DRAWINGS
15 MB Posted
- Attached to
- LAMAR REESE ELEM. HVAC AND PLUMBING UPGRADES
- Solicitation number
- 22-FAC-014
- Issued by
- Douglas County, Georgia
About this file
This set of construction drawings documents the HVAC and plumbing upgrade project for Lamar Reese Elementary School located at 1215 Lily Pond Road, Albany, Georgia 31701. The project involves the comprehensive replacement of heating, air conditioning, and plumbing systems throughout the facility, with work organized into six construction phases to minimize disruption to ongoing school operations. The scope includes demolition and removal of existing wall-hung heat pumps (WHHP), rooftop heat pump units (RTU), fan coil units (FCU), and associated refrigerant piping, followed by installation of new HVAC equipment including 35 wall-hung heat pumps, multiple rooftop units, ductless fan coil units, outside air units, and exhaust fans. The project also requires extensive ductwork modifications, condensate drain piping installations, and architectural modifications including new ceiling grid work and chase walls to conceal mechanical systems. The contractor is responsible for R-22 refrigerant recovery from all removed equipment, with recovered cylinders to be returned to the owner for processing. Construction sequencing allows for temporary modular classroom units to house displaced students, with a maximum of six classrooms relocated per phase.
The drawings specify detailed mechanical schedules and performance requirements for all HVAC components, including supply and exhaust fan specifications with defined CFM ratings, static pressure requirements, and motor horsepower specifications. Installation details address critical construction requirements such as condensate drain trap configurations, refrigerant piping routing through exterior walls, fire damper installations at wall and floor penetrations, and bi-polar ionization unit integration into new equipment. The project includes substantial ductwork fabrication with insulation requirements for exterior rooftop ductwork and detailed lintel installations for new duct penetrations through existing walls. Plumbing components are scheduled on separate drawings (P101-P103), and electrical work for power circuits and controls is coordinated through electrical drawings with mechanical installation responsibilities clearly delineated. The construction documents establish phased work completion requirements with attention to maintaining occupied building access, protecting existing structures, and restoring affected areas upon completion of each phase.
Text of this file
D A
D E
BLECKLEY LAURENS
CHATHAM
EFFINGHAM
IRWIN
BERRIEN
LOWNDESGRADY
SE
M
IN
OL
E
DECATUR
EARLY
MILLER
BAKER
THOMAS
BROOKS
COLQUITT
MITCHELL
COOK
TIFT
SCHLEY
TERRELL
DOUGHERTY
WEBSTER
RANDOLPH
QUITMAN
CLAY
CALHOUN
CHATTAHOOCHEE
STEWART
MARION
WILCOX
CRISP
WORTH
LEE
TURNER
DOOLY
MACON
SUMTER
HOUSTON
PULASKI
McINTOSH
PIERCE
CHARLTON
LA
NI
ER
CLINCH
ECHOLS
ATKINSON
WARE
CAMDEN
BRANTLEY
GLYNN
TOOMBS
APPLING
COFFEE
BEN HILL
TELFAIR
DAVIS
JEFF
WHEELER
DODGE
TREUTLEN
M
ON
TG
OM
ER
Y
LONG
WAYNE
LIBERTY
BULLOCH
EVANS
CANDLER
TATTNALL
BRYAN
DAWSON FRANKLIN
CLARKE
OCONEE
PUTNAM
BALDWIN
TWIGGS
HENRY
FA
YE
TT
E
PIKE
UPSON
SPALDING
M
ER
IW
ET
HER
HARRIS
MUSCOGEE
TALBOT
COWETA
HEARD
TROUP
PEACH
CRAWFORD
TAYLOR
BIBB
MONROE
LAMAR
BUTTS
JASPER
JONES
CHEROKEE
FULTON
PAULDING
HARALSON
CARROLL
DOUGLAS
BARTOWFLOYD
POLK
COBB
NEWTON
DEKALB
CL
AY
TO
N
ROCKD
AL
E
WALTON
MORGAN
GWINNETT
FORSYTH
JACKSON
HALL BANKS
BARROW
M cD
U F
F
IE
JEFFERSON
EMANUEL
WASHINGTON
WILKINSON
JOHNSON
HANCOCK
WARREN
GLASCOCK
JENKINS
SCREVEN
RICHMOND
BURKE
COLUMBIA
OGLETHORPE
WILKES
TALIAFERROGREENE
LINCOLN
ELBERT
HART
MADISON
RABUN
STEPHENS
FANNIN
PICKENS
GILMER
WHITF
IELD
GORDON
C H
AT
TO
O G
A
WALKER M
U
R R
A Y
CATOOSA
UNION
LUMPKIN
WHITE
HABERSHAM
TOWNS
BACON
DOUGHERTY
PROJECT NUMBER:
DATE:
DRAWN BY:
CHECKED BY:
TITLE:
SUBJECT TO GENERAL
COPYRIGHT LAWS ©
REVISIONS
INDEX OF DRAWINGS GEORGIA/COUNTY MAP PROJECT LOCATION
T100
TITLE SHEET
2021203
L A
M A
R R
E E
S E
E L E
M E
N T
A R
Y S
C H
O O
L
H V
A C
P
L U
M B
IN
G
U P
G R
A D
E S
05/20/2022
L ily P o n d R d A lb a n y G
A
LAMAR REESE ELEMENTARY SCHOOL - HVAC
& PLUMBING UPGRADES
1215 Lily Pond Rd, Albany, GA 31701
No. Description Date
GA DOE ID#: 0199
T100 TITLE SHEET
C101 SITE PLAN
A100 CONSTRUCTION PHASING PLAN
A200 ARCHITECTURAL CEILING PLAN
A300 ARCHITECTURAL CHASE PLAN & DETAILS
MD100 MECHANICAL DEMO PLAN - OVERALL
MD101 MECHANCAL DEMO PLAN - SECTOR A
MD102 MECHANCAL DEMO PLAN - SECTOR B
MD103 MECHANCAL DEMO PLAN - SECTORS C, D, & E
M100 MECHANICAL NEW WORK PLAN - OVERALL
M101 MECHANICAL NEW WORK PLAN - SECTOR A
M102 MECHANICAL NEW WORK PLAN - SECTOR B
M103 MECHANICAL NEW WORK PLAN - SECTORS C, D, & E
M501 MECHANICAL DETAILS
M502 MECHANICAL DETAILS
M503 MECHANICAL DETAILS
M601 MECHANICAL SCHEDULES
M602 MECHANICAL SCHEDULES, LEGEND & GENERAL NOTES
P101 PLUMBING FLOOR PLAN - SECTOR A
P102 PLUMBING FLOOR PLAN - SECTOR B
P103 PLUMBING FLOOR PLAN - SECTORS C, D, & E
E001 ELECTRICAL OVERALL PLAN
ED101 ELECTRICAL DEMO POWER PLAN - SECTOR A
ED102 ELECTRICAL DEMO POWER PLAN - SECTOR B
ED103 ELECTRICAL DEMO POWER PLAN - SECTOR C, D, & E
E101 ELECTRICAL NEW WORK POWER PLAN - SECTOR A
E102 ELECTRICAL NEW WORK POWER PLAN - SECTOR B
E103 ELECTRICAL NEW WORK POWER PLAN - SECTORS C, D, & E
E801 ELECTRICAL SCHEDULES & LEGEND
TEMPORARY PORTABLE
CLASSROOM
TEMPORARY PORTABLE
CLASSROOM
TEMPORARY PORTABLE
CLASSROOM
SIDEWALK SIDEWALK
SIDEWALK
GENERAL NOTE: LOCATIONS OF CLASSROOM TRAILERS IS APPROXIMATE.
CONTRACTOR SHALL FIELD VERIFY LOCATIONS OF EXISTING STORM
DRAINS, FENCING, SIDEWALKS, PLAYGROUNDS, DRIVES, ETC. AND
CAREFULLY COORDINATE PLACEMENT OF CLASSROMS TO AVOID
CONFLICT AND MAINTAIN REQUIRED CLEARANCES.
EXISTING PORTABLE
CLASSROOM TO REMAIN
EXISTING PLANTER BOXES
TO REMAIN (TYP)
TEMPORARILY REMOVE EXISTING GATE
AND PORTION OF FENCE AS REQUIRED
FOR ACCESS DURING CONSTRUCTION.
REPLACE FENCE AND GATE AT END OF
CONSTRUCTION.
1 1/2" DCW 2" DCW
2" DCW 2" DCW
D C
W
D C
W
2" D C W
1 1/2" DCW
1 1/2" DCW1 1/2" DCW
CONTRACTOR SHALL COORDINATE WITH OWNER FOR
TEMPORARY CONNECTION OF 2" DOMESTIC COLD
WATER PIPING TO EXISTING IN THIS APPROXIMATE
LOCATION BELOW GRADE.
APPROXIMATE LOCATION OF EXISTING
PLAYGROUND TO REMAIN. FIELD VERIFY
EXISTING CLEARANCES FOR REMOVAL OF
EQUIPMENT. RESTORE PLAYGROUND AREA TO
ORIGINAL CONDITION AT THE END OF
CONSTRUCTION.
PROJECT NUMBER:
DATE:
DRAWN BY:
CHECKED BY:
TITLE:
SUBJECT TO GENERAL
COPYRIGHT LAWS ©
REVISIONS
A B
C D
E
2021203
05/20/2022
GA DOE ID #: 0199
C101
SITE PLAN
L A
M A
R R
E E
S E
E L E
M E
N T
A R
Y S
C H
O O
L
H V
A C
P
L U
M B
IN
G
U P
G R
A D
E S
WBF
JA3
L
IL
Y
P O
N D
R D
A
L B
A N
Y
G A
1/16" = 1'-0"1 SITE PLAN
No. Description Date
PHASE 1
PHASE 1
PHASE 2 PHASE 3 PHASE 4 PHASE 5 PHASE 6
PHASE 3
PHASE 4
PHASE 5
PHASE 6
2 2
PROJECT NUMBER:
DATE:
DRAWN BY:
CHECKED BY:
TITLE:
SUBJECT TO GENERAL
COPYRIGHT LAWS ©
REVISIONS
A B
C D
E
2021203
05/20/2022
GA DOE ID #: 0199
A100
CONSTRUCTION PHASING
PLAN
L A
M A
R R
E E
S E
E L E
M E
N T
A R
Y S
C H
O O
L
H V
A C
P
L U
M B
IN
G
U P
G R
A D
E S
WBF
JA3
L
IL
Y
P O
N D
R D
A
L B
A N
Y
G A
1/16" = 1'-0"1 CONSTRUCTION PHASING PLAN
NOTES: (THIS SHEET ONLY)
1 . ADJUST TEMPORARY WALLS AS REQUIRED TO MAINTAIN
SEPARATION FROM WORK AREAS AND OCCUPIED STUDENT
AREAS. ACCESS TO EXIT DOORS SHALL BE MAINTAINED AT ALL
TIMES.
2 . ADJUST TEMPORARY WALLS AS REQUIRED TO ALLOW ACCESS TO
RESTROOMS WHILE MAINTAINING SEPARATION OF WORK AREAS
FROM OCCUPIED STUDENT AREAS.
3 . PROVIDE TEMPORARY WALL (MIN 6' TALL) TO SEPARATE WORK
AREAS FROM OCCUPIED AREAS BASED ON PHASING. PROVIDE
DOORS AS REQUIRED FOR ACCESS TO WORK AREA. PROVIDE
PROTECTION FOR EXISTING FLOORING, WALLS, ETC. TO PREVENT
DAMAGE TO EXISTING ITEMS DURING INSTALLATION / REMOVAL
OF TEMPORARY WALL.
GENERAL NOTE: PRIOR TO CONSTRUCTION, CONTRACTOR SHALL COORDINATE WITH OWNER
TO REMOVE ALL PERSONAL ITEMS FROM SPACES AFFECTED BY DEMOLITION. CONTRACTOR
SHALL PROTECT EXISTING CASEWORK, FURNITURE, FLOORING, WALLS, CEILINGS, ETC. NOT
ABLE TO BE REMOVED. AT THE END OF CONSTRUCTION, CONTRACTOR SHALL REMOVE ALL
PROTECTIVE COVERS AND WIPE DOWN AND CLEAN ALL SURFACES AFFECTED BY DUST, DIRT,
CONSTRUCTION DEBRIS, ETC.
GENERAL NOTE: THERE WILL BE 3 MODULAR CLASSROOM BUILDINGS WITH (2) CLASSROOMS
PER MODULAR UNIT ON THIS SITE PROVIDED BY THE CONTRACTOR. NO MORE THAN 6
CLASSROOMS MAY BE MOVED TO MODULAR UNITS FOR EACH PHASE. PHASES SHOWN
HEREIN ARE SUGGESTED PHASES AND MAY BE CHANGED DUE TO CONSTRUCTION
TIMELINES, CONSTRUCTION SCHEDULES, EQUIPMENT LEAD TIMES, UNFORESEEN
CIRCUMSTANCES ENCOUNTERED DURING THE CONSTRUCTION PROCESS OR FURTHER
COORDINATION WITH OWNER. VERIFY ALL PHASING, TEMPORARY WALL/PARTITION
INSTALLATION AND/OR SCHEDULING PRIOR TO COMMENCEMENT OF WORK.
1 1
DEMO EXISTING CEILNG TILE & GRID AS
REQUIRED AND REPLACE WITH NEW
CEILING TILE & GRID
DEMO EXISTING CEILING TILE &
REPLACE WITH NEW CEILING TILE
CEILING HATCH LEGEND
(NO HATCH) EXISTING CEILING TILE
& GRID TO REMAIN
PROJECT NUMBER:
DATE:
DRAWN BY:
CHECKED BY:
TITLE:
SUBJECT TO GENERAL
COPYRIGHT LAWS ©
REVISIONS
A B
C D
E
2021203
05/20/2022
GA DOE ID #: 0199
A200
ARCHITECTURAL CEILING
PLAN - OVERALL
L A
M A
R R
E E
S E
E L E
M E
N T
A R
Y S
C H
O O
L
H V
A C
P
L U
M B
IN
G
U P
G R
A D
E S
WBF
JA3
L
IL
Y
P O
N D
R D
A
L B
A N
Y
G A
1/16" = 1'-0"1 ARCHITECTURAL CEILING PLAN - OVERALL
NOTES: (THIS SHEET ONLY)
1 . PROVIDE NEW BORDER AROUND NEW CHASE AND INTEGRATE WITH
EXISTING CEILING GRID.
2 . REMOVE GRID AS REQUIRED FOR INSTALLATION OF NEW LINESETS,
DUCTWORK, CONDENSATE DRAINS, ETC. EXISTING GRID "MAINS" AND
BORDER TO REMAIN TO MAINTATIN EXISTING LIGHTING, SPEAKER, ETC.
LAYOUT. SEE MECHANICAL DRAWINGS FOR ALL NEW ABOVE CEILING
ITEMS.
WHHP
PROVIDE STEEL CORNER BEAD AT 90
DEG GYP. BOARD OUTSIDE CORNERS.
PROVIDE FRAMED OPENING FOR
SUPPLY DUCT AND RETURN GRILLE
AND DUCT. SEE MECHANICAL
DRAWINGS FOR EXACT SIZE.
SEE MECHANICAL DRAWINGS FOR
SUPPLY & RETURN DUCT SIZES.
EXTERIOR WALL
24" MAXIMUM
48" MAXIMUM
1 LAYER ABUSE RESISTANT 5/8" GYPSUM BOARD (ONE SIDE).
ACOUSTICAL TILE T-BAR CEILING
EXTEND WALL 0'-6" (MAXIMUM) PAST CEILING - OR AS DICTATED BY
EXITING STRUCTURAL CONDITIONS, SUPPLY DUCT, ETC.
3" BATTS INSULATION BETWEEN STUD FOR SOUND ATTENUATION.
CONTINUOUS SEALANT AT CEILING INTERFACE OF 5/8" GYP.
MTL. RUNNER - DO NOT FASTEN TO STUD.
HEAD
PLAN
BASE
OVERALL DIMENSION = 4-1/4"
'C' SHAPED MTL. STUD. DO NOT FASTEN TO RUNNER ABOVE.
FASTENERS @ 2'-0" O.C. MAX WITHIN 1" OF ENDS.
TOP OF STRUCTURAL SLAB.
CONTINUOUS SEALANT.
CONTINUOUS C'SHAPED METAL RUNNER.
BASEBOARD.
CLASSROOMCHASE
METAL STUD SIZE - 3-5/8"
PROJECT NUMBER:
DATE:
DRAWN BY:
CHECKED BY:
TITLE:
SUBJECT TO GENERAL
COPYRIGHT LAWS ©
REVISIONS
A B
C D
E
2021203
05/20/2022
GA DOE ID #: 0199
A300
ARCHITECTURAL CHASE
PLAN & DETAILS
L A
M A
R R
E E
S E
E L E
M E
N T
A R
Y S
C H
O O
L
H V
A C
P
L U
M B
IN
G
U P
G R
A D
E S
WBF
JA3
L
IL
Y
P O
N D
R D
A
L B
A N
Y
G A
1/16" = 1'-0"1 ARCHITECTURAL CHASE PLAN
NOTES: (THIS SHEET ONLY)
1 . NEW CHASE TO CONCEAL WHHP DUCT. SEE ARCHITECTURAL WALL CHASE
DETAIL THIS SHEET.
NOT TO SCALE
WHHP CHASE WALL DETAIL
NOT TO SCALE
CHASE WALL DETAIL
MD103
MD101
MD102
PROJECT NUMBER:
DATE:
DRAWN BY:
CHECKED BY:
TITLE:
SUBJECT TO GENERAL
COPYRIGHT LAWS ©
REVISIONS
A B
C D
E
2021203
05/20/2022
GA DOE ID #: 0199
MD100
MECHANICAL DEMO PLAN -
OVERALL
L A
M A
R R
E E
S E
E L E
M E
N T
A R
Y S
C H
O O
L
H V
A C
P
L U
M B
IN
G
U P
G R
A D
E S
WBF
JA3
L ily P o n d R d A lb a n y G
A
1/16" = 1'-0"1 MECHANICAL DEMO PLAN - OVERALL
MUSIC LAB
ART LAB
MEDIA CENTER
CONF. RM.
114F
AV. STOR.
114E
BOOK STOR.
114D
PRODUCTION ROOM
114C
WORK RM.
114B
MEDIA SPEC. OFFICE
114A
LOBBY
CONF. ROOM
PRINC. OFF.
TLT.
104A
TLT.
108A
ASST. PRINCIPAL
COUNSELOR
VAULT
RM.
103B
OFFICE MANAGER
CLINIC
TLT.
103A
WORK RM.
DATA ROOM
111A
COMPUTER LAB
CLOSET
STOR.
118A
KILN RM.
116A
STOR.
116B
DATA RM.
LOBBY
PROJECT NUMBER:
DATE:
DRAWN BY:
CHECKED BY:
TITLE:
SUBJECT TO GENERAL
COPYRIGHT LAWS ©
REVISIONS
A B
C D
E
2021203
05/20/2022
GA DOE ID #: 0199
MD101
MECHANCAL DEMO PLAN -
SECTOR A
L A
M A
R R
E E
S E
E L E
M E
N T
A R
Y S
C H
O O
L
H V
A C
P
L U
M B
IN
G
U P
G R
A D
E S
WBF
JA3
L ily P o n d R d A lb a n y G
A
1/8" = 1'-0"1 MECHANICAL DEMO PLAN - SECTOR A
NOTES: (THIS SHEET ONLY)
1 . REMOVE CEILING MOUNTED CASSETTE TYPE DUCTLESS FAN COIL
UNIT AND ASSOCIATED REFRIGERANT PIPING. REMOVE
CONDENSATE PIPING AND MAKE NOTE OF ROUTING. SEE NEW
WORK PLAN FOR INSTALLATION OF NEW CEILING MOUNTED
DUCTLESS FAN COIL UNIT IN SAME LOCATION.
2 . REMOVE EXISTING ROOF MOUNTED DUCTLESS HEAT PUMP AND
ASSOCIATED PIPING. EXISTING EQUIPMENT SUPPORT PLATFORM
TO REMAIN.
3 . REMOVE EXISTING ROOFTOP HEAT PUMP AND ASSOCIATED
CONDENSATE DRAIN. REMOVE EXISTING GPS BIPOLAR IONIZATION
UNIT AND STORE FOR REUSE IN NEW ROOFTOP HEAT PUMP.
EXISTING ROOF CURB TO REMAIN. SEE NEW WORK PLAN FOR
INSTALLATION OF NEW ROOFTOP UNIT IN SAME LOCATION.
4 . REMOVE EXISTING ROOF MOUNTED CENTRIFUGAL EXHAUST FAN.
EXISTING ROOF CURB TO REMAIN. SEE NEW WORK PLAN FOR
INSTALLATION OF NEW ROOF MOUNTED EXHAUST FAN.
5 . EXISTING ROOFTOP UNIT, DRAIN, ETC. TO REMAIN.
6 GENERAL: UNLESS OTHERWISE NOTED, ALL DUCTWORK, GRILLES,
DIFFUSERS, ETC ARE TO REMAIN. CLEAN EXISTING DUCTWORK AS
SPECIFIED. CLEAN ALL DIFFUSERS AND GRILLES TO REMOVE ALL
DUST, DIRT, SMUDGES, ETC.
7 GENERAL: CONTRACTOR SHALL REMOVE ALL EXISTING BIPOLAR
IONIZATION UNITS IN EXISTING EQUIPMENT FOR REINSTALLATION
IN NEW EQUIPMENT. ALL BIPOLAR IONIZATION UNITS NOT REUSED
SHALL BE TURNED OVER TO THE OWNER.
8 . EXISTING POWER CIRCUIT FOR RTU/CONVENIENCE OUTLET RISES
THROUGH EXISTING PITCH POCKET. SEE ELECTRICAL DRAWINGS
FOR REMOVAL OF POWER CIRCUIT TO BELOW ROOF DECK, AND
JUNCTIONING BELOW ROOF LEVEL AND ROUTING CIRCUIT UP
INSIDE ROOF CURB ADAPTER OF NEW EQUIPMENT. FILL PITCH
POCKET FOLLOWING POWER CIRCUIT REMOVAL. PROVIDE 18
GAUGE METAL CAP TO COVER EXISTING PITCH POCKET. SEAL AIR
& WATER TIGHT.
No. Description Date
GENERAL NOTE: THIS PROJECT INVOLVES THE REMOVAL AND REPLACEMENT OF
WALL HUNG HEAT PUMPS (WHHP), ROOFTOP HEAT PUMPS (RTU), & FAN COIL
UNITS AND HEAT PUMPS (FCU AND HP). MECHANICAL CONTRACTOR SHALL BE
RESPONSIBLE FOR RECOVERING ALL R-22 REFRIGERANT FROM ALL EXISTING
WHHP, RTU, FCU/HP SYSTEMS REMOVED DURING DEMOLITION PHASE(S).
CONTRACTOR SHALL PROVIDE ALL LABOR AND TOOLS/RECOVERY EQUIPMENT
REQUIRED TO RECOVER R-22 REFRIGERANT. REFRIGERANT RECOVERY
CYLINDERS SHALL BE PROVIDED BY CONTRACTOR. ONCE RECOVERED CYLINDERS
HAVE BEEN FILLED, CYLINDERS SHALL BE RETURNED TO OWNER FOR
PROCESSING.
CAFETERIA
SERVING
KITCHEN
OFFICE
JAN.
LAUNDRY
TLT.
132A
LOCKER
DRY STOR.
STOR.
MECH.
113A
MEN
115A
MECH.
100A
OFF.
STOR.
150A
STOR.
100C
ELECT.
100B
STOR.
112A
P.E. FACILITY
LIFT
122B
PROJECT NUMBER:
DATE:
DRAWN BY:
CHECKED BY:
TITLE:
SUBJECT TO GENERAL
COPYRIGHT LAWS ©
REVISIONS
A B
C D
E
2021203
05/20/2022
GA DOE ID #: 0199
MD102
MECHANCAL DEMO PLAN -
SECTOR B
L A
M A
R R
E E
S E
E L E
M E
N T
A R
Y S
C H
O O
L
H V
A C
P
L U
M B
IN
G
U P
G R
A D
E S
WBF
JA3
L ily P o n d R d A lb a n y G
A
1/8" = 1'-0"1 MECHANICAL DEMO PLAN - SECTOR B
NOTES: (THIS SHEET ONLY)
1 . REMOVE CEILING MOUNTED CASSETTE TYPE DUCTLESS FAN COIL
UNIT AND ASSOCIATED REFRIGERANT PIPING. REMOVE
CONDENSATE PIPING AND MAKE NOTE OF ROUTING. SEE NEW
WORK PLAN FOR INSTALLATION OF NEW CEILING MOUNTED
DUCTLESS FAN COIL UNIT IN SAME LOCATION.
2 . REMOVE EXISTING ROOF MOUNTED DUCTLESS HEAT PUMP AND
ASSOCIATED PIPING. EXISTING EQUIPMENT SUPPORT PLATFORM
TO REMAIN.
3 . REMOVE EXISTING ROOFTOP HEAT PUMP AND ASSOCIATED
CONDENSATE DRAIN. REMOVE EXISTING GPS BIPOLAR IONIZATION
UNIT AND STORE FOR REUSE IN NEW ROOFTOP HEAT PUMP.
EXISTING ROOF CURB TO REMAIN. SEE NEW WORK PLAN FOR
INSTALLATION OF NEW ROOFTOP UNIT IN SAME LOCATION.
4 . REMOVE EXISTING ROOF MOUNTED CENTRIFUGAL EXHAUST FAN.
EXISTING ROOF CURB TO REMAIN. SEE NEW WORK PLAN FOR
INSTALLATION OF NEW ROOF MOUNTED EXHAUST FAN.
5 . REMOVE EXISTING DUCTLESS HEAT PUMP MOUNTED ON
CONCRETE PAD, ASSOCIATED PIPING, ETC. SEE NEW WORK PLAN
FOR INSTALLATION OF NEW DUCTLESS HEAT PUMP TO REUSE
EXISTING PIPE ROUTING.
6 . COMPLETELY REMOVE EXISTING LOUVER AND ASSOCIATED DUCT
ABOVE LOW ROOF. SEE NEW WORK PLAN FOR REUSE OF
EXISTING OPENING. TEMPORARILY SEAL OPENINGS DURING
CONSTRUCTION AS REQUIRED TO PREVENT AIR & WATER
INFILTRATION.
7 . COMPLETELY REMOVE EXISTING SUSPENDED AIR HANDLING UNIT,
ASSOCIATED SUPPORTS, CONDENSATE PIPING, REFRIGERANT
PIPING, ETC.
8 . COMPLETELY REMOVE EXISTING CONCRETE PAD MOUNTED HEAT
PUMPS, ASSOCIATED PIPING, ETC. PATCH PIPING PENETRATIONS
TO MATCH EXISTING BRICK EXTERIOR.
9 . COMPLETELY REMOVE EXISTING DUCTWORK, SUPPORT,
INSULATION, ETC. UP TO LOCATION SHOWN.
10 . COMPLETELY REMOVE EXISTING REFRIGERANT PIPING,
CONDENSATE PIPING, SUPPORTS, INSULATION, ETC. SERVING AIR
HANDLING UNITS.
11 . REMOVE EXISTING KITCHEN HOOD EXHAUST FAN MOUNTED ON
ROOF. SEE NEW WORK PLAN FOR INSTALLATION OF NEW
EXHAUST FAN SAME LOCATION.
12 . EXISTING KITCHEN HOOD SUPPLY FAN ABOVE COOLER / FREEZER.
REMOVE A SHORT PORTION OF DUCT AS REQUIRED TO REMOVE
EXHAUST FAN. SEE NEW WORK PLAN FOR INSTALLATION OF NEW
EXHAUST FAN SAME LOCATION.
13 . EXISTING DISHWASHER EXHAUST FAN TO REMAIN.
14 . REMOVE EXISTING INLINE EXHAUST FAN MOUNTED ABOVE
CEILING AT THIS APPROXIMATE LOCATION. SEE NEW WORK PLAN
FOR INSTALLATION OF NEW EXHAUST FAN SAME LOCATION.
15 . REMOVE EXISITNG SUPPLY DUCTWORK AS REQUIRED FOR
REMOVAL OF AIR HANDLER. REMAINDER OF EXISTING SUPPLY
DUCTWORK TO REMAIN. SEE NEW WORK PLAN FOR CONNECTION
OF NEW DUCTWORK TO EXISTING DUCTWORK AT THIS LOCATION.
16 . GENERAL: UNLESS OTHERWISE NOTED, ALL DUCTWORK, GRILLES,
DIFFUSERS, ETC ARE TO REMAIN. CLEAN EXISTING DUCTWORK AS
SPECIFIED. CLEAN ALL DIFFUSERS AND GRILLES TO REMOVE ALL
DUST, DIRT, SMUDGES, ETC.
17 . GENERAL: CONTRACTOR SHALL SALVAGE ALL EXISTING BIPOLAR
IONIZATION UNITS IN EXISTING EQUIPMENT FOR REINSTALLATION
IN NEW EQUIPMENT. ALL BIPOLAR IONIZATION UNITS NOT REUSED
SHALL BE TURNED OVER TO THE OWNER.
18 . REMOVE EXISTING DOOR AIR CURTAIN, SEE NEW WORK PLAN FOR
NEW DOOR AIR CURTAIN IN SAME LOCATION.
19 . REMOVE EXISTING FENCING AS REQUIRED FOR INSTALLATION OF
NEW DUCTLESS HEAT PUMPS. SEE NEW WORK PLAN.
20 . EXISTING POWER CIRCUIT FOR RTU/CONVENIENCE OUTLET RISES
THROUGH EXISTING PITCH POCKET. SEE ELECTRICAL DRAWINGS
FOR REMOVAL OF POWER CIRCUIT TO BELOW ROOF DECK, AND
JUNCTIONING BELOW ROOF LEVEL AND ROUTING CIRCUIT UP
INSIDE ROOF CURB ADAPTER OF NEW EQUIPMENT. FILL PITCH
POCKET FOLLOWING POWER CIRCUIT REMOVAL. PROVIDE 18
GAUGE METAL CAP TO COVER EXISTING PITCH POCKET. SEAL AIR
& WATER TIGHT.
No. Description Date
GENERAL NOTE: THIS PROJECT INVOLVES THE REMOVAL AND REPLACEMENT OF
WALL HUNG HEAT PUMPS (WHHP), ROOFTOP HEAT PUMPS (RTU), & FAN COIL
UNITS AND HEAT PUMPS (FCU AND HP). MECHANICAL CONTRACTOR SHALL BE
RESPONSIBLE FOR RECOVERING ALL R-22 REFRIGERANT FROM ALL EXISTING
WHHP, RTU, FCU/HP SYSTEMS REMOVED DURING DEMOLITION PHASE(S).
CONTRACTOR SHALL PROVIDE ALL LABOR AND TOOLS/RECOVERY EQUIPMENT
REQUIRED TO RECOVER R-22 REFRIGERANT. REFRIGERANT RECOVERY
CYLINDERS SHALL BE PROVIDED BY CONTRACTOR. ONCE RECOVERED CYLINDERS
1 1
TT TT
TTTT
TT
TT
TT
TT
TT
TT TT
TT TT
TT
TT TT
TT
TTTT
TT TT
TTTT
TTTT
TT TT
TT
TT
TT
TT
TT TT
TT
TT
4 4 4 4
4 4
4 4
3 3
6 6
8 8
F.D./S.D. F.D./S.D.
F.D./S.D. F.D./S.D.
F.D./S.D. F.D./S.D.
F.D./S.D.
F.D./S.D.
F.D./S.D.
F.D./S.D. F.D./S.D. F.D./S.D.
9 9
9 9
K-1 CLASSROOM
K-1 CLASSROOM
K-1 CLASSROOM
K-1 CLASSROOM
K-1 CLASSROOM
2-3 CLASSROOM
2-3 CLASSROOM
2-3 CLASSROOM
2-3 CLASSROOM
K-1 CLASSROOM
K-1 CLASSROOM
K-1 CLASSROOM
K-1 CLASSROOM
SPECIAL ED.
SPECIAL ED.
TITLE ONE
CLASSROOM
TLT.
205A
TLT.
205B
WORK ROOM
BOOK STOR.
2-3 CLASSROOM
2-3 CLASSROOM
TITLE ONE
CLASSROOM
TITLE ONE
CLASSROOM
2-3 CLASSROOM
2-3 CLASSROOM
4-5 CLASSROOM
4-5 CLASSROOM
4-5 CLASSROOM
4-5 CLASSROOM
SPECIAL EDUCATION
WORK RM.
BOOK STOR.
SPECIAL EDUCATION
4-5 CLASSROOM
4-5 CLASSROOM
4-5 CLASSROOM
4-5 CLASSROOM
ELECT.
TLT.
210A
TLT.
210B
TLT.
211A
TLT.
209A
TLT.
213A
TLT.
213B
TLT.
214A
TLT.
214B
STOR.
TLT.
201A
TLT.
201B
TLT.
202A
TLT.
202B
GIRLS
306B
WORK RM.
BOOK STOR.
ELECT.
STOR.
BOYS
306A
TLT.
310B
TLT.
310A
JAN.
ELEC.
STOR.
TLT.
405C
TLT
405B
KITCHEN
405A
JAN.
TLT.
410A
TLT.
410B
GIRLS
406B
BOYS
406A
CORRIDOR
CORRIDOR
CORRIDOR
PROJECT NUMBER:
DATE:
DRAWN BY:
CHECKED BY:
TITLE:
SUBJECT TO GENERAL
COPYRIGHT LAWS ©
REVISIONS
A B
C D
E
2021203
05/20/2022
GA DOE ID #: 0199
MD103
MECHANCAL DEMO PLAN -
SECTORS C, D, & E
L A
M A
R R
E E
S E
E L E
M E
N T
A R
Y S
C H
O O
L
H V
A C
P
L U
M B
IN
G
U P
G R
A D
E S
WBF
JA3
L ily P o n d R d A lb a n y G
A
1/8" = 1'-0"1 MECHANICAL DEMO PLAN - SECTORS C, D, & E
NOTES: (THIS SHEET ONLY)
1 . REMOVE EXISTING WALL HUNG HEAT PUMP. REMOVE EXISTING
GPS BIPOLAR IONIZATION UNIT AND STORE FOR REUSE IN NEW
WALL HUNG HEAT PUMP.
2 . EXISTING 4"Ø DRYER WALL CAP TO REMAIN.
3 . EXISTING 8" X 6" EXHAUST WALL CAP TO REMAIN.
4 . REMOVE EXISTING CEILING MOUNTED EXHAUST FAN AND
ASSOCIATED DUCTWORK UP TO LOCATION SHOWN. SEE NEW
WORK PLAN FOR INSTALLATION OF NEW EXHAUST FAN SAME
LOCATION.
5 . EXISTING PROPELLER EXHAUST FAN IN ATTIC TO REMAIN.
6 . REMOVE EXISTING ROOF MOUNTED CENTRIFUGAL EXHAUST FAN.
SEE NEW WORK PLAN FOR INSTALLATION OF NEW EXHAUST FAN
SAME LOCATION.
7 . REMOVE EXISTING HORIZONTAL FAN COIL UNIT, ASSOCIATED
REFRIGERANT PIPING, CONDENSATE PIPING, ETC. MOUNTED ON
PLATFORM IN ATTIC. NOTE EXISTING REFRIGERANT PIPE AND
CONDENSATE PIPE ROUTING, EXISTING PIPE ROUTINGS TO BE
REUSED. SEE NEW WORK PLAN FOR INSTALLTION OF NEW FAN
COIL UNIT SAME LOCATION. FIELD VERIFY INSTALLATION OF
EXISTING BIPOLAR IONIZATION UNIT AND REMOVE AND STORE
FOR REUSE IN NEW FAN COIL UNIT.
8 . REMOVE EXISTING PAD MOUNTED HEAT PUMP AND ASSOCIATED
PIPING. SEE NEW WORK PLAN FOR INSTALLATION OF NEW HEAT
PUMP IN SAME LOCATION.
9 . EXISTING 16" X 14" FIRE/SMOKE DAMPER IN ATTIC PARTITION TO
REMAIN.
No. Description Date
GENERAL NOTE: THIS PROJECT INVOLVES THE REMOVAL AND REPLACEMENT OF
WALL HUNG HEAT PUMPS (WHHP), ROOFTOP HEAT PUMPS (RTU), & FAN COIL
UNITS AND HEAT PUMPS (FCU AND HP). MECHANICAL CONTRACTOR SHALL BE
RESPONSIBLE FOR RECOVERING ALL R-22 REFRIGERANT FROM ALL EXISTING
WHHP, RTU, FCU/HP SYSTEMS REMOVED DURING DEMOLITION PHASE(S).
CONTRACTOR SHALL PROVIDE ALL LABOR AND TOOLS/RECOVERY EQUIPMENT
REQUIRED TO RECOVER R-22 REFRIGERANT. REFRIGERANT RECOVERY
CYLINDERS SHALL BE PROVIDED BY CONTRACTOR. ONCE RECOVERED CYLINDERS
M103
M101
M102
PROJECT NUMBER:
DATE:
DRAWN BY:
CHECKED BY:
TITLE:
SUBJECT TO GENERAL
COPYRIGHT LAWS ©
REVISIONS
A B
C D
E
2021203
05/20/2022
GA DOE ID #: 0199
M100
MECHANICAL NEW WORK
PLAN - OVERALL
L A
M A
R R
E E
S E
E L E
M E
N T
A R
Y S
C H
O O
L
H V
A C
P
L U
M B
IN
G
U P
G R
A D
E S
WBF
JA3
L ily P o n d R d A lb a n y G
A
1/16" = 1'-0"1 MECHANICAL NEW WORK PLAN - OVERALL
RTU-1
RTU-2
RTU-4
RTU-9 RTU-10
DFCU-3
DHP-3
DHP-1
DFCU-1
EF-25
EF-26
OAU-2
OAU-3
EF-37
RTU-5
RTU-6
RTU-7
RTU-8
MUSIC LAB
118ART LAB
MEDIA CENTER
CONF. RM.
114F
AV. STOR.
114E
BOOK STOR.
114D
PRODUCTION ROOM
114C
WORK RM.
114B
MEDIA SPEC. OFFICE
114A
LOBBY
CONF. ROOM
PRINC. OFF.
TLT.
104A
ASST. PRINCIPAL
COUNSELOR
RM.
103B
OFFICE MANAGER
CLINIC
WORK RM.
DATA ROOM
111A
COMPUTER LAB
CLOSET
STOR.
118A
KILN RM.
116A
STOR.
116B
DATA RM.
LOBBY
CC
CC
SS
16"x16"
16"x16"16"x18"
8 8
RTU-3
S S S
R
OAU-1
260 260
260 260
D
D D
D
D
D
D D
D
D
335 335
335 335 330
D
D
D
D
OAU-1
D
6 6 6
R
D
D
12 12
NOTES: (THIS SHEET ONLY)
PROJECT NUMBER:
DATE:
DRAWN BY:
CHECKED BY:
TITLE:
SUBJECT TO GENERAL
COPYRIGHT LAWS ©
REVISIONS
A B
C D
E
2021203
05/20/2022
GA DOE ID #: 0199
M101
MECHANICAL NEW WORK
PLAN - SECTOR A
L A
M A
R R
E E
S E
E L E
M E
N T
A R
Y S
C H
O O
L
H V
A C
P
L U
M B
IN
G
U P
G R
A D
E S
WBF
JA3
L ily P o n d R d A lb a n y G
A
1/8" = 1'-0"1 MECHANICAL NEW WORK PLAN - SECTOR A
1 . NEW ROOF MOUNTED HEAT PUMP MOUNTED ATOP EXISTING
ROOF CURB. PROVIDE ADAPTER CURB AS REQUIRED TO
TRANSITION FROM NEW UNIT CONNECTIONS TO EXISTING DUCT
LAYOUT. REINSTALL BIPOLAR IONIZATION UNIT REMOVED DURING
DEMOLITION. SEE BIPOLAR IONIZATION UNIT DETAIL.
2 . NEW CENTRIFUGAL EXHAUST FAN MOUNTED ATOP EXISTING
ROOF CURB. PROVIDE ADAPTER CURB AS REQUIRED TO MAKE
TRANSITION FROM NEW FAN CONNECTION TO EXISTING DUCT
DIMENSION.
3 . DUCTLESS HEAT PUMP MOUNTED ATOP EXISTING EQUIPMENT
SUPPORT PLATFORM ON ROOF. PROVIDE NEW CAP AT EXISTING
CURB AND NEW PIPE BOX FOR ROUTING OF PIPING AND CONDUIT.
SEE DUCTLESS HEAT PUMP CAP AT EXISTING CURB DETAIL.
4 . NEW CEILING MOUNTED CASSETTE TYPE DUCTLESS FAN COIL
UNIT. ROUTE CONDENSATE TO SAME LOCATION AS CASSETTE
REMOVED DURING DEMOLITION. REPAIR CEILING GRID / TILE
DAMAGED DURING DEMOLITION TO MATCH EXISTING.
REFRIGERANT PIPING ROUTED FROM FAN COIL UNIT UP THROUGH
PIPE BOX TO DUCTLESS HEAT PUMP ON ROOF.
5 . EXISTING RTAC, DUCTWORK, GRILLES, ETC. TO REMAIN. CLEAN
DUCTWORK IN ACCORDANCE WITH DUCT CLEANING SPEC.
6 . ROUTE LINE SIZE, SLOPED (1/4" PER FOOT), TRAPPED, PVC
CONDENSATE DRAIN PIPING FROM RTAC TO ROOF DRAIN AS
SHOWN. PROVIDE PIPE SUPPORTS ON MAXIMUM 6' CENTERS. SEE
CONDENSATE DRAIN TRAP DETAIL AND CONDENSATE PIPE
SUPPORT ON ROOF DETAIL.
7 . NEW HORIZONTAL DISCHARGE 100% OUTSIDE AIR UNIT MOUNTED
ATOP ROOF CURB. PROVIDE JOIST REINFORCEMENT AT JOISTS
BELOW NEW OUTSIDE AIR UNIT. SEE ROOF CURB DETAIL- CURB
ATOP EXISTING ROOF, AND JOIST REINFORCEMENT DETAIL.
8 . 16" X 16" 100% OUTSIDE AIR DUCT PENETRATES EXTERIOR WALL
AND CONTINUES TO ABOVE CLASSROOM CEILING. SEE SHEET
M103 SECTOR C FOR CONTINUATION. DUCTWORK ROUTED
OUTDOORS SHALL HAVE ONE LAYER OF 2" THICK ARMAFLEX
CLOSED CELL ELASTOMERIC INSULATION ON EXTERIOR OF DUCT.
COVER INSULATION WITH EMBOSSED ALUMINUM COVER. PROVIDE
AN ADDITIONAL SHEET METAL COVER OVER
DUCTWORK/INSULATION ASSEMBLY TO COMPLETELY ENCLOSE
DUCTWORK. SEE ROOF MOUNTED EXTERIOR METAL DUCT HOOD
DETAIL.
9 . CONDENSATE DRAIN CONTINUES TO ROOF DRAIN. SEE SHEET
M102 FOR CONTINUATION.
10 . NEW CONDENSATE DRAIN PIPING ROUTED TO SAME LOCATION AS
CONDENSATE DRAIN PIPE REMOVED DURING DEMOLITION. FIELD
VERIFY EXISTING PIPE ROUTING.
11 . REFRIGERANT PIPING ROUTED DOWN THRU PIPE BOX. SEE
DUCTLESS HEAT PUMP CAP AT EXISTING CURB DETAIL AND PIPE
BOX/HOOD ASSEMBLY DETAIL.
12 . DUCT MOUNTED SMOKE DETECTOR PROVIDED AND WIRED BY
ELECTRICAL. INSTALLED BY MECHANICAL.
No. Description Date
GENERAL NOTE: PROVIDE LINTEL AT ALL NEW DUCT PENETRATIONS
THRU EXISTING WALLS. SEE LINTEL DETAIL AT EXISTING WALL.
RTU-15
RTU-16
RTU-14
DHP-2
DFCU-2
DHP-4
DFCU-4
RTU-13
EF-27
EF-32
EF-30
EF-33
D D
D
D
D
D
D
D
CAFETERIA
SERVING
KITCHEN
OFFICE
JAN.
LAUNDRY
TLT.
132A
LOCKER
DRY STOR.
STOR.
MECH.
113A
MEN
115A
MECH.
100A
OFF.
STOR.
150A
STOR.
100C
ELECT.
100B
STOR.
112A
P.E. FACILITY
LIFT
122B
RTU-17
"ø
"ø
"ø
"ø
26"x32"
26"x32"
26"x32"
26"x32"
56"x30"
EF-31
CORRIDOR
WOMEN
115B
SF-1
DHP-5
DHP-6
DFCU-5
DFCU-6
TT
CC
TT
RTU-12
RTU-11
DAC-1
56"x30"
1 1/2" D
D
D
R
R(TYP)
D
R
R
1 1/2" D
S
S
S
D
D
R
D
PROJECT NUMBER:
DATE:
DRAWN BY:
CHECKED BY:
TITLE:
SUBJECT TO GENERAL
COPYRIGHT LAWS ©
REVISIONS
A B
C D
E
2021203
05/20/2022
GA DOE ID #: 0199
M102
MECHANICAL NEW WORK
PLAN - SECTOR B
L A
M A
R R
E E
S E
E L E
M E
N T
A R
Y S
C H
O O
L
H V
A C
P
L U
M B
IN
G
U P
G R
A D
E S
WBF
JA3
L ily P o n d R d A lb a n y G
A
1/8" = 1'-0"1 MECHANICAL NEW WORK PLAN - SECTOR B
NOTES: (THIS SHEET ONLY)
1 . NEW DUCTWORK OF INDICATED SIZE PENETRATES EXTERIOR
WALL AT EXISTING OPENING LOCATION. FIELD VERIFY EXACT
DIMENSIONS OF OPENING.
2 . NEW EXPOSED ROUND SPIRAL DUCTWORK CONNECTS TO
EXISTING DUCTWORK AT THIS APPROXIMATE LOCATION. PAINT
DUCTWORK, SUPPORTS, ETC. TO MATCH EXISTING.
3 . NEW ROOF MOUNTED HEAT PUMP MOUNTED ATOP EXISTING
ROOF CURB. PROVIDE ADAPTER CURB AS REQUIRED TO
TRANSITION FROM NEW UNIT CONNECTIONS TO EXISTING DUCT
LAYOUT. REINSTALL BIPOLAR IONIZATION UNIT REMOVED DURING
DEMOLITION. SEE BIPOLAR IONIZATION UNIT DETAIL.
4 . EXISTING ROOF DRAIN AT THIS APPROXIMATE LOCATION.
7 . DUCTLESS HEAT PUMP MOUNTED ATOP EXISTING EQUIPMENT
SUPPORT PLATFORM ON ROOF. PROVIDE NEW CAP AT EXISTING
CURB AND NEW PIPE BOX FOR ROUTING OF PIPING AND CONDUIT.
SEE DUCTLESS HEAT PUMP CAP AT EXISTING CURB DETAIL.
8 . CEILING MOUNTED CASSETTE TYPE DUCTLESS FAN COIL UNIT.
9 . NEW DUCTLESS HEAT PUMP MOUNTED ON EXISTING CONCRETE
EQUIPMENT PAD. SEE CONCRETE EQUIPMENT PAD DETAIL.
10 . ROUTE LINE SIZE, SLOPED (1/4" PER FOOT), TRAPPED, PVC
CONDENSATE DRAIN PIPING FROM RTAC TO ROOF DRAIN AS
SHOWN. BASIS OF DESIGN CONDENSATE DRAIN CONNECTION IS IN
A DIFFICULT TO ACCESS LOCATION, INSTALL TRAP IN AN
ACCESSIBLE LOCATION AS SHOWN. ENSURE DRAIN PIPING DOES
NOT BLOCK ACCESS PANELS. SEE CONDENSATE DRAIN TRAP
DETAIL AND CONDENSATE ROOF SUPPORT DETAIL.
11 . INSTALL CONDENSATE P-TRAP AT THIS LOCATION.
12 . ROUTE LINE SIZE, SLOPED (1/4" PER FOOT), TRAPPED, PVC
CONDENSATE DRAIN PIPING FROM RTAC TO ROOF DRAIN AS
SHOWN. SEE CONDENSATE DRAIN TRAP DETAIL AND
CONDENSATE ROOF SUPPORT DETAIL.
13 . DUCT PENETRATES EXTERIOR WALL 56" X 30", TRANSITIONS IN
ELBOW TO 56" X 16", RISES TO ABOVE BOTTOM OF STRUCTUAL
TRUSS AND IS ROUTED AS SHOWN. PROVIDE TRANSITIONS &
OFFSETS AS REQUIRED TO AVOID CONFLICTS WITH STRUCTURAL
MEMBERS.
14 . COORDINATE DUCT ROUTING WITH EXISTING STRUCTURAL
FRAMING AND BASKETBALL GOAL SUPPORTS.
15 . NEW DUCTLESS CASSETTE MOUNTED IN CEILING. MODIFY
EXISTING CEILING GRID AS REQUIRED TO INSTALL NEW DUCTLESS
FAN COIL UNIT. BLANK OFF SUPPLY LOUVER FACING KITCHEN
HOOD TO ENSURE DFCU AIRFLOW DOES NOT AFFECT KITCHEN
HOOD.
16 . NEW SUPPLY FAN MOUNTED ABOVE COOLER/FREEZER. FIELD
VERIFY EXISTING LOCATION, SUPPLY, & RETURN CONNECTIONS.
PROVIDE FITTINGS / TRANSITIONS AS REQUIRED TO MAKE A
SMOOTH TRANSITION FROM NEW FAN CONNECTIONS TO EXISTING
DUCTWORK.
17 . NEW DOOR AIR CURTAIN MOUNTED IN SAME LOCATION AS DOOR
AIR CURTAIN REMOVED DURING DEMOLITION. FIELD VERIFY
EXISTNG DOOR DIMENSIONS.
18 . NEW ROOF MOUNTED HEAT PUMP MOUNTED ON ROOF. PROVIDE
JOIST REINFORCEMENT AT BAR JOISTS BELOW RTU. SEE ROOF
CURB DETAIL - NEW CURB ON EXISTING ROOF AND JOIST
REINFORCEMENT DETAIL.
19 . NEW DUCTLESS HEAT PUMP MOUNTED ON NEW CONCRETE
EQUIPMENT PAD. SEE CONCRETE EQUIPMENT PAD DETAIL.
20 . EXTEND EXISTING CONCRETE EQUIPMENT PAD FOR NEW
DUCTLESS HEAT PUMPS. SEE CONCRETE EQUIPMENT PAD DETAIL.
FIELD VERIFY EXISTING FENCING HEIGHT AND DISTANCE FROM
BUILDING. MODIFY AMD EXTEND EXISTING FENCING AS SHOWN TO
INCLUDE NEW DUCTLESS HEAT PUMPS.
21 . DUCTWORK ROUTED EXPOSED ON ROOF. CAREFULLY
COORDINATE ROUTING WITH EXISTING PLUMBING VENT STACKS,
FLUES, ETC. DUCTWORK ROUTED OUTDOORS SHALL HAVE ONE
LAYER OF 2" THICK ARMAFLEX CLOSED CELL ELASTOMERIC
INSULATION ON EXTERIOR OF DUCT. COVER INSULATION WITH
EMBOSSED ALUMINUM COVER. PROVIDE NON-PENETRATING DUCT
SUPPORTS ON MAXIMUM 4' CENTERS TO SUPPORT DUCTWORK ON
ROOF. SEE NON-PENETRATING DUCT SUPPORT DETAIL. COVER
SUPPLY AND RETURN DUCT INDIVIDUALLY WITH SHEET METAL
COVERS. SEE ROOF MOUNTED EXTERIOR METAL DUCT HOOD
22 . REFRIGERANT PIPING RISES UP EXTERIOR WALL AND
PENETRATES BUILDING AT EXISTING PIPING PENETRATION
ELEVATION. PROVIDE COVER FOR REFRIGERANT PIPING AND
PAINT TO MATCH EXISTING BUILDING.
23 . CONDENSATE PIPE CONTINUES TO EXISTING CONDENSATE
TERMINATION. FIELD VERIFY EXACT LOCATION.
24 . NEW ROOF MOUNTED HEAT PUMP MOUNTED ATOP EXISTING
ROOF CURB. PROVIDE ADAPTER CURB AS REQUIRED TO
TRANSITION FROM NEW UNIT CONNECTIONS TO EXISTING DUCT
LAYOUT. COORDINATE DUCT CURB TO PREVENT INTERFERENCE
WITH ADJACENT ROOF SOFFIT & EXTERIOR WALL. REINSTALL
BIPOLAR IONIZATION UNIT REMOVED DURING DEMOLITION. SEE
BIPOLAR IONIZATION UNIT DETAIL.
25 . NEW CENTRIFUGAL EXHAUST FAN MOUNTED ATOP EXISTING
ROOF CURB. PROVIDE ADAPTER CURB AS REQUIRED TO MAKE
TRANSITION FROM NEW FAN CONNECTION TO EXISTING DUCT
DIMENSION.
26 . CAREFULLY COORDINATE ROOFTOP PLACEMENT TO MAINTAIN
MINIMUM 10' FROM OUTSIDE AIR INTAKE TO EXISTING WATER
HEATER FLUE.
27 . PROVIDE NON-PENETRATING KEEGUARD CONTRACTOR ROOFTOP
GUARDRAIL OR PRIOR APPROVED EQUAL AROUND EDGE OF
ROOFTOP UNIT TO ALLOW FOR MAINTENANCE.
28 . NEW CONDENSATE DRAIN PIPING ROUTED TO SAME LOCATION AS
CONDENSATE DRAIN PIPE REMOVED DURING DEMOLITION. FIELD
VERIFY EXISTING PIPE ROUTING.
29 . REFRIGERANT PIPING ROUTED DOWN THRU PIPE BOX. SEE
DUCTLESS HEAT PUMP CAP AT EXISTING CURB DETAIL AND PIPE
BOX/HOOD ASSEMBLY DETAIL.
30 . DUCT MOUNTED SMOKE DETECTOR PROVIDED AND WIRED BY
ELECTRICAL. INSTALLED BY MECHANICAL.
No. Description Date
TT
TT
TT
4 4 4 4
4 4
4 4
F.D./S.D.
F.D./S.D. F.D./S.D. F.D./S.D.
F.D./S.D.F.D./S.D.
F.D./S.D. F.D./S.D.
F.D./S.D.
F.D./S.D.
F.D./S.D. F.D./S.D.
WHHP-1
WHHP-2
WHHP-3
WHHP-4
WHHP-5
WHHP-6
WHHP-7
WHHP-8
WHHP-9
WHHP-10
WHHP-11
WHHP-12
WHHP-14
WHHP-15 WHHP-23
WHHP-24 WHHP-25
WHHP-26
WHHP-27
WHHP-28
WHHP-22
WHHP-21
WHHP-29
WHHP-20
WHHP-30
WHHP-19
WHHP-17
WHHP-16
WHHP-18
WHHP-31
WHHP-32
WHHP-33
WHHP-34
WHHP-35
EF-1 EF-2 EF-13 EF-14
EF-3
EF-4
EF-11 EF-12
EF-6EF-5
EF-8EF-7 EF-10 EF-9
EF-15 EF-16
EF-22
FCU-1
HP-1
EF-23
EF-17
EF-21 EF-20
FCU-2
EF-18
EF-19
EF-24
F.D.
F.D.
F.D.
F.D.
F.D.
F.D.
EF-34 EF-35 EF-36
ø6" ø6" ø6"ø6" ø6" ø6" ø6" ø6" ø6" ø6" ø6" ø6" ø6" ø6" ø6"
"x
"ø
"ø
"ø
"ø
"ø
"ø
"ø
"ø
"ø
"ø
"ø
"ø
"ø
"ø
"ø
"ø
"ø
"ø
"x
"ø
"ø
"ø
"ø
"ø
"ø
"ø
"ø
"ø
A2
A2
A2
A2
A2
A2
A1
A1
A1
A2
A2
A2
A2
A2
A2
A2
A2
A2
A2
A2
A2
A2
A2
A2
A2
A2
A2
A2
A2
A2
A2
A2
A2
A3
A3
A3
A3
A3
A3
A3
A3
A3
A3
A3
A3
A3
A3
A3
A3
A3
A3
A3
A3
A3
A3
A3
A3
A3
A3
A3
250 A3
A3
A3
A3
A3
A3
A3
A3
A3
A3
A3
A3
A3
14"x14" 8"x14"
10"ø 10"ø
10"ø 10"ø
14"x14" 8"x14"
10"ø 10"ø
10"ø 10"ø
14"x14" 8"x14"
10"ø 10"ø
10"ø 10"ø
14"x14" 8"x14"
10"ø 10"ø
10"ø 10"ø
14"x14" 8"x14"
10"ø 10"ø
10"ø 10"ø
14"x14" 8"x14"
10"ø 10"ø
10"ø 10"ø
10"ø 10"ø
10"ø 10"ø
14"x14"
8"x14"
30"x10"
10"ø 10"ø
10"ø 10"ø
14"x14"
8"x14"
30"x10"
10"ø 10"ø
10"ø 10"ø
14"x14"
8"x14"
30"x10"
10"ø 10"ø
10"ø 10"ø
14"x14"
8"x14"
30"x10" ø6" ø6" ø6" ø6"
8"ø
8"ø8"ø
8"ø
8"ø
8"ø
8"ø
8"ø
8"ø
WHHP-13
30"x10"
30"x10"
30"x10"
30"x10"
30"x10"
30"x10"
A3
A3
A3
A3
8"x14"
10"ø 10"ø
10"ø 10"ø
30"x10"
A3
A3
A3
A3
8"x14"
10"ø 10"ø
10"ø 10"ø
30"x10"
A3
A3
A3
A3
8"x14"
10"ø 10"ø
10"ø 10"ø
30"x10"
A3
A3
A3
A3
8"x14"
10"ø 10"ø
10"ø 10"ø
30"x10"
A3
A3
A3
A3
8"x14"
10"ø 10"ø
10"ø 10"ø
30"x10"
A3
A3
A3
A3
8"x14"
10"ø 10"ø
10"ø 10"ø
30"x10"
A3
A3
A3
A3
8"x14"
10"ø 10"ø
10"ø 10"ø
30"x10"
A3
A3
A3
A3
8"x14"
10"ø 10"ø
10"ø 10"ø
30"x10"
A3
275A3
A3
A3
8"x14"
10"ø 10"ø
10"ø 10"ø
30"x10"
A3
A3
A3
A3
8"x14"
10"ø 10"ø
10"ø 10"ø
30"x10"
A3
A3
A3
A3
8"x14"
10"ø 10"ø
10"ø 10"ø
30"x10"
A3
A3
A3
A3
10"ø 10"ø
10"ø 10"ø
14"x14"
8"x14"
30"x10"
A3
A3
A3
A3
10"ø 10"ø
10"ø 10"ø
14"x14"
8"x14"
30"x10"
A3
A3
A3
A3
10"ø 10"ø
10"ø 10"ø
14"x14"
8"x14"
30"x10"
A3
A3
A3
A3
10"ø 10"ø
10"ø 10"ø
14"x14"
8"x14"
30"x10"
A3
A3
A3
A3
10"ø 10"ø
10"ø 10"ø
14"x14"
8"x14"
30"x10"
A3
A3
A3
A3
10"ø 10"ø
10"ø 10"ø
14"x14"
8"x14"
30"x10"
A3
A3
A3
A3
10"ø 10"ø
10"ø 10"ø
14"x14"
8"x14"
30"x10"
A3
A3
A3
A3
10"ø 10"ø
10"ø 10"ø
14"x14"
8"x14"
30"x10"
A3
A3
A3
A3
10"ø 10"ø
10"ø 10"ø
14"x14"
8"x14"
30"x10"
14"x14"
14"x14"
14"x14"
14"x14"
14"x14"
14"x14"
14"x14"
14"x14"
14"x14"
8"ø 8"ø
8"ø 8"ø
C1
C1
C1
C1
C1
C1 C1
C1
C1
C1
C1
C1
C1
C1
C1
C1
C1
C1
C1
C1
C1
C1
C1
C1
C1 C1
C1
C1
C1
C1
8"ø
8"ø
8"ø 8"ø
8"ø
8"ø
8"ø 8"ø
8"ø 8"ø
"x
8"ø
28"x8" 12"x14"
8"x14" ø10" 10"ø
A3
A3
A1
10"ø
10"ø
A3
A3
10"ø
10"ø
10"ø
A3
A3
10"ø
28"x8"
14"x14"
28"x8"
14"x14"
10"ø
28"x8"
14"x14" 10"ø 10"ø
A3
A3
A3
A1
6"ø
6"ø
A1
6"ø
A1
A3
A3
A1
12"x14"
8"x14"
10"ø 10"ø
28"x8"
6"ø
A1
C1
C1
C1
C1
C1 ø6" ø6" ø6"
A3
A3
6"ø
6"ø
A1
6"ø
6"ø
A1
6"ø
A1
6"ø
6"ø
A1
A1
6"ø
A1
6"ø
6"ø A1
6"ø
A1
A1
6"ø
A1
6"ø
K-1 CLASSROOM
K-1 CLASSROOM
K-1 CLASSROOM
K-1 CLASSROOM
K-1 CLASSROOM
SPECIAL ED.
SPECIAL ED.
TITLE ONE
CLASSROOM
K-1 CLASSROOM
TLT.
205A
TLT.
205B
K-1 CLASSROOM
K-1 CLASSROOM
K-1 CLASSROOM
WORK ROOM
BOOK STOR.
2-3 CLASSROOM
2-3 CLASSROOM
TITLE ONE
CLASSROOM
TITLE ONE
CLASSROOM
2-3 CLASSROOM
2-3 CLASSROOM
4-5 CLASSROOM
4-5 CLASSROOM
4-5 CLASSROOM
4-5 CLASSROOM
SPECIAL EDUCATION
WORK RM.
410BOOK STOR.
SPECIAL EDUCATION
4-5 CLASSROOM
4-5 CLASSROOM
4-5 CLASSROOM
4-5 CLASSROOM
ELECT.
TLT.
210A
TLT.
210B
TLT.
211A
TLT.
209A
TLT.
213A
TLT.
213B
TLT.
214A
TLT.
214B
STOR.
TLT.
201A
TLT.
201B
TLT.
202A
TLT.
202B
2-3 CLASSROOM
2-3 CLASSROOM
2-3 CLASSROOM
2-3 CLASSROOM
GIRLS
306B
WORK RM.
BOOK STOR.
ELECT.
STOR.
BOYS
306A
TLT.
310B
TLT.
310A
JAN.
ELEC.
STOR.
TLT.
405C
TLT
405B
KITCHEN
405A
JAN.
TLT.
410A
TLT.
410B
GIRLS
406B
BOYS
406A
CORRIDOR
CORRIDOR
CORRIDOR
16"x16"
HP-2
MM MM MM MM
MM MM
MM
MM
MM MM
MM MM MM MM
CC MM MM
CC
MM
MM
MM MMCC
2 2
CC
TT TT
TTTT
TT
TT
TT
TT
TT
TT TT
TTTT
TTTT
TT TT
TTTT
TT
TTTT
TT
TT TT TT
TTTT
TT
TT
TTTT
TT TT
TT
10 10
16"x18"
6"ø
6"ø 6"ø
6"ø
8"ø
8"ø
8"ø 8"ø
6"ø
8"ø
8"ø
6"ø
6"ø A1
6"ø
A1
PROJECT NUMBER:
DATE:
DRAWN BY:
CHECKED BY:
TITLE:
SUBJECT TO GENERAL
COPYRIGHT LAWS ©
REVISIONS
A B
C D
E
2021203
05/20/2022
GA DOE ID #: 0199
M103
MECHANICAL NEW WORK
PLAN - SECTORS C, D, & E
L A
M A
R R
E E
S E
E L E
M E
N T
A R
Y S
C H
O O
L
H V
A C
P
L U
M B
IN
G
U P
G R
A D
E S
WBF
JA3
L ily P o n d R d A lb a n y G
A
NOTES: (THIS SHEET ONLY)
1/8" = 1'-0"1 MECHANICAL NEW WORK PLAN - SECTORS C, D, & E
1 . NEW WALL HUNG HEAT PUMP MOUNTED IN SAME LOCATION AS
REMOVED WALL HUNG HEAT PUMP. PROVIDE CURB ADAPTER AS
REQUIRED FOR NEW INSTALLATION OF WHHP. SEE WALL HUNG
HEAT PUMP DUCTED DETAIL.
2 . DUCT ROUTED OVER FIRE RATED MEZZANINE. NO FIRE DAMPER
REQUIRED. DO NOT PENETRATE CORRIDIR FIRE RATED WALL.
3 . 6"Ø DUCT ROUTED OVER FIRE RATED MEZZANINE. DUCT ELBOWS
DOWN AND PENETRATES FIRE RATED MEZZANINE FOR
CONNECTION TO INDICATED GRILLE. PROVIDE FIRE DAMPER AT
DUCT PENETRATION OF RATED MEZZANINE. PROVIDE APPROX. 1'
OF FLEX DUCT AT DUCT CONNECTION TO GRILLE.
4 . NEW CEILING MOUNTED EXHAUST FAN. PROVIDE FLEX DUCT OF
SIZE INDICATED TO CONNECT TO EXISTING DUCTWORK. PROVIDE
FITTINGS/OFFSETS AS REQUIRED TO MAKE CONNECTION.
5 . NEW PROPELLER EXHAUST FAN MOUNTED IN ATTIC IN SAME
LOCATION AS FAN REMOVED DURING DEMOLITION.
6 . NEW ROOF MOUNTED CENTRIFUGAL EXHAUST FAN CONNECTS TO
EXISTING DUCTWORK OF SIZE INDICATED. PROVIDE FITTINGS AND
OFFSETS AS REQUIRED TO MAKE CONNECTION.
7 . NEW HORIZONTAL FAN COIL UNIT MOUNTED IN MEZZANINE SAME
LOCATION AS FAN COIL UNIT REMOVED DURING DEMOLITION.
PROVIDE DUCT TRANSITIONS/OFFSETS AS REQUIRED TO
CONNECT NEW FCU TO EXISTING DUCTWORK. ROUTE
REFRIGERANT AND CONDENSATE PIPING TO SAME LOCATION AS
REMOVED FCU.
8 . NEW HEAT PUMP MOUNTED EXISTING CONCRETE PAD. EXTEND
PAD AS REQUIRED TO MAINTAIN MINIMUM 6" BETWEEN HEAT PUMP
AND EDGE OF PAD.
9 . 100% OUTSIDE AIR DUCT ROUTED ABOVE CEILING IN ATTIC.
10 . REFRIGERANT PIPING ROUTED UP EXTERIOR WALL IN NEW
PAINT-GRIP SHEET METAL PIPE CHASE. PAINT TO MATCH EXISTING
COLOR. FIELD VERIFY EXACT LOCATION OF EXISTING PIPE CHASE.
REFRIGERANT PIPING ROUTED TO ASSOCATED FAN COIL UNIT.
FIELD VERIFY EXACT ROUTING OF EXISTING PIPING.
NOTES: (THIS SHEET ONLY - CONTINUED)
No. Description Date
MAIN ROUND TRUNK DUCT
DUCT WRAP INSULATION FOR
SUPPLY AND RETURN DUCT
OPENING IN SIDE OF RECTANGULAR SHEET METAL
DUCT SHALL BE CUT WITH DRILL-CUTTER OR TIN
SNIPS. DIAMETER OF OPENING SHALL MATCH INNER
DIAMETER OF FOAM GASKET OR DIAMETER
RECOMMENDED BY TAKEOFF MANUFACTURER
DUCT
DUCT MASTICSHEET METAL SCREWS ON 6" CENTERS
FOAM GASKET
EXTERIOR VAPOR BARRIER (ONLY) SECURED
TO FITTING WITH NYLON "ZIP STRIP" BAND
SECURE INNER DUCT TO FITTING WITH NYLON
ZIP STRIP BAND IN ADDITION TO NYLON
STRIPBAND. SEAL INNER CORE TO DUCT.
FLEXIBLE DUCTWORK
90° SADDLE TAKEOFF COLLAR DAMPER AND THERMA-SEAL
GASKET FLANGE AND DAMPER HANDLE STANDOFF, SIMILAR TO
CROWN PRODUCT MODEL #314-DSO
FOR SUPPLY/RETURN DUCTS, INSULATE ENTIRE FITTING (EXCEPT OPERATOR
HANDLE) WITH DUCT WRAP SEALED WITH VAPOR PROOF MASTIC AND FABRIC
CLTOH TO FLEX DUCT VAPOR BARRIER (NOT SHOWN FOR CLARITY)
CEILING, BY ARCHITECTURAL
SQUARE TO ROUND TRANSITION (WHERE ELBOW CONNECTS TO SQUARE
NECK DIFFUSERS). PROVIDE ROUND TO ROUND TRANSITION WHERE GRILLE
NECK SIZE DIFFERS FROM CONNECTING DUCT SIZE (EITHER LARGER OR
SMALLER). INSULATE ON SUPPLY DUCTS.
3 GORE ADJUSTABLE ELBOW. INSULATE
ON SUPPLY DUCTS.
NYLON ZIP STRIP ON OUTER VAPOR BARRIER.
ENSURE INSULATION IS PULLED DOWN WITH
VAPOR BARRIER SO NO DUCTWORK IS
UNINSULATED.
NOTE: DETAIL IS TYPICAL FOR ALL FLEX DUCT RUNOUTS TO DIFFUSERS
STAINLESS STEEL DRAWBAND
ON INNER DUCT
FLEX DUCT
INSULATION BLANKET ON TOP
OF SUPPLY DIFFUSERS
CEILING DIFFUSER
J
POWER WIRING AND CONDUIT BY ELECTRICAL
PROVIDE "KNOCK OUT" AND GROMMET
FOR POWER CABLE
EXISTING ROOF CURB.
POWER CABLE BY ELECTRICAL
REMOVABLE ACCESS COVER FOR MOTOR
COMPARTMENT
INTERNAL FACTORY INSTALLED NEMA-1 DISCONNECT
SWITCH UNLESS SCHEDULED OTHERWISE
SEE SCHEDULE FOR DRIVE TYPE. (PROVIDE
ADJUSTABLE SHEAVE FOR ALL BELT DRIVE)
FACTORY WIRED FROM MOTOR TO
DISCONNECT SWITCH.
EXHAUST FAN
EXISTING EXHAUST DUCT UP FROM
BELOW
FACTORY INSTALLED, MINIMUM 1/2"
DIA. CONDUIT CHASE
J
POWER WIRING AND CONDUIT BY ELECTRICAL
EXISTING ROOF CURB.
POWER CABLE BY ELECTRICAL
REMOVABLE ACCESS COVER FOR MOTOR
COMPARTMENT
INTERNAL FACTORY INSTALLED NEMA-1 DISCONNECT
SWITCH UNLESS SCHEDULED OTHERWISE
SEE SCHEDULE FOR DRIVE TYPE.
FACTORY WIRED FROM MOTOR TO
DISCONNECT SWITCH.
UPBLAST EXHAUST FAN
EXISTING EXHAUST DUCT UP FROM
BELOW
FACTORY INSTALLED, MINIMUM 1/2"
DIA. CONDUIT CHASE GALVANIZED BIRD SCREEN
SECURE CURB CAP TO CURB WITH ANCHORS ON
MAXIMUM 12" CENTERS (MINIMUM 2 ANCHORS
EACH SIDE)
GRADE
WELDED WIRE MESH
AT MID DEPTH OF SLAB
6" X 6" 10/10 WWF
3000 PSI CONCRETE
1" CHAMFER
SEE SPECIFICATIONS FOR
PAD HEIGHT ABOVE
ADJACENT GRADE
2" MINIMUM
EXTERIOR CONCRETE PAD
FLOOR
1" CHAMFER
ANCHOR (TYPICAL OF 4)
INTERIOR CONCRETE PAD
WELDED WIRE MESH
AT MID DEPTH OF SLAB
6" X 6" 10/10 WWF
SEE SPECIFICATIONS FOR
PAD HEIGHT ABOVE
ADJACENT GRADE
2"
3000 PSI CONCRETE
1½"
3"
UNION
AC UNIT
DRAIN CONNECTION
DRAIN PIPE SHALL BE AT LEAST
THE SAME DIAMETER AS THE NIPPLE
ON THE DRAIN PAN CONNECTION
OPEN END NIPPLE
SEE DRAWINGS FOR
PIPE REQUIRED MATERIAL
SLOPE AS REQUIRED
IN SPECIFICATIONS
PIPE NIPPLE
6"
FRONT VIEW
4"
SIDE VIEW
V A
R
IE
S
CONDENSATE PIPE,
VERIFY SIZE (TYP)
UV - STABILIZED, EDPM ADJUSTABLE RUBBER PIPE
SUPPORT, VERIFY PIPE DIAMETER BEING SUPPORTED.
SPACED ON MAXIMUM 8 FT. CENTERS AND 24" OF
FITTINGS (ERICO CADDY PYRAMID RPSE - TYPICAL)
INSTALL CONDENSATE PIPE AT THE LOWEST
POSSIBLE ELEVATION TO REDUCE TOP
HEAVY PIPE AND TO REDUCE TIPPING OVER
BUT TO MAINTAIN SPECIFIED SLOPE.
GENERAL: THIS CONDENSATE SUPPORT SHALL BE USED WITH DRAIN ELEVATIONS ABOVE ROOF OF 7" OR LESS. CONDENSATE ELEVATIONS ABOVE 8" SHALL USE ERICO CADDY PYRAMID ST ADJUSTABLE
STRUT SUPPORT OR EQUAL BY MIRO.
OPENING IN SIDE OF RECTANGULAR
SHEET METAL DUCT SHALL BE CUT
WITH DRILL CUTTER (NOT TIN SNIPS).
DIAMETER OF OPENING SHALL MATCH
INNER DIAMTER OF FOAM GASKET.
DUCT
DUCT MASTIC
FOAM GASKET
SHEET METAL SCREWS
ON 4" CENTERSDUCT
2 3/16" DUCT WRAP INSULATION FOR SUPPLY DUCT
EXTERIOR VAPOR BARRIER (ONLY) SECURED TO
FITTING WITH NYLON "ZIP-STRIP" BAND
FLEXIBLE DUCTWORK
BELLMOUTH OR 45° FITTING WITH DAMPER
FOR SUPPLY DUCTS, INSULATE ENTIRE FITTING (EXCEPT OPERATOR HANDLE)
WITH 2 3/16" DUCTWRAP SEALED WITH VAPOR PROOF MASTIC AND FABRIC
CLOTH TO FLEX DUCT VAPOR BARRIER (NOT SHOWN FOR CLARITY)
PROVIDE OPTIONAL EXTENDED NECK SHAFT
FOR INSULATED DUCTS TO CLEAR INSULATION THICKNESS
SECURE INNER DUCT TO FITTING WITH 1/2" STAINLESS STEEL
DRAW BAND. CONTRACTOR SHALL NOT UTILIZE NYLON "ZIP-
STRIP" BAND TO SECURE INNER DUCT TO FITTING.
DIA. -",
(SEE PLANS)
3"
DIM. + ?"
DIM. + ?"
3"
PAINT INTERIOR OF BOX MATTE BLACK.1
2 MINIMUM 26 GAUGE GALV. SHEET METAL.
4 ADAPTER MAY BE FABRICATED BY CONTRACTOR OR PROVIDED BY CROWN
PRODUCTS MODEL #666 ADAPTER OR EQUAL.
PROVIDE 1/2" DUCT LINER ON RETURN DUCT
APPLICATIONS AND NO LINER ON EXHAUST APPLICATION.
NOTES: (THIS DETAIL ONLY)
AIR
NOTE: SINGLE BI-POLAR IONIZATION UNIT SHOWN. INSTALLATION SIMILAR WHEN
MULTIPLE UNITS ARE INSTALLED IN ONE HVAC UNIT, EXCEPT 24V WIRING FROM
HVAC UNIT'S TERMINAL SIDE SHALL FEED CONTRACTOR FURNISHED TERMINAL
STRIP, WHICH SHALL THEN FEED POWER TO MULTIPLE UNITS. CONTRACTOR
FURNISHED TERMINAL STRIP SHALL BE ELECTRICALLY ISOLATED FROM THE HVAC
UNIT CASING AND ALL OTHER METAL COMPONENTS.
SECURE WITH SCREWS IN LOCATION THAT
WILL NOT DAMAGE HVAC EQUIPMENT OR
ASSOCIATED REFRIGERANT PIPE, WIRING
OR OTHER COMPONENTS
NEEDLEPOINT ELECTRODES. ENSURE UNIT IS
ORIENTED AND INSTALLED SO THAT AIR FLOW
PASSES BETWEEN ELECTRODES (INSTALL
PERPENDICULAR TO AIRFLOW). MAINTAIN
MANUFACTURER'S DISTANCE FROM NEEDLES
TO METAL SURFACE TO PREVENT ARCING.
FACTORY
FURNISHED
24VAC WIRING
BI-POLAR UNIT. SEE SCHEDULE FOR QUANTITY.
SEE ENLARGED DRAWING BELOW.
LED CONFIRMING IONIZATION OPERATION
B.A.S. CONTACTS TO ALLOW OWNER TO MONITOR STATUS.
MONITORING IS NOT INCLUDED IN THIS PROJECT.
BI-POLAR IONIZATION UNIT MOUNTED INSIDE UNIT DOWNSTREAM OF
FILTER IN SUPPLY AIRSTREAM IN LOCATION APPROVED BY HVAC
EQUIPMENT MANUFACTURER AND BI-POLAR MANUFACTURER
(FAN)
(24V POWER)
G
R
Y W
C
O
CONNECT TO FAN AND 24V POWER TERMINALS ON 24 VAC
TERMINAL STRIP IN HVAC EQUIPMENT. ADDITIONAL GENERIC
TERMINALS ARE SHOWN FOR SYMBOLIC PURPOSES AND
ACTUAL TERMINALS WILL VARY BASED ON TYPE OF
EQUIPMENT.
PROVIDE ADDITIONAL WIRING (AS REQUIRED) IF FACTORY FURNISHED
WIRING WILL NOT REACH 24VAC TERMINAL STRIP. PROVIDE WIRE NUTS
AND ELECTRICAL TAPE AT JOINT. MATCH WIRE GAUGE OF
MANUFACTURER'S WIRING.
PROJECT NUMBER:
DATE:
DRAWN BY:
CHECKED BY:
TITLE:
SUBJECT TO GENERAL
COPYRIGHT LAWS ©
REVISIONS
2021203
05/20/2022
GA DOE ID #: 0199
M501
MECHANICAL DETAILS
L A
M A
R R
E E
S E
E L E
M E
N T
A R
Y S
C H
O O
L
H V
A C
P
L U
M B
IN
G
U P
G R
A D
E S
WBF
JA3
L ily P o n d R d A lb a n y G
A
NOT TO SCALE
90° SADDLE TAP TAKEOFF FITTING DETAIL
NOT TO SCALE
CEILING GRILLE DUCT CONNECTION DETAIL
NOT TO SCALE
CENTRIFUGAL DOWN BLAST EXHAUST FAN DETAIL
NOT TO SCALE
CENTRIFUGAL UPBLAST EXHAUST FAN DETAIL (CHECK)
NOT TO SCALE
CONCRETE EQUIPMENT PAD DETAIL
NOT TO SCALE
CONDENSATE DRAIN TRAP DETAIL
NOT TO SCALE
CONDENSATE PIPE SUPPORT ON ROOF DETAIL
NOT TO SCALE
BELLMOUTH AND 45° TAKEOFF FITTING DETAIL1
NOT TO SCALE
RECTANGULAR TO ROUND FLAT ADAPTER
No. Description Date
NOT TO SCALE
COMPACT BI-POLAR IONIZATION UNIT DETAIL
PROVIDE INSULATED HOUSING WHERE SCHEDULED
DUCT
AIRFLOW
PARALLEL BLADE BACKDRAFT DAMPER
SQUARE ACCESS PANEL FOR DAMPER ACTUATOR ACCESS
ACCESS PANEL (BOTH SIDES)
MOUNTING BRACKETS (TYP)
HANGING VIBRATION ISOLATORS. SEE SPECS FOR TYPE.
THREADED ROD
SUPPLEMENTAL ANGLE IRON FRAMING
DOUBLE NUTS
DOUBLE NUTS
DUCT
MOTOR. SEE SPECS FOR TYPE.
NOTE: BELT DRIVE FAN SIMILAR, EXCEPT MOTOR
OUTISDE OF FAN CASING, AND WITH INSULATED
MOTOR COVER WHERE SPECIFIED.
DUCT MOUNTING COLLAR (TYP INLET AND OUTLET). PROVIDE
1/2" X 1/2" WELDED WIRE GALVANIZED INLET GUARD FOR
NON-DUCTED INLET APPLICATIONS AS SCHEDULED.
MAINTAIN MINIMUM 2.5 TIMES WHERE DIAMETER STRAIGHT
DUCT LENGTH AT INLET AND OUTLET OF FAN BEFORE
ELBOW, TRANSITION, DAMPER, ETC.
PROVIDE MOTORIZED DAMPER WITH INTERNAL ACTUATOR WHERE
SCHEDULED. DAMPER VOLTAGE SHALL MATCH FAN VOLTAGE.
FLEXIBLE DUCT
CONNECTION (TYP)
GALVANIZED MOTOR COVER
WHERE SCHEDULED
BACKWARD
INCLINED WHEEL
MAINTAIN MINIMUM 2.5 TIMES
WHEEL DIAMETER STRAIGHT
DUCT LENGTH AT INLET AND
OUTLET OF FAN BEFORE ELBOW,
TRANSITION, DAMPER, ETC.
FACTORY INSTALLED NEMA-1
DISCONNECT SWITCH
FACTORY WIRED FROM MOTOR
TO DISCONNECT SWITCH
WELD SIDE ANGLE CLIP TO PAN (TYP OF 4)
TO CORNERS. SUSPEND WITH 3/8"
THREADED ROD. DO NOT BLOCK ACCESS
TO CONTROLLER.
PAN SHALL BE MIN. 18 GAUGE
GALVANIZED STEEL
2"
3/4" NIPPLE WELDED
TO PAN
PIPE 3/4" PAN DRAIN TO SAME
LOCATION AS PRIMARY DRAIN.
SLOPE PAN TO THIS SIDE.
FABRICATE DRAIN PAN MINIMUM
12" LONGER AND WIDER THAN
MAIN/SUB CONTROLLER
FABRICATE DRAIN PAN MINIMUM
12" LONGER AND WIDER THAN
MAIN/SUB CONTROLLER
CAULK AROUND FULL PERIMETER OF ANGLE
EACH SIDE OF WALL.
3" X 3", 22 GAUGE SHEET METAL ANGLE
AROUND PERIMETER OF DUCT EACH SIDE
OF WALL. ANCHOR TO WALL WITH
EXPANSION ANCHOR.
DUCT WRAP INSULATION WITH FSK JACKET.
INSULATION IS CONTINUOUS THROUGH WALL
OPENING.
ELEVATION SECTION
NOTE: DETAIL IS SIMILAR FOR UNINSULATED DUCTS.
SEAL WITH VAPOR PROOF MASITC AND CLOTH FABRIC
OVERLAPPING ANGLE AND DUCT WRAP FSK JACKET TO
PREVENT PASSAGE OF SMOKE.
CAULK AROUND FULL PERIMETER OF ANGLE
EACH SIDE OF WALL.
3" X 3", 22 GAUGE SHEET METAL ANGLE AROUND
PERIMETER OF DUCT EACH SIDE OF WALL.
ANCHOR TO WALL WITH EXPANSION ANCHOR.
DUCT WRAP INSULATION WITH FSK JACKET.
INSULATION IS CONTINUOUS THROUGH
WALL OPENING.
SEAL WITH VAPOR PROOF MASTIC AND CLOTH FABRIC
OVERLAPPING ANGLE AND DUCT WRAP FSK JACKET
TO PREVENT PASSAGE OF SMOKE.
S T
Y
LE
A
S T
Y
LE
B
S T
Y
LE
C
2" MAX.
1" 1"
FOLDING BLADE STATIC RATED FIRE DAMPER
IN TYPE 'B' FRAME (EXCEPT TYPE 'A' SHALL BE
USED AT SIDEWALL REGISTERS AND NON-DUCTED
TRANSFER OPENING). DYNAMIC RATED DAMPERS
SHALL BE USED WHERE SPECIFICALLY SHOWN
ON DRAWINGS
ATTACH FIRE DAMPER TO SLEEVE IN
ACCORDANCE WITH MANUFACTUER'S
UL INSTALLATION INSTRUCTIONSFACTORY FURNISHED ROUND OR OVAL
TRANSITION WITH BLADE STACK OUT
OF AIR STREAM
ROUND AND OVAL FIRE DAMPER
INSTALLATION SIMILAR
DUCT (WHERE APPLICABLE)
SLEEVE LENGTH SHALL BE DETERMINED BY CONTRACTOR TO
BE WITHIN MINIMUM AND MAXIMUM DISTANCE FROM
WALL/FLOOR AS REQUIRED BY MANUFACTUER
NOTE: INSTALLATION SHALL CONFORM TO THE FIRE
DAMPERS MANUFACTURER'S "UL" INSTALLATION
INSTRUCTIONS
WALL OR FLOOR. CONTRACTOR SHALL VERIFY
THICKNESS RATING, AND MATERIAL OF
CONSTRUCTION FROM ARCHITECTURAL DRAWINGS,
AND USE THIS INFORMATION TO SELECT FIRE
DAMPER AND FIRE DAMPER ACCESSORIES.
PROVIDE MINIMUM OVERLAP ALL AROUND AS REQUIRED BY
MANUFACTURER'S UL INSTALLATION INSTRUCTIONS
CLEARANCE (TYPICAL) AS REQUIRED BY MANUFACTURER'S
UL INSTALLATION INSTRUCTIONS
165° FUSIBLE LINK
DUCT TO SLEEVE CONNECTION SHALL BE AN APPROVED
TYPE AS LISTED IN THE MANUFACTURER'S UL INSTALLATION
INSTRUCTIONS. PROVIDE DUCT SEALANT APPROVED BY
FIRE DAMPER MANUFACTURER.
PROVIDE ACCESS PANEL FOR RECTANGULAR DUCTS. FOR ROUND DUCTS,
DOOR SIZE SHALL BE AS NOTED IN SPECIFICATIONS. FOR FLOOR
PENETRATIONS ACCESS PANEL SHALL BE ABOVE FLOOR.
FACTORY PROVIDED SLEEVE. SLEEVE LENGTH AND GAUGE SHALL
BE DETERMINED BY CONTRACTOR IN ACCORDANCE WITH
MANUFACTURER'S UL INSTALLATION INSTRUCTIONS.
FACTORY PROVIDED RETAINING ANGLES. ANGLE SIZE AND GAUGE
SHALL BE DETERMINED BY CONTRACTOR IN ACCORDANCE WITH
MANUFACTURER'S UL INSTALLATION INSTRUCTIONS.
INSIDE
UNINSULATED REFRIGERANT LIQUID PIPE
REFRIGERANT PIPE DROPS
IN WALL AS REQUIRED
INSULATED REFRIGERANT
SUCTION PIPE
20 GAUGE GALVANIZED
STEEL SHEET METAL SLEEVE
TERMINATE SLEEVE
FLUSH WITH WALL
OUTSIDE
PIPE PENETRATES WALL
NEAR GRADE LEVEL
EXTERIOR PAINTABLE SILICON CAULK.
PAINT TO MATCH EXTERIOR. EXTERIOR WALL. SEE ARCHITECTURAL PLANS
FOR CONSTRUCTION
FIRE RESISTANT FOAM OF APPROPRIATE
THICKNESS TO MAINTAIN WALL'S FIRE RATING
(1" MINIMUM THICKNESS)
LIGHT
RETURN
DUCT
22 GAUGE PAINT GALV GRIP GALVANIZED FLASHING. PAINT
FLASHING TO MATCH WHHP COLOR. FLASHING SHALL EXTEND
UP 4". CAULK AND SEAL WATERTIGHT AT FLASHING OVERLAP
FLASHING OVER WHHP'S INTEGRAL VERTICAL FLASHING.
WALL HUNG HEAT PUMP (WHHP)
INTEGRAL SLOPED TOP
WALL HUNG HEAT PUMP MOUNTED TO WALL CURB PER
MANUFACTURER'S INSTALLATION INSTRUCTIONS.
EXTERIOR WALL.
INTEGRAL DISCONNECT SWITCH
INTEGRAL VINYL DRAIN TUBING BY EQUIPMENT
MANUFACTURER. PVC TUBING SHALL BE
INSERTED INTO VINYL TUBING
STAINLESS STEEL HOSE CLAMP
3/4" PAINTED SCHEDULE 80 PVC DRAIN PIPE
PIPE CLAMP SECURED TO WALL
ON MAX 18" CENTERS
HEAVY DUTY STEEL RETURN GRILLE.
CONDENSATE LINE DOWN WALL TO GRADE. AT
GRADE, ELBOW PIPE AWAY FROM BUILDING
ROUTE DUCT HARD AGAINST
WALL AS POSSIBLE.
PROVIDE 1" LINER FROM UNIT CONNECTION
THRU BOTH ELBOWS. REMAINDER OF SUPPLY
DUCT SHALL BE EXTERNALLY INSULATED WITH
R-8 DUCT WRAP.
MOUNTING HEIGHT OF WHHP UNIT ABOVE GRADE / FINISHED
FLOOR VARIES. MAINTAIN MINIMUM 12" FROM BOTTOM OF
WHHP TO GRADE.
SEE
INSERT
ROUTE DUCT HARD AGAINST
WALL AS POSSIBLE.
WALL CURB TO ALLOW INSTALLATION OF NEW
WHHP IN SAME LOCATION AS EXISTING WHHP.
CAULK FULL LENGTH, BOTH SIDES AND TOP OF
UNIT. COLOR SHALL MATCH EXTERIOR WALL.
1" DUCT LINER INSIDE ALL RETURN DUCT.
PROVIDE CLOSED CELL EPDM ADHESIVE BACKED WEATHER
STRIPPING AROUND FULL PERIMETER OF UNIT PRIOR TO
MOUNTING AGAINST WALL TO SERVE AS INSECT AND
INFILTRATION BARRIER.
FILTER ACCESS PANEL
INTERNALLY MOUNTED BI-POLAR
IONIZATION UNIT
8" A.F.F. TO B.E. GRILLE
SOUND TRAP ELBOW
MAINTAIN DUCT WIDTH BUT REDUCE DEPTH
IN DROP WITH SIZE INDICATED ON PLANS.
BRICK AND BLOCK WALL
FILTER IN INTEGRAL FILTER RACK
3" X 3" X 1/4" STRUCTURAL ANGLE. PAINT EXPOSED ANGLE
WITH TWO COATS OF PANT TO MATCH BUILDING COLOR
NEW ARCHITECTURAL CHASE TO CONCEAL DUCT.
SEE ARCH DRAWINGS FOR DETAILS.
SUPPLY DUCTWORK
STEEL BAR JOIST
EXISTING INSULATION BATTS
ON CEILING.
T
DDC SUPPLY AIR
TEMPERATURE SENSOR.
CEILING
TRANSITION AS
SHOWN ON PLAN
ELECTRIC HEAT
SUPPLY
DUCT
DUCT SUPPORT KIT SHALL BE MIRO OR ERICO
SECURE DUCT TO UNISTRUT
WITH GALVANIZED SCREWS.
SEAL WATERTIGHT.
SEE PLANS FOR SIZES
ADJUSTABLE
HORIZONTAL STRUT
DUCT. SEE PLANS
FOR SIZES.
ROOFROOF
ISOMETRIC VIEW
M
IN
V A
R
IE
S
1 5/8" X 1 5/8" HOT
DIPPED GALVANIZED
UNISTRUT
16 X 18 POLYCARBONATE
BASE (TYP)
PROVIDE EXTRA EPDM OR
TPO PAD UNDER FEET OF
STANDS (TYP)
SUPPLY DUCT
INSIDE
OUTSIDE
(NOTE: SUPPLY DUCT SHOWN. RETURN DUCT IS SIMILAR)
ROOF
NON-PENETRATING DUCT
SUPPORT. SEE NON-PENETRATING
DUCT SUPPORT DETAIL.
SEE PLANS FOR DUCT SIZES
4" X 4", 22 GAUGE GALV-GRIP SHEET METAL
ANGLE AROUND FULL PERIMETER OF DUCT INSIDE.
PAINT TO MATCH EXISTING WALL COLOR.
DUCT INSIDE
CAULK PERIMETER OF DUCT
EXTERIOR DUCT SHALL BE PAINT GRIP SHEET METAL. ALL DUCTWORK,
JOINTS AND SEAMS SHALL BE TAPED OFF AND SEALED NEATLY AND
WATERTIGHT, THEN THE TAPE SHALL BE REMOVED. PAINT EXTERIOR
DUCTWORK WITH 2 COATS OF PAINT. VERIFY COLOR WITH OWNER.
22 GAUGE METAL COUNTER FLASHING FULL
WIDTH OF DUCT ANCHORED TO RTAC AND
OVERLAPPING FLANGE OF COVER
RTU / OAU
CAULK FULL WIDTH
CAULK FULL WIDTH OF FLANGE
TURN CONNECTING DUCT UPWARD WITH 2"
FLANGE ON RTAC CONNECTION. CAULK FULL
PERIMETER OF DUCT.
INTERIOR 2" THICK ARMACELL CLOSED CELL
ELASTOMERIC INSULATION. FIBERGLASS
INTERNAL DUCT LINER IS NOT ALLOWED ON THE
INTERIOR OF DUCT.
NOTE: THE DUCT ROUTING SHOWN BETWEEN THE RTAC AND THE EXTERIOR WALL IS
SYMBOLIC IN THIS DETAIL AND DOES NOT INTEND TO INDICATE ALL ELBOWS, TRANSITIONS,
OFFSETS, ETC. SEE FLOOR PLANS FOR ACTUAL ROUTING.
GROUT
1" ABOVE FLOOR; FLUSH FOR WALLS
SCHEDULE 10 (MINIMUM)
STEEL PIPE
CONDUIT OR PIPING
PIPING INSULATION AS SPECIFIED.
PIPE INSULATION SHALL BE CONTINUOUS
THRU PENETRATION.
SEAL BETWEEN SLEEVE AND PIPING WITH FIRE RESISTANT
SEALANT OF SUFFICIENT THICKNESS TO MAINTAIN WALL'S
OR FLOOR FIRE RATING (1" MINIMUM THICKNESS). IF WALL
IS NOT FIRE RATED, PROVIDE CAULKING IN LIEU OF FIRE
RESISTANT SEALANT. SEALANT IS ONLY REQUIRED ON
ONE SIDE OF WALL, UNLESS REQUIRED BY MANUFACTURER
ON BOTH SIDES.
FIBERGLASS BATTS PACKED BETWEEN SLEEVE
AND PIPE (OR PIPE INSULATION ON INSULATED PIPE)
WALL OR FLOOR. CONTRACTOR SHALL VERIFY
CONSTRUCTION TYPE (MASONRY, CONCRETE,
BRICK AND CMU, ETC.) AND THICKNESS.
PROJECT NUMBER:
DATE:
DRAWN BY:
CHECKED BY:
TITLE:
SUBJECT TO GENERAL
COPYRIGHT LAWS ©
REVISIONS
2021203
05/20/2022
GA DOE ID #: 0199
M502
MECHANICAL DETAILS
L A
M A
R R
E E
S E
E L E
M E
N T
A R
Y S
C H
O O
L
H V
A C
P
L U
M B
IN
G
U P
G R
A D
E S
WBF
JA3
L ily P o n d R d A lb a n y G
A
NOT TO SCALE
CENTRIFUGAL INLINE FAN DETAIL
NOT TO SCALE
CONDENSATE AUXILIARY DRAIN PAN DETAIL
NOT TO SCALE
DUCT PENETRATION THRU WALL DETAIL
NOT TO SCALE
FIRE DAMPER DETAIL
NOT TO SCALE
PIPE SLEEVE DETAIL - REFRIGERANT PIPE THRU EXTERIOR WALL
NOT TO SCALE
WALL HUNG AIR CONDITIONER - DUCTED SUPPLY DETAIL
NOT TO SCALE
NON-PENETRATING DUCT SUPPORT ON ROOF DETAIL
NOT TO SCALE
RTAC EXTERIOR DUCT DETAIL
NOT TO SCALE
PIPE SLEEVE DETAIL
EXISTING ROOF
RE-WORK ROOFING FOR INSTALLATION
OF NEW ROOF CURB IN ACCORDANCE WITH
ROOF MANUFACTURER'S BOND REQUIREMENTS.
C U
R B
H E
IG
H
T
EQUIPMENT
GASKET SEALER
PRESSURE
TREATED
WOOD NAILER
RIGID INSULATION
METAL ROOF CURB
LAG BOLT
PRESSURE TREATED BLOCKING
AS REQUIRED TO MATCH INSULATION
THICKNESS.
ANCHOR TO DECK
ROOF DECK TO EXTEND
BENEATH ENTIRE ROOF CURB.
FULL PERIMETER STRUCTURAL STEEL FRAMING
UNDER ROOF CURB.
EXISTING METAL DECK
5/16" X 1/2" (MINIMUM) HEX HEAD
SCREWS ON 18"…
This is the start of the file's text. The full file is on GovTribe.
Other files
| File | Type | Posted |
|---|---|---|
| Addendum 3 | — | |
| Award Information | — | |
| Addendum 1 | — | |
| Addendum 4 | — | |
| Addendum 2 | — | |
| Bid Invitation | — |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
File details come from the government source that posted it. Updated .