About this file

This document is a county government procurement document from Pinellas County, Florida, involving a professional engineering services contract for the Crystal Beach Drainage and Roadway Improvements project (PID 003896A). The contract will provide comprehensive professional engineering services for developing drainage system design plans to alleviate flooding, including 30%, 60%, 90%, and 100% design plans and specifications. The project will involve engineering, design, plans preparation, permit documents, public outreach, and engineer-of-record construction services. The contract was procured through a Request for Qualifications (RFQ) in compliance with the Consultants' Competitive Negotiation Act (CCNA), with a contract term of 548 consecutive calendar days from the notice to proceed, potentially extendable through amendment.

The project is budgeted in the Fiscal Year 2025-2030 Capital Improvement Plan and will be funded through multiple sources: Penny for Pinellas, Florida Department of Environmental Protection (FDEP) Resilient Florida grant, and FDEP State Appropriations. Design work is scheduled to start in FY26 and conclude in FY27, with construction expected to begin in FY28 and end in FY29. The contract is awarded to a single consultant firm for a negotiated not-to-exceed amount, with the total project aligned with strategic goals of maintaining and enhancing county infrastructure, improving environmental quality, and enhancing community safety. The project partner is the Florida Department of Environmental Protection (FDEP).

View the file

Other files

File Type Posted
Crystal_Beach_Potable_Water_Assessment_Report.pdf PDF
Crystal_Beach_Green_Infrastructure_Rec_Report_FINAL_20250702.pdf PDF
Crystal_Beach_Draft_Scope_Tasks_Only_20250626.pdf PDF
Grant_Provisions_LPA0365.pdf PDF
Crystal_Beach_Topographic_Survey.pdf PDF
Crystal_Beach_Topographic_Survey.pdf PDF
Crystal_Beach_Drainage_and_Roadway_Imps_Project_Location_Map.pdf PDF
Crystal_Beach_15%_Plans_October2023.pdf PDF
ATTACHMENT_C_DESIGN_SUBMITTAL_CHECKLISTS.pdf PDF
Sample_Agreement.pdf PDF
25-0731-RFQ-CCNA.pdf PDF
Crystal_Beach_DRAFT_PER_October2023.pdf PDF
CrystalBeach15_Plans_October2023_Rev.pdf PDF
Crystal_Beach_Geotech_Final_Report_April_2025.pdf PDF
DES_229018_Additional_Pavt_Cores_4-18-2023.pdf PDF
Crystal_Beach_Community_Overlay.pdf PDF
Crystal_Beach_Geotech_2019.pdf PDF
Crystal_Beach-Topographic_Survey.pdf PDF
Crystal_Beach_003896A_REVISED_DRAFT_Design_Scope_20250521.docx DOCX document
Crystal_Beach_Drainage_and_Roadway_Imps_Project_Location_MapPID_003896A-R1.pdf PDF
003896A_Crystal_Beach_Design_ITB_CCNA_RFP_20250519.pdf PDF
ATTACHMENT_C_DESIGN_SUBMITTAL_CHEKLISTS.pdf PDF
Draft_Staff_Report_Crystal_Beach_RFQ_003896A.pdf PDF
Non-Competitive_Oversight_Committee_Justification_Form.docx DOCX document
Show all 24

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Subject:

..Title Ranking of firms and agreement with CONSULTANT _________________ for professional engineering services for the Crystal Beach Drainage and Roadway Improvements project.

..label

Recommended Action:

..Recommended Action Approval of the ranking of firms and agreement with ____________________ for professional engineering services for the Crystal Beach Drainage and Roadway Improvements project, PID 003896A.

• The contract is for providing professional engineering services, engineering design plans (60%, 90%, 100%), and post design services for the design of a drainage system to alleviate flooding _________________________ The design shall also include roadway and utility improvements. Services include engineering, design, plans preparation, permit documents preparation, obtaining permits, bid support documents, public outreach, and engineer-of record construction services.

• A Request for Qualifications to comply with the Consultants Competitive Negotiation Act (CCNA), per Florida Statute 287.055, was released on MONTH DAY, 2025; the negotiation and scoping process concluded on MONTH DAY, 2025.

• Award recommended to the sole firm, CONSULTANT FIRM, in the negotiated amount of $XXXXXXX. This Capital Improvement Program project has been budgeted in the 2025-2030 Capital Improvement Plan, FY2025 - 2030: Ranking of firms and agreement with __________________________ for professional engineering services for the Crystal Beach Drainage and Roadway Improvements project, PID 003896A.

• This Project is funded by Penny for Pinellas, Florida Department of

Environmental Protection (FDEP) Resilient Florida grant, and FDEP State

Appropriations.

Contract No. XX-XXXX-RFP-CCNA, in the total not to exceed amount of $XXXXXX for 548 consecutive calendar days from the notice to proceed date; Agreement term may be extended through an amendment; Authorize the Chairman to sign and the Clerk of the Circuit Court to attest.

..Body

Strategic Plan:

Resilient Infrastructure and Environment

1.2 Maintain and enhance County infrastructure

1.4 Improve environmental quality

Healthy and Safe Communities

2.1 Improve public health

2.2 Enhance community safety

Summary:

..Summary The overall objectives of the engineering agreement are to develop plans and specifications and provide all other professional engineering services as may be required to perform full and final design work for a drainage system to alleviate flooding. Such design work shall include development of 30%, 60%, 90% and 100% Design Plans and Specifications.

..Body

Background Information:

The objective of this project is to design a drainage system to alleviate flooding concerns

A Request for Qualifications (RFQ) to comply with the Consultants’ Competitive Negotiation Act (CCNA), per Florida Statute 287.055, was released on _______________________, and the scoping negotiation process concluded on

Fiscal Impact:

This Capital Improvement Program project has been budgeted in the Fiscal Year 2025- 2030 Capital Improvement Plan: the Crystal Beach Drainage and Roadway Improvements project, PID 003896A.

Design for this project will start in FY26 and end FY27. Construction is expected to start in FY28 and end in FY29.

The total agreement not-to-exceed amount is $XXXXXXXX . This Project is funded by Penny for Pinellas, Florida Department of Environmental Protection (FDEP) Resilient Florida grant, and FDEP State Appropriations.

Staff Member Responsible:

Kelli Hammer Levy, Director, Public Works Merry Celeste, Division Director, Purchasing & Risk Management, Administrative Services Joe Lauro, Director, Administrative Services

Partners:

FDEP

Attachments:

Agreement Scope of Work (including Design Submittal Checklists) Ranking Location Map

File details come from the government source that posted it. Updated .