Draft DNTS Sect L6 - OCT Participation.pdf
PDF 348 KB Posted
- Attached to
- Draft Screening Information Request (SIR) Dedicated Network Telecommunications System (DNTS)
- Solicitation number
- Not on record
View the file
Other files
Show all 25
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Dedicated Network Telecommunications System (DNTS) DRAFT SIR # 693KA8-23-R-000xx
L6-1
SECTION L-6 - Operational Capability Test (OCT) Participation Form
1 Introduction In accordance with Dedicated Network Telecommunications System (DNTS) SIR Section L.5.1, and SIR Attachment M-1, Operational Capability Test (OCT) plan, Offerors are required to participate in a DNTS OCT at FAA’s William J. Hughes Technical Center (WJHTC) in Atlantic City, New Jersey and ship all required OCT equipment and materials to the WJHTC by the proposal due date listed in SIR Section L, Table L-1.
2 OCT Submission Compliance Review After proposals have been submitted, the Government will conduct a Compliance Review (SIR Section M.3.1) to verify Offeror submissions are complete and compliant with the instructions in Section L. As part of this review, the Government will verify that Offerors have submitted all OCT-required equipment and materials, and are fully committed to participate in the OCT as instructed in the DNTS OCT Plan (SIR Attachment M-1). If an Offeror’s submission is found to be incomplete or non-compliant, the Offeror will be precluded from participating in the OCT and deemed ineligible for award.
Offerors may select from two options for their OCT Compliance Review, namely:
A) Government OCT Compliance Review. Government in-person review of the Offeror’s OCT submission with an Offeror representative at the WJHTC within 15 business days after the proposal due date (the Government will assign the exact date and time), or
B) Offeror OCT Self-certification. Offeror certifies that all OCT submission requirements have been met. With this option, Offerors must wait until their OCT equipment submission is verified during the Offeror’s OCT Installation and Checkout (see OCT Plan, Section 5.4.1.2), which may be several months (up to one year) after the proposal due date.
The Government’s preference is that Offerors select Option A, so they are aware earlier-- within 15 business days of the proposal due date-- whether their OCT submission is compliant. However, selecting Option B will not count against the Offeror’s evaluation rating.
L6-2
NOTE: All Offerors must complete Parts 1 and 2 of L-6 Form, regardless of which type of OCT Compliance is selected.
Form L-6 Part 1 Election of Government OCT Compliance Review
Offeror Name Click or tap here to enter text.
The Offeror (you), in fulfilling the OCT requirements (check applicable block),
(A) ☐ accepts the Government’s offer to perform an in-person OCT Compliance Review during the proposal compliance review period, generally within 15 business days after the proposal due date.
By accepting this option, the Offeror understands and agrees to the following:
• The Government will notify the Offeror within 5 business days of its scheduled Compliance Review date and time. The Offeror’s OCT Compliance Review may begin as soon as 5 business days after the proposal due date.
• The Offeror must have at least one representative present at the scheduled date and time to unpack its OCT submission and to verify that the items delivered meet all OCT submission requirements. The representative must also repack the boxes at the end of the review. Due to the limited compliance review timeframe, Government vetting of International visitors to the WJHTC is not possible; therefore, the Offeror’s representative must be a U.S. Citizen.
• Offerors who did not meet the OCT submission requirements will be ineligible for award and must remove their equipment from the WJHTC within 5 business days after the CO has sent an official notification of non-compliance.
• In accordance with Section L.3.5, the Government will not pay or reimburse any costs incurred by the Offeror associated with the OCT.
(B) ☐ declines the Government’s offer to perform a Government OCT Compliance Review during the proposal compliance review period. By declining the OCT Compliance Review, the Offeror understands the following:
• Self-certification. The Offeror represents that it has submitted all required OCT equipment and materials as required in the DNTS OCT Plan by the proposal due date.
• The Offeror understands that its equipment must reside at the WJHTC until the Offeror’s OCT equipment submission is verified during the Offeror’s OCT Installation and Checkout (see OCT Plan, Section 5.4.1.2), which may be several months (up to one year) after the proposal due date.1
• Offerors who did not meet the OCT submission requirements will be ineligible for award and must remove their equipment from the WJHTC within 5 business days after the CO has sent an official notification of non-compliance.
• In accordance with Section L.3.5, the Government will not pay or reimburse any costs incurred by the Offeror associated with the OCT
1 The DNTS OCT Plan states that, “Removal of submitted equipment from the WJHTC is not permitted until all offerers have completed the OCT evaluation.” Therefore, for Offerors whose OCT submissions are found to be compliant during “Installation and Check-out”, the equipment must reside at the WJHTC past their OCT completion.
L6-3
Form L-6 Part 2 Description of Offeror’s OCT Submission Contents
Offerors must attach a list of all items included in their OCT submission to this J-6 form. Offerors may use the format shown below or a format of their own choosing, as long as all information required in the format below is included.
Offeror Name Click here to enter name. Total Number of Boxes Submitted Click here to enter number A. Item For equipment, enter the unit’s make and model number (spares should be listed separately). Offerors must include the demonstration scripts and training materials
B. Quantity Enter the total quantity submitted
C. OCT Requirement Met Enter a letter, a-I, in accordance with the list below. Enter “Other” if the item is not one of these requirements.
D. Comment Enter any comments that describe the item’s function for OCT or for items marked as “Other” in column C, why the unit is included
E. FAA
Verification/Comment For FAA use only
1.
2.
3.
4.
5.
6.
7. (add lines as needed and continue numbering)
OCT Requirement Met – In your response to column C, enter the corresponding letter for the OCT submission requirement (OCT Plan Section 5.4.1)
a. DNTS Platform Chassis: 8 units; supporting the interfaces specified in section 3.3 of the OCT plan. The 8 units represent the equipment delivered for use in both Offeror conducted demonstrations and FAA conducted tests and inspections
b. Single mode optic fiber patch cords, customized with a SC connector at one end for termination at the FAA patch panel. The other end of the fiber optic patch cord will contain a connector design to mate the vendor DNTS product
c. Ethernet cables for IEEE 802.3 10/100/1000BaseT interfaces
d. Equipment Configuration Cables (if required)
e. AC/DC power subsystems, power cords, etc., as required
f. DNTS wall mounting hardware set (for inspection)
g. Sufficient number of spares to sustain the Offeror’s DNTS during the OCT test period. The quantity of spares to be provided is at the Offeror’s discretion. However, additional spares will not be permitted after the OCT Equipment has been received at the WJHTC
h. Demonstration Test Scripts (four (4) copies)
i. Familiarization Training Material (six (6) copies)
| 1 Introduction |
| 2 OCT Submission Compliance Review |
File details come from the government source that posted it. Updated .