Draft - AM 1423 Non-level 1 20260922.pdf

PDF 54 KB Posted

Attached to
Request for Information: Additive Manufacturing
Solicitation number
N0010427RZ058
Issued by

About this file

This document is a PDF viewer error message, not a federal contract opportunity file. The document contains only technical instructions for upgrading Adobe Reader software and does not include any solicitation details, requirements, timelines, pricing information, or contract-related content. No substantive information about federal contract opportunities is present in this file.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Please wait...

If this message is not eventually replaced by the proper contents of the document, your PDF viewer may not be able to display this type of document.

You can upgrade to the latest version of Adobe Reader for Windows®, Mac, or Linux® by visiting http://www.adobe.com/go/reader_download.

For more assistance with Adobe Reader visit http://www.adobe.com/go/acrreader.

Windows is either a registered trademark or a trademark of Microsoft Corporation in the United States and/or other countries. Mac is a trademark of Apple Inc., registered in the United States and other countries. Linux is the registered trademark of Linus Torvalds in the U.S. and other countries.

PREVIOUS EDITION MAY BE USED.

DD FORM 1423, FEB 2024

Page of (Updated 20260512) Instructions

INSTRUCTIONS FOR COMPLETING DD FORM 1423

(See DoDM 5010.12 for detailed instructions.)

DD FORM 1423, FEB 2024

Page of (Updated 20260512)

CONTRACT DATA REQUIREMENTS LIST

C. CATEGORY:

14. DISTRIBUTION

14. DISTRIBUTION

a. ADDRESSEE

b. COPIES Draft Final Reg Repro

16. REMARKS

14. DISTRIBUTION

15.TOTAL

Image of arrow pointing towards totals

FOR GOVERNMENT PERSONNEL

Item A. Self-explanatory.

Item B. Self-explanatory.

Item C. Mark (X) appropriate category: TDP - Technical Data Package; TM - Technical Manual; Other - other category of data, such as "Provisioning," "Configuration Management," etc.

Item D. Enter name of system/item being acquired that data will support (e.g., Mission Design Series (MDS) designator).

Item E. Self-explanatory (to be filled in after contract award).

Item F. Self-explanatory (to be filled in after contract award).

Item G. Name of preparer of CDRL.

Item H. Date CDRL was prepared and signature of preparer of CDRL.

Item I. Name of CDRL approval authority.

Item J. Date CDRL was approved and signature of CDRL approval authority.

Item 1. See DFARS Subpart 204.71 for proper numbering. To add or delete additional data items, point and click the plus or minus sign to the right of Block J.

Item 2. Enter title as it appears on data acquisition document cited in Item 4.

Item 3. Enter subtitle of data item for further definition of data item (optional entry).

Item 4. Identify only one Data Acquisition Document No. If a single work task generates more than one deliverable data product, prepare a separate data item for each deliverable data product.

Item 5. Enter reference to tasking in contract that generates requirement for the data item (e.g., Statement of Work/Performance Work Statement paragraph number).

Item 6. Enter technical office responsible for ensuring adequacy of the data item.

Item 7. Specify requirement for inspection/acceptance of the data item by the Government.

Item 8. Specify requirement for approval of a draft before preparation of the final data item.

Item 9. For technical data and computer software, specify the contractor's requirement to mark the appropriate distribution statement on the technical data or computer software (ref. DoDI 5230.24).

Item 10. Specify number of times data items are to be delivered.

Item 11. Specify as-of date of data item, when applicable.

Item 12. Specify when first submittal is required.

Item 13. Specify when subsequent submittals are required, when applicable.

Item 14. Enter addressees and number of draft/final copies to be delivered to each addressee. Explain reproducible copies in Item 16.

Item 15. Enter total number of draft/final copies to be delivered.

Item 16. Use for additional/clarifying information for Items 1 through 15. Examples are: Tailoring of documents cited in Item 4; Clarification of submittal dates in Items 12 and 13; Explanation of reproducible copies in Item 14; Desired medium for delivery of the data item.

Identify for which data item additional remarks are provided. When tailoring the Data Acquisition Document invoked in Item 4, identify which portions of that Document are being tailored.

Identify any referenced attachments to the form. Attachments can be added using the button at the bottom of page 1.

FOR THE CONTRACTOR

Item 17. Specify appropriate price group from one of the following groups of effort in developing estimated prices for each data item listed on the DD Form 1423.

a. Group I. Definition - Data which is not otherwise essential to the contractor's performance of the primary contracted effort (production, development, testing, and administration) but which is required by DD Form 1423.

Estimated Price - Costs to be included under Group I are those applicable to preparing and assembling the data item in conformance with Government requirements, and the administration and other expenses related to reproducing and delivering such data items to the Government.

b. Group II. Definition - Data which is essential to the performance of the primary contracted effort but the contractor is required to perform additional work to conform to Government requirements with regard to depth of content, format, frequency of submittal, preparation, control, or quality of the data item.

Estimated Price - Costs to be included under Group II are those incurred over and above the cost of the essential data item without conforming to Government requirements, and the administrative and other expenses related to reproducing and delivering such data item to the Government.

c. Group III. Definition - Data which the contractor must develop for his internal use in performance of the primary contracted effort and does not require any substantial change to conform to Government requirements with regard to depth of content, format, frequency of submittal, preparation, control, and quality of the data item.

Estimated Price - Costs to be included under Group III are the administrative and other expenses related to reproducing and delivering such data item to the Government.

d. Group IV. Definition - Data which is developed by the contractor as part of his normal operating procedures and his effort in supplying these data to the Government is minimal.

Estimated Price - Group IV items should normally be shown on the DD Form 1423 at no cost.

Item 18. For each data item, enter an amount equal to that portion of the total price which is estimated to be attributable to the production or development for the Government of that item of data.

These estimated data prices shall be developed only from those costs which will be incurred as a direct result of the requirement to supply the data, over and above those costs which would otherwise be incurred in performance of the contract if no data were required. The estimated data prices shall not include any amount for rights in data. The Government’s rights to use the data shall be governed by the pertinent provisions of the contract.

9.0.0.2.20120627.2.874785 DD Form 1423, "Contract Data Requirements List"

CurrentPage:
PageCount:
Select Classification from drop-down list.: 1
CUI Indicator Information:
Click on this button to attach a file(s).:
show:
hide:
A. CONTRACT LINE ITEM NUMBER:
exhibit:
C. CATEGORY: Select for "TDP.": 1
C. CATEGORY: Select for "TM.": 0
C. CATEGORY: Select for "OTHER.": 0
C. CATEGORY: Enter specification for "Other.":
System:
ContractNum:
Contractor:
1. DATA ITEM NUMBER: AXXX
titleDataItem: CERTIFICATION / DATA REPORTS
subtitle: Process and Material Traceability
4. AUTHORITY (Data Acquisition Document Number): DI-MISC-80678
contractRef:
reqOffice: NAVSUP-WSS
7. DD 250 REQUIREMENT: SS
8. APPROVAL CODE : A
9. DISTRIBUTION STATEMENT REQUIRED: B
freq: ONE/R
asOfDate: N/A
dateFirstSub: As Required
dateSubseqSub: As Required
16. REMARKS: Paragraphs 10.1, 10.2, 10.2.1, 10.2.2, 10.2.4 and 10.5 of DI-MISC-80678 apply.

0. APPLICABILITY TRIGGER: If Additive Manufacturing (AM) methods, processes, or components are invoked, utilized, or delivered in the execution of this contract, this CDRL (AXXX) is active, mandatory, and fully applies.

1. COMPONENT TRACEABILITY LEDGER MANDATE: The contractor shall compile and maintain a Master Component Traceability Ledger. For every shipped part, the ledger shall map the unique AM component to its complete manufacturing genealogy, including but not limited to:

a. Manufacturing Process Travelers: Documenting the specific build platform run number, machine identifier, parameter settings, and operator stamps.

b. Feedstock & Material Origin: Linking the physical part being utilized for AM to the specific raw material heat number, powder or alloy lot number, and blending/reuse records.

2. SUBMISSION OF MASTER TRACEABILITY LEDGER: The completed Master Traceability Ledger and all associated manufacturing/quality records shall be submitted electronically to the NAVSUP HQ AM mailbox and WAWF:

2.1 Electronic Submission via Email:

a. Target Address: NAVSUP HQ AM mailbox - NAVSUPHQAMTeam@us.navy.mil [or as designated by the Contracting Officer].

b. Naming Convention: The email subject line and compressed file name shall utilize the following standard format: "[Contract Number] - [National Stock Number] - [Part Number] Traceability Pkg (CDRL AXXX)"

c. Format & Security: All documents must be compiled into a single, secure, password-protected PDF or ZIP archive. Files exceeding 15MB shall be transmitted via DoD SAFE (Secure Access File Exchange) with notification sent to the NAVSUP HQ AM mailbox.

2.2 WAWF Receiving Report:

a. Attachment Requirement: The contractor shall upload the complete Master Traceability Ledger and associated records directly into the electronic WAWF utilizing the "Add Attachment" function.

Block 7: Source Inspection and Source Acceptance (SS) required. DCMA QAR shall verify that the complete Master Traceability Ledger is compiled, accurate, and electronically transmitted to the NAVSUPHQAM and WAWF prior to signing the DD 250 / WAWF receiving report.

Block 10: ONE/R (One time and subsequent revisions).

Block 12: First submission to the NAVSUP HQ AM mailbox, DCMA QAR, and PCO must occur within five (5) business days of DCMA QAR on-site validation and prior to physical packaging and shipping of the production lot.

Block 13: Subsequent submission required if any element of the traceability chain (process travelers, inspection metrology, or material feedstock pedigree) is revised, updated, or amended post-approval.

Click to add/remove continuation field for Remarks:
Click to delete CURRENT data items for 1 through 18, unless this is the only data item.:
Click to add a page of data items for 1 through 18 immediately following the current page.:
14. DISTRIBUTION - a. ADDRESSEE, new line: NAVSUP HQ AM
14. DISTRIBUTION - a. ADDRESSEE, new line: DCMA QAR
14. DISTRIBUTION - a. ADDRESSEE, new line: PCO
15.TOTAL - Total draft copies is automatically calculated.: 0
15.TOTAL - Total final regular copies is automatically calculated.: 1
15.TOTAL - Total final regular copies is automatically calculated.: 1
15.TOTAL - Total final regular copies is automatically calculated.: 1
15.TOTAL - Total final regular copies is automatically calculated.: 3
15.TOTAL - Total final reproducible copies is automatically calculated.: 0
priceGrp:
estTotalPrice:
remarks_cont:
preparedBy:
H. SIGNATURE: H. SIGNATURE
H. SIGNATURE:
approvedBy:
J. SIGNATURE: J. SIGNATURE
J. SIGNATURE:
Click to add additional data items 1 through 18 to the end of the form.:

File details come from the government source that posted it. Updated .