Drainage_Report.pdf
PDF 27 MB Posted
- Solicitation number
- 25-054
- Issued by
- Jefferson County, Weston CDP, Colorado
About this file
This is a drainage report prepared by Olsson, Inc. for the City of Wheat Ridge, Colorado, detailing the hydrologic and hydraulic design for the Wadsworth Path project extending from 32nd to 35th Avenue. The project encompasses 0.25 miles of improvements including sidewalk installation along the west side of Wadsworth Boulevard, curb and gutter work, roadway patching, relocation of the existing Rocky Mountain Water Company (RMWC) 6-foot by 3-foot box culvert, bulkheading of the existing Colorado Department of Transportation (CDOT) 6-foot by 3-foot box culvert with extensions using 24-inch and 18-inch reinforced concrete pipes, and relocation of existing drainage structures including inlets and storm pipes. The project is designed in conjunction with CDOT and aligns with the Improve Wadsworth project currently under construction to the north. The drainage design utilizes the Rational Method for hydrology calculations and applies City of Wheat Ridge Site Drainage Requirements supplemented with Mile High Flood District (MHFD) criteria. Five drainage basins were delineated for both existing and proposed conditions, with design flows calculated for 5-year (initial/minor) and 100-year (major) storm events. The proposed inlets P01 and P02 meet spread design criteria using a combination of Type R inlets and Wheat Ridge Curb inlets, while inlet P04 cannot meet spread criteria due to large upstream contributing area and the absence of upstream inlets on 32nd Avenue.
The project requires water quality treatment per the City's MS4 permit because it disturbs more than one acre, with a total treatment area of 1.59 acres recommended to satisfy the WQCV standard through a water quality pond. The existing Improve Wadsworth water quality pond, sized to treat approximately 13.1 acres, can provide treatment for this project without modifications. Due to site constraints including existing grades and utilities, 20 percent of the project in the southern portion cannot be treated and conveyed to the water quality pond; this deviation was accepted by the City of Wheat Ridge in March 2025. The project proposes treating additional area in the northern portion within the Improve Wadsworth pond to compensate for the untreated southern area. No detention is required as the increase in impervious surface is less than two percent, resulting in approximately 0.22 cubic feet per second additional runoff and less than 0.01 acre-feet of required detention. Minor changes in flows contribute to basins E01/P01 and E02/P02, while basins E03/P03, E04/P04, and E05/P05 show reduced or unchanged flows. The project stationing extends from 103+16.88 to 116+41.45, with the design high point located near station 107+00.
View the file
Other files
Show all 24
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
WADSWORTH
PATH 32ND TO 35TH
AVENUE
Prepared for:
City of Wheat Ridge
Wheat Ridge, Colorado
Prepared by:
Laura Kindt, PE
Olsson, Inc.
September 2025
Olsson Project No. 024-03656
ACQ M361-013 (25614) Wadsworth Path 32nd to 35th Avenue
Project No. 024-03656 September 2025
024-03656 1
TABLE OF CONTENTS
1. INTRODUCTION
1.1. Project Location and Purpose
1.2. Description of Property
1.2.1. Ground Cover and Topography
1.2.2. Soils Description
1.2.3. Major Drainageways
2. HYDROLOGY
2.1. Drainage Basin Map
2.2. Major Basin Description
2.3. On-Site Description
2.4. Precipitation Data
2.5. Design Flood Frequency
3. EXISTING STRUCTURES
4. DESIGN DISCUSSION
5. RECOMMENDED DESIGN
5.1. Inlets
5.2. Storm Drain
5.3. Detention/Water Quality
REFERENCES
024-03656 2
LIST OF FIGURES
Figure 1: Vicinity Map
Figure 2: MHFD Initial Storm Street Capacity Criteria
Figure 3: MHFD Major Storm Street Capacity Criteria
LIST OF TABLES
Table 1: Existing and Proposed Initial and Major Flows
APPENDICES
Appendix A Hydrology
Appendix B Hydraulics
Appendix C Reference Information
024-03656 3
1. INTRODUCTION
The Wadsworth Path 32nd to 35th Avenue project includes adding a sidewalk along the west side of Wadsworth Boulevard (Blvd) from 32nd to 35th Avenue, curb and gutters, roadway patching, relocating the existing Rocky Mountain Water Company (RMWC) 6-foot by 3-foot box culvert, bulkheading the existing Colorado Department of Transportation (CDOT) 6-foot by 3-foot box culvert and extending the culvert with 24” and 18” reinforced concrete pipes, and relocating existing drainage structures (inlets and storm pipes) along Wadsworth. This project is designed for the City of Wheat Ridge in conjunction with CDOT.
1.1. Project Location and Purpose
The Improve Wadsworth project located to the north, that is currently under construction by others, is adding a detached shared path on the west side of Wadsworth Blvd. from 35th Avenue to Clear Creek. This project is extending the path south from 35th Avenue to 32nd Avenue and will improve ADA facilities of the path at 35th Avenue. This project is 0.25 miles long and is located within the City of Wheat Ridge, Colorado. The project stationing begins at 103+16.88 and extends to 116+41.45. The existing roadway includes CDOT right-of-way along Wadsworth
Blvd. that is bound by residential and commercial properties. The project is located in Section
26 Township 3 Range 69. A vicinity map is located in Figure 1.
024-03656 4
Figure 1: Vicinity Map
1.2. Description of Property
1.2.1. Ground Cover and Topography
The improvements include adding a sidewalk to the west side of Wadsworth Blvd. for approximately 0.25 miles. The project area is fully developed and is comprised primarily of roadway, grass, and dirt as ground cover. There is a high point located near station
024-03656 5
107+00 along Wadsworth Blvd. Drainage north of 107+00 drains to the north to the storm system located within Wadsworth and ultimately outfalls to Clear Creek. Drainage south of 107+00 drains south towards 32nd Avenue. Drainage is collected and conveyed within an existing storm system located within 32nd Avenue. Drainage is conveyed east where it outfalls to an unnamed Creek located east of the intersection of 32nd Avenue and Independence Street. The unnamed creek ultimately outfalls to Clear Creek. Offsite drainage generally flows southwest to northeast towards Wadsworth Blvd.
The surrounding topography slopes range from zero percent up to approximately nine percent, with adjoining offsite properties being a combination of residential and commercial properties draining towards Wadsworth Blvd.
1.2.2. Soils Description
The project area and tributary offsite areas include Hydrologic Soil Group Type C soils, which are characterized by slow infiltration rates and high runoff potential. According to the United States Department of Agriculture (USDA) Natural Resources Conservation
Service (NRCS), the soils in the project area are primarily comprised of Nunn-Urban land complex with some portions of Englewood-Urban land complex. Refer to Appendix
A for the soil maps.
1.2.3. Major Drainageways
There are no major drainageways within the project. The entire project drains to Clear
Creek via street conveyance, storm inlets and pipe.
2. HYDROLOGY
2.1. Drainage Basin Map
Drainage basins were delineated using survey information and supplemented with 2020
LiDAR data outside of the project limits. The Rational Method was used to complete hydrology calculations using the MHFD Rational spreadsheet.
2.2. Major Basin Description
There are no major cross-drainage waterways that pass through the project area and no major offsite basin delineation was required for the project. The project site flows directly to
Clear Creek.
2.3. On-Site Description
Five basins were delineated for both existing and proposed conditions.
024-03656 6
E01/P01-This basin delineates flow contributing to the 20’ Type R inlet that will be installed as part of the Improve Wadsworth project.
E02/P02-This basin delineates flow contributing to the existing No.16 Combination inlet and proposed 10’ Type R inlet at station 113+50.
E03/P03- This basin delineates flow contributing to the existing RMWC 6’x3’ box culvert.
E04/PR04- This basin delineates flow contributing to the existing and proposed No.16
Combination inlet located in the curb return at the southwest corner of 32nd Avenue and
Wadsworth Blvd. intersection.
E05/P05- This basin delineates flow contributing to the existing 6’x3’ box culvert that flows east under Wadsworth Blvd.
Table 1: Existing and Proposed Initial and Major Flows
Basin Existing 5-year Flows (cfs)/ Proposed 5-year Flows (cfs)
Existing 100-year Flows (cfs)/ Proposed 100-year Flows (cfs)
E01/P01 4.24/4.27 12.59/12.68
E02/P02 2.94/3.08 7.98/8.37
E03/P03 17.67/17.58 52.51/52.25
E04/PR04 17.62/17.62 47.85/47.85
E05/P05 0.18/0.18 0.68/0.68
Total 42.65/42.73 121.61/121.83
2.4. Precipitation Data
The project is located in the City of Wheat Ridge; therefore, the City of Wheat Ridge drainage design criteria was applied and supplemented with Mile High Flood District (MHFD)
Criteria as required. Precipitation data is developed in accordance with the MHFD guidance using the point precipitation frequency estimates from NOAA Atlas 14, Volume 8, Version 2 for Wheat Ridge, Colorado. Refer to Appendix A for precipitation data.
2.5. Design Flood Frequency
Design flood frequency was selected per the City of Wheat Ridge Site Drainage
Requirements. Refer to Figures 2 and 3 for the criteria from MHFD that are applicable to this project. Wadsworth Blvd. from 32nd Avenue to 35th Avenue is generally two lanes in each direction with separate continuous turn lanes in both directions.
Wadsworth Blvd. is posted at 40 miles per hour (mph) and is classified as a principal arterial.
The 5-year and 100-year events will be used for the initial/minor and major system designs, respectively. Wheat Ridge defers to MHFD on inlet design criteria. The initial/minor storm event spread is limited to no curb overtopping and flow spread must leave at least one lane
024-03656 7 free of water in each direction and should not flood more than two lanes in each direction.
For the major event residential dwellings and public, commercial, and industrial buildings should be no less than 12 inches above the 100-year flood at the ground line or lowest water entry of the building. The depth of water should not exceed the street crown to allow the operation of emergency vehicles. The depth of water over the gutter flow line should not exceed 12 inches.
Figure 2: MHFD Initial Storm Street Capacity Criteria
Figure 3: MHFD Major Storm Street Capacity Criteria
024-03656 8
3. EXISTING STRUCTURES
There is one major cross culvert CDOT structure number 121A015250BL, a 6-foot wide by 3-foot-high box culvert within the project limits located at approximately station 109+75. There is no proposed change to the area contributing to this box culvert, therefore a hydraulic analysis was not completed. At the request of the RMWC, the existing headwalls and wingwalls will be removed, a bulkhead will be installed at the end of the box culvert, and a 24” RCP will extend to a manhole to collect offsite drainage falling into the adjacent lot as well as diversion drainage from the RMWC ditch to the south. The culvert runs east under Wadsworth Blvd and outfalls to an open channel that continues to flow to the east.
The existing inlets located at stations 103+25 and 113+50 will be removed and replaced with new inlets due to the realignment and replacement of the existing curb and gutter. There are minor changes to the flows contributing to these inlets due to the increase in impervious surface. The inlet at 115+75 will remain in place and will not be impacted by this project. As part of the removal and replacement of the inlet at 113+50 a portion of the existing storm sewer will be removed and replaced.
In addition to the CDOT 6’x3’ concrete box that runs under Wadsworth Blvd there is an existing
RMWC 6’x3’ box that runs along the western portion of Wadsworth Blvd. The RMWC 6’x3’ concrete box culvert will be shifted west to accommodate the sidewalk improvements. The vertical alignment will match existing. There are minimal impacts to the flows contributing to the box, and no impacts to the hydraulics are anticipated. No hydraulic analysis is being completed as part of this project.
From station 107+00 to the north project limits, surface drainage is collected within the inlets located at 113+50 and 115+75 and conveyed via the existing storm pipe that drains towards the
Improve Wadsworth Project. The storm drain system drains into a water quality pond and ultimately into Clear Creek. From station 107+00 to the south project limits, surface drainage is collected in the inlets located at 32nd Avenue and Wadsworth Blvd. This storm system drains east in 32nd Avenue and ultimately outfalls into Clear Creek.
4. DESIGN DISCUSSION
The proposed drainage design is limited to removing and replacing existing inlets located at stations 103+25 and 113+50, removing and replacing the existing pipe at station 113+50, removing the existing headwall and wingwalls and bulkheading the existing CDOT 6’x3’ concrete box culvert and adding 24” RCP extension near station 109+75, and shifting the existing RMWC 6’x3’ concrete box culvert that runs parallel to Wadsworth Blvd. from station
109+25 to 104+41. There are minor changes to tributary areas and percent impervious that
024-03656 9 increase flows at design points 1 and 2. Design points 3, 4 and 5 all reduce flows, or the flows remain the same. Refer to the hydrology maps located in Appendix A for design point locations.
The Inlets P01 and P02 meet the City of Wheat Ridge and MHFD spread design criteria. Inlet
P04 does not meet the City of Wheat Ridge or MHFD spread design criteria due to the large contributing area upstream and no upstream inlets. In order to meet criteria a storm system with inlets and pipes would need to be placed in 32nd Avenue, which is outside the scope of this project.
This project disturbs more than one acre, which would therefore require water quality treatment per the City’s MS4 permit.
5. RECOMMENDED DESIGN
5.1. Inlets
Inlets were analyzed to meet spread requirements as outlined in Section 2.5. See Appendix B for these calculations using MHFD spreadsheet, UD-Inlet (v 5.03). The project is using a combination of Type R inlets and Wheat Ridge Curb inlets. Inlets P01 and P02 meet spread criteria. Spread criteria at inlet P04 cannot be met as there are no inlets on 32nd Ave. upstream of the intersection. An additional inlet can be added upstream of the intersection; however the conveyance is limited by the existing 12” storm pipe. A separate storm system improvement project is recommended in 32nd Avenue to improve conveyance.
5.2. Storm Drain
A portion of storm pipe is proposed to be removed and replaced at IN-P02. Flows are not changing at this location, and no hydraulic analysis was performed. The RMWC 3’x6’ culvert that runs along Wadsworth Blvd. will be relocated west to accommodate the proposed improvements. The existing CDOT 6’x3’ box culvert headwalls and wingwalls will be removed, a bulkhead will be installed at the end of the box culvert, and a 24” RCP will extend to a manhole to collect offsite drainage falling into the adjacent lot as well as diversion drainage from the
RMWC ditch to the south. The RMWC 6’x3’ box culvert that runs parallel to Wadsworth Blvd will be relocated to accommodate the proposed sidewalk improvements. No hydraulic analysis was completed on either of the two 6’x3’ box culverts as the improvements will minimally impact flows contributing to the structures, and no change in hydraulic performance is anticipated.
5.3. Detention/Water Quality
This project is not required to provide detention and aligns with the design of the Improve
Wadsworth project to the north. The increase in impervious surface is less than 2% resulting in
024-03656 10 an increase in runoff of approximately 0.22 cfs, resulting in less than 0.01 ac-feet of required detention. Due to the minimal increase in runoff, there will be minimal impact to the downstream storm system and pond. The Improve Wadsworth drainage design, including storm sewer, pond and bypass flow design, can accommodate the minimal increases in impervious surface created by this project.
The project disturbs over one acre; therefore, water quality is required. The total treatment area required is 1.59 acres. The WQCV standard is recommended to satisfy the MS4 permit, with the recommended control measure a water quality pond. Since over 80% of this project drains to the Improve Wadsworth pond located to the north, the pond was reviewed to evaluate the feasibility of treating this project within the pond. The Improve Wadsworth Project was sized to capture and treat a total area of 21.3 acres. Of the total 21.3 acres, a total of 1.29 acres of this project area included within the water quality pond sizing. The Improve Wadsworth Project was required to provide treatment for approximately 1.6 acres of pavement; however, it was sized to accommodate approximately 13.1 acres. Based on the design of the Improve Wadsworth water quality pond, the pond can provide the required water quality treatment for this project with no modifications to the pond. Refer to Appendix C for reference information on the pond design.
Additionally, due to site constraints (existing grades and utilities), 20% of the project will not be able to be treated. The south portion of the project cannot be collected and conveyed to the water quality pond near Clear Creek. This meets the requirements of the general MS4 permit section 4 ii. A.1. Refer to Appendix C for the applicable MS4 post construction water quality requirements. Since both the north and south portions of this project ultimately drain to Clear
Creek, the project proposes treating additional area to the north within the Improve Wadsworth
Water pond to make up for the area untreated in the south. This approach was accepted by the
City of Wheat Ridge in March of 2025 when consideration for modifications to the north pond were requested. Refer to Appendix C for water quality approach documentation and correspondence.
024-03656 11
REFERENCES
Colorado Department of Transportation. 2019. Drainage Design Manual. Chapters 7, 9, 13 and
16. December 2024. 2019 Drainage Design Manual — Colorado Department of Transportation
HDR. November 2020. Hydraulic Design Report Wadsworth Blvd. Widening from 35th Avenue to
Interstate 70. Wheat Ridge Colorado.
Mile High Flood District. 2024. Urban Storm Drainage Criteria Manual, Volume 1 Management, Hydrology and Hydraulics. December 2024. Criteria Manual Volume 1 | Mile High Flood District
Mile High Flood District. 2024. Urban Storm Drainage Criteria Manual, Volume 3 Stormwater
Quality. December 2024. 01_USDCM-Volume-3.pdf
NOAA. 2024. Atlas 14, Volume 8, Version 2. December 2024. PF Map: Contiguous US
United States Department of Agriculture. 2024. Web Soil Survey. December 2024.
https://websoilsurvey.nrcs.usda.gov/app/
APPENDIX A
HYDROLOGY
U
1+
2+
3+
4+
5+
6+
7+
8+
9+
0+
1+
2+
3+
4+
5+
6+
7+
8+
9+
54955500
550555 05 5505
10 5470
548054855490
NUMBERS
STRUCTURE
NO REVISIONS:
REVISED:
VOID: SHEET SUBSET:
DETAILER:
DESIGNER:
SHEET NUMBER:SUBSET SHEETS:
INIT.COMMENTSDATE:
SHEET REVISIONS AS CONSTRUCTEDJuly 14, 2025PRINT DATE:
VERT. SCALE:
FILE NAME:
UNIT INFORMATION
W_HMAP01_02403656.DWG
HORIZ. SCALE:
PROJECT NO./CODE
Suite 400 Denver, CO 80204
1525 Raleigh St
PROJECT NO.:
CODE:
City of Wheat Ridge
OF
7500 W. 29th Ave.
Wheat Ridge, CO 80033 Phone: 303-205-7600
Region 1
CDOT
F:
\2
4\
1-
0\
4-
6\
-D es ig n\
Au to
C
AD
\F in al P la ns
\S he et s\
W
TS
\W _H
M
AP
_0
6.
dw g
D
AT
E:
J ul
4, :1
4p m
SE
R
: j be yn er
NOT FOR
CONSTRUCTION
BGK
25614
AQC M361-013
LEGEND
A = BASIN DESCRIPTION
B = AREA (AC)
C = 10-YR RUNOFF
COEFFICIENT (C10)
D = 100-YR RUNOFF
COEFFICIENT (C100)
E = DESIGN POINT
CB
A
D
E
EXISTING BASIN
EXISTING MAJOR
CONTOUR
EXISTING MINOR
CONTOUR
FLOW PATH
0.5718.37
E03
0.73
0.6515.61
E04
0.77
0.572.88
E01
0.73
0.651.38
E02
0.77
P04
E02
E01
E03
EXISTING HYDROLOGY MAP
W 32ND AVE
W 35TH AVE
W
AD
SW
O
R
TH
B
LV
D
ZE
PH
YR
C
T
YA
R
R O
W C
T
YA
R
R O
W S
T
W 34TH AVE
E05
0.430.16
E05
0.65
J. BEYNER
J. BEYNER
1 2HYDROLOGY N/A
SCALE IN FEET
20' 40'10'0'
Designer:
Company: 2-yr 5-yr 10-yr 25-yr 50-yr 100-yr 500-yr
Date: 1-hour rainfall depth, P1 (in) = 0.78 1.04 1.28 1.63 1.92 2.22 2.99 Project: a b c
Location: Rainfall Intensity Equation Coefficients = 28.50 10.00 0.786
2-yr 5-yr 10-yr 25-yr 50-yr 100-yr 500-yr Overland
Flow Length Li (ft)
U/S Elevation
(ft) (Optional)
D/S Elevation
(ft) (Optional)
Overland Flow Slope
Si (ft/ft)
Overland Flow Time ti (min)
Channelized Flow Length
Lt (ft)
U/S Elevation
(ft) (Optional)
D/S Elevation
(ft) (Optional)
Channelized Flow Slope
St (ft/ft)
NRCS
Conveyance
Factor K
Channelized Flow
Velocity Vt (ft/sec)
Channelized Flow Time tt (min)
Computed tc (min)
Regional tc (min)
Selected tc (min) 2-yr 5-yr 10-yr 25-yr 50-yr 100-yr 500-yr 2-yr 5-yr 10-yr 25-yr 50-yr 100-yr 500-yr
0.47 0.52 0.57 0.66 0.69 0.73 0.78 8.83 10.08 10.08 2.09 2.80 3.45 4.40 5.18 5.99 8.06 2.83 4.24 5.70 8.30 10.29 12.59 18.06
0.56 0.61 0.65 0.71 0.74 0.77 0.81 3.61 4.98 5.00 2.63 3.53 4.34 5.53 6.51 7.53 10.14 2.02 2.94 3.86 5.41 6.62 7.98 11.28
0.47 0.52 0.57 0.66 0.69 0.73 0.78 8.89 24.44 24.44 1.37 1.84 2.26 2.88 3.39 3.92 5.28 11.82 17.67 23.78 34.62 42.92 52.51 75.33
0.56 0.61 0.65 0.71 0.74 0.77 0.81 13.31 23.78 23.78 1.39 1.86 2.29 2.92 3.44 3.98 5.36 12.12 17.62 23.15 32.43 39.69 47.85 67.64
0.30 0.36 0.43 0.54 0.59 0.65 0.71 5.87 7.73 7.73 2.30 3.09 3.81 4.85 5.71 6.60 8.89 0.11 0.18 0.26 0.42 0.53 0.68 1.00
5532.73 5528.00 0.016 1804.00 5528.00 5490.80 0.021
33.00 5494.66 5493.70 0.029 422.00E02 1.38
20.48
25.24
E05 0.16 C 40.0 57.60 5490.89 5487.88 0.052 190.30 5487.88 5482.39 0.029 10 1.70 1.87
33.67
E04 15.61 C 70.0 300.00
Cells of this color are for calculated results based on overrides
Joshua Beyner Olsson 12/13/2024 Wadsworth Path 32nd to 35th lakewood Colorado
Version 2.00 released May 2017
20 2.87 10.47
15.56
E03 18.37 C 60.0 300.00 5519.50 5494.00 0.085 1146.70 5494.00 5489.67 0.004 20 1.23
5493.70
15.55
5466.00 0.066 20 5.12 1.37C 70.0
0.087300.00 5492.05 5466.00
Rainfall Intensity, I (in/hr)
3.17 1.25 17.24200.0255460.005466.00238.66
Peak Flow, Q (cfs)
Calculation of Peak Runoff using Rational Method
Overland (Initial) Flow Time Channelized (Travel) Flow Time Time of ConcentrationRunoff Coefficient, C
Subcatchment Name
Area (ac)
NRCS
Hydrologic Soil Group
Percent Imperviousnes s
E01 2.88 C 60.0
Select UDFCD location for NOAA Atlas 14 Rainfall Depths from the pulldown list OR enter your own depths obtained from the NOAA website (click this link)
Cells of this color are for required user-input Cells of this color are for optional override values
I 𝑖𝑛/ℎ𝑟 = a ∗ Pଵ b + tୡ ୡ t୧ =
0.395 1.1 − Cହ L୧
S୧ .ଷଷ t୲ = L୲
60K S୲
L୲
60V୲
Computed tୡ = t୧ + t୲
Regional tୡ = 26 − 17i + L୲
60 14i + 9 S୲
Selected tୡ = max t୫୧୬୧୫୳୫ , min Computed tୡ , Regional tୡ t୫୧୬୧୫୳୫= 5 (urban) t୫୧୬୧୫୳୫= 10 (non-urban)
Q 𝑐𝑓𝑠 = CIA
MH
MH
MH
MH
1+
2+
3+
4+
5+
6+
7+
8+
9+
0+
1+
2+
3+
4+
5+
6+
7+
8+
9+
54955500
550555 05 5505
10 5470
548054855490
NUMBERS
STRUCTURE
NO REVISIONS:
REVISED:
VOID: SHEET SUBSET:
DETAILER:
DESIGNER:
SHEET NUMBER:SUBSET SHEETS:
INIT.COMMENTSDATE:
SHEET REVISIONS AS CONSTRUCTEDJuly 14, 2025PRINT DATE:
VERT. SCALE:
FILE NAME:
UNIT INFORMATION
W_HMAP01_02403656.DWG
HORIZ. SCALE:
PROJECT NO./CODE
Suite 400 Denver, CO 80204
1525 Raleigh St
PROJECT NO.:
CODE:
City of Wheat Ridge
OF
7500 W. 29th Ave.
Wheat Ridge, CO 80033 Phone: 303-205-7600
Region 1
CDOT
F:
\2
4\
1-
0\
4-
6\
-D es ig n\
Au to
C
AD
\F in al P la ns
\S he et s\
W
TS
\W _H
M
AP
_0
6.
dw g
D
AT
E:
J ul
4, :1
4p m
SE
R
: j be yn er
NOT FOR
CONSTRUCTION
BGK
25614
AQC M361-013
LEGEND
A = BASIN DESCRIPTION
B = AREA (AC)
C = 10-YR RUNOFF
COEFFICIENT (C10)
D = 100-YR RUNOFF
COEFFICIENT (C100)
E = DESIGN POINT
CB
A
D
E
PROPOSED BASIN
EXISTING MAJOR
CONTOUR
EXISTING MINOR
CONTOUR
FLOW PATH
0.5718.28
P03
0.73
0.6515.61
P04
0.77
0.572.90
P01
0.73
0.651.44
P02
0.77
P04
P02
P03
PROPOSED HYDROLOGY MAP
W 32ND AVE
W 35TH AVE
W
AD
SW
O
R
TH
B
LV
D
ZE
PH
YR
C
T
YA
R
R O
W C
T
YA
R
R O
W S
T
W 34TH AVE
P01
P05
0.430.16
P05
0.65
J. BEYNER
J. BEYNER
2 2HYDROLOGY N/A
SCALE IN FEET
20' 40'10'0'
Designer:
Company: 2-yr 5-yr 10-yr 25-yr 50-yr 100-yr 500-yr
Date: 1-hour rainfall depth, P1 (in) = 0.78 1.04 1.28 1.63 1.92 2.22 2.99
Project: a b c
Location: Rainfall Intensity Equation Coefficients = 28.50 10.00 0.786
2-yr 5-yr 10-yr 25-yr 50-yr 100-yr 500-yr
Overland
Flow Length
Li (ft)
U/S Elevation
(ft)
(Optional)
D/S Elevation
(ft)
(Optional)
Overland
Flow Slope
Si (ft/ft)
Overland
Flow Time ti (min)
Channelized
Flow Length
Lt (ft)
U/S Elevation
(ft)
(Optional)
D/S Elevation
(ft)
(Optional)
Channelized
Flow Slope
St (ft/ft)
NRCS
Conveyance
Factor K
Channelized
Flow
Velocity
Vt (ft/sec)
Channelized
Flow Time tt (min)
Computed tc (min)
Regional tc (min)
Selected tc (min) 2-yr 5-yr 10-yr 25-yr 50-yr 100-yr 500-yr 2-yr 5-yr 10-yr 25-yr 50-yr 100-yr 500-yr
0.47 0.52 0.57 0.66 0.69 0.73 0.78 8.83 10.09 10.09 2.09 2.80 3.45 4.40 5.18 5.99 8.06 2.85 4.27 5.74 8.36 10.37 12.68 18.20
0.56 0.61 0.65 0.71 0.74 0.77 0.81 3.60 4.98 5.00 2.63 3.53 4.34 5.53 6.51 7.53 10.14 2.12 3.08 4.05 5.67 6.94 8.37 11.83
0.47 0.52 0.57 0.66 0.69 0.73 0.78 8.89 24.44 24.44 1.37 1.84 2.26 2.88 3.39 3.92 5.28 11.76 17.58 23.67 34.45 42.71 52.25 74.97
0.56 0.61 0.65 0.71 0.74 0.77 0.81 13.31 23.78 23.78 1.39 1.86 2.29 2.92 3.44 3.98 5.36 12.12 17.62 23.15 32.43 39.69 47.85 67.64
0.30 0.36 0.43 0.54 0.59 0.65 0.71 5.87 7.73 7.73 2.30 3.09 3.81 4.85 5.71 6.60 8.89 0.11 0.18 0.26 0.42 0.53 0.68 1.00
0.83 0.85 0.87 0.88 0.89 0.89 0.90 1.82 4.27 5.00 2.63 3.53 4.34 5.53 6.51 7.53 10.14 1.54 2.11 2.64 3.41 4.06 4.72 6.43
0.83 0.85 0.87 0.88 0.89 0.89 0.90 3.83 5.09 5.09 2.62 3.51 4.32 5.50 6.48 7.49 10.09 0.77 1.05 1.32 1.70 2.02 2.35 3.20
C 70.0
0.087300.00 5492.06 5466.00
Rainfall Intensity, I (in/hr)
3.17 1.26 17.25200.0255460.005466.00239.30
Peak Flow, Q (cfs)
Calculation of Peak Runoff using Rational Method
Overland (Initial) Flow Time Channelized (Travel) Flow Time Time of ConcentrationRunoff Coefficient, C
Subcatchment
Name
Area
(ac)
NRCS
Hydrologic
Soil Group
Percent
Imperviousnes s
P01 2.90 C 60.0
Select UDFCD location for NOAA Atlas 14 Rainfall Depths from the pulldown list OR enter your own depths obtained from the NOAA website (click this link)
Cells of this color are for required user-input
Cells of this color are for optional override values
Cells of this color are for calculated results based on overrides
Joshua Beyner
Olsson
5/7/2025
Wadsworth Path 32nd to 35th lakewood Colorado
Version 2.00 released May 2017
20 2.87 10.47
15.57
P03 18.28 C 60.0 300.00 5519.50 5494.00 0.085 1146.70 5494.00 5489.67 0.004 20 1.23
5493.70
15.55
5466.00 0.065 20 5.12 1.3833.10 5494.67 5493.70 0.029 423.40P02 1.44
20.48
25.24
P05 (no change) 0.16 C 40.0 57.60 5490.89 5487.88 0.052 190.30 5487.88 5482.39 0.029 10 1.70 1.87
33.67
P04 (no change) 15.61 C 70.0 300.00 5532.73 5528.00 0.016 1804.00 5528.00 5490.80 0.021
WQ P02 0.70 C 100.0 33.10 5494.67 5493.70 0.029 662.70 5493.70 5460.00 0.051 20 4.51 2.45
10.10
11.13
WQ P01 0.35 C 100.0 300.00 5492.06 5466.00 0.087 239.30 5466.00 5460.00 0.025 20 3.17 1.26
I ��/ℎ� = a ∗ P� b + t� t� =
0.395 1.1 − C� L�
S� t� = L�
60K S�
L�
60V�
Computed t� = t� + t�
Regional t� = 26 − 17i + L�
60 14i + 9 S�
Selected t� = max t3�4�353 , min Computed t� , Regional t� t3�4�353= 5 (urban) t3�4�353= 10 (non-urban)
Q 89: = CIA
Supplementary Design Information for UD-Rational Workbook Urban Storm Drainage Criteria Manual (USDCM) Volume 1, Chapter 6 - Runoff (March 2017)
Version 2.00 released May 2017
Hydrologic Soil Group—Golden Area, Colorado, Parts of Denver, Douglas, Jefferson, and Park Counties
Natural Resources Conservation Service
Web Soil Survey National Cooperative Soil Survey
11/13/2024
490500 490800 491100 491400 491700 492000 492300 492600 492900 493200
490500 490800 491100 491400 491700 492000 492300 492600 492900 493200
39° 46' 22'' N
5°
' 4 4'
' W 39° 46' 22'' N
5°
' 4
1' ' W
39° 45' 21'' N
5°
' 4
4' ' W
39° 45' 21'' N
5°
' 4
1' ' W
N
Map projection: Web Mercator Corner coordinates: WGS84 Edge tics: UTM Zone 13N WGS84 0 500 1000 2000 3000
Feet 0 150 300 600 900
Meters Map Scale: 1:13,400 if printed on A landscape (11" x 8.5") sheet.
Soil Map may not be valid at this scale.
MAP LEGEND MAP INFORMATION
Area of Interest (AOI) Area of Interest (AOI)
Soils Soil Rating Polygons
A
A/D
B
B/D
C
C/D
D
Not rated or not available
Soil Rating Lines A
A/D
B
B/D
C
C/D
D
Not rated or not available
Soil Rating Points A
A/D
B
B/D
C
C/D
D
Not rated or not available
Water Features Streams and Canals
Transportation Rails
Interstate Highways
US Routes
Major Roads
Local Roads
Background Aerial Photography
The soil surveys that comprise your AOI were mapped at 1:24,000.
Warning: Soil Map may not be valid at this scale.
Enlargement of maps beyond the scale of mapping can cause misunderstanding of the detail of mapping and accuracy of soil line placement. The maps do not show the small areas of contrasting soils that could have been shown at a more detailed scale.
Please rely on the bar scale on each map sheet for map measurements.
Source of Map: Natural Resources Conservation Service Web Soil Survey URL:
Coordinate System: Web Mercator (EPSG:3857)
Maps from the Web Soil Survey are based on the Web Mercator projection, which preserves direction and shape but distorts distance and area. A projection that preserves area, such as the Albers equal-area conic projection, should be used if more accurate calculations of distance or area are required.
This product is generated from the USDA-NRCS certified data as of the version date(s) listed below.
Soil Survey Area: Golden Area, Colorado, Parts of Denver, Douglas, Jefferson, and Park Counties Survey Area Data: Version 19, Aug 29, 2024
Soil map units are labeled (as space allows) for map scales 1:50,000 or larger.
Date(s) aerial images were photographed: Jul 1, 2020—Jul 2, The orthophoto or other base map on which the soil lines were compiled and digitized probably differs from the background imagery displayed on these maps. As a result, some minor shifting of map unit boundaries may be evident.
Hydrologic Soil Group—Golden Area, Colorado, Parts of Denver, Douglas, Jefferson, and Park Counties
Natural Resources Conservation Service
Web Soil Survey National Cooperative Soil Survey
11/13/2024
Hydrologic Soil Group
Map unit symbol Map unit name Rating Acres in AOI Percent of AOI
32 Denver-Kutch-Urban land complex, 5 to 9 percent slopes
C 8.1 2.3%
44 Englewood-Urban land complex, 0 to 2 percent slopes
C 6.5 1.8%
80 Leyden-Primen- Standley cobbly clay loams, 15 to 50 percent slopes
D 0.6 0.2%
105 Nunn-Urban land complex, 0 to 2 percent slopes
C 161.8 44.9%
106 Nunn-Urban land complex, 2 to 5 percent slopes
C 104.0 28.8%
107 Nunn-Urban land complex, 5 to 9 percent slopes
C 71.0 19.7%
178 Water 8.7 2.4%
Totals for Area of Interest 360.8 100.0%
Hydrologic Soil Group—Golden Area, Colorado, Parts of Denver, Douglas, Jefferson, and Park Counties
Natural Resources Conservation Service
Web Soil Survey National Cooperative Soil Survey
Description
Hydrologic soil groups are based on estimates of runoff potential. Soils are assigned to one of four groups according to the rate of water infiltration when the soils are not protected by vegetation, are thoroughly wet, and receive precipitation from long-duration storms.
The soils in the United States are assigned to four groups (A, B, C, and D) and three dual classes (A/D, B/D, and C/D). The groups are defined as follows:
Group A. Soils having a high infiltration rate (low runoff potential) when thoroughly wet. These consist mainly of deep, well drained to excessively drained sands or gravelly sands. These soils have a high rate of water transmission.
Group B. Soils having a moderate infiltration rate when thoroughly wet. These consist chiefly of moderately deep or deep, moderately well drained or well drained soils that have moderately fine texture to moderately coarse texture.
These soils have a moderate rate of water transmission.
Group C. Soils having a slow infiltration rate when thoroughly wet. These consist chiefly of soils having a layer that impedes the downward movement of water or soils of moderately fine texture or fine texture. These soils have a slow rate of water transmission.
Group D. Soils having a very slow infiltration rate (high runoff potential) when thoroughly wet. These consist chiefly of clays that have a high shrink-swell potential, soils that have a high water table, soils that have a claypan or clay layer at or near the surface, and soils that are shallow over nearly impervious material. These soils have a very slow rate of water transmission.
If a soil is assigned to a dual hydrologic group (A/D, B/D, or C/D), the first letter is for drained areas and the second is for undrained areas. Only the soils that in their natural condition are in group D are assigned to dual classes.
Rating Options
Aggregation Method: Dominant Condition
Component Percent Cutoff: None Specified
Tie-break Rule: Higher
Hydrologic Soil Group—Golden Area, Colorado, Parts of Denver, Douglas, Jefferson, and Park Counties
Natural Resources Conservation Service
Web Soil Survey National Cooperative Soil Survey
Hydrologic Soil Group—Golden Area, Colorado, Parts of Denver, Douglas, Jefferson, and Park Counties
Natural Resources Conservation Service
Web Soil Survey National Cooperative Soil Survey
11/13/2024
492400 492500 492600 492700 492800 492900 493000 493100
492400 492500 492600 492700 492800 492900 493000 493100
39° 46' 12'' N
5°
' 2 0'
' W 39° 46' 12'' N
5°
' 4
8' ' W
39° 45' 40'' N
5°
' 2
0' ' W
39° 45' 40'' N
5°
' 4
8' ' W
N
Map projection: Web Mercator Corner coordinates: WGS84 Edge tics: UTM Zone 13N WGS84 0 200 400 800 1200
Feet 0 50 100 200 300
Meters Map Scale: 1:4,830 if printed on A portrait (8.5" x 11") sheet.
Soil Map may not be valid at this scale.
MAP LEGEND MAP INFORMATION
Area of Interest (AOI) Area of Interest (AOI)
Soils Soil Rating Polygons
A
A/D
B
B/D
C
C/D
D
Not rated or not available
Soil Rating Lines A
A/D
B
B/D
C
C/D
D
Not rated or not available
Soil Rating Points A
A/D
B
B/D
C
C/D
D
Not rated or not available
Water Features Streams and Canals
Transportation Rails
Interstate Highways
US Routes
Major Roads
Local Roads
Background Aerial Photography
The soil surveys that comprise your AOI were mapped at 1:24,000.
Warning: Soil Map may not be valid at this scale.
Enlargement of maps beyond the scale of mapping can cause misunderstanding of the detail of mapping and accuracy of soil line placement. The maps do not show the small areas of contrasting soils that could have been shown at a more detailed scale.
Please rely on the bar scale on each map sheet for map measurements.
Source of Map: Natural Resources Conservation Service Web Soil Survey URL:
Coordinate System: Web Mercator (EPSG:3857)
Maps from the Web Soil Survey are based on the Web Mercator projection, which preserves direction and shape but distorts distance and area. A projection that preserves area, such as the Albers equal-area conic projection, should be used if more accurate calculations of distance or area are required.
This product is generated from the USDA-NRCS certified data as of the version date(s) listed below.
Soil Survey Area: Golden Area, Colorado, Parts of Denver, Douglas, Jefferson, and Park Counties Survey Area Data: Version 19, Aug 29, 2024
Soil map units are labeled (as space allows) for map scales 1:50,000 or larger.
Date(s) aerial images were photographed: Jul 1, 2020—Jul 2, The orthophoto or other base map on which the soil lines were compiled and digitized probably differs from the background imagery displayed on these maps. As a result, some minor shifting of map unit boundaries may be evident.
Hydrologic Soil Group—Golden Area, Colorado, Parts of Denver, Douglas, Jefferson, and Park Counties
Natural Resources Conservation Service
Web Soil Survey National Cooperative Soil Survey
Hydrologic Soil Group
Map unit symbol Map unit name Rating Acres in AOI Percent of AOI
44 Englewood-Urban land complex, 0 to 2 percent slopes
C 7.5 5.9%
105 Nunn-Urban land complex, 0 to 2 percent slopes
C 36.7 28.8%
106 Nunn-Urban land complex, 2 to 5 percent slopes
C 56.5 44.4%
107 Nunn-Urban land complex, 5 to 9 percent slopes
C 26.6 20.9%
Totals for Area of Interest 127.2 100.0%
Hydrologic Soil Group—Golden Area, Colorado, Parts of Denver, Douglas, Jefferson, and Park Counties
Natural Resources Conservation Service
Web Soil Survey National Cooperative Soil Survey
Description
Hydrologic soil groups are based on estimates of runoff potential. Soils are assigned to one of four groups according to the rate of water infiltration when the soils are not protected by vegetation, are thoroughly wet, and receive precipitation from long-duration storms.
The soils in the United States are assigned to four groups (A, B, C, and D) and three dual classes (A/D, B/D, and C/D). The groups are defined as follows:
Group A. Soils having a high infiltration rate (low runoff potential) when thoroughly wet. These consist mainly of deep, well drained to excessively drained sands or gravelly sands. These soils have a high rate of water transmission.
Group B. Soils having a moderate infiltration rate when thoroughly wet. These consist chiefly of moderately deep or deep, moderately well drained or well drained soils that have moderately fine texture to moderately coarse texture.
These soils have a moderate rate of water transmission.
Group C. Soils having a slow infiltration rate when thoroughly wet. These consist chiefly of soils having a layer that impedes the downward movement of water or soils of moderately fine texture or fine texture. These soils have a slow rate of water transmission.
Group D. Soils having a very slow infiltration rate (high runoff potential) when thoroughly wet. These consist chiefly of clays that have a high shrink-swell potential, soils that have a high water table, soils that have a claypan or clay layer at or near the surface, and soils that are shallow over nearly impervious material. These soils have a very slow rate of water transmission.
If a soil is assigned to a dual hydrologic group (A/D, B/D, or C/D), the first letter is for drained areas and the second is for undrained areas. Only the soils that in their natural condition are in group D are assigned to dual classes.
Rating Options
Aggregation Method: Dominant Condition
Component Percent Cutoff: None Specified
Tie-break Rule: Higher
Hydrologic Soil Group—Golden Area, Colorado, Parts of Denver, Douglas, Jefferson, and Park Counties
Natural Resources Conservation Service
Web Soil Survey National Cooperative Soil Survey
APPENDIX B
HYDRAULICS
MHFD-Inlet, Version 5.03 (August 2023)
Worksheet Protected
INLET NAME P04 P02 P01
Site Type (Urban or Rural) URBAN URBAN URBAN Inlet Application (Street or Area) STREET STREET STREET Hydraulic Condition In Sump On Grade On Grade Inlet Type Denver No. 16 Combination CDOT Type R Curb Opening CDOT Type R Curb Opening
USER-DEFINED INPUT
User-Defined Design Flows Minor QKnown (cfs) 23.2 4.1 5.7 Major QKnown (cfs) 47.9 8.4 12.7
Bypass (Carry-Over) Flow from Upstream Inlets must be organized from upstream (left) to downstream (right) in order for bypass flows to be linked.
Receive Bypass Flow from: No Bypass Flow Received No Bypass Flow Received P02 Minor Bypass Flow Received, Qb (cfs) 0.0 0.0 0.0 Major Bypass Flow Received, Qb (cfs) 0.0 0.0 1.6
Watershed Characteristics Subcatchment Area (acres) Percent Impervious NRCS Soil Type
Watershed Profile Overland Slope (ft/ft) Overland Length (ft) Channel Slope (ft/ft) Channel Length (ft)
Minor Storm Rainfall Input Design Storm Return Period, Tr (years) One-Hour Precipitation, P1 (inches)
Major Storm Rainfall Input Design Storm Return Period, Tr (years) One-Hour Precipitation, P1 (inches)
CALCULATED OUTPUT
Minor Total Design Peak Flow, Q (cfs) 23.2 4.1 5.8 Major Total Design Peak Flow, Q (cfs) 47.9 8.4 14.3 Minor Flow Bypassed Downstream, Qb (cfs) N/A 0.0 0.0 Major Flow Bypassed Downstream, Qb (cfs) N/A 1.6 0.4
INLET MANAGEMENT
MHFD-Inlet, Version 5.03 (August 2023)
Worksheet Protected
INLET NAME
Site Type (Urban or Rural) Inlet Application (Street or Area) Hydraulic Condition Inlet Type
USER-DEFINED INPUT
User-Defined Design Flows Minor QKnown (cfs) Major QKnown (cfs)
Bypass (Carry-Over) Flow from Upstream Receive Bypass Flow from:
Minor Bypass Flow Received, Qb (cfs) Major Bypass Flow Received, Qb (cfs)
Watershed Characteristics Subcatchment Area (acres) Percent Impervious NRCS Soil Type
Watershed Profile Overland Slope (ft/ft) Overland Length (ft) Channel Slope (ft/ft) Channel Length (ft)
Minor Storm Rainfall Input Design Storm Return Period, Tr (years) One-Hour Precipitation, P1 (inches)
Major Storm Rainfall Input Design Storm Return Period, Tr (years) One-Hour Precipitation, P1 (inches)
CALCULATED OUTPUT
Minor Total Design Peak Flow, Q (cfs) Major Total Design Peak Flow, Q (cfs) Minor Flow Bypassed Downstream, Qb (cfs) Major Flow Bypassed Downstream, Qb (cfs)
INLET MANAGEMENT
HDR_IN-A3 User-Defined
URBAN
STREET
On Grade CDOT Type R Curb Opening
0.9 2.0
P01 0.0 0.4
0.9 2.4 0.0 0.0
Project:
Inlet ID:
Gutter Geometry:
Maximum Allowable Width for Spread Behind Curb TBACK = 16.0 ft Side Slope Behind Curb (leave blank for no conveyance credit behind curb) SBACK = 0.015 ft/ft Manning's Roughness Behind Curb (typically between 0.012 and 0.020) nBACK = 0.012
Height of Curb at Gutter Flow Line HCURB = 6.00 inches Distance from Curb Face to Street Crown TCROWN = 30.0 ft Gutter Width W = 2.00 ft Street Transverse Slope SX = 0.031 ft/ft Gutter Cross Slope (typically 2 inches over 24 inches or 0.083 ft/ft) SW = 0.083 ft/ft Street Longitudinal Slope - Enter 0 for sump condition SO = 0.000 ft/ft Manning's Roughness for Street Section (typically between 0.012 and 0.020) nSTREET = 0.016
Minor Storm Major Storm Max. Allowable Spread for Minor & Major Storm TMAX = 6.0 30.0 ft Max. Allowable Depth at Gutter Flowline for Minor & Major Storm dMAX = 6.0 6.0 inches Check boxes are not applicable in SUMP conditions
MINOR STORM Allowable Capacity is not applicable to Sump Condition Minor Storm Major Storm MAJOR STORM Allowable Capacity is not applicable to Sump Condition Qallow = SUMP SUMP cfs
MHFD-Inlet, Version 5.03 (August 2023)
ALLOWABLE CAPACITY FOR ONE-HALF OF STREET (Minor & Major Storm) (Based on Regulated Criteria for Maximum Allowable Flow Depth and Spread)
P04
02403656_PR_MHFD-Inlet_v5.03, P04 12/16/2024, 12:49 PM
Design Information (Input) MINOR MAJOR Type of Inlet Type = Local Depression (additional to continuous gutter depression 'a' from above) alocal = 2.00 2.00 inches Number of Unit Inlets (Grate or Curb Opening) No = 1 1 Water Depth at Flowline (outside of local depression) Ponding Depth = 3.5 8.0 inches Grate Information MINOR MAJOR Length of a Unit Grate Lo (G) = 3.00 3.00 feet Width of a Unit Grate Wo = 1.73 1.73 feet Open Area Ratio for a Grate (typical values 0.15-0.90) Aratio = 0.31 0.31 Clogging Factor for a Single Grate (typical value 0.50 - 0.70) Cf (G) = 0.50 0.50 Grate Weir Coefficient (typical value 2.15 - 3.60) Cw (G) = 3.60 3.60 Grate Orifice Coefficient (typical value 0.60 - 0.80) Co (G) = 0.60 0.60 Curb Opening Information MINOR MAJOR Length of a Unit Curb Opening Lo (C) = 3.00 3.00 feet Height of Vertical Curb Opening in Inches Hvert = 6.50 6.50 inches Height of Curb Orifice Throat in Inches Hthroat = 5.25 5.25 inches Angle of Throat Theta = 0.00 0.00 degrees Side Width for Depression Pan (typically the gutter width of 2 feet) Wp = 2.00 2.00 feet Clogging Factor for a Single Curb Opening (typical value 0.10) Cf (C) = 0.10 0.10 Curb Opening Weir Coefficient (typical value 2.3-3.7) Cw (C) = 3.70 3.70 Curb Opening Orifice Coefficient (typical value 0.60 - 0.70) Co (C) = 0.66 0.66
Low Head Performance Reduction (Calculated) MINOR MAJOR Depth for Grate Midwidth dGrate = 0.31 0.69 ft Depth for Curb Opening Weir Equation dCurb = 0.12 0.50 ft Grated Inlet Performance Reduction Factor for Long Inlets RFGrate = 0.54 1.00 Curb Opening Performance Reduction Factor for Long Inlets RFCurb = N/A N/A Combination Inlet Performance Reduction Factor for Long Inlets RFCombination = 0.54 1.00
MINOR MAJOR
Total Inlet Interception Capacity (assumes clogged condition) Qa = 1.1 7.6 cfs WARNING: Inlet Capacity < Q Peak for Minor and Major Storms Q PEAK REQUIRED = 23.2 47.9 cfs
INLET IN A SUMP OR SAG LOCATION
MHFD-Inlet, Version 5.03 (August 2023)
Denver No. 16 Combination
H-Vert H-Curb
W
Lo (C)
Lo (G)
Wo
WP
Denver No. 16 Combination
Override Depths
02403656_PR_MHFD-Inlet_v5.03, P04 12/16/2024, 12:49 PM
Gutter Geometry:
Maximum Allowable Width for Spread Behind Curb TBACK = 16.0 ft Side Slope Behind Curb (leave blank for no conveyance credit behind curb) SBACK = 0.015 ft/ft Manning's Roughness Behind Curb (typically between 0.012 and 0.020) nBACK = 0.013
Height of Curb at Gutter Flow Line HCURB = 6.00 inches Distance from Curb Face to Street Crown TCROWN = 30.0 ft Gutter Width W = 2.00 ft Street Transverse Slope SX = 0.031 ft/ft Gutter Cross Slope (typically 2 inches over 24 inches or 0.083 ft/ft) SW = 0.083 ft/ft Street Longitudinal Slope - Enter 0 for sump condition SO = 0.045 ft/ft Manning's Roughness for Street Section (typically between 0.012 and 0.020) nSTREET = 0.016
Minor Storm Major Storm Max. Allowable Spread for Minor & Major Storm TMAX = 6.0 30.0 ft Max. Allowable Depth at Gutter Flowline for Minor & Major Storm dMAX = 6.0 6.0 inches Allow Flow Depth at Street Crown (check box for yes, leave blank for no)
MINOR STORM Allowable Capacity is based on Spread Criterion Minor Storm Major Storm MAJOR STORM Allowable Capacity is based on Depth Criterion Qallow = 3.8 26.0 cfs
MHFD-Inlet, Version 5.03 (August 2023)
ALLOWABLE CAPACITY FOR ONE-HALF OF STREET (Minor & Major Storm) (Based on Regulated Criteria for Maximum Allowable Flow Depth and Spread)
P02
WARNING: MINOR STORM max. allowable capacity is less than the design peak flow of 4.05 cfs on sheet 'Inlet Management' Major storm max. allowable capacity GOOD - greater than the design peak flow of 8.37 cfs on sheet 'Inlet Management'
02403656_PR_MHFD-Inlet_v5.03, P02 12/16/2024, 12:49 PM
Local Depression (additional to continuous gutter depression 'a') aLOCAL = 3.0 3.0 inches Total Number of Units in the Inlet (Grate or Curb Opening) No = 1 1 Length of a Single Unit Inlet (Grate or Curb Opening) Lo = 10.00 10.00 ft Width of a Unit Grate (cannot be greater than W, Gutter Width) Wo = N/A N/A ft Clogging Factor for a Single Unit Grate (typical min. value = 0.5) Cf (G) = N/A N/A Clogging Factor for a Single Unit Curb Opening (typical min. value = 0.1) Cf (C) = 0.10 0.10 Street Hydraulics: WARNING: Q > ALLOWABLE Q FOR MINOR & MAJOR STORM MINOR MAJOR Total Inlet Interception Capacity Q = 4.0 6.7 cfs Total Inlet Carry-Over Flow (flow bypassing inlet) Qb = 0.0 1.6 cfs Capture Percentage = Qa/Qo C% = 99 80 %
INLET ON A CONTINUOUS GRADE
MHFD-Inlet, Version 5.03 (August 2023)
CDOT Type R Curb Opening CDOT Type R Curb Opening
02403656_PR_MHFD-Inlet_v5.03, P02 12/16/2024, 12:49 PM
Gutter Geometry:
Maximum Allowable Width for Spread Behind Curb TBACK = 16.0 ft Side Slope Behind Curb (leave blank for no conveyance credit behind curb) SBACK = 0.015 ft/ft Manning's Roughness Behind Curb (typically between 0.012 and 0.020) nBACK = 0.013
Height of Curb at Gutter Flow Line HCURB = 6.00 inches Distance from Curb Face to Street Crown TCROWN = 30.0 ft Gutter Width W = 2.00 ft Street Transverse Slope SX = 0.033 ft/ft Gutter Cross Slope (typically 2 inches over 24 inches or 0.083 ft/ft) SW = 0.083 ft/ft Street Longitudinal Slope - Enter 0 for sump condition SO = 0.010 ft/ft Manning's Roughness for Street Section (typically between 0.012 and 0.020) nSTREET = 0.016
Minor Storm Major Storm Max. Allowable Spread for Minor & Major Storm TMAX = 6.0 30.0 ft Max. Allowable Depth at Gutter Flowline for Minor & Major Storm dMAX = 6.0 6.0 inches Allow Flow Depth at Street Crown (check box for yes, leave blank for no)
MINOR STORM Allowable Capacity is based on Spread Criterion Minor Storm Major Storm MAJOR STORM Allowable Capacity is based on Depth Criterion Qallow = 2.0 27.1 cfs
MHFD-Inlet, Version 5.03 (August 2023)
ALLOWABLE CAPACITY FOR ONE-HALF OF STREET (Minor & Major Storm) (Based on Regulated Criteria for Maximum Allowable Flow Depth and Spread)
P01
WARNING: MINOR STORM max. allowable capacity is less than the design peak flow of 5.77 cfs on sheet 'Inlet Management' Major storm max. allowable capacity GOOD - greater than the design peak flow of 14.32 cfs on sheet 'Inlet Management'
02403656_PR_MHFD-Inlet_v5.03, P01 12/16/2024, 12:49 PM
Local Depression (additional to continuous gutter depression 'a') aLOCAL = 3.0 3.0 inches Total Number of Units in the Inlet (Grate or Curb Opening) No = 1 1 Length of a Single Unit Inlet (Grate or Curb Opening) Lo = 20.00 20.00 ft Width of a Unit Grate (cannot be greater than W, Gutter Width) Wo = N/A N/A ft Clogging Factor for a Single Unit Grate (typical min. value = 0.5) Cf (G) = N/A N/A Clogging Factor for a Single Unit Curb Opening (typical min. value = 0.1) Cf (C) = 0.10 0.10 Street Hydraulics: WARNING: Q > ALLOWABLE Q FOR MINOR & MAJOR STORM MINOR MAJOR Total Inlet Interception Capacity Q = 5.8 13.9 cfs Total Inlet Carry-Over Flow (flow bypassing inlet) Qb = 0.0 0.4 cfs Capture Percentage = Qa/Qo C% = 100 97 %
INLET ON A CONTINUOUS GRADE
MHFD-Inlet, Version 5.03 (August 2023)
CDOT Type R Curb Opening
02403656_PR_MHFD-Inlet_v5.03, P01 12/16/2024, 12:49 PM
Gutter Geometry:
Maximum Allowable Width for Spread Behind Curb TBACK = 9.5 ft Side Slope Behind Curb (leave blank for no conveyance credit behind curb) SBACK = 0.015 ft/ft Manning's Roughness Behind Curb (typically between 0.012 and 0.020) nBACK = 0.013
Height of Curb at Gutter Flow Line HCURB = 6.00 inches Distance from Curb Face to Street Crown TCROWN = 30.0 ft Gutter Width W = 2.00 ft Street Transverse Slope SX = 0.020 ft/ft Gutter Cross Slope (typically 2 inches over 24 inches or 0.083 ft/ft) SW = 0.083 ft/ft Street Longitudinal Slope - Enter 0 for sump condition SO = 0.004 ft/ft Manning's Roughness for Street Section (typically between 0.012 and 0.020) nSTREET = 0.016
Minor Storm Major Storm Max. Allowable Spread for Minor & Major Storm TMAX = 6.0 30.0 ft Max. Allowable Depth at Gutter Flowline for Minor & Major Storm dMAX = 6.0 6.0 inches Allow Flow Depth at Street Crown (check box for yes, leave blank for no)
MINOR STORM Allowable Capacity is based on Spread Criterion Minor Storm Major Storm MAJOR STORM Allowable Capacity is based on Depth Criterion Qallow = 0.7 23.8 cfs
MHFD-Inlet, Version 5.03 (August 2023)
ALLOWABLE CAPACITY FOR ONE-HALF OF STREET (Minor & Major Storm) (Based on Regulated Criteria for Maximum Allowable Flow Depth and Spread)
HDR_IN-A3
WARNING: MINOR STORM max. allowable capacity is less than the design peak flow of 0.86 cfs on sheet 'Inlet Management' Major storm max. allowable capacity GOOD - greater than the design peak flow of 2.35 cfs on sheet 'Inlet Management'
02403656_PR_MHFD-Inlet_v5.03, HDR_IN-A3 12/16/2024, 12:49 PM
Local Depression (additional to continuous gutter depression 'a') aLOCAL = 3.0 3.0 inches Total Number of Units in the Inlet (Grate or Curb Opening) No = 2 2 Length of a Single Unit Inlet (Grate or Curb Opening) Lo = 5 5.00 ft Width of a Unit Grate (cannot be greater than W, Gutter Width) Wo = N/A N/A ft Clogging Factor for a Single Unit Grate (typical min. value = 0.5) Cf (G) = N/A N/A Clogging Factor for a Single Unit Curb Opening (typical min. value = 0.1) Cf (C) = 0.10 0.10 Street Hydraulics: WARNING: Q > ALLOWABLE Q FOR MINOR & MAJOR STORM MINOR MAJOR Total Inlet Interception Capacity Q = 0.9 2.4 cfs Total Inlet Carry-Over Flow (flow bypassing inlet) Qb = 0.0 0.0 cfs Capture Percentage = Qa/Qo C% = 100 100 %
INLET ON A CONTINUOUS GRADE
MHFD-Inlet, Version 5.03 (August 2023)
CDOT Type R Curb Opening
02403656_PR_MHFD-Inlet_v5.03, HDR_IN-A3 12/16/2024, 12:49 PM
APPENDIX C
REFERENCE INFORMATION
���� �����������������������0�����
�$%1������
"2$%������������������)�������!��������������������"�$� ����3����������� ����*4����������
���� �����������������������0�����
�����5���� �5������� �,���� �������������������&'�(� �������� ���������������67����� �������������8� ����������������������������������� ������7�����
"9$%#��� ������9�����������) ���9�� ��������������������������������5� �������0�1�;���
"1$%#��� ������9�����������) ���9�� �/��2������� ������0��
�����5� lkindt Rectangle
601 P Street / Suite 200 / Lincoln, NE 68508
O 402.474.6311 / olsson.com
To: City of Wheat Ridge From: Olsson, Laura Kindt, PE, CFM Date: March 4, 2025 Subject: Water Quality and Detention Design Approach for Wadsworth Path Project
The Wadsworth Path 32nd to 35th Avenue project is seeking guidance on the water quality and detention design approach. The project is located along Wadsworth from 32nd Avenue to 35th
Avenue (Figure 1). The project includes adding sidewalk along the west side of Wadsworth
Boulevard from 32nd to 35th Avenue, curb and gutters, roadway patching, relocating the existing
Rocky Mountain Water Company (RMWC) 6-foot by 3-foot box culvert, and relocating existing drainage structures. There is a high point along Wadsworth Boulevard located approximately at station 107+00. Drainage north of 107+00 drains to the north to the existing storm system located within Wadsworth and ultimately outfalls to Clear Creek via a water quality pond being constructed with the Improve Wadsworth project.
This is the start of the file's text. The full file is on GovTribe.