This is Addendum No. 3, dated June 15, 2022, issued by Andrews, Hammock & Powell, Inc. on behalf of the Dougherty County Board of Education in Albany, Georgia, for HVAC and plumbing upgrades at Lamar Reese Elementary School. The addendum modifies the original contract documents dated May 20, 2022, and must be acknowledged by all bidders to avoid disqualification. Key changes include revised specifications for temporary modular classrooms (68' x 28' minimum) with fire alarm systems, emergency lighting, intercom speakers, ADA-accessible restrooms, HVAC equipment maintaining 70–75°F temperatures, and above-ground septic tanks with weekly pumping service. The addendum identifies two modular classroom distributors: Wilscot in Tallahassee, Florida, and Mobile Modular in Arcade, Georgia. Additional specification changes modify Section 095113 for acoustical panel ceilings and Section 234100 for particulate air filtration and bi-polar ionization units, requiring manufacturers such as Global Plasma Solutions for ionization equipment. The addendum replaces eight mechanical and electrical drawing sheets (MD101–MD103, M101–M102, M601, E001, and E801) with revised versions dated June 15, 2022, addressing mechanical demolition and new work plans across five building sectors.
The revised mechanical and electrical drawings incorporate comprehensive HVAC and plumbing system changes across the school facility, including new rooftop heat pumps, ductless fan coil units, ceiling-mounted cassette systems, exhaust fans, outside air units, and condensate drain piping with P-traps. Specifications require coordination with existing structural systems, proper insulation of exterior ductwork with Armaflex closed-cell elastomeric insulation and aluminum covers, fire-rated duct penetrations through walls, and bi-polar ionization units salvaged from existing equipment for reinstallation in new units. Equipment schedules detail supply and return grilles from Titus, including louvered face diffusers and return filter grilles, alongside exhaust fans from Greenheck with specified CFM ratings and motor horsepower. All removed equipment not retained by the owner becomes contractor property; GPS needlepoint bi-polar ionization devices must be labeled, stored, and reinstalled by the controls contractor. The project requires compliance with ASTM standards for acoustical panels, proper ceiling installation before mechanical systems are operational, above-ceiling observations by the architect, and fire marshal coordination prior to ceiling installation.
Text of this file
Lamar Reese Elementary School May 20, 2022 HVAC & Plumbing Upgrades Dougherty County Board of Education Albany, Georgia
Addendum No. 3- Page 1 of 3
ANDREWS, HAMMOCK & POWELL, INC. 250 CHARTER LANE, SUITE 100, MACON, GA 31210
ADDENDUM NUMBER: THREE DATED: June 15, 2022
To: All contract bidders of record.
This addendum forms a part of the Contract Documents and modifies the original Specifications and Drawings dated May 20, 2022, as noted below. Acknowledge receipt of this Addendum in the space provided on the Bid Price Form; failure to do so may subject bidder to disqualification.
CHANGES TO SPECIFICATIONS
1. SECTION 015000 - TEMPORARY FACILITIES AND CONTROLS
A. On page 015000-3, delete paragraph 2.2.C. in its entirety and replace with the following:
“C. Modular Classrooms: Of sufficient size (68’ x 28’ minimum) to accommodate two
(2) standard size classrooms (600-700 s.f.) and two (2) restrooms with ADA access. Furnish and equip modular classrooms as follows:
1. Fire Alarm Pull Station at door (one in each classroom). Connect pull station to the main building Fire Alarm Panel.
2. Fire Alarm Horn/Strobe (one in each classroom). Connect fire alarm to the main building Fire Alarm Panel.
3. Exit Light/Emergency Light (one in each classroom at egress).
4. Computer Hub/Switch. Connect to nearest IDF in the main building.
5. Wireless internet access, associated with main building. Connect portable classroom hub/switch to nearest IDF in the main building.
6. Wireless Access Point (one in each classroom). Connect to hub/switch.
7. Intercom Speaker (one in each classroom). Bogen model number
MB8TSL(VR) or approved equal.
8. Relay Board/s and Analog Card to Main Intercom Head End to support the additional temporary classroom intercom speakers.
9. Intrusion Alarm on Exterior Doors. Connect to main building alarm panel.
10. ADA Accessible Rest Room (one in each classroom).
11. Cooling and heating equipment necessary to maintain a uniform indoor temperature of 70-75 deg. F.
12. Lighting fixtures capable of maintaining average illumination of 50fc at desk height
13. One Set of Steps and One ADA Ramp.
14. Above ground septic tank, which will include weekly pumping service.
15. Exterior Light (Hubbell Model # LMC-30LU-4K-3-1-BZ or equal (one each portable).
16. Above ground septic tank, which will include weekly pumping service.
Addendum No. 3- Page 2 of 3
17. Modular Classroom Distributers:
a. Wilscot, 4742 Blountstown Hwy., Tallahassee, FL 3204;
(850) 574-9222, Contact Person; Rusty Young (850) 228-6575.
b. Mobile Modular, 530 Etheridge Rd., Arcade GA 30549,
(770) 366-3356, wendy.grenske@mobilemodular.com”
2. SECTION 095113 - ACOUSTICAL PANEL CEILINGS
A. Delete Section 095113 - Acoustical Panel Ceilings dated May 20, 2022, in its entirety and replace with Section 095113 - Acoustical Panel Ceilings, revised June 15, 2022, included herewith.
3. SECTION 234100 - PARTICULATE AIR FILTRATION AND BI-POLAR IONIZATION
UNITS
A. On page 234100-3, paragraph 2.3.A, delete the last sentence of this paragraph in its entirety and replace with the following:
“Bi-polar ionization unit shall be manufactured by Global Plasma Solutions or prior approved equal.”
CHANGES TO DRAWINGS
1. SHEET MD101 - MECHANICAL DEMO PLAN - SECTOR A
A. Delete Sheet MD101 in its entirety and replace with Sheet MD101, revised 06/15/2022, included herewith.
2. SHEET MD102 - MECHANICAL DEMO PLAN - SECTOR B
A. Delete Sheet MD102 in its entirety and replace with Sheet MD102, revised 06/15/2022, included herewith.
3. SHEET MD103 - MECHANICAL DEMO PLAN - SECTORS C, D & E
A. Delete Sheet MD103 in its entirety and replace with Sheet MD103, revised 06/15/2022, included herewith.
4. SHEET M101 - MECHANICAL NEW WORK PLAN - SECTOR A
A. Delete Sheet M101 in its entirety and replace with Sheet M101, revised 06/15/2022, included herewith.
5. SHEET M102 - MECHANICAL NEW WORK PLAN - SECTOR B
A. Delete Sheet M102 in its entirety and replace with Sheet M102, revised 06/15/2022, included herewith.
Addendum No. 3- Page 3 of 3
6. SHEET M601 - MECHANICAL SCHEDULES
A. Delete Sheet M601 in its entirety and replace with Sheet M601, revised 06/15/2022, included herewith.
7. SHEET E001- ELECTRICAL OVERALL PLAN
A. Delete Sheet E001 in its entirety and replace with Sheet E001, revised 06/15/2022, included herewith.
8. SHEET E801- ELECTRICAL SCHEDULES AND LEGEND
A. Delete Sheet E801 in its entirety and replace with Sheet E801, revised 06/15/2022, included herewith.
END OF ADDENDUM #3
Lamar Reese Elementary School Revised June 15, 2022
ACOUSTICAL PANEL CEILINGS 095113 - 1
SECTION 095113 - ACOUSTICAL PANEL CEILINGS
PART 1 - GENERAL
1.1 RELATED DOCUMENTS
A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification Sections, apply to this Section.
1.2 SUMMARY
A. Section includes acoustical panels and exposed suspension systems for ceilings.
1.3 ACTION SUBMITTALS
A. Product Data: For each type of product.
1.4 CLOSEOUT SUBMITTALS
A. Maintenance Data: For finishes to include in maintenance manuals.
1.5 MAINTENANCE MATERIAL SUBMITTALS
A. Furnish extra materials that match products installed and that are packaged with protective covering for storage and identified with labels describing contents.
1. Acoustical Ceiling Panels: Furnish 100 full-size panels of APC #1 and 25 full-size panels of APC #2.
2. Suspension-System Components: Furnish 100 lineal feet of each exposed component for suspension system for APC #1.
1.6 DELIVERY, STORAGE, AND HANDLING
A. Deliver acoustical panels, suspension-system components, and accessories to Project site in original, unopened packages and store them in a fully enclosed, conditioned space where they will be protected against damage from moisture, humidity, temperature extremes, direct sunlight, surface contamination, and other causes.
B. Before installing acoustical panels, permit them to reach room temperature and a stabilized moisture content.
C. Handle acoustical panels carefully to avoid chipping edges or damaging units in any way.
1.7 FIELD CONDITIONS
A. Environmental Limitations: Do not install acoustical panel ceilings until spaces are enclosed and weatherproof, wet work in spaces is complete and dry, work above ceilings is complete, and ambient temperature and humidity conditions are maintained at the levels indicated for Project when occupied for its intended use.
ACOUSTICAL PANEL CEILINGS 095113 - 2
B. Above-Ceiling Observation: Before Contractor installs acoustical panel ceilings, Architect will conduct an above-ceiling observation and report deficiencies in the Work observed.
Do not proceed with installation of ceilings until deficiencies have been corrected.
1. Notify Architect seven days in advance of date and time when Project, or part of Project, will be ready for above-ceiling observation.
2. Before notifying Architect, complete the following in areas to receive ceilings:
a. Installation of lighting fixtures, powered for operation.
b. Installation, insulation, and leak and pressure testing of water piping systems.
c. Installation of air-duct systems.
d. Installation of air devices.
e. Installation of mechanical system control-air tubing.
f. Installation of ceiling support framing.
C. Coordinate with fire marshal prior to installing ceilings. Most jurisdictions require above-ceiling inspections prior to installing ceilings.
PART 2 - PRODUCTS
2.1 PERFORMANCE REQUIREMENTS
A. Surface-Burning Characteristics: Comply with ASTM E 84; testing by a qualified testing agency. Identify products with appropriate markings of applicable testing agency.
1. Flame-Spread Index: Comply with ASTM E 1264 for Class A materials.
2. Smoke-Developed Index: 450 or less.
2.2 ACOUSTICAL PANELS, GENERAL
A. Source Limitations: Obtain acoustical ceiling panels and supporting suspension system from single source from single manufacturer.
B. Acoustical Panel Standard: Provide manufacturer's standard panels of configuration indicated that comply with ASTM E 1264 classifications as designated by types, patterns, acoustical ratings, and light reflectances unless otherwise indicated.
C. Acoustical Panel Colors and Patterns: Match appearance characteristics indicated for each product type.
2.3 ACOUSTICAL PANELS <APC #1> (NON WET AREAS)
A. Acoustical tile ceiling in non-wet areas shall be provided by one of the following:
1. Armstrong World Industries, Inc.
2. CertainTeed Corp.
3. USG Interiors, Inc.
ACOUSTICAL PANEL CEILINGS 095113 - 3
B. Classification: Provide panels complying with ASTM E 1264 for type, form, and pattern as follows:
1. Type and Form: Type XII, mineral fiber with transparent membrane, non-directional fissured design; Form 2, water felted.
2. Pattern: E.
C. Color: White.
D. LR: Not less than 0.90.
E. NRC: Not less than 0.95.
F. Humidity/Sag Resistance: Humiguard Plus.
G. Edge/Joint Detail: Square edge.
H. Thickness: 5/8 inch.
I. Modular Size: 24 by 24 inches.
2.4 ACOUSTICAL PANELS <APC #2> (WET AREAS)
A. Manufacturers/Products: Subject to compliance with requirements, provide one of the following:
1. Armstrong World Industries, Inc.; Clean Room VL
2. CertainTeed Corp.; Performa, Vinyrock
3. USG Interiors, Inc.; Subsidiary of USG Corporation.; Gypsum Lay-in Clima Plus
B. Classification: Provide panels complying with ASTM E 1264 for type, form, and pattern as follows:
1. Type and Form: Type IV or Type XX other types; described as high-density, ceramic- and mineral base panels with scrubbable finish, resistant to heat, moisture, and corrosive fumes. Provide gypsum core and stippled pattern tile.
2. Pattern: As indicated by manufacturer’s designation.
C. Color: White.
D. LR: Not less than 0.78.
E. CAC: Not less than 38.
F. Edge/Joint Detail: Square.
G. Thickness: 1/2 inch.
H. Modular Size: 24 by 24 inches.
ACOUSTICAL PANEL CEILINGS 095113 - 4
2.5 METAL SUSPENSION SYSTEMS, GENERAL
A. Metal Suspension-System Standard: Provide manufacturer's standard direct-hung metal suspension systems of types, structural classifications, and finishes indicated that comply with applicable requirements in ASTM C 635/C 635M.
1. High-Humidity Finish: Comply with ASTM C 635/C 635M requirements for "Coating Classification for Severe Environment Performance" where high-humidity finishes are indicated.
B. Wire Hangers, Braces, and Ties: Provide wires complying with the following requirements:
1. Zinc-Coated, Carbon-Steel Wire: ASTM A 641/A 641M, Class 1 zinc coating, soft temper.
2. Size: Select wire diameter so its stress at three times hanger design load (ASTM C 635/C 635M, Table 1, "Direct Hung") will be less than yield stress of wire, but provide not less than 0.106-inch-diameter wire.
2.6 METAL SUSPENSION SYSTEM <For APC #1 Ceilings>
A. Basis-of-Design Product: Subject to compliance with requirements, provide Armstrong World Industries; Suprafine ML or a comparable product by another manufacturer:
1. Armstrong World Industries, Inc.
2. CertainTeed Corp.
3. USG Interiors, Inc.; Subsidiary of USG Corporation
B. 15/16-Inch Capped, Double-Web, Steel Suspension System: Main and cross runners roll formed from cold-rolled steel sheet; prepainted, electrolytically zinc coated, or hot-dip galvanized according to ASTM A 653/A 653M, not less than G30 coating designation; with prefinished 15/16-inch-wide metal caps on flanges.
1. Structural Classification: Intermediate-duty system.
2. End Condition of Cross Runners: Override (stepped) type.
3. Face Design: Flat, flush.
4. Cap Material: Steel cold-rolled sheet.
5. Cap Finish: Painted white.
2.7 METAL SUSPENSION SYSTEM <For APC #2 Ceilings>
A. Manufacturers/Products: Subject to compliance with requirements, provide one of the following:
1. Armstrong World Industries, Inc.; Prelude Plus XL Fireguard
2. CertainTeed Corp.; Classic Environmental Stab
3. USG Interiors, Inc.; Subsidiary of USG Corporation; Don ZXLA
ACOUSTICAL PANEL CEILINGS 095113 - 5
B. 15/16-Inch Capped, Double-Web, Hot-Dip Galvanized, G60, Steel Suspension System:
Main and cross runners roll formed from cold-rolled steel sheet; hot-dip galvanized according to ASTM A 653/A 653M, G60 coating designation; with prefinished, cold-rolled, 15/16-inch-wide aluminum caps on flanges.
1. Structural Classification: Intermediate-duty system.
2. Face Design: Flat, flush.
3. Face Finish: Painted white.
2.8 METAL EDGE MOLDINGS AND TRIM
A. Manufacturers: Subject to compliance with requirements, provide products by one of the following:
1. Armstrong World Industries, Inc.
2. CertainTeed Corp.
3. USG Interiors, Inc.; Subsidiary of USG Corporation.
B. Roll-Formed, Sheet-Metal Edge Moldings and Trim: Type and profile indicated or, if not indicated, manufacturer's standard moldings for edges and penetrations that comply with seismic design requirements; formed from sheet metal of same material, finish, and color as that used for exposed flanges of suspension-system runners.
1. Provide manufacturer's standard edge moldings that fit acoustical panel edge details and suspension systems indicated and that match width and configuration of exposed runners unless otherwise indicated.
2. For lay-in panels in corridors, provide stepped edge molding that forms reveal of same depth and width as that formed between edge of panel and flange at exposed suspension member.
3. For circular penetrations of ceiling, provide edge moldings fabricated to diameter required to fit penetration exactly.
PART 3 - EXECUTION
3.1 EXAMINATION
A. Examine substrates, areas, and conditions, including structural framing to which acoustical panel ceilings attach or abut, with Installer present, for compliance with requirements specified in this and other Sections that affect ceiling installation and anchorage and with requirements for installation tolerances and other conditions affecting performance of acoustical panel ceilings.
B. Examine acoustical panels before installation. Reject acoustical panels that are wet, moisture damaged, or mold damaged.
C. Proceed with installation only after unsatisfactory conditions have been corrected.
ACOUSTICAL PANEL CEILINGS 095113 - 6
3.2 PREPARATION
A. Measure each ceiling area and establish layout of acoustical panels to balance border widths at opposite edges of each ceiling. Avoid using less-than-half-width panels at borders, and comply with layout shown on reflected ceiling plans.
3.3 INSTALLATION
A. General: Install acoustical panel ceilings to comply with ASTM C 636/C 636M and seismic design requirements indicated, according to manufacturer's written instructions and CISCA's "Ceiling Systems Handbook."
B. Suspend ceiling hangers from building's structural members and as follows:
1. Install hangers plumb and free from contact with insulation or other objects within ceiling plenum that are not part of supporting structure or of ceiling suspension system.
2. Splay hangers only where required to miss obstructions; offset resulting horizontal forces by bracing, countersplaying, or other equally effective means.
3. Where width of ducts and other construction within ceiling plenum produces hanger spacings that interfere with location of hangers at spacings required to support standard suspension-system members, install supplemental suspension members and hangers in form of trapezes or equivalent devices.
4. Secure wire hangers to ceiling-suspension members and to supports above with a minimum of three tight turns. Connect hangers directly either to structures or to inserts, eye screws, or other devices that are secure and appropriate for substrate and that will not deteriorate or otherwise fail due to age, corrosion, or elevated temperatures.
5. Secure flat, angle, channel, and rod hangers to structure, including intermediate framing members, by attaching to inserts, eye screws, or other devices that are secure and appropriate for both the structure to which hangers are attached and the type of hanger involved. Install hangers in a manner that will not cause them to deteriorate or fail due to age, corrosion, or elevated temperatures.
6. Do not support ceilings directly from permanent metal forms or floor deck. Fasten hangers to cast-in-place hanger inserts, postinstalled mechanical or adhesive anchors, or power-actuated fasteners that extend through forms into concrete.
7. When steel framing does not permit installation of hanger wires at spacing required, install carrying channels or other supplemental support for attachment of hanger wires.
8. Do not attach hangers to steel deck tabs.
9. Do not attach hangers to steel roof deck. Attach hangers to structural members.
10. Space hangers not more than 48 inches o.c. along each member supported directly from hangers unless otherwise indicated; provide hangers not more than 8 inches from ends of each member.
11. Size supplemental suspension members and hangers to support ceiling loads within performance limits established by referenced standards and publications.
ACOUSTICAL PANEL CEILINGS 095113 - 7
C. Secure bracing wires to ceiling suspension members and to supports with a minimum of four tight turns. Suspend bracing from building's structural members as required for hangers, without attaching to permanent metal forms, steel deck, or steel deck tabs. Fasten bracing wires into concrete with cast-in-place or post installed anchors.
D. Install edge moldings and trim of type indicated at perimeter of acoustical ceiling area and where necessary to conceal edges of acoustical panels.
1. Screw attach moldings to substrate at intervals not more than 16 inches o.c. and not more than 3 inches from ends, leveling with ceiling suspension system to a tolerance of 1/8 inch in 12 feet. Miter corners accurately and connect securely.
2. Do not use exposed fasteners, including pop rivets, on moldings and trim.
E. Install suspension-system runners so they are square and securely interlocked with one another. Remove and replace dented, bent, or kinked members.
F. Install acoustical panels with undamaged edges and fit accurately into suspension-system runners and edge moldings. Scribe and cut panels at borders and penetrations to provide a neat, precise fit.
1. Arrange directionally patterned acoustical panels as follows:
a. Install panels in a basket-weave pattern.
2. For square-edged panels, install panels with edges fully hidden from view by flanges of suspension-system runners and moldings.
3. Paint cut edges of panel remaining exposed after installation; match color of exposed panel surfaces using coating recommended in writing for this purpose by acoustical panel manufacturer.
3.4 CLEANING
A. Clean exposed surfaces of acoustical panel ceilings, including trim, edge moldings, and suspension-system members. Comply with manufacturer's written instructions for cleaning and touchup of minor finish damage. Remove and replace ceiling components that cannot be successfully cleaned and repaired to permanently eliminate evidence of damage.
END OF SECTION 095113
ACOUSTICAL PANEL CEILINGS 095113 - 8
THIS PAGE INTENTIONALLY LEFT BLANK
MUSIC LAB
ART LAB
MEDIA CENTER
CONF. RM.
114F
AV. STOR.
114E
BOOK STOR.
114D
PRODUCTION ROOM
114C
WORK RM.
114B
MEDIA SPEC. OFFICE
114A
LOBBY
CONF. ROOM
PRINC. OFF.
TLT.
104A
TLT.
108A
ASST. PRINCIPAL
COUNSELOR
VAULT
RM.
103B
OFFICE MANAGER
CLINIC
TLT.
103A
WORK RM.
DATA ROOM
111A
COMPUTER LAB
CLOSET
STOR.
118A
KILN RM.
116A
STOR.
116B
DATA RM.
LOBBY
PROJECT NUMBER:
DATE:
DRAWN BY:
CHECKED BY:
TITLE:
SUBJECT TO GENERAL
COPYRIGHT LAWS ©
REVISIONS
A B
C D
E
2021203
05/20/2022
GA DOE ID #: 0199
MD101
MECHANCAL DEMO PLAN -
SECTOR A
L A
M A
R R
E E
S E
E L E
M E
N T
A R
Y S
C H
O O
L
H V
A C
P
L U
M B
IN
G
U P
G R
A D
E S
WBF
JA3
L ily P o n d R d A lb a n y G
A
1/8" = 1'-0"1 MECHANICAL DEMO PLAN - SECTOR A
NOTES: (THIS SHEET ONLY)
1 . REMOVE CEILING MOUNTED CASSETTE TYPE DUCTLESS FAN COIL
UNIT AND ASSOCIATED REFRIGERANT PIPING. REMOVE
CONDENSATE PIPING AND MAKE NOTE OF ROUTING. SEE NEW
WORK PLAN FOR INSTALLATION OF NEW CEILING MOUNTED
DUCTLESS FAN COIL UNIT IN SAME LOCATION.
2 . REMOVE EXISTING ROOF MOUNTED DUCTLESS HEAT PUMP AND
ASSOCIATED PIPING. EXISTING EQUIPMENT SUPPORT PLATFORM
TO REMAIN.
3 . REMOVE EXISTING ROOFTOP HEAT PUMP AND ASSOCIATED
CONDENSATE DRAIN. REMOVE EXISTING GPS BIPOLAR IONIZATION
UNIT AND STORE FOR REUSE IN NEW ROOFTOP HEAT PUMP.
EXISTING ROOF CURB TO REMAIN. SEE NEW WORK PLAN FOR
INSTALLATION OF NEW ROOFTOP UNIT IN SAME LOCATION.
4 . REMOVE EXISTING ROOF MOUNTED CENTRIFUGAL EXHAUST FAN.
EXISTING ROOF CURB TO REMAIN. SEE NEW WORK PLAN FOR
INSTALLATION OF NEW ROOF MOUNTED EXHAUST FAN.
5 . EXISTING ROOFTOP UNIT, DRAIN, ETC. TO REMAIN.
6 GENERAL: UNLESS OTHERWISE NOTED, ALL DUCTWORK, GRILLES,
DIFFUSERS, ETC ARE TO REMAIN. CLEAN EXISTING DUCTWORK AS
SPECIFIED. CLEAN ALL DIFFUSERS AND GRILLES TO REMOVE ALL
DUST, DIRT, SMUDGES, ETC.
7 GENERAL: CONTRACTOR SHALL REMOVE ALL EXISTING BIPOLAR
IONIZATION UNITS IN EXISTING EQUIPMENT FOR REINSTALLATION
IN NEW EQUIPMENT. ALL BIPOLAR IONIZATION UNITS NOT REUSED
SHALL BE TURNED OVER TO THE OWNER.
8 . EXISTING POWER CIRCUIT FOR RTU/CONVENIENCE OUTLET RISES
THROUGH EXISTING PITCH POCKET. SEE ELECTRICAL DRAWINGS
FOR REMOVAL OF POWER CIRCUIT TO BELOW ROOF DECK, AND
JUNCTIONING BELOW ROOF LEVEL AND ROUTING CIRCUIT UP
INSIDE ROOF CURB ADAPTER OF NEW EQUIPMENT. FILL PITCH
POCKET FOLLOWING POWER CIRCUIT REMOVAL. PROVIDE 18
GAUGE METAL CAP TO COVER EXISTING PITCH POCKET. SEAL AIR
& WATER TIGHT.
GENERAL NOTE: OWNERSHIP OF ALL REMOVED EQUIPMENT NOT RETAINED BY
THE OWNER SHALL BECOME PROPERTY OF THE CONTRACTOR. COORDINATE
WITH OWNER FOR SALVAGE OF ANY EQUIPMENT TO BE RETAINED BY THE OWNER.
GENERAL NOTE: GPS NEEDLEPOINT BIPOLAR IONIZATION DEVICES (NPBI) SHALL
BE REMOVED FROM THE EXISTING HVAC UNITS BY THE CONTROLS CONTRACTOR.
NPBI DEVICE(S) SHALL BE LABELED, PROPERLY AND SAFELY STORED, AND
REINSTALLED IN THE NEW UNIT IN THE SAME LOCATION. NPBI DEVICE(S) FROM
HVAC UNITS REMOVED AND NOT REPLACED SHALL BE TURNED OVER TO THE
OWNER.
No. Description Date
1 ADDENDUM #2 06/06/22
2 ADDENDUM #3 06/15/22
CAFETERIA
SERVING
KITCHEN
OFFICE
JAN.
LAUNDRY
TLT.
132A
LOCKER
DRY STOR.
STOR.
MECH.
113A
MEN
115A
MECH.
100A
OFF.
STOR.
150A
STOR.
100C
ELECT.
100B
STOR.
112A
P.E. FACILITY
LIFT
122B
PROJECT NUMBER:
DATE:
DRAWN BY:
CHECKED BY:
TITLE:
SUBJECT TO GENERAL
COPYRIGHT LAWS ©
REVISIONS
A B
C D
E
2021203
05/20/2022
GA DOE ID #: 0199
MD102
MECHANCAL DEMO PLAN -
SECTOR B
L A
M A
R R
E E
S E
E L E
M E
N T
A R
Y S
C H
O O
L
H V
A C
P
L U
M B
IN
G
U P
G R
A D
E S
WBF
JA3
L ily P o n d R d A lb a n y G
A
1/8" = 1'-0"1 MECHANICAL DEMO PLAN - SECTOR B
NOTES: (THIS SHEET ONLY)
1 . REMOVE CEILING MOUNTED CASSETTE TYPE DUCTLESS FAN COIL
UNIT AND ASSOCIATED REFRIGERANT PIPING. REMOVE
CONDENSATE PIPING AND MAKE NOTE OF ROUTING. SEE NEW
WORK PLAN FOR INSTALLATION OF NEW CEILING MOUNTED
DUCTLESS FAN COIL UNIT IN SAME LOCATION.
2 . REMOVE EXISTING ROOF MOUNTED DUCTLESS HEAT PUMP AND
ASSOCIATED PIPING. EXISTING EQUIPMENT SUPPORT PLATFORM
TO REMAIN.
3 . REMOVE EXISTING ROOFTOP HEAT PUMP AND ASSOCIATED
CONDENSATE DRAIN. REMOVE EXISTING GPS BIPOLAR IONIZATION
UNIT AND STORE FOR REUSE IN NEW ROOFTOP HEAT PUMP.
EXISTING ROOF CURB TO REMAIN. SEE NEW WORK PLAN FOR
INSTALLATION OF NEW ROOFTOP UNIT IN SAME LOCATION.
4 . REMOVE EXISTING ROOF MOUNTED CENTRIFUGAL EXHAUST FAN.
EXISTING ROOF CURB TO REMAIN. SEE NEW WORK PLAN FOR
INSTALLATION OF NEW ROOF MOUNTED EXHAUST FAN.
5 . REMOVE EXISTING DUCTLESS HEAT PUMP MOUNTED ON
CONCRETE PAD, ASSOCIATED PIPING, ETC. SEE NEW WORK PLAN
FOR INSTALLATION OF NEW DUCTLESS HEAT PUMP TO REUSE
EXISTING PIPE ROUTING.
6 . COMPLETELY REMOVE EXISTING LOUVER IN EXISTING WINDOW
FRAME AND ASSOCIATED DUCT ABOVE LOW ROOF. FIELD VERIFY
EXISTING SIZE. SEE NEW WORK PLAN FOR REUSE OF EXISTING
OPENING. TEMPORARILY SEAL OPENINGS DURING
CONSTRUCTION AS REQUIRED TO PREVENT AIR & WATER
INFILTRATION.
7 . COMPLETELY REMOVE EXISTING SUSPENDED AIR HANDLING UNIT,
ASSOCIATED SUPPORTS, CONDENSATE PIPING, REFRIGERANT
PIPING, ETC.
8 . COMPLETELY REMOVE EXISTING CONCRETE PAD MOUNTED HEAT
PUMPS, ASSOCIATED PIPING, ETC. PATCH PIPING PENETRATIONS
TO MATCH EXISTING BRICK EXTERIOR.
9 . COMPLETELY REMOVE EXISTING DUCTWORK, SUPPORT,
INSULATION, ETC. UP TO LOCATION SHOWN.
10 . COMPLETELY REMOVE EXISTING REFRIGERANT PIPING,
CONDENSATE PIPING, SUPPORTS, INSULATION, ETC. SERVING AIR
HANDLING UNITS.
11 . REMOVE EXISTING KITCHEN HOOD EXHAUST FAN MOUNTED ON
ROOF. SEE NEW WORK PLAN FOR INSTALLATION OF NEW
EXHAUST FAN SAME LOCATION.
12 . EXISTING KITCHEN HOOD SUPPLY FAN ABOVE COOLER / FREEZER.
REMOVE A SHORT PORTION OF DUCT AS REQUIRED TO REMOVE
EXHAUST FAN. SEE NEW WORK PLAN FOR INSTALLATION OF NEW
EXHAUST FAN SAME LOCATION.
13 . EXISTING DISHWASHER EXHAUST FAN TO REMAIN.
14 . REMOVE EXISTING INLINE EXHAUST FAN MOUNTED ABOVE
CEILING AT THIS APPROXIMATE LOCATION. SEE NEW WORK PLAN
FOR INSTALLATION OF NEW EXHAUST FAN SAME LOCATION.
15 . REMOVE EXISITNG SUPPLY DUCTWORK AS REQUIRED FOR
REMOVAL OF AIR HANDLER. REMAINDER OF EXISTING SUPPLY
DUCTWORK TO REMAIN. SEE NEW WORK PLAN FOR CONNECTION
OF NEW DUCTWORK TO EXISTING DUCTWORK AT THIS LOCATION.
16 . GENERAL: UNLESS OTHERWISE NOTED, ALL DUCTWORK, GRILLES,
DIFFUSERS, ETC ARE TO REMAIN. CLEAN EXISTING DUCTWORK AS
SPECIFIED. CLEAN ALL DIFFUSERS AND GRILLES TO REMOVE ALL
DUST, DIRT, SMUDGES, ETC.
17 . GENERAL: CONTRACTOR SHALL SALVAGE ALL EXISTING BIPOLAR
IONIZATION UNITS IN EXISTING EQUIPMENT FOR REINSTALLATION
IN NEW EQUIPMENT. ALL BIPOLAR IONIZATION UNITS NOT REUSED
SHALL BE TURNED OVER TO THE OWNER.
18 . REMOVE EXISTING DOOR AIR CURTAIN, SEE NEW WORK PLAN FOR
NEW DOOR AIR CURTAIN IN SAME LOCATION.
19 . REMOVE EXISTING FENCING AS REQUIRED FOR INSTALLATION OF
NEW DUCTLESS HEAT PUMPS. SEE NEW WORK PLAN.
20 . EXISTING POWER CIRCUIT FOR RTU/CONVENIENCE OUTLET RISES
THROUGH EXISTING PITCH POCKET. SEE ELECTRICAL DRAWINGS
FOR REMOVAL OF POWER CIRCUIT TO BELOW ROOF DECK, AND
JUNCTIONING BELOW ROOF LEVEL AND ROUTING CIRCUIT UP
INSIDE ROOF CURB ADAPTER OF NEW EQUIPMENT. FILL PITCH
POCKET FOLLOWING POWER CIRCUIT REMOVAL. PROVIDE 18
GAUGE METAL CAP TO COVER EXISTING PITCH POCKET. SEAL AIR
& WATER TIGHT.
GENERAL NOTE: OWNERSHIP OF ALL REMOVED EQUIPMENT NOT RETAINED BY
THE OWNER SHALL BECOME PROPERTY OF THE CONTRACTOR. COORDINATE
WITH OWNER FOR SALVAGE OF ANY EQUIPMENT TO BE RETAINED BY THE OWNER.
GENERAL NOTE: GPS NEEDLEPOINT BIPOLAR IONIZATION DEVICES (NPBI) SHALL
BE REMOVED FROM THE EXISTING HVAC UNITS BY THE CONTROLS CONTRACTOR.
NPBI DEVICE(S) SHALL BE LABELED, PROPERLY AND SAFELY STORED, AND
REINSTALLED IN THE NEW UNIT IN THE SAME LOCATION. NPBI DEVICE(S) FROM
HVAC UNITS REMOVED AND NOT REPLACED SHALL BE TURNED OVER TO THE
OWNER.
No. Description Date
1 ADDENDUM #2 06/06/22
2 ADDENDUM #3 06/15/22
1 1
TT TT
TTTT
TT
TT
TT
TT
TT
TT TT
TT TT
TT
TT TT
TT
TTTT
TT TT
TTTT
TTTT
TT TT
TT
TT
TT
TT
TT TT
TT
TT
4 4 4 4
4 4
4 4
3 3
6 6
8 8
F.D./S.D. F.D./S.D.
F.D./S.D. F.D./S.D.
F.D./S.D. F.D./S.D.
F.D./S.D.
F.D./S.D.
F.D./S.D.
F.D./S.D. F.D./S.D. F.D./S.D.
9 9
9 9
K-1 CLASSROOM
K-1 CLASSROOM
K-1 CLASSROOM
K-1 CLASSROOM
K-1 CLASSROOM
2-3 CLASSROOM
2-3 CLASSROOM
2-3 CLASSROOM
2-3 CLASSROOM
K-1 CLASSROOM
K-1 CLASSROOM
K-1 CLASSROOM
K-1 CLASSROOM
SPECIAL ED.
SPECIAL ED.
TITLE ONE
CLASSROOM
TLT.
205A
TLT.
205B
WORK ROOM
BOOK STOR.
2-3 CLASSROOM
2-3 CLASSROOM
TITLE ONE
CLASSROOM
TITLE ONE
CLASSROOM
2-3 CLASSROOM
2-3 CLASSROOM
4-5 CLASSROOM
4-5 CLASSROOM
4-5 CLASSROOM
4-5 CLASSROOM
SPECIAL EDUCATION
WORK RM.
BOOK STOR.
SPECIAL EDUCATION
4-5 CLASSROOM
4-5 CLASSROOM
4-5 CLASSROOM
4-5 CLASSROOM
ELECT.
TLT.
210A
TLT.
210B
TLT.
211A
TLT.
209A
TLT.
213A
TLT.
213B
TLT.
214A
TLT.
214B
STOR.
TLT.
201A
TLT.
201B
TLT.
202A
TLT.
202B
GIRLS
306B
WORK RM.
BOOK STOR.
ELECT.
STOR.
BOYS
306A
TLT.
310B
TLT.
310A
JAN.
ELEC.
STOR.
TLT.
405C
TLT
405B
KITCHEN
405A
JAN.
TLT.
410A
TLT.
410B
GIRLS
406B
BOYS
406A
CORRIDOR
CORRIDOR
CORRIDOR
PROJECT NUMBER:
DATE:
DRAWN BY:
CHECKED BY:
TITLE:
SUBJECT TO GENERAL
COPYRIGHT LAWS ©
REVISIONS
A B
C D
E
2021203
05/20/2022
GA DOE ID #: 0199
MD103
MECHANCAL DEMO PLAN -
SECTORS C, D, & E
L A
M A
R R
E E
S E
E L E
M E
N T
A R
Y S
C H
O O
L
H V
A C
P
L U
M B
IN
G
U P
G R
A D
E S
WBF
JA3
L ily P o n d R d A lb a n y G
A
1/8" = 1'-0"1 MECHANICAL DEMO PLAN - SECTORS C, D, & E
NOTES: (THIS SHEET ONLY)
1 . REMOVE EXISTING WALL HUNG HEAT PUMP. REMOVE EXISTING
GPS BIPOLAR IONIZATION UNIT AND STORE FOR REUSE IN NEW
WALL HUNG HEAT PUMP.
2 . EXISTING 4"Ø DRYER WALL CAP TO REMAIN.
3 . EXISTING 8" X 6" EXHAUST WALL CAP TO REMAIN.
4 . REMOVE EXISTING CEILING MOUNTED EXHAUST FAN AND
ASSOCIATED DUCTWORK UP TO LOCATION SHOWN. SEE NEW
WORK PLAN FOR INSTALLATION OF NEW EXHAUST FAN SAME
LOCATION.
5 . EXISTING PROPELLER EXHAUST FAN IN ATTIC TO REMAIN.
6 . REMOVE EXISTING ROOF MOUNTED CENTRIFUGAL EXHAUST FAN.
SEE NEW WORK PLAN FOR INSTALLATION OF NEW EXHAUST FAN
SAME LOCATION.
7 . REMOVE EXISTING HORIZONTAL FAN COIL UNIT, ASSOCIATED
REFRIGERANT PIPING, CONDENSATE PIPING, ETC. MOUNTED ON
PLATFORM IN ATTIC. NOTE EXISTING REFRIGERANT PIPE AND
CONDENSATE PIPE ROUTING, EXISTING PIPE ROUTINGS TO BE
REUSED. SEE NEW WORK PLAN FOR INSTALLTION OF NEW FAN
COIL UNIT SAME LOCATION. FIELD VERIFY INSTALLATION OF
EXISTING BIPOLAR IONIZATION UNIT AND REMOVE AND STORE
FOR REUSE IN NEW FAN COIL UNIT.
8 . REMOVE EXISTING PAD MOUNTED HEAT PUMP AND ASSOCIATED
PIPING. SEE NEW WORK PLAN FOR INSTALLATION OF NEW HEAT
PUMP IN SAME LOCATION.
9 . EXISTING 16" X 14" FIRE/SMOKE DAMPER IN ATTIC PARTITION TO
REMAIN.
GENERAL NOTE:OWNERSHIP OF ALL REMOVED EQUIPMENT NOT RETAINED BY
THE OWNER SHALL BECOME PROPERTY OF THE CONTRACTOR. COORDINATE
WITH OWNER FOR SALVAGE OF ANY EQUIPMENT TO BE RETAINED BY THE OWNER.
GENERAL NOTE: GPS NEEDLEPOINT BIPOLAR IONIZATION DEVICES (NPBI) SHALL
BE REMOVED FROM THE EXISTING HVAC UNITS BY THE CONTROLS CONTRACTOR.
NPBI DEVICE(S) SHALL BE LABELED, PROPERLY AND SAFELY STORED, AND
REINSTALLED IN THE NEW UNIT IN THE SAME LOCATION. NPBI DEVICE(S) FROM
HVAC UNITS REMOVED AND NOT REPLACED SHALL BE TURNED OVER TO THE
OWNER.
No. Description Date
1 ADDENDUM #2 06/06/22
RTU-1
RTU-2
RTU-4
RTU-9 RTU-10
DFCU-3
DHP-3
DHP-1
DFCU-1
EF-25
EF-26
OAU-2
OAU-3
EF-37
RTU-5
RTU-6
RTU-7
RTU-8
MUSIC LAB
118ART LAB
MEDIA CENTER
CONF. RM.
114F
AV. STOR.
114E
BOOK STOR.
114D
PRODUCTION ROOM
114C
WORK RM.
114B
MEDIA SPEC. OFFICE
114A
LOBBY
CONF. ROOM
PRINC. OFF.
TLT.
104A
ASST. PRINCIPAL
COUNSELOR
RM.
103B
OFFICE MANAGER
CLINIC
WORK RM.
DATA ROOM
111A
COMPUTER LAB
CLOSET
STOR.
118A
KILN RM.
116A
STOR.
116B
DATA RM.
LOBBY
CC
CC
SS
16"x16"
16"x16"16"x18"
8 8
RTU-3
S S S
R
OAU-1
260 260
260 260
D
D D
D
D
D
D D
D
D
335 335
335 335 330
D
D
D
D
OAU-1
D
6 6 6
R
D
D
12 12 132
NOTES: (THIS SHEET ONLY)
PROJECT NUMBER:
DATE:
DRAWN BY:
CHECKED BY:
TITLE:
SUBJECT TO GENERAL
COPYRIGHT LAWS ©
REVISIONS
A B
C D
E
2021203
05/20/2022
GA DOE ID #: 0199
M101
MECHANICAL NEW WORK
PLAN - SECTOR A
L A
M A
R R
E E
S E
E L E
M E
N T
A R
Y S
C H
O O
L
H V
A C
P
L U
M B
IN
G
U P
G R
A D
E S
WBF
JA3
L ily P o n d R d A lb a n y G
A
1/8" = 1'-0"1 MECHANICAL NEW WORK PLAN - SECTOR A
1 . NEW ROOF MOUNTED HEAT PUMP MOUNTED ATOP EXISTING
ROOF CURB. PROVIDE ADAPTER CURB AS REQUIRED TO
TRANSITION FROM NEW UNIT CONNECTIONS TO EXISTING DUCT
LAYOUT. REINSTALL BIPOLAR IONIZATION UNIT REMOVED DURING
DEMOLITION. SEE BIPOLAR IONIZATION UNIT DETAIL.
2 . NEW CENTRIFUGAL EXHAUST FAN MOUNTED ATOP EXISTING
ROOF CURB. PROVIDE ADAPTER CURB AS REQUIRED TO MAKE
TRANSITION FROM NEW FAN CONNECTION TO EXISTING DUCT
DIMENSION.
3 . DUCTLESS HEAT PUMP MOUNTED ATOP EXISTING EQUIPMENT
SUPPORT PLATFORM ON ROOF. PROVIDE NEW CAP AT EXISTING
CURB AND NEW PIPE BOX FOR ROUTING OF PIPING AND CONDUIT.
SEE DUCTLESS HEAT PUMP CAP AT EXISTING CURB DETAIL.
4 . NEW CEILING MOUNTED CASSETTE TYPE DUCTLESS FAN COIL
UNIT. ROUTE CONDENSATE TO SAME LOCATION AS CASSETTE
REMOVED DURING DEMOLITION. REPAIR CEILING GRID / TILE
DAMAGED DURING DEMOLITION TO MATCH EXISTING.
REFRIGERANT PIPING ROUTED FROM FAN COIL UNIT UP THROUGH
PIPE BOX TO DUCTLESS HEAT PUMP ON ROOF.
5 . EXISTING RTAC, DUCTWORK, GRILLES, ETC. TO REMAIN. CLEAN
DUCTWORK IN ACCORDANCE WITH DUCT CLEANING SPEC.
6 . ROUTE LINE SIZE, SLOPED (1/4" PER FOOT), TRAPPED, PVC
CONDENSATE DRAIN PIPING FROM RTAC TO ROOF DRAIN AS
SHOWN. PROVIDE PIPE SUPPORTS ON MAXIMUM 6' CENTERS. SEE
CONDENSATE DRAIN TRAP DETAIL AND CONDENSATE PIPE
SUPPORT ON ROOF DETAIL.
7 . NEW HORIZONTAL DISCHARGE 100% OUTSIDE AIR UNIT MOUNTED
ATOP ROOF CURB. PROVIDE JOIST REINFORCEMENT AT JOISTS
BELOW NEW OUTSIDE AIR UNIT. SEE ROOF CURB DETAIL- CURB
ATOP EXISTING ROOF, AND JOIST REINFORCEMENT DETAIL.
8 . 16" X 16" 100% OUTSIDE AIR DUCT PENETRATES EXTERIOR WALL
AND CONTINUES TO ABOVE CLASSROOM CEILING. SEE SHEET
M103 SECTOR C FOR CONTINUATION. DUCTWORK ROUTED
OUTDOORS SHALL HAVE ONE LAYER OF 2" THICK ARMAFLEX
CLOSED CELL ELASTOMERIC INSULATION ON EXTERIOR OF DUCT.
COVER INSULATION WITH EMBOSSED ALUMINUM COVER. PROVIDE
AN ADDITIONAL SHEET METAL COVER OVER
DUCTWORK/INSULATION ASSEMBLY TO COMPLETELY ENCLOSE
DUCTWORK. SEE ROOF MOUNTED EXTERIOR METAL DUCT HOOD
DETAIL.
9 . CONDENSATE DRAIN CONTINUES TO ROOF DRAIN. SEE SHEET
M102 FOR CONTINUATION.
10 . NEW CONDENSATE DRAIN PIPING ROUTED TO SAME LOCATION AS
CONDENSATE DRAIN PIPE REMOVED DURING DEMOLITION. FIELD
VERIFY EXISTING PIPE ROUTING.
11 . REFRIGERANT PIPING ROUTED DOWN THRU PIPE BOX. SEE
DUCTLESS HEAT PUMP CAP AT EXISTING CURB DETAIL AND PIPE
BOX/HOOD ASSEMBLY DETAIL.
12 . DUCT MOUNTED SMOKE DETECTOR PROVIDED AND WIRED BY
ELECTRICAL. INSTALLED BY MECHANICAL.
13 . NEW MAIN DDC CONTROL PANEL MOUNTED ON 3/4" PLYWOOD
BACKBOARD. COORDINATE EXACT LOCATION WITH EXISTING DATA
ROOM EQUIPMENT, SHELVING, ETC.
GENERAL NOTE: PROVIDE LINTEL AT ALL NEW DUCT PENETRATIONS
THRU EXISTING WALLS. SEE LINTEL DETAIL AT EXISTING WALL. No. Description Date
RTU-15
RTU-16
RTU-14
DHP-2
DFCU-2
DHP-4
DFCU-4
RTU-13
EF-27
EF-32
EF-30
EF-33
D D
D
D
D
D
D
D
CAFETERIA
SERVING
KITCHEN
OFFICE
JAN.
LAUNDRY
TLT.
132A
LOCKER
DRY STOR.
STOR.
MECH.
113A
MEN
115A
MECH.
100A
OFF.
STOR.
150A
STOR.
100C
ELECT.
100B
STOR.
112A
P.E. FACILITY
LIFT
122B
RTU-17
"ø
"ø
"ø
"ø
26"x32"
26"x32"
26"x32"
26"x32"
56"x30"
EF-31
CORRIDOR
WOMEN
115B
SF-1
DHP-5
DHP-6
DFCU-5
DFCU-6
TT
CC
TT
RTU-12
RTU-11
DAC-1
56"x30"
1 1/2" D
D
D
R
R(TYP)
D
R
R
1 1/2" D
S
S
S
D
D
R
D
E1
PROJECT NUMBER:
DATE:
DRAWN BY:
CHECKED BY:
TITLE:
SUBJECT TO GENERAL
COPYRIGHT LAWS ©
REVISIONS
A B
C D
E
2021203
05/20/2022
GA DOE ID #: 0199
M102
MECHANICAL NEW WORK
PLAN - SECTOR B
L A
M A
R R
E E
S E
E L E
M E
N T
A R
Y S
C H
O O
L
H V
A C
P
L U
M B
IN
G
U P
G R
A D
E S
WBF
JA3
L ily P o n d R d A lb a n y G
A
1/8" = 1'-0"1 MECHANICAL NEW WORK PLAN - SECTOR B
NOTES: (THIS SHEET ONLY)
1 . NEW DUCTWORK OF INDICATED SIZE ROUTED THROUGH
APPROXIMATELY 56" X 30" EXISTING WINDOW FRAME IN SAME
LOCATION AS LOUVER REMOVED DURING DEMOLITION. FIELD
VERIFY EXACT DIMENSIONS OF OPENING. SEAL OPENING AIR AND
WATER TIGHT.
2 . NEW EXPOSED ROUND SPIRAL DUCTWORK CONNECTS TO
EXISTING DUCTWORK AT THIS APPROXIMATE LOCATION. PAINT
DUCTWORK, SUPPORTS, ETC. TO MATCH EXISTING.
3 . NEW ROOF MOUNTED HEAT PUMP MOUNTED ATOP EXISTING
ROOF CURB. PROVIDE ADAPTER CURB AS REQUIRED TO
TRANSITION FROM NEW UNIT CONNECTIONS TO EXISTING DUCT
LAYOUT. REINSTALL BIPOLAR IONIZATION UNIT REMOVED DURING
DEMOLITION. SEE BIPOLAR IONIZATION UNIT DETAIL.
4 . EXISTING ROOF DRAIN AT THIS APPROXIMATE LOCATION.
7 . DUCTLESS HEAT PUMP MOUNTED ATOP EXISTING EQUIPMENT
SUPPORT PLATFORM ON ROOF. PROVIDE NEW CAP AT EXISTING
CURB AND NEW PIPE BOX FOR ROUTING OF PIPING AND CONDUIT.
SEE DUCTLESS HEAT PUMP CAP AT EXISTING CURB DETAIL.
8 . CEILING MOUNTED CASSETTE TYPE DUCTLESS FAN COIL UNIT.
9 . NEW DUCTLESS HEAT PUMP MOUNTED ON EXISTING CONCRETE
EQUIPMENT PAD. SEE CONCRETE EQUIPMENT PAD DETAIL.
10 . ROUTE LINE SIZE, SLOPED (1/4" PER FOOT), TRAPPED, PVC
CONDENSATE DRAIN PIPING FROM RTAC TO ROOF DRAIN AS
SHOWN. BASIS OF DESIGN CONDENSATE DRAIN CONNECTION IS IN
A DIFFICULT TO ACCESS LOCATION, INSTALL TRAP IN AN
ACCESSIBLE LOCATION AS SHOWN. ENSURE DRAIN PIPING DOES
NOT BLOCK ACCESS PANELS. SEE CONDENSATE DRAIN TRAP
DETAIL AND CONDENSATE ROOF SUPPORT DETAIL.
11 . INSTALL CONDENSATE P-TRAP AT THIS LOCATION.
12 . ROUTE LINE SIZE, SLOPED (1/4" PER FOOT), TRAPPED, PVC
CONDENSATE DRAIN PIPING FROM RTAC TO ROOF DRAIN AS
SHOWN. SEE CONDENSATE DRAIN TRAP DETAIL AND
CONDENSATE ROOF SUPPORT DETAIL.
13 . DUCT PENETRATES EXTERIOR WALL 56" X 30", TRANSITIONS IN
ELBOW TO 56" X 16", RISES TO ABOVE BOTTOM OF STRUCTUAL
TRUSS AND IS ROUTED AS SHOWN. PROVIDE TRANSITIONS &
OFFSETS AS REQUIRED TO AVOID CONFLICTS WITH STRUCTURAL
MEMBERS.
14 . COORDINATE DUCT ROUTING WITH EXISTING STRUCTURAL
FRAMING AND BASKETBALL GOAL SUPPORTS. INTERNALLY LINE
DUCTWORK WITH 1" LINER. ALL DUCTWORK EXPOSED IN GYM
SHALL BE GALVIGRIP TYPE, PRIMED, AND PAINTED WITH 2 COATS
OF PAINT TO MATCH EXISTING DUCTWORK. DUCTWORK SHALL BE
PAINTED PRIOR TO HANGING.
15 . NEW DUCTLESS CASSETTE MOUNTED IN CEILING. MODIFY
EXISTING CEILING GRID AS REQUIRED TO INSTALL NEW DUCTLESS
FAN COIL UNIT. BLANK OFF SUPPLY LOUVER FACING KITCHEN
HOOD TO ENSURE DFCU AIRFLOW DOES NOT AFFECT KITCHEN
HOOD.
16 . NEW SUPPLY FAN MOUNTED ABOVE COOLER/FREEZER. FIELD
VERIFY EXISTING LOCATION, SUPPLY, & RETURN CONNECTIONS.
PROVIDE FITTINGS / TRANSITIONS AS REQUIRED TO MAKE A
SMOOTH TRANSITION FROM NEW FAN CONNECTIONS TO EXISTING
DUCTWORK.
17 . NEW DOOR AIR CURTAIN MOUNTED IN SAME LOCATION AS DOOR
AIR CURTAIN REMOVED DURING DEMOLITION. FIELD VERIFY
EXISTNG DOOR DIMENSIONS.
18 . NEW ROOF MOUNTED HEAT PUMP MOUNTED ON ROOF. PROVIDE
JOIST REINFORCEMENT AT BAR JOISTS BELOW RTU. SEE ROOF
CURB DETAIL - NEW CURB ON EXISTING ROOF AND JOIST
REINFORCEMENT DETAIL.
19 . NEW DUCTLESS HEAT PUMP MOUNTED ON NEW CONCRETE
EQUIPMENT PAD. SEE CONCRETE EQUIPMENT PAD DETAIL.
20 . EXTEND EXISTING CONCRETE EQUIPMENT PAD FOR NEW
DUCTLESS HEAT PUMPS. SEE CONCRETE EQUIPMENT PAD DETAIL.
FIELD VERIFY EXISTING FENCING HEIGHT AND DISTANCE FROM
BUILDING. MODIFY AMD EXTEND EXISTING FENCING AS SHOWN TO
INCLUDE NEW DUCTLESS HEAT PUMPS.
21 . DUCTWORK ROUTED EXPOSED ON ROOF. CAREFULLY
COORDINATE ROUTING WITH EXISTING PLUMBING VENT STACKS,
FLUES, ETC. DUCTWORK ROUTED OUTDOORS SHALL HAVE ONE
LAYER OF 2" THICK ARMAFLEX CLOSED CELL ELASTOMERIC
INSULATION ON EXTERIOR OF DUCT. COVER INSULATION WITH
EMBOSSED ALUMINUM COVER. PROVIDE NON-PENETRATING DUCT
SUPPORTS ON MAXIMUM 4' CENTERS TO SUPPORT DUCTWORK ON
ROOF. SEE NON-PENETRATING DUCT SUPPORT DETAIL. COVER
SUPPLY AND RETURN DUCT INDIVIDUALLY WITH SHEET METAL
COVERS. SEE ROOF MOUNTED EXTERIOR METAL DUCT HOOD
22 . REFRIGERANT PIPING RISES UP EXTERIOR WALL AND
PENETRATES BUILDING AT EXISTING PIPING PENETRATION
ELEVATION. PROVIDE COVER FOR REFRIGERANT PIPING AND
PAINT TO MATCH EXISTING BUILDING.
23 . CONDENSATE PIPE CONTINUES TO EXISTING CONDENSATE
TERMINATION. FIELD VERIFY EXACT LOCATION.
24 . NEW ROOF MOUNTED HEAT PUMP MOUNTED ATOP EXISTING
ROOF CURB. PROVIDE ADAPTER CURB AS REQUIRED TO
TRANSITION FROM NEW UNIT CONNECTIONS TO EXISTING DUCT
LAYOUT. COORDINATE DUCT CURB TO PREVENT INTERFERENCE
WITH ADJACENT ROOF SOFFIT & EXTERIOR WALL. REINSTALL
BIPOLAR IONIZATION UNIT REMOVED DURING DEMOLITION. SEE
BIPOLAR IONIZATION UNIT DETAIL.
25 . NEW CENTRIFUGAL EXHAUST FAN MOUNTED ATOP EXISTING
ROOF CURB. PROVIDE ADAPTER CURB AS REQUIRED TO MAKE
TRANSITION FROM NEW FAN CONNECTION TO EXISTING DUCT
DIMENSION.
26 . CAREFULLY COORDINATE ROOFTOP PLACEMENT TO MAINTAIN
MINIMUM 10' FROM OUTSIDE AIR INTAKE TO EXISTING WATER
HEATER FLUE.
27 . PROVIDE NON-PENETRATING KEEGUARD CONTRACTOR ROOFTOP
GUARDRAIL OR PRIOR APPROVED EQUAL AROUND EDGE OF
ROOFTOP UNIT TO ALLOW FOR MAINTENANCE.
28 . NEW CONDENSATE DRAIN PIPING ROUTED TO SAME LOCATION AS
CONDENSATE DRAIN PIPE REMOVED DURING DEMOLITION. FIELD
VERIFY EXISTING PIPE ROUTING.
29 . REFRIGERANT PIPING ROUTED DOWN THRU PIPE BOX. SEE
DUCTLESS HEAT PUMP CAP AT EXISTING CURB DETAIL AND PIPE
BOX/HOOD ASSEMBLY DETAIL.
30 . DUCT MOUNTED SMOKE DETECTOR PROVIDED AND WIRED BY
ELECTRICAL. INSTALLED BY MECHANICAL.
31 . EXISTING DISHWASHER EXHAUST FAN TO REMAIN.
GENERAL NOTE: PROVIDE LINTEL AT ALL NEW DUCT PENETRATIONS
THRU EXISTING WALLS. SEE LINTEL DETAIL AT EXISTING WALL.
No. Description Date
2 ADDENDUM #3 06/15/22
PROJECT NUMBER:
DATE:
DRAWN BY:
CHECKED BY:
TITLE:
SUBJECT TO GENERAL
COPYRIGHT LAWS ©
REVISIONS
2021203
05/20/2022
GA DOE ID #: 0199
M601
MECHANICAL SCHEDULES
L A
M A
R R
E E
S E
E L E
M E
N T
A R
Y S
C H
O O
L
H V
A C
P
L U
M B
IN
G
U P
G R
A D
E S
WBF
JA3
L ily P o n d R d A lb a n y G
A
GRILLES
TAG
TITUS MODEL
NUMBER
CONN. SIZE FINISH
THROW AND/OR
APPLICATION
NOTES
A1 TMS 6" Ø WHITE 4-WAY 1:4:5:7:8
A2 TMS 8" Ø WHITE 4-WAY 1:4:5:7:8
A3 TMS 10" Ø WHITE 4-WAY 1:4:5:7:8
A4 TMS 12" Ø WHITE 4-WAY 1:4:5:7:8
B1 50F 12" X 12" WHITE CEILING RETURN 3:4:6:7
C1 33RL 30" X 16" WHITE SIDEWALL RETURN 4:6:7:10
D1 45F 24" X 24" WHITE CEILING RETURN 2:5:7:9
E1 30RL 56" X 30" WHITE SIDEWALL RETURN 4:6:7:11
1. LOUVERED FACE SQUARE CONE STEEL CEILING SUPPLY DIFFUSER WITH FIXED AIR 360º DISCHARGE PATTERN AS SCHEDULED. PROVIDE
FULL FACED LOUVERS.
2. RETURN FILTER GRILLE WITH 1/2" X 1/2" X 1/2" ALUMINUM EGGCRATE CORE, DESIGNED TO HOLD 1" FILTER. SEE RETURN FILTER GRILLE
DETAIL.
3. ALL ALUMINUM 1" X 1" X 1" "EGG CRATE" EXHAUST/RETURN GRILLE.
4. PROVIDE OPPOSED BLADE DAMPER.
5. IN 24 X 24 PANEL FOR LAY-IN CEILING.
6. FLANGED FRAME FOR SURFACE MOUNTING.
7. NC LEVEL NOT TO EXCEED NC 25.
8. SEE CEILING GRILLE DUCT CONNECTION DETAIL.
9. PROVIDE RECTANGULAR TO ROUND FLAT ADAPTER OF SIZE REQUIRED. SEE RECTANGULAR TO ROUND FLAT ADAPTER DETAIL.
10. HEAVY DUTY STEEL SIDEWALL RETURN GRILLE WITH FIXED HORIZONTAL BLADES AT 38° TO 45° DEFLECTION. PROVIDE 3/8" TO 1/2" BLADE
SPACING AND WELDED CONSTRUCTION.
11. HEAVY DUTY STEEL SIDEWALL RETURN GRILLE WITH FIXED HORIZONTAL BLADES AT 0° DEFLECTION. PROVIDE 3/8" TO 1/2" BLADE
SPACING AND WELDED CONSTRUCTION.
EXHAUST / SUPPLY FANS
TAG
GREENHECK
MODEL NUMBER
CFM APPROX. E.S.P. (IN.W.G.) FAN RPM MOTOR HP SONES NOTES
EF-1 SP-80-VG 75 0.25 879 4W <0.3 2:3:4:8
EF-2 SP-80-VG 75 0.25 879 4W <0.3 2:3:4:8
EF-3 SP-80-VG 75 0.25 879 4W <0.3 2:3:4:8
EF-4 SP-80-VG 75 0.25 879 4W <0.3 2:3:4:8
EF-5 SP-80-VG 75 0.25 879 4W <0.3 2:3:4:8
EF-6 SP-80-VG 75 0.25 879 4W <0.3 2:3:4:8
EF-7 SP-80-VG 75 0.25 879 4W <0.3 2:3:4:8
EF-8 SP-80-VG 75 0.25 879 4W <0.3 2:3:4:8
EF-9 SP-80-VG 75 0.25 879 4W <0.3 2:3:4:8
EF-10 SP-80-VG 75 0.25 879 4W <0.3 2:3:4:8
EF-11 SP-80-VG 75 0.25 879 4W <0.3 2:3:4:8
EF-12 SP-80-VG 75 0.25 879 4W <0.3 2:3:4:8
EF-13 SP-80-VG 75 0.25 879 4W <0.3 2:3:4:8
EF-14 SP-80-VG 75 0.25 879 4W <0.3 2:3:4:8
EF-15 SP-80-VG 75 0.25 879 4W <0.3 2:3:4:8
EF-16 SP-80-VG 75 0.25 879 4W <0.3 2:3:4:8
EF-17 SP-80-VG 75 0.25 879 4W <0.3 2:3:4:8
EF-18 SP-80-VG 75 0.25 879 4W <0.3 2:3:4:8
EF-19 SP-80-VG 75 0.25 879 4W <0.3 2:3:4:8
EF-20 SP-80-VG 75 0.25 879 4W <0.3 2:3:4:8
EF-21 SP-80-VG 75 0.25 879 4W <0.3 2:3:4:8
EF-22 SP-80-VG 75 0.25 897 4W <0.3 2:3:4:8
EF-23 G-090-VG 600 0.25 1496 1/10 7.0 1:3:4:5:7
EF-24 G-090-VG 600 0.25 1496 1/10 7.0 1:3:4:5:7
EF-25 G-070-VG 150 0.25 1260 1/15 2.5 1:3:4:5:7
EF-26 G-060-VG 75 0.25 1385 1/15 2.8 1:3:4:5:7
EF-27 G-095-VG 900 0.25 1595 1/6 9.3 1:3:4:5:7
EF-28 OMITTED - - - - - -
EF-29 OMITTED - - - - - -
EF-30 CUE-240-VG 6000 2.0 1108 5 26 3:4:5:7:10
EF-31 EXISTING TO REMAIN - - - - -
EF-32 G-090-VG 415 0.25 1208 1/10 4.9 1:3:4:5:7
EF-33 SQ-90-VG 290 0.25 1161 1/10 4.6 3:4:5:6
EF-34 EXISTING TO REMAIN - - - - -
EF-35 EXISTING TO REMAIN - - - - -
EF-36 EXISTING TO REMAIN - - - - -
EF-37 G-090-VG 415 0.25 1208 1/10 4.9 1:3:4:5:7
SF-1 BCF-210-20 4200 0.5 1174 2 17.5 4:6:9
1. CENTRIFUGAL CURB MOUNTED EXHAUST FAN. PROVIDE BIRDSCREEN, GRAVITY BACKDRAFT DAMPER, DAMPER TRAY, AND HOOD HASPS.
SEE CENTRIFUGAL ROOF EXHAUST FAN DETAIL.
2. CENTRIFUGAL CEILING EXHAUST FAN WITH INTEGRAL POLYPROPYLENE WHITE GRILLE, FLAPPER BACKDRAFT DAMPER, PLUG-IN TYPE
DISCONNECT AND MOUNTING BRACKETS.
3. DIRECT DRIVE. MOTORS WITH VG IN MODEL SHALL BE PROVIDED WITH ELECTRONICALLY COMMUNICATED MOTOR.
4. PROVIDE FACTORY MOUNTED DISCONNECT SWITCH.
5. VG MOTOR SHALL HAVE FACTORY POTENTIOMETER DIAL.
6 INLINE CENTRIFUGAL FAN WITH BACKDRAFT DAMPER, MOUNTING BRACKETS, AND VIBRATION ISOLATORS. SEE CENTRIFUGAL INLINE FAN
DETAIL.
7. MOUNT EXHAUST FAN ATOP EXISTING ROOF CURB. PROVIDE ADAPTER CURB AS REQUIRED TO TRANSITION FROM EXISTING DUCT
CONNECTION TO NEW FAN DUCT CONNECTION.
8. PROVIDE MANUFACTURER PROVIDED, GRILLE MOUNTED MOTION DETECTOR WITH ADJUSTABLE TIME DELAY.
9. BELT DRIVE.
10. CENTRIFUGAL DIRECT DRIVE UPBLAST EXHAUST FAN FOR GREASE LADEN KITCHEN EXHAUST APPLICATION. FAN SHALL HAVE HIGH-TEMP CURB SEAL RATED FOR CONTINUOUS DUTY AT 1500°F, GREASE TRAP, AND GALVANIZED BIRD SCREEN WITH NOMINAL 70% FREE AREA.
HEAT PUMPS
TAG
CARRIER MODEL
NUMBER
COOLING CAPACITY (MBH) MIN. STAGES CAPACITY
MINIMUM AMBIENT
COOLING TEMP
HEATING
CAPACITY (MBH)
NOTES
HP-1 25HBC530 28.8 2 35 14.8 1:2:3:4:5:6:7:8:9:10:11:12:13
HP-2 25HBC530 28.8 2 35 14.8 1:2:3:4:5:6:7:8:9:10:11:12:13
1. COOLING CAPACITIES BASED ON 95°F AMBIENT AIR TEMPERATURE. HEATING CAPACITY BASED ON 17°F AMBIENT TEMP.
2. ALL REFRIGERANT LINES TO BE INSTALLED AND SIZED PER MANUFACTURER'S INSTALLATION RECOMMENDATIONS.
3. SCHEDULED CAPACITIES ARE OVERALL CAPACITIES REQUIRED FOR MATACHED HEAT PUMP AND EVAPORATOR COIL WITH 2°F SUCTION LINE LOSS.
4. PROVIDE INTEGRAL CONTROLS INCLUDING CONTACTORS, CRANKCASE HEATER, 5 MINUTE COMPRESSOR TIME DELAY RELAY, AND COMPRESSOR OVER TEMPERATURE (OVERLOAD) PROTECTION.
5. PROVIDE ALL CONTROLS, ACCESSORIES, AND SYSTEM MODIFICATIONS TO PERMIT COOLING OPERATION TO SPECIFIED TEMPERATURE.
6. PROVIDE LIQUID AND SUCTION LINE SERVICE VALVES/GAUGE PORTS.
7. PROVIDE HIGH PRESSURE SWITCH AND LOW PRESSURE SWITCH.
8. PROVIDE TIME INITIATED, TEMPERATURE TERMINATE DEFROST CONTROLS.
9. SEE HEAT PUMP/CONDENSING UNIT DETAIL.
10. UNIT SHALL UTILIZE R-410a REFRIGERANT.
11. PROVIDE LOUVERED COIL GUARD.
12. PROVIDE 2-STAGE SCROLL COMPRESSOR.
13. MOUNT UNIT ATOP EXISTING CONCRETE EQUIPMENT PAD. EXTEND CONCRETE PAD AS REQUIRED TO MAINTAIN MINIMUM 6" FROM HEAT PUMP TO EDGE OF PAD ON ALL SIDES.
1. VERTICAL DRAW THRU FAN COIL UNIT, MOUNTED HORIZONTALLY, WITH SINGLE WALL CONSTRUCTION AND 1" THICKNESS R4.2 INTERIOR INSULATION, PROVIDE BAKED ENAMEL FINISH. SEE HORIZONTAL FCU DETAIL.
2. COOLING CAPACITIES BASED ON AIR ENTERING EVAPORATOR AT SCHEDULED CONDITIONS AND MATCHED WITH INDICATED HEAT PUMP UNIT.
3. HEATING CAPACITY BASED ON 70°F RETURN AIR AND OUTDOOR AIR AT 17°F, AND MATCHED WITH INDICATED HEAT PUMP UNIT.
4. PROVIDE DX COOLING COIL WITH FACTORY INSTALLED THERMOSTATIC EXPANSION VALVE FOR REFRIGERANT CONTROL.
5. SCHEDULED CAPACITIES ARE OVERALL CAPACITIES FOR MATCHED HEAT PUMP UNIT AND EVAPORATOR COIL WITH 2°F LINE LOSS.
6. EXTERNAL STATIC PRESSURE SCHEDULED DOES NOT INCLUDE WET COOLING COIL, CASING, ELECTRIC HEAT COIL, OR FILTER LOSSES. BLOWER MOTOR MUST OVERCOME E.S.P. AT CONNECTED VOLTAGE.
7. PROVIDE UNIT MOUNTED FACTORY INSTALLED ELECTRIC STRIP HEATERS OF INDICATED KW AT CONNECTED VOLTAGE. PROVIDE SINGLE POINT UNIT POWER CONNECTION FOR ENTIRE UNIT.
8. PROVIDE FAN MOTOR CONTACTOR, TERMINAL STRIP, AND ALL CONTROLS.
9. PROVIDE INTEGRAL FILTER RACK DESIGNED TO ACCOMODATE 1" FILTERS.
10. PROVIDE DOUBLE SLOPED REMOVABLE CONDENSATE DRAIN PAN. PROVIDE TRAPPED CONDENSATE DRAIN. SEE CONDENSATE DRAIN TRAP DETAIL.
11. PROVIDE ECM CONSTANT TORQUE MOTOR.
12. REUSE EXISTING NEEDLEPOINT BI POLAR IONIZATION UNIT REMOVED DURING DEMOLITION. IF NO BIPOLAR UNIT PRESENT IN EXISTING EQUIPMENT, PROVIDE NEW NEEDLEPOINT BIPOLAR IONIZATION UNIT FOR SCHEDULED
AIRFLOW. SEE SPECIFICATIONS FOR DETAILS.
FAN COIL UNITS
TAG
CARRIER
MODEL
NUMBER
CFM O.A. CFM
COOLING
CAPACITY
(MBH)
SENSIBLE
COOLING
CAPACITY (MBH)
HEATING
CAPACITY
(MBH)
ELECTRIC
HEAT (KW)
APPROX.
E.S.P.
(IN.W.G.)
BLOWER
MOTOR HP
COOLING ENT. AIR
TEMP. NOTES
°F D.B. °F W.B.
FCU-1 FV4CNF003 875 - 26.2 19.7 14.5 5 0.25 1/2 75 63 1:2:3:4:5:6:7:8:9:10:11:12
FCU-2 FV4CNF003 875 - 26.2 19.7 14.5 5 0.25 1/2 75 63 1:2:3:4:5:6:7:8:9:10:11:12
DUCTLESS FAN COIL UNITS
TAG
CARRIER
MODEL NUMBER
TOTAL COOLING MBH SENSIBLE COOLING
CAPACITY (MBH)
TOTAL
SUPPLY CFM
HEATING CAPACITY MBH APPROX. E.S.P.
(IN.W.G.)
BLOWER
MOTOR WATTS
NOTES
RATED MIN. RATED MIN
DFCU-1 40MBCQ18 18.0 4.5 12.8 562 - - - 45 1:2:3:4:5
DFCU-2 40MBCQ18 18.0 4.5 12.8 562 18.0 8.3 - 45 1:2:3:4:6
DFCU-3 40MBCQ18 18.0 4.5 12.8 562 - - - 45 1:2:3:4:5
DFCU-4 40MBCQ18 18.0 4.5 12.8 562 18.0 8.3 - 45 1:2:3:4:6
DFCU-5 40MBCQ36 36.0 9.0 25.6 1095 36.0 16.5 - 246 1:2:3:4:6
DFCU-6 40MBCQ36 36.0 9.0 25.6 1095 36.0 16.5 - 246 1:2:3:4:6
DUCTLESS CONDENSING UNITS/HEAT PUMPS
TAG
CARRIER MODEL
NUMBER
TOTAL COOLING MBH HEATING CAPACITY MBH MINIMUM AMBIENT
COOLING TEMP. °F
NOTES
RATED MIN. RATED MIN.
DHP-1 38MAQB18 18.0 4.5 - - 20 1:2:3:4:5:6:7
DHP-2 38MAQB18 18.0 4.5 18.0 8.3 20 1:2:3:4:5:6:7
DHP-3 38MAQB18 18.0 4.5 - - 20 1:2:3:4:5:6:7
DHP-4 38MAQB18 18.0 4.5 18.0 8.3 20 1:2:3:4:5:6:7
DHP-5 38MAQB36 36.0 9.0 36.0 16.5 20 1:2:3:4:5:6:7
DHP-6 38MAQB36 36.0 9.0 36.0 16.5 20 1:2:3:4:5:6:7
1. CEILING CASSETTE STYLE DUCTLESS FAN COIL UNIT.
2. COOLING CAPACITIES BASED ON AIR ENTERING EVAPORATOR AT 80ºFdb, 67ºFwb AND MATCHED WITH INDICATED CONDENSING UNIT/HEATPUMP.HEATING
CAPACITY BASED ON 47 F.
3. PROVIDE FACTORY CONDENSATE PUMP. CONDENSATE PUMP SHALL BE FACTORY PROVIDED MODEL#X87 BLUE DIAMOND MAXIBLUE PUMP WITH A MINIMUM DISCHARGE HEAD OF 23 FT AND A MINIMUM SUCTION HEAD OF 16.5 FT. MOUNT CONDENSATE PUMP 6" ABOVE CEILING ON WALL ON BRACKET AND PIPE SUCTION DOWN TO UNIT CONNECTION. STANDARD INTERNAL PUMP WILL NOT BE ALLOWED. PROVIDE VINYL TUBING TO DISCHARGE AS NOTED ON DRAWINGS, VERIFY
LENGTH.
4. PROVIDE PERMANENT WALL MOUNTED HARD WIRED THERMOSTAT IN SAME LOCATION AS THERMOSTAT REMOVED DURING DEMOLITION. LOOSE HAND HELD
WIRELESS REMOTE WILL NOT BE ALLOWED.
5. UNIT SERVES IDF/MDF ROOM AND IS DESIGNED TO BE COOLING ONLY UNIT. UNIT SHALL HAVE A LOWER COOLING SET POINT TO PREVENT UNIT FROM
OPERATING IN HEATING MODE.
6. PROVIDE NEEDLEPOINT BIPOLAR IONIZATION UNIT. NOT SHOWN ON DRAWINGS. SEE SPECIFICATIONS FOR MORE INFORMATION.
1. COOLING CAPACITY BASED ON 95ºF AMBIENT AIR TEMPERATURE AND HEATING AT 47ºF AMBIENT AND MATCHED WITH SCHEDULED DUCTLESS FAN COIL UNIT.
2. PROVIDE REFRIGERANT PIPING SIZED AND DESIGNED IN ACCORDANCE WITH MANUFACTURERS INSTRUCTION. NOTE THAT BOTH REFRIGERANT LINES MUST BE INSULATED PER MANUFACTURER'S INSTRUCTIONS. PROVIDE INSULATED LINE SET, VERIFY EXACT LENGTH.
3. SCHEDULED CAPACITIES ARE OVERALL CAPACITIES REQUIRED FOR MATCHED CONDENSING UNIT/HEATPUMP AND EVAPORATOR COIL 2 # LINE LOSS.
4. PROVIDE INTEGRAL CONTROLS INCLUDING CONTACTORS, DEFROST BOARD (HEAT PUMP ONLY), CONTROL TRANSFORMER, ETC
5. UNIT SHALL UTILIZE R-410a REFRIGERANT. PROVIDE DC ROTARY COMPRESSOR WITH VARIABLE SPEED INVERTER TECHNOLOGY.
6. MOUNT ON EXISTING EQUIPMENT SUPPORT RAIL. SEE DUCTLESS UNIT ATOP EQUIPMENT SUPPORT RAIL DETAIL.
7. PROVIDE FACTORY WIND BAFFLE.
ROOFTOP UNITS
TAG
CARRIER
MODEL
NUMBER
TOTAL
COOLING MBH
SENSIBLE
COOLING MBH
TOTAL
SUPPLY CFM
O.A. CFM HEATER KW
APPROX.
E.S.P.
(IN.W.G.)
SUPPLY
FAN BHP
MINIMUM STAGES
COOLING ENTERING
CONDITIONS
MINIMUM
AMBIENT
COOLING TEMP
NOTES
COOLING HEATING E.A.T. D.B. °F E.A.T. W.B. °F
RTU-1 50GCQ05 44.8 35.6 1600 160 10.6 0.4 0.42 2 1 77.3 63.9 40 1:2:3:4:5:6:7:8:9:10:11:12:16:17
RTU-2 50GCQ05 44.8 35.6 1600 160 10.6 0.4 0.42 2 1 77.3 63.9 40 1:2:3:4:5:6:7:8:9:10:11:12:17:18
RTU-3 50GCQ04 30.7 20.9 800 75 4.9 0.3 0.11 2 1 77.0 64.4 40 1:2:3:4:5:6:7:8:9:10:11:12:16:17
RTU-4 50GCQ06 59.5 47.3 2000 150 10.6 0.4 0.75 2 1 76.6 64.1 40 1:2:3:4:5:6:7:8:9:10:11:12:17:18
RTU-5 EXISTING TO REMAIN - - - - - - - - - - - -
RTU-6 EXISTING TO REMAIN - - - - - - - - - - - -
RTU-7 EXISTING TO…
This is the start of the file's text. The full file is on GovTribe.
Other files
| File | Type | Posted |
|---|---|---|
| Award Information | — | |
| Addendum 1 | — | |
| Addendum 4 | — | |
| Addendum 2 | — | |
| Bid Invitation | — | |
| DRAWINGS | — |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
File details come from the government source that posted it. Updated .