Bid Documents Ammended Drawings 11-01-24.pdf

PDF 2 MB Posted

Attached to
Y1FE-- Lebanon NC Correct Cemetery Facility Condition Assessment 856CM3012
Solicitation number
36C78624B0045
Issued by

About this file

This document appears to be a set of bid documents and drawings for a project titled "Correct Cemetery Facility Condition Assessment (FCA) Deficiencies" at the Lebanon National Cemetery in Lebanon, Kentucky. The project number is 856CM3012.

The key details are:

  • The project involves performing construction work to correct cemetery facility condition assessment deficiencies at the Lebanon National Cemetery.
  • The solicitation number is 36C78624B0045 and it is being issued by the Department of Veterans Affairs National Cemetery Administration.
  • The site visit is scheduled for October 15 and RFI questions are due by October 23, with bids due on November 8.
  • The drawings cover various aspects of the project including site plans, demolition plans, hazardous materials abatement, electrical, mechanical, and plumbing work for administration and maintenance buildings, and signage details.
  • The project team includes the architect/engineer of record, surveyor, electrical engineer, geotechnical consultant, and hazardous materials consultant.

View the file

Other files

File Type Posted
Wage Determination.pdf PDF
36C78624B0045 0002.docx DOCX document
Bid Documents Ammended Drawings.pdf PDF
site visit sign in sheet.pdf PDF
36C78624B0045 0001.docx DOCX document
IFB-36C78624B0045_.docx DOCX document
Drawings 56-84.pdf PDF
Lebanon NC Combined Specifications 2 of 2.pdf PDF
Drawings 30-55.pdf PDF
Drawings 4-14.pdf PDF
Drawings 1-3.pdf PDF
36C78624B0045_1.docx DOCX document
Lebanon NC Combined Specifications 1 of 2.pdf PDF
Drawings 15-29.pdf PDF
Show all 14

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

BID PACKAGE

N/A

National Cemetery Administration

Design and Construction Service

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

56 Louis Prima Drive, Suite B, Covington LA 70433 504.684.4408; Sean Fitzpatrick

CORRECT CEMETERY FACILITY

CONDITION ASSESSMENT (FCA)

DEFICIENCIES

LEBANON, KY

856CM3012

N/A Project Manager/ COR

07/19/2024Revisions: Date:

Bobbie Griffin Department of Veterans Affairs, NCA

Phone: 470-998-1497 Email: Bobbie.Griffin@va.gov Sheet of 84

VCI Project Management Construction Management Engineering

623 26TH AVENUE

QUAD CITIES, IL

61201

PH: 309.788.0673

FAX: 309.786.5967

www.imegcorp.com

SITE LOCATION MAP

SCALE: NTS

SITE LOCATION AND ACCESS MAP

SCALE: NTS

PROJECT TEAM

FIRM PANEL

SCALE: NTS

COVERSHEET

N

SHEET INDEX

SHEET

NO.

DRAWING

NO. SHEET TITLE

1 G-001 COVERSHEET

DEPARTMENT OF VETERANS AFFAIRS

LEBANON NATIONAL CEMETERY

CORRECT CEMETERY FACILITY CONDITION ASSESSMENT (FCA) DEFICIENCIES

NCA PROJECT NO. 856CM3012

20 HWY 208, LEBANON, KY 40033

N

STANDARDS OF CONDUCT

1. THE NATIONAL CEMETERY ADMINISTRATION HONORS VETERANS WITH A FINAL RESTING PLACE AND LASTING MEMORIALS THAT COMMEMORATE THEIR SERVICE TO OUR NATION. NATIONAL CEMETERIES ARE NATIONAL SHRINES. THE STANDARDS OF WORK, APPEARANCE, AND PROCEDURES PERFORMED BY THE CONTRACTOR AT THE CEMETERY SHALL REFLECT THIS NATIONS CONCERN FOR THOSE INTERRED THERE.

DUE TO THE SENSITIVE MISSION OF THE CEMETERY, CONTRACTOR PERSONNEL MUST EXERCISE AND

EXHIBIT ABSOLUTE DECORUM, COMPOSURE, AND STABILITY AT ALL TIMES.

2. THE BURIAL ACTIVITIES AT A NATIONAL CEMETERY SHALL TAKE PRECEDENCE OVER CONSTRUCTION ACTIVITIES. THE CONTRACTOR SHALL COOPERATE AND COORDINATE WITH THE CEMETERY DIRECTOR IN ARRANGING CONSTRUCTION SCHEDULE ACTIVITIES TO CAUSE THE LEAST POSSIBLE INTERFERENCE WITH CEMETERY ACTIVITIES IN ACTUAL BURIAL AREAS. CONSTRUCTION NOISE DURING THE INTERMENT SERVICES SHALL NOT DISTURB THE SERVICE. TRUCKS AND WORKMEN SHALL NOT PASS THROUGH THE

SERVICE AREA DURING THIS PERIOD.

3. THE CONTRACTOR SHALL CEASE WORK OPERATIONS AS NECESSARY TO ENSURE THAT NO CONTRACT WORK CAUSES ANY FUNERAL, CEREMONY, PROCESSION OR VISITATION BE DELAYED, ALTERED, OR OTHERWISE IMPACTED IN SUCH A WAY THAT THE DIGNITY, SERENITY OR SECURITY OF THE EVENT IS

COMPROMISED.

4. THE CONTRACTOR IS REQUIRED TO DISCONTINUE HIS WORK SUFFICIENTLY IN ADVANCE OF EASTER SUNDAY, MOTHER'S DAY, FATHER'S DAY, MEMORIAL DAY, VETERAN'S DAY AND FEDERAL HOLIDAYS, TO PERMIT THE CONTRACTOR TO CLEAN UP ALL AREAS OF OPERATION ADJACENT TO EXISTING BURIAL PLOTS BEFORE THESE DATES. CLEANING UP SHALL INCLUDE THE REMOVAL OF ALL EQUIPMENT, TOOLS, MATERIALS AND DEBRIS AND LEAVING THE AREAS IN A CLEAN, NEAT CONDITION.

5. WORKMEN ARE SUBJECT TO RULES OF THE CEMETERY APPLICABLE TO THEIR CONDUCT. WHILE ON SITE AT THE NATIONAL CEMETERY, CONTRACTOR PERSONNEL SHALL BE REQUIRED TO ADHERE TO THE

FOLLOWING STANDARDS OF DRESS AND CONDUCT WHILE PERFORMING WORK IN THE NATIONAL

CEMETERY. THESE STANDARDS AND REGULATIONS ARE ENFORCEABLE UNDER TITLE 38, U.S.C., SECTION 218.

6. CONTRACTOR PERSONNEL APPEARANCE AND CONDUCT SHALL BE PROFESSIONAL AND UNOBTRUSIVE AT

ALL TIMES. SHIRTS AND FULL LENGTH PANTS MUST BE WORN AT ALL TIMES.

7. SMOKING IS NOT ALLOWED IN ANY BUILDING AT THE NATIONAL CEMETERY.

8. THE PLAYING OF RADIOS, CASSETTE RECORDERS, ETC., IS PROHIBITED ON SITE OR IN BUILDINGS. THE CONTRACTOR'S WORK FORCE IS GOVERNED BY THE SAME RULES GOVERNING CEMETERY EMPLOYEES.

ALL INDIVIDUALS FAILING TO COMPLY WILL BE REMOVED FROM THE SITE.

9. SEXUAL HARASSMENT WILL NOT BE TOLERATED AND THE OFFENDING INDIVIDUAL(S) WILL BE REMOVED

FROM THE SITE.

10. CONTRACTOR PERSONNEL SHALL NOT SLEEP ON CEMETERY GROUNDS, SIT OR STAND ON INSTALLED

GRAVE MARKERS, OR PUT, PLACE OR LEAN EQUIPMENT OR MATERIALS ON GRAVE MARKERS.

11. QUESTIONS FROM CEMETERY VISITORS SHALL BE POLITELY REFERRED OR DIRECTED TO CEMETERY

PERSONNEL.

12. THE CONTRACTOR SHALL ENSURE THAT ALL EMPLOYEES BEHAVE WITH APPROPRIATE DECORUM, COURTESY, AND RESPECT WHILE WITHIN THE CEMETERY OR AT ITS PERIMETER OR ENTRANCES.

SHOUTING, CURSING, ANGRY OUTBURSTS, SLEEPING, INTOXICATION, UNSAFE DRIVING OF PRIVATE OR COMPANY VEHICLES, AND VIOLENCE OR CRIMINAL ACTS OF ANY KIND WILL NOT BE TOLERATED AND IS

CAUSE FOR IMMEDIATE REMOVAL FROM THE CEMETERY.

13. THE CONTRACTOR AND SUBCONTRACTORS WILL NOT FUEL EQUIPMENT IN GRASS/TURF AREAS.

PETROLEUM BASED PRODUCTS WILL DAMAGE THE GRASS/TURF. CONTRACTOR SHALL BEAR ALL COSTS ASSOCIATED WITH REMOVING ANY CONTAMINATED SOIL AS A RESULT OF FUELING IN GRASS/TURF AREAS

AND SHALL RESOD THE AREA.

1. TOPOGRAPHIC INFORMATION PROVIDED BY SURVEY PERFORMED BY ABBIE JONES. THE GENERAL

CONTRACTOR SHALL VERIFY ALL SURVEY INFORMATION.

2. THE BASIS OF BEARINGS FOR THE SURVEY IS THE KYCORS STATE PLANE COORDINATES, KY SINGLE

DATUM, US SURVEY FOOT, GRID DISTANCES, NAD83.

3. LEBANON NATIONAL CEMETERY IS LOCATED IN ZONE X "AREA OF MINIMAL FLOODING" PER FEMA FLOOD

MAP 21155C0170D EFFECTIVE DATE MAY 23, 2023.

4. THE EXISTING UNDERGROUND UTILITIES SHOWN HEREON ARE BASED UPON AVAILABLE INFORMATION.

THE CONTRACTOR SHALL BE RESPONSIBLE FOR DETERMINING THE EXACT LOCATION OF ALL UTILITIES PRIOR TO BEGINNING ANY WORK. IF UTILITIES OTHER THAN THOSE SHOWN HEREIN ARE ENCOUNTERED, THE CONTRACTOR SHALL NOTIFY THE COR IMMEDIATELY AND TAKE APPROPRIATE MEASURES TO

PROTECT THE LINE(S) AND ENSURE CONTINUED SERVICE. DAMAGE CAUSED TO EXISTING UTILITIES BY

THE CONTRACTOR SHALL BE REPAIRED BY THE CONTRACTOR AT NO ADDITIONAL COST TO THE

CEMETERY DIRECTOR. THE CONTRACTOR SHALL VERIFY THE CONNECTION POINTS OF NEW UTILITIES TO

EXISTING UTILITIES PRIOR TO BEGINNING CONSTRUCTION.

5. THE CONTRACTOR SHALL INSTALL TREE PROTECTION BARRICADES PRIOR TO BEGINNING EARTHWORK

OPERATIONS.

6. THE CONTRACTOR SHALL NOTIFY THE COR IF UNSUITABLE MATERIAL IS DISCOVERED PRIOR TO

BEGINNING ANY REMOVAL OPERATION. (SEE SPECIFICATION SECTION 31.20.00)

7. THE CONTRACTOR SHALL STABILIZE ALL DISTURBED AREA WITH SOD OR MULCH, NOT SHOWN FOR ASPHALT OR CONCRETE, WITHIN LIMITS OF DEMOLITION AND PROPOSED WORK. THIS INCLUDES

STAGING AREA AND LAYDOWN AREAS.

8. CONTRACTOR SHALL GRADE ALL DISTURBED AREAS TO DRAIN FOR POSITIVE FLOW PRIOR TO FINAL

APPROVAL.

9. THE DESIGN ADEQUACY AND SAFETY OF ALL BRACING, SHORING AND TEMPORARY SUPPORTS, ETC. IS

THE SOLE RESPONSIBILITY OF THE CONTRACTOR.

10. IN PERFORMING CONSTRUCTION OBSERVATION VISITS TO THE JOB SITE, THE ENGINEER SHALL HAVE NEITHER CONTROL OVER NOR RESPONSIBILITY FOR THE CONTRACTOR'S MEANS, METHODS, SEQUENCE, TECHNIQUES OR PROCEDURES IN PERFORMING THE WORK.

11. THE CONTRACTOR'S MEANS, METHODS, SEQUENCE, TECHNIQUES OR PROCEDURES IN PERFORMING THE WORK IS SOLELY THE RESPONSIBILITY OF THE CONTRACTOR, WHO IS ALSO RESPONSIBLE FOR COMPLYING WITH ALL HEALTH AND SAFETY PRECAUTIONS AS REQUIRED BY ANY REGULATORY AGENCY.

12. THERE SHALL BE AT ALL TIMES, WHEN WORK IS BEING DONE, A COMPETENT PERSON WHO IS APPRISED OF THE CONDITION AND PROGRESS OF ALL AREAS OF WORK ON SITE. THIS COMPETENT PERSON SHALL BE ABLE TO SPEAK FOR AND ACT IN THE BEHALF OF THE CONTRACTOR. HE SHALL BE AWARE AND KNOWLEDGEABLE OF ALL THE SAFETY CONCERNS ON THE JOB SITE. HE SHALL BE EMPOWERED TO

IMMEDIATELY AND EFFECTIVELY MITIGATE THE ACTIONS OF ANY WORKMAN ON SITE.

13. CONTRACTOR SHALL PREPARE AND SUBMIT A WELDING PLAN TO THE COR PRIOR TO PERFORMING ANY FIELD WELDING SHOULD IT BE REQUIRED. FOLLOWING APPROVAL ALL WELDS SHALL BE PERFORMED IN

ACCORDANCE WITH THE APPROVED PLAN. WELDING PLAN SHALL LIST CERTIFIED WELDERS THE

CONTRACTOR INTENDS TO USE.

14. CONTRACTOR SHALL PREPARE AND SUBMIT A HAZARDOUS ABATEMENT PLAN TO THE COR PRIOR TO

PERFORMING ANY ABATEMENT. FOLLOWING APPROVAL ALL ABATEMENT SHALL BE PERFORMED IN

ACCORDANCE WITH THE APPROVED PLANS AND SPECIFICATIONS. ABATEMENT PLAN SHALL LIST THE

CERTIFIED CONTRACTOR.

GENERAL NOTES

ARCHITECT / ENGINEER

VALI COOPER INTERNATIONAL, LLC

CONTACT: SEAN FITZPATRICK

SEAN@VALIINT.COM

504-684-4408

SURVEYOR

ABBIE-JONES

CONTACT: ABBIE JONES

ABBIE@ABBIE-JONES.COM

859-396-3866

VA COR

CONTACT: BOB GRIFFIN

BOBBIE.GRIFFIN@VA.GOV

470-998-1497

ELECTRICAL ENGINEER

IMEG

CONTACT: MATT SNYDER

MATTHEW.D.SNYDER@IMEGCORP.COM

309-793-34304

N

G-101

V-101

C-401

CONSTRUCTION ACCESS, STAGING & FENCING PLAN

CD101

TOPOGRAPHICAL SURVEY

DEMOLITION PLAN

ENLARGED SITE PLAN - STONE WALL REPAIR & ADA PARKING

ED102

ADMIN BLDG DEMOLITION PLANS - ELECRICAL

EROSION AND SEDIMENTATION CONTROL PLAN

AD101 ADMINISTRATION BUILDING DEMOLITION FLOOR PLANS

A-101 ADMINISTRATION BUILDING NEW WORK FLOOR PLANS

GC101

ED103

LEBANON NC

AD201

A-401

AD102

AD103

A-102

ADMINISTRATION BUILDING REFLECTED CEILING PLANS

ADMINISTRATION BUILDING DEMO ELEVATIONS

ADMINISTRATION BUILDING ENLARGED VIEWS

NEW MAINTENANCE BUILDING DEMO FLOOR PLANS

NEW MAINTENANCE BUILDING RCP & ROOF DEMO PLANS

E-001 ELECTRICAL GENERAL NOTES

C-501 DETAILS - SITE

C-403

C-402 ENLARGED SITE PLAN - MAINTENANCE YARD

ED101

LEBANON NC

METTS DR

NEW

C

ALV

ARY R

D

LEBANON NC

US ROUTE 68

INDUSTRIAL DR

ADAM HUGHES MEMORIAL HWY

FRANCIS MARION DR

G-001

GEOTECHNICAL

TERRACON

CONTACT: ISAAC HARDESTY

ISAAC.HARDESTY@TERRACON.COM

859-303-9014

HAZARDOUS MATERIALS

TERRACON

CONTACT: JOSHUA VOGEL

JOSHUA.VOGEL@TERRACON.COM

513-612-9002

V-401 ENLARGED - TOPOGRAPHICAL SURVEY

V-402 ENLARGED - TOPOGRAPHICAL SURVEY

V-403 ENLARGED - TOPOGRAPHICAL SURVEY

V-404 ENLARGED - TOPOGRAPHICAL SURVEY

V-405 ENLARGED - TOPOGRAPHICAL SURVEY

V-406 ENLARGED - TOPOGRAPHICAL SURVEY

V-407 ENLARGED - TOPOGRAPHICAL SURVEY

V-408 ENLARGED - TOPOGRAPHICAL SURVEY

V-409 ENLARGED - TOPOGRAPHICAL SURVEY

V-410 ENLARGED - TOPOGRAPHICAL SURVEY

V-411 ENLARGED - TOPOGRAPHICAL SURVEY

ENLARGED GRADING PLAN & PROFILES - MAINTENANCE YARD

HD101 HAZARDOUS MATERIALS & MOLD ABATEMENT PLAN

OLD MAINT. BLDG DEMOLITION PLANS - ELECTRICAL

ED104 COMMITTAL SHELTER DEMOLITION PLANS - ELECTRICAL

E-102

ADMIN BLDG PLANS - ELECRICAL

NEW MAINT. BLDG PLANS - ELECTRICALE-103

E-101

OLD MAINT. BLDG PLANS - ELECTRICALE-104

COMMITTAL SHELTER PLANS - ELECTRICAL

E-502 TECHNOLOGY DETAILS

E-601 ELECTRICAL SCHEDULES

A-103 NEW MAINTENANCE BUILDING NEW WORK FLOOR PLANS

A-104 NEW MAINTENANCE BUILDING RCP & ROOF NEW WORK PLANS

AD202 NEW MAINTENANCE BUILDING DEMO ELEVATIONS

A-201 NEW MAINTENANCE BUILDING NEW WORK ELEVATIONS

AD104

OLD MAINTENANCE BUILDING DEMO FLOOR PLANS

A-105 OLD MAINTENANCE BUILDING NEW WORK FLOOR PLANS

AD203 OLD MAINTENANCE BUILDING DEMO ELEVATIONS

COMMITTAL SHELTER FLOOR PLANS

A-202 COMMITTAL SHELTER ELEVATIONS

A-106 COMMITTAL SHELTER FLOOR PLANS

M-001 MECHANICAL SYMBOLS & ABBREVIATIONS

MD101 MECHANICAL & PLUMBING DEMO PLANS

MD102 MECHANICAL & PLUMBING DEMO PLANS

M-501 MECHANICAL DETAILS

M-601 MECHANICAL SCHEDULES

C-101 SITE PLAN

A-001 ARCHITECTURAL SYMBOLS AND ABBREVIATIONS

A-901 ARCHITECTURAL RENDERINGS

A-501 ARCHITECTURAL DETAILS

A-601 ARCHITECTURAL SCHEDULE

M-101 MECHANICAL & PLUMBING FLOOR PLANS

M-102 MECHANICAL & PLUMBING FLOOR PLANS

HD401 HAZARDOUS MATERIALS ABATEMENT - ADMINISTRATION BUILDING

HD402 HAZARDOUS MATERIALS ABATEMENT - OLD MAINTENANCE BUILDING

C-404

ENLARGED SITE PLAN, GRADING PLAN & PROFILES - SPOILS ROAD

CD401 ENLARGED - DEMOLITION PLAN

ADMIN BLDG PLANS - ELECRICAL

E-105

ROOF NEW MAINT BLDG - ELECTRICALE-106

E-501 ELECTRICAL DETAILS

E-602 TECHNOLOGY SCHEDULES

M-002 PLUMBING SYMBOLS & ABBREVIATIONS

M-502 MECHANICAL DETAILS

M-503 PLUMBING DETAILS

A-503 SIGNAGE DETAILS

A-602 WINDOW & ROOM FINISH SCHEDULE

1. CONTRACTOR SHALL PROVIDE A DETAILED PHASING PLAN A MINIMUM OF THREE WEEKS IN ADVANCE TO ANY ROAD CLOSURES AND SHALL BE BE COORDINATED WITH THE CEMETERY DIRECTOR AND APPROVED

BY THE PM/COR PRIOR TO COMMENCING WORK AND SHALL INCLUDE THE FOLLOWING:

1.1. WORK/PHASE SEQUENCES

1.2. DETAILED SCHEDULE

1.3. ROAD CLOSURES

1.4. BUILDING CLOSURES

1.5. MAINTENANCE YARD CLOSURE

2. CONTRACTOR SHALL PROVIDE PEDESTRIAN ACCESS TO ALL BURIAL LOCATIONS AT ALL TIMES. ALL

DISRUPTIONS IN ACCESS ARE TO BE COORDINATED IN WRITING WITH THE NCA.

3. CONTRACTOR SHALL PROVIDE A TEMPORARY SHELTER FOR THE DURATION OF CONSTRUCTION

ACTIVITIES TAKING PLACE AT THE COMMITTAL SHELTER.

4. CONTRACTOR SHALL PROVIDE A MINIMUM OF ONE OPERATIONAL PUBLIC RESTROOM AT THE CEMETERY

AT ALL TIMES.

PHASING & ROAD CLOSURES

C-502 DETAILS - FLOWER WATER STATION

C-503 DETAILS - FLOWER WATER STATION

AD105

ADMINISTRATION BUILDING DEMO REFLECTED CEILING PLANS

A-502 ARCHITECTURAL DETAILS

ENLARGED SITE PLAN - CONDUIT ROUTING

C-405

A-301 RAMP AND STAIR SECTIONS, ELEVATIONS & DETAILS

E-002 SITE - ELECTRICAL-NORTH

E-003 SITE - ELECTRICAL-SOUTH

E-503 TECHNOLOGY DETAILS

E-701 PANEL SCHEDULES

A-504 SIGNAGE DETAILS

No. 44593

PROFESSIONAL

REGISTERED

JORDAN D. VANDERMEE

RENG INE ER

7/19/2024

1AMENDMENT 001 10/18/2024

AMENDMENT 002 11/01/20242

Do Not Enter

NOTE:

STOP SIGN TO MEET NCA STANDARD

REQUIREMENTS.

NOTE:

1. SIGN TYPE: NC-01.03A-M2 WITH "DO NOT ENTER" TEXT IN PLACE OF

"AUTHORIZED VEHICLES ONLY".

2. SEE NATIONAL CEMETERY SIGN MANUAL, PAGE 12-2-4 , FOR NCA

SPECIFIED PANEL COLORS.

3. PROVIDE ONE SIGN PANEL AND ONE BLANK PANEL ON BACK SIDE.

METAL POST

METAL POST

SIGN PANEL

POWDER COATED

ALUMINUM

CHANNEL

SUBGRADE

POWDER

COATED

ALUMINUM POST

CAP

METAL POST

METAL POST

SIGN PANEL

POWDER COATED

ALUMINUM

CHANNEL

SUBGRADE

POWDER

COATED

ALUMINUM POST

CAP

METAL POST

SIGN PANEL

METAL POST

POWDER COATED

ALUMINUM CHANNEL

SUBGRADE

POWDER COATED

ALUMINUM POST CAP

METAL POST

SIGN PANEL

METAL POST

POWDER COATED

ALUMINUM CHANNEL

SUBGRADE

POWDER COATED

ALUMINUM POST CAP

METAL POST

POWDER COATED

ALUMINUM

CHANNEL

SUBGRADE

POWDER COATED

ALUMINUM POST

CAP

SUBGRADE

METAL POST

SIGN PANEL

METAL POST

POWDER COATED

ALUMINUM CHANNEL

POWDER COATED

ALUMINUM POST CAP

2"

4" 3'-0"

1' -6

2"

3' -6

3'-0"

1"

1"

2"

4"

3'-0"

2' -0

2"

3' -6

3'-0"

1"

1"

2"

4"

1'-6"

1' -6

2"

3' -6

1'-6" 1"

2"

4"

3'-0"

1' -0

2"

3' -6

3'-0" 1"

6' -0

4' -0

3'-0"

3'-0"

2" 1"

2" 1"

4"

2"

4"

1'-6"

1' -6

2"

3' -6

1'-6" 1"

1' -6

1' -0

EQ

EQ

1'-6"

1'-0"EQ

EQ

EQ (B

1' -0

EQ (B

13 _ 4 13 _ 4 13 _ 4

1' -6

1'-6"

EQ(A) EQ(A)

EQ

(C)

EQ

(C)

C1 A-503C1

A-503

C3 A-503

C3 A-503

C1 A-503

C1 A-503

PLAN VIEW

ELEVATION

TEXT AS SHOWN ON DETAILS

& SIGNAGE SCHEDULE

2 SIGN PANELS BACK TO BACK

PLAN VIEW

ELEVATION

TEXT AS SHOWN ON DETAILS

& SIGNAGE SCHEDULE

2 SIGN PANELS BACK TO BACK

PLAN VIEW

ELEVATION

PLAN VIEW

ELEVATION

TEXT AS SHOWN ON

DETAILS & SIGNAGE

SCHEDULE

PLAN VIEW

TEXT AND IMAGE AS SHOWN ON

DETAILS & SIGNAGE SCHEDULE

ELEVATION

ELEVATION

PLAN VIEW

TEXT AS

SHOWN ON

DETAILS &

SIGNAGE

SCHEDULE

DO NOT

ENTER

TEXT AS

SHOWN ON

DETAILS &

SIGNAGE

SCHEDULE

MEN WOMEN

9"

9" 9"

9"

7/19/24

00404366CO

LO

RA

DO L ICENSED

A RCH I T EC

T

SE

AN

M.

F ITZPATRICK

623 26TH AVENUE

QUAD CITIES, IL

61201

PH: 309.788.0673

FAX: 309.786.5967

www.imegcorp.com

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved: Project Manager/ COR Bobbie Griffin Department of Veteran Affairs, NCA

Phone: 470-998-1497 Email: Bobbie.Griffin@va.gov

VA FORM 08 - 6231

A

BID PACKAGE

NA

National Cemetery Administration Design and

Construction Service U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD A/E: Vali Cooper International

STAMPCONSULTANT

321 4 5 6 7 8 9 10

CORRECT CEMETERY FACILITY

CONDITION ASSESSMENT (FCA)

DEFICIENCIES

856CM3012

LEBANON, KY

504.684.4408; Sean Fitzpatrick 56 Louis Prima Drive, Suite B, Covington LA 70433

VCI Project ManagementProject Management Construction ManagementConstruction Management EngineeringEngineering

07/19/2024 Sheet of 84

C :\U se rs \d an ia .h ab bo ub \V C I\V A N C A Le ba no n N C F C A Im pr ov em en ts D oc um en ts \a W or kF ile s\ 4_ Bi d_ D oc s\ 1_ Pl an s\ C

AD

\A dm in b ui ld in g.

rv t

7/ /2 :5 6:

A M

A-504

Signage Details 2

C1 N.T.S

Two Post, 1'-6"x3'-0" Panel Sign Elevation and Plan C3 N.T.S

Two Post, 2'-0"x3'-0" Panel Sign Elevation and Plan C5 N.T.S

Two Post, 4'-0"x3'-0" Panel Sign Elevation and Plan C8 N.T.S

Two Post, 1'-0"x3'-0" Panel Sign Elevation and Plan

E1 N.T.S

Two Post, 1'-6"x1'-6" Stop Sign Panel Elevation and Plan E3 N.T.S

Two Post, 1'-6"x1'-6" Panel Sign Elevation and Plan

NOTE: SEE CIVIL FOR SIGN LOCATIONS

3" = 1'-0" F1 Toilet Signs

Revisions: Date:

F3 N.T.S

Do Not Enter Sign Detail

ETR: EXISTING TO REMAIN

SIGN PANEL, SEE

SIGNAGE SCHEDULE

THIS SHEET

SIGN PANEL, SEE

SIGNAGE SCHEDULE

THIS SHEET

SIGN PANEL, SEE

SIGNAGE SCHEDULE

THIS SHEET

SIGN PANEL, SEE

SIGNAGE SCHEDULE

THIS SHEET

SIGN PANEL, SEE

SIGNAGE SCHEDULE

THIS SHEET

SIGN PANEL, SEE

SIGNAGE SCHEDULE

THIS SHEET

2AMENDMENT 002 11/01/2024

Sheets and Views
G-001 COVERSHEET
G-101 CONSTRUCTION ACCESS, STAGING & FENCING PLAN
V-101 TOPOGRAPHICAL SURVEY
V-401 ENLARGED - TOPOGRAPHICAL SURVEY
V-402 ENLARGED - TOPOGRAPHICAL SURVEY
V-403 ENLARGED - TOPOGRAPHICAL SURVEY
V-404 ENLARGED - TOPOGRAPHICAL SURVEY
V-405 ENLARGED - TOPOGRAPHICAL SURVEY
V-406 ENLARGED - TOPOGRAPHICAL SURVEY
V-407 ENLARGED - TOPOGRAPHICAL SURVEY
V-408 ENLARGED - TOPOGRAPHICAL SURVEY
V-409 ENLARGED - TOPOGRAPHICAL SURVEY
V-410 ENLARGED - TOPOGRAPHICAL SURVEY
V-411 ENLARGED - TOPOGRAPHICAL SURVEY
GC-101 EROSION & SEDIMENTATION CONTROL PLAN
CD101 DEMOLITION PLAN
CD401 ENLARGED - DEMOLITION PLAN
C-101 SITE PLAN
C-401 ENLAGRED SITE PLAN - STONE WALL REPAIR & ADA PARKING
C-402 ENLARGED SITE PLAN - MAINTENANCE YARD PAVING
C-403 ENLARGED SITE PLAN - CONDUIT ROUTING
C-404 ENLARGED GRADING PLAN & PROFILES - MAINTENANCE YARD PAVING
C-405 ENLARGED SITE PLAN, GRADING PLAN & PROFILE - SPOILS ROAD PAVING
C-501 DETAILS - SITE
C-502 DETAILS - FLOWER WATER STATION
C-503 DETAILS - FLOWER WATER STATION
HD101 HAZARDOUS MATERIALS & MOLD ABATEMENT
HD401 HAZARDOUS MATERIALS ABATEMENT - ADMINISTRATION BUILDING
HD402 HAZARDOUS MATERIALS ABATEMENT - OLD MAINTENANCE BUILDING

File details come from the government source that posted it. Updated .