The file's text, extracted by GovTribe without its formatting.
Cover Page
| Program Name: Global Unified Airbase Readiness and Defense (GUARD) | LEGEND: | Input Fields |
| Solicitation #: FA2381-26-R-B012 | | |
| Offeror Name: | | |
| Offeror CAGE Code: | | |
| Cumulative Score - Phase I | Maximum Points | Points Earned |
| Element 1 | 378 | |
| Element 2 | 500 | |
| Element 3 | 120 | |
| Element 4 | 235 | |
| Element 5 | 378 | |
| Element 6 | 40 | |
| Acronyms Used: | | |
| AAA | Authentication, Authorization, and Accounting | |
| ACL | Access Control List | |
| ACS | Access Control System | |
| ATO | Authorization to Operate | |
| CNSA 2.0 | Commercial National Security Algorithm Suite 2.0 | |
| CS-ACS | Cisco Secure Access Control System | |
| DISA | Defense Information Systems Agency | |
| EAP-TLS | Extensible Authentication Protocol–Transport Layer Security | |
| ESS | Electronic Security System | |
| EXEC | Executive mode / EXEC session — Cisco terminology for a command-line session | |
| FIPS | Federal Information Processing Standards | |
| FVRF-Lite | Virtual Routing and Forwarding Lite | |
| iACL | Infrastructure Access Control List | |
| IDS | Intrusion Detection System | |
| IEEE 802.1X | Institute of Electrical and Electronics Engineers 802.1X, Port-Based Network Access Control | |
| ISE | Cisco Identity Services Engine | |
| MAB | MAC Authentication Bypass | |
| MAC | Media Access Control | |
| MACsec | Media Access Control Security | |
| MPLS | Multiprotocol Label Switching | |
| PIM-SM | Protocol Independent Multicast–Sparse Mode | |
| PIM-SSM/SSM | Protocol Independent Multicast–Source-Specific Multicast / Source-Specific Multicast | |
| PPS | Ports, Protocols, and Services | |
| PQC | Post-Quantum Cryptography | |
| RADIUS | Remote Authentication Dial-In User Service | |
| RMF | Risk Management Framework | |
| SBOM | Software Bill of Materials | |
| SRG | Security Requirements Guide | |
| STIG | Security Technical Implementation Guide | |
| TACACS+ | Terminal Access Controller Access-Control System | |
| TLS 1.3 | Transport Layer Security, version 1.3 | |
| VPN | Virtual Private Network | |
Element 1
| ELEMENT 1 | The Offeror performed on a DoW contract requiring successful approval of a New System Authorization to Operate (ATO) OR successful validation of security requirements against an existing ATO security baseline within the last five years. | Max Points: | 378 |
| Note: | The offeror shall submit a single reference for each Activity Number (reference input fields below). Each example may be from the same or different contracts. No additional points shall be considered for multiple examples of the same activity. | Points Earned: | |
| LEGEND: | Input Fields |
| The Contractor performed the following activities in the specified capacity (select at least one): | | |
See Section L-6.1 - Phase I: Relevant Experience and Artifacts for Performed As definition Activity Number Description Location in Requirements Document Work Completed Supporting New ATO Approval (20 pts) Work Completed Supporting Existing ATO Validation (16 pts) Performed As (The Offeror, Attributable Partner(s), or Attributable Subcontractor(s)
| 1 | Delivery of a comprehensive DISA Security Technical Implementation Guide (STIG)/ Security Requirements Guide (SRG) evaluation for all system components within the scope of work. | | | | |
| 2 | Delivery of vulnerability assessments for all system components within the scope of work utilizing automated tools such as Tenable Nessus | | | | |
| 3 | Delivery of complete Ports, Protocols, and Services (PPS) report documenting full communication and dataflow between all system components within the scope of work as well as external systems. | | | | |
| Activity | Location in Requirements Document | Work Completed Supporting New ATO Approval (15 pts) | Work Completed Supporting Existing ATO Validation (11 pts) | Performed As |
(The Offeror, Attributable Partner(s), or Attributable Subcontractor(s)
| 4 | Delivery of Topology Diagram depicting the system authorization boundary and all system components within it. | | | | |
| Activity | Location in Requirements Document | Work Completed Supporting New ATO Approval (10 pts) | Work Completed Supporting Existing ATO Validation (6 pts) | Performed As |
(The Offeror, Attributable Partner(s), or Attributable Subcontractor(s)
| 5 | Delivery of complete Hardware Lists for all system components within the scope of work. |
| 6 | Delivery of complete Software Lists for all system components within the scope of work. |
| 7 | Delivery of complete Software Bill of Materials (SBOM) with vulnerability reports for all system components within the scope of work. |
| Activity Number: 1 | |
| References | Contract, Order, or Project Title | |
| | Contract, Order, or Project Number |
| | Issuing Activity |
| The total duration of this reference (including all modifications and future options) is: |
| Performance Start Date |
| Performance End Date |
| This reference can be validated by the Offeror's customer via the following information: | |
| Name: | |
| Title: | Customer: |
| Phone: | Email: |
| Name: | |
| Title: | Customer: |
| Phone: | Email: |
| Activity Number: 2 | |
| References | Contract, Order, or Project Title | |
| | Contract, Order, or Project Number |
| | Issuing Activity |
| The total duration of this reference (including all modifications and future options) is: |
| Performance Start Date |
| Performance End Date |
| This reference can be validated by the Offeror's customer via the following information: | |
| Name: | |
| Title: | Customer: |
| Phone: | Email: |
| Name: | |
| Title: | Customer: |
| Phone: | Email: |
| Activity Number: 3 | |
| References | Contract, Order, or Project Title | |
| | Contract, Order, or Project Number |
| | Issuing Activity |
| The total duration of this reference (including all modifications and future options) is: |
| Performance Start Date |
| Performance End Date |
| This reference can be validated by the Offeror's customer via the following information: | |
| Name: | |
| Title: | Customer: |
| Phone: | Email: |
| Name: | |
| Title: | Customer: |
| Phone: | Email: |
| Activity Number: 4 | |
| References | Contract, Order, or Project Title | |
| | Contract, Order, or Project Number |
| | Issuing Activity |
| The total duration of this reference (including all modifications and future options) is: |
| Performance Start Date |
| Performance End Date |
| This reference can be validated by the Offeror's customer via the following information: | |
| Name: | |
| Title: | Customer: |
| Phone: | Email: |
| Name: | |
| Title: | Customer: |
| Phone: | Email: |
| Activity Number: 5 | |
| References | Contract, Order, or Project Title | |
| | Contract, Order, or Project Number |
| | Issuing Activity |
| The total duration of this reference (including all modifications and future options) is: |
| Performance Start Date |
| Performance End Date |
| This reference can be validated by the Offeror's customer via the following information: | |
| Name: | |
| Title: | Customer: |
| Phone: | Email: |
| Name: | |
| Title: | Customer: |
| Phone: | Email: |
| Activity Number: 6 | |
| References | Contract, Order, or Project Title | |
| | Contract, Order, or Project Number |
| | Issuing Activity |
| The total duration of this reference (including all modifications and future options) is: |
| Performance Start Date |
| Performance End Date |
| This reference can be validated by the Offeror's customer via the following information: | |
| Name: | |
| Title: | Customer: |
| Phone: | Email: |
| Name: | |
| Title: | Customer: |
| Phone: | Email: |
| Activity Number: 7 | |
| References | Contract, Order, or Project Title | |
| | Contract, Order, or Project Number |
| | Issuing Activity |
| The total duration of this reference (including all modifications and future options) is: |
| Performance Start Date |
| Performance End Date |
| This reference can be validated by the Offeror's customer via the following information: | |
| Name: | |
| Title: | Customer: |
| Phone: | Email: |
| Name: | |
| Title: | Customer: |
| Phone: | Email: |
Element 2
| ELEMENT 2 | The Offeror performed on a DoW, or equivalent Federal, contract requiring sustainment of defense security systems within the last five years. | Max Points: | 500 | LEGEND: | Input Fields |
| Note: | The Offeror may submit additional examples of a contract(s) in which sustainment activities were performed at separate USG sites, with a maximum of 500 points. | Points Earned: | | | |
REFERENCE ONE REFERENCE TWO
| A. | Contract, Order, or Project Title | A. | Contract, Order, or Project Title |
| Contract, Order, or Project Number | | Contract, Order, or Project Number |
| Issuing Activity | | Issuing Activity |
| B. | The total duration of this reference (including all modifications and future options) is: | B. | The total duration of this reference (including all modifications and future options) is: |
| Performance Start Date | | Performance Start Date |
| Performance End Date | | Performance End Date |
| C. | The Offeror presents this Reference as performance of (mark at least one): | | |
| See Section L-6.1 - Phase I: Relevant Experience and Artifacts | | | C. | The Offeror presents this Reference as performance of (mark at least one): |
See Section L-6.1 - Phase I: Relevant Experience and Artifacts
| The Offeror | The Offeror |
| Attributable Partner(s) | Attributable Partner(s) |
| Attributable Subcontractor(s) | Attributable Subcontractor(s) |
| D. | This reference can be validated by the Offeror's customer via the following information: | | D. | This reference can be validated by the Offeror's customer via the following information: | |
| Name: | | | Name: | |
| Title: | Customer: | | Title: | Customer: |
| Phone: | Email: | | Phone: | Email: |
| Name: | | | Name: | |
| Title: | Customer: | | Title: | Customer: |
| Phone: | Email: | | Phone: | Email: |
| F. | The size of the site(s) sustained were as follows (select at least one): | | | F. | The size of the site(s) sustained were as follows (select at least one): | | |
| Site Size (number of Alarm Points): | Number of Sites | Site Name(s) | | Site Size (number of Alarm Points): | Number of Sites | Site Name(s) |
| Small: < 1,500 Alarm Points | | | | | | |
(10 pts) tc={2DACBF23-77AD-49CA-A5CD-25FFCE19E877}: [Threaded comment]
Your version of Excel allows you to read this threaded comment; however, any edits to it will get removed if the file is opened in a newer version of Excel. Learn more: https://go.microsoft.com/fwlink/?linkid=870924
Comment:
No idea if this is an accurate measure of base size. Do we want to use alarm points vs panels? If alarm points, are these ranges accurate? If panels, same q Small: < 1,500 Alarm Points (10 pts) tc={DB8B94A1-A562-4226-A8AD-BC2A919F4429}: [Threaded comment]
Your version of Excel allows you to read this threaded comment; however, any edits to it will get removed if the file is opened in a newer version of Excel. Learn more: https://go.microsoft.com/fwlink/?linkid=870924
Comment:
No idea if this is an accurate measure of base size. Do we want to use alarm points vs panels? If alarm points, are these ranges accurate? If panels, same q
| Medium: 1,500-2,999 Alarm Points | |
| (25 points) | | Medium: 1,500-2,999 Alarm Points |
(25 points)
| Large: > 3,000 Alarm Points | |
| (50 pts) | | Large: > 3,000 Alarm Points |
(50 pts)
| G. | At any of the above installations, did the Offeror perform sustainment activities for Sensitive Compartmented Information Facilities (SCIFs) or Special Access Program Facilities (SAPFs)? | G. | At any of the above installations, did the Offeror perform sustainment activities for Sensitive Compartmented Information Facilities (SCIFs) or Special Access Program Facilities (SAPFs)? |
| Yes (20 pts): | | Yes (20 pts): |
| No (0 pts): | | No (0 pts): |
REFERENCE THREE REFERENCE FOUR
| A. | Contract, Order, or Project Title | A. | Contract, Order, or Project Title |
| Contract, Order, or Project Number | | Contract, Order, or Project Number |
| Issuing Activity | | Issuing Activity |
| B. | The total duration of this reference (including all modifications and future options) is: | B. | The total duration of this reference (including all modifications and future options) is: |
| Performance Start Date | | Performance Start Date |
| Performance End Date | | Performance End Date |
| C. | The Offeror presents this Reference as performance of (mark at least one): | | |
| See Section L-6.1 - Phase I: Relevant Experience and Artifacts | | | C. | The Offeror presents this Reference as performance of (mark at least one): |
See Section L-6.1 - Phase I: Relevant Experience and Artifacts
| The Offeror | The Offeror |
| Attributable Partner(s) | Attributable Partner(s) |
| Attributable Subcontractor(s) | Attributable Subcontractor(s) |
| D. | This reference can be validated by the Offeror's customer via the following information: | | D. | This reference can be validated by the Offeror's customer via the following information: | |
| Name: | | | Name: | |
| Title: | Customer: | | Title: | Customer: |
| Phone: | Email: | | Phone: | Email: |
| Name: | | | Name: | |
| Title: | Customer: | | Title: | Customer: |
| Phone: | Email: | | Phone: | Email: |
| F. | The size of the site(s) sustained were as follows (select at least one): | | | F. | The size of the site(s) sustained were as follows (select at least one): | | |
| Site Size (number of Alarm Points): | Number of Sites | Site Name(s) | | Site Size (number of Alarm Points): | Number of Sites | Site Name(s) |
| Small: < 1,500 Alarm Points | | | | | | |
(10 pts) tc={0C7E371D-BC56-4640-A7C9-B79A6C400FFB}: [Threaded comment]
Your version of Excel allows you to read this threaded comment; however, any edits to it will get removed if the file is opened in a newer version of Excel. Learn more: https://go.microsoft.com/fwlink/?linkid=870924
Comment:
No idea if this is an accurate measure of base size. Do we want to use alarm points vs panels? If alarm points, are these ranges accurate? If panels, same q Small: < 1,500 Alarm Points (10 pts) tc={7FD5C258-1A03-4BF3-85D8-FBA731E5CDC3}: [Threaded comment]
Your version of Excel allows you to read this threaded comment; however, any edits to it will get removed if the file is opened in a newer version of Excel. Learn more: https://go.microsoft.com/fwlink/?linkid=870924
Comment:
No idea if this is an accurate measure of base size. Do we want to use alarm points vs panels? If alarm points, are these ranges accurate? If panels, same q
| Medium: 1,500-2,999 Alarm Points | |
| (25 points) | | Medium: 1,500-2,999 Alarm Points |
(25 points)
| Large: > 3,000 Alarm Points | |
| (50 pts) | | Large: > 3,000 Alarm Points |
(50 pts)
| G. | At any of the above installations, did the Offeror perform sustainment activities for Sensitive Compartmented Information Facilities (SCIFs) or Special Access Program Facilities (SAPFs)? | G. | At any of the above installations, did the Offeror perform sustainment activities for Sensitive Compartmented Information Facilities (SCIFs) or Special Access Program Facilities (SAPFs)? |
| Yes (20 pts): | | Yes (20 pts): |
| No (0 pts): | | No (0 pts): |
REFERENCE FIVE REFERENCE SIX
| A. | Contract, Order, or Project Title | A. | Contract, Order, or Project Title |
| Contract, Order, or Project Number | | Contract, Order, or Project Number |
| Issuing Activity | | Issuing Activity |
| B. | The total duration of this reference (including all modifications and future options) is: | B. | The total duration of this reference (including all modifications and future options) is: |
| Performance Start Date | | Performance Start Date |
| Performance End Date | | Performance End Date |
| C. | The Offeror presents this Reference as performance of (mark at least one): | | |
| See Section L-6.1 - Phase I: Relevant Experience and Artifacts | | | C. | The Offeror presents this Reference as performance of (mark at least one): |
See Section L-6.1 - Phase I: Relevant Experience and Artifacts
| The Offeror | The Offeror |
| Attributable Partner(s) | Attributable Partner(s) |
| Attributable Subcontractor(s) | Attributable Subcontractor(s) |
| D. | This reference can be validated by the Offeror's customer via the following information: | | D. | This reference can be validated by the Offeror's customer via the following information: | |
| Name: | | | Name: | |
| Title: | Customer: | | Title: | Customer: |
| Phone: | Email: | | Phone: | Email: |
| Name: | | | Name: | |
| Title: | Customer: | | Title: | Customer: |
| Phone: | Email: | | Phone: | Email: |
| F. | The size of the site(s) sustained were as follows (select at least one): | | | F. | The size of the site(s) sustained were as follows (select at least one): | | |
| Site Size (number of Alarm Points): | Number of Sites | Site Name(s) | | Site Size (number of Alarm Points): | Number of Sites | Site Name(s) |
| Small: < 1,500 Alarm Points | | | | | | |
(10 pts) tc={B504266C-9E42-4CB0-A809-D346E8795554}: [Threaded comment]
Your version of Excel allows you to read this threaded comment; however, any edits to it will get removed if the file is opened in a newer version of Excel. Learn more: https://go.microsoft.com/fwlink/?linkid=870924
Comment:
No idea if this is an accurate measure of base size. Do we want to use alarm points vs panels? If alarm points, are these ranges accurate? If panels, same q tc={DB8B94A1-A562-4226-A8AD-BC2A919F4429}: [Threaded comment]
Your version of Excel allows you to read this threaded comment; however, any edits to it will get removed if the file is opened in a newer version of Excel. Learn more: https://go.microsoft.com/fwlink/?linkid=870924
Comment:
No idea if this is an accurate measure of base size. Do we want to use alarm points vs panels? If alarm points, are these ranges accurate? If panels, same q Small: < 1,500 Alarm Points (10 pts) tc={17683A69-16B6-4AC0-B44A-525CA017CE6B}: [Threaded comment]
Your version of Excel allows you to read this threaded comment; however, any edits to it will get removed if the file is opened in a newer version of Excel. Learn more: https://go.microsoft.com/fwlink/?linkid=870924
Comment:
No idea if this is an accurate measure of base size. Do we want to use alarm points vs panels? If alarm points, are these ranges accurate? If panels, same q
| Medium: 1,500-2,999 Alarm Points | |
| (25 points) | | Medium: 1,500-2,999 Alarm Points |
(25 points)
| Large: > 3,000 Alarm Points | |
| (50 pts) | | Large: > 3,000 Alarm Points |
(50 pts)
| G. | At any of the above installations, did the Offeror perform sustainment activities for Sensitive Compartmented Information Facilities (SCIFs) or Special Access Program Facilities (SAPFs)? | G. | At any of the above installations, did the Offeror perform sustainment activities for Sensitive Compartmented Information Facilities (SCIFs) or Special Access Program Facilities (SAPFs)? |
| Yes (20 pts): | | Yes (20 pts): |
| No (0 pts): | | No (0 pts): |
REFERENCE SEVEN REFERENCE EIGHT
| A. | Contract, Order, or Project Title | A. | Contract, Order, or Project Title |
| Contract, Order, or Project Number | | Contract, Order, or Project Number |
| Issuing Activity | | Issuing Activity |
| B. | The total duration of this reference (including all modifications and future options) is: | B. | The total duration of this reference (including all modifications and future options) is: |
| Performance Start Date | | Performance Start Date |
| Performance End Date | | Performance End Date |
| C. | The Offeror presents this Reference as performance of (mark at least one): | | |
| See Section L-6.1 - Phase I: Relevant Experience and Artifacts | | | C. | The Offeror presents this Reference as performance of (mark at least one): |
See Section L-6.1 - Phase I: Relevant Experience and Artifacts
| The Offeror | The Offeror |
| Attributable Partner(s) | Attributable Partner(s) |
| Attributable Subcontractor(s) | Attributable Subcontractor(s) |
| D. | This reference can be validated by the Offeror's customer via the following information: | | D. | This reference can be validated by the Offeror's customer via the following information: | |
| Name: | | | Name: | |
| Title: | Customer: | | Title: | Customer: |
| Phone: | Email: | | Phone: | Email: |
| Name: | | | Name: | |
| Title: | Customer: | | Title: | Customer: |
| Phone: | Email: | | Phone: | Email: |
| F. | The size of the site(s) sustained were as follows (select at least one): | | | F. | The size of the site(s) sustained were as follows (select at least one): | | |
| Site Size (number of Alarm Points): | Number of Sites | Site Name(s) | | Site Size (number of Alarm Points): | Number of Sites | Site Name(s) |
| Small: < 1,500 Alarm Points | | | | | | |
(10 pts) tc={3FFB711A-5DA7-4006-99AB-6FB0ED31FC24}: [Threaded comment]
Your version of Excel allows you to read this threaded comment; however, any edits to it will get removed if the file is opened in a newer version of Excel. Learn more: https://go.microsoft.com/fwlink/?linkid=870924
Comment:
No idea if this is an accurate measure of base size. Do we want to use alarm points vs panels? If alarm points, are these ranges accurate? If panels, same q tc={7FD5C258-1A03-4BF3-85D8-FBA731E5CDC3}: [Threaded comment]
Your version of Excel allows you to read this threaded comment; however, any edits to it will get removed if the file is opened in a newer version of Excel. Learn more: https://go.microsoft.com/fwlink/?linkid=870924
Comment:
No idea if this is an accurate measure of base size. Do we want to use alarm points vs panels? If alarm points, are these ranges accurate? If panels, same q tc={17683A69-16B6-4AC0-B44A-525CA017CE6B}: [Threaded comment]
Your version of Excel allows you to read this threaded comment; however, any edits to it will get removed if the file is opened in a newer version of Excel. Learn more: https://go.microsoft.com/fwlink/?linkid=870924
Comment:
No idea if this is an accurate measure of base size. Do we want to use alarm points vs panels? If alarm points, are these ranges accurate? If panels, same q Small: < 1,500 Alarm Points (10 pts) tc={34A68777-C613-4DE6-8D02-A58141405468}: [Threaded comment]
Your version of Excel allows you to read this threaded comment; however, any edits to it will get removed if the file is opened in a newer version of Excel. Learn more: https://go.microsoft.com/fwlink/?linkid=870924
Comment:
No idea if this is an accurate measure of base size. Do we want to use alarm points vs panels? If alarm points, are these ranges accurate? If panels, same q tc={2DACBF23-77AD-49CA-A5CD-25FFCE19E877}: [Threaded comment]
Your version of Excel allows you to read this threaded comment; however, any edits to it will get removed if the file is opened in a newer version of Excel. Learn more: https://go.microsoft.com/fwlink/?linkid=870924
Comment:
| No idea if this is an accurate measure of base size. Do we want to use alarm points vs panels? If alarm points, are these ranges accurate? If panels, same q | Medium: 1,500-2,999 Alarm Points | |
| (25 points) | | Medium: 1,500-2,999 Alarm Points |
(25 points)
| Large: > 3,000 Alarm Points | |
| (50 pts) | | Large: > 3,000 Alarm Points |
(50 pts)
| G. | At any of the above installations, did the Offeror perform sustainment activities for Sensitive Compartmented Information Facilities (SCIFs) or Special Access Program Facilities (SAPFs)? | G. | At any of the above installations, did the Offeror perform sustainment activities for Sensitive Compartmented Information Facilities (SCIFs) or Special Access Program Facilities (SAPFs)? |
| Yes (20 pts): | | Yes (20 pts): |
| No (0 pts): | | No (0 pts): |
No idea if this is an accurate measure of base size. Do we want to use alarm points vs panels? If alarm points, are these ranges accurate? If panels, same q
No idea if this is an accurate measure of base size. Do we want to use alarm points vs panels? If alarm points, are these ranges accurate? If panels, same q
No idea if this is an accurate measure of base size. Do we want to use alarm points vs panels? If alarm points, are these ranges accurate? If panels, same q
No idea if this is an accurate measure of base size. Do we want to use alarm points vs panels? If alarm points, are these ranges accurate? If panels, same q
No idea if this is an accurate measure of base size. Do we want to use alarm points vs panels? If alarm points, are these ranges accurate? If panels, same q
No idea if this is an accurate measure of base size. Do we want to use alarm points vs panels? If alarm points, are these ranges accurate? If panels, same q
No idea if this is an accurate measure of base size. Do we want to use alarm points vs panels? If alarm points, are these ranges accurate? If panels, same q
No idea if this is an accurate measure of base size. Do we want to use alarm points vs panels? If alarm points, are these ranges accurate? If panels, same q
Element 3
| ELEMENT 3 | The Offeror performed on a contract requiring the contractor to acquire, hold, and maintain applicable host nation business license(s) and Visas within the last five years. | Max Points: | 120 | LEGEND: | Input Fields |
| Note: | The Offeror may submit up to five additional examples of a contract requiring acquisition and maintenance of host nation license(s) and Visas in the specified time frame, with a maximum of one hundred twenty (120) points. | Points Earned: | | | |
REFERENCE ONE REFERENCE TWO
| A. | Contract, Order, or Project Title | A. | Contract, Order, or Project Title |
| Contract, Order, or Project Number | | Contract, Order, or Project Number |
| Issuing Activity | | Issuing Activity |
| B. | The total duration of this reference (including all modifications and future options) is: | B. | The total duration of this reference (including all modifications and future options) is: |
| Performance Start Date | | Performance Start Date |
| Performance End Date | | Performance End Date |
| C. | The Offeror presents this Reference as performance of (mark at least one): | | |
| See Section L-6.1 - Phase I: Relevant Experience and Artifacts for Performed As definition | | | C. | The Offeror presents this Reference as performance of (mark at least one): |
See Section L-6.1 - Phase I: Relevant Experience and Artifacts
| The Offeror | The Offeror |
| Attributable Partner(s) | Attributable Partner(s) |
| Attributable Subcontractor(s) | Attributable Subcontractor(s) |
| D. | This reference can be validated by the Offeror's customer via the following information: | | D. | This reference can be validated by the Offeror's customer via the following information: | |
| Name: | | | Name: | |
| Title: | Customer: | | Title: | Customer: |
| Phone: | Email: | | Phone: | Email: |
| Name: | | | Name: | |
| Title: | Customer: | | Title: | Customer: |
| Phone: | Email: | | Phone: | Email: |
| E. | The referenced work sample was performed in the following location: | E. | The referenced work sample was performed in the following location: |
| Country in which work was performed: | | Country in which work was performed: |
| Country's Region (select one): | | |
tc={4251FB34-CD18-42C0-A511-5C91E3203DC7}: [Threaded comment]
Your version of Excel allows you to read this threaded comment; however, any edits to it will get removed if the file is opened in a newer version of Excel. Learn more: https://go.microsoft.com/fwlink/?linkid=870924
Comment:
| Initially had AOR (CENTCOM, PACOM, etc) but removed to be accommodating to non-AF work - ability to obtain the licenses should translate across departments/etc. Lmk if wrong | | Country's Region (select one): | |
| Europe (20 pts) | | Europe (20 pts) |
| Indo-Pacific (15 pts) | | Indo-Pacific (15 pts) |
| Africa (5 pts) | | Africa (5 pts) |
| Central Asia (5 pts) | | Central Asia (5 pts) |
REFERENCE THREE REFERENCE FOUR
| A. | Contract, Order, or Project Title | A. | Contract, Order, or Project Title |
| Contract, Order, or Project Number | | Contract, Order, or Project Number |
| Issuing Activity | | Issuing Activity |
| B. | The total duration of this reference (including all modifications and future options) is: | B. | The total duration of this reference (including all modifications and future options) is: |
| Performance Start Date | | Performance Start Date |
| Performance End Date | | Performance End Date |
| C. | The Offeror presents this Reference as performance of (mark at least one): | | |
| See Section L-6.1 - Phase I: Relevant Experience and Artifacts for Performed As definition | | | C. | The Offeror presents this Reference as performance of (mark at least one): |
See Section L-6.1 - Phase I: Relevant Experience and Artifacts for Performed As definition
| The Offeror | The Offeror |
| Attributable Partner(s) | Attributable Partner(s) |
| Attributable Subcontractor(s) | Attributable Subcontractor(s) |
| D. | This reference can be validated by the Offeror's customer via the following information: | | D. | This reference can be validated by the Offeror's customer via the following information: | |
| Name: | | | Name: | |
| Title: | Customer: | | Title: | Customer: |
| Phone: | Email: | | Phone: | Email: |
| Name: | | | Name: | |
| Title: | Customer: | | Title: | Customer: |
| Phone: | Email: | | Phone: | Email: |
| E. | The referenced work sample was performed in the following location: | E. | The referenced work sample was performed in the following location: |
| Country in which work was performed: | | Country in which work was performed: |
| Country's Region (select one): | | Country's Region (select one): |
| Europe (20 pts) | | Europe (20 pts) |
| Indo-Pacific (15 pts) | | Indo-Pacific (15 pts) |
| Africa (5 pts) | | Africa (5 pts) |
| Central Asia (5 pts) | | Central Asia (5 pts) |
REFERENCE FIVE REFERENCE SIX
| A. | Contract, Order, or Project Title | A. | Contract, Order, or Project Title |
| Contract, Order, or Project Number | | Contract, Order, or Project Number |
| Issuing Activity | | Issuing Activity |
| B. | The total duration of this reference (including all modifications and future options) is: | B. | The total duration of this reference (including all modifications and future options) is: |
| Performance Start Date | | Performance Start Date |
| Performance End Date | | Performance End Date |
| C. | The Offeror presents this Reference as performance of (mark at least one): | | |
| See Section L-6.1 - Phase I: Relevant Experience and Artifacts for Performed As definition | | | C. | The Offeror presents this Reference as performance of (mark at least one): |
See Section L-6.1 - Phase I: Relevant Experience and Artifacts for Performed As definition
| The Offeror | The Offeror |
| Attributable Partner(s) | Attributable Partner(s) |
| Attributable Subcontractor(s) | Attributable Subcontractor(s) |
| D. | This reference can be validated by the Offeror's customer via the following information: | | D. | This reference can be validated by the Offeror's customer via the following information: | |
| Name: | | | Name: | |
| Title: | Customer: | | Title: | Customer: |
| Phone: | Email: | | Phone: | Email: |
| Name: | | | Name: | |
| Title: | Customer: | | Title: | Customer: |
| Phone: | Email: | | Phone: | Email: |
| E. | The referenced work sample was performed in the following location: | E. | The referenced work sample was performed in the following location: |
| Country in which work was performed: | | Country in which work was performed: |
| Country's Region (select one): | | Country's Region (select one): |
| Europe (20 pts) | | Europe (20 pts) |
| Indo-Pacific (15 pts) | | Indo-Pacific (15 pts) |
| Africa (5 pts) | | Africa (5 pts) |
| Central Asia (5 pts) | | Central Asia (5 pts) |
Initially had AOR (CENTCOM, PACOM, etc) but removed to be accommodating to non-AF work - ability to obtain the licenses should translate across departments/etc. Lmk if wrong
Element 4
| ELEMENT 4 | The Offeror performed on a contract requiring one or more the following Network Engineering activities below within the last five years. | Max Points: | 235 | LEGEND: | Input Fields |
| Note: | The offeror shall submit a single reference for each Activity Number (reference input fields below). Where DoW is not specified, equivalent Federal or Commercial experience shall be acceptable. Each example may be from the same or different contracts. No additional points shall be considered for multiple examples of the same activity. | Points Earned: | | | |
The Contractor performed the following activities in the specified capacity (select at least one):
See Section L-6.1 - Phase I: Relevant Experience and Artifacts for Performed As definition Activity Number Description Points Location in Requirements Document Performed As (The Offeror, Attributable Partner(s), or Attributable Subcontractor(s)
| 1 | Installation and configuration of wireless secure networks. | 50 |
| 2 | Design, implementation, or maintainance of a secure Layer 3 network utilizing VRF-Lite or MPLS VPNs, hardened ACLs, and multicast (PIM-SM/SSM) in a DoW environment. | 48 |
| 3 | Performance of Post-Quantum Cryptography (PQC) planning, crypto-inventory efforts, or TLS 1.3 migration projects in support of CNSA 2.0. | 25 |
| 4 | Design and implementation of hardened ACLs using object-groups, time-based ACLs, and infrastructure ACLs (iACLs) on both distribution and border routers. | 22 |
| 5 | Implementation or maintenance of FIPS 140-2 OR 140-3 compliant configurations on network devices. | 20 |
| 6 | Implementation and management of AAA using TACACS+ and/or RADIUS, including command-set based Exec authorization, privilege levels, and integration with ISE or CS-ACS. | 19 |
| 7 | Implementation and maintenance of DISA STIGs for Core, Distribution, and Access layer switches and routers in a DoW environment. | 19 |
| 8 | Work to support the RMF process for network devices or infrastructure, including control implementation, assessment, and continuous monitoring. | 17 |
| 9 | Design and deployment of 802.1X (including MAB, EAP-TLS, and MACSec) for wired network access control in a production environment. | 15 |
| Activity Number: 1 | |
| References | Contract, Order, or Project Title | |
| | Contract, Order, or Project Number |
| | Issuing Activity |
| The total duration of this reference (including all modifications and future options) is: |
| Performance Start Date |
| Performance End Date |
| This reference can be validated by the Offeror's customer via the following information: | |
| Name: | |
| Title: | Customer: |
| Phone: | Email: |
| Name: | |
| Title: | Customer: |
| Phone: | Email: |
| Activity Number: 2 | |
| References | Contract, Order, or Project Title | |
| | Contract, Order, or Project Number |
| | Issuing Activity |
| The total duration of this reference (including all modifications and future options) is: |
| Performance Start Date |
| Performance End Date |
| This reference can be validated by the Offeror's customer via the following information: | |
| Name: | |
| Title: | Customer: |
| Phone: | Email: |
| Name: | |
| Title: | Customer: |
| Phone: | Email: |
| Activity Number: 3 | |
| References | Contract, Order, or Project Title | |
| | Contract, Order, or Project Number |
| | Issuing Activity |
| The total duration of this reference (including all modifications and future options) is: |
| Performance Start Date |
| Performance End Date |
| This reference can be validated by the Offeror's customer via the following information: | |
| Name: | |
| Title: | Customer: |
| Phone: | Email: |
| Name: | |
| Title: | Customer: |
| Phone: | Email: |
| Activity Number: 4 | |
| References | Contract, Order, or Project Title | |
| | Contract, Order, or Project Number |
| | Issuing Activity |
| The total duration of this reference (including all modifications and future options) is: |
| Performance Start Date |
| Performance End Date |
| This reference can be validated by the Offeror's customer via the following information: | |
| Name: | |
| Title: | Customer: |
| Phone: | Email: |
| Name: | |
| Title: | Customer: |
| Phone: | Email: |
| Activity Number: 5 | |
| References | Contract, Order, or Project Title | |
| | Contract, Order, or Project Number |
| | Issuing Activity |
| The total duration of this reference (including all modifications and future options) is: |
| Performance Start Date |
| Performance End Date |
| This reference can be validated by the Offeror's customer via the following information: | |
| Name: | |
| Title: | Customer: |
| Phone: | Email: |
| Name: | |
| Title: | Customer: |
| Phone: | Email: |
| Activity Number: 6 | |
| References | Contract, Order, or Project Title | |
| | Contract, Order, or Project Number |
| | Issuing Activity |
| The total duration of this reference (including all modifications and future options) is: |
| Performance Start Date |
| Performance End Date |
| This reference can be validated by the Offeror's customer via the following information: | |
| Name: | |
| Title: | Customer: |
| Phone: | Email: |
| Name: | |
| Title: | Customer: |
| Phone: | Email: |
| Activity Number: 7 | |
| References | Contract, Order, or Project Title | |
| | Contract, Order, or Project Number |
| | Issuing Activity |
| The total duration of this reference (including all modifications and future options) is: |
| Performance Start Date |
| Performance End Date |
| This reference can be validated by the Offeror's customer via the following information: | |
| Name: | |
| Title: | Customer: |
| Phone: | Email: |
| Name: | |
| Title: | Customer: |
| Phone: | Email: |
| Activity Number: 8 | |
| References | Contract, Order, or Project Title | |
| | Contract, Order, or Project Number |
| | Issuing Activity |
| The total duration of this reference (including all modifications and future options) is: |
| Performance Start Date |
| Performance End Date |
| This reference can be validated by the Offeror's customer via the following information: | |
| Name: | |
| Title: | Customer: |
| Phone: | Email: |
| Name: | |
| Title: | Customer: |
| Phone: | Email: |
| Activity Number: 9 | |
| References | Contract, Order, or Project Title | |
| | Contract, Order, or Project Number |
| | Issuing Activity |
| The total duration of this reference (including all modifications and future options) is: |
| Performance Start Date |
| Performance End Date |
| This reference can be validated by the Offeror's customer via the following information: | |
| Name: | |
| Title: | Customer: |
| Phone: | Email: |
| Name: | |
| Title: | Customer: |
| Phone: | Email: |
Element 5
| ELEMENT 5 | The Offeror performed on a contract requiring one or more the following Systems Engineering activities below within the last five years. | Max Points: | 378 |
| Note: | The offeror shall submit a single reference for each Activity Number (reference input fields below). Where DoW is not specified, equivalent Federal or Commercial experience shall be acceptable. Each example may be from the same or different contracts. No additional points shall be considered for multiple examples of the same activity. | Points Earned: | |
| | The Contractor performed the following activities in the specified capacity (select at least one): | | | | |
| See Section L-6.1 - Phase I: Relevant Experience and Artifacts for Performed As definition | | | | | LEGEND: | Input Fields |
| Activity Number | Description | Points | Location in Requirements Document | Performed As | |
(The Offeror, Attributable Partner(s), or Attributable Subcontractor(s)
| 1 | Annunciator Installation | 40 |
| 2 | Buried Line Sensor Installation | 36 |
| 3 | FIPS-201 Access Control System Installation | 34 |
| 4 | Installation and Configuration of overlapping fields of view at a Nuclear Security boundary/asset | 32 |
| 5 | Perimeter Fence Infrastructure Installation/Repair | 32 |
| 6 | ACS Installation | 30 |
| 7 | Access Control with Level 3 Biometrics | 28 |
| 8 | CCTV System Assessment - Thermal or Infrared Imaging | 24 |
| 9 | Perimeter Lighting Installation | 22 |
| 10 | Video Analytics Deployment Utilized in an Exterior Environment - Detection | 20 |
| 11 | Video Analytics Deployment Utilized in an Exterior Environment - Identification | 20 |
| 12 | Video Analytics Deployment Utilized in an Exterior Environment - Classification | 20 |
| 13 | Perimeter Detection Sensor Installation | 16 |
| 14 | Video Management System Installation | 14 |
| 15 | Perimeter Surveillance Cameras - Installation or Assessment | 6 |
| 16 | Explosion-Proof Sensor Installation | 4 |
| Activity Number: 1 | | | |
| References | Contract, Order, or Project Title | | Activity Number: 9 | |
| References | Contract, Order, or Project Title | | | |
| | Contract, Order, or Project Number | | Contract, Order, or Project Number |
| | Issuing Activity | | Issuing Activity |
| The total duration of this reference (including all modifications and future options) is: | The total duration of this reference (including all modifications and future options) is: |
| Performance Start Date | Performance Start Date |
| Performance End Date | Performance End Date |
| This reference can be validated by the Offeror's customer via the following information: | | This reference can be validated by the Offeror's customer via the following information: | |
| Name: | | Name: | |
| Title: | Customer: | Title: | Customer: |
| Phone: | Email: | Phone: | Email: |
| Name: | | Name: | |
| Title: | Customer: | Title: | Customer: |
| Phone: | Email: | Phone: | Email: |
| Activity Number: 2 | | | |
| References | Contract, Order, or Project Title | | Activity Number: 10 | |
| References | Contract, Order, or Project Title | | | |
| | Contract, Order, or Project Number | | Contract, Order, or Project Number |
| | Issuing Activity | | Issuing Activity |
| The total duration of this reference (including all modifications and future options) is: | The total duration of this reference (including all modifications and future options) is: |
| Performance Start Date | Performance Start Date |
| Performance End Date | Performance End Date |
| This reference can be validated by the Offeror's customer via the following information: | | This reference can be validated by the Offeror's customer via the following information: | |
| Name: | | Name: | |
| Title: | Customer: | Title: | Customer: |
| Phone: | Email: | Phone: | Email: |
| Name: | | Name: | |
| Title: | Customer: | Title: | Customer: |
| Phone: | Email: | Phone: | Email: |
| Activity Number: 3 | | | |
| References | Contract, Order, or Project Title | | Activity Number: 11 | |
| References | Contract, Order, or Project Title | | | |
| | Contract, Order, or Project Number | | Contract, Order, or Project Number |
| | Issuing Activity | | Issuing Activity |
| The total duration of this reference (including all modifications and future options) is: | The total duration of this reference (including all modifications and future options) is: |
| Performance Start Date | Performance Start Date |
| Performance End Date | Performance End Date |
| This reference can be validated by the Offeror's customer via the following information: | | This reference can be validated by the Offeror's customer via the following information: | |
| Name: | | Name: | |
| Title: | Customer: | Title: | Customer: |
| Phone: | Email: | Phone: | Email: |
| Name: | | Name: | |
| Title: | Customer: | Title: | Customer: |
| Phone: | Email: | Phone: | Email: |
| Activity Number: 4 | | | |
| References | Contract, Order, or Project Title | | Activity Number: 12 | |
| References | Contract, Order, or Project Title | | | |
| | Contract, Order, or Project Number | | Contract, Order, or Project Number |
| | Issuing Activity | | Issuing Activity |
| The total duration of this reference (including all modifications and future options) is: | The total duration of this reference (including all modifications and future options) is: |
| Performance Start Date | Performance Start Date |
| Performance End Date | Performance End Date |
| This reference can be validated by the Offeror's customer via the following information: | | This reference can be validated by the Offeror's customer via the following information: | |
| Name: | | Name: | |
| Title: | Customer: | Title: | Customer: |
| Phone: | Email: | Phone: | Email: |
| Name: | | Name: | |
| Title: | Customer: | Title: | Customer: |
| Phone: | Email: | Phone: | Email: |
| Activity Number: 5 | | | |
| References | Contract, Order, or Project Title | | Activity Number: 13 | |
| References | Contract, Order, or Project Title | | | |
| | Contract, Order, or Project Number | | Contract, Order, or Project Number |
| | Issuing Activity | | Issuing Activity |
| The total duration of this reference (including all modifications and future options) is: | The total duration of this reference (including all modifications and future options) is: |
| Performance Start Date | Performance Start Date |
| Performance End Date | Performance End Date |
| This reference can be validated by the Offeror's customer via the following information: | | This reference can be validated by the Offeror's customer via the following information: | |
| Name: | | Name: | |
| Title: | Customer: | Title: | Customer: |
| Phone: | Email: | Phone: | Email: |
| Name: | | Name: | |
| Title: | Customer: | Title: | Customer: |
| Phone: | Email: | Phone: | Email: |
| Activity Number: 6 | | | |
| References | Contract, Order, or Project Title | | Activity Number: 14 | |
| References | Contract, Order, or Project Title | | | |
| | Contract, Order, or Project Number | | Contract, Order, or Project Number |
| | Issuing Activity | | Issuing Activity |
| The total duration of this reference (including all modifications and future options) is: | The total duration of this reference (including all modifications and future options) is: |
| Performance Start Date | Performance Start Date |
| Performance End Date | Performance End Date |
| This reference can be validated by the Offeror's customer via the following information: | | This reference can be validated by the Offeror's customer via the following information: | |
| Name: | | Name: | |
| Title: | Customer: | Title: | Customer: |
| Phone: | Email: | Phone: | Email: |
| Name: | | Name: | |
| Title: | Customer: | Title: | Customer: |
| Phone: | Email: | Phone: | Email: |
| Activity Number: 7 | | | |
| References | Contract, Order, or Project Title | | Activity Number: 15 | |
| References | Contract, Order, or Project Title | | | |
| | Contract, Order, or Project Number | | Contract, Order, or Project Number |
| | Issuing Activity | | Issuing Activity |
| The total duration of this reference (including all modifications and future options) is: | The total duration of this reference (including all modifications and future options) is: |
| Performance Start Date | Performance Start Date |
| Performance End Date | Performance End Date |
| This reference can be validated by the Offeror's customer via the following information: | | This reference can be validated by the Offeror's customer via the following information: | |
| Name: | | Name: | |
| Title: | Customer: | Title: | Customer: |
| Phone: | Email: | Phone: | Email: |
| Name: | | Name: | |
| Title: | Customer: | Title: | Customer: |
| Phone: | Email: | Phone: | Email: |
| Activity Number: 8 | | | |
| References | Contract, Order, or Project Title | | Activity Number: 16 | |
| References | Contract, Order, or Project Title | | | |
| | Contract, Order, or Project Number | | Contract, Order, or Project Number |
| | Issuing Activity | | Issuing Activity |
| The total duration of this reference (including all modifications and future options) is: | The total duration of this reference (including all modifications and future options) is: |
| Performance Start Date | Performance Start Date |
| Performance End Date | Performance End Date |
| This reference can be validated by the Offeror's customer via the following information: | | This reference can be validated by the Offeror's customer via the following information: | |
| Name: | | Name: | |
| Title: | Customer: | Title: | Customer: |
| Phone: | Email: | Phone: | Email: |
| Name: | | Name: | |
| Title: | Customer: | Title: | Customer: |
| Phone: | Email: | Phone: | Email: |
Element 6
| ELEMENT 6 | The Offeror performed on a contract requiring an active UL2050 CRZH Company Certification. | Max Points: | 40 |
| Note: | The Offeror may submit up to three additional examples of a contract in which the certification was required, with each example totaling 10 points. | Points Earned: | |
| | LEGEND: | Input Fields |
| REFERENCE ONE | REFERENCE TWO | | |
| A. | Contract, Order, or Project Title | A. | Contract, Order, or Project Title |
| Contract, Order, or Project Number | | Contract, Order, or Project Number |
| Issuing Activity | | Issuing Activity |
| B. | The total duration of this reference (including all modifications and future options) is: | B. | The total duration of this reference (including all modifications and future options) is: |
| Performance Start Date | | Performance Start Date |
| Performance End Date | | Performance End Date |
| D. | This reference can be validated by the Offeror's customer via the following information: | | D. | This reference can be validated by the Offeror's customer via the following information: | |
| Name: | | | Name: | |
| Title: | Customer: | | Title: | Customer: |
| Phone: | Email: | | Phone: | Email: |
| Name: | | | Name: | |
| Title: | Customer: | | Title: | Customer: |
| Phone: | Email: | | Phone: | Email: |
REFERENCE THREE REFERENCE FOUR
| A. | Contract, Order, or Project Title | A. | Contract, Order, or Project Title |
| Contract, Order, or Project Number | | Contract, Order, or Project Number |
| Issuing Activity | | Issuing Activity |
| B. | The total duration of this reference (including all modifications and future options) is: | B. | The total duration of this reference (including all modifications and future options) is: |
| Performance Start Date | | Performance Start Date |
| Performance End Date | | Performance End Date |
| D. | This reference can be validated by the Offeror's customer via the following information: | | D. | This reference can be validated by the Offeror's customer via the following information: | |
| Name: | | | Name: | |
| Title: | Customer: | | Title: | Customer: |
| Phone: | Email: | | Phone: | Email: |
| Name: | | | Name: | |
| Title: | Customer: | | Title: | Customer: |
| Phone: | Email: | | Phone: | Email: |