Phoenix
Job Corps Center Phoenix, AZ
Facility Planning Report Volume II
Supporting Data
Preliminary May 2011
Department of Labor/ Office of Job Corps
22Phoenix Job Corps Center
Phoenix
Job Corps Center Phoenix, AZ
Facility Planning Report Volume II
Supporting Data
Preliminary May 2011
Main Building 1 Gymnasium
33 Phoenix Job Corps Center
CONTENTS
PHOENIX JOB CORPS CENTER
FACILITY PLANNING REPORT
VOLUME I - Planning Strategy
• Existing Site Plan
• Center Statistics
INTRODUCTION
• Purpose
• Report Contents
EXECUTIVE SUMMARY
A. EXISTING CONDITIONS
• Background
• General Site Conditions
• General Building Conditions
• Ownership
• Facility Assessment by Function
• Energy
• Environmental Issues
• Sustainability
• Accessibility Standards
• Current and Completed Projects Since the Last Survey
• Health and Life Safety Issues
• Summary of Defi ciencies
B. RECOMMENDATIONS
• Status of the Previous (PY07) Plan
• Signifi cant Issues
• PY 10 Plan Overview
• Regional Projects
• Proposed Site Plan
C. PLANNING ANALYSIS
• Purpose
• Planning Objectives and Assumptions
• Space Utilization Analysis
• Federal Real Property Asset Management
• Mission Dependency Site Plan
• Defi ciency Analysis
• Facility Condition Summary Report
• Building Condition by Function
• Building Condition Site Plan
VOLUME II - Supporting Data
• Vicinity Map
• Location Map
• Existing Site Plan
D. DESCRIPTIONS
• Program Descriptions
— Square Footage Details GSF by Building Space Utilization Comparison NSF by Building
— Energy Management
— Environmental Management
Environmental Management Report Asbestos Report Radon Report
• Site Descriptions
• Building Descriptions
E. DEFICIENCIES
F. CORRESPONDENCE AND REPORTS
• Survey Brief
• RA and Student Facility Feedback Questionnaire
• Life Safety Defi ciencies Transmittal and List
• O & M Defi ciency List
• Active Warranty Report
• FRPC Performance Measures Matrix
44Phoenix Job Corps Center
55 Phoenix Job Corps Center
Phoenix Job C orps C enter
77 Phoenix Job Corps Center
D Descriptions
BUILDINGS AND STRUCTURES
00904 PHOENIX 09-MAY-11
1Page:
0001 - MAIN BUILDING
0002 - VOCATIONAL BUILDING
0007 - ANNEX II - MULTIPURPOSE/HR
0008 - RECREATION
HALL/ADMINISTRATION
0010 - DORMITORY
0015 -EDUCATIONAL BUILDING
0016 - VOCATIONAL COMPLEX
BUILDING 1
0017 - VOCATIONAL COMPLEX
BUILDING 2
0018 - VOCATIONAL COMPLEX
BUILDING 3
0010A - LUGGAGE STORAGE 1
0010B - LUGGAGE STORAGE 2
0010C - TRELLIS 1
0010D - TRELLIS 2
0017A - FACILITIES STORAGE
Name GSF
62,460 11,080 4,800
10,050
34,690 1,583
12,551
3,759
3,647
Active Active Active Active
Active Active Active
Active
Active
Active Active Active Active Active
StatusType
Building Building Building Building
Building Building Building
Building
Building
Structure Structure Structure Structure Structure
Use Group Built Flrs Const
Business/Ass Business Business/Ass Assembly
Residential Business Business
Business
Business
Storage Storage Assembly Assembly
Good Good Good Good
Good Good Good
Good
Good
Good Good Good Good Good
ConditionAsset Number
0090400002 0090400003 0090400017 0090400018
0090400019 0090400023 0090408043
0090408044
0090408045
0090408039 0090408040 0090408041 0090408042 0090408046
9 144,620
5 1,310
14 145,930
Buildings
Structures
Total
GSF
GSF
GSF
Summary
May 09, 2011 Space Utilization By Function 00904 Phoenix
HOUSING
EDUCATION
FOOD SERVICE
SUGGESTED
NSF/
ENROLLEE
SUGGESTED
TOTAL
NSF
ACTUAL
TOTAL
NSF
TYPE OF SPACE
SUB TOTAL
SUB TOTAL
SUB TOTAL
Resident Men Resident Women Total Residents
Residents 239 Non Residents 211
450Total Students
(239)
(450)
(450)
DIFFERENCE
23,900
26,840
11,700
24,819
38,102
5,305
Lounge Other Shower/Toilet Sleeping Storage
Academic (450) Non-Academic
60 -- Business Office Technologies 20 -- Carpentry + 20 -- Cement Masonry + 30 -- Cert. Nursing Asst.
30 -- Computer Service Tech.
20 -- Facilities Maint. and Const. + 30 -- Medical Assistant 24 -- Painting + 20 -- Plastering + 30 -- Retail Sales + 60 -- Security Services
Vocational Theory (134)
Dining (1 Serving) Food Preparation Food Storage
4,146 2,977 2,494
14,853
8,319 7,165
2,143 3,132 2,974 1,168
2,537 1,740 2,810 3,047
1,507
2,993
1,794
2,390
2,868 17,208
1,434
4,500 4,500
2,400 1,500 1,500 1,200
1,500
1,800 1,500 1,200 2,100
1,340
7,200 2,700 1,800
1,756
-374 -2,355 -1,085
3,819 2,665
-257 1,632 1,474
-32 -302
1,037
1,010 1,547
-538 -593
-1,040
-4,207 -2,182
-6
Vocations
11,262
-6,395
May 09, 2011 Space Utilization By Function 00904 Phoenix
RECREATION
MEDICAL/DENTAL
ADMINISTRATION
STORAGE/SUPPORT
VACANT
SUGGESTED
NSF/
ENROLLEE
SUGGESTED
TOTAL
NSF
ACTUAL
TOTAL
NSF
TYPE OF SPACE
SUB TOTAL
SUB TOTAL
SUB TOTAL
SUB TOTAL
SUB TOTAL
TOTAL 222.83 100,275 102,486
(450)
(450)
(450)
(450)
(0)
DIFFERENCE
144,620
0.71
TOTAL GSF
NET TO GROSS RATIO
15,115
4,720
9,000
9,000
16,772
3,435
7,800
5,590
Arts & Crafts Canteen Gymnasium Men's Exercise Room Miscellaneous Recreation Multipurpose Room Recreation Office Recreation Storage Women's Exercise Room
Medical Only Medical/Dental
Administration
Operations & Maintenance Warehouse
Vacant
4.53 5.96
1,092
4,793
4,217 2,963
1,790
1,033 2,402
7,800
3,532 2,058
2,040 2,680
9,000
3,600 5,400
-1,007 -278
-1,200
-68 -3,342
RESIDENT
NON-RESIDENT
(239)
(211) 15
50 11,950 3,165
1,657
-1,285
-1,200
-3,410
2,211
Net Square Footage By Building Date: 05/09/2011 Page: 1Center: PHOENIX (00904)
HOUSING
Sleeping
Lounge
Storage
Shower/Toilet
Other
Function Suggested NSF
12,562 2,291
3,482
2,154
2,977
0010 - DORMITORY
0001 - MAIN BUILDING
0001 - MAIN BUILDING
0010 - DORMITORY
0010 - DORMITORY
0001 - MAIN BUILDING
0010 - DORMITORY
0001 - MAIN BUILDING
0010 - DORMITORY
Bldg Name Actual NSF Difference
14,853
4,146
2,494
2,977
Sub Total: 24,819
17,208
2,390
1,434
2,868
23,900
-2,355
1,756
-1,085
-374
2,977
( 239
Page: 2Center: PHOENIX (00904)
EDUCATION
Academic
Vocational Theory (134)
Carpentry
Cement Masonry
Painting
Plastering
Retail Sales
Computer Service Tech.
Facilities Maint. and Const.
Medical Assistant
Security Services
Non-Academic
Business Office Technologies
Cert. Nursing Asst.
Function Suggested NSF
1,040
4,448 1,213
3,132
2,974
2,810
3,047
2,537
1,740
1,507
1,263 2,440
1,134
2,143
1,168
0002 - VOCATIONAL BUILDING
0008 - RECREATION HALL/ADMINISTRATION
0001 - MAIN BUILDING
0001 - MAIN BUILDING
0001 - MAIN BUILDING
0018 - VOCATIONAL COMPLEX BUILDING 3
0017 - VOCATIONAL COMPLEX BUILDING 2
0017 - VOCATIONAL COMPLEX BUILDING 2
0016 - VOCATIONAL COMPLEX BUILDING 1
0016 - VOCATIONAL COMPLEX BUILDING 1
0016 - VOCATIONAL COMPLEX BUILDING 1
0002 - VOCATIONAL BUILDING
0018 - VOCATIONAL COMPLEX BUILDING 3
0016 - VOCATIONAL COMPLEX BUILDING 1
0001 - MAIN BUILDING
0002 - VOCATIONAL BUILDING
0001 - MAIN BUILDING
0010 - DORMITORY
0018 - VOCATIONAL COMPLEX BUILDING 3
0015 -EDUCATIONAL BUILDING
0002 - VOCATIONAL BUILDING
0001 - MAIN BUILDING
0010 - DORMITORY
0007 - ANNEX II - MULTIPURPOSE/HR
0008 - RECREATION HALL/ADMINISTRATION
0001 - MAIN BUILDING
0001 - MAIN BUILDING
Bldg Name Actual NSF Difference
8,319
3,132
2,974
2,810
3,047
2,537
1,740
1,507
7,165
2,143
1,168
Sub Total: 38,102
4,500
1,340
1,500
1,500
1,800
1,500
1,200
1,500
2,100
4,500
2,400
1,200
26,840
3,819
-1,040
1,632
1,474
1,010
1,547
-538
-302
1,037
-593
2,665
-257
-32
( 450
11,262
Page: 3Center: PHOENIX (00904)
FOOD SERVICE
RECREATION
MEDICAL/DENTAL
Food Preparation
Food Storage
Dining (1 Serving)
Multipurpose Room
Arts & Crafts
Gymnasium
Miscellaneous Recreation
Canteen
Men's Exercise Room
Women's Exercise Room
Recreation Storage
Recreation Office
Medical/Dental
Medical Only
Function Suggested NSF
1,794
2,993
2,963
1,092
4,793
3,504
1,579
2,402
1,033
0001 - MAIN BUILDING
0001 - MAIN BUILDING
0001 - MAIN BUILDING
0007 - ANNEX II - MULTIPURPOSE/HR
0001 - MAIN BUILDING
0001 - MAIN BUILDING
0008 - RECREATION HALL/ADMINISTRATION
0001 - MAIN BUILDING
0008 - RECREATION HALL/ADMINISTRATION
0001 - MAIN BUILDING
0001 - MAIN BUILDING
0008 - RECREATION HALL/ADMINISTRATION
0001 - MAIN BUILDING
0008 - RECREATION HALL/ADMINISTRATION
0001 - MAIN BUILDING
0001 - MAIN BUILDING
0001 - MAIN BUILDING
Bldg Name Actual NSF Difference
1,794
2,993
2,963
1,092
4,793
4,217
1,790
2,402
1,033
Sub Total:
Sub Total:
Sub Total:
5,305
16,772
3,435
2,700
1,800
7,200
2,680
2,040
11,700
15,115
4,720
-2,182
-6
-4,207
-278
-1,007
-6,395
1,657
-1,285
Page: 4Center: PHOENIX (00904)
ADMINISTRATION
STORAGE/SUPPORT
VACANT
Administration
Warehouse
Operations & Maintenance
Vacant
Function Suggested NSF
5,133
1,477 1,111
1,454
3,532
0001 - MAIN BUILDING
0010 - DORMITORY
0008 - RECREATION HALL/ADMINISTRATION
0002 - VOCATIONAL BUILDING
0002 - VOCATIONAL BUILDING
0008 - RECREATION HALL/ADMINISTRATION
0001 - MAIN BUILDING
0016 - VOCATIONAL COMPLEX BUILDING 1
0002 - VOCATIONAL BUILDING
Bldg Name Actual NSF Difference
7,800
2,058
3,532
Sub Total:
Sub Total:
Sub Total:
7,800
5,590
9,000
5,400
3,600
9,000
9,000
-1,200
-3,342
-68
-1,200
-3,410
Energy Management Report Center: PHOENIX (00904)
Page: 1 Date: 05/09/2011
CENTER ENERGY DATA
Yes
ENERGY CONSUMPTION ASSESSMENT
1% 72,856 62,689 73,752
ENERGY USE BY FUEL TYPE
Energy Audit :
Date of Audit :
Status of Energy Conservation Measure Recommendations :
Electric Company :
FY 2003 Energy Baseline :
Percent Reduction since Baseline Year :
Natural Gas Company :
Property Status :
4/25/06 Implemented Arizona Public Service Co.
Southwest Gas
Federally Owned (DOL)
2,518,766 8,594=
Total 10,536
MBtu
MBtu
Total $312,738 MBtu/ $29.683
BTU/GSF
BTU/GSF
BTU/GSF
Electricity
Natural Gas kWh
1,884 MCF = 1,942 MBtu
$287,768 $0.114= kWhElectricity
Natural Gas $24,970 = $13.254 MCF
ENERGY COST BY FUEL TYPE
WATER CONSUMPTION ASSESSMENT
FY 2007 Baseline:
Percent Reduction Since Baseline Year:
1,000 Gallons
1,000 Gallons
FY 2010 Energy Goal:
Further Reduction in Energy Usage is needed to meet Energy Reduction Goals.
FY 2010 Energy Consumption:
Note: The Federal Government has set a goal of 3% Energy Consumption Reduction per year in EO 13423.
8,591 8,076 6,070
29%
Water Goals are being met. Keep reducing Water Consumption.
Note: The Federal Government has set a goal of 2% Water Consumption Reduction per year in EO 13423.
FY 2010 Goal:
FY 2010 Water Consumption:
1,000 Gallons
Page: 2 Date: 05/09/2011
Implementing some of the below recommendations can save you 10% to 25% off your annual energy bill without negatively impacting comfort or productivity.
1. Your staff and students are the key to savings. Educate the students and staff on the why of energy saving - costs and environmental impacts. Encouraging them to actively participate in energy reduction is also important. Post reminders at exit doors and bulletin boards about energy conservation. Simple tips include:
a. Turn it down (lights, heating & cooling),
b. Turn it off (lights, computers, other equipment),
c. Keep it tight (close doors and windows, use window blinds)
2. Operations and Maintenance: Educate the O&M staff on the why of energy saving -costs and environmental impacts. Simple tips include:
a. Make sure that the Operations and Maintenance staff is properly trained for the equipment they operate.
b. Tune and clean HVAC: Perform seasonal cleanups on air conditioners, boilers and furnaces, and regularly clean cooling coils and drain pans. Get rooftop or outdoor condenser coils cleaned and maintain an appropriate filter changing schedule.
c. Check (or ask your HVAC contractor to check) your outside air dampers or economizers to verify proper ventilation. Make sure economizer controls function properly. Make sure automatic dampers close during unoccupied periods.
d. Restore automatic control: When troubleshooting a system, take time to figure out and repair the automatic controls. Today's quick fix is tomorrow's bad idea.
e. Reasonable set points: Try 68°F in the heating season and 78°F in the cooling season.
f. Schedule HVAC equipment and lighting: (weekdays, weekends, holidays, off-season). Make sure equipment runs only when it is needed and the buildings are occupied. When buildings are vacant (i.e. dormitories during the day with students in class), make sure all the lights in the building are off.
g. Seasonal (resets, schedules, and shutoffs): As the seasons change, adjust set points and schedules to match the system's response to the weather.
h. Lighting: Invest in an inexpensive light level meter to measure the foot-candles in spaces to determine whether or not they are over lit and lamps can be safely removed. Where four-lamp fixtures are in use, two lamps can usually be removed from every fixture or every other fixture. After lamps are removed, disconnect ballasts. Contact the Energy team at PBDewberry for suggested light levels for individual space types. Cleaning fixtures regularly increases light levels.
i. Utilize power management features for all computers and monitors to shut them off when idle for more than 15 minutes.
Page: 3 Date: 05/09/2011
j. Have your vending machine suppliers turn off or remove light tubes from the advertising lighting in the machine. This will save about $50 per year per vending machine.
k. Save water with low flow sink aerators (0.5gpm) and low flow shower heads (1.5gpm - 2.0gpm). This will also reduce water heating energy consumption.
l. Set your water heater to 120°F. Verify by measuring at the tap. Never go below 115°F.
m. For water heaters installed in unconditioned spaces, add insulation blankets making sure that access covers, electric connection areas, and pressure relief valves are left uncovered.
n. Caulk and fill cracks around doors and windows to reduce costly air leaks.
o. When replacing broken glass, use high transmittance, low heat gain windows.
p. Make sure automatic door closers are functioning properly to avoid drafts.
3. Buy energy efficient, buy EnergyStar (www.energystar.gov).
a. Buy EnergyStar appliances and equipment.
b. Replace burned out lightbulbs with EnergyStar labeled compact fluorescent lightbulbs (CFLs).
c. Replace broken thermostats with EnergyStar labeled programmable products.
d. Replace broken exit signs with EnergyStar LED exit signs.
Environmental Management Report
Page: 1 Date: 05/09/2011
SOLID & HAZARDOUS WASTE MANAGEMENT (RCRA)
Commercial Waste Service
HAZARDOUS MATERIALS STORAGE (EPCRA)
No Pre-apprenticeship Vocational Building
Oil-based paints/stains, organic solvent, paint thinner, wax stripper Yes
PETROLEUM UNDERGROUND STORAGE TANKS (RCRA)
N/A0
PETROLEUM ABOVEGROUND STORAGE TANKS (CWA)
ASBESTOS AND PCB MANAGEMENT (TSCA)
AIR POLLUTION CONTROL (CAA)
N/A None
Non-Attainment
Solid Waste Disposal :
Hazardous Waste Generator :
Hazardous Waste ID :
Generator Classification :
Hazadous Materials Storage :
Hazardous Materials ID :
HazMat Storage Area :
HazMat Spill Response Plan :
Number of Regulated USTs :
Number of Un-regulated USTs :
Local Hazardous Use Permit :
LEPC Notification :
EPA Generator ID Number :
Hazardous Waste Disposal :
RCRA Compliance
ID LocationFuel Type Capacity
Number of ASTs :
Asbestos Survey Date :
Asbestos Type :
Asbestos Coordinator :
Coordinator Training Date:
Custodial/Maintenance Training :
AHERA Regulated :
Management Plan Approval :
PCB Transformer Testing :
PCB Transformers :
PCB-Contaminated Transformers :
Transformers Labelled :
Regional Air Quality :
Permitted Air Pollution Source :
Source Description :
Waste Management, Inc.
Yes Organic solvent (2 gals/yr), paint thinner (3 gals/yr)
Conditionally Exempt Small Quantity Generator N/A Commercial Hazardous Waste Disposal Service
Safety-Kleen, Chandler, AZ
No No
Overfill Leak Corrosion
SPCC Plan Required : SPCC Plan Completed :
No N/A
10/11/1990 Friable/Non-Friable Troy Lacy 07/06/1992 Yes No
No No
CO, Ozone, PM-10
ID Fuel Type Capacity Location Overfill
Prevention Secondary ContainmentTank Status
Tank Status Prevention/Detection
Asbestos-Containing Materials Inventory
Date: May. 09, 2011Center : Phoenix (00904) Page: 1 of 1
Heating Floor Finishes Roof Repair/Replacement Roof Repair/Replacement Roof Repair/Replacement Floor Finishes Floor Finishes Floor Finishes Floor Finishes Floor Finishes Floor Finishes Floor Finishes Floor Finishes
Roof Repair/Replacement Ceiling Finishes Floor Finishes Roof Repair/Replacement Ceiling Finishes
Bldg System
Bldg System
Pipe fitting insulation Mastic beneath 12x12 tile Roof flashing Roofing felt/asphalt shingles Built-up roofing 12x12 tile, white (covered) 12x12 floor tile, off-white 12x12 floor tile, tan/orange 12x12 floor tile, tan 12x12 floor tile, brown 12x12 floor tile, grey 12x12 floor tile, brown 12x12 tile, tan (covered)
Roof flashing Acoustical plaster 12x12 floor tile, beige Built-up roofing material Acoustical plaster
Category Description
Category Description
Ea.
Sq. Ft.
Sq. Ft.
Sq. Ft.
Sq. Ft.
Sq. Ft.
Sq. Ft.
Sq. Ft.
Sq. Ft.
Sq. Ft.
Sq. Ft.
Sq. Ft.
Sq. Ft.
Sq. Ft.
Sq. Ft.
Sq. Ft.
Sq. Ft.
Sq. Ft.
Location
Location
Unit
Unit
Quantity
Quantity
Above 1st fl. hall See above locations Building perimeter Roof sections 7, 8 Roof section 3 1st fl., back hall 1st fl., storage rm.
1st fl., gym hallway 1st fl., print shop Gymnasium 1st fl., fire equip.
1st fl., elec. room 1st fl., common area
Roof, maint. area 2nd fl., maint. area 2nd fl., maint. area Roof, maint. area 1st fl., maint. area
Building :
Building :
0001 - MAIN BUILDING
0002 - VOCATIONAL BUILDING
Radon
Page: 1 of 1
0001 - MAIN BUILDING
0002 - VOCATIONAL BUILDING
0007 - ANNEX II - MULTIPURPOSE/HR
0008 - RECREATION HALL/ADMINISTRATION
0010 - DORMITORY
0015 -EDUCATIONAL BUILDING
0016 - VOCATIONAL COMPLEX BUILDING 1
0017 - VOCATIONAL COMPLEX BUILDING 2
0018 - VOCATIONAL COMPLEX BUILDING 3
Bldg Name
08/11/1992
06/06/1990
06/06/1990
06/06/1990
06/06/1990
Test Date
Yes
Yes
Yes
Yes
Yes
No
No
No
No
Radon Testing
< 4 pCi
< 4 pCi
< 4 pCi
< 4 pCi
< 4 pCi
Test Result
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
Mitigation Mitigation Date
RADON EXPLANATORY NOTES
The US Environmental Protection Agency (EPA) has established a radon action level of 4.0 picoCuries per liter (pCi/L). Occupied buildings with radon concentrations less than 4.0 pCi/L do not require radon mitigation; un-occupied buildings, or those buildings which are occupied only infrequently for brief periods of time, also do not require radon mitigation. Occupied buildings with radon concentrations greater than
4.0 pCi/L require radon mitigation and verification of radon reductions as soon as possible, with priority given to dormitories and student recreation buildings. Occupied buildings with radon concentrations greater than 20.0 pCi/L should be considered significant radon exposure hazards, and priority for mitigation should be given to buildings with these highly elevated radon concentrations.
Radon mitigation techniques include: (1) adjustment of the building HVAC system to create a positive pressure within the building; (2) sealing of foundation wall cracks, penetrations, or other openings;
(3) sealing crawlspace openings and sump pits; (4) installing an active subslab depressurization (ASD) system.
Site Description
Page: 1 Date: 05/09/2011
ACCESSIBILITY
Yes
The site is flat and most sidewalks have curb cuts.Comments:
UnknownNoNoNo
Nationally Registered Site
Site Eligible for National Register
Located in Historic District
Archaeological Significance
Drain System Soil Erosion Soil Erosion Location
No NoneUnderground
Comments:
Paving Type for Roads & Parking
The city owns the roads and sidewalks. Parking is provided by center owned/leased lots including street parking. The condition of the roads, parking lots and sidewalks is good. A new parking lot for non-resident students and staff was recently completed.
Paving Type for Sidewalks
Asphalt Concrete
Comments:
Structures Fencing Outdoor Recreation
Facilities Storage; Luggage Storage 1 & 2;
Trellis 1 & 2
Chain Link, Painted Masonry None
The campus has several courtyards paved with a combination of exposed aggregate concrete pavers, decorative brick and plain concrete pavers. Plants, trellises, benches and tables are located within these courtyards. The dormitory courtyard has extensive landscape, water features, a series of ponds and an outdoor grill. The soft vocation, education, recreation, administration and dormitory blocks have perimeter masonry fences with stucco finish. The hard vocation and new parking blocks have perimeter chain link fences.
ROADS, PARKING & SIDEWALKS
Water Source Water Authority Service Meter On-Site Treatment Plant
1. Water
Treatment Type Storage Type Storage Capacity Maintenance Responsibility
Center
NoIndividualCity of PhoenixPublic Water Authority
None 0None
Comments:
Fire Hydrants On-Site Water Supply Storage Capacity Pressure Source # of Fire Pumps
Yes 0 0None Municipal
There is a fire department at 16th and Buckeye, approximately 3 miles from the center and about 5 minutes response time.
Number of Deficiencies = 1
Number of Deficiencies = 1
Accessible Parking: Accessible Slope:
Yes
Curb Cuts:
Yes
Ramps:
N/AYes
Site Accessible Route:
HISTORIC PRESERVATION
STORM WATER SYSTEM
SITE FEATURES
UTILITY
2. Fire Protection
Page: 2 Date: 05/09/2011
Sewage Treatment Sewer Line Owner
N/APublicly Owned Treatment Works CenterMunicipal
Maintenance ResponsibilityCapacity(Gallons)
Comments: There are two gas meters at the campus.
Natural
None
Comments:
Electric Company
PCB
Trans.
Transformer Mounting
Transformer Ownership
Systems Ownership
Maintenance Responsibility
Arizona Public Service Co.
Services enter the center at multiple locations. Main Building 1 has two services. The first service, approaching from the west, is brought from three 75 kVA pole-mounted transformers on Second Street. The second service, approaching from the east, is brought from a power pole on Third Street. Vocational Building 2 also has two services, one from the north and one from the east, which are brought from two 25 kVA pole-mounted transformers on Buchanan Street and two 75 kVA pole-mounted transformer on Third Street respectively. The pole-mounted transformers on Third Street additionally serve Annex II Building 7 and Recreational Hall Building 8. Dormitory Building 10 service is brought from a power pole on Buchanan Street to a pad-mounted transformer located in the back of the building. The three Vocational Complex Buildings 16, 17 and 18 are served by a pad-mounted transformer adjacent to Building 16. Most buildings have their own meter while others are zoned. The local utility company, Arizona Public Service Company, owns and maintains all pole and pad-mounted transformers. Site lighting includes building and pole-mounted fixtures which are controlled by photocell and time clock. The center owns and maintains the site lighting.
Pole and Pad Utility Utility UtilityNo
Comments:
Telephone Company On-site Line Owner
The telephone communication and data service main closet (MC) is located in Building 1. Local telephone service is provided by Qwest. Long distance telephone service is provided by Job Corps Data Center (JCDC). JCDC provides and maintains internal distribution Voice over IP (VoIP), LAN and WAN networks which are interconnected by fiber optic cables. The telephone switch contains 96 analog phone ports and 16 digital phone ports to service the center telephone and FAX traffic. The telephone system including Full DSI DID Trucking Service is maintained under a service contract with Integra Telecom Communication. The data transmission is routed from each building over a fiber optic cable to MC which is connected to a Cisco 6500 router. Total of 13 buildings are interconnected with a Gigabyte Cisco Catalyst 3560 switch to the data network. The MC contains four servers (two for staff and two for student applications) and two routers for data transfer. All data communication system managed by the JCDC are connected to UPS which buffers the power surges and drops in the line voltage and will maintain the system up to 20 minutes before an automated, shut down is enacted. The center fire alarm system is monitored in Administration Building 1.
Qwest
Maint. Responsibility
Center Center
Security
None
7.2/4.16 kV, 3-Phase, 4 Wire
208/120 V, 3-Ph, 4 W and 120/240V, 3-Ph, 4 WOverhead & Underground
Overhead & UndergroundPrimary Service
Secondary Service
Distribution Characteristics
3. Sanitary Sewer System/ Sewage Treatment Plant
4. Gas
5. Central Plant
6. Electric
7. Communication
Gas Company: Southwest GasGas Type:
Page: 3 Date: 05/09/2011
There are no storage tanks.
STORAGE TANK
Comments:
TypeStatus Location Owner Fuel Type Capacity Install Date
Earthquake Risk
Medium Medium LowMedium MediumIBC Medium
LightningEarthquake Def. Authority Flooding Tornado Hurricane Forest
Fire
ID Reg.
GENERAL SITE CONDITION
Rating X Good Fair Poor
NATURAL HAZARDS
The facility condition is not impacting the functional use of the facility.
The facility condition IS impacting the functional use of the facility.
The facility condition IS SIGNIFICANTLY impacting the functional use of the facility.
Purpose
Building Descriptions and Utilities Phoenix
BUILDING 1 - MAIN BUILDING
Building Descriptions
Page: 1 of 43
Building: 0001 - MAIN BUILDING
BUILDING ENVELOPE
Foundation RoofBuilding
Concrete Concrete/CMU Concrete
The floor construction is concrete.
Brick Masonry Stucco
AccessibilityFeature
GSF NSF Year Built Use Group Historic Ownership#Floors
Business/Assembly 62,460 41,515 5 Owned 1925 Unevaluated
Comments: The basement and mezzanine levels are not accessible. The gymnasium is not accessible from within the building. The gymnasium floor is 35 inches lower than the rest of the building and can only be accessed via steps inside the building. The exterior ramp located outside the south exit of the gym is used for egress only. First floor public restrooms are not accessible. Upper floor restrooms are accessible.
REAL ESTATE
Access to Building
Ramps
Entrance
2nd Egress
Visual Alarm
Corridor/Aisle
Rooms
Stairs
Elevator
Restrooms
Drinking Fountain
Telephone
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
N/A
ACCESSIBILITY
Structural Systems1.
Exterior Walls2. Number of Deficiencies = 2
Material
Asbestos: Yes
Roof condition assessment is based on visual observation during the Facility Survey.
The roofs over the gymnasium and tower are in good condition and do not need to be replaced.
This building has 11 different roof sections which have a sprayed-on membrane. Ten of them were installed in 2001. The 4th floor membrane was installed in 2004.
Drainage Year Life
Remaining Type Area Served
Asphalt & Sprayed-on Membrane
Asphalt & Sprayed-on Membrane
Interior Roof Drains
Interior Roof Drains
Multi type
Flat
Multi - Use
Classrooms & Offices
Number of Deficiencies = 1
Comments:
Comments:
3. Roof
Entire Building
Area Served
Comments:
Page: 2 of 43
Building: 0001 - MAIN BUILDING
Wall Roof None Batt
Comments: The building has the original single pane, non-insulated windows.
INTERIOR FINISH
Carpet Ceramic Tile Concrete Epoxy Resin Plywood Wood
Comments: New VCT flooring installed on 4th floor in 2010.
CMU Ceramic Tile Drywall Wood Paneling
Metal Units - Metal Frame Wood Units - Wood Frame
VERTICAL CIRCULATION
Concrete Stairs Elevator Ramp Wood Stairs
Comments: A small passenger elevator serves the four story section of the building located at the east side.
Metal Units - Metal Frame
Awning Units - Steel Frame; Single Glazing; Fixed - Steel Frame; Single Glazing;
Sliding - Steel Frame; Single Glazing;
Acoustical Tile Exposed Structure Gypsum Board
Insulation4.
Exterior Doors5. Number of Deficiencies = 1
Windows6. Number of Deficiencies = 2
Floors1. Asbestos: Yes Number of Deficiencies = 3
Interior Walls2.
3. Number of Deficiencies = 1
Interior Doors4. Number of Deficiencies = 2
Ceilings
Page: 3 of 43
Building: 0001 - MAIN BUILDING
Mechanical
Mechanical
Toilet/Shower
Kitchen
Ventilation Area Served
Split Direct Expansion (Air
Source)
Packaged Heat Pump (Air
Source)
Single Duct
Single Duct
Refrigerant
None
Electric
Electronic
Natural
Mechanical
None
None
Electronic Equipment
Room
Entire Building
Exhaust Ventilation
A split DX air conditioner serves the computer room located in the medical/dental area.
This building has 24 packaged heat pumps manufactured by Trane, York, and Arco Air. Eight are 15 ton units. Three are 10 ton units. Two are 7.5 ton units. Nine are 5 ton units. One is a 4 ton unit. One is a 3 ton unit.
Comments:
Comments:
Number of Deficiencies = 2
Heat Source
Heat Distribution
Piping System
Control System
Fresh Air Intake
Energy Conservation
Measure
Area Served
This building has 24 packaged heat pumps manufactured by Trane, York, and Arco Air. Eight are 15 ton units. Three are 10 ton units. Two are 7.5 ton units. Nine are 5 ton units. One is a 4 ton unit. One is a 3 ton unit. A typical Trane packaged rooftop unit is model WCH180B300FA manufactured in 11/2002.
A Goettl model VGLP 5-T electric furnace serves the weight room area.
Comments:
Comments:
HVAC
Heat1. Asbestos: Yes
Split Heat Pump (Air
Source)
Electric Furnace
Single Duct
Single Duct
None
None
Electronic
Electric
Mechanical
Natural
None
None
Entire Building
Recreation Area
Ventilation2.
System Type
Number of Deficiencies = 2
Air Distribution
Piping System
Control System
Fresh Air Intake
Energy Conservation
Measure
Area Served
3. Air Conditioning
Page: 4 of 43
Building: 0001 - MAIN BUILDING
The gymnasium showers are provided with hot water from an A.O. Smith model DRE 120 917 electric water heater with two Raypak 115 gallon insulated storage tanks. The kitchen is provided with hot water by an A.O. Smith model BTR 199 118, manufactured on 12/09/2009. Kitchen hot water is treated with a water softener. The upper floors are provided with hot water from a Raypak model W3-1083 hot water boiler.
Comments:
Comments:
Cast-Iron Outdoor Cast-Iron
The kitchen is served by bio-chemical digester type grease interceptors.
Electric Water Cooler Fixed Emergency Eyewash Hose Bibb Lavatory Shower Sink Urinal Water Closet (Flush Valve) Waterless Urinal
Gas (Natural)
Wet None ABC Type Fire Extinguisher, K Type Fire Extinguisher, Wet Chemical, Dry Chemical
Comments: Only the basement center maintenance area is sprinklered. Kitchen hoods are protected by wet chemical fire suppression systems. The serving line hood has a dry chemical system.
Galvanized Steel and Copper
Galvanized Steel and Copper
Electric Water Softener No
Hot Water Cold Water Water Heater Water Treatment HW Storage Tank
Grease InterceptorWaste / Vent Interior Storm
Sprinkler System Stand Pipe System Fire Suppression
PLUMBING Number of Deficiencies = 3
Water Distribution1.
Sanitary Distribution2. Number of Deficiencies = 1
Fixtures3.
Fuel Distribution4.
FIRE PROTECTION
Location UL300 Compliance Status Kitchen Unknown
Comments: Compliance with UL 300 is not specifically noted on the inspection report.
UL300 COMMERCIAL KITCHEN HOOD FIRE SUPPRESSION
Page: 5 of 43
Building: 0001 - MAIN BUILDING
Comments: This building has two services. The first service is brought from three 75 kVA pole-mounted transformers on Second Street to an 800A switchboard located in the gymnasium electrical room. This switchboard serves loads on the west side of the building which includes the gymnasium, academic education and dental/medical areas. The second service is brought from a power pole on Third Street. The primary overhead lines from this pole change to underground and terminate in a pad-mounted transformer located in the back of the building. This transformer energizes a 3000A switchgear adjacent to the transformer.
The switchgear supplies power to two 1200A switchboards located in the cafeteria electrical room and on the roof. The switchboard in the electrical room serves loads in the kitchen, administration and part of the education which are on the east side of the building. The switchboard on the roof serves the building mechanical and elevator equipment. Each service has its own meter.
Service Entrance Electrical Characteristics Distribution Equipment Wiring Devices
Comments: Recorded footcandle levels include natural light contribution. Some of the spaces have mixtures of T8 and T12 lighting fixtures.
High Intensity Discharge (HID)
Comments: Exterior building-mounted and surrounding area pole-mounted light fixtures are controlled by time clock and photocells.
T8 - Fluorescent
T8 - Fluorescent
T8 - Fluorescent
T8 - Fluorescent
T8 - Fluorescent
T8 - Fluorescent
T8 - Fluorescent
T8 - Fluorescent
T8 - Fluorescent
T8 - Fluorescent
High Intensity Discharge (HID)
T8 - Fluorescent
T8 - Fluorescent
T8 - Fluorescent
T8 - Fluorescent
T8 - Fluorescent
Offices
Conference Rooms
Classrooms
Medical/Dental
Reception
Wards (Patient)
Food Preparation
Dining/Lunch Rooms
Dishwashing
Storage Rooms
Gymnasium
Recreation
Locker Room
Toilets
Equipment Rooms (Elec/Mech)
Corridors & Stairs
Area Recommended Level
Recorded Level Light Type
Battery Backup Battery Backup
Switchboard 120/208V, 3-Phase, 4 Wire Panelboard Receptacles, GFCI, Switches
Emergency Exit
ELECTRICAL SERVICES Number of Deficiencies = 3
Exterior Lighting1. Number of Deficiencies = 1
Interior Lighting2. Number of Deficiencies = 1
Emergency /Exit Lighting3.
LIGHTING
Page: 6 of 43
Building: 0001 - MAIN BUILDING
FIRE ALARM
Comments: The building central fire alarm control/annunciator panel is a SafeTech 3000. It is located in the security office on the first floor. The fire alarm panel in this building additionally serves devices in Building 8.
However, at the time of November 2010 Facility Survey, center was in process of replacing centerwide fire alarm system.
Comments: Most of the classrooms have TV-VCR and computer work stations.
Audible Alarm Central Annunciator Panel Duct Smoke Detector Flow/Tamper Switch Heat Detector Manual Pull Station Smoke Detector Visual Alarm
Connected to Main System Magnetic Door/Alarm None TV with VCR
Telephone Security Public Address Television
Number of Deficiencies = 2
GENERAL BUILDING CONDITION
Rating X Good
Fair Poor
COMMUNICATION
The facility condition is not impacting the functional use of the facility.
The facility condition IS impacting the functional use of the facility.
The facility condition IS SIGNIFICANTLY impacting the functional use of the facility.
Electric Water Gas Yes YesYes
BUILDING UTILITY METERING
Structure: Good Exterior: Fair Interior: Good Mechanical: Good Electrical: Good
BUILDING 2 - VOCATIONAL BUILDING
Page: 7 of 43
Building: 0002 - VOCATIONAL BUILDING
BUILDING ENVELOPE
Foundation RoofBuilding
Concrete Loadbearing Masonry Wood
The floor construction is concrete and wood frame.
Stucco
AccessibilityFeature
GSF NSF Year Built Use Group Historic Ownership#Floors
Business 11,080 8,429 2 Owned 1930 Unevaluated
Comments: The first floor of the building has four separate sections which do not communicate with one another.
Each section has an accessible entry. The largest section, located at the north of the building, has a second means of egress which is not accessible. In the absence of an elevator, the second floor of the north section is not accessible. At the time of the November 2010 Facility Survey, a restroom renovation project was underway. The new restrooms will be accessible. These restrooms are located in the north section of the building. These are the only restrooms in the building.
REAL ESTATE
Access to Building
Ramps
Entrance
2nd Egress
Visual Alarm
Corridor/Aisle
Rooms
Stairs
Elevator
Restrooms
Drinking Fountain
Telephone
Yes
Yes
Yes
No
Yes
Yes
Yes
Yes
No
No
Yes
N/A
ACCESSIBILITY
Structural Systems1.
Exterior Walls2. Number of Deficiencies = 1
Material
Asbestos: Yes
Asphalt roof was installed in 1988. Sprayed-on membrane was added on top of asphalt over the entire roof area in 2001.
Asphalt roof was installed in 1988. Sprayed-on membrane was added on top of asphalt over the entire roof area in 2001.
Drainage Year Life
Remaining Type Area Served
Asphalt & Sprayed-on Membrane
Asphalt & Sprayed-on Membrane
Gutters and Downspouts
Interior Roof Drains
Gable
Flat
Original Building
Building Addition
Comments:
Comments:
3. Roof
Entire Building
Page: 8 of 43
Building: 0002 - VOCATIONAL BUILDING
Wall Roof None Batt
INTERIOR FINISH
Carpet Ceramic Tile Concrete Vinyl Tile
CMU Ceramic Tile Drywall Wood Paneling
Metal Units - Metal Frame Wood Units - Wood Frame
VERTICAL CIRCULATION
Concrete Stairs Wood Stairs
Comments: There is one exterior concrete stair. There are two interior wood stairs.
Metal Unit, Metal Overhead - Metal Frame
Fixed - Aluminum Frame; Single Glazing; Fixed - Steel Frame; Single Glazing;
Sliding - Steel Frame; Single Glazing;
Acoustical Tile Exposed Structure Gypsum Board
Insulation4.
Exterior Doors5.
Windows6.
Floors1. Asbestos: Yes Number of Deficiencies = 2
Interior Walls2.
3. Asbestos: Yes
Interior Doors4.
Page: 9 of 43
Building: 0002 - VOCATIONAL BUILDING
Mechanical Restroom
Domestic hot water is provided by a 40 gallon electric water heater.Comments:
Cast-Iron None Cast-Iron
Electric Water Cooler Hose Bibb Lavatory Portable Bottled Water Cooler Urinal Water Closet (Tank)
None
Ventilation Area Served
Galvanized Steel Galvanized Steel Electric None No
Hot Water Cold Water Water Heater Water Treatment HW Storage Tank
Grease InterceptorWaste / Vent Interior Storm
Packaged Heat Pump (Air
Source)
Single Duct None Electronic Mechanical None Entire Building
PLUMBING
Exhaust Ventilation
This building has 11 packaged heat pumps manufactured by Trane, Goettl, York, Ruud, and Tappan.
Ten are 5 ton units. One is a 2 ton unit.
Comments:
Heat Source
Heat Distribution
Piping System
Control System
Fresh Air Intake
Energy Conservation
Measure
Area Served
This building has 11 packaged heat pumps manufactured by Trane, Goettl, York, Ruud, and Tappan.
Ten are 5 ton units. One is a 2 ton unit.
The warehouse area has electric unit heaters.
Comments:
Comments:
HVAC
Heat1.
Packaged Heat Pump (Air
Source)
Electric Resistance
Single Duct
Unit Heater
None
None
Electronic
Electric
Mechanical
Natural
None
None
Entire Building
Storage
Ventilation2.
System Type
Air Distribution
Piping System
Control System
Fresh Air Intake
Energy Conservation
Measure
Area Served
Water Distribution1.
Sanitary Distribution2.
Fixtures3.
Fuel Distribution4.
Page: 10 of 43
Building: 0002 - VOCATIONAL BUILDING
None None ABC Type Fire Extinguisher
Comments: This building has two services. One service comes from two 25 kVA pole-mounted transformers across from Buchanan Street and terminates in a 600A switchboard located in the warehouse on the second floor. The other service comes from two 75 kVA pole-mounted transformers on Third Street and terminates in a 600A switchboard located in the electrical room on the first floor. This switchboard also sub-feeds Classroom/Reading Building 15. Separate metering is installed at the switchboard for each of the services. The pole-mounted transformers on Third Street also serve Annex II Building 7 and Recreational Hall Building 8.
FIRE ALARM
Comments: The building fire alarm control/annunciator panel is a SafeTech 3000. It is located in the vocational education office on the first floor. The fire alarm panel in this building additionally serves devices in Building 15. However, at the time of November 2010 Facility Survey, center was in process of replacing centerwide fire alarm system.
Service Entrance Electrical Characteristics Distribution Equipment Wiring Devices
Audible Alarm Control/Annunciator Panel Heat Detector Manual Pull Station Smoke Detector Visual Alarm
Comments: Recorded footcandle levels include natural light contribution.
High Intensity Discharge (HID)
Comments: Exterior building-mounted light fixtures are controlled by timeclock and photocell.
T8 - Fluorescent
T8 - Fluorescent
T12 - Fluorescent
T8 - Fluorescent
Compact Fluorescent
T8 - Fluorescent
Offices
Classrooms
Storage Rooms
Equipment Rooms (Elec/Mech)
Toilets
Corridors & Stairs
Area Recommended Level
Recorded Level Light Type
Battery Backup Battery Backup
Switchboard 120/208V, 3-Phase, 4 Wire Panelboard Receptacles, GFCI, Switches
Sprinkler System Stand Pipe System Fire Suppression
Emergency Exit
FIRE PROTECTION
ELECTRICAL SERVICES Number of Deficiencies = 1
Exterior Lighting1.
Interior Lighting2. Number of Deficiencies = 2
Emergency /Exit Lighting3.
Page: 11 of 43
Building: 0002 - VOCATIONAL BUILDING
Comments: The classrooms are equipped with TV-VCR and computer work stations.
Connected to Main System None Connected to Main System None
Telephone Security Public Address Television
GENERAL BUILDING CONDITION
Rating X Good
Fair Poor
COMMUNICATION
The facility condition is not impacting the functional use of the facility.
The facility condition IS impacting the functional use of the facility.
The facility condition IS SIGNIFICANTLY impacting the functional use of the facility.
Electric Water Gas Yes N/ANo
Structure: Good Exterior: Good Interior: Good Mechanical: Good Electrical: Good
BUILDING 7 - ANNEX II - MULTIPURPOSE/HR
Page: 12 of 43
Building: 0007 - ANNEX II - MULTIPURPOSE/HR
BUILDING ENVELOPE
Foundation RoofBuilding
Concrete Loadbearing Masonry Wood
The floor construction is concrete.
Brick Masonry Stucco
Wall Roof Batt Batt
Storefront - Metal Frame Wood Unit - Metal Frame
AccessibilityFeature
GSF NSF Year Built Use Group Historic Ownership#Floors
Business/Assembly 4,800 4,097 1 Owned 1978 Unevaluated
Comments: The building has two sections. The Phoenix room located at the south does not have accessible restrooms. The north section of the building has two accessible entries. The common corridor linking those two entries is not accessible. The restroom of the north section is not accessible.
REAL ESTATE
Access to Building
Ramps
Entrance
2nd Egress
Visual Alarm
Corridor/Aisle
Rooms
Stairs
Elevator
Restrooms
Drinking Fountain
Telephone
Yes
Yes
Yes
Yes
Yes
No
Yes
N/A
N/A
No
Yes
N/A
ACCESSIBILITY
Structural Systems1.
Exterior Walls2.
Insulation4.
Exterior Doors5.
Material Drainage Year Life
Remaining Type Area Served
Asphalt Shingles Surface Run-off 2001 11 Gable Entire Building
3. Roof
Entire Building
Page: 13 of 43
Building: 0007 - ANNEX II - MULTIPURPOSE/HR
INTERIOR FINISH
Carpet Ceramic Tile Vinyl Tile
CMU Ceramic Tile Drywall
Wood Units - Wood Frame
Mechanical Restroom
Ventilation Area Served
VERTICAL CIRCULATION
None
Sliding - Aluminum Frame; Single Glazing;
Acoustical Tile Exposed Structure Gypsum Board
Exhaust Ventilation
Windows6.
Floors1. Number of Deficiencies = 1
Interior Walls2.
3.
Interior Doors4.
Heat Source
Heat Distribution
Piping System
Control System
Fresh Air Intake
Energy Conservation
Measure
Area Served
There are two Ducane 5 ton units and one Ducane 4 ton unit, all mounted on the roof.Comments:
HVAC
Heat1.
Packaged Heat Pump (Air
Source)
Single Duct None Electronic Mechanical None Entire Building
Ventilation2.
Page: 14 of 43
Building: 0007 - ANNEX II - MULTIPURPOSE/HR
Domestic hot water is provided by a 40 gallon electric water heater.Comments:
Cast-Iron None None
Electric Bottled Water Cooler Hose Bibb Lavatory Water Closet (Flush Valve) Water Closet (Tank)
None
Wet None ABC Type Fire Extinguisher
Comments: Service is brought from two pole-mounted transformers on Third Street to a 400A main disconnect switch and meter installed on the building's exterior southwest wall. The transformers also serve Vocational Building 2 and Recreational Hall Building 8.
Copper Copper Electric None No
Hot Water Cold Water Water Heater Water Treatment HW Storage Tank
Grease InterceptorWaste / Vent Interior Storm
Service Entrance Electrical Characteristics Distribution Equipment Wiring Devices
Packaged Heat Pump (Air
Source)
Single Duct None Electronic Mechanical None Entire Building
High Intensity Discharge (HID)
Comments: Exterior building-mounted and surrounding area pole-mounted light fixtures are controlled by time clock and photocells.
Main Disconnect Switch 120/208V, 3-Phase, 4 Wire Panelboard Receptacles, GFCI, Switches
Sprinkler System Stand Pipe System Fire Suppression
PLUMBING
There are two Ducane 5 ton units and one Ducane 4 ton unit, all mounted on the roof.Comments:
System Type
Air Distribution
Piping System
Control System
Fresh Air Intake
Energy Conservation
Measure
Area Served
Water Distribution1.
Sanitary Distribution2.
Fixtures3.
Fuel Distribution4.
FIRE PROTECTION
ELECTRICAL SERVICES
Exterior Lighting1.
Page: 15 of 43
Building: 0007 - ANNEX II - MULTIPURPOSE/HR
FIRE ALARM
Comments: The building fire alarm control/annunciator panel is a SafeTech 3000. However, at the time of November 2010 Facility Survey, center was in process of replacing centerwide fire alarm system.
Audible Alarm Control/Annunciator Panel Flow Switch Manual Pull Station Smoke Detector Tamper Switch Visual Alarm
Connected to Main System None None TV with VCR
Telephone Security Public Address Television
Comments: Recorded footcandle levels include natural light contribution. There are recessed incandescent lights in the recreational space.
T8 - Fluorescent
T8 - Fluorescent
T12 - Fluorescent
Incandescent
Incandescent
Offices
Recreation
Equipment Rooms (Elec/Mech)
Toilets
Reception
Area Recommended Level
Recorded Level Light Type
Battery Backup Battery Backup
Emergency Exit
GENERAL BUILDING CONDITION
Rating X Good
Fair Poor
Interior Lighting2. Number of Deficiencies = 1
Emergency /Exit Lighting3.
COMMUNICATION
The facility condition is not impacting the functional use of the facility.
The facility condition IS impacting the functional use of the facility.
The facility condition IS SIGNIFICANTLY impacting the functional use of the facility.
Electric Water Gas Yes N/AYes
BUILDING 8 - RECREATION HALL/ADMINISTRATION
Page: 16 of 43
Building: 0008 - RECREATION HALL/ADMINISTRATION
BUILDING ENVELOPE
Foundation RoofBuilding
Concrete Loadbearing Masonry Wood
The floor construction is concrete.
Stucco
AccessibilityFeature
GSF NSF Year Built Use Group Historic Ownership#Floors
Assembly 10,050 7,758 1 Owned 1978 Unevaluated
REAL ESTATE
Access to Building
Ramps
Entrance
2nd Egress
Visual Alarm
Corridor/Aisle
Rooms
Stairs
Elevator
Restrooms
Drinking Fountain
Telephone
Yes
N/A
Yes
Yes
Yes
N/A
Yes
N/A
N/A
Yes
No
Yes
ACCESSIBILITY
Structural Systems1.
Exterior Walls2.
Material
The building has three sections. The original building (Canteen) has a gable roof with asphalt shingles.
The east addition (Admin) has a rolled asphalt flat roof. The west addition (SIA Tech) has a rolled asphalt shed roof.
Roof condition assessment is based on visual observation during the Facility Survey.
Drainage Year Life
Remaining Type Area Served
Asphalt Shingles
Rolled Asphalt
Rolled Asphalt
Surface Run-off
Surface Run-off
Surface Run-off
Gable
Flat
Shed
Original Building
East Building Addition
West Building Addition
Number of Deficiencies = 1
Comments:
Comments:
3. Roof
Entire Building
Page: 17 of 43
Building: 0008 - RECREATION HALL/ADMINISTRATION
Wall Roof Batt Batt
INTERIOR FINISH
Carpet Ceramic Tile Concrete Vinyl Tile
CMU Ceramic Tile Drywall
Wood Units - Wood Frame
VERTICAL CIRCULATION
None
Metal Units - Metal Frame
Sliding - Aluminum Frame; Single Glazing;
Acoustical Tile Exposed Structure Gypsum Board
Insulation4.
Exterior Doors5.
Windows6.
Floors1.
Interior Walls2.
3.
Interior Doors4.
Heat Source
Heat Distribution
Piping System
Control System
Fresh Air Intake
Energy Conservation
Measure
Area Served
Heating and cooling are provided by four Arco Air 5 ton rooftop units.Comments:
HVAC
Heat1.
Packaged Heat Pump (Air
Source)
Single Duct None Electronic Mechanical None Entire Building
Page: 18 of 43
Building: 0008 - RECREATION HALL/ADMINISTRATION
Mechanical Restroom
Domestic hot water is provided by a 50 gallon electric water heater. The water heater is GE model GE50M06AAG with input of 4500W, and was manufactured in 06/2009.
Comments:
Cast-Iron None None
Electric Water Cooler Hose Bibb Lavatory Sink Water Closet (Flush Valve)
None
None None ABC Type Fire Extinguisher
Ventilation Area Served
Copper Copper Electric None No
Hot Water Cold Water Water Heater Water Treatment HW Storage Tank
Grease InterceptorWaste / Vent Interior Storm
Packaged Heat Pump (Air
Source)
Single Duct None Electronic Mechanical None Entire Building
Sprinkler System Stand Pipe System Fire Suppression
PLUMBING
Exhaust Ventilation
Heating and cooling are provided by four Arco Air 5 ton rooftop units.Comments:
Ventilation2.
System Type
Air Distribution
Piping System
Control System
Fresh Air Intake
Energy Conservation
Measure
Area Served
Water Distribution1.
Sanitary Distribution2.
Fixtures3.
Fuel Distribution4.
FIRE PROTECTION
Page: 19 of 43
Building: 0008 - RECREATION HALL/ADMINISTRATION
Comments: Service is brought from two pole-mounted transformers on Third Street to a 200A panel inside the building. A meter is installed on the building's exterior wall. The transformers also serve Vocational Building 2 and Annex II Building 7.
FIRE ALARM
Comments: The building fire alarm system components are connected to the central fire alarm control/annunciator panel in the security office in Building 1. However, at the time of November 2010 Facility Survey, center was in process of replacing centerwide fire alarm system.
Comments: A pay phone is provided on the exterior wall near the building's main entrance for student use.
Service Entrance Electrical Characteristics Distribution Equipment Wiring Devices
Audible Alarm Manual Pull Station Smoke Detector Visual Alarm
Connected to Main System None None Satellite Dish
Telephone Security Public Address Television
Comments: The recorded footcandle levels include natural light contribution.
High Intensity Discharge (HID)
Comments: Exterior building-mounted light fixtures are controlled by timeclock and photocell.
T8 - Fluorescent
T8 - Fluorescent
T8 - Fluorescent
T8 - Fluorescent
Recreation
Study Room
Offices
Toilets
Area Recommended Level
Recorded Level Light Type
Selected Lighting w/ Battery Battery Backup
Main Distribution Panel 120/208V, 3-Phase, 4-Wire Panelboard Receptacles, GFCI, Switches
Emergency Exit
ELECTRICAL SERVICES Number of Deficiencies = 1
Exterior Lighting1.
Interior Lighting2.
Emergency /Exit Lighting3.
COMMUNICATION
Electric Water Gas Yes N/AYes
Page: 20 of 43
Building: 0008 - RECREATION HALL/ADMINISTRATION
GENERAL BUILDING CONDITION
Rating X Good
Fair Poor
The facility condition is not impacting the functional use of the facility.
The facility condition IS impacting the functional use of the facility.
BUILDING 10 - DORMITORY
Page: 21 of 43
Building: 0010 - DORMITORY
BUILDING ENVELOPE
Foundation RoofBuilding
Concrete Structural Steel, CMU Steel
Stucco
Wall Roof Rigid Batt
Comments: The mechanical room has sliding metal doors with louvers.
Metal Units - Metal Frame
AccessibilityFeature
GSF NSF Year Built Use Group Historic Ownership#Floors
Residential 34,690 21,647 2 Owned 1991 Unevaluated
REAL ESTATE
Access to Building
Ramps
Entrance
2nd Egress
Visual Alarm
Corridor/Aisle
Rooms
Stairs
Elevator
Restrooms
Drinking Fountain
Telephone
Yes
N/A
Yes
Yes
Yes
Yes
Yes
Yes
N/A
Yes
Yes
Yes
ACCESSIBILITY
Structural Systems1.
Exterior Walls2. Number of Deficiencies = 2
Insulation4.
Exterior Doors5.
Material Drainage Year Life
Remaining Type Area Served
Metal Gutters and Downspouts 1991 20 Gable Entire Building
3. Roof
Entire Building
Page: 22 of 43
Building: 0010 - DORMITORY
INTERIOR FINISH
Carpet Ceramic Tile Vinyl Tile
CMU Ceramic Tile Plaster
Wood Units - Metal Frame
Mechanical Toilet/Shower
Ventilation Area Served
VERTICAL CIRCULATION
Concrete Stairs Metal Stairs
Casement - Aluminum Frame; Double Glazing;
Acoustical Tile Exposed Structure Gypsum Board
Exhaust Ventilation
Number of Deficiencies = 1
Windows6.
Floors1. Number of Deficiencies = 1
Interior Walls2.
3.
Interior Doors4. Number of Deficiencies = 1
Heat Source
Heat Distribution
Piping System
Control System
Fresh Air Intake
Energy Conservation
Measure
Area Served
Heating and cooling is accomplished by a system of 43 water source heat pumps ranging in capacity from 2 to 4 tons.
This is the start of the file's text. The full file is on GovTribe.
Other files
| File | Type | Posted |
|---|---|---|
| SF30 AMENDMENT No. 2 to RFP-Phoenix00001_Final.doc | DOC document | |
| Utilities-Fuel Usage and Inventory Estimate_Attachment J-11 J-12 Revised.xlsx | XLSX spreadsheet | |
| MOU_TAR_Attachment C.C.3 C.13c.pdf | ||
| MOU_MCCCD_Attachment C.C.3 C.13a.pdf | ||
| Regional Career Pathways Presentation FMT_Attachment.doc | DOC document | |
| MOU_PJCC- AZ SIATech_Operations_Attachment C. C.3 C.13 b.pdf | ||
| Phoenix JCC_Perf Report Cards_Attachment J-16.pdf | ||
| National Staff Compensation Report Data_J-13_revised.xls | XLS spreadsheet | |
| SF30 AMENDMENT No. 1 to RFP-Phoenix00001_11-22-11.doc | DOC document | |
| Fleet List_J-10.xlsx | XLSX spreadsheet | |
| Phoenix RFP DOLJ12SA00001_11-18-11_FINAL.doc | DOC document | |
| Master Itemized Property Report_J-10.pdf | ||
| National Staff Compensation Report Data_J-13.xls | XLS spreadsheet | |
| Facility Survey | — |
Show all 14
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
File details come from the government source that posted it. Updated .