LANDSCAPING REPAIR, ASPHALT REPAIR, SIDEWALK REPAIR & STRIPING.
500 SF MIN. TEMPORARY
OFFICE TRAILER, SEE
NOTES BELOW
No. 44593
PROFESSIONAL
REGISTERED
JORDAN D. VANDERMEE
RENG INEER
7/19/2024
CONSTRUCTION FENCING
WITH LOCKABLE 20'
ACCESS GATE FOR
CEMETERY USE
1AMENDMENT 001 10/18/2024
N E
W C
A
LV
A R
Y R
D
K Y
8)
FRANCIS MARION DRIVE
METTS DRIVE
N
EW
C A
LV
A
R Y
R D
(K Y
8)
N E
W C
A
LV
A R
Y R
D
K Y
8)
N E
W C
A
LV
A R
Y R
D
K Y
8)
N E
W C
A
LV
A R
Y R
D
K Y
8)
FRANCIS MARION DRIVE
DEMOLITION PLAN
CD101
0 50 100
1 INCH = 150 FEET
No. 44593
PROFESSIONAL
REGISTERED
JORDAN D. VANDERMEE
RENG INE ER
7/19/2024 JVSF
KEYED NOTES
SEE SURVEY SHEETS FOR EXISTING CONDITIONS LEGEND
DEMOLITION LEGEND AND SYMBOLS
EXISTING MINOR CONTOUR
EXISTING MAJOR CONTOUR
PROPOSED MINOR CONTOUR
PROPOSED MAJOR CONTOUR
1. REPLACE EXISTING FLAGPOLE BASE IN KIND, SEE IMAGE
A6 THIS SHEET.
2. REPAIR/RESHAPE PICKETS AT THE HISTORIC PEDESTRIAN
& VEHICULAR GATES, SEE IMAGE E9 THIS SHEET..
3. REMOVE EXISTING GRAVEL DRIVE, SEE GENERAL NOTES
THIS SHEET.
4. STRIP AND REPAINT EXISTING HISTORIC PEDESTRIAN
AND VEHICULAR GATES, SEE IMAGE E9 THIS SHEET.
5. REPAINT EXISTING PERIMETER FENCING, SEE IMAGE A8
AND FENCING REPAIR NOTES THIS SHEET.
6. CLEAN & INSPECT EXISTING DRAINAGE INLETS.
7. REMOVE EXISTING FLOWER WATER STATION, CONCRETE
BASE AND RECEPTACLES, SEE IMAGE C7 THIS SHEET.
8. REFURBISH (STRIP, REPAINT & RE-APPLY) EXISTING
CEMETERY MAP SIGN.
9. REFURBISH (STRIP, REPAINT & RE-APPLY VINYL) ON
EXISTING SIGNAGE.
10. REMOVE EXISTING HANDICAP PARKING SIGN.
11. REMOVE AND RELOCATE EXISTING BRONZE PLAQUES.
SEE ARCHITECTURAL SHEETS FOR RELOCATION, SEE
IMAGE E6 & E7 THIS SHEET AND GENERAL NOTES THIS
SHEET.
12. REPAIR EXISTING STONE COLUMNS, SEE GENERAL NOTES
BELOW, SEE IMAGE E7 & E9 THIS SHEET.
13. REMOVE EXISTING TREE, STUMP AND ROOT BALL, SEE
LANDSCAPE NOTES THIS SHEET.
14. TRIM ALL DEAD LIMBS, SEE LANDSCAPE NOTES THIS
SHEET.
15. REMOVE SIDEWALK AS NECESSARY TO CONNECT TO THE
NEW ACCESS RAMP. REMOVE AT NEAREST JOINT.
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
BID PACKAGE
N/A
National Cemetery Administration
Design and Construction Service
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
56 Louis Prima Drive, Suite B, Covington LA 70433 504.684.4408; Sean Fitzpatrick
CORRECT CEMETERY FACILITY
CONDITION ASSESSMENT (FCA)
DEFICIENCIES
LEBANON, KY
856CM3012
N/A Project Manager/ COR
07/19/2024Revisions: Date:
Bobbie Griffin Department of Veterans Affairs, NCA
Phone: 470-998-1497 Email: Bobbie.Griffin@va.gov Sheet of 84
VCI Project Management Construction Management Engineering
623 26TH AVENUE
QUAD CITIES, IL
61201
PH: 309.788.0673
FAX: 309.786.5967
www.imegcorp.com
ASPHALT REMOVAL
GRAVEL DRIVE REMOVAL
GENERAL NOTES:
1. COLUMN REPAIR:
1.1. CONTRACTOR SHALL REMOVE ALL ADDED BRICK VENEER.
1.2. CONTRACTOR SHALL REMOVE ALL PREVIOUSLY MADE REPAIRS.
1.3. CONTRACTOR SHALL REMOVE BRONZE PLAQUES.
1.4. CONTRACTOR SHALL REPAIR ALL HOLES AND FRAGMENTS
CAUSED BY THE REMOVAL OF THE BRICK VENEER AND PLAQUES.
1.4.1. REPAIRS SHALL BE MADE IN ACCORDANCE WITH
SPECIFICATION 04 01 40361 SECTION 3.4 & 3.5.
2. HISTORIC GATE REPAIR:
2.1. STRIP AND REPAINT ALL METAL AND HINGES TO MATCH.
2.2. STRAIGHTEN ALL BENT PICKETS.
3. GRAVEL ROAD REMOVAL:
3.1. CONTRACTOR SHALL STOCKPILE ALL GRAVEL MATERIAL IN THE
MATERIAL STORAGE AREA AT NO ADDITIONAL COST TO THE
GOVERNMENT.
3.2. CONTRACTOR SHALL DISPOSE OF ALL NON GRAVEL MATERIAL
OFF SITE AT NO ADDITIONAL COST TO THE GOVERNMENT.
SEE SHEET CD401
LANDSCAPE NOTES:
1. CERTIFIED ARBORIST SHALL TRIM/PRUNE ALL DEAD LIMBS FROM
TREES INDICATED ON CONSTRUCTION PLANS.
2. CONTRACTORS SHALL REMOVE TREE, STUMP AND ROOT MASS
ASSOCIATED WITH TREES INDICATED FOR REMOVAL.
2.1. CONTRACTOR SHALL PLANT A 4" CALIPER TREE OR APPROVED
SIZE IN EACH LOCATION WHERE A TREE IS REMOVED.
2.2. CONTRACTOR SHALL SUBMIT A TREE PLANTING SCHEDULE FOR
ALL TREES TO BE REPLACED.
3. CONTRACTOR SHALL SOD ALL DISTURBED AREAS WITH A GRASS
SPECIES APPROVED BY NCA STAFF. CONTRACTOR SHALL SUBMIT
GRASS SPECIES FOR APPROVAL PRIOR TO INSTALLATION.
4. CONTRACTOR SHALL REPAIR OF ALL DAMAGED IRRIGATION
COMPONENTS AT NO ADDITIONAL COST TOT HE GOVERNMENT TO
THE SATISFACTION OF THE COR.
FENCING REPAIR NOTES:
1. CONTRACTOR SHALL REMOVE ALL LOOSE OR PEELING PAINT PRIOR
TO PAINTING.
2. CONTRACTOR SHALL CLEAN FENCING PRIOR TO PAINTING.
3. CONTRACTOR SHALL REPAINT THE FENCING AND ASSOCIATED
HARDWARE PER SPECIFICATIONS.
4. CONTRACTOR SHALL BRING ALL DAMAGED PANELS TO THE
ATTENTION OF THE COR PRIOR TO PAINTING.
5. SHOULD THE CONTRACTOR REMOVE THE FENCE PANELS,
TEMPORARY FENCING SHALL BE INSTALLED.
1AMENDMENT 001 10/18/2024
FD
R ef rig er at or
SERVICE BAYS
RESTROOM
LOCKER ROOM
005 BREAK ROOM
CORRIDOR
CLOSET
MECH/ELEC ROOM
GRAVE LOCATOR SERVICE
MEN'S RESTROOM
WOMEN'S RESTROOM
1. REMOVE EXISTING FUEL-OIL TANK INCLUDING CONTAINMENT AND ALL FUEL PIPING.
2. REMOVE EXISTING PLUMBING FIXTURES, INCLUDING EXPOSED SANITARY, VENT
AND WATER LINES.
3. REMOVE EXISTING AIR-HANDLER, INCLUDING FUEL PUMP AND FLUE VENT.
4. REMOVE EXISTING ROOF FAN.
5. EXISTING HVAC EQUIPMENT SHALL REMAIN.
6. REMOVE EXISTING ELECTRIC UNIT HEATER.
7. REMOVE EXISTING BREAKROOM SINK.
8. EXISTING EYE WASH SHALL REMAIN
( THIS SHEET)KEYED NOTES:
MD102
MECHANICAL/PLUMBING
DEMO PLANS
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
BID PACKAGE
N/A
National Cemetery Administration
Design and Construction Service
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
56 Louis Prima Drive, Suite B, Covington LA 70433 504.684.4408; Sean Fitzpatrick
CORRECT CEMETERY FACILITY
CONDITION ASSESSMENT (FCA)
DEFICIENCIES
LEBANON, KY
856CM3012
N/A Project Manager/ COR
07/19/2024Revisions: Date:
Bobbie Griffin Department of Veterans Affairs, NCA
Phone: 470-998-1497 Email: Bobbie.Griffin@va.gov Sheet of 84
VCI Project Management Construction Management Engineering
BMSSF
623 26TH AVENUE
QUAD CITIES, IL
61201
PH: 309.788.0673
FAX: 309.786.5967
www.imegcorp.com
07/19/24
0 4
1/4 INCH = 1 FOOT
2 6 8
1AMENDMENT 001 10/18/2024
FD
R ef rig er at or
SERVICE BAYS
RESTROOM
LOCKER ROOM
005 BREAK ROOM
CORRIDOR
CLOSET
MECH/ELEC ROOM
GRAVE LOCATOR SERVICE
MEN'S RESTROOM
WOMEN'S RESTROOM
P-402
EF-02
CO-MONITOR
1. EXISTING FURNACE AND CONNECTED OUTDOOR UNIT SHALL REMAIN AS IS.
( THIS SHEET)KEYED NOTES:
2. INSTALL NEW GAS FURNACE, CONNECT TO EXISTING DUCTWORK. SEE CIVIL PLANS
FOR GAS LINE ROUTING FROM ADMINISTRATION BUILDING. SEE M-601 FOR
EQUIPMENT SCHEDULES
3. INSTALL NEW ROOF MOUNTED EXHAUST FAN, INCLUDING NEW ROOF CURB.
4. INSTALL NEW ELECTRIC WATER HEATER AND MIXING VALVE, CONNECT TO
RESTROOM LAVATORY AND EXISTING EYE WASH. INSTALL WATER HEATER ON
WALL SUPPORT.
MENS RESTROOM
WOMENS RESTROOM
SERVICE BAY 3
SERVICE BAY 2
SERVICE BAY 1
P-101
P-101 P-201
P-301
P-301
EF-01
EF-01
F-02
EWH-02
MV-01
M-102
MECHANICAL/PLUMBING
FLOOR PLANS
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
BID PACKAGE
N/A
National Cemetery Administration
Design and Construction Service
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
56 Louis Prima Drive, Suite B, Covington LA 70433 504.684.4408; Sean Fitzpatrick
CORRECT CEMETERY FACILITY
CONDITION ASSESSMENT (FCA)
DEFICIENCIES
LEBANON, KY
856CM3012
N/A Project Manager/ COR
07/19/2024Revisions: Date:
Bobbie Griffin Department of Veterans Affairs, NCA
Phone: 470-998-1497 Email: Bobbie.Griffin@va.gov Sheet of 84
VCI Project Management Construction Management Engineering
BMSSF
623 26TH AVENUE
QUAD CITIES, IL
61201
PH: 309.788.0673
FAX: 309.786.5967
www.imegcorp.com
07/19/24
0 4
1/4 INCH = 1 FOOT
2 6 8
1AMENDMENT 001 10/18/2024
SYMBOL
NO.
MANUFACTURER/MODEL
NO. TYPE
INDOOR UNIT SCHEDULE
SUPPLY
AIRFLOW
(CFM)
SOUND
(dBA)
ELECTRICAL DATA
VOLTS PHASE HZ MCA
WEIGHT
(LBS)
SYMBOL
NO.
MANUFACTURER/MODEL
NO. TYPE CFM
EF-01 GREENHECK SPB90 CEILING 60
EXHAUST FAN SCHEDULE
S.P.
INCH W.C.
0.3
SOUND
(SONES)
1.5
ELECTRICAL DATA
VOLTS PHASE HZ HP
120 1 60 1/25
WIDTH (IN)
14.5
HEIGHT
(IN)
7.25
WEIGHT
(LBS)
10.5
ELECTRIC WATER HEATER SCHEDULE
*BASED ON MITSUBISHI
SYMBOL
NO.
MANUFACTURER/MODEL
NO.
B-01 WEIL-MCLAIN GV90 175,000 160,000
GAS-FIRED BOILER SCHEDULE
91%
VENT/COMB
3"PVC
ELECTRICAL DATA
VOLTS PHASE HZ MCA
120 1 60 9.0 15
WATER
FLOW
(GPM)
WEIGHT
(LBS)
HEATING
CAPACITY
(BTU/H)
AFUE
MOCP
HEATING
CAPACITY
SYMBOL STORAGE
CAPACITY
(GALLONS)
CAPACITY
@ 60°F RISE
(GPH)
POWER REQUIRMENTS
(KW)/VOLTAGE/PHASE MFG. AND MODEL No. LOCATION REMARKS
EWH-1 30 44 4.5KW/240V/1PH STATE WATER HEATER/ EN6 30 DORS MECH RM.
2"3" - ZURN Z5615, WALL MOUNT, TOP SPUD, ABA COMPLIANT, ELONGATED BOWL. PROVIDE W/ ZURN Z5955SS-EL OPEN FRONT SEAT, SLOAN ROYAL 111-1.28ES 1.28 GPF SENSORY FLUSH VALVE, SLOAN EL-154
TRANSFORMER, JR SMITH 0417 CARRIER.
WATER CLOSET
(ADA)P101
-- WATTS #LF15M2, LEAD-FREE, 60 PSI AIR PRE-LOAD, PER PDI WH201. PROVIDE W/ ACCESS PANEL.
WATER
HAMMER
ARRESTER
P905
2"2"
ZURN Z5351, WALL MOUNTED, 19"x17", WHITE VITREOUS CHINA. PROVIDE W/ SLOAN OPTIMA SYSTEM FAUCET MODEL ETF-80 HARDWIRED SENSOR ACTIVATED, ZURN Z8743-1-PC GRID STRAINER DRAIN, Z8700-PC CHROME PLATED P-TRAP AND TRUEBRO LAV GUARD 2 E-Z MODEL #102E-Z; BRASSCRAFT REGULAR PART NUMBER SCR39 C REGULAR PATTERN COMPRESSION JOINT ANGLE VALVE WITH LOOSE
KEY, POLYMER BRAID CONNECTORS, AND ESCUTCHEON PLATES
P301 LAVATORY
(ADA)
PLUMBING FIXTURE SCHEDULE
ITEM DESCRIPTION
MINIMUM ROUGH-IN
CONNECTION (INCH) REMARKSELECTRICAL DATA
CWVW HW
2"11
2"2"
JUST MFG SLN-ADA-2122, LEDGE MOUNT, STAINLESS STEEL, 21"Lx22"Wx6"D. PROVIDE W/ CHICAGO FAUCET AGN8AE2805-5CP 0.5 GPM AERATOR GOOSENECK, DUAL WRIST BLADE HANDLE; JUST #J-ADA-35-FS PUNCH DRAIN AND REMOVABLE STRAINER; CHROME PLATED P-TRAP (HOT WATER SUPPLY AND P-TRAP SHALL BE TRUEBRO WRAPPED FOR ACCESSIBILITY PROTECTION; BRASSCRAFT COMPRESSION JOINT ANGLE VALVE, POLYMER BRAID CONNECTORS, AND ESCUTCHEON PLATES
2"P402 BREAKROOM
SINK
2" 1
2"
P906 -TRAP PRIMER WATTS #WPIME-1, COMPLETE W/ QUARTER-TURN BRASS VALVE AND ENCLOSURE1 2"--
TRAP
INT
2"
2"
2"
-1 2"
P806 -HOSE-BIB WATTS #SC8-6, HEX SHOULDER W/ TEE HANDLE AND VACUUM BREAKER--- -
P701 SHOWER J.R. SMITH FIGURE 2005Y-A05-B-P050-CP, ROUND ADJUSTABLE STRAINER WITH SEDIMENT BUCKET, CHROME PLATED STRAINER AND TRAP PRIMER CONNECTION.2" 2" 1
2"2" -
(ADA)
2"
2"
SYMBOL
NO.
MANUFACTURER/MODEL
NO.
SENSIBLE
COOLING
CAPACITY
(BTU/H)
CU-01 MUY-GL24NA 22,400 8,200
COOLING ONLY OUTDOOR UNIT SCHEDULE
18.0
SOUND
(dBA)
ELECTRICAL DATA
VOLTS PHASE HZ MCA
208/230 1 60 17.1 20.0
DIM
(IN)
28x33x13
WEIGHT
(LBS)
*BASED ON MITSUBISHI
SEER MOCP
SENSIBLE
COOLING
CAPACITY
(BTU/H)
HEATING
CAPACITY
@47degF
(BTU/H)
MINIMUM
COOLING
CAPACITY
(BTU/H)
AC-01 MSY-GL24NA* WALL MOUNTED 562 22,400 45208/230 1 60 1.0 35N/A
MOCP
EF-02 GREENHECK G-060-VG ROOF 180 0.25 6.5 120 1 60 1/15 17.0 7.25 18.0
SYMBOL
NO.
MANUFACTURER/MODEL
NO.
EH-01 MODINE HER 30C 380 3.0
ELECTRIC HEATER SCHEDULE
HEAT
THROW
(FT.)
ELECTRICAL DATA
VOLTS PHASE HZ AMPS
240 1 60 12.5 15
DIM
(IN)
14x17x18
WEIGHT
(LBS)
BLOWER
FAN
(CFM) MOCP
HEAT
CAPACITY TEMP RISE
(DEG.F)(KW)
EH-02 BERKO CZ1548T 50 1.5 12 5 240 1 60 6.2 15 9x12x5 10
2"2"P201 URINAL 1
2" --2" --
INPUT OUTPUT
(BTU/H) DIA.
B-02 WEIL-MCLAIN GV90 175,000 160,000 91% 3"PVC 120 1 60 9.0 15 16 180
NOTES & OPTIONS
1. P1 AND P2 BOILER PUMPS
2. P3-HEATING SYSTEM PUMP
3. CONNECT PUMPS TO BOILER PACKAGED CONTROLLER
SYMBOL
NO.
MANUFACTURER/MODEL
NO. TYPE SERVICE
PUMP SCHEDULE
FLOW
(GPM)
HEAD
(Ft)
P1&P2 TACO MODEL-007 INLINE HEATING 12
NPSH
(Ft)
MIN EFF
ELECTRICAL DATA
VOLTS PHASE Hz 120 1 60
HP
.125
CONTROL FLUID
CONST 30% PG
WEIGHT
(LBS)
CIRCULATING FLUID
HP
SPEED
P3 TACO MODEL-2400 INLINE HEATING 24 --- --- 120 1 60 .125 CONST 30% PG12
SYMBOL
NO.
MANUFACTURER/MODEL
NO.
GAS-FIRED FURNACE SCHEDULE
VENT/COMB
ELECTRICAL DATA
VOLTS PHASE HZ MCA (XXX)
WEIGHT
(LBS)
HEATING
CAPACITY
(BTU/H)
AFUE
MOCP
AIRFLOWINPUT
(CFM) DIA.
F-02 CARRIER 59SC2A 40,000 800 92% 3"PVC 120 1 60 9.0 15 -- ---
NOTES & OPTIONS
1. XXXXXXXXXXX
EWH-2 20 30 4.5KW/240V/1PH STATE WATER HEATER/ EN6 20 DORS OLD MAINTENANCE
MIXING VALVE SCHEDULE
SYMBOL DISCHARGE
TEMPERATURE
MAXIMUM
FLOW GPM
PRESURE DROP
@ MAX FLOW
CAPACITY
CW IN HW IN MIXED OUT MFG. AND MODEL No. REMARKS
MV-1 85F 3 8PSI 1.5 1.5 WATTS LFMMV3.0
CONNECT TO 1/2" EXISITNG DCW AND
NEW 12" DHW
NOT USED
M-601
MECHANICAL SCHEDULES
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
BID PACKAGE
N/A
National Cemetery Administration
Design and Construction Service
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
56 Louis Prima Drive, Suite B, Covington LA 70433 504.684.4408; Sean Fitzpatrick
CORRECT CEMETERY FACILITY
CONDITION ASSESSMENT (FCA)
DEFICIENCIES
LEBANON, KY
856CM3012
N/A Project Manager/ COR
07/19/2024Revisions: Date:
Bobbie Griffin Department of Veterans Affairs, NCA
Phone: 470-998-1497 Email: Bobbie.Griffin@va.gov Sheet of 84
VCI Project Management Construction Management Engineering
BMSSF
623 26TH AVENUE
QUAD CITIES, IL
61201
PH: 309.788.0673
FAX: 309.786.5967
www.imegcorp.com
07/19/24
1AMENDMENT 001 10/18/2024
| Sheets and Views |
| G-001 COVERSHEET |
| G-101 CONSTRUCTION ACCESS, STAGING & FENCING PLAN |
| CD101 DEMOLITION PLAN |