Draft_Technical Exhibit 3A Form AF Form 487 - Blank.xlsx
Air Force Form XLSX spreadsheet 58 KB Posted
- Attached to
- Yakima Training Center Generator Maintenance
- Solicitation number
- w911s823Q0001
View the file
Other versions and copies of AF Form 487
| File | Revision | Posted | Attached to |
|---|---|---|---|
| Appendix G - AF Form 487 Generator Inspection Form.pdf | Revision not stated | SATCOM Milstar Building Maintenance and Repair | |
| Attachment 19 - Appendix A - AF Form 487 Generator Inspection Form - 3-4-26.pdf | Revision not stated | B518 Generator Maintenance and Operations | |
| Attachment 20 - Appendix A - AF Form 487 Generator Inspection Form - 3-4-26.pdf | Revision not stated | B518 Power Plant Maintenance |
Who attaches AF Form 487
Other files
| File | Type | Posted |
|---|---|---|
| Draft_Technical Exhibit 2 Generator details.xlsx | XLSX spreadsheet | |
| Draft_YTC Generator PWS.docx | DOCX document | |
| Draft_Technical Exhibit 3B Inspection Sheet - Blank.xlsx | XLSX spreadsheet |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Generator Insp Checklist PG1
| Technical Exhibit 6 | |||||||
| Generator Operating Log | |||||||
| (Inspection Checklist) | Front: annotate optimal readings (operating temp., peak kW and amps, etc.) | ||||||
| Reverse: continuation of readings and annotate any discrepancies and/or correctirve actions | 52 | J00848 | |||||
| 1. GENERAL INFORMATION | |||||||
| A. INSPECTOR/OPERATOR (Print) | B. DATE | C. SUPERVISOR (Print/Signature) | D. DATE |
E. RECORD ID F. SITE NAME/BUILDING NUMBER G. ORGANIZATION H. BASE
| I. START HRS | J. FINISH HRS | K. TIME | L. OUTSIDE TEMP. | M. SYSTEM TYPE | N. EQUIPMENT TYPE | ||||
| AUTO | MANUAL | RPIE | EAID | ||||||
| 2. ALTERNATOR INFORMATION | |||||||||
| A. MAKE | B. MODEL | C. SERIAL NUMBER | D. POWER FACTOR |
E. VOLTAGE F. AMPERAGE RATING G. KILOWATT RATING H. OTHER
| 3. ENGINE INFORMATION | ||||
| A. MAKE | B. MODEL | C. SERIAL NUMBER | D. RPM/HZ | E. EXHAUST GAS TEMP. |
| 4. Automatic/Manual Transfer Switch Data | N/A (This section is not required for generators without switchgear) | ||||||||||||||||||||||||||||
| A. MAKE | B. MODEL | C. SERIAL NUMBER | D. BYPASS CAPABILITY | ||||||||||||||||||||||||||
| YES | NO | ||||||||||||||||||||||||||||
| E. AMP RATING | F. PHASE | G. POLES | H. DISCONNECT METHOD FOR LOAD TEST | I. ATS OPERATED (Attempt) | |||||||||||||||||||||||||
| KEY/TEST SWITCH | MAIN DISCONNECT | FIRST | SECOND | THIRD | MANUAL | ||||||||||||||||||||||||
| 5. GENERAL SITE AND GENERATOR SET CONDITIONS | |||||||||||||||||||||||||||||
| SAT | REMARKS/CORRECTIVE ACTION | SAT | REMARKS/CORRECTIVE ACTION | ||||||||||||||||||||||||||
| A. CLEANLINESS | E. BELT CONDITION | ||||||||||||||||||||||||||||
| B. LOOSE ITEMS | F. CONTROLS/GAUGES | ||||||||||||||||||||||||||||
| C. AREA (ROOM) LIGHTING | G. ENGINE VIBRATION | ||||||||||||||||||||||||||||
| D. GROUND CONNECTION | H. EXHAUST TEMP. / CONDITION | Degress (F) | |||||||||||||||||||||||||||
| 6. COOLING SYSTEM | 7. FUEL SYSTEM | ||||||||||||||||||||||||||||
| SAT | REMARKS/CORRECTIVE ACTION | SAT | REMARKS/CORRECTIVE ACTION | ||||||||||||||||||||||||||
| A. LEAKS | A. LEAKS | ||||||||||||||||||||||||||||
| B. COOLANT LEVEL | B. TRANSFER PUMP OPERATION | ||||||||||||||||||||||||||||
| C. HOSES | C. TANK CAPACITY (GAL) | DAY | STORAGE | ||||||||||||||||||||||||||
| D. RADIATOR, LOUVERS | D. TANK LEVEL (GAL) | DAY | STORAGE | ||||||||||||||||||||||||||
| E. AMBIENT TEMP. | Degress (F) | E. WATER DRAINED (GAL) | YES | NO | |||||||||||||||||||||||||
| F. OPERATING TEMP. | Degress (F) | 9. LUBRICATION SYSTEM | |||||||||||||||||||||||||||
| SAT | REMARKS/CORRECTIVE ACTION | ||||||||||||||||||||||||||||
| 8. LOAD DEMAND | A. LEAKS | ||||||||||||||||||||||||||||
| A. KILOWATTS (PEAK) | B. OIL LEVEL | ||||||||||||||||||||||||||||
| B. AMPERAGE | PH1 | PH 2 | PH 3 | C. OIL PRESSURE | PSI | ||||||||||||||||||||||||
| C. VOLTAGE (L-L) | PH1 | PH 2 | PH 3 | D. OIL TEMP. (IF APPLICALBE) | DEGRESS (F) | ||||||||||||||||||||||||
| 10. BATTERY AND CHARGING SYSTEM | 11. AUTOMATIC/MANUAL TRANSFER SWITCH | ||||||||||||||||||||||||||||
| SAT | REMARKS/CORRECTIVE ACTION | SAT | REMARKS/CORRECTIVE ACTION | ||||||||||||||||||||||||||
| A. WIRING CONNECTIONS | A. WIRING AND CONNECTIONS | ||||||||||||||||||||||||||||
| B. BATTERY VOLTS DC | C. INSTALL DATE (MM/YY) | B. CONTACT CONDITION | |||||||||||||||||||||||||||
| D. BATTERY TYPE | WET CELL | SEALED | C. COMPONENTS AND CONTROLS | ||||||||||||||||||||||||||
| E. BATTERY CHARGING | VOLTS DC | AMPS | D. MECHANISM OPERABILITY | ||||||||||||||||||||||||||
| F. BATTERY LOAD TEST | GOOD | WEAK | NOT TESTED | E. INDICATOR LIGHTS | |||||||||||||||||||||||||
| 12. MAINTENANCE ACTIONS | (NO MAINTENANCE DUE) | 13. INSPECTION TYPE | |||||||||||||||||||||||||||
| A. FILTER CHANGE | AIR | COOLANT | FUEL | OIL | A. SEMI-MONTHLY | B. MONTHLY | C. QUARTERLY | ||||||||||||||||||||||
| B. FLUIDS ADDED (GAL) | COOLANT | OIL | D. SEMI-ANNUAL | E. ANNUAL | F. OTHER | ||||||||||||||||||||||||
| C. LAST OIL CHANGE DATE (MM/YY) | G. TEST METHOD (EGT, 30% LOAD OR LESS THAN 30% LOAD) | ||||||||||||||||||||||||||||
| D. OIL ANALYSIS DATE (MM/YY) | RESULTS | H. LOAD TYPE (FACILITY, | |||||||||||||||||||||||||||
| LOAD BANK OR BOTH | I. DENIED LOAD TEST | ||||||||||||||||||||||||||||
| 14. SITE DOCUMENTATION (CURRENT DOCUMENTATION) | 15. UNIT STARTED | ||||||||||||||||||||||||||||
| A. OI'S | B. TRAINING LETTER | C. ONE-LINE DIAGRAMS | A. First | B. Second | C. Third | D. Did Not Start | |||||||||||||||||||||||
| AF FORM 487, 20150401 | Page 1 |
File details come from the government source that posted it. Updated .