Draft SAI_SIR_Attachment J.2 Strategic Plan 11.09.2023.docx
DOCX document 140 KB Posted
- Attached to
- Surface Awareness Initiative (SAI) Market Survey
- Solicitation number
- SAI-11-2023
About this file
This document outlines the Federal Aviation Administration's (FAA) Surface Awareness Initiative (SAI) strategic plan. The FAA seeks to establish a Qualified Product List of surface situational awareness solutions for airports without existing surveillance capabilities. Solutions must leverage Automatic Dependent Surveillance-Broadcast and display aircraft positions over airport maps. The FAA will evaluate technical proposals on a pass/fail basis and select proposals to demonstrate operational capability. Solutions meeting requirements will comprise the Qualified Product List, from which the FAA and airports may procure. The FAA will award initial work orders for four categories of airports using best value or lowest price technically acceptable determinations. The FAA will maintain the Qualified Product List biennially through 2027 and may issue discrete task orders to modify services. Key program milestones include publishing the initial Qualified Product List in April 2025 and making block awards between 2024-2027.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Final Government Responses to Industry Questions 12.5.2023.xlsx | XLSX spreadsheet | |
| Draft SAI_SIR Comment Matrix Template 11.09.2023.xlsx | XLSX spreadsheet | |
| Draft SAI_SIR_Section_B 11.09.2023.docx | DOCX document | |
| Draft SAI_SIR_Section_M 11.09.2023.docx | DOCX document | |
| Draft SAI_SIR_Section_C PWS 11.09.2023.docx | DOCX document | |
| Draft SAI_SIR_Section_L 11.09.2023.docx | DOCX document | |
| Draft SAI_SIR Questions To Industry 11.09.23.docx | DOCX document | |
| Draft SAI_SIR_Attachment J.3 Requirements Compliance Matrix 11.09.2023.xlsx | XLSX spreadsheet | |
| Draft SAI_SIR_Attachment J.1 MRD 11.09.2023.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Surface Awareness Initiative 11/09/2023 Attachment J.2 – Strategic Plan
11/09/2023 Attachment J.2 – Strategic Plan
Draft Strategic Plan Version 0.1 9 November 2023
DRAFT 1
Introduction The purpose of this Strategic Plan is to facilitate communication between the Federal Aviation Administration (FAA) and Industry for the Surface Awareness Initiative (SAI). This document provides overarching program objectives and vision for the deployment of solutions that will provide surface situational awareness to operational environments that do not have existing Airport Surface Detection Equipment (ASDE) or Airport Surface Surveillance Capability (ASSC) systems. This plan also provides information about the planned FAA acquisition approach and provides insight on issues of importance to the FAA. The information and timelines in this plan are subject to change.
SAI will deliver innovative, cost-effective technological solutions to airports (Attachment A; Initial SAI Airport Listing) without existing surface surveillance capabilities to expand Air Traffic Control’s (ARC) surface situational awareness. SAI solutions will leverage Automatic Dependent Surveillance – Broadcast (ADS-B) as a primary source of aircraft position both on the surface and in airport arrival and departure corridors. These ‘targets’ will be displayed overtop an airport surface map that will at a minimum depict runways, taxiways, hold ramps, and other movement areas.
Objectives The FAA is pursuing implementation of SAI solutions with the greatest sense of urgency. These solutions must be effective in providing enhanced surface situational awareness with an architecture that supports rapid deployment with minimal impact to existing infrastructure and operations.
SAI solutions must meet minimum performance requirements; however, the FAA is also interested in enhanced capabilities beyond minimum performance as well as future expansion of inherent performance that may be pursued after initial solution commissioning.
Program Scope The SAI program includes additional scope items beyond provision of the surface situational awareness solution. The SAI solution provider must provide these services:
· Solution Installation – The solution provider must be responsible for the installation of all on-site equipment. This work must be in accordance with prescribed policy and requirements. At FAA facilities, the solution provider must consult and get approvals from the designated FAA representative for all matters relative to placement, power, integration, and/or any other aspects they identify.
· Training – The solution provider must deliver documentation (to include user manual) and materials that describe the functionality and operation of the solution to support the FAA’s development of web-based training courses. The solution provider must conduct on-site user training at each site prior to completion of solution implementation.
· Sustainment Services – The solution provider must monitor the status of the SAI solution. The solution provider must report anticipated and unanticipated service disruption to the installation site specific focal point. The solution provider must repair and restore service, address SAI solution outages, and maintain solution as necessary to ensure continuity of service.
· Upgrades – The solution provider must provide any routine upgrades to their SAI solution. Any upgrades must not negatively impact the capability of the equipment installed to meet all qualification requirements.
Acquisition Approach Under this SAI acquisition, the FAA intends to develop a Qualified Product List (QPL), from which the FAA and other entities, such as airport authorities (using their independent authority and processes), may elect to procure products for surface situational awareness. A QPL establishes a list of qualified products that have been evaluated and meet all applicable qualification requirements.
Initial establishment of the QPL will be based on a Screening Information Request (SIR) where Offerors Technical Volumes will be evaluated on PASS/FAIL criteria. After evaluation of the Technical Volumes, those submissions that “PASS” will be selected to conduct an Operational Capability Demonstration (OCD). The OCD, which will also be evaluated on PASS/FAIL criteria, will ensure solution compliance to minimum performance requirements. In addition, the OCD will serve as an opportunity for Offerors to demonstrate performance beyond what is required. When selected for the OCD, the Offeror must submit the remaining SIR Volumes (e.g., price, past performance) for FAA evaluation.
If the Offeror passes the OCD, the solution will be placed on the QPL. Work orders from the QPL for three categories of airports will be made on Best Value determination, while one category of airports will be awarded using Lowest Price, Technically Acceptable (LPTA). Best value describes the solution that is the most advantageous to the FAA based on technical evaluation (adjectival rating based on identified strengths and weaknesses), past performance, total evaluated price, and FAA’s independent risk and opportunity assessment.
To ensure an understanding of whether a proposed enhanced technical capability is identified as a either a strength or opportunity, the following examples are provided:
The following items are examples of “strengths” beyond minimum performance:
· User displays that enable entry and viewing of dynamic data (i.e., scratch pad)
· Differentiating targets based on target report quality metrics
· Mode C altitude correction
· Ability to record and playback data
The following items are examples of “opportunities” beyond minimum performance:
· Alerting / notifications of targets in collision conflict
· Incorporating target position information for other sources, while still being compliant with minimum performance requirements
The QPL will be reassessed on an at least biennial basis through Fiscal Year (FY) 2027. Candidates that previously failed to make the QPL would be able to requalify with technical proposal submission and an OCD. Solutions already on the list could also resubmit proposals, to account for pricing adjustments and/or enhance capabilities, and consequently, update their best value determination.
After initial deployment of an SAI solution pursuant to a work order from the QPL, the FAA may elect to issue discrete task orders to modify the provided service. Situations that may constitute such a need would be to address ATC suitability issues and airport configuration changes.
Program Milestones
| Event |
| Date |
| Publish QPL |
| April 2025 |
| Initial Awards |
| June 2024 - December 2024 |
| QPL Maintenance |
| January 2025 |
| Block 2 Awards |
| February 2025 – September 2025 |
| QPL Maintenance |
| October 2025 |
| Block 3 Awards |
| January 2026 – September 2026 |
| QPL Maintenance |
| October 2026 |
| Block 4 Awards |
| January 2027 – September 2027 |
Attachment A Initial Airport Site Listing
| Airport |
| Name |
| Airspace Class |
| Region |
| BNA |
| Nashville International Airport |
| C |
| Eastern |
| TPA |
| Tampa International Airport |
| B |
| Eastern |
| DAL |
| Dallas Love Field Airport |
| B |
| Central |
| AUS |
| Austin-Bergstrom International Airport |
| C |
| Central |
| IND |
| Indianapolis International Airport |
| C |
| Central |
| SJC |
| Norman Y Mineta San Jose International Airport |
| C |
| Western |
| OAK |
| Oakland International Airport |
| C |
| Western |
| RDU |
| Raleigh-Durham International Airport |
| C |
| Eastern |
| SAT |
| San Antonio International Airport |
| C |
| Central |
| ABQ |
| Alburquerque International Airport |
| C |
| Central |
| SMF |
| Sacramento International Airport |
| C |
| Western |
| PBI |
| Palm Beach International Airport |
| C |
| Eastern |
| SFB |
| Orlando Sanford International Airport |
| C |
| Eastern |
| DAB |
| Daytona Beach International Airport |
| C |
| Eastern |
| BUR |
| Bob Hope Airport |
| C |
| Western |
| CMH |
| John Glenn Columbus International Airport |
| C |
| Central |
| TUS |
| Tucson International Airport |
| C |
| Central |
DRAFT A-1
image1.png
File details come from the government source that posted it. Updated .