DRAWINGS 100 PERCENT.pdf

PDF 27 MB Posted

Attached to
NEW | 549-22-800 Replace Windows Building 2J Federal contract opportunity
Solicitation number
36C25726R0048
Issued by
Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 17

About this file

This is a comprehensive set of architectural and engineering drawings for a window replacement project at the Dallas VA Medical Center. The project involves replacing windows in Building 2J, located at 4500 S. Lancaster Rd, Dallas, TX 75216, with a VA project number of 549-22-800. The 76-sheet drawing set includes detailed plans for window and skylight replacements across multiple levels (1st, 3rd, 5th floors and roof), with specific phasing for different building areas and zones. The drawings specify bronze anodized aluminum window frames, 1-inch double-glazed laminated glass with Guardian 'SNR 43 Grey' specification, and include specific installation requirements such as using moisture-resistant gypsum board, maintaining infection control protocols, and carefully managing demolition and installation to minimize disruption to the medical facility's operations.

View the file

Other files for this federal contract opportunity

Other files attached to NEW | 549-22-800 Replace Windows Building 2J, newest first.
File Type Posted
Amendment 0009 36C25726R0048.docx DOCX document
Asbestos Inspection and Management Plan.pdf PDF
Lightning Protection System Certificate of Completion.pdf PDF
Amendment 0008 36C25726R0048.docx DOCX document
RFIs with Responses 36C25726R0048.docx DOCX document
Addendum 01.pdf PDF
Amendment 0007 36C25726R0048.docx DOCX document
Amendment 0006 36C25726R0048.docx DOCX document
Amendment 0005 36C25726R0048.docx DOCX document
Amendment 0004 36C25726R0048.docx DOCX document
Attachment 4 Itemized Cost Breakdown.xlsx XLSX spreadsheet
Site Visit Sign in Sheet 2nd Site Visit Replace Windows Building 2J.pdf PDF
Site Visit Sign in Sheet 1st Site Visit Replace Windows Building 2J.pdf PDF
Amendment 0003 36C25726R0048.docx DOCX document
Amendment 0002 36C25726R0048.docx DOCX document
Amendment 36C25726R0048 0001.docx DOCX document
STRUCTURAL CALCULATION PACKAGE.pdf PDF
VHA PCRA ICRA CATEX ILSM.pdf PDF
36C25726R0048 SOLICITATION.docx DOCX document
ASBESTOS ANALYSIS.pdf PDF
SPECIFICATIONS 100 PERCENT.pdf PDF
Show all 21

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

WV

ICV

RD

RD

R D

RD

RD

DRRDRD DR

WV

RD RD

RD

MH

FDC

UP

v v v v v v v v v v v v v v v v v v v v v v vv v v v v v v

ASPHALT

PAVEMENT

SIGN

E LE V P4E LE V P3

B B 101

S EC URI TY

TRB A 101

I T/ TEL TR

B A 104

S EC URI TY

S -01

S T AI R 01

B B 105

E LEC TRI CAL

E LE V P1F UT URE

E LE V P2

S -02

S T AI R 02

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X X X

XX

X

X

X

X

X

X X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X X

X

X

X

X

XX

X

X

X

X X X

X

X X

X

X

X

X

X X

XX X

X

X

X

X X

X

X

X X

X

X

X X

X

X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X XX XX X XXX XX XXX X

X

X

X

X

X

X

X

X

X

X

X

X

X X XX XXX XX XXX XX X XX X

X

X

X

X XX XX X XXX XX XXX X X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

XX

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X

X

X

X

X

X

X X

X

X

X

X

X

X

X

X X

X

X

X

X X

X

X

X

X

X

X

X

X

X

X

X

X

X

X X

2J

LIBERTY LOOP

LIBERTY LOOP

A V

E N

U E

O F

F L

A G

S

LANDCASTER ROAD

L

IB

E R

T Y

L O

O P

4T H

S T.

LIBERTY LOOP

1S T

S T

L

IB

E R

T Y

L O

O P

6TH ST.

A N

N A

R B

O R

A V

E N

U E

ANN A

RBOR A

VENUE VETER

A

N S D

R

IVE

th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t o n e e ig h th in c h o n e fo o t

A

B

C

D

E

F

Veterans Health

Administration

VA FORM 08-6231

Drawing Title Project Title

Location

Date Checked Drawn

Project Number

CONSULTANTS:

Drawing # OF

U.S. DEPARTMENT OF VETERANS AFFAIRS

VA Health Care System Approval:

ARCHITECT:

SPUR DESIGN, LLC

312 SW 25TH STREET

Oklahoma City, OK 73109

(405) 842-6100

TX ARCH COA #BR2171 EXP. 09/30/2023

TX ENGR COA #F-17591 EXP. 02/28/2023

STRUCTURAL ENGINEER

H2B

1225 NORTH LOOP WEST

SUITE 800

HOUSTON TX 77008

(713) 864-2900

ENVIRONMENTAL ENGINEER

RIVERFRONT SAFETY & HEALTH

11140 SOUTH TOWNE SQUARE,

SUITE 100

SAINT LOUIS, MO 63123

(314) 436-9492

FULLY SPRINKLERED

PHYSICAL SECURITY

FORCE PROTECT

10901 FRONT BEACH RD, UNIT 1415

PANAMA CITY BEACH, FL 32407

(502) 836-4232

1 2 3 4 5 6 7 8 9

1 2 3 4 5 6 7 8 9

A

B

C

D

E

F

STAMP:

Drawing Number

Building Number

/1

/2

:2

:3

P

M

COVER SHEET

MJA 01 76DLK

100% CONSTRUCTION DOCUMENTS

REPLACE WINDOWS BUILDING 2J

VA PROJECT NUMBER: 549-22-800

REPLACE WINDOWS

BUILDING 2J

12/14/2022

549-22-800

DALLAS VA MEDICAL CENTER

4500 S. LANCASTER RD.

DALLAS, TX 75216

VA NORTH TEXAS HEALTHCARE SYSTEM

4500 S. LANCASTER RD.

DALLAS, TX 75216

100% CONSTRUCTION DOCUMENTS

GI000

2J

SPUR #: 2090.03

SHEET INDEX

SEQUENCE NUMBER SHEET NAME

51 AE107 REFERENCE AND DIMENSION PLAN - LEVEL 3 - SERVICE ZONE - AREA A

52 AE108 REFERENCE AND DIMENSION PLAN - LEVEL 3 - SERVICE ZONE - AREA B

53 AE109 REFERENCE AND DIMENSION PLAN - LEVEL 5 - AREA A

54 AE110 REFERENCE AND DIMENSION PLAN - LEVEL 5 - AREA B

55 AE111 REFERENCE AND DIMENSION PLAN - LEVEL 5 - SERVICE ZONE - AREA A

56 AE112 REFERENCE AND DIMENSION PLAN - LEVEL 5 - SERVICE ZONE - AREA B

57 AE113 REFERENCE AND DIMENSION PLAN - ROOF - AREA A

58 AE114 REFERENCE AND DIMENSION PLAN - ROOF - AREA B

59 AE201 BUILDING ELEVATION

60 AE202 BUILDING ELEVATION

61 AE203 BUILDING ELEVATION

62 AE204 BUILDING ELEVATION

63 AE205 BUILDING ELEVATION

64 AE206 BUILDING ELEVATION

65 AE207 BUILDING ELEVATION

66 AE208 BUILDING ELEVATION

67 AE209 BUILDING ELEVATION

68 AE210 BUILDING ELEVATION

69 AE211 BUILDING ELEVATIONS

70 AE212 BUILDING ELEVATIONS

71 AE601 DOOR TYPES AND SCHEDULE

72 AE602 WINDOW TYPES

73 AE603 WINDOW TYPES

74 AE604 WINDOW TYPES

75 AE605 WINDOW DETAILS

76 AE606 SKYLIGHT DETAILS

TOTAL SHEETS: 76

SHEET INDEX

SEQUENCE NUMBER SHEET NAME

[01] GENERAL

01 GI000 COVER SHEET

02 GI001 GENERAL INFORMATION

03 GI002 ICRA NOTES

04 GI003 ICRA CONSTRUCTION DETAILS

05 GI004 PHASING PLAN - LEVEL 1

06 GI005 PHASING PLAN - LEVEL 1 - AREA A

07 GI006 PHASING PLAN - LEVEL 1 - AREA B

08 GI007 PHASING PLAN - LEVEL 1 - SERVICE ZONE

09 GI008 PHASING PLAN - LEVEL 3

10 GI009 PHASING PLAN - LEVEL 3 - AREA A

11 GI010 PHASING PLAN - LEVEL 3 - AREA B

12 GI011 PHASING PLAN - LEVEL 3 - SERVICE ZONE

13 GI012 PHASING PLAN - LEVEL 5

14 GI013 PHASING PLAN - LEVEL 5 - AREA A

15 GI014 PHASING PLAN - LEVEL 5 - AREA B

16 GI015 PHASING PLAN - LEVEL 5 - SERVICE ZONE

17 GI016 PHASING PLAN - ROOF

[02] STRUCTURAL

18 SA001 STRUCTURAL GENERAL NOTES

19 SA010 STRUCTURAL SPECIAL INSPECTIONS

20 SS100 OVERALL SITE PLAN

21 SF101 ENLARGED SKYLIGHT PLANS

22 SF102 ENLARGED PORTE COCHERE PLANS & DETAILS

23 SF501 SKYLIGHT DETAILS

[03] HAZARDOUS MATERIALS

24 HA100 ENVIRONMENTAL HAZARDS - FLOOR 1-A

25 HA101 ENVIRONMENTAL HAZARDS - FLOOR 1-B

26 HA102 ENVIRONMENTAL HAZARDS - FLOOR 3-A

27 HA103 ENVIRONMENTAL HAZARDS - FLOOR 3-B

28 HA104 ENVIRONMENTAL HAZARDS - FLOOR 5-A

29 HA105 ENVIRONMENTAL HAZARDS - FLOOR 5-B

30 HA106 ENVIRONMENTAL HAZARDS - ROOF

[04] ARCHITECTURAL

31 AD101 DEMOLITION PLAN - LEVEL 1 - AREA A

32 AD102 DEMOLITION PLAN - LEVEL 1 - AREA B

33 AD103 DEMOLITION PLAN - LEVEL 1 - SERVICE ZONE - AREA A

34 AD104 DEMOLITION PLAN - LEVEL 1 - SERVICE ZONE - AREA B

35 AD105 DEMOLITION PLAN - LEVEL 3 - AREA A

36 AD106 DEMOLITION PLAN - LEVEL 3 - AREA B

37 AD107 DEMOLITION PLAN - LEVEL 3 - SERVICE ZONE - AREA A

38 AD108 DEMOLITION PLAN - LEVEL 3 - SERVICE ZONE - AREA B

39 AD109 DEMOLITION PLAN - LEVEL 5 - AREA A

40 AD110 DEMOLITION PLAN - LEVEL 5 - AREA B

41 AD111 DEMOLITION PLAN - LEVEL 5 - SERVICE ZONE - AREA A

42 AD112 DEMOLITION PLAN - LEVEL 5 - SERVICE ZONE - AREA B

43 AD113 DEMOLITION PLAN - ROOF - AREA A

44 AD114 DEMOLITION PLAN - ROOF - AREA B

45 AE101 REFERENCE AND DIMENSION PLAN - LEVEL 1 - AREA A

46 AE102 REFERENCE AND DIMENSION PLAN - LEVEL 1 - AREA B

47 AE103 REFERENCE AND DIMENSION PLAN - LEVEL 1 - SERVICE ZONE - AREA A

48 AE104 REFERENCE AND DIMENSION PLAN - LEVEL 1 - SERVICE ZONE - AREA B

49 AE105 REFERENCE AND DIMENSION PLAN - LEVEL 3 - AREA A

50 AE106 REFERENCE AND DIMENSION PLAN - LEVEL 3 - AREA B

AREA

PLAN

N

LOCATION

PLAN

N

PROJECT LOCATION

DEDUCT ALTERNATES

1. KEEP THE EXISTING WINDOWS AT THE STAIR TOWERS (#1, 2, 3, AND 4).

2. REMOVE THE TWO EXTERIOR SKYLIGHTS AT THE DROP OFF CANOPIES FROM SCOPE.

3. REMOVE THE THREE INTERIOR SKYLIGHTS OVER MAIN ATRIUM FROM THE SCOPE.

No. REVISION DESCRIPTION DATE

ABBREVIATIONS CODES STANDARDS AND EXECUTIVE ORDERSMATERIALS LEGEND

PURPOSE: THE PUBLIC BUILDINGS AMENDMENT ACT OF 1988, PUBLIC LAW (PUB. L.) 100-678 REQUIRES FEDERAL AGENCIES TO FOLLOW NATIONAL RECOGNIZED "MODEL" BUILDING CODES. THE FEDERAL PARTICIPATION IN THE DEVELOPMENT AND USE OF VOLUNTARY STANDARDS, OFFICE OF MANAGEMENT AND BUDGET (OMB) CIRCULAR A-119, REQUIRES ALL EXECUTIVE AGENCIES TO RELY ON VOLUNTARY STANDARDS, BOTH DOMESTIC AND INTERNATIONAL, WHENEVER FEASIBLE, AND TO PARTICIPATE IN

VOLUNTARY STANDARD BODIES.

GENERAL: VA HAS ADOPTED THE LATEST EDITION OF THE FOLLOWING CODES AND STANDARDS AS A MINIMUM FOR ALL PROJECTS PERFORMED IN THE MODERNIZATION, ALTERATION, ADDITION, OR IMPROVEMENT OF ITS REAL PROPERTY AND THE CONSTRUCTION OF NEW STRUCTURES. VA DESIGN MANUALS AND MASTER SPECIFICATIONS

SPECIFY OTHER CODES AND STANDARDS THAT VA FOLLOWS ON ITS PROJECTS:

• VA DIRECTIVES, DESIGN MANUALS, MASTER SPECIFICATIONS, VA NATIONAL CAD STANDARD APPLICATION GUIDE, AND OTHER GUIDANCE ON THE TECHNICAL

INFORMATION LIBRARY (TIL) (HTTP://WWW.CFM.VA.GOV/TIL/).

• 2021 INTERNATIONAL BUILDING CODE (IBC) (ONLY WHEN SPECIFICALLY REFERENCED IN VA DESIGN DOCUMENTS, SEE NOTES BELOW)

• 2021 INTERNATIONAL EXISTING BUILDING CODE (IEBC) (IF APPLICABLE)

• 2021 NFPA 101 LIFE SAFETY CODE (SEE NOTES BELOW)

• 2021 NATIONAL FIRE CODES (NFPA)

• OCCUPATIONAL, SAFETY AND HEALTH ADMINISTRATION (OSHA) STANDARDS.

• 2020 VA SEISMIC DESIGN REQUIREMENTS, H-18-8

• 2021 INTERNATIONAL MECHANICAL CODE

• 2020 NATIONAL ELECTRICAL CODE (NEC), NFPA 70

• 2021 INTERNATIONAL PLUMBING CODE (IPC)

• 2016 SAFETY CODE FOR ELEVATORS AND ESCALATORS, AMERICAN SOCIETY OF MECHANICAL ENGINEERS (ASME) A 17.1.

• 2015 ARCHITECTURAL BARRIERS ACT (ABA) STANDARDS INCLUDING VA SUPPLEMENT, VA BARRIER FREE DESIGN STANDARD (PG-18-13)

• 2017 ANSI ICC A117.1 ACCESIBLE AND USABLE BUILDINGS AND FACILITIES

• 2019 BUILDING CODE REQUIREMENTS FOR STRUCTURAL CONCRETE AND COMMENTARY, AMERICAN CONCRETE INSTITUTE AND COMMENTARY (ACI 318-19)

• 2017 STEEL CONSTRUCTION MANUAL (15TH EDITION), AMERICAN INSTITUTE OF STEEL CONSTRUCTION (AISC)

• ENERGY POLICY ACT OF 2005 (EPACT)

• 2007 DOE INTERIM FINAL RULE: ENERGY CONSERVATION STANDARDS FOR NEW FEDERAL, COMMERCIAL AND MULTI-FAMILY HIGH-RISE RESIDENTIAL BUILDINGS AND

NEW LOW-RISE RESIDENTIAL BUILDINGS, 10 CFR PARTS 433, 434 AND 435.

• 2006 FEDERAL LEADERSHIP IN HIGH PERFORMANCE AND SUSTAINABLE BUILDINGS: MEMORANDUM OF UNDERSTANDING (MOU)

• 2018 EXECUTIVE ORDER 13834: EFFICIENT FEDERAL OPERATIONS

• 2021 THE PROVISIONS FOR CONSTRUCTION AND SAFETY SIGNS. STATED IN THE GENERAL REQUIREMENTS SECTION 010000 OF THE VA MASTER CONSTRUCTION

SPECIFICATION.

• 2019 VENTILATION FOR ACCEPTABLE INDOOR AIR QUALITY – ASHRAE STANDARD 62.1

• 2019 SAFETY STANDARD FOR REFRIGERATION SYSTEMS – ASHRAE STANDARD 15

LOCAL CODES: AS AN AGENCY OF THE FEDERAL GOVERNMENT, VA IS NOT SUBJECT TO LOCAL IMPOSITION OF CODE ENFORCEMENT PROCEDURES (DRAWING REVIEWS, BUILDING PERMITS, INSPECTIONS, FEES, ETC.). VA MUST FUNCTION AS THE AUTHORITY HAVING JURISDICTION (AHJ) AND THUS HAS THE RESPONSIBILITY TO GUARD PUBLIC HEALTH AND SAFETY THROUGH ENFORCING ITS ADOPTED CODES. HOWEVER, LOCAL AUTHORITIES SHOULD BE NOTIFIED ABOUT PLANNED PROJECTS AND GIVEN OPPORTUNITY TO REVIEW DRAWINGS PROVIDED THAT VA DOES NOT PAY FOR REVIEW OR INSPECTION FEES.

NOTES:

1. NFPA 101 PRIMARILY ADDRESSES LIFE SAFETY AND FIRE PROTECTION FEATURES WHILE THE IBC ADDRESSES A WIDE RANGE OF CONSIDERATIONS, INCLUDING, BUT

NOT LIMITED TO, STRUCTURAL STRENGTH, SEISMIC STABILITY, SANITATION, ADEQUATE LIGHT AND VENTILATION, AND ENERGY CONSERVATION. VA BUILDINGS MUST MEET THE REQUIREMENTS OF NFPA 101 AND DOCUMENTS REFERENCED BY NFPA 101 IN ORDER TO COMPLY WITH THE ACCREDITATION REQUIREMENTS OF THE JOINT COMMISSION. THEREFORE, DESIGNS SHALL COMPLY WITH THE REQUIREMENTS OF THE LATEST EDITION OF NFPA 101 AND DOCUMENTS REFERENCED THEREIN.

DESIGN FEATURES NOT ADDRESSED BY NFPA 101 OR DOCUMENTS REFERENCED THEREIN SHALL COMPLY WITH THE REQUIREMENTS OF THE LATEST EDITION OF THE IBC OR AS OTHERWISE ADDRESSED ABOVE IN THIS PROGRAM GUIDE. FOR DESIGN FEATURES THAT ARE ADDRESSED BY BOTH THE IBC AS WELL AS NFPA 101 OR A DOCUMENT REFERENCED BY NFPA 101, THE REQUIREMENTS OF NFPA 101 OR THE DOCUMENT REFERENCED BY NFPA 101 SHALL BE USED EXCLUSIVELY (THIS APPLIES

EVEN IF THE IBC REQUIREMENTS ARE DIFFERENT).

2. CONFLICTS BETWEEN NATIONALLY RECOGNIZED CODES AND STANDARDS AND VA REQUIREMENTS – SHOULD A CONFLICT EXIST BETWEEN VA REQUIREMENTS AND VA ADOPTED NATIONALLY RECOGNIZED CODES AND STANDARDS, THE CONFLICT SHALL BE BROUGHT TO THE ATTENTION OF VA. THE RESOLUTION OF THE CONFLICT SHALL BE MADE BY THE AUTHORITY HAVING JURISDICTION FOR VA TO ENSURE A CONSISTENCY SYSTEM WIDE.

ASHRAE 90.1 - 2019 EDITION

BUILDING LOCATION: DALLAS, TX

CLIMATE ZONE (TABLE ANNEX 1-1): ZONE 3A

INTERIOR DESIGN CONDITIONS:

THE INTERIOR DESIGN TEMPERATURES FOR HEATING AND COOLING AS DEPICTED IN THE PROJECT DESIGN CONDITIONS SCHEDULE IN THE MECHANICAL CONTROL DRAWINGS SHALL BE THE MAXIMUM

AND MINIMUM VALUES FOR THE ASSOCIATED TEMPERATURE CONTROL ZONES.

BUILDING ENVELOPE REQUIREMENTS (5.5 )

BUILDING ENVELOPE REQUIREMENTS FOR CLIMATE ZONE 3 (A,B,C)

ROOFS REQUIRED DESIGNED

INSULATION: R-30 c.i. EXISTING METAL BUILDINGS: R-19 + R-11 Ls or R-25 + R-8 Ls EXISTING

ATTIC AND OTHER: R-49 EXISTING

WALLS, ABOVE GRADE

MASS: R-9.5 c.i. EXISTING METAL BUILDING: R-0 + R-15.8 c.i. EXISTING STEEL-FRAMED: R-13 + R-7.5 c.i. EXISTING WOOD-FRAMED AND OTHER: R-13 + R-3.8 c.i. or R-20 EXISTING

WALL, BELOW GRADE

BELOW-GRADE WALL: R-7.5 c.i. EXISTING

FLOORS

MASS: R-14.6 c.i. EXISTING

STEEL-FRAMED: R-30 EXISTING

WOOD-FRAMED AND OTHER: R-30 EXISTING

SLAB-ON-GRADE FLOORS

UNHEATED SLABS: R-15 for 24 in. EXISTING HEATED SLABS: R-20 for 24 in. EXISTING

OPAQUE DOORS

SWINGING: U-0.370 EXISTING

NONSWINGING: U-0.310 EXISTING

FENESTRATION (TABLE 5.5-3):

VERTICAL FENESTRATION, U-FACTOR

FIXED: U-0.43 U- 0.212

OPERABLE: U-0.57 U- 0.212

ENTRANCE DOOR: U-0.73 U- 0.212

SKYLIGHTS: U-0.52 U- 0.212

DEFINITIONS

c.i = CONTINUOUS INSULATION Ls = LINEAR SYSTEM

NR = NO (INSULATION) REQUIREMENT

ENERGY REQUIREMENTS

N

1. DRAWINGS ARE PART OF A COMPLETE DOCUMENTS SET. CONTRACTOR SHALL

CONFIRM ALL ITEMS REQUIRED BASED UPON THE OVERALL DESIGN INTENT OF THE

ENTIRE DOCUMENT SET.

2. CONTRACTOR SHALL VERIFY ALL EXISTING CONDITIONS, PRIOR TO BEGINNING ANY

WORK, TO CONFIRM THE ACCURACY OF THE DRAWINGS AND REPORT ANY

DISCREPANCIES TO THE ARCHITECT. DO NOT SCALE THE DRAWINGS. FIELD VERIFY

ALL DIMENSIONS AND EXISTING STRUCTURAL CONDITIONS.

3. ALL AREAS NOT INVOLVED IN THE SCOPE OF WORK FOR THIS PROJECT SHALL BE KEPT

CLEAN AND FREE OF OBSTRUCTIONS AT ALL TIMES.

4. ERECT BARRICADES AND WARNING SIGNS TO DIVERT AND WARN PASSERS-BY OF THE

CONSTRUCTION WORK. PROVIDE DUST PROOFING ENCLOSURES TO SEPARATE WORK

AREAS FROM THE EXISTING FACILITIES.

5. ALL TRASH AND DEBRIS TO BE REMOVED ON A DAILY BASIS.

6. PROVIDE PROTECTION FOR ALL EXISTING SURFACES AND CONDITIONS TO REMAIN IN

PLACE DURING THE SCOPE OF WORK. SHOULD ANY DAMAGE OCCUR, PATCH AND

REPAIR ANY DAMAGE TO ADJACENT FINISHES TO MATCH EXISTING.

7. ANY DAMAGE CAUSED TO THE BUILDING OR OWNER EQUIPMENT SHALL BE REPAIRED

OR REPLACED BACK TO ITS ORIGINAL CONDITIONS AT NO ADDITIONAL COST TO THE

OWNER.

8. COVER ALL RETURN AIR GRILLES WITHIN THE AREA OF CONSTRUCTION TO PREVENT

PARTICULATE MATERIAL FROM EXHAUSTING INTO SURROUNDING SPACES.

9. APPROPRIATE LIGHT FIXTURES SHALL BE TEMPORARILY SUSPENDED TO PROVIDE

ADEQUATE LIGHTING LEVELS FOR CONSTRUCTION.

10. CONTRACTOR AND SUBCONTRACTORS ARE REQUIRED TO COORDINATE WITH OTHER

DISCIPLINES TO INSTALL COMPLETE AND OPERATIONAL SYSTEMS. DRAWINGS, AS A

WHOLE, REPRESENT A COMPLETE SET AND DEPICT REQUIREMENTS FOR COMPLETE

AND OPERATIONAL SYSTEMS. INDIVIDUAL DRAWINGS MAY NOT DEPICT COMPLETE AND

ACCURATE INFORMATION TO COORDINATE COMPLETE AND OPERATIONAL SYSTEMS,

BUT DO SO AS AN ENTIRE DOCUMENT TO BE REFERENCED WITH OTHER INDIVIDUAL

DRAWINGS. CONTRACTOR AND SUBCONTRACTORS ARE REQUIRED TO REFERENCE

OTHER SHEETS AND SPECIFICATIONS AS AN ENTIRE SET OF CONSTRUCTION

DOCUMENTS THAT REFLECT WORK REQUIRED TO ACHIEVE A COMPLETE AND

OPERATIONAL GOAL. LACK OF COORDINATION AND REVIEW OF DRAWINGS AND

SPECIFICATIONS AS AN ENTIRE DOCUMENT TO INSTALL COMPLETE AND OPERATIONAL

SYSTEMS, BEING OBVIOUS AND TYPICAL INDUSTRY STANDARD, IDENTIFIED IN THE

DRAWINGS AND SPECIFICATIONS, SHALL NOT BE IN ANY WAY AN ADDITIONAL COST TO

THE GOVERNMENT.

11. CONTRACTOR SHALL SUBMIT A REQUEST, IN WRITING, TO INTERRUPT ANY SUCH

SERVICES TO COR (CONTRACTING OFFICER’S REPRESENTATIVE) 48 HOURS IN

ADVANCE OF PROPOSED INTERRUPTION. REQUEST SHALL STATE REASON, DATE,

EXACT TIME OF, AND APPROXIMATE DURATION OF SUCH INTERRUPTION. MAJOR

INTERRUPTIONS OF ANY SYSTEM MUST BE REQUESTED, IN WRITING, AT LEAST 60

CALENDAR DAYS PRIOR TO THE DESIRED TIME AND SHALL BE PERFORMED AS

DIRECTED BY THE COR. MAJOR INTERRUPTIONS SHALL BE COORDINATED WITH OTHER

MAJOR INTERRUPTIONS AND MAY NOT BE SCHEDULED FOR ONE DISCIPLINE MORE

THAN TWICE THROUGHOUT THE OVERALL CONSTRUCTION SCHEDULE UNLESS

REQUESTED IN WRITING AND APPROVED BY THE COR. CONTRACTOR WILL BE ADVISED,

IN WRITING, OF APPROVAL OF REQUEST, OR OF WHICH OTHER DATE AND/OR TIME

SUCH INTERRUPTION WILL CAUSE THE LEAST INCONVENIENCE TO OPERATIONS OF

THE MEDICAL CENTER. INTERRUPTION TIME APPROVED BY THE MEDICAL CENTER MAY

OCCUR AT TIMES OTHER THAN CONTRACTOR'S NORMAL WORKING HOURS. SCHEDULE

INTERRUPTION MAY BE ON WEEKENDS OR LATE HOURS AND MAY NOT BE AN

ADDITIONAL COST TO THE GOVERNMENT. COORDINATE ALL INTERRUPTIONS THAT MAY

AFFECT THE NORMAL OPERATION OF THE FACILITY WITH THE COR WHEN SUBMITTING

THE CONSTRUCTION SCHEDULE OR UPDATES TO THE CONSTRUCTION SCHEDULE.

12. NO ASBESTOS CONTAINING MATERIALS ARE TO BE USED ON THIS PROJECT. SPUR

DESIGN, THE A/E OF RECORD, CAN CERTIFY THAT NO ASBESTOS CONTAINING

BUILDING MATERIALS (ACBM) OR LEAD BASED PAINT (LBP) PRODUCTS WERE

DESIGNED/SPECIFIED AS BUILDING MATERIAL IN ANY OF THE CONSTRUCTION

DOCUMENTS.

13. REFER TO THE DESIGN BINDER FOR THE ICRA INFORMATION DOCUMENTATION.

14. IN AREAS WHERE THE WINDOW JAMS ARE WALLPAPER, CONTRACTOR IS TO REMOVE

WALLPAPER TO AN IMMEDIATELY ADJACENT PERPENDICULAR WALL AND PAINT TO

MATCH. PAINT TO MATCH IN ALL OTHER AREAS NEAREST ADJACENT PERPENDICULAR

WALLS.

15. EXISTING INTERIOR FINISHES ARE TO BE MAINTAINED IN EXISTING CONDITION

FOLLOWING COMPLETION OF PROJECT OR BE REPLACED BY THE CONTRACTOR TO

ITS ORIGINAL CONDITION.

GENERAL NOTES

AREA NAME

150 SF

A101

A101

SIM

A

00.0

A101

1 1

A101

LEVEL NAME

00'-00"

00'-00" 4B

3A

FIBERGLASS BATT

INSULATION

RIGID INSULATION

CONCRETE / PRECAST

CONCRETE

EARTH / SOIL

SAND, EIFS FINISH, OR

PLASTER FINISH

GYPSUM BOARD FINISH

BRICK

CONCRETE MASONRY

UNIT

STONE / CAST STONE

GYPSUM BOARD SECTION

EXTERIOR SHEATHING

BOARD SECTION

PLYWOOD SECTION

CLEAN UTILITY

000A

150 SF

/1 A101

X0000

ROOM TAG

AREA TAG

SPECIALTY EQUIPMENT TAG

DOOR TAG

KEYED NOTE TAG

WALL TAG

WINDOW TAG

A101

SIM

A101

SIM

A

ACB ACOUSTIC CEILING BAFFLE

ACP ACOUSTIC CEILING PANEL

ACST ACOUSTIC

ADA AMERICANS WITH DISABILITIES ACT

ACT ACOUSTICAL CEILING TILE

ADDL ADDITIONAL

ADDN ADDITION

ADJ ADJACENT, ADJOINING, OR

ADJUSTABLE

ADMIN ADMINISTRATION

AE ARCHITECT/ENGINEER

AF ACCESS FLOORING

AFF ABOVE FINISHED FLOOR

AFG ABOVE FINISHED GRADE

AHJ AUTHORITY HAVING JURISDICTION

AIA AMERICAN INSTITUTE OF

ARCHITECTS

ALT ALTERNATE

ALT NO ALTERNATE NUMBER

ALUM ALUMINIUM (TRIM)

AMT AMOUNT

APPROX APPROXIMATE

ARCH ARCHITECT

ASC ABOVE SUSPENDED CEILING

AT ACOUSTIC CEILING TILE

AVG AVERAGE

B

BD BOARD

BLDG BUILDING

BLKG BLOCKING

BLT IN BUILT-IN

BOS BOTTOM OF STEEL

BOT BOTTOM

BRKT BRACKET

BTWN BETWEEN

C

CAB CABINET

CAV CAVITY

CBB CONCRETE BACKER BOARD

CD CONSTRUCTION DOCUMENTS

CFM CUBIC FEET PER MINUTE

CFS CUBIC FEET PER SECOND

CG CORNER GUARD

CH BD CHALK BOARD

CIP CAST-IN-PLACE

CJ CONTROL JOINT

CL CENTER LINE

CLG CEILING

CLG HT CEILING HEIGHT

CLR CLEAR

CMU CONCRETE MASONRY UNIT

CO CONTRACTING OFFICER

COL COLUMN

COMM COMMUNICATION

CONC CONCRETE

CONT CONTINUOUS

COORD COORDINATE

COR CONTRACTING OFFICER'S

REPRESENTATIVE

CP CONTRACTOR PROVIDED

CP/CI CONTRACTOR PROVIDED /

CONTRACTOR INSTALLED

CPT CAROET/CARPET TILE

CS CONCRETE SEALED

CSWK CASEWORK

CT CERAMIC TILE

CTB CERAMIC TILE BASE

CTR CENTER

CU FT CUBIC FEET

D

DBL DOUBLE

DEMO DEMOLITION

DEPT DEPARTMENT

DET DETAIL

DIA DIAMETER

DIR DIRECTION

DIST DISTANCE

DOC DOCUMENT

DR DOOR

DS DOWNSPOUT

DWG DRAWING

DWP DIMENSIONAL WALL PANEL

E

EA EACH

EJ EXPANSION JOINT

EL ELEVATION

ELEV ELEVATOR

ENTR ENTRANCE

EPY EPXOY FLOORING

EQ EQUAL

ETR EXISTING TO REMAIN

EX EXISTING

EXP EXPOSED

EXT EXTERIOR

F

FAB FABRIC

FED FEDERAL

FF FINISH FACE

FF EL FINISH FLOOR ELEVATION

FIN FINISH

FIN BS FINISH BOTH SIDES

FIN FLR FINISH FLOOR

FIN GR FINISH GRADE

FIXT FIXTURE

FLDG FOLDING

FLEX FLEXIBLE

FLG FLOORING

FLMT FLUSH MOUNT

FLR FLOOR

FOC FACE OF CONCRETE

FOM FACE OF MASONRY

FP FIRE PROTECTION

FR FIRE RESISTANT

FT FEET

FTG FOOTING

FV FIELD VERIFY

FWC FABRIC WALL COVERING

G

GDR GUARDRAIL

GL GLASS/GLAZING

GRAN GRANITE

GR FL GROUND FLOOR

GT GROUT

GSM GALVANIZED SHEET METAL

GYP BD GYPSUM BOARD

H

HDW HARDWARE

HEPA HIGH EFFICIENCY

PARTICULATE AIR (FILTER)

HM HOLLOW METAL

HORIZ HORIZONTAL

HR HANDRAIL

HT HEIGHT

I

IBC INTERNATIONAL BUILDING CODE

INSUL INSULATION

INT INTERIOR

ILO IN LIEU OF

J

J-BOX JUNCTION BOX

L

LAV LAVATORY

LBS POUND

LDG LANDING

LF LINEAR FEET (FOOT)

LIN LINEAR

LN LINOLEUM

LOC LOCATION

LT LIGHT

LVR LOUVER

LVT LUXURY VINYL TILE

M

MAT CARPET MAT / WALK-OFF MAT

MATL MATERIAL

MAX MAXIMUM

MECH MECHANICAL

MEMB MEMBRANE

MFR MANUFACTURER

MID MIDDLE

MIL STD MILITARY STANDARD

MIN MINIMUM

MISC MISCELLANEOUS

MO MASONRY OPENING

MOD MODIFY

MTG MOUNTING

MTL METAL

MVBL MOVABLE

N

NA NOT APPLICABLE

NIC NOT IN CONTRACT

NO NUMBER

NOM NOMINAL

NTS NOT TO SCALE

O

OA OVERALL

OC ON CENTER

OD OUTSIDE DIAMETER

OPNG OPENING

OPP OPPOSITE

OPR OPERABLE

ORD OVERFLOW ROOF DRAIN

ORIG ORIGINAL

P

P PAINT

PA PUBLIC ADDRESS

PBD PARTICLE BOARD

PCF POUNDS PER CUBIC FOOT

PCT PERCENT

PERF PERFORATED

PERIM PERIMETER

PERP PERPENDICULAR

PL PROPERTY LINE

PLAM PLASTIC LAMINATE

PLBG PLUMBING

PNL PANEL

PR PAIR

PRB PROFILE BASE

PRKG PARKING

PSF POUNDS PER SQUARE FOOT

PSI POUNDS PER SQUARE INCH

PT PORCELAIN TILE

PWR POWER

Q

QA QUALITY ASSURANCE

QC QUALITY CONTROL

QTY QUANTITY

REFERENCE SYMBOLS IDENTIFICATION TAGS

GRID HEAD AND

LINE

LEVEL INDICATOR

MATCH LINE AND

VIEW REFERENCE

NORTH ARROW W/

PROJECT NORTH

SPOT ELEVATION

DETAIL

SECTION

WALL

SECTION

BUILDING

SECTION

DETAIL

ELEVATION

INTERIOR

ELEVATION

BUILDING

ELEVATION

1 1

R

RAF RESILIENT ATHETIC FLOORING

RB RUBBER BASE/RESILIENT BASE

RCP REFLECTED CEILING PLAN

RD ROOF DRAIN

REC RECESSED

REF REFERENCE

REM REMOVABLE

REP REPAIR

REPL REPLACE

REQ REQUIRE

REQD REQUIRED

RES RESINOUS FLOORING

RES-W RESINOUS / EPOXY WALL / CEILING

RF RUBBER FLOORING

RFG ROOFING

RM ROOM

RO ROUGH OPENING

RP RESIN PANEL

RSF RESILIENT SHEET FLOORING

RV ROOF VENT

RWC RIGID VINYL WALLCOVERING

S

SC SPECIALTY COATING

SD STATIC DISSIPATIVE FLOORING/TILE

SCHED SCHEDULE

SECT SECTION

SF SQUARE FOOT (FEET)

SGL SINGLE

SIM SIMILAR

SJ SCORED JOINT

SLNT SEALANT

SM SHEET METAL

SPEC SPECIFICATION

SQ SQUARE

SQ IN SQUARE INCH

SQ YD SQUARE YARD

SS SOLID SURFACE

ST STONE

STD STANDARD

STOR STORAGE

SV SHEET VINYL (ROLLED OR TILE)

T

TEL TELEPHONE

TEMP TEMPORARY

TER TERRAZO

TOF TOP OF FOOTING/ FOUNDATION

TOM TOP OF MASONRY

TOS TOP OF SLAB/ STEEL

U

UNO UNLESS NOTED OTHERWISE

UTIL UTILITY

V

VAR VARIES

VC VA PROVIDED / CONTRACTOR

INSTALLED

VCT VINYL COMPOSITION TILE

VFAT VINYL FACED ACOUSTICLAL TILE

VP VENEERED PLASTER

VT VINYL TILE

VV VA PROVIDED / VA INSTALLED

VWC VINYL WALLCOVERING

VWF VINYL WALL FABRIC

W

W/ WITH

W/O WITHOUT

W/C WATER CLOSET

WC WHEELCHAIR

WD WOOD

WFAB WALL FABRIC

WPM WATERPROOF MEMBRANE

WSF WELDED SHEET FLOOR

X

X BRACE CROSS BRACE

SAFETY & SECURITY DESIGN (MISSION CRITICAL FACILITIES)

EXTERIOR WALLS

1. CONSTRUCTION SHALL BE REINFORCED MASONRY, OR EQUIVALENT.

2. EXTERIOR WALLS COMPOSED OF METAL OR WOOD FRAME SHALL HAVE AN INTERIOR BACKING OF STEEL SECURITY SCREEN MESH OR SHEET PARTITION.

3. WINDOWS OR SKYLIGHTS BELOW 18 FEET (4 M) FROM GROUND LEVEL OR THE ROOF OF A LOWER ABUTMENT, OR LESS THAN 18 FEET (4 M) FROM WINDOWS OF AN

ADJOINING BUILDING, OR ACCESSIBLE BY A BUILDING LEDGE LEADING TO WINDOWS OF OTHER FLOOR ROOMS, SHALL HAVE FORCED ENTRY CONSTRUCTION OF

STAINLESS STEEL WOVEN SECURITY MESH.

FACADE FENESTRATION

1. ALL FAÇADE FENESTRATION SHALL BE DESIGNED TO CRACK BUT REMAIN IN THE FRAME IN RESPONSE TO THE CALCULATED PEAK PRESSURES AND IMPULSES

RESULTING FROM THE DESIGN LEVEL VEHICLE THREAT (W1) LOCATED AT MINIMUM STANDOFF DISTANCE OF 50 FEET (15 M), BUT NO GREATER THAN GP2. STANDOFF PROVIDED IN EXCESS OF THE 50 FEET (15 M) OR INCREASED DISTANCES OVER THE HEIGHT OF THE BUILDING MAY NOT BE ACCOUNTED FOR IN THE CALCULATION OF THE BLAST LOADING ENVIRONMENT. ALTHOUGH NEGATIVE PHASE LOADING SHOULD NOT BE CONSIDERED, THE EFFECTS OF REBOUND SHALL BE INCLUDED IN THE DESIGN OF BLAST RESISTANT GLAZING. ALL BLAST RESISTANT DESIGN REQUIREMENTS ARE IN ADDITION TO THE REQUIREMENTS OF THE VA WINDOW SPECIFICATIONS. THE USE OF OPERABLE WINDOWS FOR BLAST RESISTANT DESIGN IS DISCOURAGED; HOWEVER, WHERE OPERABLE WINDOWS ARE REQUIRED, THEIR PERFORMANCE MUST BE DEMONSTRATED WITH ACCEPTABLE EXPLOSIVE (OR SHOCK TUBE) TEST DATA WHILE IN THE OPEN POSITION.

2. GLASS: ALL NEW EXTERIOR GLAZING IS TO USE LAMINATED GLASS. FOR INSULATED GLAZING UNITS (IGUS) THE LAMINATED GLASS IS REQUIRED ONLY FOR THE INNER LITE. THE GLASS SHALL BE RESTRAINED WITHIN THE MULLIONS WITH A MINIMUM ½” BITE AND A CONTINUOUS BEAD OF STRUCTURAL SILICONE ADHESIVE ATTACHING THE INNER LITE OF GLASS TO THE FRAME TO ALLOW IT TO DEVELOP ITS POST-DAMAGE CAPACITY.

3. MULLIONS: THE MULLIONS ARE TO BE OF ALUMINUM AND/OR STEEL CONSTRUCTION AND SHALL BE DESIGNED TO ACCEPT A BLAST LOAD EQUAL TO THE MAXIMUM CAPACITY OF THE WEAKEST LITE OF SUPPORTED GLASS (I.E., BALANCED DESIGN), BUT NO LESS THAN THE DESIGN LEVEL PRESSURES WHILE SUSTAINING DEFORMATIONS NO GREATER THAN L/60. FOR WINDOWS WITH GLAZING LAY-UP GOVERNED BY NON-BLAST REQUIREMENTS (HURRICANE, FORCED ENTRY, FABRICATION, HANDLING, AND BALLISTIC), MULLIONS ARE TO BE DESIGNED FOR THE CAPACITY OF THE GLAZING THAT WOULD BE REQUIRED TO MEET THE BLAST

REQUIREMENTS ONLY.

4. CURTAINWALL: CURTAINWALL FRAMING MEMBERS SHALL SPAN FROM SLAB TO SLAB AND SHALL NOT BE ATTACHED DIRECTLY TO GRAVITY LOAD BEARING ELEMENTS (SUCH AS COLUMNS AND SHEAR WALLS) UNLESS AN ADVANCED ANALYSIS OF THE LOAD BEARING ELEMENT DEMONSTRATES IT CAN ACCEPT THE MAXIMUM BLAST FORCES TRANSFERRED BY THE MEMBERS FRAMING INTO IT WITHOUT COMPROMISING ITS LOAD BEARING CAPACITY.

PENTHOUSE ENCLOSING CRITICAL EQUIPMENT

1. PENTHOUSE ENCLOSURES SHALL BE DESIGNED TO RESIST THE PEAK BLAST PRESSURES AND IMPULSES RESULTING FROM THE DESIGN LEVEL VEHICLE THREAT

(W1) LOCATED AT THE MINIMUM STANDOFF DISTANCE OF 50 FEET (15 M), BUT NO GREATER THAN GP2. STANDOFF PROVIDED IN EXCESS OF THE 50 FEET (15 M) MAY

NOT BE ACCOUNTED FOR IN THE CALCULATION OF THE BLAST LOADING ENVIRONMENT.

EXISTING FACILITY - FENESTRATION

1. FOR UPGRADES IN WHICH THE FAÇADE IS NOT REPLACED, A MECHANICALLY ANCHORED OR WET GLAZED ATTACHED 7-MIL THICK ANTI-SHATTER FILM MAY BE USED

TO SATISFY THE REQUIREMENTS OF THIS SECTION. GLASS REPLACEMENT UPGRADES, WINDOW REPLACEMENT UPGRADES, AND “STORM-WINDOW” UPGRADES INTERIOR TO EXISTING HISTORIC FACADE SHALL USE LAMINATED GLASS AND STRUCTURAL SILICONE SEALANT. FOR INSULATED GLAZING UNITS (IGUS) THE LAMINATED GLASS IS REQUIRED ONLY FOR THE INNER LITE. NO UPGRADES TO THE FRAMES OR MULLIONS ARE REQUIRED FOR GLASS REPLACEMENT PROJECTS.

DEMOLITION

1. REMOVE GYPSUM BOARD AND BLOCKING AT EXISTING WINDOW JAMBS AND HEADS AS REQUIRED FOR WINDOW

INSTALLATION. BOARD TO BE REMOVED WITH CLEAN CUT LINES FOR PATCHING.

2. REMOVE ALL SEALANT FROM THE ADJACENT WINDOW SURFACES INCLUDING CONCRETE AND BRICK.

3. REMOVE EXISTING WINDOW ANCHORAGE OF SUB-SILLS, STRAPS, ETC.

4. REMOVE ALL BLOCKING AND ANY DETERIORATED BLOCKING IN THE WAY OF THE NEW WINDOW INSTALLATION.

5. DETAILS HAVE BEEN DRAWN TO REFLECT WHAT WAS OBSERVED IN THE FIELD AND PER THE ORIGINAL

CONSTRUCTION DRAWINGS. CONDITIONS BEHIND THE EXISTING WINDOWS, GYPSUM BOARD, AND STOOLS MAY BE

DIFFERENT IN THE FEILD UPON REMOVAL OF ITEMS, AS INDICATED ON THE DETAILS.

6. CONTRACTOR SHALL REMOVE THE EXISTING WINDOWS AND IS RESPONSIBLE FOR COMPLETE

REMOVAL/DISPOSAL.

7. CONTRACTOR TO VERIFY WORKING ORDER OF ALL EQUIPMENT IN EXISTING WINDOWS PRIOR TO REMOVAL AND ANYTHING FOUND NOT IN WORKING ORDER NOTIFY VA REPRESENTATIVE PRIOR TO REMOVAL. CONTRACTOR IS RESPONSIBLE TO REMOVE, STORE AND REINSTALL ALL EQUIPMENT FROM EXISTING WINDOW INTO NEW WINDOW.

WINDOWS

1. WINDOW DETAILS HAVE BEEN DRAWN GENERICALLY AND INCLUDE PLUS OR MINUS DIMENSIONS BASED ON THE

MANUFACTURERS FIXED WINDOW TYPE AND MATERIAL ANCHORAGE.

2. REFER TO SCHEDULES AND SPECIFICATIONS FOR GLASS TYPES.

3. WINDOW DRAWINGS HAVE BEEN PREPARED TO MATCH THE METHOD EMPLOYED AT THE TIME OF THE PREVIOUS

CONSTRUCTION.

4. WINDOWS TO BE INSTALLED FROM THE SAME SIDE THEY WERE REMOVED FROM SO CONTAINMENT SYSTEM IS IN

PLACE PRIOR TO THE WINDOW BEING DEMOLISHED UNTIL THE NEW FRAME AND WINDOW UNIT ARE PUT BACK IN

PLACE.

WINDOW SILLS

1. PROVIDE NEW WINDOW SILLS OVER NEW COMPOSITE BLOCKING AT THE AREAS INDICATED.

2. SILLS SHALL BE THE WALL DEPTH PLUS A 3/4" OVERHANG AND AN EASED EDGE AT THE FRONT.

3. INSTALL CORNER BEADS AND J MOLDINGS AT GYPSUM BOARD HEAD, JAMB, AND STOOL.

GYPSUM BOARD

1. NEW GYPSUM BOARD SHALL BE 5/8" MOISTURE RESISTANT, TYPE X. ANCHORED TO THE NEW METAL BLOCKING AND

ALIGNING WITH THE ADJACENT GYPSUM BOARD SURFACES.

2. INSTALL NEW GYPSUM BOARD ON THE NEW METAL OR COMPOSITE BLOCKING.

3. INSTALL CORNER BEADS AND J MOLDINGS AT GYPSUM BOARD HEAD, JAMB, AND STOOL.

PAINTING

1. PAINT WALL TO MATCH THE ADJACENT WALL COLOR.

2. PAINT ENTIRE WALL INCLUDING SOFFIT/WALL OVER THE WINDOW AND THE WALL BELOW THE STOOL TO THE BASE

BELOW.

3. PAINT AROUND ANY EXISTING WALL PROJECTIONS SUCH AS BUMPER RAILS, ETC.

4. PAINT DOWN TO TOP OF WALL MOUNTED CASEWORK, ABOUT 10" BELOW STOOL.

5. PAINT TO TOP OF CERAMIC TILE WAINSCOT AT STOOL HEIGHT IN THE TOILET ROOMS.

6. PAINT WALL OF WINDOWS TO THE CORNER AT EACH SIDE, AND AROUND ADJOINING COLUMN PROJECTION.

JOINTS

1. PROVIDE BACKER ROD AND SEALANT AT THE JOINTS INDICATED ON THE DETAILS ANP PER THE WINDOWS

MANUFACTURERS RECOMMENDATIONS.

WINDOW DETAIL NOTES

th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t o n e e ig h th in c h o n e fo o t

A

B

C

D

E

F

Veterans Health

Administration

VA FORM 08-6231

Drawing Title Project Title

Location

Date Checked Drawn

Project Number

CONSULTANTS:

Drawing # OF

VA Health Care System Approval:

ARCHITECT:

SPUR DESIGN, LLC

312 SW 25TH STREET

Oklahoma City, OK 73109

(405) 842-6100

TX ARCH COA #BR2171 EXP. 09/30/2023

TX ENGR COA #F-17591 EXP. 02/28/2023

STRUCTURAL ENGINEER

H2B

1225 NORTH LOOP WEST

SUITE 800

HOUSTON TX 77008

(713) 864-2900

ENVIRONMENTAL ENGINEER

RIVERFRONT SAFETY & HEALTH

11140 SOUTH TOWNE SQUARE,

SUITE 100

SAINT LOUIS, MO 63123

(314) 436-9492

FULLY SPRINKLERED

PHYSICAL SECURITY

FORCE PROTECT

10901 FRONT BEACH RD, UNIT 1415

PANAMA CITY BEACH, FL 32407

(502) 836-4232

1 2 3 4 5 6 7 8 9

1 2 3 4 5 6 7 8 9

A

B

C

D

E

F

STAMP:

Drawing Number

Building Number

/1

/2

:2

:3

P

M

GENERAL INFORMATION

MJA 02 76DLK

100% CONSTRUCTION DOCUMENTS

REPLACE WINDOWS

BUILDING 2J

12/14/2022

549-22-800

DALLAS VA MEDICAL CENTER

4500 S. LANCASTER RD.

DALLAS, TX 75216

GI001

2J

SPUR #: 2090.03

INFECTION CONTROL RISK ASSESSMENT MATRIX OF

PRECAUTIONS FOR CONSTRUCTION AND RENOVATION

PATIENT RISK GROUP TABLE

TYPE OF CONSTRUCTION PROJECT ACTIVITY (TYPE A-D)

INSPECTION AND NON-INVASIVE ACTIVITIES

INCLUDES, BUT IS NOT LIMITED TO:

- REMOVAL OF CEILING TILES FOR VISUAL INSPECTION LIMITED TO 1 TILE PER 50 SQUARE FEET

- PAINTING (BUT NOT SANDING)

- WALL COVERING, ELECTRICAL TRIM WORK, MINOR PLUMBING, AND ACTIVITIES WHICH DO NOT GENERATE DUST OR REQUIRE CUTTING OF WALLS OR ACCESS TO CEILINGS OTHER THAN FOR VISUAL INSPECTION

TYPE A

SMALL SCALE, SHORT DURATION ACTIVITIES WHICH CREATE MINIMAL DUST

INCLUDES, BUT IS NOT LIMITED TO:

- INSTALLATION OF TELEPHONE AND COMPUTER CABLING

- ACCESS TO CHASE SPACES

- CUTTING OF WALLS OR CEILING WHERE DUST MIGRATION CAN BE CONTROLLED

TYPE B

WORK THAT GENERATES A MODERATE TO HIGH LEVEL OF DUST OR REQUIRES DEMOLITION OR REMOVAL

OF ANY FIXED BUILDING COMPONENTS OR ASSEMBLIES

INCLUDES, BUT IS NOT LIMITED TO:

- SANDING OF WALLS FOR PAINTING OR WALL COVERING

- REMOVAL OF FLOOR COVERINGS, CEILING TILES AND CASEWORK

- NEW WALL CONSTRUCTION

- MINOR DUCT WORK OR ELECTRICAL WORK ABOVE CEILINGS

- MAJOR CABLING ACTIVITIES

- ANY ACTIVITY WHICH CANNOT BE COMPLETED WITHIN A SINGLE WORK SHIFT

TYPE C

MAJOR DEMOLITION AND CONSTRUCTION PROJECTS

INCLUDES, BUT IS NOT LIMITED TO:

- ACTIVITIES WHICH REQUIRE CONSECUTIVE WORK SHIFTS

- REQUIRES HEAVY DEMOLITION OR REMOVAL OF A COMPLETE CABLING SYSTEM

- NEW CONSTRUCTION

TYPE D

GROUP 1

LOW RISK

GROUP 2

MEDIUM RISK

GROUP 3

HIGH RISK

GROUP 4

HIGHEST RISK

- OFFICE AREAS

- OUTDOORS

- ELECTRICAL ROOMS

- MECHANICAL ROOMS

- STAIRWELLS

- CONFERENCE ROOMS

- OTHER

-PHYSICAL & OCCUPATIONAL THERAPY

- OUTPATIENT CLINICS

- WAITING ROOMS

- SLEEP LAB

- MENTAL HEALTH (OUTPATIENT ONLY)

- PROSTHETICS

- ORTHOTICS

- DOMICILIARY

- OTHER

- EMERGENCY ROOM

- KITCHEN

- FOOD PREPARATION

- DINING

- CANTEEN

- ECHOCARDIOGRAPHY

- RADIOLOGY/MRI

-RESPIRATORY THERAPY

-NUCLEAR MEDICINE

-SENIOR MENTAL HEALTH

-COMMUNITY LIVING CENTER

CLEAN SUPPLY

-OTHER

-CARDIAC CATH

-EP LAB OR CARDIOLOGY

-STERILE PROCESSING SERVICE

-ALL INPATIENT MEDICAL OR

SURGICAL UNITS

-CARE UNITS

-PACU

-MICU

-SICU

-TCU

-SPINAL CORD INJURY

-NEGATIVE PRESSURE

ISOLATION ROOMS

-OPTPATIENT CHEMOTHERAPY

-ONCOLOGY AREAS

-OPERATING ROOMS

-ENDOSCOPY

-DIALYSIS

- BRONCHOSCOPY

-PHARMACY

-CLINICAL LABORATORIES

-OTHER

1. EXECUTE WORK BY METHODS TO MINIMIZE RAISING

DUST FROM CONSTRUCTION OPERATIONS.

2. IMMEDIATELY REPLACE A CEILING TILE DISPLACED FOR

VISUAL INSPECTION.

CLASS I

DURING CONSTRUCTION PROJECT UPON COMPLETION OF PROJECT

1. PROVIDE ACTIVE MEANS TO PREVENT AIRBORNE DUST

FROM DISPERSING INTOATMOSPHERE.

2. WATER MIST WORK SURFACES TO CONTROL DUST

WHILE CUTTING.

3. SEAL UNUSED DOORS WITH DUCT TAPE.

4. BLOCK OFF AND SEAL AIR VENTS.

5. PLACE DUST MAT AT ENTRANCE AND EXIT OF WORK

AREA. REPLACE USED MATS IN ACCORDANCE WITH

MANUFACTURER'S RECOMMENDATIONS.

6. REMOVE OR ISOLATE HVAC SYSTEM IN AREA WHERE

WORK IS BEING DONE TO PREVENT CONTAMINATION OF

DUCT SYSTEM.

CLASS II

1. WIPE WORK SURFACES WITH DISINFECTANT.

2. CONTAIN CONSTRUCTION WASTE BEFORE

TRANSPORT IN TIGHTLY COVERED

CONTAINERS.

3. WET MOP AND/OR VACUUM WORK AREA

WITH HEPA FILTERED VACUUM BEFORE

LEAVING WORK AREAS.

4. REMOVE ISOLATION OF HVAC SYSTEM IN

AREAS WHERE WORK IS BEING PERFORMED.

1. REMOVE OR ISOLATE HVAC SYSTEM IN AREA WHERE

WORK IS BEING DONE TO PREVENT CONTAMINATION OF

DUCT SYSTEM.

2. COMPLETE ALL CRITICAL BARRIERS I.E. SHEETROCK,

PLYWOOD, PLASTIC TO SEAL AREA FROM NON WORK

AREA OR IMPLEMENT CONTROL CUBE METHOD (CART

WITH PLASTIC COVERING AND SEALED CONNECTION TO

WORK SITE WITH HEPA VACUUM FOR VACUUMING PRIOR

TO EXIT) BEFORE CONSTRUCTION BEGINS.

3. MAINTAIN NEGATIVE AIR PRESSURE VENTILATION (NPV)

AT 0.01" WATER COLUMN (wc) WITHIN THE WORK SITE

UTILIZING NPV MACHINE

4. NPV MONITORING DEVICES WHOULD BE VISIBLE FROM

OUTSIDE THE WORKSITE AND READINGS SHALL BE

DOCUMNETED DAILY OT MORE OFTEN AS NEEDED.

KEEP TRACKING MONITORING DEVICES AND TRACKING

LOG AT OUTSIDE OR ENTRANCE AT THE SITE

5. CONTAIN CONSTRUCTION WASTE BEFORE TRANSPORT

IN TIGHTLY COVERED CONTAINERS.

6. COVER TRANSPORT RECEPTACLES OR CARTS. TAPE

COVERS.

CLASS III

1. DO NOT REMOVE BARRIERS FROM WORK

AREA UNTIL COMPLETED PROJECT IS

INSPECTED BY THE OWNER'S SAFETY

DEPARTMENT AND INFECTION CONTROL

DEPARTMENT AND THOROUGHLY CLEANED

BY THE OWNER'S ENVIRONMENTAL SERVICES

DEPARTMENT.

2. REMOVE BARRIER MATERIALS CAREFULLY TO

MINIMIZE SPREADING OF DIRT AND DEBRIS

ASSOCIATED WITH CONSTRUCTION.

3. VACUUM WORK AREA WITH HEPA FILTERED

VACUUMS.

4. WET MOP AREA WITH DISINFECTANT.

5. REMOVE ISOLATION OF HVAC SYSTEM IN

AREAS WHERE WORK IS BEING PERFORMED.

1. ISOLATE HVAC SYSTEM IN AREAS WHERE WORK IS BEING

DONE TOP REVENT CONTAMINATION OF DUCT SYSTEM.

2. COMPLETE ALL CRITICAL BARRIERS I.E. SHEETROCK,

PLYWOOD, PLASTITCO, SEAL AREA FROM NON WORK

AREA OR IMPLEMENT CONTROL CUBEM ETHOD (CART

WITH PLASTIC MCOVERING AND SEALED CONNECTION

TO WORK SITE WITH HEPA VACUUM FOR VACUUMING

PRIOR TO EXIT) BEFORE CONSTRUCTION BEGINS.

3. MAINTAIN NEGATIVE AIR PRESSURE WITHIN WORK SITE

UTILIZING HEPA EQUIPPED AIR FILTRATION UNIT.

4. SEAL HOLES, PIPES, CONDUITS, AND PUNCTURES

APPROPRIATELY.

5. CONSTRUCT ANTEROOM AND REQUIRE ALL PERSONNEL

TO PASS THROUGH THIS ROOM SO THEY CAN BE

VACUUMED SING A HEPA VACUUM CLEANER BEFORE

LEAVING WORK SITE OR THEY CAN WEAR CLOTH OR

PAPER COVERALLS THAT RE REMOVED EACH TIME THEY

LEAVE THE WORK SITE.

6. ALL PERSONNEL ENTERING WORK SITE ARE REQUIRED

TO WEAR SHOE COVERS. SHOE COVERS MUST BE

CHANGED EACH TIME THE WORKEERX ITS THE WORK

AREA.

7. DO NOT REMOVE BARRIERS FROM WORK AREA UNTIL

COMPLETED PROJECT IS INSPECTED BY THE OWNER'S

SAFETY DEPARTMENT AND INFECTION CONTROL

DEPARTMENT AND THOROUGHLY CLEANED BY THE

OWNER'S ENVIRONMENTAL SERVICES DEPARTMENT.

CLASS IV

1. REMOVE BARRIER MATERIAL CAREFULLY TO

MINIMIZE SPREADING OF DIRT AND DEBRIS

ASSOCIATED WITH CONSTRUCTION.

2. CONTAIN CONSTRUCTION WASTE BEFORE

TRANSPORT IN TIGHTLY COVERED

CONTAINERS.

3. COVER TRANSPORT RECEPTACLES OR

CARTS. TAPE COVERING UNLESS SOLID LID.

4. VACUUM WORK AREA WITH HEPA FILTERED

VACUUMS.

5. WET MOP AREA WITH DISINFECTANT.

6. REMOVE OR ISOLATION OF HVAC SYSTEM IN

AREAS WHERE WORK WAS BEING

PERFORMED.

INFECTION CONTROL MATRIX - CLASS OF PRECAUTIONS: CONSTRUCTION PROJECT BY PATIENT

IT IS THE CONTRACTOR'S RESPONSIBILITY TO PROVIDE THE FOLLOWING INFECTION

CONTROL PRECAUTIONS DEPENDING UPON THE AREA CLASS DESIGNATION

CONSTRUCTION PROJECT TYPE

LOW RISK GROUP

MEDIUM RISK GROUP

HIGH RISK GROUP

HIGHEST RISK GROUP

PATIENT RISK GROUP TYPE A TYPE B TYPE C TYPE D

I

II

II

III/IV

I

II

III

I

II

IV

III/IV

IV

II

III/IV

III/IV

IV

1. CLEAN UP CEILING TILE AND FLOORING

SURFACE BELOW WITH HEPA FILTERED

VACUUM OR DAMP MOP

GENERAL ICRA NOTES:

ICRA NOTES:

DUST CONTROL PLAN NOTES

1. THIS PROJECT INCLUDES CONSTRUCTION ENTRY VESTIBLE -CONSTRUCTION ANTEROOM. THEY SHALL BE USED WHEN GOING INTO

CONSTRUCTION AREA AND LEAVING THE CONSTRUCTION AREA AND TIGHT SEALS SHALL BE MAINTAINED AT THE FULL PERIMETER OF WALLS AND WALL PENETRATIONS. ANY DUST SHALL BE IMMEDIATELY CLEANED IF TRACKED OUTSIDE OF THE CONSTRUCTION BARRIER. UPON COMPLETION OF THE CONSTRUCTION PHASE, DUST BARRIERS SHALL BE REMOVED CAREFULLY AFTER VA COR'S APPROVAL TO MINIMIZE SPREADING OF DUST AND THE CONTRACTOR SHALL HAVE TEMPORARY DUST PROTECTION IN PLACE

BEFORE REMOVAL OF A PERMANENT BARRIER.

INTERNAL DEMOLITION AND CONSTRUCTION ACTIVITIES DUST AND DEBRIS CONTROL

1. USE A-WING SOUTH ENTRY AS PRIMARY CONSTRUCTION ACCESS FOR PHASE I - USE B-WING SOUTH EMERGENCY EXIT FOR

ALTERNATE ACCESS AS PHASE I WORK PROGRESSES. USE NORTHEAST CONFERENCE ROOM FOR PHASE II CONSTRUCTION

ACCESS

2. TRAFFIC CONTROL: DESIGNATED ENTRY AND EXIT PROCEDURES SHALL BE DEFINED. EGRESS PATHS SHALL BE FREE OF DEBRIS;

ONLY AUTHORIZED PERSONNEL SHALL BE ALLOWED TO ENTER THE CONSTRUCTION ZONE. SIGNAGE SHALL DIRECT PEDESTRIAN

TRAFFIC AWAY FROM THE CONSTRUCTION AREA AND MATERIALS.

3. CONTRACTOR SHALL USE TWO CARTS TO TRANSFER CONSTRUCTION MATERIAL AND OUT OF THE PROJECT - CLEAN CART SHALL BE USED; THE NOT-SO-CLEAN CART SHALL BE USED BETWEEN THE MAIN ENTRY AND THE CONSTRUCTION STAGING PREP AREA.

4. DEMOLITION DEBRIS: DEBRIS SHALL BE REMOVED IN CARTS WITH TIGHTLY FITTED COVERS, USING DESIGNATED TRAFFIC ROUTE.

EFFORTS SHALL BE MADE TO MINIMIZE USE OF ELEVATORS WITH AN EMPHASIS ON TRANSPORT DURING THE LOWEST PERIOD OF ACTIVITY. DEBRIS SHALL BE REMOVED DAILY AND AT TIMES SPECIFIED BY THE COR. IF CHUTES ARE USED TO DIRECT DEBRIS OUTSIDE, HIGH EFFICIENCY PARTICULATE AIR (HEPA) FILTERED NEGATIVE AIR MACHINES SHALL BE USED, AND THE CHUTE OPENING SHALL BE SEALED WHEN NOT IN USE. FILTERS SHALL BE BAGGED AND SEALED BEFORE BEING TRANSPORTED OUT OF THE CONSTRUCTION AREA. THE CONTRACTOR SHALL NOT HAUL DEBRIS THROUGH PATIENT-CARE AREAS WITHOUT PRIOR

APPROVAL OF THE COR.

5. EXTERIOR WINDOWS: EXISTING WINDOWS SHALL BE PROTECTED TO PREVENT DAMAGE BY ADJACENT CONSTRUCTION WORK.

VENTILATION AND ENVIRONMENTAL CONTROLS

1. AIR SYSTEM FLOW: THE COR VERIFY AND ACKNOWLEDGE CONTRACTOR WHETHER THE CONSTRUCTION AREA USES

FRESH/OUTSIDE OR RE-CIRCUATED AIR; FILTERS SHALL BE ADDED OR RETURN VENTS COVERED AS NEEDED WITH FILTER

MATERIAL OR PLASTIC. AIR MUST FLOW FROM CLEAN TO DIRTY PLACES.

2. NEGATIVE AIR PRESSURE: THE AIR WITHIN THE CONSTRUCTION AREA SHALL BE NEGATIVE WITH RESPECT TO SURROUNDING AREAS AND WITH NO DISRUPTION OF AIR SYSTEMS OF ADJACENT AREAS. USE OF THE NEGATIVE AIR PRESSURE SYSTEM WITHIN THE ENCLOSURE TO REMOVE DUST SHALL PASS AIR THROUGH AN INDUSTRIAL GRADE PORTABLE HEPA FILTER CAPABLE OF FILTRATION RATES OF 300-800 CUBIC FEET PER MINUTE (9FT3/MIN), OR EXHAUST AIR DIRECTLY TO THE OUTSIDE IF APPROVED BY COR. IF EXHAUST SHALL BE TIED INTO A RE-CIRCULATED AIR SYSTEM, PRE-FILTER AND HEPA FILTER SHALL BE USED BEFORE

EXHAUST TO PREVENT CONTAMINATION OF THE DUCTS.

3. ADJACENT AREAS: THE STATUS OF SEALED PENETRATIONS AND INTACT CEILIING SHALL BE VERIFIED DAILY.

4. AIR EXCHANGE RATES AND PRESSURE RELATIONSHIPS: VAMC AND CONTRACTOR SHALL VERIFY AND MAINTAIN PROPER RATES IN

CRITICAL AREAS NEAR CONSTRUCTION ACTIVITY AND ENSURE AIR IS NOT BEING RE-CIRCUATED WITHOUT FILTRATION FROM THE CONSTRUCTION AREA ELSEWHERE. PROVIDE AIR PRESSURE TESTING THOUGHOUT THE PROJECT IN THE FREQUENCY AS

IDENTIFIED BY THE COR.

GENERAL NOTES

1. PROVIDE TEMPORARY 1-HOUR RATED SLAB-TO-SLAB BARRIERS CONSIST OF 3-5/8" METAL STUD FRAMING WITH 5/8" ON BOTH SIDES.

BARRIERS SHALL BE INSPECTED BY VA PCRA STAFF PRIOR TO START OF CONSTRUCTION IN SPACE. MAINTAIN NEGATIVE PRESSURE

VENTILATION IN THE CONSTRUCTION SPACE.

2. PROVIDED HARD DOOR FOR ANTEROOM FOR CONSTRUCTION ACCESS.

3. USE ISOLATION CART FOR ALL WORK IN THIS AREA.

4. PROVIDE TWO STICKY MATS AT EACH CONSTRUCTION ACCESS POINT IN ALL PHASES.

5. VA REQUIRES THAT ALL APPLICABLE PERMITS BE COMPLETED AND APPROVED PRIOR TO BEGINNING ANY WORK ON STATION.

PERMITS INCLUDE: ICRA, PCRA, ILSM, ABOVE CEILING, FIRE/SMOKE WALL, UTILITY, FIRE SPRINKLER, FIRE ALARM SYSTEM, MEDICAL

GASES, CONFINED SPACE AND HOT WORK.

1. ALL CONTRACTORS CONSTRUCTION WORKERS AND CORS MUST ATTEND THE INFECTION PREVENTION TRAINING ANNUALLY AND

BRING PROOF NEGATIVE TB WITH THEM AT THAT TIME.

2. THE INFECTION PREVENTION OFFICE SHALL BE NOTIFIED OF ALL PRE-CONSTRUCTION MEETINGS.

3. THE ICRA (INFECTION CONTROL RISK ASSESSMENT) SHALL BE WRITTEN INTO THE CONTRACT FOR ALL CONTRACTORS AND

SUBCONTRACTORS.

4. THE CONTRACTOR SHALL CLEAN THE WHEELS AND OUTSIDE OF ALL CARTS AND EQUIPMENT BROUGHT INTO AND OUT OF THE

MAIN HOSPITAL OR POLYTRAUMA FACILITIES.

5. INFECTION PREVENTION OFFICE MUST BE NOTIFIED OF ALL WATER SHUT-OFF OR INTERRUPTIONS.

6. THE CONTRACTOR SHALL WET MOP HEAVY TRAFFIC AREAS AT LEAST TWO (2) TIMES A DAY OR MORE IF SITE HAS AN ICRA LEVEL

OF 3 OR 4 AND/OR IF THE AREA HAS HIGH VOLUME OF DUST. WATER SHALL BE CHANGED DAILY. DO NO LEAVE STANDING WATER

OVER NIGHT.

7. CONSTRUCTION WORKERS SHALL WEAR DUPONT TYVEK COVERALLS OR EQUIVALENT OVER CLOTHES AND SHOE COVERS IN MODERATE TO HIGH DUST AREAS IN MAIN HOSPITAL OR POLYTRAUMA FACILITIES TO PREVENT CONTAMINATION OF EMPLOYEE CLOTHES AND TRACKING DUST AND DIRT INTO THESE FACILITIES. CONSTRUCTION WORKERS SHALL REMOVE COVERALLS BEFORE

LEAVING THE AREA.

8. THE INFECTION PREVENTION OFFICE NEEDS TO BE NOTIFIED IF THE HVAC MUST BE INTERRUPTED IN AREAS THAT AFFECT PATIENT

CARE.

9. THE INFECTION PREVENTION OFFICE SHALL BE NOTIFIED OF ANY ANTICIPATED ALTERATIONS TO THE ACCESS ROUTES USED

DURING CONSTRUCTION ACTIVITIES.

10. ALL ICRA LEVEL 4 PROJECT SITES MUST HAVE AN ANTE-ROOM TO MAINTAIN NEGATIVE AIRFLOW AND BE LARGE ENOUGH TO REMOVE COVERALLS AND HAVE A TRASH CONTAINER. THE ANTE-ROOM MUST BE CLEARLY IDENTIFIED ON THE DRAWINGS.

11. AIR FILTRATION DEVICES WITH HEPA FILTERS SHALL BE USED ON SITE FOR SMALL CLEAN-UPS IN PATIENT CARE AREAS THAT HAVE

AN ICRA LEVEL OF 1 OR 2.

12. THE CONTRACTOR SHALL PROVIDE A DAILY LOG FOR THE VA STAFF LOCATED ON SITE THAT CONTAINS UPDATES NOTING THE READING ON THE PRESSURE SENSOR, CERTIFYING THAT THE SITE HAS BEEN CONTINUALLY MAINTAINING NEGATIVE AIR PRESSURE DURING CONSTRUCTION FOR ALL ICRA LEVEL 3 AND 4 PR0JECT SITE. INFECTION PREVENTION MEASURES.

13. THE PRIME CONTRACTOR WILL ENSURE THAT CONTRACTORS IMPLEMENT THE REQUIREMENTS OR VAMC'S INFECTION RISK ASSESSMENT (ICRA) TEAM. ICRA GROUP MAY MONITOR DUST IN THE VICINITY OF THE CONSTRUCTION WORK AND REQUIRE THE CONTRACTOR TO TAKE CORRECTIVE ACTION IMMEDIATELY IF THE SAFE LEVELS ARE EXCEEDED.

14. THE PRIME CONTRACTOR WILL ENSURE THAT THE CONTRACTOR ESTABLISHES AND MAINTAINS A DUST CONTROL PROGRAM AS PART OF THE CONTRACTOR'S INFECTION PREVENTION MEASURES IN ACCORDANCE WITH THE GUIDELINES PROVIDED TO THE PRIME CONTRACTOR. PRIOR TO START OF WORK, THE CONTRACTOR SHALL PREPARE A PLAN DETAILING BEST MANAGEMENT

PRACTICES.

15. PROJECT-SPECIFIC DUST PROTECTION MEASURES PERIODIC STATUS REPORTS WHICH ARE TO BE SUBMITTED TO RESIDENT ENGINEER AND FACILITY ICRA TEAM FOR REVIEW FOR COMPLIANCE WITH CONTRACT REQUIREMENTS IN ACCORDANCE WITH SECTION 01 33 23, SHOP DRAWINGS, PRODUCT DATA AND SAMPLE. ALL PERSONNEL INVOLVED IN THE CONSTRUCTION OR RENOVATION ACTIVITY SHALL BE EDUCATED AND TRAINED IN INFECTION PREVENTION MEASURES ESTABLISHED BY THE MEDICAL

CENTER.

16. THE PRIME CONTRACTOR WILL ENSURE CERTIFICATION THAT THE CONTRACTOR HAS A MEDICAL PROGRAM THAT ADDRESSES TUBERCULOSIS. THE MEDICAL PROGRAM SHALL INCLUDE WRITTEN ASSURANCE THE EACH EMPLOYEE HAS NO ACTIVE TUBERCULOSIS. ALL CONTRACT EMPLOYEES ASSIGNED TO THE WORK SITE SHALL HAVE A PRE-PLACEMENT TUBERCULIN SCREENING WITHIN 90 DAYS PRIOR TO ASSIGNMENT TO THE WORK SITE AS RECOMMENDED BY THE CENTER FOR DISEASE CONTROL (CDC). THIS CAN BE THE CDC TWO-STEP SKIN TESTING OR FOOD AND DRUG ADMINISTRATION (FDA) APPROVED BLOOD TEST. EMPLOYEES MANIFESTING POSITIVE SCREENING REACTIONS TO THE TUBERCULIN SHALL BE EXAMINED PER CURRENT CDC GUIDELINES PRIOR TO WORKING ON VHA PROPERTY. IF THE EMPLOYEE IS FOUND WITHOUT EVIDENCE OF ACTIVE INFECTOUS PULMONARY TUBERCULOSIS (TB). A STATEMENT DOCUMENTING EXAMINATION BY A PHYSICIAN MUST BE ON FILE WITH THE EMPLOYER (CONSTRUCTION CONTRACTOR), NOTNG THAT THE EMPLOYEE WITH A POSITIVE TUBERCULIN SCREENING TEST IS WITHOUT EVIDENCE OF ACTIVE INFECTIOUS PULMONARY TB, THE EMPLOYEE FOUND WITH ACTIVE DISEASE WOULD REQUIRE TREATMENT WITH A SUBSEQUENT STATEMENT OUTLINES ABOVE BEFORE BEING ALLOWED TO RETURN TO WORK ON VA

PROPERTY.

17. CONTRACTOR SHALL MONITOR FOR AIRBORNE DISEASE (E.G ASPERGILLOSIS) AS APPROPRIATE DURING CONSTRUCTION. A BASELINE OF CONDITIONS MAY BE ESTABLISHED BY THE MEDICAL CENTER PRIOR TO THE START OF WORK AND PERIODICALLY DURING THE CONSTRUCTION STAGES. TO DETERMINE IMPACT OF CONSTRUCTION ACTIVITIES ON INDOOR AIR QUALITY, IN ADDITION; IN CASE OF ANY PROBLEM, THE MEDICAL CENTER, ALONG WITH ASSISTANCE FROM THE CONTRACTOR, SHALL CONDUCT AN ENVIRONMENTAL ASSESSMENT TO FIND AND ELIMINATE THE SOURCE. CONTRACTOR IS RESPONSIBLE FOR MONITORING AND MAINTAINING NEGATIVE AIR PRESSURE THROUGHOUT ENTIRE AREA UNDER CONSTRUCTION IN ICRA LEVEL 3 & 4 CONSTRUCTION

SITE.

18. THE FOLLOWING PREVENTION MEASURES SHALL BE ADOPTED DURING CONSTRUCTION TO KEEP DOWN DUST AND PREVENT

MOLD.

19. DAMPEN DEBRIS TO KEEP DUST DOWN IN EXISTING STRUCTURES WHERE DIRECTED BY RESIDENT ENGINEER. DO NOT PERFORM DUST PRODUCING TASKS WITHIN OCCUPIED AREAS WITHOUT THE APPROVAL OF THE RESIDENT ENGINEER.

INFECTION CONTROL RISK ASSESSMENT NOTES:

1. * OBTAIN INFECTION CONTROL PERMIT BEFORE CONSTRUCTION BEGINS.

2. ISOLATE HVAC SYSTEM IN AREA WHERE WORK IS BEING DONE TO PREVENT CONTAMINATION OF THE DUCT SYSTEM.

3. COMPLETE ALL CRITICAL BARRIERS OR IMPLEMENT CONTROL CUBE METHOD BEFORE CONSTRUCTION BEGINS.

4. MAINTAIN NEGATIVE AIR PRESSURE WITHIN WORK SITE UTILIZING HEPA EQUIPPED AIR FILTRATION UNITS.\

5. SEAL HOLES, PIPES, CONDUITS, AND PUNCTURES APPROPRIATELY.

6. DO NOT REMOVE BARRIERS FROM WORK AREA UNTIL COMPLETED PROJECT IS INSPECTED BY THE OWNER'S SAFETY

DEPARTMENT AND THOROUGHLY CLEANED BY THE OWNER'S ENVIRONMENTAL SERVICES DEPARTMENT.

7. REMOVE BARRIER MATERIAL CAREFULLY TO MINIMIZE SPREADING OF DIRT AND DEBRIS ASSOCIATED WITH CONSTRUCTION.

CONTAIN CONSTRUCTION WASTE BEFORE TRANSPORT IN TIGHTLY COVERED CONTAINERS.

8. COVER TRANSPORT RECEPTACLES OR CARTS. TAPE COVERING UNLESS SOLID LID. VACUUM WORK AREA WITH HEPA FILTERED

VACUUMS. WET MOP AREA WITH DISINFECTANT. REMOVE ISOLATION OF HVAC SYSTEM IN AREAS WHERE WORK IS BEING PERFOR

9. KEEP CONSTRUCTION SITE CLEAN & NEAT AT ALL TIMES.

10. CONTRACTOR TO CLEAN THE CONSTRUCTION AREA, AND PREPARE FOR SAFETY AND INFECTION CONTROL'S INSPECTION AND

FINAL CLEANING BY VA ECM STAFF.

11. VA ECM STAFF WILL PERFORM FINAL VERIFICATION OF CLEANING AND SANITATION.

HOT WORK PERMITS.

1. PERMITS MUST BE OBTAINED 24 HOURS PRIOR TO COMMENCEMENT OF WORK, WHENEVER POSSIBLE. ORIGINAL PERMIT TO BE

POSTED WHERE WORK IS BEING PERFORMED; CONTRACTOR MUST RETURN PERMIT TO SAFETY OFFICE WHEN WORK IS

COMPLETED.

2. FIRE WATCH. CONTRACTOR MUST INITIAL, DATE AND TIME EVERY 30 MINUTES AFTER HOT WORK HAS STARTED.

3. CONTRACTOR TO PROVIDE WARNING SIGNAGE AND DIRECTIONAL SIGNAGE THAT SHALL BE POSTED IN CONSTRUCTION AREA

WHILE WORK IS PERFORMED.

4. CONFINED SPACE. CONTRACTOR TO OBTAIN CONFINED SPACE PERMIT PRIOR TO ENTRY INTO MECHANICAL CHASE. ENSURE IT IS

APPROVED BY VA SAFETY DEPARTMENT AND COTR.

1. CONTRACTOR TO PROVIDE CONSTRUCTION SEQUENCING TO THE FACILITY FOR REVIEW PRIOR TO START OF ANY DEMOLITION OR

CONSTRUCTION ACTIVITIES.

2. CONTRACTOR SHALL VISIT ALL AREAS OF WORK, INCLUDING WALKING THE SITE, MEASURING EXISTING DIMENSIONS AND OBSERVING EXISTING CONDITIONS BEFORE BEGINNING WORK, ORDERING MATERIALS, OR STARTING ANY CONSTRUCTION.

CONTRACTOR TO FIELD VERIFY ALL DIMENSIONS OF EXISTING SITE CONDITION PRIOR RO START OF WORK AND ORDERING OF

MATERIALS.

3. CONTRACTOR SHALL RECYCLE REMOVED MATERIALS WHENEVER POSSIBLE. SEE SPECIFICATION SECTION ???

4. CONTRACTOR TO PROTECT AREA ADJACENT TO THE DEMOLITION AND NEW CONSTRUCTION WORK TO PREVENT DAMAGES. (IF

DAMAGED, REPAIR, RE-PATCH, SAND SMOOTH AND REFINISH TO MATCH EXISTING.)

5. CONTRACTOR SHALL REPORT TO COR IMMEDIATELY WHEN DISCREPANCIES TO THE DRAWINGS ARE FOUND IN THE FIELD.

6. CONTRACTOR TO INSTALL TEMPORARY BALL-IN-TUBE SYSTEM TO MONITOR AND ENSURE PRESSURE LEVEL TO MEET VA

GUIDELINES WITHIN CONSTRUCTION AREA. (CONTRACTOR TO VERIFY LOCATIONS) WITH VA COR PRIOR RO INSTALLATION.

DUST CONTROL PLAN NOTES

1. THE VAMC INFECTION CONTROL GROUP HAS CONFIRMED THE DESIGNATION FOR THIS PROJECT IS LEVEL III AND IV FOR THE CLASS

OF PRECAUTIONS OR LEVEL OF INFECTION CONTROL ACTIVITIES. HARD SURFACE BARRIERS SHALL BE USED EXCEPT IN THE AREA INDICATED ON THE PHASING PLAN WITH PLASTIC BARRIERS (MINIMUM 4MIL) TO SEAL AREA FROM NON-WORK AREA AS LONG AS

THE SPRINKLER SYSTEM IS INTACT AND ACTIVE.

2. THIS PROJECT NEEDS AN ENTRY VESTIBULE FOR CLOTHING CHANGES (PROVIDE AND LOCATE A STAGING AREA FOR TYVEK SUITS NEAR THE PLASTIC BARRIER ENTRANCE SPACES - CONSTRUCTION ANTEROOM. THEY SHALL BE USED WHEN GOING INTO CONSTRUCTION AREA AND LEAVING THE CONSTRUCTION AREA) AND TOOL STORAGE TIGHT SEALS SHALL BE MAINTAINED AT THE FULL PERIMETER OF WALLS AND WALL PENETRATIONS. ANY DUST SHALL BE IMMEDIATELY CLEANED IF TRACKED OUTSIDE OF THE CONSTRUCTION BARRIER. UPONCOMPLETION OF THE CONSTRUCTION PHASE, DUST BARRIERS SHALL BE REMOVED CAREFULLY TO MINIMIZE SPREADING OF DUST AND THE CONTRACTOR SHALL HAVE TEMPORARY DUST PROTECTION IN PLACE BEFORE REMOVAL

OF A PERMANENT BARRIER.

3. A DWYER GAUGE SHALL BE USED AT CONSTRUCTION ENTRY TO VALIDATE NEGATIVE AIR FLOWS.

4. AFTER EACH PHASE, PERFORM TASKS STATED IN NOTE 6A.

5. PROVIDE STICKY MATS AT THE PLASTIC BARRIER ENTRANCE SPACES (CONSTRUCTION ANTEROOM) AND CHANGE DAILY OR MORE

OFTEN AS NEEDED TO PREVENT THE SPREAD OF DUST AND DEBRIS INTO ADJACENT CLEAN SPACE.

INTERNAL DEMOLITION AND CONSTRUCTION ACTIVITIES DUST AND DEBRIS CONTROL

1. CONTRACTOR SHALL COORDINATE ACCESS WITH FACILITY PRIOR TO THE START OF ANY DEMOLITION OR CONSTRUCTION

ACTIVITIES.

2. TRAFFIC CONTROL: DESIGNATED ENTRY AND EXIT PROCEDURES SHALL BE DEFINED. EGRESS PATHS SHALL BE FREE OF DEBRIS;

DESIGNATED ELEVATORS SHALL BE USED DURING SCHEDULED TIMES; AND ONLY AUTHORIZED PERSONNEL SHALL BE ALLOWED TOENTER THE CONSTRUCTION ZONE. SIGNAGE SHALL DIRECT PEDESTRIAN TRAFFIC AWAY FROM THE CONSTRUCTION AREA AND

MATERIALS.

3. CONTRACTOR SHALL USE ISOLATION CARTS TO TRANSFER CONSTRUCTION MATERIAL IN AND OUT OF THE PROJECT - A CLEAN CART SHALL BE USED; THE NOT-SO-CLEAN CART SHALL BE USED BETWEEN THE MAIN ENTRY AND THE CONSTRUCTION

STAGING/PREP AREA.

4. DEMOLITION DEBRIS: DEBRIS SHALL BE…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .