Draft SAI_SIR Questions To Industry 11.09.23.docx
DOCX document 18 KB Posted
- Attached to
- Surface Awareness Initiative (SAI) Market Survey
- Solicitation number
- SAI-11-2023
About this file
This document contains questions from the Federal Aviation Administration to industry regarding a potential Surface Awareness Initiative solution procurement. The FAA is seeking information about industry solutions' ability to meet technical and manufacturing requirements as defined in program documents. Respondents are also asked to provide details on demonstrating solution capabilities including appropriate timelines for an operational capability demonstration. Implementation questions focus on delivery timelines, site survey and installation processes at airports. The document additionally requests information on solution baseline management, security compliance, and types of enhanced functionality vendors may propose.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Final Government Responses to Industry Questions 12.5.2023.xlsx | XLSX spreadsheet | |
| Draft SAI_SIR Comment Matrix Template 11.09.2023.xlsx | XLSX spreadsheet | |
| Draft SAI_SIR_Section_B 11.09.2023.docx | DOCX document | |
| Draft SAI_SIR_Section_M 11.09.2023.docx | DOCX document | |
| Draft SAI_SIR_Attachment J.2 Strategic Plan 11.09.2023.docx | DOCX document | |
| Draft SAI_SIR_Section_C PWS 11.09.2023.docx | DOCX document | |
| Draft SAI_SIR_Section_L 11.09.2023.docx | DOCX document | |
| Draft SAI_SIR_Attachment J.3 Requirements Compliance Matrix 11.09.2023.xlsx | XLSX spreadsheet | |
| Draft SAI_SIR_Attachment J.1 MRD 11.09.2023.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Questions to Industry:
1. Requirements
a. Are there any unique FAA requirements within the Minimum Requirements Document or Section C which will drive substantial cost increases to a solution you would propose?
b. Does your SAI solution meet the requirements as defined in the Minimum Requirements Document?
c. If not, which requirements does your proposed solution not meet?
d. Does your SAI solution meet the minimum Technology and Manufacturing Readiness Levels as defined in the Performance Work Statement (PWS)?
e. If not, please provide a description of the technology and manufacturing maturity of the proposed solution.
2. Operational Capability Demonstration
a. If you are asked to participate, where would you like to conduct an Operational Capability Demonstration of your proposed solution?
b. If the Operational Capability Demonstration is restricted to a domestic US location, where would you like to conduct it?
c. Is 3 days on site an appropriate amount of time to conduct the demonstration?
d. Can a demonstration of your proposed solution be conducted in less than 3 days?
e. Does your proposed solution have enhanced functionality (as referenced in C.4.3.1 and L.5.2.4) you envision demonstrating during the OCD?
f. If so, could you provide an overview or description?
3. Implementation
a. What is an estimated delivery timeline for your solution from receipt of order through on-site Service Acceptance Test?
b. Upon receipt of direction, how long will it take you to conduct a site survey of an airport and then submit a site design?
c. After conducting a site survey, submitting a site design, receiving agreement with the design and a corresponding order, how long will it take to install a solution at an airport? If more specificity is required, please answer for BNA.
d. Are there any processes which can be implemented to expedite the timeframes addressed in questions a, b and c above?
e. Are there corresponding increased costs and if so, how great will these cost increases be?
f. What Government Furnished information (GFI) is required to facilitate installation activities?
4. Proposed Solution
a. What is the current process you use to manage ongoing modifications to the service baseline (i.e., release cycle, requalification)?
b. Does your proposed solution have an inherent performance monitoring capability that verifies the system performance on a continuous basis?
c. Does your proposed solution comply with the National Institute of Standards and Technology (NIST), Special Publication (SP) 800-53 Rev. 5, Security and Privacy Controls for Federal Information Systems and Organizations?
d. If not, please describe the inherent security features the solution does have.
5. Other
a. Regarding the direction in Section L, what types of enhanced functionality would you consider proposing?
File details come from the government source that posted it. Updated .