DRAWINGS 100 PERCENT.pdf
PDF 27 MB Posted
- Attached to
- NEW | 549-22-800 Replace Windows Building 2J Federal contract opportunity
- Solicitation number
- 36C25726R0048
About this file
This is a comprehensive set of architectural and engineering drawings for a window replacement project at the Dallas VA Medical Center. The project involves replacing windows in Building 2J, located at 4500 S. Lancaster Rd, Dallas, TX 75216, with a VA project number of 549-22-800. The 76-sheet drawing set includes detailed plans for window and skylight replacements across multiple levels (1st, 3rd, 5th floors and roof), with specific phasing for different building areas and zones. The drawings specify bronze anodized aluminum window frames, 1-inch double-glazed laminated glass with Guardian 'SNR 43 Grey' specification, and include specific installation requirements such as using moisture-resistant gypsum board, maintaining infection control protocols, and carefully managing demolition and installation to minimize disruption to the medical facility's operations.
View the file
Other files for this federal contract opportunity
Show all 21
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
WV
ICV
RD
RD
R D
RD
RD
DRRDRD DR
WV
RD RD
RD
MH
FDC
UP
v v v v v v v v v v v v v v v v v v v v v v vv v v v v v v
ASPHALT
PAVEMENT
SIGN
E LE V P4E LE V P3
B B 101
S EC URI TY
TRB A 101
I T/ TEL TR
B A 104
S EC URI TY
S -01
S T AI R 01
B B 105
E LEC TRI CAL
E LE V P1F UT URE
E LE V P2
S -02
S T AI R 02
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X X X
XX
X
X
X
X
X
X X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X X
X
X
X
X
XX
X
X
X
X X X
X
X X
X
X
X
X
X X
XX X
X
X
X
X X
X
X
X X
X
X
X X
X
X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X XX XX X XXX XX XXX X
X
X
X
X
X
X
X
X
X
X
X
X
X X XX XXX XX XXX XX X XX X
X
X
X
X XX XX X XXX XX XXX X X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
XX
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X
X
X
X
X
X
X X
X
X
X
X
X
X
X
X X
X
X
X
X X
X
X
X
X
X
X
X
X
X
X
X
X
X
X X
2J
LIBERTY LOOP
LIBERTY LOOP
A V
E N
U E
O F
F L
A G
S
LANDCASTER ROAD
L
IB
E R
T Y
L O
O P
4T H
S T.
LIBERTY LOOP
1S T
S T
L
IB
E R
T Y
L O
O P
6TH ST.
A N
N A
R B
O R
A V
E N
U E
ANN A
RBOR A
VENUE VETER
A
N S D
R
IVE
th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t o n e e ig h th in c h o n e fo o t
A
B
C
D
E
F
Veterans Health
Administration
VA FORM 08-6231
Drawing Title Project Title
Location
Date Checked Drawn
Project Number
CONSULTANTS:
Drawing # OF
U.S. DEPARTMENT OF VETERANS AFFAIRS
VA Health Care System Approval:
ARCHITECT:
SPUR DESIGN, LLC
312 SW 25TH STREET
Oklahoma City, OK 73109
(405) 842-6100
TX ARCH COA #BR2171 EXP. 09/30/2023
TX ENGR COA #F-17591 EXP. 02/28/2023
STRUCTURAL ENGINEER
H2B
1225 NORTH LOOP WEST
SUITE 800
HOUSTON TX 77008
(713) 864-2900
ENVIRONMENTAL ENGINEER
RIVERFRONT SAFETY & HEALTH
11140 SOUTH TOWNE SQUARE,
SUITE 100
SAINT LOUIS, MO 63123
(314) 436-9492
FULLY SPRINKLERED
PHYSICAL SECURITY
FORCE PROTECT
10901 FRONT BEACH RD, UNIT 1415
PANAMA CITY BEACH, FL 32407
(502) 836-4232
1 2 3 4 5 6 7 8 9
1 2 3 4 5 6 7 8 9
A
B
C
D
E
F
STAMP:
Drawing Number
Building Number
/1
/2
:2
:3
P
M
COVER SHEET
MJA 01 76DLK
100% CONSTRUCTION DOCUMENTS
REPLACE WINDOWS BUILDING 2J
VA PROJECT NUMBER: 549-22-800
REPLACE WINDOWS
BUILDING 2J
12/14/2022
549-22-800
DALLAS VA MEDICAL CENTER
4500 S. LANCASTER RD.
DALLAS, TX 75216
VA NORTH TEXAS HEALTHCARE SYSTEM
4500 S. LANCASTER RD.
DALLAS, TX 75216
100% CONSTRUCTION DOCUMENTS
GI000
2J
SPUR #: 2090.03
SHEET INDEX
SEQUENCE NUMBER SHEET NAME
51 AE107 REFERENCE AND DIMENSION PLAN - LEVEL 3 - SERVICE ZONE - AREA A
52 AE108 REFERENCE AND DIMENSION PLAN - LEVEL 3 - SERVICE ZONE - AREA B
53 AE109 REFERENCE AND DIMENSION PLAN - LEVEL 5 - AREA A
54 AE110 REFERENCE AND DIMENSION PLAN - LEVEL 5 - AREA B
55 AE111 REFERENCE AND DIMENSION PLAN - LEVEL 5 - SERVICE ZONE - AREA A
56 AE112 REFERENCE AND DIMENSION PLAN - LEVEL 5 - SERVICE ZONE - AREA B
57 AE113 REFERENCE AND DIMENSION PLAN - ROOF - AREA A
58 AE114 REFERENCE AND DIMENSION PLAN - ROOF - AREA B
59 AE201 BUILDING ELEVATION
60 AE202 BUILDING ELEVATION
61 AE203 BUILDING ELEVATION
62 AE204 BUILDING ELEVATION
63 AE205 BUILDING ELEVATION
64 AE206 BUILDING ELEVATION
65 AE207 BUILDING ELEVATION
66 AE208 BUILDING ELEVATION
67 AE209 BUILDING ELEVATION
68 AE210 BUILDING ELEVATION
69 AE211 BUILDING ELEVATIONS
70 AE212 BUILDING ELEVATIONS
71 AE601 DOOR TYPES AND SCHEDULE
72 AE602 WINDOW TYPES
73 AE603 WINDOW TYPES
74 AE604 WINDOW TYPES
75 AE605 WINDOW DETAILS
76 AE606 SKYLIGHT DETAILS
TOTAL SHEETS: 76
SHEET INDEX
SEQUENCE NUMBER SHEET NAME
[01] GENERAL
01 GI000 COVER SHEET
02 GI001 GENERAL INFORMATION
03 GI002 ICRA NOTES
04 GI003 ICRA CONSTRUCTION DETAILS
05 GI004 PHASING PLAN - LEVEL 1
06 GI005 PHASING PLAN - LEVEL 1 - AREA A
07 GI006 PHASING PLAN - LEVEL 1 - AREA B
08 GI007 PHASING PLAN - LEVEL 1 - SERVICE ZONE
09 GI008 PHASING PLAN - LEVEL 3
10 GI009 PHASING PLAN - LEVEL 3 - AREA A
11 GI010 PHASING PLAN - LEVEL 3 - AREA B
12 GI011 PHASING PLAN - LEVEL 3 - SERVICE ZONE
13 GI012 PHASING PLAN - LEVEL 5
14 GI013 PHASING PLAN - LEVEL 5 - AREA A
15 GI014 PHASING PLAN - LEVEL 5 - AREA B
16 GI015 PHASING PLAN - LEVEL 5 - SERVICE ZONE
17 GI016 PHASING PLAN - ROOF
[02] STRUCTURAL
18 SA001 STRUCTURAL GENERAL NOTES
19 SA010 STRUCTURAL SPECIAL INSPECTIONS
20 SS100 OVERALL SITE PLAN
21 SF101 ENLARGED SKYLIGHT PLANS
22 SF102 ENLARGED PORTE COCHERE PLANS & DETAILS
23 SF501 SKYLIGHT DETAILS
[03] HAZARDOUS MATERIALS
24 HA100 ENVIRONMENTAL HAZARDS - FLOOR 1-A
25 HA101 ENVIRONMENTAL HAZARDS - FLOOR 1-B
26 HA102 ENVIRONMENTAL HAZARDS - FLOOR 3-A
27 HA103 ENVIRONMENTAL HAZARDS - FLOOR 3-B
28 HA104 ENVIRONMENTAL HAZARDS - FLOOR 5-A
29 HA105 ENVIRONMENTAL HAZARDS - FLOOR 5-B
30 HA106 ENVIRONMENTAL HAZARDS - ROOF
[04] ARCHITECTURAL
31 AD101 DEMOLITION PLAN - LEVEL 1 - AREA A
32 AD102 DEMOLITION PLAN - LEVEL 1 - AREA B
33 AD103 DEMOLITION PLAN - LEVEL 1 - SERVICE ZONE - AREA A
34 AD104 DEMOLITION PLAN - LEVEL 1 - SERVICE ZONE - AREA B
35 AD105 DEMOLITION PLAN - LEVEL 3 - AREA A
36 AD106 DEMOLITION PLAN - LEVEL 3 - AREA B
37 AD107 DEMOLITION PLAN - LEVEL 3 - SERVICE ZONE - AREA A
38 AD108 DEMOLITION PLAN - LEVEL 3 - SERVICE ZONE - AREA B
39 AD109 DEMOLITION PLAN - LEVEL 5 - AREA A
40 AD110 DEMOLITION PLAN - LEVEL 5 - AREA B
41 AD111 DEMOLITION PLAN - LEVEL 5 - SERVICE ZONE - AREA A
42 AD112 DEMOLITION PLAN - LEVEL 5 - SERVICE ZONE - AREA B
43 AD113 DEMOLITION PLAN - ROOF - AREA A
44 AD114 DEMOLITION PLAN - ROOF - AREA B
45 AE101 REFERENCE AND DIMENSION PLAN - LEVEL 1 - AREA A
46 AE102 REFERENCE AND DIMENSION PLAN - LEVEL 1 - AREA B
47 AE103 REFERENCE AND DIMENSION PLAN - LEVEL 1 - SERVICE ZONE - AREA A
48 AE104 REFERENCE AND DIMENSION PLAN - LEVEL 1 - SERVICE ZONE - AREA B
49 AE105 REFERENCE AND DIMENSION PLAN - LEVEL 3 - AREA A
50 AE106 REFERENCE AND DIMENSION PLAN - LEVEL 3 - AREA B
AREA
PLAN
N
LOCATION
PLAN
N
PROJECT LOCATION
DEDUCT ALTERNATES
1. KEEP THE EXISTING WINDOWS AT THE STAIR TOWERS (#1, 2, 3, AND 4).
2. REMOVE THE TWO EXTERIOR SKYLIGHTS AT THE DROP OFF CANOPIES FROM SCOPE.
3. REMOVE THE THREE INTERIOR SKYLIGHTS OVER MAIN ATRIUM FROM THE SCOPE.
No. REVISION DESCRIPTION DATE
ABBREVIATIONS CODES STANDARDS AND EXECUTIVE ORDERSMATERIALS LEGEND
PURPOSE: THE PUBLIC BUILDINGS AMENDMENT ACT OF 1988, PUBLIC LAW (PUB. L.) 100-678 REQUIRES FEDERAL AGENCIES TO FOLLOW NATIONAL RECOGNIZED "MODEL" BUILDING CODES. THE FEDERAL PARTICIPATION IN THE DEVELOPMENT AND USE OF VOLUNTARY STANDARDS, OFFICE OF MANAGEMENT AND BUDGET (OMB) CIRCULAR A-119, REQUIRES ALL EXECUTIVE AGENCIES TO RELY ON VOLUNTARY STANDARDS, BOTH DOMESTIC AND INTERNATIONAL, WHENEVER FEASIBLE, AND TO PARTICIPATE IN
VOLUNTARY STANDARD BODIES.
GENERAL: VA HAS ADOPTED THE LATEST EDITION OF THE FOLLOWING CODES AND STANDARDS AS A MINIMUM FOR ALL PROJECTS PERFORMED IN THE MODERNIZATION, ALTERATION, ADDITION, OR IMPROVEMENT OF ITS REAL PROPERTY AND THE CONSTRUCTION OF NEW STRUCTURES. VA DESIGN MANUALS AND MASTER SPECIFICATIONS
SPECIFY OTHER CODES AND STANDARDS THAT VA FOLLOWS ON ITS PROJECTS:
• VA DIRECTIVES, DESIGN MANUALS, MASTER SPECIFICATIONS, VA NATIONAL CAD STANDARD APPLICATION GUIDE, AND OTHER GUIDANCE ON THE TECHNICAL
INFORMATION LIBRARY (TIL) (HTTP://WWW.CFM.VA.GOV/TIL/).
• 2021 INTERNATIONAL BUILDING CODE (IBC) (ONLY WHEN SPECIFICALLY REFERENCED IN VA DESIGN DOCUMENTS, SEE NOTES BELOW)
• 2021 INTERNATIONAL EXISTING BUILDING CODE (IEBC) (IF APPLICABLE)
• 2021 NFPA 101 LIFE SAFETY CODE (SEE NOTES BELOW)
• 2021 NATIONAL FIRE CODES (NFPA)
• OCCUPATIONAL, SAFETY AND HEALTH ADMINISTRATION (OSHA) STANDARDS.
• 2020 VA SEISMIC DESIGN REQUIREMENTS, H-18-8
• 2021 INTERNATIONAL MECHANICAL CODE
• 2020 NATIONAL ELECTRICAL CODE (NEC), NFPA 70
• 2021 INTERNATIONAL PLUMBING CODE (IPC)
• 2016 SAFETY CODE FOR ELEVATORS AND ESCALATORS, AMERICAN SOCIETY OF MECHANICAL ENGINEERS (ASME) A 17.1.
• 2015 ARCHITECTURAL BARRIERS ACT (ABA) STANDARDS INCLUDING VA SUPPLEMENT, VA BARRIER FREE DESIGN STANDARD (PG-18-13)
• 2017 ANSI ICC A117.1 ACCESIBLE AND USABLE BUILDINGS AND FACILITIES
• 2019 BUILDING CODE REQUIREMENTS FOR STRUCTURAL CONCRETE AND COMMENTARY, AMERICAN CONCRETE INSTITUTE AND COMMENTARY (ACI 318-19)
• 2017 STEEL CONSTRUCTION MANUAL (15TH EDITION), AMERICAN INSTITUTE OF STEEL CONSTRUCTION (AISC)
• ENERGY POLICY ACT OF 2005 (EPACT)
• 2007 DOE INTERIM FINAL RULE: ENERGY CONSERVATION STANDARDS FOR NEW FEDERAL, COMMERCIAL AND MULTI-FAMILY HIGH-RISE RESIDENTIAL BUILDINGS AND
NEW LOW-RISE RESIDENTIAL BUILDINGS, 10 CFR PARTS 433, 434 AND 435.
• 2006 FEDERAL LEADERSHIP IN HIGH PERFORMANCE AND SUSTAINABLE BUILDINGS: MEMORANDUM OF UNDERSTANDING (MOU)
• 2018 EXECUTIVE ORDER 13834: EFFICIENT FEDERAL OPERATIONS
• 2021 THE PROVISIONS FOR CONSTRUCTION AND SAFETY SIGNS. STATED IN THE GENERAL REQUIREMENTS SECTION 010000 OF THE VA MASTER CONSTRUCTION
SPECIFICATION.
• 2019 VENTILATION FOR ACCEPTABLE INDOOR AIR QUALITY – ASHRAE STANDARD 62.1
• 2019 SAFETY STANDARD FOR REFRIGERATION SYSTEMS – ASHRAE STANDARD 15
LOCAL CODES: AS AN AGENCY OF THE FEDERAL GOVERNMENT, VA IS NOT SUBJECT TO LOCAL IMPOSITION OF CODE ENFORCEMENT PROCEDURES (DRAWING REVIEWS, BUILDING PERMITS, INSPECTIONS, FEES, ETC.). VA MUST FUNCTION AS THE AUTHORITY HAVING JURISDICTION (AHJ) AND THUS HAS THE RESPONSIBILITY TO GUARD PUBLIC HEALTH AND SAFETY THROUGH ENFORCING ITS ADOPTED CODES. HOWEVER, LOCAL AUTHORITIES SHOULD BE NOTIFIED ABOUT PLANNED PROJECTS AND GIVEN OPPORTUNITY TO REVIEW DRAWINGS PROVIDED THAT VA DOES NOT PAY FOR REVIEW OR INSPECTION FEES.
NOTES:
1. NFPA 101 PRIMARILY ADDRESSES LIFE SAFETY AND FIRE PROTECTION FEATURES WHILE THE IBC ADDRESSES A WIDE RANGE OF CONSIDERATIONS, INCLUDING, BUT
NOT LIMITED TO, STRUCTURAL STRENGTH, SEISMIC STABILITY, SANITATION, ADEQUATE LIGHT AND VENTILATION, AND ENERGY CONSERVATION. VA BUILDINGS MUST MEET THE REQUIREMENTS OF NFPA 101 AND DOCUMENTS REFERENCED BY NFPA 101 IN ORDER TO COMPLY WITH THE ACCREDITATION REQUIREMENTS OF THE JOINT COMMISSION. THEREFORE, DESIGNS SHALL COMPLY WITH THE REQUIREMENTS OF THE LATEST EDITION OF NFPA 101 AND DOCUMENTS REFERENCED THEREIN.
DESIGN FEATURES NOT ADDRESSED BY NFPA 101 OR DOCUMENTS REFERENCED THEREIN SHALL COMPLY WITH THE REQUIREMENTS OF THE LATEST EDITION OF THE IBC OR AS OTHERWISE ADDRESSED ABOVE IN THIS PROGRAM GUIDE. FOR DESIGN FEATURES THAT ARE ADDRESSED BY BOTH THE IBC AS WELL AS NFPA 101 OR A DOCUMENT REFERENCED BY NFPA 101, THE REQUIREMENTS OF NFPA 101 OR THE DOCUMENT REFERENCED BY NFPA 101 SHALL BE USED EXCLUSIVELY (THIS APPLIES
EVEN IF THE IBC REQUIREMENTS ARE DIFFERENT).
2. CONFLICTS BETWEEN NATIONALLY RECOGNIZED CODES AND STANDARDS AND VA REQUIREMENTS – SHOULD A CONFLICT EXIST BETWEEN VA REQUIREMENTS AND VA ADOPTED NATIONALLY RECOGNIZED CODES AND STANDARDS, THE CONFLICT SHALL BE BROUGHT TO THE ATTENTION OF VA. THE RESOLUTION OF THE CONFLICT SHALL BE MADE BY THE AUTHORITY HAVING JURISDICTION FOR VA TO ENSURE A CONSISTENCY SYSTEM WIDE.
ASHRAE 90.1 - 2019 EDITION
BUILDING LOCATION: DALLAS, TX
CLIMATE ZONE (TABLE ANNEX 1-1): ZONE 3A
INTERIOR DESIGN CONDITIONS:
THE INTERIOR DESIGN TEMPERATURES FOR HEATING AND COOLING AS DEPICTED IN THE PROJECT DESIGN CONDITIONS SCHEDULE IN THE MECHANICAL CONTROL DRAWINGS SHALL BE THE MAXIMUM
AND MINIMUM VALUES FOR THE ASSOCIATED TEMPERATURE CONTROL ZONES.
BUILDING ENVELOPE REQUIREMENTS (5.5 )
BUILDING ENVELOPE REQUIREMENTS FOR CLIMATE ZONE 3 (A,B,C)
ROOFS REQUIRED DESIGNED
INSULATION: R-30 c.i. EXISTING METAL BUILDINGS: R-19 + R-11 Ls or R-25 + R-8 Ls EXISTING
ATTIC AND OTHER: R-49 EXISTING
WALLS, ABOVE GRADE
MASS: R-9.5 c.i. EXISTING METAL BUILDING: R-0 + R-15.8 c.i. EXISTING STEEL-FRAMED: R-13 + R-7.5 c.i. EXISTING WOOD-FRAMED AND OTHER: R-13 + R-3.8 c.i. or R-20 EXISTING
WALL, BELOW GRADE
BELOW-GRADE WALL: R-7.5 c.i. EXISTING
FLOORS
MASS: R-14.6 c.i. EXISTING
STEEL-FRAMED: R-30 EXISTING
WOOD-FRAMED AND OTHER: R-30 EXISTING
SLAB-ON-GRADE FLOORS
UNHEATED SLABS: R-15 for 24 in. EXISTING HEATED SLABS: R-20 for 24 in. EXISTING
OPAQUE DOORS
SWINGING: U-0.370 EXISTING
NONSWINGING: U-0.310 EXISTING
FENESTRATION (TABLE 5.5-3):
VERTICAL FENESTRATION, U-FACTOR
FIXED: U-0.43 U- 0.212
OPERABLE: U-0.57 U- 0.212
ENTRANCE DOOR: U-0.73 U- 0.212
SKYLIGHTS: U-0.52 U- 0.212
DEFINITIONS
c.i = CONTINUOUS INSULATION Ls = LINEAR SYSTEM
NR = NO (INSULATION) REQUIREMENT
ENERGY REQUIREMENTS
N
1. DRAWINGS ARE PART OF A COMPLETE DOCUMENTS SET. CONTRACTOR SHALL
CONFIRM ALL ITEMS REQUIRED BASED UPON THE OVERALL DESIGN INTENT OF THE
ENTIRE DOCUMENT SET.
2. CONTRACTOR SHALL VERIFY ALL EXISTING CONDITIONS, PRIOR TO BEGINNING ANY
WORK, TO CONFIRM THE ACCURACY OF THE DRAWINGS AND REPORT ANY
DISCREPANCIES TO THE ARCHITECT. DO NOT SCALE THE DRAWINGS. FIELD VERIFY
ALL DIMENSIONS AND EXISTING STRUCTURAL CONDITIONS.
3. ALL AREAS NOT INVOLVED IN THE SCOPE OF WORK FOR THIS PROJECT SHALL BE KEPT
CLEAN AND FREE OF OBSTRUCTIONS AT ALL TIMES.
4. ERECT BARRICADES AND WARNING SIGNS TO DIVERT AND WARN PASSERS-BY OF THE
CONSTRUCTION WORK. PROVIDE DUST PROOFING ENCLOSURES TO SEPARATE WORK
AREAS FROM THE EXISTING FACILITIES.
5. ALL TRASH AND DEBRIS TO BE REMOVED ON A DAILY BASIS.
6. PROVIDE PROTECTION FOR ALL EXISTING SURFACES AND CONDITIONS TO REMAIN IN
PLACE DURING THE SCOPE OF WORK. SHOULD ANY DAMAGE OCCUR, PATCH AND
REPAIR ANY DAMAGE TO ADJACENT FINISHES TO MATCH EXISTING.
7. ANY DAMAGE CAUSED TO THE BUILDING OR OWNER EQUIPMENT SHALL BE REPAIRED
OR REPLACED BACK TO ITS ORIGINAL CONDITIONS AT NO ADDITIONAL COST TO THE
OWNER.
8. COVER ALL RETURN AIR GRILLES WITHIN THE AREA OF CONSTRUCTION TO PREVENT
PARTICULATE MATERIAL FROM EXHAUSTING INTO SURROUNDING SPACES.
9. APPROPRIATE LIGHT FIXTURES SHALL BE TEMPORARILY SUSPENDED TO PROVIDE
ADEQUATE LIGHTING LEVELS FOR CONSTRUCTION.
10. CONTRACTOR AND SUBCONTRACTORS ARE REQUIRED TO COORDINATE WITH OTHER
DISCIPLINES TO INSTALL COMPLETE AND OPERATIONAL SYSTEMS. DRAWINGS, AS A
WHOLE, REPRESENT A COMPLETE SET AND DEPICT REQUIREMENTS FOR COMPLETE
AND OPERATIONAL SYSTEMS. INDIVIDUAL DRAWINGS MAY NOT DEPICT COMPLETE AND
ACCURATE INFORMATION TO COORDINATE COMPLETE AND OPERATIONAL SYSTEMS,
BUT DO SO AS AN ENTIRE DOCUMENT TO BE REFERENCED WITH OTHER INDIVIDUAL
DRAWINGS. CONTRACTOR AND SUBCONTRACTORS ARE REQUIRED TO REFERENCE
OTHER SHEETS AND SPECIFICATIONS AS AN ENTIRE SET OF CONSTRUCTION
DOCUMENTS THAT REFLECT WORK REQUIRED TO ACHIEVE A COMPLETE AND
OPERATIONAL GOAL. LACK OF COORDINATION AND REVIEW OF DRAWINGS AND
SPECIFICATIONS AS AN ENTIRE DOCUMENT TO INSTALL COMPLETE AND OPERATIONAL
SYSTEMS, BEING OBVIOUS AND TYPICAL INDUSTRY STANDARD, IDENTIFIED IN THE
DRAWINGS AND SPECIFICATIONS, SHALL NOT BE IN ANY WAY AN ADDITIONAL COST TO
THE GOVERNMENT.
11. CONTRACTOR SHALL SUBMIT A REQUEST, IN WRITING, TO INTERRUPT ANY SUCH
SERVICES TO COR (CONTRACTING OFFICER’S REPRESENTATIVE) 48 HOURS IN
ADVANCE OF PROPOSED INTERRUPTION. REQUEST SHALL STATE REASON, DATE,
EXACT TIME OF, AND APPROXIMATE DURATION OF SUCH INTERRUPTION. MAJOR
INTERRUPTIONS OF ANY SYSTEM MUST BE REQUESTED, IN WRITING, AT LEAST 60
CALENDAR DAYS PRIOR TO THE DESIRED TIME AND SHALL BE PERFORMED AS
DIRECTED BY THE COR. MAJOR INTERRUPTIONS SHALL BE COORDINATED WITH OTHER
MAJOR INTERRUPTIONS AND MAY NOT BE SCHEDULED FOR ONE DISCIPLINE MORE
THAN TWICE THROUGHOUT THE OVERALL CONSTRUCTION SCHEDULE UNLESS
REQUESTED IN WRITING AND APPROVED BY THE COR. CONTRACTOR WILL BE ADVISED,
IN WRITING, OF APPROVAL OF REQUEST, OR OF WHICH OTHER DATE AND/OR TIME
SUCH INTERRUPTION WILL CAUSE THE LEAST INCONVENIENCE TO OPERATIONS OF
THE MEDICAL CENTER. INTERRUPTION TIME APPROVED BY THE MEDICAL CENTER MAY
OCCUR AT TIMES OTHER THAN CONTRACTOR'S NORMAL WORKING HOURS. SCHEDULE
INTERRUPTION MAY BE ON WEEKENDS OR LATE HOURS AND MAY NOT BE AN
ADDITIONAL COST TO THE GOVERNMENT. COORDINATE ALL INTERRUPTIONS THAT MAY
AFFECT THE NORMAL OPERATION OF THE FACILITY WITH THE COR WHEN SUBMITTING
THE CONSTRUCTION SCHEDULE OR UPDATES TO THE CONSTRUCTION SCHEDULE.
12. NO ASBESTOS CONTAINING MATERIALS ARE TO BE USED ON THIS PROJECT. SPUR
DESIGN, THE A/E OF RECORD, CAN CERTIFY THAT NO ASBESTOS CONTAINING
BUILDING MATERIALS (ACBM) OR LEAD BASED PAINT (LBP) PRODUCTS WERE
DESIGNED/SPECIFIED AS BUILDING MATERIAL IN ANY OF THE CONSTRUCTION
DOCUMENTS.
13. REFER TO THE DESIGN BINDER FOR THE ICRA INFORMATION DOCUMENTATION.
14. IN AREAS WHERE THE WINDOW JAMS ARE WALLPAPER, CONTRACTOR IS TO REMOVE
WALLPAPER TO AN IMMEDIATELY ADJACENT PERPENDICULAR WALL AND PAINT TO
MATCH. PAINT TO MATCH IN ALL OTHER AREAS NEAREST ADJACENT PERPENDICULAR
WALLS.
15. EXISTING INTERIOR FINISHES ARE TO BE MAINTAINED IN EXISTING CONDITION
FOLLOWING COMPLETION OF PROJECT OR BE REPLACED BY THE CONTRACTOR TO
ITS ORIGINAL CONDITION.
GENERAL NOTES
AREA NAME
150 SF
A101
A101
SIM
A
00.0
A101
1 1
A101
LEVEL NAME
00'-00"
00'-00" 4B
3A
FIBERGLASS BATT
INSULATION
RIGID INSULATION
CONCRETE / PRECAST
CONCRETE
EARTH / SOIL
SAND, EIFS FINISH, OR
PLASTER FINISH
GYPSUM BOARD FINISH
BRICK
CONCRETE MASONRY
UNIT
STONE / CAST STONE
GYPSUM BOARD SECTION
EXTERIOR SHEATHING
BOARD SECTION
PLYWOOD SECTION
CLEAN UTILITY
000A
150 SF
/1 A101
X0000
ROOM TAG
AREA TAG
SPECIALTY EQUIPMENT TAG
DOOR TAG
KEYED NOTE TAG
WALL TAG
WINDOW TAG
A101
SIM
A101
SIM
A
ACB ACOUSTIC CEILING BAFFLE
ACP ACOUSTIC CEILING PANEL
ACST ACOUSTIC
ADA AMERICANS WITH DISABILITIES ACT
ACT ACOUSTICAL CEILING TILE
ADDL ADDITIONAL
ADDN ADDITION
ADJ ADJACENT, ADJOINING, OR
ADJUSTABLE
ADMIN ADMINISTRATION
AE ARCHITECT/ENGINEER
AF ACCESS FLOORING
AFF ABOVE FINISHED FLOOR
AFG ABOVE FINISHED GRADE
AHJ AUTHORITY HAVING JURISDICTION
AIA AMERICAN INSTITUTE OF
ARCHITECTS
ALT ALTERNATE
ALT NO ALTERNATE NUMBER
ALUM ALUMINIUM (TRIM)
AMT AMOUNT
APPROX APPROXIMATE
ARCH ARCHITECT
ASC ABOVE SUSPENDED CEILING
AT ACOUSTIC CEILING TILE
AVG AVERAGE
B
BD BOARD
BLDG BUILDING
BLKG BLOCKING
BLT IN BUILT-IN
BOS BOTTOM OF STEEL
BOT BOTTOM
BRKT BRACKET
BTWN BETWEEN
C
CAB CABINET
CAV CAVITY
CBB CONCRETE BACKER BOARD
CD CONSTRUCTION DOCUMENTS
CFM CUBIC FEET PER MINUTE
CFS CUBIC FEET PER SECOND
CG CORNER GUARD
CH BD CHALK BOARD
CIP CAST-IN-PLACE
CJ CONTROL JOINT
CL CENTER LINE
CLG CEILING
CLG HT CEILING HEIGHT
CLR CLEAR
CMU CONCRETE MASONRY UNIT
CO CONTRACTING OFFICER
COL COLUMN
COMM COMMUNICATION
CONC CONCRETE
CONT CONTINUOUS
COORD COORDINATE
COR CONTRACTING OFFICER'S
REPRESENTATIVE
CP CONTRACTOR PROVIDED
CP/CI CONTRACTOR PROVIDED /
CONTRACTOR INSTALLED
CPT CAROET/CARPET TILE
CS CONCRETE SEALED
CSWK CASEWORK
CT CERAMIC TILE
CTB CERAMIC TILE BASE
CTR CENTER
CU FT CUBIC FEET
D
DBL DOUBLE
DEMO DEMOLITION
DEPT DEPARTMENT
DET DETAIL
DIA DIAMETER
DIR DIRECTION
DIST DISTANCE
DOC DOCUMENT
DR DOOR
DS DOWNSPOUT
DWG DRAWING
DWP DIMENSIONAL WALL PANEL
E
EA EACH
EJ EXPANSION JOINT
EL ELEVATION
ELEV ELEVATOR
ENTR ENTRANCE
EPY EPXOY FLOORING
EQ EQUAL
ETR EXISTING TO REMAIN
EX EXISTING
EXP EXPOSED
EXT EXTERIOR
F
FAB FABRIC
FED FEDERAL
FF FINISH FACE
FF EL FINISH FLOOR ELEVATION
FIN FINISH
FIN BS FINISH BOTH SIDES
FIN FLR FINISH FLOOR
FIN GR FINISH GRADE
FIXT FIXTURE
FLDG FOLDING
FLEX FLEXIBLE
FLG FLOORING
FLMT FLUSH MOUNT
FLR FLOOR
FOC FACE OF CONCRETE
FOM FACE OF MASONRY
FP FIRE PROTECTION
FR FIRE RESISTANT
FT FEET
FTG FOOTING
FV FIELD VERIFY
FWC FABRIC WALL COVERING
G
GDR GUARDRAIL
GL GLASS/GLAZING
GRAN GRANITE
GR FL GROUND FLOOR
GT GROUT
GSM GALVANIZED SHEET METAL
GYP BD GYPSUM BOARD
H
HDW HARDWARE
HEPA HIGH EFFICIENCY
PARTICULATE AIR (FILTER)
HM HOLLOW METAL
HORIZ HORIZONTAL
HR HANDRAIL
HT HEIGHT
I
IBC INTERNATIONAL BUILDING CODE
INSUL INSULATION
INT INTERIOR
ILO IN LIEU OF
J
J-BOX JUNCTION BOX
L
LAV LAVATORY
LBS POUND
LDG LANDING
LF LINEAR FEET (FOOT)
LIN LINEAR
LN LINOLEUM
LOC LOCATION
LT LIGHT
LVR LOUVER
LVT LUXURY VINYL TILE
M
MAT CARPET MAT / WALK-OFF MAT
MATL MATERIAL
MAX MAXIMUM
MECH MECHANICAL
MEMB MEMBRANE
MFR MANUFACTURER
MID MIDDLE
MIL STD MILITARY STANDARD
MIN MINIMUM
MISC MISCELLANEOUS
MO MASONRY OPENING
MOD MODIFY
MTG MOUNTING
MTL METAL
MVBL MOVABLE
N
NA NOT APPLICABLE
NIC NOT IN CONTRACT
NO NUMBER
NOM NOMINAL
NTS NOT TO SCALE
O
OA OVERALL
OC ON CENTER
OD OUTSIDE DIAMETER
OPNG OPENING
OPP OPPOSITE
OPR OPERABLE
ORD OVERFLOW ROOF DRAIN
ORIG ORIGINAL
P
P PAINT
PA PUBLIC ADDRESS
PBD PARTICLE BOARD
PCF POUNDS PER CUBIC FOOT
PCT PERCENT
PERF PERFORATED
PERIM PERIMETER
PERP PERPENDICULAR
PL PROPERTY LINE
PLAM PLASTIC LAMINATE
PLBG PLUMBING
PNL PANEL
PR PAIR
PRB PROFILE BASE
PRKG PARKING
PSF POUNDS PER SQUARE FOOT
PSI POUNDS PER SQUARE INCH
PT PORCELAIN TILE
PWR POWER
Q
QA QUALITY ASSURANCE
QC QUALITY CONTROL
QTY QUANTITY
REFERENCE SYMBOLS IDENTIFICATION TAGS
GRID HEAD AND
LINE
LEVEL INDICATOR
MATCH LINE AND
VIEW REFERENCE
NORTH ARROW W/
PROJECT NORTH
SPOT ELEVATION
DETAIL
SECTION
WALL
SECTION
BUILDING
SECTION
DETAIL
ELEVATION
INTERIOR
ELEVATION
BUILDING
ELEVATION
1 1
R
RAF RESILIENT ATHETIC FLOORING
RB RUBBER BASE/RESILIENT BASE
RCP REFLECTED CEILING PLAN
RD ROOF DRAIN
REC RECESSED
REF REFERENCE
REM REMOVABLE
REP REPAIR
REPL REPLACE
REQ REQUIRE
REQD REQUIRED
RES RESINOUS FLOORING
RES-W RESINOUS / EPOXY WALL / CEILING
RF RUBBER FLOORING
RFG ROOFING
RM ROOM
RO ROUGH OPENING
RP RESIN PANEL
RSF RESILIENT SHEET FLOORING
RV ROOF VENT
RWC RIGID VINYL WALLCOVERING
S
SC SPECIALTY COATING
SD STATIC DISSIPATIVE FLOORING/TILE
SCHED SCHEDULE
SECT SECTION
SF SQUARE FOOT (FEET)
SGL SINGLE
SIM SIMILAR
SJ SCORED JOINT
SLNT SEALANT
SM SHEET METAL
SPEC SPECIFICATION
SQ SQUARE
SQ IN SQUARE INCH
SQ YD SQUARE YARD
SS SOLID SURFACE
ST STONE
STD STANDARD
STOR STORAGE
SV SHEET VINYL (ROLLED OR TILE)
T
TEL TELEPHONE
TEMP TEMPORARY
TER TERRAZO
TOF TOP OF FOOTING/ FOUNDATION
TOM TOP OF MASONRY
TOS TOP OF SLAB/ STEEL
U
UNO UNLESS NOTED OTHERWISE
UTIL UTILITY
V
VAR VARIES
VC VA PROVIDED / CONTRACTOR
INSTALLED
VCT VINYL COMPOSITION TILE
VFAT VINYL FACED ACOUSTICLAL TILE
VP VENEERED PLASTER
VT VINYL TILE
VV VA PROVIDED / VA INSTALLED
VWC VINYL WALLCOVERING
VWF VINYL WALL FABRIC
W
W/ WITH
W/O WITHOUT
W/C WATER CLOSET
WC WHEELCHAIR
WD WOOD
WFAB WALL FABRIC
WPM WATERPROOF MEMBRANE
WSF WELDED SHEET FLOOR
X
X BRACE CROSS BRACE
SAFETY & SECURITY DESIGN (MISSION CRITICAL FACILITIES)
EXTERIOR WALLS
1. CONSTRUCTION SHALL BE REINFORCED MASONRY, OR EQUIVALENT.
2. EXTERIOR WALLS COMPOSED OF METAL OR WOOD FRAME SHALL HAVE AN INTERIOR BACKING OF STEEL SECURITY SCREEN MESH OR SHEET PARTITION.
3. WINDOWS OR SKYLIGHTS BELOW 18 FEET (4 M) FROM GROUND LEVEL OR THE ROOF OF A LOWER ABUTMENT, OR LESS THAN 18 FEET (4 M) FROM WINDOWS OF AN
ADJOINING BUILDING, OR ACCESSIBLE BY A BUILDING LEDGE LEADING TO WINDOWS OF OTHER FLOOR ROOMS, SHALL HAVE FORCED ENTRY CONSTRUCTION OF
STAINLESS STEEL WOVEN SECURITY MESH.
FACADE FENESTRATION
1. ALL FAÇADE FENESTRATION SHALL BE DESIGNED TO CRACK BUT REMAIN IN THE FRAME IN RESPONSE TO THE CALCULATED PEAK PRESSURES AND IMPULSES
RESULTING FROM THE DESIGN LEVEL VEHICLE THREAT (W1) LOCATED AT MINIMUM STANDOFF DISTANCE OF 50 FEET (15 M), BUT NO GREATER THAN GP2. STANDOFF PROVIDED IN EXCESS OF THE 50 FEET (15 M) OR INCREASED DISTANCES OVER THE HEIGHT OF THE BUILDING MAY NOT BE ACCOUNTED FOR IN THE CALCULATION OF THE BLAST LOADING ENVIRONMENT. ALTHOUGH NEGATIVE PHASE LOADING SHOULD NOT BE CONSIDERED, THE EFFECTS OF REBOUND SHALL BE INCLUDED IN THE DESIGN OF BLAST RESISTANT GLAZING. ALL BLAST RESISTANT DESIGN REQUIREMENTS ARE IN ADDITION TO THE REQUIREMENTS OF THE VA WINDOW SPECIFICATIONS. THE USE OF OPERABLE WINDOWS FOR BLAST RESISTANT DESIGN IS DISCOURAGED; HOWEVER, WHERE OPERABLE WINDOWS ARE REQUIRED, THEIR PERFORMANCE MUST BE DEMONSTRATED WITH ACCEPTABLE EXPLOSIVE (OR SHOCK TUBE) TEST DATA WHILE IN THE OPEN POSITION.
2. GLASS: ALL NEW EXTERIOR GLAZING IS TO USE LAMINATED GLASS. FOR INSULATED GLAZING UNITS (IGUS) THE LAMINATED GLASS IS REQUIRED ONLY FOR THE INNER LITE. THE GLASS SHALL BE RESTRAINED WITHIN THE MULLIONS WITH A MINIMUM ½” BITE AND A CONTINUOUS BEAD OF STRUCTURAL SILICONE ADHESIVE ATTACHING THE INNER LITE OF GLASS TO THE FRAME TO ALLOW IT TO DEVELOP ITS POST-DAMAGE CAPACITY.
3. MULLIONS: THE MULLIONS ARE TO BE OF ALUMINUM AND/OR STEEL CONSTRUCTION AND SHALL BE DESIGNED TO ACCEPT A BLAST LOAD EQUAL TO THE MAXIMUM CAPACITY OF THE WEAKEST LITE OF SUPPORTED GLASS (I.E., BALANCED DESIGN), BUT NO LESS THAN THE DESIGN LEVEL PRESSURES WHILE SUSTAINING DEFORMATIONS NO GREATER THAN L/60. FOR WINDOWS WITH GLAZING LAY-UP GOVERNED BY NON-BLAST REQUIREMENTS (HURRICANE, FORCED ENTRY, FABRICATION, HANDLING, AND BALLISTIC), MULLIONS ARE TO BE DESIGNED FOR THE CAPACITY OF THE GLAZING THAT WOULD BE REQUIRED TO MEET THE BLAST
REQUIREMENTS ONLY.
4. CURTAINWALL: CURTAINWALL FRAMING MEMBERS SHALL SPAN FROM SLAB TO SLAB AND SHALL NOT BE ATTACHED DIRECTLY TO GRAVITY LOAD BEARING ELEMENTS (SUCH AS COLUMNS AND SHEAR WALLS) UNLESS AN ADVANCED ANALYSIS OF THE LOAD BEARING ELEMENT DEMONSTRATES IT CAN ACCEPT THE MAXIMUM BLAST FORCES TRANSFERRED BY THE MEMBERS FRAMING INTO IT WITHOUT COMPROMISING ITS LOAD BEARING CAPACITY.
PENTHOUSE ENCLOSING CRITICAL EQUIPMENT
1. PENTHOUSE ENCLOSURES SHALL BE DESIGNED TO RESIST THE PEAK BLAST PRESSURES AND IMPULSES RESULTING FROM THE DESIGN LEVEL VEHICLE THREAT
(W1) LOCATED AT THE MINIMUM STANDOFF DISTANCE OF 50 FEET (15 M), BUT NO GREATER THAN GP2. STANDOFF PROVIDED IN EXCESS OF THE 50 FEET (15 M) MAY
NOT BE ACCOUNTED FOR IN THE CALCULATION OF THE BLAST LOADING ENVIRONMENT.
EXISTING FACILITY - FENESTRATION
1. FOR UPGRADES IN WHICH THE FAÇADE IS NOT REPLACED, A MECHANICALLY ANCHORED OR WET GLAZED ATTACHED 7-MIL THICK ANTI-SHATTER FILM MAY BE USED
TO SATISFY THE REQUIREMENTS OF THIS SECTION. GLASS REPLACEMENT UPGRADES, WINDOW REPLACEMENT UPGRADES, AND “STORM-WINDOW” UPGRADES INTERIOR TO EXISTING HISTORIC FACADE SHALL USE LAMINATED GLASS AND STRUCTURAL SILICONE SEALANT. FOR INSULATED GLAZING UNITS (IGUS) THE LAMINATED GLASS IS REQUIRED ONLY FOR THE INNER LITE. NO UPGRADES TO THE FRAMES OR MULLIONS ARE REQUIRED FOR GLASS REPLACEMENT PROJECTS.
DEMOLITION
1. REMOVE GYPSUM BOARD AND BLOCKING AT EXISTING WINDOW JAMBS AND HEADS AS REQUIRED FOR WINDOW
INSTALLATION. BOARD TO BE REMOVED WITH CLEAN CUT LINES FOR PATCHING.
2. REMOVE ALL SEALANT FROM THE ADJACENT WINDOW SURFACES INCLUDING CONCRETE AND BRICK.
3. REMOVE EXISTING WINDOW ANCHORAGE OF SUB-SILLS, STRAPS, ETC.
4. REMOVE ALL BLOCKING AND ANY DETERIORATED BLOCKING IN THE WAY OF THE NEW WINDOW INSTALLATION.
5. DETAILS HAVE BEEN DRAWN TO REFLECT WHAT WAS OBSERVED IN THE FIELD AND PER THE ORIGINAL
CONSTRUCTION DRAWINGS. CONDITIONS BEHIND THE EXISTING WINDOWS, GYPSUM BOARD, AND STOOLS MAY BE
DIFFERENT IN THE FEILD UPON REMOVAL OF ITEMS, AS INDICATED ON THE DETAILS.
6. CONTRACTOR SHALL REMOVE THE EXISTING WINDOWS AND IS RESPONSIBLE FOR COMPLETE
REMOVAL/DISPOSAL.
7. CONTRACTOR TO VERIFY WORKING ORDER OF ALL EQUIPMENT IN EXISTING WINDOWS PRIOR TO REMOVAL AND ANYTHING FOUND NOT IN WORKING ORDER NOTIFY VA REPRESENTATIVE PRIOR TO REMOVAL. CONTRACTOR IS RESPONSIBLE TO REMOVE, STORE AND REINSTALL ALL EQUIPMENT FROM EXISTING WINDOW INTO NEW WINDOW.
WINDOWS
1. WINDOW DETAILS HAVE BEEN DRAWN GENERICALLY AND INCLUDE PLUS OR MINUS DIMENSIONS BASED ON THE
MANUFACTURERS FIXED WINDOW TYPE AND MATERIAL ANCHORAGE.
2. REFER TO SCHEDULES AND SPECIFICATIONS FOR GLASS TYPES.
3. WINDOW DRAWINGS HAVE BEEN PREPARED TO MATCH THE METHOD EMPLOYED AT THE TIME OF THE PREVIOUS
CONSTRUCTION.
4. WINDOWS TO BE INSTALLED FROM THE SAME SIDE THEY WERE REMOVED FROM SO CONTAINMENT SYSTEM IS IN
PLACE PRIOR TO THE WINDOW BEING DEMOLISHED UNTIL THE NEW FRAME AND WINDOW UNIT ARE PUT BACK IN
PLACE.
WINDOW SILLS
1. PROVIDE NEW WINDOW SILLS OVER NEW COMPOSITE BLOCKING AT THE AREAS INDICATED.
2. SILLS SHALL BE THE WALL DEPTH PLUS A 3/4" OVERHANG AND AN EASED EDGE AT THE FRONT.
3. INSTALL CORNER BEADS AND J MOLDINGS AT GYPSUM BOARD HEAD, JAMB, AND STOOL.
GYPSUM BOARD
1. NEW GYPSUM BOARD SHALL BE 5/8" MOISTURE RESISTANT, TYPE X. ANCHORED TO THE NEW METAL BLOCKING AND
ALIGNING WITH THE ADJACENT GYPSUM BOARD SURFACES.
2. INSTALL NEW GYPSUM BOARD ON THE NEW METAL OR COMPOSITE BLOCKING.
3. INSTALL CORNER BEADS AND J MOLDINGS AT GYPSUM BOARD HEAD, JAMB, AND STOOL.
PAINTING
1. PAINT WALL TO MATCH THE ADJACENT WALL COLOR.
2. PAINT ENTIRE WALL INCLUDING SOFFIT/WALL OVER THE WINDOW AND THE WALL BELOW THE STOOL TO THE BASE
BELOW.
3. PAINT AROUND ANY EXISTING WALL PROJECTIONS SUCH AS BUMPER RAILS, ETC.
4. PAINT DOWN TO TOP OF WALL MOUNTED CASEWORK, ABOUT 10" BELOW STOOL.
5. PAINT TO TOP OF CERAMIC TILE WAINSCOT AT STOOL HEIGHT IN THE TOILET ROOMS.
6. PAINT WALL OF WINDOWS TO THE CORNER AT EACH SIDE, AND AROUND ADJOINING COLUMN PROJECTION.
JOINTS
1. PROVIDE BACKER ROD AND SEALANT AT THE JOINTS INDICATED ON THE DETAILS ANP PER THE WINDOWS
MANUFACTURERS RECOMMENDATIONS.
WINDOW DETAIL NOTES
th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t o n e e ig h th in c h o n e fo o t
A
B
C
D
E
F
Veterans Health
Administration
VA FORM 08-6231
Drawing Title Project Title
Location
Date Checked Drawn
Project Number
CONSULTANTS:
Drawing # OF
VA Health Care System Approval:
ARCHITECT:
SPUR DESIGN, LLC
312 SW 25TH STREET
Oklahoma City, OK 73109
(405) 842-6100
TX ARCH COA #BR2171 EXP. 09/30/2023
TX ENGR COA #F-17591 EXP. 02/28/2023
STRUCTURAL ENGINEER
H2B
1225 NORTH LOOP WEST
SUITE 800
HOUSTON TX 77008
(713) 864-2900
ENVIRONMENTAL ENGINEER
RIVERFRONT SAFETY & HEALTH
11140 SOUTH TOWNE SQUARE,
SUITE 100
SAINT LOUIS, MO 63123
(314) 436-9492
FULLY SPRINKLERED
PHYSICAL SECURITY
FORCE PROTECT
10901 FRONT BEACH RD, UNIT 1415
PANAMA CITY BEACH, FL 32407
(502) 836-4232
1 2 3 4 5 6 7 8 9
1 2 3 4 5 6 7 8 9
A
B
C
D
E
F
STAMP:
Drawing Number
Building Number
/1
/2
:2
:3
P
M
GENERAL INFORMATION
MJA 02 76DLK
100% CONSTRUCTION DOCUMENTS
REPLACE WINDOWS
BUILDING 2J
12/14/2022
549-22-800
DALLAS VA MEDICAL CENTER
4500 S. LANCASTER RD.
DALLAS, TX 75216
GI001
2J
SPUR #: 2090.03
INFECTION CONTROL RISK ASSESSMENT MATRIX OF
PRECAUTIONS FOR CONSTRUCTION AND RENOVATION
PATIENT RISK GROUP TABLE
TYPE OF CONSTRUCTION PROJECT ACTIVITY (TYPE A-D)
INSPECTION AND NON-INVASIVE ACTIVITIES
INCLUDES, BUT IS NOT LIMITED TO:
- REMOVAL OF CEILING TILES FOR VISUAL INSPECTION LIMITED TO 1 TILE PER 50 SQUARE FEET
- PAINTING (BUT NOT SANDING)
- WALL COVERING, ELECTRICAL TRIM WORK, MINOR PLUMBING, AND ACTIVITIES WHICH DO NOT GENERATE DUST OR REQUIRE CUTTING OF WALLS OR ACCESS TO CEILINGS OTHER THAN FOR VISUAL INSPECTION
TYPE A
SMALL SCALE, SHORT DURATION ACTIVITIES WHICH CREATE MINIMAL DUST
INCLUDES, BUT IS NOT LIMITED TO:
- INSTALLATION OF TELEPHONE AND COMPUTER CABLING
- ACCESS TO CHASE SPACES
- CUTTING OF WALLS OR CEILING WHERE DUST MIGRATION CAN BE CONTROLLED
TYPE B
WORK THAT GENERATES A MODERATE TO HIGH LEVEL OF DUST OR REQUIRES DEMOLITION OR REMOVAL
OF ANY FIXED BUILDING COMPONENTS OR ASSEMBLIES
INCLUDES, BUT IS NOT LIMITED TO:
- SANDING OF WALLS FOR PAINTING OR WALL COVERING
- REMOVAL OF FLOOR COVERINGS, CEILING TILES AND CASEWORK
- NEW WALL CONSTRUCTION
- MINOR DUCT WORK OR ELECTRICAL WORK ABOVE CEILINGS
- MAJOR CABLING ACTIVITIES
- ANY ACTIVITY WHICH CANNOT BE COMPLETED WITHIN A SINGLE WORK SHIFT
TYPE C
MAJOR DEMOLITION AND CONSTRUCTION PROJECTS
INCLUDES, BUT IS NOT LIMITED TO:
- ACTIVITIES WHICH REQUIRE CONSECUTIVE WORK SHIFTS
- REQUIRES HEAVY DEMOLITION OR REMOVAL OF A COMPLETE CABLING SYSTEM
- NEW CONSTRUCTION
TYPE D
GROUP 1
LOW RISK
GROUP 2
MEDIUM RISK
GROUP 3
HIGH RISK
GROUP 4
HIGHEST RISK
- OFFICE AREAS
- OUTDOORS
- ELECTRICAL ROOMS
- MECHANICAL ROOMS
- STAIRWELLS
- CONFERENCE ROOMS
- OTHER
-PHYSICAL & OCCUPATIONAL THERAPY
- OUTPATIENT CLINICS
- WAITING ROOMS
- SLEEP LAB
- MENTAL HEALTH (OUTPATIENT ONLY)
- PROSTHETICS
- ORTHOTICS
- DOMICILIARY
- OTHER
- EMERGENCY ROOM
- KITCHEN
- FOOD PREPARATION
- DINING
- CANTEEN
- ECHOCARDIOGRAPHY
- RADIOLOGY/MRI
-RESPIRATORY THERAPY
-NUCLEAR MEDICINE
-SENIOR MENTAL HEALTH
-COMMUNITY LIVING CENTER
CLEAN SUPPLY
-OTHER
-CARDIAC CATH
-EP LAB OR CARDIOLOGY
-STERILE PROCESSING SERVICE
-ALL INPATIENT MEDICAL OR
SURGICAL UNITS
-CARE UNITS
-PACU
-MICU
-SICU
-TCU
-SPINAL CORD INJURY
-NEGATIVE PRESSURE
ISOLATION ROOMS
-OPTPATIENT CHEMOTHERAPY
-ONCOLOGY AREAS
-OPERATING ROOMS
-ENDOSCOPY
-DIALYSIS
- BRONCHOSCOPY
-PHARMACY
-CLINICAL LABORATORIES
-OTHER
1. EXECUTE WORK BY METHODS TO MINIMIZE RAISING
DUST FROM CONSTRUCTION OPERATIONS.
2. IMMEDIATELY REPLACE A CEILING TILE DISPLACED FOR
VISUAL INSPECTION.
CLASS I
DURING CONSTRUCTION PROJECT UPON COMPLETION OF PROJECT
1. PROVIDE ACTIVE MEANS TO PREVENT AIRBORNE DUST
FROM DISPERSING INTOATMOSPHERE.
2. WATER MIST WORK SURFACES TO CONTROL DUST
WHILE CUTTING.
3. SEAL UNUSED DOORS WITH DUCT TAPE.
4. BLOCK OFF AND SEAL AIR VENTS.
5. PLACE DUST MAT AT ENTRANCE AND EXIT OF WORK
AREA. REPLACE USED MATS IN ACCORDANCE WITH
MANUFACTURER'S RECOMMENDATIONS.
6. REMOVE OR ISOLATE HVAC SYSTEM IN AREA WHERE
WORK IS BEING DONE TO PREVENT CONTAMINATION OF
DUCT SYSTEM.
CLASS II
1. WIPE WORK SURFACES WITH DISINFECTANT.
2. CONTAIN CONSTRUCTION WASTE BEFORE
TRANSPORT IN TIGHTLY COVERED
CONTAINERS.
3. WET MOP AND/OR VACUUM WORK AREA
WITH HEPA FILTERED VACUUM BEFORE
LEAVING WORK AREAS.
4. REMOVE ISOLATION OF HVAC SYSTEM IN
AREAS WHERE WORK IS BEING PERFORMED.
1. REMOVE OR ISOLATE HVAC SYSTEM IN AREA WHERE
WORK IS BEING DONE TO PREVENT CONTAMINATION OF
DUCT SYSTEM.
2. COMPLETE ALL CRITICAL BARRIERS I.E. SHEETROCK,
PLYWOOD, PLASTIC TO SEAL AREA FROM NON WORK
AREA OR IMPLEMENT CONTROL CUBE METHOD (CART
WITH PLASTIC COVERING AND SEALED CONNECTION TO
WORK SITE WITH HEPA VACUUM FOR VACUUMING PRIOR
TO EXIT) BEFORE CONSTRUCTION BEGINS.
3. MAINTAIN NEGATIVE AIR PRESSURE VENTILATION (NPV)
AT 0.01" WATER COLUMN (wc) WITHIN THE WORK SITE
UTILIZING NPV MACHINE
4. NPV MONITORING DEVICES WHOULD BE VISIBLE FROM
OUTSIDE THE WORKSITE AND READINGS SHALL BE
DOCUMNETED DAILY OT MORE OFTEN AS NEEDED.
KEEP TRACKING MONITORING DEVICES AND TRACKING
LOG AT OUTSIDE OR ENTRANCE AT THE SITE
5. CONTAIN CONSTRUCTION WASTE BEFORE TRANSPORT
IN TIGHTLY COVERED CONTAINERS.
6. COVER TRANSPORT RECEPTACLES OR CARTS. TAPE
COVERS.
CLASS III
1. DO NOT REMOVE BARRIERS FROM WORK
AREA UNTIL COMPLETED PROJECT IS
INSPECTED BY THE OWNER'S SAFETY
DEPARTMENT AND INFECTION CONTROL
DEPARTMENT AND THOROUGHLY CLEANED
BY THE OWNER'S ENVIRONMENTAL SERVICES
DEPARTMENT.
2. REMOVE BARRIER MATERIALS CAREFULLY TO
MINIMIZE SPREADING OF DIRT AND DEBRIS
ASSOCIATED WITH CONSTRUCTION.
3. VACUUM WORK AREA WITH HEPA FILTERED
VACUUMS.
4. WET MOP AREA WITH DISINFECTANT.
5. REMOVE ISOLATION OF HVAC SYSTEM IN
AREAS WHERE WORK IS BEING PERFORMED.
1. ISOLATE HVAC SYSTEM IN AREAS WHERE WORK IS BEING
DONE TOP REVENT CONTAMINATION OF DUCT SYSTEM.
2. COMPLETE ALL CRITICAL BARRIERS I.E. SHEETROCK,
PLYWOOD, PLASTITCO, SEAL AREA FROM NON WORK
AREA OR IMPLEMENT CONTROL CUBEM ETHOD (CART
WITH PLASTIC MCOVERING AND SEALED CONNECTION
TO WORK SITE WITH HEPA VACUUM FOR VACUUMING
PRIOR TO EXIT) BEFORE CONSTRUCTION BEGINS.
3. MAINTAIN NEGATIVE AIR PRESSURE WITHIN WORK SITE
UTILIZING HEPA EQUIPPED AIR FILTRATION UNIT.
4. SEAL HOLES, PIPES, CONDUITS, AND PUNCTURES
APPROPRIATELY.
5. CONSTRUCT ANTEROOM AND REQUIRE ALL PERSONNEL
TO PASS THROUGH THIS ROOM SO THEY CAN BE
VACUUMED SING A HEPA VACUUM CLEANER BEFORE
LEAVING WORK SITE OR THEY CAN WEAR CLOTH OR
PAPER COVERALLS THAT RE REMOVED EACH TIME THEY
LEAVE THE WORK SITE.
6. ALL PERSONNEL ENTERING WORK SITE ARE REQUIRED
TO WEAR SHOE COVERS. SHOE COVERS MUST BE
CHANGED EACH TIME THE WORKEERX ITS THE WORK
AREA.
7. DO NOT REMOVE BARRIERS FROM WORK AREA UNTIL
COMPLETED PROJECT IS INSPECTED BY THE OWNER'S
SAFETY DEPARTMENT AND INFECTION CONTROL
DEPARTMENT AND THOROUGHLY CLEANED BY THE
OWNER'S ENVIRONMENTAL SERVICES DEPARTMENT.
CLASS IV
1. REMOVE BARRIER MATERIAL CAREFULLY TO
MINIMIZE SPREADING OF DIRT AND DEBRIS
ASSOCIATED WITH CONSTRUCTION.
2. CONTAIN CONSTRUCTION WASTE BEFORE
TRANSPORT IN TIGHTLY COVERED
CONTAINERS.
3. COVER TRANSPORT RECEPTACLES OR
CARTS. TAPE COVERING UNLESS SOLID LID.
4. VACUUM WORK AREA WITH HEPA FILTERED
VACUUMS.
5. WET MOP AREA WITH DISINFECTANT.
6. REMOVE OR ISOLATION OF HVAC SYSTEM IN
AREAS WHERE WORK WAS BEING
PERFORMED.
INFECTION CONTROL MATRIX - CLASS OF PRECAUTIONS: CONSTRUCTION PROJECT BY PATIENT
IT IS THE CONTRACTOR'S RESPONSIBILITY TO PROVIDE THE FOLLOWING INFECTION
CONTROL PRECAUTIONS DEPENDING UPON THE AREA CLASS DESIGNATION
CONSTRUCTION PROJECT TYPE
LOW RISK GROUP
MEDIUM RISK GROUP
HIGH RISK GROUP
HIGHEST RISK GROUP
PATIENT RISK GROUP TYPE A TYPE B TYPE C TYPE D
I
II
II
III/IV
I
II
III
I
II
IV
III/IV
IV
II
III/IV
III/IV
IV
1. CLEAN UP CEILING TILE AND FLOORING
SURFACE BELOW WITH HEPA FILTERED
VACUUM OR DAMP MOP
GENERAL ICRA NOTES:
ICRA NOTES:
DUST CONTROL PLAN NOTES
1. THIS PROJECT INCLUDES CONSTRUCTION ENTRY VESTIBLE -CONSTRUCTION ANTEROOM. THEY SHALL BE USED WHEN GOING INTO
CONSTRUCTION AREA AND LEAVING THE CONSTRUCTION AREA AND TIGHT SEALS SHALL BE MAINTAINED AT THE FULL PERIMETER OF WALLS AND WALL PENETRATIONS. ANY DUST SHALL BE IMMEDIATELY CLEANED IF TRACKED OUTSIDE OF THE CONSTRUCTION BARRIER. UPON COMPLETION OF THE CONSTRUCTION PHASE, DUST BARRIERS SHALL BE REMOVED CAREFULLY AFTER VA COR'S APPROVAL TO MINIMIZE SPREADING OF DUST AND THE CONTRACTOR SHALL HAVE TEMPORARY DUST PROTECTION IN PLACE
BEFORE REMOVAL OF A PERMANENT BARRIER.
INTERNAL DEMOLITION AND CONSTRUCTION ACTIVITIES DUST AND DEBRIS CONTROL
1. USE A-WING SOUTH ENTRY AS PRIMARY CONSTRUCTION ACCESS FOR PHASE I - USE B-WING SOUTH EMERGENCY EXIT FOR
ALTERNATE ACCESS AS PHASE I WORK PROGRESSES. USE NORTHEAST CONFERENCE ROOM FOR PHASE II CONSTRUCTION
ACCESS
2. TRAFFIC CONTROL: DESIGNATED ENTRY AND EXIT PROCEDURES SHALL BE DEFINED. EGRESS PATHS SHALL BE FREE OF DEBRIS;
ONLY AUTHORIZED PERSONNEL SHALL BE ALLOWED TO ENTER THE CONSTRUCTION ZONE. SIGNAGE SHALL DIRECT PEDESTRIAN
TRAFFIC AWAY FROM THE CONSTRUCTION AREA AND MATERIALS.
3. CONTRACTOR SHALL USE TWO CARTS TO TRANSFER CONSTRUCTION MATERIAL AND OUT OF THE PROJECT - CLEAN CART SHALL BE USED; THE NOT-SO-CLEAN CART SHALL BE USED BETWEEN THE MAIN ENTRY AND THE CONSTRUCTION STAGING PREP AREA.
4. DEMOLITION DEBRIS: DEBRIS SHALL BE REMOVED IN CARTS WITH TIGHTLY FITTED COVERS, USING DESIGNATED TRAFFIC ROUTE.
EFFORTS SHALL BE MADE TO MINIMIZE USE OF ELEVATORS WITH AN EMPHASIS ON TRANSPORT DURING THE LOWEST PERIOD OF ACTIVITY. DEBRIS SHALL BE REMOVED DAILY AND AT TIMES SPECIFIED BY THE COR. IF CHUTES ARE USED TO DIRECT DEBRIS OUTSIDE, HIGH EFFICIENCY PARTICULATE AIR (HEPA) FILTERED NEGATIVE AIR MACHINES SHALL BE USED, AND THE CHUTE OPENING SHALL BE SEALED WHEN NOT IN USE. FILTERS SHALL BE BAGGED AND SEALED BEFORE BEING TRANSPORTED OUT OF THE CONSTRUCTION AREA. THE CONTRACTOR SHALL NOT HAUL DEBRIS THROUGH PATIENT-CARE AREAS WITHOUT PRIOR
APPROVAL OF THE COR.
5. EXTERIOR WINDOWS: EXISTING WINDOWS SHALL BE PROTECTED TO PREVENT DAMAGE BY ADJACENT CONSTRUCTION WORK.
VENTILATION AND ENVIRONMENTAL CONTROLS
1. AIR SYSTEM FLOW: THE COR VERIFY AND ACKNOWLEDGE CONTRACTOR WHETHER THE CONSTRUCTION AREA USES
FRESH/OUTSIDE OR RE-CIRCUATED AIR; FILTERS SHALL BE ADDED OR RETURN VENTS COVERED AS NEEDED WITH FILTER
MATERIAL OR PLASTIC. AIR MUST FLOW FROM CLEAN TO DIRTY PLACES.
2. NEGATIVE AIR PRESSURE: THE AIR WITHIN THE CONSTRUCTION AREA SHALL BE NEGATIVE WITH RESPECT TO SURROUNDING AREAS AND WITH NO DISRUPTION OF AIR SYSTEMS OF ADJACENT AREAS. USE OF THE NEGATIVE AIR PRESSURE SYSTEM WITHIN THE ENCLOSURE TO REMOVE DUST SHALL PASS AIR THROUGH AN INDUSTRIAL GRADE PORTABLE HEPA FILTER CAPABLE OF FILTRATION RATES OF 300-800 CUBIC FEET PER MINUTE (9FT3/MIN), OR EXHAUST AIR DIRECTLY TO THE OUTSIDE IF APPROVED BY COR. IF EXHAUST SHALL BE TIED INTO A RE-CIRCULATED AIR SYSTEM, PRE-FILTER AND HEPA FILTER SHALL BE USED BEFORE
EXHAUST TO PREVENT CONTAMINATION OF THE DUCTS.
3. ADJACENT AREAS: THE STATUS OF SEALED PENETRATIONS AND INTACT CEILIING SHALL BE VERIFIED DAILY.
4. AIR EXCHANGE RATES AND PRESSURE RELATIONSHIPS: VAMC AND CONTRACTOR SHALL VERIFY AND MAINTAIN PROPER RATES IN
CRITICAL AREAS NEAR CONSTRUCTION ACTIVITY AND ENSURE AIR IS NOT BEING RE-CIRCUATED WITHOUT FILTRATION FROM THE CONSTRUCTION AREA ELSEWHERE. PROVIDE AIR PRESSURE TESTING THOUGHOUT THE PROJECT IN THE FREQUENCY AS
IDENTIFIED BY THE COR.
GENERAL NOTES
1. PROVIDE TEMPORARY 1-HOUR RATED SLAB-TO-SLAB BARRIERS CONSIST OF 3-5/8" METAL STUD FRAMING WITH 5/8" ON BOTH SIDES.
BARRIERS SHALL BE INSPECTED BY VA PCRA STAFF PRIOR TO START OF CONSTRUCTION IN SPACE. MAINTAIN NEGATIVE PRESSURE
VENTILATION IN THE CONSTRUCTION SPACE.
2. PROVIDED HARD DOOR FOR ANTEROOM FOR CONSTRUCTION ACCESS.
3. USE ISOLATION CART FOR ALL WORK IN THIS AREA.
4. PROVIDE TWO STICKY MATS AT EACH CONSTRUCTION ACCESS POINT IN ALL PHASES.
5. VA REQUIRES THAT ALL APPLICABLE PERMITS BE COMPLETED AND APPROVED PRIOR TO BEGINNING ANY WORK ON STATION.
PERMITS INCLUDE: ICRA, PCRA, ILSM, ABOVE CEILING, FIRE/SMOKE WALL, UTILITY, FIRE SPRINKLER, FIRE ALARM SYSTEM, MEDICAL
GASES, CONFINED SPACE AND HOT WORK.
1. ALL CONTRACTORS CONSTRUCTION WORKERS AND CORS MUST ATTEND THE INFECTION PREVENTION TRAINING ANNUALLY AND
BRING PROOF NEGATIVE TB WITH THEM AT THAT TIME.
2. THE INFECTION PREVENTION OFFICE SHALL BE NOTIFIED OF ALL PRE-CONSTRUCTION MEETINGS.
3. THE ICRA (INFECTION CONTROL RISK ASSESSMENT) SHALL BE WRITTEN INTO THE CONTRACT FOR ALL CONTRACTORS AND
SUBCONTRACTORS.
4. THE CONTRACTOR SHALL CLEAN THE WHEELS AND OUTSIDE OF ALL CARTS AND EQUIPMENT BROUGHT INTO AND OUT OF THE
MAIN HOSPITAL OR POLYTRAUMA FACILITIES.
5. INFECTION PREVENTION OFFICE MUST BE NOTIFIED OF ALL WATER SHUT-OFF OR INTERRUPTIONS.
6. THE CONTRACTOR SHALL WET MOP HEAVY TRAFFIC AREAS AT LEAST TWO (2) TIMES A DAY OR MORE IF SITE HAS AN ICRA LEVEL
OF 3 OR 4 AND/OR IF THE AREA HAS HIGH VOLUME OF DUST. WATER SHALL BE CHANGED DAILY. DO NO LEAVE STANDING WATER
OVER NIGHT.
7. CONSTRUCTION WORKERS SHALL WEAR DUPONT TYVEK COVERALLS OR EQUIVALENT OVER CLOTHES AND SHOE COVERS IN MODERATE TO HIGH DUST AREAS IN MAIN HOSPITAL OR POLYTRAUMA FACILITIES TO PREVENT CONTAMINATION OF EMPLOYEE CLOTHES AND TRACKING DUST AND DIRT INTO THESE FACILITIES. CONSTRUCTION WORKERS SHALL REMOVE COVERALLS BEFORE
LEAVING THE AREA.
8. THE INFECTION PREVENTION OFFICE NEEDS TO BE NOTIFIED IF THE HVAC MUST BE INTERRUPTED IN AREAS THAT AFFECT PATIENT
CARE.
9. THE INFECTION PREVENTION OFFICE SHALL BE NOTIFIED OF ANY ANTICIPATED ALTERATIONS TO THE ACCESS ROUTES USED
DURING CONSTRUCTION ACTIVITIES.
10. ALL ICRA LEVEL 4 PROJECT SITES MUST HAVE AN ANTE-ROOM TO MAINTAIN NEGATIVE AIRFLOW AND BE LARGE ENOUGH TO REMOVE COVERALLS AND HAVE A TRASH CONTAINER. THE ANTE-ROOM MUST BE CLEARLY IDENTIFIED ON THE DRAWINGS.
11. AIR FILTRATION DEVICES WITH HEPA FILTERS SHALL BE USED ON SITE FOR SMALL CLEAN-UPS IN PATIENT CARE AREAS THAT HAVE
AN ICRA LEVEL OF 1 OR 2.
12. THE CONTRACTOR SHALL PROVIDE A DAILY LOG FOR THE VA STAFF LOCATED ON SITE THAT CONTAINS UPDATES NOTING THE READING ON THE PRESSURE SENSOR, CERTIFYING THAT THE SITE HAS BEEN CONTINUALLY MAINTAINING NEGATIVE AIR PRESSURE DURING CONSTRUCTION FOR ALL ICRA LEVEL 3 AND 4 PR0JECT SITE. INFECTION PREVENTION MEASURES.
13. THE PRIME CONTRACTOR WILL ENSURE THAT CONTRACTORS IMPLEMENT THE REQUIREMENTS OR VAMC'S INFECTION RISK ASSESSMENT (ICRA) TEAM. ICRA GROUP MAY MONITOR DUST IN THE VICINITY OF THE CONSTRUCTION WORK AND REQUIRE THE CONTRACTOR TO TAKE CORRECTIVE ACTION IMMEDIATELY IF THE SAFE LEVELS ARE EXCEEDED.
14. THE PRIME CONTRACTOR WILL ENSURE THAT THE CONTRACTOR ESTABLISHES AND MAINTAINS A DUST CONTROL PROGRAM AS PART OF THE CONTRACTOR'S INFECTION PREVENTION MEASURES IN ACCORDANCE WITH THE GUIDELINES PROVIDED TO THE PRIME CONTRACTOR. PRIOR TO START OF WORK, THE CONTRACTOR SHALL PREPARE A PLAN DETAILING BEST MANAGEMENT
PRACTICES.
15. PROJECT-SPECIFIC DUST PROTECTION MEASURES PERIODIC STATUS REPORTS WHICH ARE TO BE SUBMITTED TO RESIDENT ENGINEER AND FACILITY ICRA TEAM FOR REVIEW FOR COMPLIANCE WITH CONTRACT REQUIREMENTS IN ACCORDANCE WITH SECTION 01 33 23, SHOP DRAWINGS, PRODUCT DATA AND SAMPLE. ALL PERSONNEL INVOLVED IN THE CONSTRUCTION OR RENOVATION ACTIVITY SHALL BE EDUCATED AND TRAINED IN INFECTION PREVENTION MEASURES ESTABLISHED BY THE MEDICAL
CENTER.
16. THE PRIME CONTRACTOR WILL ENSURE CERTIFICATION THAT THE CONTRACTOR HAS A MEDICAL PROGRAM THAT ADDRESSES TUBERCULOSIS. THE MEDICAL PROGRAM SHALL INCLUDE WRITTEN ASSURANCE THE EACH EMPLOYEE HAS NO ACTIVE TUBERCULOSIS. ALL CONTRACT EMPLOYEES ASSIGNED TO THE WORK SITE SHALL HAVE A PRE-PLACEMENT TUBERCULIN SCREENING WITHIN 90 DAYS PRIOR TO ASSIGNMENT TO THE WORK SITE AS RECOMMENDED BY THE CENTER FOR DISEASE CONTROL (CDC). THIS CAN BE THE CDC TWO-STEP SKIN TESTING OR FOOD AND DRUG ADMINISTRATION (FDA) APPROVED BLOOD TEST. EMPLOYEES MANIFESTING POSITIVE SCREENING REACTIONS TO THE TUBERCULIN SHALL BE EXAMINED PER CURRENT CDC GUIDELINES PRIOR TO WORKING ON VHA PROPERTY. IF THE EMPLOYEE IS FOUND WITHOUT EVIDENCE OF ACTIVE INFECTOUS PULMONARY TUBERCULOSIS (TB). A STATEMENT DOCUMENTING EXAMINATION BY A PHYSICIAN MUST BE ON FILE WITH THE EMPLOYER (CONSTRUCTION CONTRACTOR), NOTNG THAT THE EMPLOYEE WITH A POSITIVE TUBERCULIN SCREENING TEST IS WITHOUT EVIDENCE OF ACTIVE INFECTIOUS PULMONARY TB, THE EMPLOYEE FOUND WITH ACTIVE DISEASE WOULD REQUIRE TREATMENT WITH A SUBSEQUENT STATEMENT OUTLINES ABOVE BEFORE BEING ALLOWED TO RETURN TO WORK ON VA
PROPERTY.
17. CONTRACTOR SHALL MONITOR FOR AIRBORNE DISEASE (E.G ASPERGILLOSIS) AS APPROPRIATE DURING CONSTRUCTION. A BASELINE OF CONDITIONS MAY BE ESTABLISHED BY THE MEDICAL CENTER PRIOR TO THE START OF WORK AND PERIODICALLY DURING THE CONSTRUCTION STAGES. TO DETERMINE IMPACT OF CONSTRUCTION ACTIVITIES ON INDOOR AIR QUALITY, IN ADDITION; IN CASE OF ANY PROBLEM, THE MEDICAL CENTER, ALONG WITH ASSISTANCE FROM THE CONTRACTOR, SHALL CONDUCT AN ENVIRONMENTAL ASSESSMENT TO FIND AND ELIMINATE THE SOURCE. CONTRACTOR IS RESPONSIBLE FOR MONITORING AND MAINTAINING NEGATIVE AIR PRESSURE THROUGHOUT ENTIRE AREA UNDER CONSTRUCTION IN ICRA LEVEL 3 & 4 CONSTRUCTION
SITE.
18. THE FOLLOWING PREVENTION MEASURES SHALL BE ADOPTED DURING CONSTRUCTION TO KEEP DOWN DUST AND PREVENT
MOLD.
19. DAMPEN DEBRIS TO KEEP DUST DOWN IN EXISTING STRUCTURES WHERE DIRECTED BY RESIDENT ENGINEER. DO NOT PERFORM DUST PRODUCING TASKS WITHIN OCCUPIED AREAS WITHOUT THE APPROVAL OF THE RESIDENT ENGINEER.
INFECTION CONTROL RISK ASSESSMENT NOTES:
1. * OBTAIN INFECTION CONTROL PERMIT BEFORE CONSTRUCTION BEGINS.
2. ISOLATE HVAC SYSTEM IN AREA WHERE WORK IS BEING DONE TO PREVENT CONTAMINATION OF THE DUCT SYSTEM.
3. COMPLETE ALL CRITICAL BARRIERS OR IMPLEMENT CONTROL CUBE METHOD BEFORE CONSTRUCTION BEGINS.
4. MAINTAIN NEGATIVE AIR PRESSURE WITHIN WORK SITE UTILIZING HEPA EQUIPPED AIR FILTRATION UNITS.\
5. SEAL HOLES, PIPES, CONDUITS, AND PUNCTURES APPROPRIATELY.
6. DO NOT REMOVE BARRIERS FROM WORK AREA UNTIL COMPLETED PROJECT IS INSPECTED BY THE OWNER'S SAFETY
DEPARTMENT AND THOROUGHLY CLEANED BY THE OWNER'S ENVIRONMENTAL SERVICES DEPARTMENT.
7. REMOVE BARRIER MATERIAL CAREFULLY TO MINIMIZE SPREADING OF DIRT AND DEBRIS ASSOCIATED WITH CONSTRUCTION.
CONTAIN CONSTRUCTION WASTE BEFORE TRANSPORT IN TIGHTLY COVERED CONTAINERS.
8. COVER TRANSPORT RECEPTACLES OR CARTS. TAPE COVERING UNLESS SOLID LID. VACUUM WORK AREA WITH HEPA FILTERED
VACUUMS. WET MOP AREA WITH DISINFECTANT. REMOVE ISOLATION OF HVAC SYSTEM IN AREAS WHERE WORK IS BEING PERFOR
9. KEEP CONSTRUCTION SITE CLEAN & NEAT AT ALL TIMES.
10. CONTRACTOR TO CLEAN THE CONSTRUCTION AREA, AND PREPARE FOR SAFETY AND INFECTION CONTROL'S INSPECTION AND
FINAL CLEANING BY VA ECM STAFF.
11. VA ECM STAFF WILL PERFORM FINAL VERIFICATION OF CLEANING AND SANITATION.
HOT WORK PERMITS.
1. PERMITS MUST BE OBTAINED 24 HOURS PRIOR TO COMMENCEMENT OF WORK, WHENEVER POSSIBLE. ORIGINAL PERMIT TO BE
POSTED WHERE WORK IS BEING PERFORMED; CONTRACTOR MUST RETURN PERMIT TO SAFETY OFFICE WHEN WORK IS
COMPLETED.
2. FIRE WATCH. CONTRACTOR MUST INITIAL, DATE AND TIME EVERY 30 MINUTES AFTER HOT WORK HAS STARTED.
3. CONTRACTOR TO PROVIDE WARNING SIGNAGE AND DIRECTIONAL SIGNAGE THAT SHALL BE POSTED IN CONSTRUCTION AREA
WHILE WORK IS PERFORMED.
4. CONFINED SPACE. CONTRACTOR TO OBTAIN CONFINED SPACE PERMIT PRIOR TO ENTRY INTO MECHANICAL CHASE. ENSURE IT IS
APPROVED BY VA SAFETY DEPARTMENT AND COTR.
1. CONTRACTOR TO PROVIDE CONSTRUCTION SEQUENCING TO THE FACILITY FOR REVIEW PRIOR TO START OF ANY DEMOLITION OR
CONSTRUCTION ACTIVITIES.
2. CONTRACTOR SHALL VISIT ALL AREAS OF WORK, INCLUDING WALKING THE SITE, MEASURING EXISTING DIMENSIONS AND OBSERVING EXISTING CONDITIONS BEFORE BEGINNING WORK, ORDERING MATERIALS, OR STARTING ANY CONSTRUCTION.
CONTRACTOR TO FIELD VERIFY ALL DIMENSIONS OF EXISTING SITE CONDITION PRIOR RO START OF WORK AND ORDERING OF
MATERIALS.
3. CONTRACTOR SHALL RECYCLE REMOVED MATERIALS WHENEVER POSSIBLE. SEE SPECIFICATION SECTION ???
4. CONTRACTOR TO PROTECT AREA ADJACENT TO THE DEMOLITION AND NEW CONSTRUCTION WORK TO PREVENT DAMAGES. (IF
DAMAGED, REPAIR, RE-PATCH, SAND SMOOTH AND REFINISH TO MATCH EXISTING.)
5. CONTRACTOR SHALL REPORT TO COR IMMEDIATELY WHEN DISCREPANCIES TO THE DRAWINGS ARE FOUND IN THE FIELD.
6. CONTRACTOR TO INSTALL TEMPORARY BALL-IN-TUBE SYSTEM TO MONITOR AND ENSURE PRESSURE LEVEL TO MEET VA
GUIDELINES WITHIN CONSTRUCTION AREA. (CONTRACTOR TO VERIFY LOCATIONS) WITH VA COR PRIOR RO INSTALLATION.
DUST CONTROL PLAN NOTES
1. THE VAMC INFECTION CONTROL GROUP HAS CONFIRMED THE DESIGNATION FOR THIS PROJECT IS LEVEL III AND IV FOR THE CLASS
OF PRECAUTIONS OR LEVEL OF INFECTION CONTROL ACTIVITIES. HARD SURFACE BARRIERS SHALL BE USED EXCEPT IN THE AREA INDICATED ON THE PHASING PLAN WITH PLASTIC BARRIERS (MINIMUM 4MIL) TO SEAL AREA FROM NON-WORK AREA AS LONG AS
THE SPRINKLER SYSTEM IS INTACT AND ACTIVE.
2. THIS PROJECT NEEDS AN ENTRY VESTIBULE FOR CLOTHING CHANGES (PROVIDE AND LOCATE A STAGING AREA FOR TYVEK SUITS NEAR THE PLASTIC BARRIER ENTRANCE SPACES - CONSTRUCTION ANTEROOM. THEY SHALL BE USED WHEN GOING INTO CONSTRUCTION AREA AND LEAVING THE CONSTRUCTION AREA) AND TOOL STORAGE TIGHT SEALS SHALL BE MAINTAINED AT THE FULL PERIMETER OF WALLS AND WALL PENETRATIONS. ANY DUST SHALL BE IMMEDIATELY CLEANED IF TRACKED OUTSIDE OF THE CONSTRUCTION BARRIER. UPONCOMPLETION OF THE CONSTRUCTION PHASE, DUST BARRIERS SHALL BE REMOVED CAREFULLY TO MINIMIZE SPREADING OF DUST AND THE CONTRACTOR SHALL HAVE TEMPORARY DUST PROTECTION IN PLACE BEFORE REMOVAL
OF A PERMANENT BARRIER.
3. A DWYER GAUGE SHALL BE USED AT CONSTRUCTION ENTRY TO VALIDATE NEGATIVE AIR FLOWS.
4. AFTER EACH PHASE, PERFORM TASKS STATED IN NOTE 6A.
5. PROVIDE STICKY MATS AT THE PLASTIC BARRIER ENTRANCE SPACES (CONSTRUCTION ANTEROOM) AND CHANGE DAILY OR MORE
OFTEN AS NEEDED TO PREVENT THE SPREAD OF DUST AND DEBRIS INTO ADJACENT CLEAN SPACE.
INTERNAL DEMOLITION AND CONSTRUCTION ACTIVITIES DUST AND DEBRIS CONTROL
1. CONTRACTOR SHALL COORDINATE ACCESS WITH FACILITY PRIOR TO THE START OF ANY DEMOLITION OR CONSTRUCTION
ACTIVITIES.
2. TRAFFIC CONTROL: DESIGNATED ENTRY AND EXIT PROCEDURES SHALL BE DEFINED. EGRESS PATHS SHALL BE FREE OF DEBRIS;
DESIGNATED ELEVATORS SHALL BE USED DURING SCHEDULED TIMES; AND ONLY AUTHORIZED PERSONNEL SHALL BE ALLOWED TOENTER THE CONSTRUCTION ZONE. SIGNAGE SHALL DIRECT PEDESTRIAN TRAFFIC AWAY FROM THE CONSTRUCTION AREA AND
MATERIALS.
3. CONTRACTOR SHALL USE ISOLATION CARTS TO TRANSFER CONSTRUCTION MATERIAL IN AND OUT OF THE PROJECT - A CLEAN CART SHALL BE USED; THE NOT-SO-CLEAN CART SHALL BE USED BETWEEN THE MAIN ENTRY AND THE CONSTRUCTION
STAGING/PREP AREA.
4. DEMOLITION DEBRIS: DEBRIS SHALL BE…
This is the start of the file's text. The full file is on GovTribe.