Dedicated Network Telecommunications System (DNTS) DRAFT SIR - 693KA8-23-R-xxxxx

J4-1

PART III – LIST OF DOCUMENTS, EXHIBITS AND OTHER ATTACHMENTS

ATTACHMENT J-4

In-Service Decision Process

In-Service Decision is the event at which the FAA decision authority determines whether DNTS is ready for operational use and if approved, will allow the Airport Cable Loop Program Office (ACLPO) to deploy the solution at FAA-supported airports.

The ACLPO must complete multiple In-Service Decision checklist tasks to verify operational readiness, many of which require Contractor technical expertise. Under the DNTS contract, the Contractor assists the FAA to demonstrate the technology works in accordance with the DNTS Product Description and to provide life cycle support artifacts and capabilities.

This attachment illustrates the process, activities, events, and milestones required by FAA In-Service

Decision authorities, which align to DNTS contract requirements. More information about FAA’s In-

Service Decision and Operationational Readiness requirements can be found in AMS Policy 2.6 at the https://fast.faa.gov/ website.

https://fast.faa.gov/

J4-2

Evaluate New or Updated Final

Breakdown Structure

Perform Factory Acceptance

Testing

Perform FCA FAA Order

1800.66 Approval

Approval

Yes Prepare or

Correct Data for Functional

Configuration Audit (FCA)

No

Conduct Independent FAA Testing -

WJHTC

Yes

Approval

No

Yes

Resolve Technical and Logistics Issue

No

B

A Contract Award

Conduct Post Contract Award, Training Guidance, and Provisioning

Guidance Conference

Prepare or Correct Data for

Physical Configuration Audit (PCA)

Perform Production Acceptance Testing FAA

Order 1800.66

Approval Yes

ApprovalYes

No

Perform PCA FAA Order

1800.66

Resolve Technical and Logistics Issue

LRU(s) Unchanged

No

Yes

No

Establish Product Baseline FAA Order 1800.66

Solution Validation and Product Baseline Establishment

J4-3

Develop or Update Safety Documentation

Develop or Update Security Documentation

ApprovalApproval No No

Yes Yes

Develop or Update Training

Develop or Update

Logistics Approval

Approval No

No

B Install Solution at Keysite

Perform Operational

Testing AMS Policy 2.5 and 2.6

Submit Test

NCP

Perform Field Familiarization

Yes

Yes

Resolving ISR Checklist

Items Approval

No Yes

Yes

Training Approval

No

No

Obtain ISD

Logistics Approval

In-Service Decision Activities

Declare Initial Operating Capability

(AMS 2.6)