DRAFT Attachment L-2 Past Performance Questionaire Form.pdf
PDF 180 KB Posted
- Solicitation number
- 692M15-24-R-00010-SIR-DRAFT
About this file
This document is a Draft Past Performance Evaluation Survey form for the Federal Aviation Administration's (FAA) Center Operations and Maintenance Services (COMS) procurement (Solicitation Number 692M15-24-R-00010). The form is designed to collect detailed performance feedback from references about potential contractors, with comprehensive evaluation categories including quality of service, timeliness of performance, cost control, program management, customer relationship, and overall customer satisfaction.
The survey provides specific instructions for both offerors and reference providers, requiring references to complete a detailed evaluation using a rating scale from Exceptional (E) to Unsatisfactory (U) across multiple performance dimensions. References must submit their completed survey via email to sarah.e.mccarty@faa.gov by a specified deadline, with the survey covering projects performed within the last five years. The form includes an exhibit detailing rating guidelines that provide precise definitions and notes for each performance rating, helping ensure objective and standardized performance assessments.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| DRAFT 692M15-24-R-00010.pdf | ||
| Draft SIR Questions form.docx | DOCX document | |
| DRAFT Attachment C-4 PM Procedure Steps.xlsx | XLSX spreadsheet | |
| DRAFT Attachment C-2 PWS Attachment II Sections 1-15.zip | ZIP file | |
| DRAFT Attachment C-3 Equipment List by PMs.zip | ZIP file | |
| DRAFT Attachment L-1 Corporate Experience Info Sheet.pdf | ||
| DRAFT Attachment C-1 PWS Attachment I Sections 1-7.zip | ZIP file | |
| DRAFT Attachment B-1 - B-3 COMS Pricing and Rates.xlsx | XLSX spreadsheet | |
| DRAFT Attachment B-8 - B-10 COMS FFP Price Model.xlsx | XLSX spreadsheet |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Center Operations and Maintenance Services
SIR 692M15-24-R-00010
ATTACHMENT L-2 PAST PERFORMANCE EVALUATION SURVEY
INSTRUCTIONS TO OFFERORS SENDING REFERENCE SURVEY FORMS:
Part I must be completed by the Offeror (the firm requesting the reference) prior to issuing the surveys. The Offeror must send the surveys for relevant projects with performance that was ongoing or completed within five (5) years of the SIR closing date. The Offeror must send the surveys to the individuals who will provide the reference. For Government contracts, send to the Contracting Officer (CO), Contracting Officer’s Representative (COR), or Project Manager. For state, municipal, and commercial references, send to personnel with duties similar to those for Government contracts. It is the responsibility of the Offeror to follow-up and encourage references to submit the survey. The completed survey must be submitted via e-mail directly from the person providing the reference, not from the Offeror as part of the Offeror’s proposal.
INSTRUCTIONS TO PERSON PROVIDING REFERENCE:
In order to assess potential vendors under the Federal Aviation Administration’s (FAA) Center Operations and Maintenance Services competition, the FAA Contracting Office is obtaining past performance information with respect to each Offeror. As a reference for work performed by the firm identified in Part I of this survey, your candid response will assist in the evaluation process. Please complete Part II of the survey as thoroughly as possible and submit to sarah.e.mccarty@faa.gov no later than X:00 PM Eastern Time on the due date of proposal submission. The subject line in the submission e-mail must clearly indicate: COMS Past Performance Evaluation Survey Submission for <Company Name> and the message must originate from the reference’s government (federal, state, municipal) or commercial e-mail system.
In addition to this survey, you may receive a follow-up phone call or e-mail to confirm or clarify information. This is a major FAA acquisition and your input into this evaluation is greatly appreciated. If you have questions regarding this survey or require assistance, please submit inquiries to: sarah.e.mccarty@faa.gov.
Sincerely, Sarah McCarty Contracting Officer Federal Aviation Administration mailto:sarah.e.mccarty@faa.gov mailto:sarah.e.mccarty@faa.gov
ATTACHMENT L-2 PAST PERFORMANCE EVALUATION SURVEY
PART I (TO BE COMPLETED BY OFFEROR REQUESTING THE REFERENCE)
A. OFFEROR INFORMATION
Offeror Name:
Offeror Address:
B. CONTRACT IDENTIFICATION
Project Title:
Contract Number:
Agency/Customer:
Agency/Customer POC Name:
Agency/Customer POC Email:
Contract/Order/Subcontract/Other:
PART II (TO BE COMPLETED BY RESPONDENT)
Please answer each of the following questions with a rating that is based on objective measurable performance indicators to the maximum extent possible. Provide commentary to support all Outstanding and Unsatisfactory ratings on the last page.
Assign each area a rating of Outstanding (O), Good (G), Satisfactory (S), and Unsatisfactory (U). Use the attached Rating Guidelines which is provided as Exhibit 1 as guidance in making these evaluations. Enter the appropriate rating for each Category number.
A. IDENTIFICATION OF RESPONDENT
Name:
Title:
Phone:
Address:
Email:
O
FF
ER
O
R C
O M
P
LE
TE
B. EVALUATION
QUALITY OF SERVICE:
# Category Rating
E VG S M U N/A
1 Compliance with contract requirements
2 Accuracy of reports
Level of knowledge, experience, and training of personnel
Capability of personnel to perform required services
Effectiveness of personnel in performing required services
6 Overall quality of service
TIMELINESS OF PERFORMANCE:
# Category Rating
E VG S M U N/A
1 Reliability
2 Responsive to technical direction
Meets contract delivery schedules and/or task deadlines
COST CONTROL:
Rating
E VG S M U N/A
1 Current, accurate and complete billings
2 Relationship of negotiated costs to actuals
3 Cost effectiveness
PROGRAM MANAGEMENT:
Rating
E VG S M U N/A
1 Adequate and complete management plan
Specific management team dedicated to this project
Indications that the provided team had experience in subcontractor management and surveillance
Rating
E VG S M U N/A
Process, or metrics, for the evaluation of their own overall management performance
CUSTOMER RELATIONSHIP:
Rating
E VG S M U N/A
1 Effective management, including subcontracts
2 Reasonable/cooperative behavior
3 Responsive to contract requirements
4 Notification of problems
5 Flexibility
6 Proactive vs. reactive
OVERALL CUSTOMER SATISFACTION:
Response
Yes No
The contractor is committed to customer satisfaction:
a. Contractor Management Personnel
b. Contractor Onsite Facility Personnel
ADDITIONAL COMMENTS, including support for all Outstanding and Unsatisfactory ratings:
Exhibit 1: Rating Guidelines Use the following definitions in your assessment of contractor performance.
RATING DEFINITION NOTE
Exceptional (E) Performance meets contractual requirements and exceeds many to the Government’s benefit. The contractual performance of the element or sub-element being assessed was accomplished with few minor problems for which corrective actions taken by the contractor was highly effective.
To justify an Exceptional rating, there must have been multiple significant events that were of benefit to the Government. A singular benefit, however, could be of such magnitude that it alone constitutes an Exceptional rating.
Also, there must have been NO significant weaknesses identified.
Very Good (VG) Performance meets contractual requirements and exceeds some to the Government’s benefit. The contractual performance of the element or sub-element being assessed was accomplished with some minor problems for which corrective actions taken by the contractor was effective.
To justify a Very Good rating, there must have been a significant event that was a benefit to the Government. There must have been no significant weaknesses identified.
Satisfactory (S) Performance meets contractual requirements. The contractual performance of the element or sub-element contains some minor problems for which corrective actions taken by the contractor appear or were satisfactory.
To justify a Satisfactory rating, there must have been only minor problems, or major problems the contractor recovered from without impact to the contract. There must have been NO significant weaknesses identified. Contractors will not be assessed a rating lower than Satisfactory solely for not performing beyond the requirements of the contract.
Marginal (M) Performance does not meet some contractual requirements. The contractual performance of the element or sub-element being assessed reflects a serious problem for which the contractor has not yet identified corrective actions. The contractor’s proposed actions appear only marginally effective or were not fully implemented.
To justify Marginal performance, there must have been a significant event in each category that the contractor had trouble overcoming that impacted the Government. A
Unsatisfactory (U)
Performance does not meet one or more contractual requirements and recovery is not likely in a timely manner. The contractual performance of the element or sub-element contains a serious
To justify an Unsatisfactory rating, there must have been multiple significant events in each category that the contractor had trouble overcoming that impacted the Government. A singular problem, problem(s) for which the contractor’s corrective actions appear or were ineffective.
however, could be of such serious magnitude that it alone constitutes an unsatisfactory rating.
File details come from the government source that posted it. Updated .