Asbestos Inspection and Management Plan.pdf

PDF 21 MB Posted

Attached to
NEW | 549-22-800 Replace Windows Building 2J Federal contract opportunity
Solicitation number
36C25726R0048
Issued by
Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 17

About this file

This is an AHERA Asbestos Inspection and Management Plan for Building 2J at the VA Medical Center Dallas, Texas, prepared by Micro Air of Texas, Inc. in November 2010. The comprehensive asbestos survey was conducted on October 18-20, 2010, covering approximately 1,212,934 square feet of the six-story clinical addition constructed in 1998. The inspection identified 14 homogeneous sampling areas (HA-01 through HA-14) with 118 bulk material samples collected and analyzed by PLM methodology. Materials sampled included sprayed-on fireproofing, fiberglass pipe insulation, HVAC duct insulation, sheetrock with joint compound, floor tiles, ceiling tiles, cove base adhesive, sink soundproofing, and fire stop materials, with estimated quantities ranging from 4 square feet to 2,000,000 square feet across various material types.

The laboratory analysis results, performed by J3 Resources, Inc. (NIST-accredited laboratory), determined that all 118 samples tested negative for asbestos content. Consequently, no assessment or response actions were deemed necessary for any of the identified homogeneous areas. The plan designated Thomas Rattler or Ken Taylor as the facility's designated persons responsible for implementation, with contact through Charles Ballard at the VA Engineering Services (214-857-1069). The inspectors were Texas-licensed asbestos consultants Melissa Kiser (DSHS License #10-5436) and Eric Eitzen (DSHS License #10-5349). Per AHERA requirements, the facility must undergo three-year reinspection and management plan updates, with six-month visual inspections conducted by the designated person to monitor for any material condition changes.

View the file

Other files for this federal contract opportunity

Other files attached to NEW | 549-22-800 Replace Windows Building 2J, newest first.
File Type Posted
Amendment 0009 36C25726R0048.docx DOCX document
Amendment 0008 36C25726R0048.docx DOCX document
RFIs with Responses 36C25726R0048.docx DOCX document
Addendum 01.pdf PDF
Lightning Protection System Certificate of Completion.pdf PDF
Amendment 0007 36C25726R0048.docx DOCX document
Amendment 0006 36C25726R0048.docx DOCX document
Amendment 0005 36C25726R0048.docx DOCX document
Attachment 4 Itemized Cost Breakdown.xlsx XLSX spreadsheet
Amendment 0004 36C25726R0048.docx DOCX document
Site Visit Sign in Sheet 2nd Site Visit Replace Windows Building 2J.pdf PDF
Site Visit Sign in Sheet 1st Site Visit Replace Windows Building 2J.pdf PDF
Amendment 0003 36C25726R0048.docx DOCX document
Amendment 0002 36C25726R0048.docx DOCX document
Amendment 36C25726R0048 0001.docx DOCX document
36C25726R0048 SOLICITATION.docx DOCX document
ASBESTOS ANALYSIS.pdf PDF
SPECIFICATIONS 100 PERCENT.pdf PDF
DRAWINGS 100 PERCENT.pdf PDF
STRUCTURAL CALCULATION PACKAGE.pdf PDF
VHA PCRA ICRA CATEX ILSM.pdf PDF
Show all 21

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

VA MEDICAL CENTER

DALLAS, TEXAS

BUILDING 2J

A.H.E.R.A. ASBESTOS INSPECTION

MANAGEMENT PLAN

PREPARED FOR:

VA NORTH TEXAS HEALTH CARE SYSTEM

ENGINEERING SERVICES

4500 S. LANCASTER ROAD

DALLAS, TX 75216

MICRO AIR PROJECT #A-1001

PREPARED BY:

MICRO AIR OF TEXAS, INC.

P.O. Box 1225 Dickinson, TX 77539

(281) 280-9965

DALLAS, TEXAS

AHERA

ASBESTOS INSPECTION

PREPARED FOR:

VA NORTH TEXAS HEALTH CARE SYSTEM

ENGINEERING SERVICES

4500 S. LANCASTER ROAD

DALLAS, TX 75216

PREPARED BY:

MICRO AIR OF TEXAS, INC.

P.O. Box 1225 Dickinson, TX 77539

(281) 280-9965

Inspection Dates: Oct. 18 - 20, 2010

Individual Asbestos Consultant: ________________________

DSHS License # 10-5436

TABLE OF CONTENTS

Page #

General Inventory Management Plan Format

Section I - AHERA Asbestos Inspection General Information

Introduction, Required Information, & Facility Description 1 - 2

Section II - Asbestos Methodology & Lab Analytical Report

Methodology 1 Classification 1 Limitations 2 Homogeneous Sampling Area Summary Table 3 - 4 Laboratory Report Sample Location Drawing(s)

Section III - ACM Material Assessment & Quantification

General Information 1 Surfacing Materials 2 Thermal System Insulation Materials 2 - 4 Miscellaneous Materials 4 - 7

Section IV - Asbestos Material Response Action Recommendations

This Section is Not Applicable 1

Section V - Operations & Maintenance Program

Purpose / This Section is Not Applicable 1

Section VI - Facility Owner / Designated Person(s)

Licenses and Training Certificates

Section VII - Six Month Surveillance Documentation - Not Applicable

Section VIII - Three Year Reinspection Updates / Schedule

Section IX - Response Actions - Not Applicable

BUILDING INSPECTION FOR FRIABLE AND NON-FRIABLE ACM

GENERAL INVENTORY

FACILITY ID: Building 2J - Clinical Addition

INSPECTION COMPLETION DATES: October 18 - 20, 2010

FACILITY ADDRESS: Building 2J

VAMC

4500 S. Lancaster Rd.

Dallas, TX 75216

TOTAL SQUARE FOOTAGE: APPROXIMATELY 1,212,934 Square Feet

YEAR CONSTRUCTED: 1998

USE OF FACILITY: Clinics/Surgery/ICU/Radiology

DESIGNATED PERSON: Thomas Rattler or Ken Taylor

ENGINEERING PHONE: 214-857-1069 - Contact Charles Ballard

INSPECTION COMPANY: MICRO AIR OF TEXAS, INC.

P.O. Box 1225 Dickinson, TX 77539

PHONE: (281) 280-9965

NAME OF ACCREDITED PERSON

PERFORMING INSPECTION: MELISSA KISER(DSHS LICENSE # 10-5436)

ERIC EITZEN (DSHS LICENSE # 10-5349

ACCREDITATION AGENCY: TEXAS DEPT. OF STATE HEALTH SERVICES

ACCREDITATION #: N/A

THIS BUILDING CONTAINS:

1. FRIABLE ACBM

2. NON-FRIABLE ACBM

3. FRIABLE MATERIAL

(ASSUMED TO BE ACBM)

4. NON-FRIABLE MATERIAL

(ASSUMED TO BE ACBM)

5. NONE OF THE ABOVE X

_______________________________________ 11/30/10

ACCREDITED INSPECTOR DATE

DSHS LICENSE # 10-5436

BUILDING 2J

DALLAS, TX

A.H.E.R.A. ASBESTOS INSPECTION &

MANAGEMENT PLAN

PREPARED FOR:

VA NORTH TEXAS HEALTH CARE SYSTEM

ENGINEERING SERVICES

4500 S. LANCASTER ROAD

DALLAS, TX 75216

MICRO AIR PROJECT # A-1001

PREPARED BY:

MICRO AIR OF TEXAS, INC.

P.O. Box 1225

MICRO AIR OF TEXAS, INC. BUILDING 2J - VA Medical Center; Dallas, TX

AHERA ASBESTOS INSPECTION & MANAGEMENT PLAN

P.O. Box 1225

MANAGEMENT PLAN FORMAT

SECTION I: This section contains general information regarding the AHERA survey and management plan, required information, and a facility description.

SECTION II: This section contains general information, sampling information, and Homogeneous Sample Area Summary. The laboratory analytical report for the bulk samples collected during the 2010 inspection has been included. Additionally, information on the survey report and classification of homogeneous areas is located in this section. Drawings depicting the locations of all bulk building material samples collected and asbestos-containing homogeneous area locations can be found in this sub-section.

SECTION III: This section contains material assessments and quantification which are used to develop the appropriate response actions for the management plan. Photographs of each asbestos-containing material identified has been included in this section.

SECTION IV: This section contains the recommended response actions for each type of ACM in the facility including recommendations for immediate abatement, if necessary. Immediate response action recommendations are prioritized.

SECTION V: This section contains an updated Operations and Maintenance Program for the facility.

This program includes recommendations for ongoing maintenance functions.

SECTION VI: This section has been reserved for informational purposes. This section includes the Facility Owner / Designated Person information, as well as the Re-inspection / Periodic Surveillance Schedule. All applicable licenses, certifications, and accreditations of the Inspector, Management Planner, and Laboratory performing services on this Management Plan are also included in this section.

SECTION VII: This section has been reserved for reports for the six month inspections, assessments, and any ambient air monitoring.

SECTION VIII: This section has been reserved for documentation obtained from three year re-inspections. Updates to the Management Plan are to be included in this section.

SECTION IX: This section has been reserved for the owner to reference abatement response action reports and building maintenance action (O&M) reports. All documentation from asbestos abatement activities should also be included in this section.

SECTION I

M ICRO AIR OF TEXAS, INC. VAMC; Dallas, Texas - Building 2J 1

AHERA ASBESTOS INSPECTION

SECTION I - GENERAL INFORMATION

INTRODUCTION

Micro Air of Texas, Inc. (Micro Air) was contracted by the Veterans Administration North Texas Health Care System (VANTHCS) located in Dallas, Texas to perform an asbestos inspection and generate a management plan in accordance with guidelines established in 40 CFR 763, the Asbestos Hazard Emergency Response Act of 1987 (AHERA), for the aforementioned facility located in Dallas, Texas. This facility consists of numerous buildings constructed between 1940 and 2009. This particular report pertains to Building 2J, which currently houses numerous clinics, surgery rooms, ICU, and radiology. Based on information we obtained from VA personnel, this building is thought to have been constructed in 1998.

Micro Air performed a comprehensive asbestos survey of Building 2J on October 18-20, 2010.

After the comprehensive asbestos survey results were compiled, a Management Planner accredited by an EPA-approved training provider and licensed as an Individual Asbestos Consultant in the state of Texas, reviewed the analytical results of the inspection and current physical condition assessments. The management planner then determined the potential hazard posed by the ACM and evaluated and selected control / response options based on all compiled information. This information was then composed and written into a final report.

The federal National Emission Standard for Asbestos (NESHAP) and the Texas Asbestos Health Protection Act (TAHPA) both require that prior to any demolition or renovation activity in a building, a thorough inspection of the affected facility or part of the facility where the demolition or renovation operation will occur, must be performed for the presence of asbestos, including Category I and Category II non-friable asbestos-containing material (ACM).

Additionally, TAHPA requires that a minimum of three samples be collected from each homogeneous sampling area (material type) identified in the building. The work area and immediately surrounding areas which could foreseeably be disturbed by the actions necessary to perform the project must be inspected and sampled as applicable prior to renovations or demolition. While the VANTHCS is not subject to the TAHPA regulation, due to its exclusion as a federal facility, Micro Air collected bulk samples in accordance with TAHPA and AHERA protocol at the request of the VANTHCS engineering personnel.

M ICRO AIR OF TEXAS, INC. VAMC; Dallas, Texas - Building 2J 2

REQUIRED INFORMATION

In accordance with AHERA protocol, the VAMC located in Dallas, Texas is required to name a person who shall be responsible for implementation of the management plan (Designated Person - see Section V). Per the Occupational Safety and Health Administration (OSHA) 1926.1101, construction industry standard, maintenance personnel should be made aware of the types and locations of all facility ACM. These employees are required to have adequate asbestos awareness training (minimum 2 hours), and all maintenance personnel who may come in contact with or disturb ACM are required to receive a minimum of 16 hours of asbestos training in asbestos hazards and recognition of ACM. If the owner wishes to perform ACM activities with its own personnel, the owner is responsible for obtaining the required EPA training in accordance with the Model Accreditation Plan (MAP), which is located in Appendix C, Subpart E of 40 CFR, 763 (AHERA). Additionally, all OSHA requirements must be met, as well (i.e., asbestos physical, etc.). Otherwise, it is recommended that all ACM activities be performed by a Texas licensed Asbestos Contractor, and project oversight be conducted by a Texas licensed Asbestos Consultant Agency.

In accordance with the VA directive to comply with AHERA, the entire facility must be re-inspected and an reassessment of ACM conducted by an accredited inspector at least once every three years, and the management plan should be updated by a licensed Asbestos Inspector / Management Planner or Individual Asbestos Consultant. Additionally, visual inspections of the ACM must also be made by the Designated Person for the facility at least once every six months to determine whether any areas of the material have changed in condition, or if there are any other factors which may necessitate abatement actions.

FACILITY DESCRIPTION

Building 2J is a six story building with a seventh floor penthouse, which houses a mechanical room and elevator equipment. This building also has a basement and a sub-basement. It is approximately 1,212,934 square feet in size, and currently serves as the Clinical Addition at the Dallas VAMC. The construction date of this building is believed to be 1998.

The general construction of the building is a concrete slab foundation with red exterior brick, a flat tar and gravel roof, and the interior finishes consist primarily of sheetrock walls (ceramic tile walls are located in restrooms and on floors in certain areas of the building), lay-in ceiling tiles, floor tile, rubber sheet flooring, carpeting over concrete floors, and some areas have unfinished concrete floors. Sprayed-on fireproofing was noted above ceiling tiles on metal I-beams. The second, fourth, and sixth floors of the building are known as interstitial floors, as they contain mechanical equipment throughout, and they are not used for patient care. The first, third, and fifth floors are used for patient care, and the basement is utilized primarily by VAMC personnel, as it contains office space, storage, and the morgue. The sub-basement has a dirt floor, and it contains mechanical rooms in various locations, piping is located throughout the sub-basement, and some HVAC equipment was also found in the sub-basement.

M ICRO AIR OF TEXAS, INC. VAMC; Dallas, Texas - Building 2J 3

All pipe insulation noted in this building was fiberglass with a white paper / foil wrap, PVC fittings, sealed with white mastic. HVAC ducts in the building were observed to be covered with a silver foil and fiberglass insulation sealed with white mastic. HVAC ducts and equipment in mechanical rooms were not exteriorly insulated, and the metal ducts were noted to have gray mastic seam sealant (interior fiberglass insulation was noted in these particular ducts). Vibration dampeners were noted to be rubber.

Micro Air did not have access to several areas located on the first, third, and fifth floors of the building. Many of the areas were operating rooms, CAT scan rooms, surgery recovery areas, the emergency room, etc. However, based on visual observations, Micro Air was able to determine that the homogeneous areas identified and sampled in other areas of the building appeared to be consistent throughout the building.

Micro Air identified two stainless steel sinks with gray soundproofing during the course of this comprehensive inspection. There may be additional sinks with soundproofing material located in other sections of the building that were not accessible at the time of this inspection. If additional sinks are identified that contain soundproofing, they should be assumed ACM until they can be tested and proven otherwise.

SECTION II

SECTION II- ASBESTOS LABORATORY ANALYTICAL REPORT

METHODOLOGY

Micro Air of Texas, Inc. performed a comprehensive asbestos survey on Building 2J on October 18-20, 2010 in accordance with AHERA and TAHPA sampling protocol and assessment factors. The inspection was performed by Melissa Kiser, an accredited asbestos inspector who is licensed as an Individual Asbestos Consultant by the state of Texas (license #10-5436) and Eric Eitzen, an accredited asbestos inspector who is licensed as an Individual Asbestos Consultant by the State of Texas (license # 10-5349). Micro Air of Texas, Inc. is licensed as an Asbestos Consulting Agency (#10-0110). All samples collected during this inspection were analyzed by J Resources, Inc., whose laboratory is accredited by the National3

Institute of Standards and Technology (NIST) under the National Voluntary Laboratory Accreditation Program (NVLAP) program (accreditation #200525-0) and licensed by the state of Texas (license #30-0273). Laboratory analysis of collected samples was performed in accordance with EPA and NVLAP prescribed methodologies for Polarized Light Microscopy of bulk material samples for the presence of asbestos. The results of laboratory analysis of collected bulk material samples are included in this section for reference.

A total of 118 bulk material samples were collected and analyzed by PLM during this comprehensive survey. Federal regulations require that each identifiable layer of an individual bulk building material sample be analyzed separately for asbestos content. In addition, federal regulations state that if any one sample from a homogeneous area is found to be asbestos-containing, then the entire homogeneous area is considered asbestos-containing, regardless of the results from the remaining samples from that homogeneous area.

CLASSIFICATION

All materials which were sampled as being suspect for containing asbestos or were assumed to be asbestos-containing were grouped by sample type into Homogeneous Sampling Areas for purposes of assessment and quantification. Homogeneous materials are those which have similar appearance, texture, and function. If the inspector believes these materials to be the same, even if they are located in separate areas of a building, they may be grouped into the same sampling set. For purposes of this inspection report, the Homogeneous Area is designated as : HA. Each Homogeneous Area is given a number to distinguish it from other Homogeneous Areas (Example: HA-01A).

A CAD drawing(s) demonstrating the location of each collected bulk building material sample has been included in this section.

LIMITATIONS

Micro Air’s scope of services was limited primarily to accessible interior building materials.

While Micro Air made every effort to perform a thorough survey, the possibility exists that materials containing asbestos were not identified, inaccessible, or different from those identified at other locations. The findings and opinions presented are indicative of conditions on the date of our site inspection and should not be relied upon to represent conditions at substantially later dates, due to possible changes in the condition of building materials, renovations, and repairs. Additionally, most of the buildings located at this VA facility have steam pipes running underground to supply heat to each building. This material was inaccessible at the time of this inspection. All pipes located in wall chases, underground, in the crawlspace of a building, etc., is assumed to be ACM until tested and proven otherwise.

VAMC - DALLAS, TX

BUILDING 2J

HOMOGENEOUS SAMPLE AREA SUMMARY

THE FOLLOWING TABLE DENOTES THE HOMOGENEOUS AREAS

IDENTIFIED IN BUILDING 2J. THE TABLE INDICATES THE NUMBER OF

BULK BUILDING MATERIAL SAMPLES COLLECTED FOR EACH

HOMOGENEOUS AREA AND WHETHER THE HOMOGENEOUS AREA WAS

ASBESTOS-CONTAINING. ADDITIONALLY, ESTIMATED QUANTITIES OF

THE VARIOUS BUILDING MATERIALS SAMPLED HAVE ALSO BEEN

INCLUDED IN THE TABLE.

M ICRO AIR OF TEXAS, INC. VAMC; Dallas, Texas - Building 2J 4

VAMC; DALLAS, TX

BUILDING 2J

HOMOGENEOUS SAMPLE AREA SUMMARY

Homogeneous Area #

Sample Type Asbestos-containing

# of Samples Collected

Est.

Quantity

HA-01 Sprayed-on Fireproofing, Gray

No 7 200,000 SF

HA-02 Fiberglass Pipe Insulation with White Mastic

No 16 500,000 LF

HA-03 HVAC Exterior Duct Insulation, Fiberglass w/

White Mastic

No 14 800,000 SF

HA-04 HVAC Interior Insulation, Fiberglass with Black

Mastic

No 2 300,000 SF

HA-05 Gray Mastic on Metal HVAC Ducts

No 14 100,000 SF

HA-06 Sheetrock with Joint Compound

No 15 2,000,000 SF

HA-07 Wall Texture on Sheetrock

No 2 10,000 SF

HA-08 12"x12" Floor Tile, Beige with Brown, Pink, and Blue Specks & Yellow

Mastic (Type I)

No 9 500,000 SF

HA-09 Rubber Flooring, Gray with Specks and Yellow or

Beige Mastic

No 5 100,000 SF

HA-10 2' x 4' White Ceiling Tile (Type I)

No 5 200,000 SF

HA-11 2' x 2' White Ceiling Tile (Type II)

No 7 800,000 SF

HA-12 Cove Base Adhesive, Tan No 10 100,000 LF

HA-13 Sink Soundproofing, Gray No 2 4 SF

HA-14 Red Fire Stop No 12 5000 SF

SECTION III - ACM Material Assessment and Quantification

Each area where ACM was identified in the asbestos management plan was visually inspected and assessed as to physical condition and potential for airborne asbestos fiber release.

Included in the assessment factors are such items as friability, accessibility, amount of current damage, amount of airflow, vibration, or abrasion to which the material is subject, potential for water damage, type and number of personnel normally located within each homogeneous sampling area, proximity to normal maintenance activities and potential for disturbance of such materials under normal operating conditions, potential for deterioration, and overall health risk of the material.

Final hazard assessment ratings are based upon the system designed in the EPA AHERA protocol for asbestos building inspectors. The material assessment categories in order of decreasing critical importance are as follows:

1. Damaged or Significantly Damaged TSI ACM

2. Damaged Friable Surfacing ACM

3. Significantly Damaged Friable Surfacing ACM

4. Damaged or Significantly Damaged Friable Miscellaneous ACM

5. ACBM with the Potential for Damage

6. ACBM with the Potential for Significant Damage

7. Any Remaining Friable ACBM or Friable Suspected ACBM

These assessment categories were used to determine appropriate response actions for all ACM, which are included in Section II of this report.

The following accredited Inspector / Licensed Individual Asbestos Consultant has assessed the ACM located within this facility in accordance with the above AHERA requirements.

Name: Melissa Kiser Signature

License #: 10-5436 November 30, 2010 Date

Accreditation #: N/A

HOMOGENEOUS AREA SUMMARY AND MATERIAL

ASSESSMENT

SURFACING MATERIALS

DESCRIPTION OF MATERIAL(S) INCLUDED IN THIS GROUP: TROWELED-ON OR

SPRAYED ON SURFACING MATERIALS

HA-01: DESCRIPTION OF MATERIAL: GRAY SPRAYED-ON FIRE PROOFING

This sampling area includes sprayed-on fire proofing material located on I-beams throughout the building

NUMBER OF SAMPLES TAKEN: 7

SAMPLE ID NUMBERS: 2J-15, 2J-16, 2J-17, 2J-18, 2J-19, 2J-20, &

2J-21

QUANTITY OF MATERIAL: APPROX. 200,000 SF

MATERIAL ASSESSMENT: This material was found not to be asbestos-containing, therefore no assessment or response action is necessary.

THERMAL SYSTEM INSULATION

DESCRIPTION OF MATERIAL(S) INCLUDED IN THIS GROUP: PIPE AND FITTING

INSULATION & HVAC DUCT INSULATION MATERIALS

HA-02: DESCRIPTION OF MATERIAL: FIBERGLASS PIPE INSULATION WITH

WHITE PAPER / FOIL WRAP, PVC

FITTINGS, AND WHITE MASTIC

This sampling area includes all fiberglass pipe insulation with PVC fittings and white mastic located throughout the building, including the interstitial floors, patient care floors, basement and sub-basement areas.

NUMBER OF SAMPLES TAKEN: 16

SAMPLE ID NUMBERS: 2J-31, 2J-32, 2J-33, 2J-34, 2J-35, 2J-36,

2J-37, 2J-38, 2J-39, 2J-40, 2J-41, 2J-42, 2J-43, 2J-44, 2J-45, 2J-46

QUANTITY OF MATERIAL: APPROX. 500,000 LF

MATERIAL ASSESSMENT: This material was found not to be asbestos-containing, therefore no assessment or response action is necessary.

HA-03: DESCRIPTION OF MATERIAL: HVAC EXTERIOR DUCT INSULATION,

FIBERGLASS WITH A FOIL WRAP AND

WHITE MASTIC

This sampling area includes all exteriorly insulated HVAC duct with a foil and fiberglass wrap and white mastic sealant located throughout the building.

NUMBER OF SAMPLES TAKEN: 14

SAMPLE ID NUMBERS: 2J-01, 2J-02, 2J-03, 2J-04, 2J-05, 2J-06,

2J-07, 2J-08, 2J-09, 2J-10, 2J-11, 2J-12, 2J-13, 2J-14

QUANTITY OF MATERIAL: APPROX. 800,000 SF

MATERIAL ASSESSMENT: This material was found not to be asbestos-containing, therefore no assessment or response action is necessary.

HA-04: DESCRIPTION OF MATERIAL: HVAC INTERIOR DUCT INSULATION,

FIBERGLASS WITH BLACK MASTIC

This sampling area includes all metal HVAC duct that has an interior insulation (the exterior is exposed metal). Most of this type of duct was noted to be in the various Service Bay areas located on the 1 , 3 , and 5 floors; however,st rd th this material may be located throughout the building.

NUMBER OF SAMPLES TAKEN: 2

SAMPLE ID NUMBERS: 2J-117, 2J-118

QUANTITY OF MATERIAL: APPROX. 300,000 SF

MATERIAL ASSESSMENT: This material was found not to be asbestos-containing, therefore no assessment or response action is necessary.

M ICRO AIR OF TEXAS, INC. VAMC; Dallas, Texas - Building 2J 4

HA-05: DESCRIPTION OF MATERIAL: GRAY MASTIC ON METAL HVAC DUCTS

This sampling area includes the gray mastic sealant on metal HVAC ducts located throughout the building.

NUMBER OF SAMPLES TAKEN: 14

SAMPLE ID NUMBERS: 2J-74, 2J-75, 2J-76, 2J-77, 2J-78, 2J-79,

2J-80, 2J-81, 2J-82, 2J-83, 2J-84, 2J-85, 2J-86, 2J-87

QUANTITY OF MATERIAL: APPROX. 100,000 SF

MATERIAL ASSESSMENT: This material was found not to be asbestos-containing, therefore no assessment or response action is necessary.

MISCELLANEOUS MATERIALS

DESCRIPTION OF MATERIAL(S) INCLUDED IN THIS GROUP: INCLUDES BUILDING

MATERIALS OTHER THAN SURFACING AND THERMAL SYSTEM INSULATION

HA-06: DESCRIPTION OF MATERIAL: SHEETROCK AND JOINT COMPOUND

This sampling area includes sheetrock and joint compound materials located throughout the building.

NUMBER OF SAMPLES TAKEN: 15

SAMPLE ID NUMBERS: 2J-47, 2J-48, 2J-49, 2J-50, 2J-51, 2J-52,

2J-53, 2J-54, 2J-55, 2J-56, 2J-57, 2J-58, 2J-59, 2J-60, 2J-61

QUANTITY OF MATERIAL: APPROX. 2,000,000 SF

MATERIAL ASSESSMENT: This material was found not to be asbestos-containing, therefore no assessment or response action is necessary.

HA-07: DESCRIPTION OF MATERIAL: WALL TEXTURE ON SHEETROCK

This sampling area includes white wall texture found on the sheetrock located on the 1 floor hallway by Service Roomst

1-1 and on the 5 Floor in the Atrium.th

M ICRO AIR OF TEXAS, INC. VAMC; Dallas, Texas - Building 2J 5

NUMBER OF SAMPLES TAKEN: 2

SAMPLE ID NUMBERS: 2J-88, 2J-89

QUANTITY OF MATERIAL: APPROX. 10,000 SF

MATERIAL ASSESSMENT: This material was found not to be asbestos-containing, therefore no assessment or response action is necessary.

HA-08: DESCRIPTION OF MATERIAL: 12" x 12" FLOOR TILE, BEIGE WITH

BROWN, PINK, AND BLUE SPECKS WITH

YELLOW MASTIC

This sampling area includes the 12" x 12" beige with brown, pink and blue specks floor tile located throughout the building.

NUMBER OF SAMPLES TAKEN: 9

SAMPLE ID NUMBERS: 2J-22, 2J-23, 2J-24, 2J-25, 2J-26, 2J-27,

2J-28, 2J-29, 2J-30

QUANTITY OF MATERIAL: APPROX. 500,000 SF

MATERIAL ASSESSMENT: This material was found not to be asbestos-containing, therefore no assessment or response action is necessary.

HA-09: DESCRIPTION OF MATERIAL: RUBBER FLOORING, GRAY WITH

SPECKS AND YELLOW & BEIGE MASTIC

This sampling area includes the rubber flooring, gray with specks and yellow mastic, located in various locations on the 1 , 3 and 5 floors. This flooring material was notedst rd th to be used in operating rooms, emergency rooms, etc.

NUMBER OF SAMPLES TAKEN: 5

SAMPLE ID NUMBERS: 2J-110, 2J-111, 2J-112, 2J-113, & 2J-114

QUANTITY OF MATERIAL: APPROX. 100,000 SF

MATERIAL ASSESSMENT: This material was found not to be asbestos-

M ICRO AIR OF TEXAS, INC. VAMC; Dallas, Texas - Building 2J 6

HA-10: DESCRIPTION OF MATERIAL: 2' x 4' WHITE CEILING TILE WITH

PINHOLE PATTERN (TYPE I)

This sampling area includes the 2' x 4' white ceiling tile located throughout the building.

NUMBER OF SAMPLES TAKEN: 5

SAMPLE ID NUMBERS: 2J-105, 2J-106, 2J-107, 2J-108, 2J-109

QUANTITY OF MATERIAL: APPROX. 200,000 SF

MATERIAL ASSESSMENT: This material was found not to be asbestos-containing, therefore no assessment or response action is necessary.

HA-11: DESCRIPTION OF MATERIAL: 2' x 2' WHITE CEILING TILE WITH

PINHOLE PATTERN (TYPE II)

This sampling area includes the 2' x 2' white ceiling tile located throughout the building.

NUMBER OF SAMPLES TAKEN: 7

SAMPLE ID NUMBERS: 2J-98, 2J-99, 2J-100, 2J-101, 2J-102,

2J-103, 2J-104

QUANTITY OF MATERIAL: APPROX. 800,000 SF

MATERIAL ASSESSMENT: This material was found not to be asbestos-containing, therefore no assessment or response action is necessary.

HA-12: DESCRIPTION OF MATERIAL: COVE BASE ADHESIVE, TAN

This sampling area includes the tan cove base adhesive located throughout the building.

NUMBER OF SAMPLES TAKEN: 10

SAMPLE ID NUMBERS: 2J-89A, 2J-90, 2J-91, 2J-92, 2J-93, 2J-94,

2J-95, 2J-96, 2J-97, 2J-97A

QUANTITY OF MATERIAL: APPROX. 100,000 LF

M ICRO AIR OF TEXAS, INC. VAMC; Dallas, Texas - Building 2J 7

MATERIAL ASSESSMENT: This material was found not to be asbestos-containing, therefore no assessment or response action is necessary.

HA-13: DESCRIPTION OF MATERIAL: GRAY SINK SOUNDPROOFING

This sampling area includes the gray sink soundproofing located in Room 5B-401 and 3B-645.

NUMBER OF SAMPLES TAKEN: 2

SAMPLE ID NUMBERS: 2J-115, 2J-116

QUANTITY OF MATERIAL: APPROX. 4 SF

MATERIAL ASSESSMENT: This material was found not to be asbestos-containing, therefore no assessment or response action is necessary.

HA-14: DESCRIPTION OF MATERIAL: RED FIRE STOP

This sampling area includes the red fire stop located throughout the building.

NUMBER OF SAMPLES TAKEN: 12

SAMPLE ID NUMBERS: 2J-62, 2J-63, 2J-64, 2J-65, 2J-66, 2J-67,

2J-68, 2J-69, 2J-70, 2J-71, 2J-72, 2J-73

QUANTITY OF MATERIAL: APPROX. 5000 SF

MATERIAL ASSESSMENT: This material was found not to be asbestos-

J3 Resources, Inc.

6110 W. 34th Street, Houston, Texas 77092

Phone: (713) 290-0221 - Fax: (713) 290-0248

J3Resources.com

Bldg 2J, 1st Flr, New Mental Health ER

PO Box 1225 Dickinson TX 77539

Micro Air of Texas Jennifer McMillin

Bulk Asbestos Fiber Analysis by Polarized Light Microscopy (PLM)

EPA 600/M4-82-020; 600/R-93/116

Sample Description Asbestos

ConstituentsSample ID # Non-Asbestos Constituents

Date Received: 18-Dec-2014 23-Dec-2014Date Analyzed:

23-Dec-2014Date Reported:

JH1461873J3 Order #:

B1403Project #:

Cove Base Mastic, Yellow, Homogeneous

None Detected01 Other Non-Fibrous Material 100%

Cove Base Mastic, Yellow, Homogeneous

None Detected02 Other Non-Fibrous Material 100%

Cove Base Mastic, Yellow, Homogeneous

None Detected03 Other Non-Fibrous Material 100%

LAYER 1

Joint Compound, White, Homogeneous

None Detected04 Other Non-Fibrous Material 100%

Cellulose FiberLAYER 2 Wallboard, White/ Brown, Homogeneous

None Detected 10% Other Non-Fibrous Material 90%

LAYER 1

Joint Compound, White, Homogeneous

None Detected05 Other Non-Fibrous Material 100%

Cellulose FiberLAYER 2 Wallboard, White/ Brown, Homogeneous

None Detected 10%

Other Non-Fibrous Material 90%

Sheet Flooring, Wood Grain/ Brown, Homogeneous

None Detected06 Other Non-Fibrous Material 100%

Sheet Flooring, Wood Grain/ Brown, Homogeneous

None Detected07 Other Non-Fibrous Material 100%

Sheet Flooring, Wood Grain/ Brown, Homogeneous

None Detected08 Other Non-Fibrous Material 100%

LAYER 1

Joint Compound, White, Homogeneous

None Detected09 Other Non-Fibrous Material 100%

Cellulose FiberLAYER 2 Wallboard, White/ Brown, Homogeneous

None Detected 10% Other Non-Fibrous Material 90%

This report relates only to the materials tested. This report is for the exclusive use of the addressed client and shall not be reproduced except in full, without written approval by J3 Resources, Inc. (J3). Samples are analyzed according to the methods listed above and are subject to the inherent limitations of PLM and interference of matrix components. Reporting limit for the above method is a function of the quantity of sample analyzed, matrix interference, sample preparation, fiber size, and distribution. Asbestos may be detected in concentrations of <1% by area if sufficient material is analyzed. J3 recommends TEM confirmation of soils, vermiculite and non-friable organically bound materials (NOB) reported as None Detected or < 1% Asbestos by PLM. All samples received in good condition unless otherwise noted. This report shall not be used to claim product approval, certification, or endorsement by NVLAP, NIST, or any agency of the federal government.

NVLAP Lab Code: 200525-0; AIHA Lab ID: 157714; TDSHS License: 30-0273 Page 1 of 1

Lee W. Poye Lab DirectorAnalystScott Ward

Phone: (713) 290-0221 - Fax: (713) 290-0248

J3Resources.com

2J; 3rd Flr; PET Scan, Imaging, Mamogram

PO Box 1225 Dickinson TX 77539

Micro Air of Texas Jennifer McMillin

Bulk Asbestos Fiber Analysis by Polarized Light Microscopy (PLM)

EPA 600/M4-82-020; 600/R-93/116

Sample Description Asbestos

ConstituentsSample ID # Non-Asbestos Constituents

Date Received: 18-Dec-2014 23-Dec-2014Date Analyzed:

23-Dec-2014Date Reported:

JH1461874J3 Order #:

B1403Project #:

Synthetic Fiber Fibrous Glass

Vinyl Sheeting, Wood Grain/ Tan, Homogeneous

None Detected1 10% 3%

Other Non-Fibrous Material 87%

Synthetic Fiber Fibrous Glass

Vinyl Sheeting, Wood Grain/ Tan, Homogeneous

None Detected2 10% 3%

Other Non-Fibrous Material 87%

Synthetic Fiber Fibrous Glass

Vinyl Sheeting, Wood Grain/ Tan, Homogeneous

None Detected3 10% 3%

Other Non-Fibrous Material 87%

Cellulose Fiber Fibrous Glass

Ceiling Tile, White/ Gray, Homogeneous None Detected4 55% 5%

Other Non-Fibrous Material 40%

Cellulose Fiber Fibrous Glass

Ceiling Tile, White/ Gray, Homogeneous None Detected5 55% 5%

Other Non-Fibrous Material 40%

Sink Undercoat, Black, Homogeneous None Detected6 Other Non-Fibrous Material 100%

LAYER 1

Joint Compound, White, Homogeneous

None Detected7 Other Non-Fibrous Material 100%

Cellulose FiberLAYER 2 Wallboard, White/ Brown, Homogeneous

None Detected 10%

Other Non-Fibrous Material 90%

This report relates only to the materials tested. This report is for the exclusive use of the addressed client and shall not be reproduced except in full, without written approval by J3 Resources, Inc. (J3). Samples are analyzed according to the methods listed above and are subject to the inherent limitations of PLM and interference of matrix components. Reporting limit for the above method is a function of the quantity of sample analyzed, matrix interference, sample preparation, fiber size, and distribution. Asbestos may be detected in concentrations of <1% by area if sufficient material is analyzed. J3 recommends TEM confirmation of soils, vermiculite and non-friable organically bound materials (NOB) reported as None Detected or < 1% Asbestos by PLM. All samples received in good condition unless otherwise noted. This report shall not be used to claim product approval, certification, or endorsement by NVLAP, NIST, or any agency of the federal government.

NVLAP Lab Code: 200525-0; AIHA Lab ID: 157714; TDSHS License: 30-0273 Page 1 of 6

Phone: (713) 290-0221 - Fax: (713) 290-0248

J3Resources.com

2J; 3rd Flr; PET Scan, Imaging, Mamogram

PO Box 1225 Dickinson TX 77539

Micro Air of Texas Jennifer McMillin

Bulk Asbestos Fiber Analysis by Polarized Light Microscopy (PLM)

EPA 600/M4-82-020; 600/R-93/116

Sample Description Asbestos

ConstituentsSample ID # Non-Asbestos Constituents

Date Received: 18-Dec-2014 23-Dec-2014Date Analyzed:

23-Dec-2014Date Reported:

JH1461874J3 Order #:

B1403Project #:

LAYER 1

Joint Compound, White, Homogeneous

None Detected8 Other Non-Fibrous Material 100%

Cellulose FiberLAYER 2 Wallboard, White/ Brown, Homogeneous

None Detected 10% Other Non-Fibrous Material 90%

LAYER 1

Texture, White, Homogeneous

None Detected9 Other Non-Fibrous Material 100%

Cellulose FiberLAYER 2 Tape, Tan, Homogeneous

None Detected 100%

LAYER 3

Joint Compound, White, Homogeneous

None Detected Other Non-Fibrous Material 100%

Cellulose FiberLAYER 4 Wallboard, White/ Brown, Homogeneous

None Detected 10%

Other Non-Fibrous Material 90%

Fibrous Glass Cellulose Fiber

Fire Proofing, Red, Homogeneous None Detected10 3% <1

Other Non-Fibrous Material 97%

Fibrous Glass Cellulose Fiber

Fire Proofing, Red, Homogeneous None Detected11 3% <1

Other Non-Fibrous Material 97%

Fibrous Glass Cellulose Fiber

Fire Proofing, Red, Homogeneous None Detected12 3% <1

Other Non-Fibrous Material 97%

Cellulose Fiber Fibrous Glass

Ceiling Tile, White/ Gray, Homogeneous None Detected13 60% <1

Other Non-Fibrous Material 40%

This report relates only to the materials tested. This report is for the exclusive use of the addressed client and shall not be reproduced except in full, without written approval by J3 Resources, Inc. (J3). Samples are analyzed according to the methods listed above and are subject to the inherent limitations of PLM and interference of matrix components. Reporting limit for the above method is a function of the quantity of sample analyzed, matrix interference, sample preparation, fiber size, and distribution. Asbestos may be detected in concentrations of <1% by area if sufficient material is analyzed. J3 recommends TEM confirmation of soils, vermiculite and non-friable organically bound materials (NOB) reported as None Detected or < 1% Asbestos by PLM. All samples received in good condition unless otherwise noted. This report shall not be used to claim product approval, certification, or endorsement by NVLAP, NIST, or any agency of the federal government.

NVLAP Lab Code: 200525-0; AIHA Lab ID: 157714; TDSHS License: 30-0273 Page 2 of 6

Phone: (713) 290-0221 - Fax: (713) 290-0248

J3Resources.com

2J; 3rd Flr; PET Scan, Imaging, Mamogram

PO Box 1225 Dickinson TX 77539

Micro Air of Texas Jennifer McMillin

Bulk Asbestos Fiber Analysis by Polarized Light Microscopy (PLM)

EPA 600/M4-82-020; 600/R-93/116

Sample Description Asbestos

ConstituentsSample ID # Non-Asbestos Constituents

Date Received: 18-Dec-2014 23-Dec-2014Date Analyzed:

23-Dec-2014Date Reported:

JH1461874J3 Order #:

B1403Project #:

Floor Tile, Gray, Homogeneous None Detected14 Other Non-Fibrous Material 100%

Floor Tile, Gray, Homogeneous None Detected15 Other Non-Fibrous Material 100%

Floor Tile, Gray, Homogeneous None Detected16 Other Non-Fibrous Material 100%

Cellulose Fiber Fibrous Glass

Ceiling Tile, White/ Gray, Homogeneous None Detected17 60% <1

Other Non-Fibrous Material 40%

Cellulose Fiber Fibrous Glass

Ceiling Tile, White/ Gray, Homogeneous None Detected18 60% <1

Other Non-Fibrous Material 40%

Cellulose Fiber Fibrous Glass

Ceiling Tile, White/ Gray, Homogeneous None Detected19 60% <1

Other Non-Fibrous Material 40%

LAYER 1

Texture, White, Homogeneous

None Detected20 Other Non-Fibrous Material 100%

Cellulose FiberLAYER 2 Tape, Tan, Homogeneous

None Detected 100%

LAYER 3

Joint Compound, White, Homogeneous

None Detected Other Non-Fibrous Material 100%

Cellulose FiberLAYER 4 Wallboard, White/ Brown, Homogeneous

None Detected 10%

Other Non-Fibrous Material 90%

This report relates only to the materials tested. This report is for the exclusive use of the addressed client and shall not be reproduced except in full, without written approval by J3 Resources, Inc. (J3). Samples are analyzed according to the methods listed above and are subject to the inherent limitations of PLM and interference of matrix components. Reporting limit for the above method is a function of the quantity of sample analyzed, matrix interference, sample preparation, fiber size, and distribution. Asbestos may be detected in concentrations of <1% by area if sufficient material is analyzed. J3 recommends TEM confirmation of soils, vermiculite and non-friable organically bound materials (NOB) reported as None Detected or < 1% Asbestos by PLM. All samples received in good condition unless otherwise noted. This report shall not be used to claim product approval, certification, or endorsement by NVLAP, NIST, or any agency of the federal government.

NVLAP Lab Code: 200525-0; AIHA Lab ID: 157714; TDSHS License: 30-0273 Page 3 of 6

Phone: (713) 290-0221 - Fax: (713) 290-0248

J3Resources.com

2J; 3rd Flr; PET Scan, Imaging, Mamogram

PO Box 1225 Dickinson TX 77539

Micro Air of Texas Jennifer McMillin

Bulk Asbestos Fiber Analysis by Polarized Light Microscopy (PLM)

EPA 600/M4-82-020; 600/R-93/116

Sample Description Asbestos

ConstituentsSample ID # Non-Asbestos Constituents

Date Received: 18-Dec-2014 23-Dec-2014Date Analyzed:

23-Dec-2014Date Reported:

JH1461874J3 Order #:

B1403Project #:

LAYER 1

Texture, White, Homogeneous

None Detected21 Other Non-Fibrous Material 100%

Cellulose FiberLAYER 2 Tape, Tan, Homogeneous

None Detected 100%

LAYER 3

Joint Compound, White, Homogeneous

None Detected Other Non-Fibrous Material 100%

Cellulose FiberLAYER 4 Wallboard, White/ Brown, Homogeneous

None Detected 10% Other Non-Fibrous Material 90%

LAYER 1

Texture, White, Homogeneous

None Detected22 Other Non-Fibrous Material 100%

Cellulose FiberLAYER 2 Tape, Tan, Homogeneous

None Detected 100%

LAYER 3

Joint Compound, White, Homogeneous

None Detected Other Non-Fibrous Material 100%

Cellulose FiberLAYER 4 Wallboard, White/ Brown, Homogeneous

None Detected 10%

Other Non-Fibrous Material 90%

Cove Base Mastic, Yellow, Homogeneous

None Detected23 Other Non-Fibrous Material 100%

Cove Base Mastic, Yellow, Homogeneous

None Detected24 Other Non-Fibrous Material 100%

Cove Base Mastic, Yellow, Homogeneous

None Detected25 Other Non-Fibrous Material 100%

LAYER 1

Flooring, Wood Grain/ Brown, Homogeneous

None Detected26 Other Non-Fibrous Material 100%

LAYER 2

Mastic, Beige, Homogeneous

None Detected Other Non-Fibrous Material 100%

This report relates only to the materials tested. This report is for the exclusive use of the addressed client and shall not be reproduced except in full, without written approval by J3 Resources, Inc. (J3). Samples are analyzed according to the methods listed above and are subject to the inherent limitations of PLM and interference of matrix components. Reporting limit for the above method is a function of the quantity of sample analyzed, matrix interference, sample preparation, fiber size, and distribution. Asbestos may be detected in concentrations of <1% by area if sufficient material is analyzed. J3 recommends TEM confirmation of soils, vermiculite and non-friable organically bound materials (NOB) reported as None Detected or < 1% Asbestos by PLM. All samples received in good condition unless otherwise noted. This report shall not be used to claim product approval, certification, or endorsement by NVLAP, NIST, or any agency of the federal government.

NVLAP Lab Code: 200525-0; AIHA Lab ID: 157714; TDSHS License: 30-0273 Page 4 of 6

Phone: (713) 290-0221 - Fax: (713) 290-0248

J3Resources.com

2J; 3rd Flr; PET Scan, Imaging, Mamogram

PO Box 1225 Dickinson TX 77539

Micro Air of Texas Jennifer McMillin

Bulk Asbestos Fiber Analysis by Polarized Light Microscopy (PLM)

EPA 600/M4-82-020; 600/R-93/116

Sample Description Asbestos

ConstituentsSample ID # Non-Asbestos Constituents

Date Received: 18-Dec-2014 23-Dec-2014Date Analyzed:

23-Dec-2014Date Reported:

JH1461874J3 Order #:

B1403Project #:

LAYER 1

Flooring, Wood Grain/ Brown, Homogeneous

None Detected27 Other Non-Fibrous Material 100%

LAYER 2

Mastic, Beige, Homogeneous

None Detected Other Non-Fibrous Material 100%

LAYER 1

Flooring, Wood Grain/ Brown, Homogeneous

None Detected28 Other Non-Fibrous Material 100%

LAYER 2

Mastic, Beige, Homogeneous

None Detected Other Non-Fibrous Material 100%

Cellulose Fiber Fibrous Glass

Ceiling Tile, White/ Gray, Homogeneous None Detected29 60% <1

Other Non-Fibrous Material 40%

Cellulose Fiber Fibrous Glass

Ceiling Tile, White/ Gray, Homogeneous None Detected30 60% <1

Other Non-Fibrous Material 40%

Cellulose Fiber Fibrous Glass

Ceiling Tile, White/ Gray, Homogeneous None Detected31 60% <1

Other Non-Fibrous Material 40%

LAYER 1

Texture, White, Homogeneous

None Detected32 Other Non-Fibrous Material 100%

Cellulose FiberLAYER 2 Tape, Tan, Homogeneous

None Detected 100%

LAYER 3

Joint Compound, White, Homogeneous

None Detected Other Non-Fibrous Material 100%

Cellulose FiberLAYER 4 Wallboard, White/ Brown, Homogeneous

None Detected 10%

Other Non-Fibrous Material 90%

This report relates only to the materials tested. This report is for the exclusive use of the addressed client and shall not be reproduced except in full, without written approval by J3 Resources, Inc. (J3). Samples are analyzed according to the methods listed above and are subject to the inherent limitations of PLM and interference of matrix components. Reporting limit for the above method is a function of the quantity of sample analyzed, matrix interference, sample preparation, fiber size, and distribution. Asbestos may be detected in concentrations of <1% by area if sufficient material is analyzed. J3 recommends TEM confirmation of soils, vermiculite and non-friable organically bound materials (NOB) reported as None Detected or < 1% Asbestos by PLM. All samples received in good condition unless otherwise noted. This report shall not be used to claim product approval, certification, or endorsement by NVLAP, NIST, or any agency of the federal government.

NVLAP Lab Code: 200525-0; AIHA Lab ID: 157714; TDSHS License: 30-0273 Page 5 of 6

Phone: (713) 290-0221 - Fax: (713) 290-0248

J3Resources.com

2J; 3rd Flr; PET Scan, Imaging, Mamogram

PO Box 1225 Dickinson TX 77539

Micro Air of Texas Jennifer McMillin

Bulk Asbestos Fiber Analysis by Polarized Light Microscopy (PLM)

EPA 600/M4-82-020; 600/R-93/116

Sample Description Asbestos

ConstituentsSample ID # Non-Asbestos Constituents

Date Received: 18-Dec-2014 23-Dec-2014Date Analyzed:

23-Dec-2014Date Reported:

JH1461874J3 Order #:

B1403Project #:

LAYER 1

Texture, White, Homogeneous

None Detected33 Other Non-Fibrous Material 100%

Cellulose FiberLAYER 2 Tape, Tan, Homogeneous

None Detected 100%

LAYER 3

Joint Compound, White, Homogeneous

None Detected Other Non-Fibrous Material 100%

Cellulose FiberLAYER 4 Wallboard, White/ Brown, Homogeneous

None Detected 10% Other Non-Fibrous Material 90%

LAYER 1

Joint Compound, White, Homogeneous

None Detected34 Other Non-Fibrous Material 100%

Cellulose FiberLAYER 2 Wallboard, White/ Brown, Homogeneous

None Detected 10%

Other Non-Fibrous Material 90%

This report relates only to the materials tested. This report is for the exclusive use of the addressed client and shall not be reproduced except in full, without written approval by J3 Resources, Inc. (J3). Samples are analyzed according to the methods listed above and are subject to the inherent limitations of PLM and interference of matrix components. Reporting limit for the above method is a function of the quantity of sample analyzed, matrix interference, sample preparation, fiber size, and distribution. Asbestos may be detected in concentrations of <1% by area if sufficient material is analyzed. J3 recommends TEM confirmation of soils, vermiculite and non-friable organically bound materials (NOB) reported as None Detected or < 1% Asbestos by PLM. All samples received in good condition unless otherwise noted. This report shall not be used to claim product approval, certification, or endorsement by NVLAP, NIST, or any agency of the federal government.

NVLAP Lab Code: 200525-0; AIHA Lab ID: 157714; TDSHS License: 30-0273 Page 6 of 6

Date Received: 27-Oct-2010 02-Nov-2010Date Analyzed:

JH1036867J3 Order #:

VAMC DALLAS - BLDG 2J - CLINICAL

PO Box 1225 Dickinson TX 77539

Micro Air of Texas Melissa Kiser

Bulk Asbestos Fiber Analysis by Polarized Light Microscopy (PLM)

EPA 600/M4-82-020; 600/R-93/116

Asbestos (Yes/No)

Sample Description Asbestos Constituents

Sample ID # Location Non-Asbestos Constituents

J3 Resources, Inc.

6110 W. 34th Street, Houston, Texas 77092

Phone: (713) 290-0221 - Fax: (713) 290-0248

J3Resources.com

02-Nov-2010Date Reported:

Cellulose Fiber Fibrous Glass Wollastonite

NoLAYER 1 Mastic Wrap, White/ Silver, Homogeneous

None Detected2J-01 10% 5% 5%

Other Non-Fibrous Material 80%

Fibrous GlassNoLAYER 2 Insulation, Yellow, Homogeneous

None Detected 100%

Cellulose Fiber Fibrous Glass Wollastonite

NoLAYER 1 Mastic Wrap, White/ Silver, Homogeneous

None Detected2J-02 10% 5% 5%

Other Non-Fibrous Material 80%

Fibrous GlassNoLAYER 2 Insulation, Yellow, Homogeneous

None Detected 100%

Cellulose Fiber Fibrous Glass Wollastonite

NoLAYER 1 Mastic Wrap, White/ Silver, Homogeneous

None Detected2J-03 10% 5% 5%

Other Non-Fibrous Material 80%

Fibrous GlassNoLAYER 2 Insulation, Yellow, Homogeneous

None Detected 100%

Duane Salinas Analyst

This report relates only to the materials tested. This report is for the exclusive use of the addressed client and shall not be reproduced except in full, without written approval by J3 Resources, Inc. (J3). Samples are analyzed according to EPA test methods listed above and are subject to the inherent limitations of Polarized Light Microscopy and interference of matrix components. J3 recommends TEM confirmation of non-friable organically bound materials reported as < 1% by PLM. All samples received in good condition unless otherwise noted. This report shall not be used to claim product certification, approval, or endorsement by NVLAP, NIST, or any agency of the federal government.

NVLAP Lab Code: 200525-0; AIHA Lab ID: 157714; TDSHS License: 30-0273 Page 1 of 25

Lab DirectorLee W. Poye

JH1036867J3 Order #:

VAMC DALLAS - BLDG 2J - CLINICAL

PO Box 1225 Dickinson TX 77539

Micro Air of Texas Melissa Kiser

Bulk Asbestos Fiber Analysis by Polarized Light Microscopy (PLM)

EPA 600/M4-82-020; 600/R-93/116

Asbestos (Yes/No)

Sample Description Asbestos Constituents

Sample ID # Location Non-Asbestos Constituents

J3 Resources, Inc.

6110 W. 34th Street, Houston, Texas 77092

Phone: (713) 290-0221 - Fax: (713) 290-0248

J3Resources.com

02-Nov-2010Date Reported:

Cellulose Fiber Fibrous Glass Wollastonite

NoLAYER 1 Mastic Wrap, White/ Silver, Homogeneous

None Detected2J-04 10% 5% 5%

Other Non-Fibrous Material 80%

Fibrous GlassNoLAYER 2 Insulation, Yellow, Homogeneous

None Detected 100%

NoLAYER 1 Mastic Wrap, Gray, Homogeneous

None Detected2J-05 Other Non-Fibrous Material 100%

Fibrous GlassNoLAYER 2 Insulation, White, Homogeneous

None Detected 100%

Cellulose Fiber Fibrous Glass Wollastonite

NoLAYER 1 Mastic Wrap, White/ Silver, Homogeneous

None Detected2J-06 10% 5% 5%

Other Non-Fibrous Material 80%

Fibrous GlassNoLAYER 2 Insulation, Yellow, Homogeneous

None Detected 100%

Cellulose Fiber Fibrous Glass Wollastonite

NoLAYER 1 Mastic Wrap, White/ Silver, Homogeneous

None Detected2J-07 10% 5% 5%

Other Non-Fibrous Material 80%

Fibrous GlassNoLAYER 2 Insulation, Yellow, Homogeneous

None Detected 100%

Duane Salinas Analyst

This report relates only to the materials tested. This report is for the exclusive use of the addressed client and shall not be reproduced except in full, without written approval by J3 Resources, Inc. (J3). Samples are analyzed according to EPA test methods listed above and are subject to the inherent limitations of Polarized Light Microscopy and interference of matrix components. J3 recommends TEM confirmation of non-friable organically bound materials reported as < 1% by PLM. All samples received in good condition unless otherwise noted. This report shall not be used to claim product certification, approval, or endorsement by NVLAP, NIST, or any agency of the federal government.

NVLAP Lab Code: 200525-0; AIHA Lab ID: 157714; TDSHS License: 30-0273 Page 2 of 25

JH1036867J3 Order #:

VAMC DALLAS - BLDG 2J - CLINICAL

PO Box 1225 Dickinson TX 77539

Micro Air of Texas Melissa Kiser

Bulk Asbestos Fiber Analysis by Polarized Light Microscopy (PLM)

EPA 600/M4-82-020; 600/R-93/116

Asbestos (Yes/No)

Sample Description Asbestos Constituents

Sample ID # Location Non-Asbestos Constituents

J3 Resources, Inc.

6110 W. 34th Street, Houston, Texas 77092

Phone: (713) 290-0221 - Fax: (713) 290-0248

J3Resources.com

02-Nov-2010Date Reported:

Cellulose Fiber Fibrous Glass Wollastonite

NoLAYER 1 Mastic Wrap, White/ Silver, Homogeneous

None Detected2J-08 10% 5% 5%

Other Non-Fibrous Material 80%

Fibrous GlassNoLAYER 2 Insulation, Yellow, Homogeneous

None Detected 100%

Cellulose Fiber Fibrous Glass Wollastonite

NoLAYER 1 Mastic Wrap, White/ Silver, Homogeneous

None Detected2J-09 10% 5% 5%

Other Non-Fibrous Material 80%

Fibrous GlassNoLAYER 2 Insulation, Yellow, Homogeneous

None Detected 100%

Cellulose Fiber Fibrous Glass Wollastonite

NoLAYER 1 Mastic Wrap, White/ Silver, Homogeneous

None Detected2J-10 10% 5% 5%

Other Non-Fibrous Material 80%

Fibrous GlassNoLAYER 2 Insulation, Yellow, Homogeneous

None Detected 100%

Duane Salinas Analyst

This report relates only to the materials tested. This report is for the exclusive use of the addressed client and shall not be reproduced except in full, without written approval by J3 Resources, Inc. (J3). Samples are analyzed according to EPA test methods listed above and are subject to the inherent limitations of Polarized Light Microscopy and interference of matrix components. J3 recommends TEM confirmation of non-friable organically bound materials reported as < 1% by PLM. All samples received in good condition unless otherwise noted. This report shall not be used to claim product certification, approval, or endorsement by NVLAP, NIST, or any agency of the federal government.

NVLAP Lab Code: 200525-0; AIHA Lab ID: 157714; TDSHS License: 30-0273 Page 3 of 25

JH1036867J3 Order #:

VAMC DALLAS - BLDG 2J - CLINICAL

PO Box 1225 Dickinson TX 77539

Micro Air of Texas Melissa Kiser

Bulk Asbestos Fiber Analysis by Polarized Light Microscopy (PLM)

EPA 600/M4-82-020; 600/R-93/116

Asbestos (Yes/No)

Sample Description Asbestos Constituents

Sample ID # Location…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .