This is Addendum No. 1 to a Request for Proposal issued by the Florida Department of State for Landscape Management Services to DOS Historic Sites (Solicitation No. DOS-RFP-26/27-001). The addendum addresses vendor questions and provides clarifications regarding the scope of work across six historic sites: Governor Martin/Merritt Drive, Mission San Luis, The Grove/Burr, Brokaw-McDougall House, Knott House, and Velda Mound. The mandatory pre-bid site visit was held on April 9, 2026, and attendance is required for bid responsiveness. The proposed contract start date is July 1, 2026, with a base term of three years and three one-year renewal options. Respondents must submit proposals in physical form by the deadline specified in Section 5.2, and the Addendum Acknowledgement Form must be signed by an authorized representative and returned with the proposal.
The total estimated budget for all six properties shall not exceed $115,000 per fiscal year. Current contractors include All Pro Lawncare at four locations, Lawn Pros at Knott House, and DHR self-performing services at Velda Mound. The scope includes minor changes from the previous solicitation, with the addition of two new properties (Velda Mound and Knott House). Vendors must provide hourly rates for irrigation repairs, with monthly irrigation system inspections included in the base price at all sites except Velda Mound. The price proposal sheet requires vendors to submit costs for three years of landscape maintenance services, including any cost-of-living increases for each year after year one and any renewal years. The Department may award multiple contracts under this RFP, but only one contract will be awarded per historic site. A bond, W-9, and insurance certificate are required submissions.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Brokaw-McDougall House Sign-in Sheet.pdf | ||
| Velda Mound Sign-in Sheet.pdf | ||
| Site Visit Sign-In Sheets.pdf | ||
| Governor Martin House Sign-in Sheet.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
DOS-RFP-26/27-001 Addendum No. #1 Page 1 of 7
Request For Proposal Addendum Acknowledgement Form
Department of State
R.A. Gray Building
500 South Bronough Street, Room 428
Tallahassee, Florida 32399-2150
SOLICITATION TITLE: SOLICITATION NO:
Landscape Management Services to DOS Historic Sites DOS-RFP-26/27-001
Proposals DUE:
(Eastern StandardTime) and may not be withdrawn within: 180 Days after such date and time.
ADDENDUM NO.: # 1 DATE:
This Addendum Acknowledgement Form shall be signed an authorized company representative, dated and returned with the proposal.
This Addendum now becomes a part of the original RFP. RESPONDENT NAME:
RESPONDENT MAILING ADDRESS:
CITY – STATE – ZIP: *Authorized Representative’s Signature
PHONE NUMBER:
TOLL FREE
NUMBER:
*Name and Title of Authorized Representative
FAX NUMBER:
EMAIL ADDRESS: *This individual must have the authority to bind the
Respondent.
FEID NO.:
TYPE OF BUSINESS ENTITY (Corporation, LLC, partnership, etc.):
Date:
DOS-RFP-26/27-001 Addendum No. #1 Page 2 of 7
RON DESANTIS
Governor
CORD BYRD
Secretary of State
ADDENDUM NO. 1 TO THE FOLLOWING
REQUEST FOR PROPOSAL
LANDSCAPE MANAGEMENT SERVICES TO DOS HISTORIC SITES
SOLICITATION NO.: DOS-RFP-26/27-001
Date: April 23, 2026
To: Prospective Respondents to Solicitation No.: DOS-RFP-26/27-001
From: David Shufflebotham, Procurement Officer
Subject: Vendor Questions and Department Responses to Questions
FAILURE TO FILE A PROTEST WITHIN THE TIME PRESCRIBED IN SECTION 120.57(3),
FLORIDA STATUTES (F.S.) (AS ALTERED BY SUBBSECTION 110.123(3)(D)4, F.S.), OR
FAILURE TO POST THE BOND OR OTHER SECURITY REQUIRED BY LAW WITHIN THE
TIME ALLOWED FOR FILING A BOND SHALL CONSTITUTE A WAIVER OF PROCEEDINGS
UNDER CHAPTER 120, F.S.
This Addendum includes the following:
1. Written Responses to Written Questions
The questions are reproduced in the exact format in which they were submitted.
Answers to these questions will be posted as an Addendum on the Vendor Information Portal (VIP) in accordance with Section 2.3 Timeline of Events and Addendum to Solicitation.
DOS-RFP-26/27-001 Addendum No. #1 Page 3 of 7
Questions and Responses:
Question
RFP
Section
RFP Page
Vendor Question Department Response
2.3 Timeline of
Events and Addendum
Which sites does this solicitation include and how can we submit a price?
Please see page 7, Section 1.8 Pre-Bid Site Visit for the site locations. Please submit the price for services on page 57, Attachment C – Price Proposal
Sheet.
Attachment B Statement of
Work/Technical Specifications
30 to 56
Has there been any changes to the scope from the last?
Yes, there are overall minor changes in the scope for individual properties, plus the addition of two new properties (Velda Mound and Knott House). Please review the previously posted solicitation for this project and compare that listed scope for individual properties against the scope listed in this current solicitation.
3 N/A N/A
Did the previous incumbent complete the project term? Is this solicitation the same length of time?
The current term ends June 30, 2026.
No, the previous contract term was one (1) year with (three) (3) – one
(1) year options.
The new contract is a three-year term with three (3) – one (1) year option.
4 N/A N/A
If previous incumbents exist, when is the contract set to end?
The current contract ends June 30, 2026.
5 N/A N/A Is there a set budget for this solicitation?
The total budget for all properties is not expected to exceed $115,000.
Budget estimates for individual properties were not provided in this solicitation. Only a total estimated budget was provided for reference.
6 N/A N/A
Is there a projected award and start date?
The proposed contract start date is July 1, 2026.
7 N/A N/A
Was there a previous incumbent? If so, can you share their price proposal?
Please submit a public records request to
PublicRecords@dos.fl.gov with specific records you are seeking.
Please see answer to question 13, mailto:PublicRecords@dos.fl.gov
DOS-RFP-26/27-001 Addendum No. #1 Page 4 of 7 which may also provide the information you seek.
8 N/A N/A
Velda Mound - Who has the current contract and can we receive the previous bid tabulation with prices?
DHR has self-performed this work since ca. 2014. Information prior to that date is not available.
9 N/A N/A
Velda Mound - Is a bond, W-9 and /or insurance certificate required to be submitted with bid?
Yes.
Attachment B Statement of
Work/Technical Specifications
44 - 47
Mission San Luis - Tennessee St Maintenance in the contract? Beds and Turf
Beds and turf along Tennessee Street at Mission San Luis are included in this contract. The area extends from approximately the
Crape myrtles west of the entrance, to the entrance gate, and then east approximately 100’.
Attachment B Statement of
Work/Technical Specifications
44 - 47
Mission San Luis - How many total controllers for irrigation?
There are two controllers at Mission San Luis—one located at the Visitor
Center, one at the BAR Facility.
Attachment B Statement of
Work/Technical Specifications
30 - 56
I see that under Irrigation System, the scope of work includes: “Monthly Irrigation system inspections” at all sites except for Velda Mound. To clarify, you are requesting a price for (12) annual irrigation inspections, correct?
The solicitation requests the vendor’s price, per hour, for irrigation repair. At sites with irrigation systems, the vendor is required to inspect the system monthly as part of their base price.
The purpose of the monthly inspection is for the vendor to make any seasonal adjustments and determine if repairs are needed to maintain optimal operation. After inspection, any repairs recommended by the vendor will be quoted as time and material. The vendor’s hourly rate for recommended repairs will have already been agreed upon as part of their response to this solicitation— see price tabulation sheet.
DOS-RFP-26/27-001 Addendum No. #1 Page 5 of 7
13 N/A N/A
Please provide the current contract for each location.
Please see attached vendor agreement and purchase orders.
14 N/A N/A Who are the current contractors on this
RFP?
All Pro Lawncare currently provides services at Gov. Martin/Merritt Drive, Mission San Luis, The Grove/Burr, and the Brokaw- McDougall House. Lawn Pros provides services at Knott House.
DHR self-performs services at
Velda Mound.
15 N/A N/A What is the current contract value for this RFP?
The estimated total contract amount shall not exceed $115,000.00 per fiscal year. The estimated total contract amount is for all six (6) locations.
16 N/A N/A
Please provide the sign in sheets from the mandatory site visits.
Please see attached documents.
Attachment B
34, 38, 42, 46, 50
Please provide the irrigation zone count for each location.
Approximate zones at each site:
--Mission San Luis = system one has 18 zones (controller located at the Visitor Center); system two, associated with the BAR Facility, has been disturbed by active construction and must be assessed by the successful vendor when construction is complete --The Grove Museum = system one has 16 zones (controller located on west side of main house); system two has 4 zones (controller located on public restroom building)
--Knott House = one system with four zones
--Brokaw McDougall = one system, controller currently without power, but DHR believes there are 4-6 zones—successful vendor to verify
--Gov. Martin/Merritt Drive = unknown; vendor will verify based on per hour irrigation quote provided in response to this solicitation
--Velda Mound has no irrigation
DOS-RFP-26/27-001 Addendum No. #1 Page 6 of 7
18 N/A N/A
Are contractors allowed CPI increases each contract year for the initial contract term?
The contractor must include this information as part of their total price and show the price increase for each year after year one, plus any renewal years under this contract.
19 N/A N/A
Is the intent to award all locations to one contractor or to whoever is lowest bid at each location?
Please see page 5, Section 1.1 Purpose, “DOS may elect to award multiple contracts under this RFP, but only one contract will be awarded for each of the six (6) DOS
Historic Sites.”
Please see pages 25-28 for the Selection Methodology.
Attachment B
Considering the equipment restrictions for the cemetery located at The Grove, are contractors required to only push mow this area and not service areas that would be traditionally string trimmed such as against headstones and fence lines?
As stated in the scope of work, only certain manual equipment is allowed in the cemetery at The Grove. This includes push mowers but specifically excludes line trimmers for the exact reason that the line trimmers can cause damage to the soft stone markers if contacted by the lines. This prohibition on line trimmers extends to the fence line on the east side of the cemetery and everywhere inside the cemetery boundaries. The grassy area immediately west of the cemetery and the large magnolia and live oak is considered outside the boundaries of the cemetery.
21 Attachment C 57
The price proposal sheet list price per month, per for 12 months and Total price for property.
Should the total price for property reflect the 3 year base contract pricing?
Yes, the total price should include cost of landscape maintenance services for three (3) years.
Attachment F
Page 93 states that we can submit bids electronically, but on My FL Market Place it does not have a place to submit. Please
Please page 12, 3.1 General Instructions, Section 3 and 5 of PUR 1001 are inapplicable and are replaced as follows:
DOS-RFP-26/27-001 Addendum No. #1 Page 7 of 7 confirm if these bids can be submitted electronically or if they need to be submitted in person, Section 3. Electronic Submission of Response
Responses shall be submitted in accordance with Section 5.2, How to Submit a Proposal, of this solicitation.
*Bids must be submitted in accordance with Section 5.2 which does not allow for electronic submission. Bids must be received in physical form – not electronically.
File details come from the government source that posted it. Updated .