Facility Survey

3 MB Posted

Attached to
Operation of the Phoenix Job Corps Center
Solicitation number
DOLJ12SA00001
Issued by

About this file

Attachment J-9 (Volume 2) to RFP

Text of this file

Phoenix

Job Corps Center Phoenix, AZ

Facility Planning Report Volume II

Supporting Data

Preliminary May 2011

Department of Labor/ Office of Job Corps

22Phoenix Job Corps Center

Phoenix

Job Corps Center Phoenix, AZ

Facility Planning Report Volume II

Supporting Data

Preliminary May 2011

Main Building 1 Gymnasium

33 Phoenix Job Corps Center

CONTENTS

PHOENIX JOB CORPS CENTER

FACILITY PLANNING REPORT

VOLUME I - Planning Strategy

• Existing Site Plan

• Center Statistics

INTRODUCTION

• Purpose

• Report Contents

EXECUTIVE SUMMARY

A. EXISTING CONDITIONS

• Background

• General Site Conditions

• General Building Conditions

• Ownership

• Facility Assessment by Function

• Energy

• Environmental Issues

• Sustainability

• Accessibility Standards

• Current and Completed Projects Since the Last Survey

• Health and Life Safety Issues

• Summary of Defi ciencies

B. RECOMMENDATIONS

• Status of the Previous (PY07) Plan

• Signifi cant Issues

• PY 10 Plan Overview

• Regional Projects

• Proposed Site Plan

C. PLANNING ANALYSIS

• Purpose

• Planning Objectives and Assumptions

• Space Utilization Analysis

• Federal Real Property Asset Management

• Mission Dependency Site Plan

• Defi ciency Analysis

• Facility Condition Summary Report

• Building Condition by Function

• Building Condition Site Plan

VOLUME II - Supporting Data

• Vicinity Map

• Location Map

• Existing Site Plan

D. DESCRIPTIONS

• Program Descriptions

— Square Footage Details GSF by Building Space Utilization Comparison NSF by Building

— Energy Management

— Environmental Management

Environmental Management Report Asbestos Report Radon Report

• Site Descriptions

• Building Descriptions

E. DEFICIENCIES

F. CORRESPONDENCE AND REPORTS

• Survey Brief

• RA and Student Facility Feedback Questionnaire

• Life Safety Defi ciencies Transmittal and List

• O & M Defi ciency List

• Active Warranty Report

• FRPC Performance Measures Matrix

44Phoenix Job Corps Center

55 Phoenix Job Corps Center

Phoenix Job C orps C enter

77 Phoenix Job Corps Center

D Descriptions

BUILDINGS AND STRUCTURES

00904 PHOENIX 09-MAY-11

1Page:

0001 - MAIN BUILDING

0002 - VOCATIONAL BUILDING

0007 - ANNEX II - MULTIPURPOSE/HR

0008 - RECREATION

HALL/ADMINISTRATION

0010 - DORMITORY

0015 -EDUCATIONAL BUILDING

0016 - VOCATIONAL COMPLEX

BUILDING 1

0017 - VOCATIONAL COMPLEX

BUILDING 2

0018 - VOCATIONAL COMPLEX

BUILDING 3

0010A - LUGGAGE STORAGE 1

0010B - LUGGAGE STORAGE 2

0010C - TRELLIS 1

0010D - TRELLIS 2

0017A - FACILITIES STORAGE

Name GSF

62,460 11,080 4,800

10,050

34,690 1,583

12,551

3,759

3,647

Active Active Active Active

Active Active Active

Active

Active

Active Active Active Active Active

StatusType

Building Building Building Building

Building Building Building

Building

Building

Structure Structure Structure Structure Structure

Use Group Built Flrs Const

Business/Ass Business Business/Ass Assembly

Residential Business Business

Business

Business

Storage Storage Assembly Assembly

Good Good Good Good

Good Good Good

Good

Good

Good Good Good Good Good

ConditionAsset Number

0090400002 0090400003 0090400017 0090400018

0090400019 0090400023 0090408043

0090408044

0090408045

0090408039 0090408040 0090408041 0090408042 0090408046

9 144,620

5 1,310

14 145,930

Buildings

Structures

Total

GSF

GSF

GSF

Summary

May 09, 2011 Space Utilization By Function 00904 Phoenix

HOUSING

EDUCATION

FOOD SERVICE

SUGGESTED

NSF/

ENROLLEE

SUGGESTED

TOTAL

NSF

ACTUAL

TOTAL

NSF

TYPE OF SPACE

SUB TOTAL

SUB TOTAL

SUB TOTAL

Resident Men Resident Women Total Residents

Residents 239 Non Residents 211

450Total Students

(239)

(450)

(450)

DIFFERENCE

23,900

26,840

11,700

24,819

38,102

5,305

Lounge Other Shower/Toilet Sleeping Storage

Academic (450) Non-Academic

60 -- Business Office Technologies 20 -- Carpentry + 20 -- Cement Masonry + 30 -- Cert. Nursing Asst.

30 -- Computer Service Tech.

20 -- Facilities Maint. and Const. + 30 -- Medical Assistant 24 -- Painting + 20 -- Plastering + 30 -- Retail Sales + 60 -- Security Services

Vocational Theory (134)

Dining (1 Serving) Food Preparation Food Storage

4,146 2,977 2,494

14,853

8,319 7,165

2,143 3,132 2,974 1,168

2,537 1,740 2,810 3,047

1,507

2,993

1,794

2,390

2,868 17,208

1,434

4,500 4,500

2,400 1,500 1,500 1,200

1,500

1,800 1,500 1,200 2,100

1,340

7,200 2,700 1,800

1,756

-374 -2,355 -1,085

3,819 2,665

-257 1,632 1,474

-32 -302

1,037

1,010 1,547

-538 -593

-1,040

-4,207 -2,182

-6

Vocations

11,262

-6,395

May 09, 2011 Space Utilization By Function 00904 Phoenix

RECREATION

MEDICAL/DENTAL

ADMINISTRATION

STORAGE/SUPPORT

VACANT

SUGGESTED

NSF/

ENROLLEE

SUGGESTED

TOTAL

NSF

ACTUAL

TOTAL

NSF

TYPE OF SPACE

SUB TOTAL

SUB TOTAL

SUB TOTAL

SUB TOTAL

SUB TOTAL

TOTAL 222.83 100,275 102,486

(450)

(450)

(450)

(450)

(0)

DIFFERENCE

144,620

0.71

TOTAL GSF

NET TO GROSS RATIO

15,115

4,720

9,000

9,000

16,772

3,435

7,800

5,590

Arts & Crafts Canteen Gymnasium Men's Exercise Room Miscellaneous Recreation Multipurpose Room Recreation Office Recreation Storage Women's Exercise Room

Medical Only Medical/Dental

Administration

Operations & Maintenance Warehouse

Vacant

4.53 5.96

1,092

4,793

4,217 2,963

1,790

1,033 2,402

7,800

3,532 2,058

2,040 2,680

9,000

3,600 5,400

-1,007 -278

-1,200

-68 -3,342

RESIDENT

NON-RESIDENT

(239)

(211) 15

50 11,950 3,165

1,657

-1,285

-1,200

-3,410

2,211

Net Square Footage By Building Date: 05/09/2011 Page: 1Center: PHOENIX (00904)

HOUSING

Sleeping

Lounge

Storage

Shower/Toilet

Other

Function Suggested NSF

12,562 2,291

3,482

2,154

2,977

0010 - DORMITORY

0001 - MAIN BUILDING

0001 - MAIN BUILDING

0010 - DORMITORY

0010 - DORMITORY

0001 - MAIN BUILDING

0010 - DORMITORY

0001 - MAIN BUILDING

0010 - DORMITORY

Bldg Name Actual NSF Difference

14,853

4,146

2,494

2,977

Sub Total: 24,819

17,208

2,390

1,434

2,868

23,900

-2,355

1,756

-1,085

-374

2,977

( 239

Page: 2Center: PHOENIX (00904)

EDUCATION

Academic

Vocational Theory (134)

Carpentry

Cement Masonry

Painting

Plastering

Retail Sales

Computer Service Tech.

Facilities Maint. and Const.

Medical Assistant

Security Services

Non-Academic

Business Office Technologies

Cert. Nursing Asst.

Function Suggested NSF

1,040

4,448 1,213

3,132

2,974

2,810

3,047

2,537

1,740

1,507

1,263 2,440

1,134

2,143

1,168

0002 - VOCATIONAL BUILDING

0008 - RECREATION HALL/ADMINISTRATION

0001 - MAIN BUILDING

0001 - MAIN BUILDING

0001 - MAIN BUILDING

0018 - VOCATIONAL COMPLEX BUILDING 3

0017 - VOCATIONAL COMPLEX BUILDING 2

0017 - VOCATIONAL COMPLEX BUILDING 2

0016 - VOCATIONAL COMPLEX BUILDING 1

0016 - VOCATIONAL COMPLEX BUILDING 1

0016 - VOCATIONAL COMPLEX BUILDING 1

0002 - VOCATIONAL BUILDING

0018 - VOCATIONAL COMPLEX BUILDING 3

0016 - VOCATIONAL COMPLEX BUILDING 1

0001 - MAIN BUILDING

0002 - VOCATIONAL BUILDING

0001 - MAIN BUILDING

0010 - DORMITORY

0018 - VOCATIONAL COMPLEX BUILDING 3

0015 -EDUCATIONAL BUILDING

0002 - VOCATIONAL BUILDING

0001 - MAIN BUILDING

0010 - DORMITORY

0007 - ANNEX II - MULTIPURPOSE/HR

0008 - RECREATION HALL/ADMINISTRATION

0001 - MAIN BUILDING

0001 - MAIN BUILDING

Bldg Name Actual NSF Difference

8,319

3,132

2,974

2,810

3,047

2,537

1,740

1,507

7,165

2,143

1,168

Sub Total: 38,102

4,500

1,340

1,500

1,500

1,800

1,500

1,200

1,500

2,100

4,500

2,400

1,200

26,840

3,819

-1,040

1,632

1,474

1,010

1,547

-538

-302

1,037

-593

2,665

-257

-32

( 450

11,262

Page: 3Center: PHOENIX (00904)

FOOD SERVICE

RECREATION

MEDICAL/DENTAL

Food Preparation

Food Storage

Dining (1 Serving)

Multipurpose Room

Arts & Crafts

Gymnasium

Miscellaneous Recreation

Canteen

Men's Exercise Room

Women's Exercise Room

Recreation Storage

Recreation Office

Medical/Dental

Medical Only

Function Suggested NSF

1,794

2,993

2,963

1,092

4,793

3,504

1,579

2,402

1,033

0001 - MAIN BUILDING

0001 - MAIN BUILDING

0001 - MAIN BUILDING

0007 - ANNEX II - MULTIPURPOSE/HR

0001 - MAIN BUILDING

0001 - MAIN BUILDING

0008 - RECREATION HALL/ADMINISTRATION

0001 - MAIN BUILDING

0008 - RECREATION HALL/ADMINISTRATION

0001 - MAIN BUILDING

0001 - MAIN BUILDING

0008 - RECREATION HALL/ADMINISTRATION

0001 - MAIN BUILDING

0008 - RECREATION HALL/ADMINISTRATION

0001 - MAIN BUILDING

0001 - MAIN BUILDING

0001 - MAIN BUILDING

Bldg Name Actual NSF Difference

1,794

2,993

2,963

1,092

4,793

4,217

1,790

2,402

1,033

Sub Total:

Sub Total:

Sub Total:

5,305

16,772

3,435

2,700

1,800

7,200

2,680

2,040

11,700

15,115

4,720

-2,182

-6

-4,207

-278

-1,007

-6,395

1,657

-1,285

Page: 4Center: PHOENIX (00904)

ADMINISTRATION

STORAGE/SUPPORT

VACANT

Administration

Warehouse

Operations & Maintenance

Vacant

Function Suggested NSF

5,133

1,477 1,111

1,454

3,532

0001 - MAIN BUILDING

0010 - DORMITORY

0008 - RECREATION HALL/ADMINISTRATION

0002 - VOCATIONAL BUILDING

0002 - VOCATIONAL BUILDING

0008 - RECREATION HALL/ADMINISTRATION

0001 - MAIN BUILDING

0016 - VOCATIONAL COMPLEX BUILDING 1

0002 - VOCATIONAL BUILDING

Bldg Name Actual NSF Difference

7,800

2,058

3,532

Sub Total:

Sub Total:

Sub Total:

7,800

5,590

9,000

5,400

3,600

9,000

9,000

-1,200

-3,342

-68

-1,200

-3,410

Energy Management Report Center: PHOENIX (00904)

Page: 1 Date: 05/09/2011

CENTER ENERGY DATA

Yes

ENERGY CONSUMPTION ASSESSMENT

1% 72,856 62,689 73,752

ENERGY USE BY FUEL TYPE

Energy Audit :

Date of Audit :

Status of Energy Conservation Measure Recommendations :

Electric Company :

FY 2003 Energy Baseline :

Percent Reduction since Baseline Year :

Natural Gas Company :

Property Status :

4/25/06 Implemented Arizona Public Service Co.

Southwest Gas

Federally Owned (DOL)

2,518,766 8,594=

Total 10,536

MBtu

MBtu

Total $312,738 MBtu/ $29.683

BTU/GSF

BTU/GSF

BTU/GSF

Electricity

Natural Gas kWh

1,884 MCF = 1,942 MBtu

$287,768 $0.114= kWhElectricity

Natural Gas $24,970 = $13.254 MCF

ENERGY COST BY FUEL TYPE

WATER CONSUMPTION ASSESSMENT

FY 2007 Baseline:

Percent Reduction Since Baseline Year:

1,000 Gallons

1,000 Gallons

FY 2010 Energy Goal:

Further Reduction in Energy Usage is needed to meet Energy Reduction Goals.

FY 2010 Energy Consumption:

Note: The Federal Government has set a goal of 3% Energy Consumption Reduction per year in EO 13423.

8,591 8,076 6,070

29%

Water Goals are being met. Keep reducing Water Consumption.

Note: The Federal Government has set a goal of 2% Water Consumption Reduction per year in EO 13423.

FY 2010 Goal:

FY 2010 Water Consumption:

1,000 Gallons

Page: 2 Date: 05/09/2011

Implementing some of the below recommendations can save you 10% to 25% off your annual energy bill without negatively impacting comfort or productivity.

1. Your staff and students are the key to savings. Educate the students and staff on the why of energy saving - costs and environmental impacts. Encouraging them to actively participate in energy reduction is also important. Post reminders at exit doors and bulletin boards about energy conservation. Simple tips include:

a. Turn it down (lights, heating & cooling),

b. Turn it off (lights, computers, other equipment),

c. Keep it tight (close doors and windows, use window blinds)

2. Operations and Maintenance: Educate the O&M staff on the why of energy saving -costs and environmental impacts. Simple tips include:

a. Make sure that the Operations and Maintenance staff is properly trained for the equipment they operate.

b. Tune and clean HVAC: Perform seasonal cleanups on air conditioners, boilers and furnaces, and regularly clean cooling coils and drain pans. Get rooftop or outdoor condenser coils cleaned and maintain an appropriate filter changing schedule.

c. Check (or ask your HVAC contractor to check) your outside air dampers or economizers to verify proper ventilation. Make sure economizer controls function properly. Make sure automatic dampers close during unoccupied periods.

d. Restore automatic control: When troubleshooting a system, take time to figure out and repair the automatic controls. Today's quick fix is tomorrow's bad idea.

e. Reasonable set points: Try 68°F in the heating season and 78°F in the cooling season.

f. Schedule HVAC equipment and lighting: (weekdays, weekends, holidays, off-season). Make sure equipment runs only when it is needed and the buildings are occupied. When buildings are vacant (i.e. dormitories during the day with students in class), make sure all the lights in the building are off.

g. Seasonal (resets, schedules, and shutoffs): As the seasons change, adjust set points and schedules to match the system's response to the weather.

h. Lighting: Invest in an inexpensive light level meter to measure the foot-candles in spaces to determine whether or not they are over lit and lamps can be safely removed. Where four-lamp fixtures are in use, two lamps can usually be removed from every fixture or every other fixture. After lamps are removed, disconnect ballasts. Contact the Energy team at PBDewberry for suggested light levels for individual space types. Cleaning fixtures regularly increases light levels.

i. Utilize power management features for all computers and monitors to shut them off when idle for more than 15 minutes.

Page: 3 Date: 05/09/2011

j. Have your vending machine suppliers turn off or remove light tubes from the advertising lighting in the machine. This will save about $50 per year per vending machine.

k. Save water with low flow sink aerators (0.5gpm) and low flow shower heads (1.5gpm - 2.0gpm). This will also reduce water heating energy consumption.

l. Set your water heater to 120°F. Verify by measuring at the tap. Never go below 115°F.

m. For water heaters installed in unconditioned spaces, add insulation blankets making sure that access covers, electric connection areas, and pressure relief valves are left uncovered.

n. Caulk and fill cracks around doors and windows to reduce costly air leaks.

o. When replacing broken glass, use high transmittance, low heat gain windows.

p. Make sure automatic door closers are functioning properly to avoid drafts.

3. Buy energy efficient, buy EnergyStar (www.energystar.gov).

a. Buy EnergyStar appliances and equipment.

b. Replace burned out lightbulbs with EnergyStar labeled compact fluorescent lightbulbs (CFLs).

c. Replace broken thermostats with EnergyStar labeled programmable products.

d. Replace broken exit signs with EnergyStar LED exit signs.

Environmental Management Report

Page: 1 Date: 05/09/2011

SOLID & HAZARDOUS WASTE MANAGEMENT (RCRA)

Commercial Waste Service

HAZARDOUS MATERIALS STORAGE (EPCRA)

No Pre-apprenticeship Vocational Building

Oil-based paints/stains, organic solvent, paint thinner, wax stripper Yes

PETROLEUM UNDERGROUND STORAGE TANKS (RCRA)

N/A0

PETROLEUM ABOVEGROUND STORAGE TANKS (CWA)

ASBESTOS AND PCB MANAGEMENT (TSCA)

AIR POLLUTION CONTROL (CAA)

N/A None

Non-Attainment

Solid Waste Disposal :

Hazardous Waste Generator :

Hazardous Waste ID :

Generator Classification :

Hazadous Materials Storage :

Hazardous Materials ID :

HazMat Storage Area :

HazMat Spill Response Plan :

Number of Regulated USTs :

Number of Un-regulated USTs :

Local Hazardous Use Permit :

LEPC Notification :

EPA Generator ID Number :

Hazardous Waste Disposal :

RCRA Compliance

ID LocationFuel Type Capacity

Number of ASTs :

Asbestos Survey Date :

Asbestos Type :

Asbestos Coordinator :

Coordinator Training Date:

Custodial/Maintenance Training :

AHERA Regulated :

Management Plan Approval :

PCB Transformer Testing :

PCB Transformers :

PCB-Contaminated Transformers :

Transformers Labelled :

Regional Air Quality :

Permitted Air Pollution Source :

Source Description :

Waste Management, Inc.

Yes Organic solvent (2 gals/yr), paint thinner (3 gals/yr)

Conditionally Exempt Small Quantity Generator N/A Commercial Hazardous Waste Disposal Service

Safety-Kleen, Chandler, AZ

No No

Overfill Leak Corrosion

SPCC Plan Required : SPCC Plan Completed :

No N/A

10/11/1990 Friable/Non-Friable Troy Lacy 07/06/1992 Yes No

No No

CO, Ozone, PM-10

ID Fuel Type Capacity Location Overfill

Prevention Secondary ContainmentTank Status

Tank Status Prevention/Detection

Asbestos-Containing Materials Inventory

Date: May. 09, 2011Center : Phoenix (00904) Page: 1 of 1

Heating Floor Finishes Roof Repair/Replacement Roof Repair/Replacement Roof Repair/Replacement Floor Finishes Floor Finishes Floor Finishes Floor Finishes Floor Finishes Floor Finishes Floor Finishes Floor Finishes

Roof Repair/Replacement Ceiling Finishes Floor Finishes Roof Repair/Replacement Ceiling Finishes

Bldg System

Bldg System

Pipe fitting insulation Mastic beneath 12x12 tile Roof flashing Roofing felt/asphalt shingles Built-up roofing 12x12 tile, white (covered) 12x12 floor tile, off-white 12x12 floor tile, tan/orange 12x12 floor tile, tan 12x12 floor tile, brown 12x12 floor tile, grey 12x12 floor tile, brown 12x12 tile, tan (covered)

Roof flashing Acoustical plaster 12x12 floor tile, beige Built-up roofing material Acoustical plaster

Category Description

Category Description

Ea.

Sq. Ft.

Sq. Ft.

Sq. Ft.

Sq. Ft.

Sq. Ft.

Sq. Ft.

Sq. Ft.

Sq. Ft.

Sq. Ft.

Sq. Ft.

Sq. Ft.

Sq. Ft.

Sq. Ft.

Sq. Ft.

Sq. Ft.

Sq. Ft.

Sq. Ft.

Location

Location

Unit

Unit

Quantity

Quantity

Above 1st fl. hall See above locations Building perimeter Roof sections 7, 8 Roof section 3 1st fl., back hall 1st fl., storage rm.

1st fl., gym hallway 1st fl., print shop Gymnasium 1st fl., fire equip.

1st fl., elec. room 1st fl., common area

Roof, maint. area 2nd fl., maint. area 2nd fl., maint. area Roof, maint. area 1st fl., maint. area

Building :

Building :

0001 - MAIN BUILDING

0002 - VOCATIONAL BUILDING

Radon

Page: 1 of 1

0001 - MAIN BUILDING

0002 - VOCATIONAL BUILDING

0007 - ANNEX II - MULTIPURPOSE/HR

0008 - RECREATION HALL/ADMINISTRATION

0010 - DORMITORY

0015 -EDUCATIONAL BUILDING

0016 - VOCATIONAL COMPLEX BUILDING 1

0017 - VOCATIONAL COMPLEX BUILDING 2

0018 - VOCATIONAL COMPLEX BUILDING 3

Bldg Name

08/11/1992

06/06/1990

06/06/1990

06/06/1990

06/06/1990

Test Date

Yes

Yes

Yes

Yes

Yes

No

No

No

No

Radon Testing

< 4 pCi

< 4 pCi

< 4 pCi

< 4 pCi

< 4 pCi

Test Result

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

Mitigation Mitigation Date

RADON EXPLANATORY NOTES

The US Environmental Protection Agency (EPA) has established a radon action level of 4.0 picoCuries per liter (pCi/L). Occupied buildings with radon concentrations less than 4.0 pCi/L do not require radon mitigation; un-occupied buildings, or those buildings which are occupied only infrequently for brief periods of time, also do not require radon mitigation. Occupied buildings with radon concentrations greater than

4.0 pCi/L require radon mitigation and verification of radon reductions as soon as possible, with priority given to dormitories and student recreation buildings. Occupied buildings with radon concentrations greater than 20.0 pCi/L should be considered significant radon exposure hazards, and priority for mitigation should be given to buildings with these highly elevated radon concentrations.

Radon mitigation techniques include: (1) adjustment of the building HVAC system to create a positive pressure within the building; (2) sealing of foundation wall cracks, penetrations, or other openings;

(3) sealing crawlspace openings and sump pits; (4) installing an active subslab depressurization (ASD) system.

Site Description

Page: 1 Date: 05/09/2011

ACCESSIBILITY

Yes

The site is flat and most sidewalks have curb cuts.Comments:

UnknownNoNoNo

Nationally Registered Site

Site Eligible for National Register

Located in Historic District

Archaeological Significance

Drain System Soil Erosion Soil Erosion Location

No NoneUnderground

Comments:

Paving Type for Roads & Parking

The city owns the roads and sidewalks. Parking is provided by center owned/leased lots including street parking. The condition of the roads, parking lots and sidewalks is good. A new parking lot for non-resident students and staff was recently completed.

Paving Type for Sidewalks

Asphalt Concrete

Comments:

Structures Fencing Outdoor Recreation

Facilities Storage; Luggage Storage 1 & 2;

Trellis 1 & 2

Chain Link, Painted Masonry None

The campus has several courtyards paved with a combination of exposed aggregate concrete pavers, decorative brick and plain concrete pavers. Plants, trellises, benches and tables are located within these courtyards. The dormitory courtyard has extensive landscape, water features, a series of ponds and an outdoor grill. The soft vocation, education, recreation, administration and dormitory blocks have perimeter masonry fences with stucco finish. The hard vocation and new parking blocks have perimeter chain link fences.

ROADS, PARKING & SIDEWALKS

Water Source Water Authority Service Meter On-Site Treatment Plant

1. Water

Treatment Type Storage Type Storage Capacity Maintenance Responsibility

Center

NoIndividualCity of PhoenixPublic Water Authority

None 0None

Comments:

Fire Hydrants On-Site Water Supply Storage Capacity Pressure Source # of Fire Pumps

Yes 0 0None Municipal

There is a fire department at 16th and Buckeye, approximately 3 miles from the center and about 5 minutes response time.

Number of Deficiencies = 1

Number of Deficiencies = 1

Accessible Parking: Accessible Slope:

Yes

Curb Cuts:

Yes

Ramps:

N/AYes

Site Accessible Route:

HISTORIC PRESERVATION

STORM WATER SYSTEM

SITE FEATURES

UTILITY

2. Fire Protection

Page: 2 Date: 05/09/2011

Sewage Treatment Sewer Line Owner

N/APublicly Owned Treatment Works CenterMunicipal

Maintenance ResponsibilityCapacity(Gallons)

Comments: There are two gas meters at the campus.

Natural

None

Comments:

Electric Company

PCB

Trans.

Transformer Mounting

Transformer Ownership

Systems Ownership

Maintenance Responsibility

Arizona Public Service Co.

Services enter the center at multiple locations. Main Building 1 has two services. The first service, approaching from the west, is brought from three 75 kVA pole-mounted transformers on Second Street. The second service, approaching from the east, is brought from a power pole on Third Street. Vocational Building 2 also has two services, one from the north and one from the east, which are brought from two 25 kVA pole-mounted transformers on Buchanan Street and two 75 kVA pole-mounted transformer on Third Street respectively. The pole-mounted transformers on Third Street additionally serve Annex II Building 7 and Recreational Hall Building 8. Dormitory Building 10 service is brought from a power pole on Buchanan Street to a pad-mounted transformer located in the back of the building. The three Vocational Complex Buildings 16, 17 and 18 are served by a pad-mounted transformer adjacent to Building 16. Most buildings have their own meter while others are zoned. The local utility company, Arizona Public Service Company, owns and maintains all pole and pad-mounted transformers. Site lighting includes building and pole-mounted fixtures which are controlled by photocell and time clock. The center owns and maintains the site lighting.

Pole and Pad Utility Utility UtilityNo

Comments:

Telephone Company On-site Line Owner

The telephone communication and data service main closet (MC) is located in Building 1. Local telephone service is provided by Qwest. Long distance telephone service is provided by Job Corps Data Center (JCDC). JCDC provides and maintains internal distribution Voice over IP (VoIP), LAN and WAN networks which are interconnected by fiber optic cables. The telephone switch contains 96 analog phone ports and 16 digital phone ports to service the center telephone and FAX traffic. The telephone system including Full DSI DID Trucking Service is maintained under a service contract with Integra Telecom Communication. The data transmission is routed from each building over a fiber optic cable to MC which is connected to a Cisco 6500 router. Total of 13 buildings are interconnected with a Gigabyte Cisco Catalyst 3560 switch to the data network. The MC contains four servers (two for staff and two for student applications) and two routers for data transfer. All data communication system managed by the JCDC are connected to UPS which buffers the power surges and drops in the line voltage and will maintain the system up to 20 minutes before an automated, shut down is enacted. The center fire alarm system is monitored in Administration Building 1.

Qwest

Maint. Responsibility

Center Center

Security

None

7.2/4.16 kV, 3-Phase, 4 Wire

208/120 V, 3-Ph, 4 W and 120/240V, 3-Ph, 4 WOverhead & Underground

Overhead & UndergroundPrimary Service

Secondary Service

Distribution Characteristics

3. Sanitary Sewer System/ Sewage Treatment Plant

4. Gas

5. Central Plant

6. Electric

7. Communication

Gas Company: Southwest GasGas Type:

Page: 3 Date: 05/09/2011

There are no storage tanks.

STORAGE TANK

Comments:

TypeStatus Location Owner Fuel Type Capacity Install Date

Earthquake Risk

Medium Medium LowMedium MediumIBC Medium

LightningEarthquake Def. Authority Flooding Tornado Hurricane Forest

Fire

ID Reg.

GENERAL SITE CONDITION

Rating X Good Fair Poor

NATURAL HAZARDS

The facility condition is not impacting the functional use of the facility.

The facility condition IS impacting the functional use of the facility.

The facility condition IS SIGNIFICANTLY impacting the functional use of the facility.

Purpose

Building Descriptions and Utilities Phoenix

BUILDING 1 - MAIN BUILDING

Building Descriptions

Page: 1 of 43

Building: 0001 - MAIN BUILDING

BUILDING ENVELOPE

Foundation RoofBuilding

Concrete Concrete/CMU Concrete

The floor construction is concrete.

Brick Masonry Stucco

AccessibilityFeature

GSF NSF Year Built Use Group Historic Ownership#Floors

Business/Assembly 62,460 41,515 5 Owned 1925 Unevaluated

Comments: The basement and mezzanine levels are not accessible. The gymnasium is not accessible from within the building. The gymnasium floor is 35 inches lower than the rest of the building and can only be accessed via steps inside the building. The exterior ramp located outside the south exit of the gym is used for egress only. First floor public restrooms are not accessible. Upper floor restrooms are accessible.

REAL ESTATE

Access to Building

Ramps

Entrance

2nd Egress

Visual Alarm

Corridor/Aisle

Rooms

Stairs

Elevator

Restrooms

Drinking Fountain

Telephone

Yes

Yes

Yes

Yes

Yes

Yes

Yes

Yes

Yes

Yes

Yes

N/A

ACCESSIBILITY

Structural Systems1.

Exterior Walls2. Number of Deficiencies = 2

Material

Asbestos: Yes

Roof condition assessment is based on visual observation during the Facility Survey.

The roofs over the gymnasium and tower are in good condition and do not need to be replaced.

This building has 11 different roof sections which have a sprayed-on membrane. Ten of them were installed in 2001. The 4th floor membrane was installed in 2004.

Drainage Year Life

Remaining Type Area Served

Asphalt & Sprayed-on Membrane

Asphalt & Sprayed-on Membrane

Interior Roof Drains

Interior Roof Drains

Multi type

Flat

Multi - Use

Classrooms & Offices

Number of Deficiencies = 1

Comments:

Comments:

3. Roof

Entire Building

Area Served

Comments:

Page: 2 of 43

Building: 0001 - MAIN BUILDING

Wall Roof None Batt

Comments: The building has the original single pane, non-insulated windows.

INTERIOR FINISH

Carpet Ceramic Tile Concrete Epoxy Resin Plywood Wood

Comments: New VCT flooring installed on 4th floor in 2010.

CMU Ceramic Tile Drywall Wood Paneling

Metal Units - Metal Frame Wood Units - Wood Frame

VERTICAL CIRCULATION

Concrete Stairs Elevator Ramp Wood Stairs

Comments: A small passenger elevator serves the four story section of the building located at the east side.

Metal Units - Metal Frame

Awning Units - Steel Frame; Single Glazing; Fixed - Steel Frame; Single Glazing;

Sliding - Steel Frame; Single Glazing;

Acoustical Tile Exposed Structure Gypsum Board

Insulation4.

Exterior Doors5. Number of Deficiencies = 1

Windows6. Number of Deficiencies = 2

Floors1. Asbestos: Yes Number of Deficiencies = 3

Interior Walls2.

3. Number of Deficiencies = 1

Interior Doors4. Number of Deficiencies = 2

Ceilings

Page: 3 of 43

Building: 0001 - MAIN BUILDING

Mechanical

Mechanical

Toilet/Shower

Kitchen

Ventilation Area Served

Split Direct Expansion (Air

Source)

Packaged Heat Pump (Air

Source)

Single Duct

Single Duct

Refrigerant

None

Electric

Electronic

Natural

Mechanical

None

None

Electronic Equipment

Room

Entire Building

Exhaust Ventilation

A split DX air conditioner serves the computer room located in the medical/dental area.

This building has 24 packaged heat pumps manufactured by Trane, York, and Arco Air. Eight are 15 ton units. Three are 10 ton units. Two are 7.5 ton units. Nine are 5 ton units. One is a 4 ton unit. One is a 3 ton unit.

Comments:

Comments:

Number of Deficiencies = 2

Heat Source

Heat Distribution

Piping System

Control System

Fresh Air Intake

Energy Conservation

Measure

Area Served

This building has 24 packaged heat pumps manufactured by Trane, York, and Arco Air. Eight are 15 ton units. Three are 10 ton units. Two are 7.5 ton units. Nine are 5 ton units. One is a 4 ton unit. One is a 3 ton unit. A typical Trane packaged rooftop unit is model WCH180B300FA manufactured in 11/2002.

A Goettl model VGLP 5-T electric furnace serves the weight room area.

Comments:

Comments:

HVAC

Heat1. Asbestos: Yes

Split Heat Pump (Air

Source)

Electric Furnace

Single Duct

Single Duct

None

None

Electronic

Electric

Mechanical

Natural

None

None

Entire Building

Recreation Area

Ventilation2.

System Type

Number of Deficiencies = 2

Air Distribution

Piping System

Control System

Fresh Air Intake

Energy Conservation

Measure

Area Served

3. Air Conditioning

Page: 4 of 43

Building: 0001 - MAIN BUILDING

The gymnasium showers are provided with hot water from an A.O. Smith model DRE 120 917 electric water heater with two Raypak 115 gallon insulated storage tanks. The kitchen is provided with hot water by an A.O. Smith model BTR 199 118, manufactured on 12/09/2009. Kitchen hot water is treated with a water softener. The upper floors are provided with hot water from a Raypak model W3-1083 hot water boiler.

Comments:

Comments:

Cast-Iron Outdoor Cast-Iron

The kitchen is served by bio-chemical digester type grease interceptors.

Electric Water Cooler Fixed Emergency Eyewash Hose Bibb Lavatory Shower Sink Urinal Water Closet (Flush Valve) Waterless Urinal

Gas (Natural)

Wet None ABC Type Fire Extinguisher, K Type Fire Extinguisher, Wet Chemical, Dry Chemical

Comments: Only the basement center maintenance area is sprinklered. Kitchen hoods are protected by wet chemical fire suppression systems. The serving line hood has a dry chemical system.

Galvanized Steel and Copper

Galvanized Steel and Copper

Electric Water Softener No

Hot Water Cold Water Water Heater Water Treatment HW Storage Tank

Grease InterceptorWaste / Vent Interior Storm

Sprinkler System Stand Pipe System Fire Suppression

PLUMBING Number of Deficiencies = 3

Water Distribution1.

Sanitary Distribution2. Number of Deficiencies = 1

Fixtures3.

Fuel Distribution4.

FIRE PROTECTION

Location UL300 Compliance Status Kitchen Unknown

Comments: Compliance with UL 300 is not specifically noted on the inspection report.

UL300 COMMERCIAL KITCHEN HOOD FIRE SUPPRESSION

Page: 5 of 43

Building: 0001 - MAIN BUILDING

Comments: This building has two services. The first service is brought from three 75 kVA pole-mounted transformers on Second Street to an 800A switchboard located in the gymnasium electrical room. This switchboard serves loads on the west side of the building which includes the gymnasium, academic education and dental/medical areas. The second service is brought from a power pole on Third Street. The primary overhead lines from this pole change to underground and terminate in a pad-mounted transformer located in the back of the building. This transformer energizes a 3000A switchgear adjacent to the transformer.

The switchgear supplies power to two 1200A switchboards located in the cafeteria electrical room and on the roof. The switchboard in the electrical room serves loads in the kitchen, administration and part of the education which are on the east side of the building. The switchboard on the roof serves the building mechanical and elevator equipment. Each service has its own meter.

Service Entrance Electrical Characteristics Distribution Equipment Wiring Devices

Comments: Recorded footcandle levels include natural light contribution. Some of the spaces have mixtures of T8 and T12 lighting fixtures.

High Intensity Discharge (HID)

Comments: Exterior building-mounted and surrounding area pole-mounted light fixtures are controlled by time clock and photocells.

T8 - Fluorescent

T8 - Fluorescent

T8 - Fluorescent

T8 - Fluorescent

T8 - Fluorescent

T8 - Fluorescent

T8 - Fluorescent

T8 - Fluorescent

T8 - Fluorescent

T8 - Fluorescent

High Intensity Discharge (HID)

T8 - Fluorescent

T8 - Fluorescent

T8 - Fluorescent

T8 - Fluorescent

T8 - Fluorescent

Offices

Conference Rooms

Classrooms

Medical/Dental

Reception

Wards (Patient)

Food Preparation

Dining/Lunch Rooms

Dishwashing

Storage Rooms

Gymnasium

Recreation

Locker Room

Toilets

Equipment Rooms (Elec/Mech)

Corridors & Stairs

Area Recommended Level

Recorded Level Light Type

Battery Backup Battery Backup

Switchboard 120/208V, 3-Phase, 4 Wire Panelboard Receptacles, GFCI, Switches

Emergency Exit

ELECTRICAL SERVICES Number of Deficiencies = 3

Exterior Lighting1. Number of Deficiencies = 1

Interior Lighting2. Number of Deficiencies = 1

Emergency /Exit Lighting3.

LIGHTING

Page: 6 of 43

Building: 0001 - MAIN BUILDING

FIRE ALARM

Comments: The building central fire alarm control/annunciator panel is a SafeTech 3000. It is located in the security office on the first floor. The fire alarm panel in this building additionally serves devices in Building 8.

However, at the time of November 2010 Facility Survey, center was in process of replacing centerwide fire alarm system.

Comments: Most of the classrooms have TV-VCR and computer work stations.

Audible Alarm Central Annunciator Panel Duct Smoke Detector Flow/Tamper Switch Heat Detector Manual Pull Station Smoke Detector Visual Alarm

Connected to Main System Magnetic Door/Alarm None TV with VCR

Telephone Security Public Address Television

Number of Deficiencies = 2

GENERAL BUILDING CONDITION

Rating X Good

Fair Poor

COMMUNICATION

The facility condition is not impacting the functional use of the facility.

The facility condition IS impacting the functional use of the facility.

The facility condition IS SIGNIFICANTLY impacting the functional use of the facility.

Electric Water Gas Yes YesYes

BUILDING UTILITY METERING

Structure: Good Exterior: Fair Interior: Good Mechanical: Good Electrical: Good

BUILDING 2 - VOCATIONAL BUILDING

Page: 7 of 43

Building: 0002 - VOCATIONAL BUILDING

BUILDING ENVELOPE

Foundation RoofBuilding

Concrete Loadbearing Masonry Wood

The floor construction is concrete and wood frame.

Stucco

AccessibilityFeature

GSF NSF Year Built Use Group Historic Ownership#Floors

Business 11,080 8,429 2 Owned 1930 Unevaluated

Comments: The first floor of the building has four separate sections which do not communicate with one another.

Each section has an accessible entry. The largest section, located at the north of the building, has a second means of egress which is not accessible. In the absence of an elevator, the second floor of the north section is not accessible. At the time of the November 2010 Facility Survey, a restroom renovation project was underway. The new restrooms will be accessible. These restrooms are located in the north section of the building. These are the only restrooms in the building.

REAL ESTATE

Access to Building

Ramps

Entrance

2nd Egress

Visual Alarm

Corridor/Aisle

Rooms

Stairs

Elevator

Restrooms

Drinking Fountain

Telephone

Yes

Yes

Yes

No

Yes

Yes

Yes

Yes

No

No

Yes

N/A

ACCESSIBILITY

Structural Systems1.

Exterior Walls2. Number of Deficiencies = 1

Material

Asbestos: Yes

Asphalt roof was installed in 1988. Sprayed-on membrane was added on top of asphalt over the entire roof area in 2001.

Asphalt roof was installed in 1988. Sprayed-on membrane was added on top of asphalt over the entire roof area in 2001.

Drainage Year Life

Remaining Type Area Served

Asphalt & Sprayed-on Membrane

Asphalt & Sprayed-on Membrane

Gutters and Downspouts

Interior Roof Drains

Gable

Flat

Original Building

Building Addition

Comments:

Comments:

3. Roof

Entire Building

Page: 8 of 43

Building: 0002 - VOCATIONAL BUILDING

Wall Roof None Batt

INTERIOR FINISH

Carpet Ceramic Tile Concrete Vinyl Tile

CMU Ceramic Tile Drywall Wood Paneling

Metal Units - Metal Frame Wood Units - Wood Frame

VERTICAL CIRCULATION

Concrete Stairs Wood Stairs

Comments: There is one exterior concrete stair. There are two interior wood stairs.

Metal Unit, Metal Overhead - Metal Frame

Fixed - Aluminum Frame; Single Glazing; Fixed - Steel Frame; Single Glazing;

Sliding - Steel Frame; Single Glazing;

Acoustical Tile Exposed Structure Gypsum Board

Insulation4.

Exterior Doors5.

Windows6.

Floors1. Asbestos: Yes Number of Deficiencies = 2

Interior Walls2.

3. Asbestos: Yes

Interior Doors4.

Page: 9 of 43

Building: 0002 - VOCATIONAL BUILDING

Mechanical Restroom

Domestic hot water is provided by a 40 gallon electric water heater.Comments:

Cast-Iron None Cast-Iron

Electric Water Cooler Hose Bibb Lavatory Portable Bottled Water Cooler Urinal Water Closet (Tank)

None

Ventilation Area Served

Galvanized Steel Galvanized Steel Electric None No

Hot Water Cold Water Water Heater Water Treatment HW Storage Tank

Grease InterceptorWaste / Vent Interior Storm

Packaged Heat Pump (Air

Source)

Single Duct None Electronic Mechanical None Entire Building

PLUMBING

Exhaust Ventilation

This building has 11 packaged heat pumps manufactured by Trane, Goettl, York, Ruud, and Tappan.

Ten are 5 ton units. One is a 2 ton unit.

Comments:

Heat Source

Heat Distribution

Piping System

Control System

Fresh Air Intake

Energy Conservation

Measure

Area Served

This building has 11 packaged heat pumps manufactured by Trane, Goettl, York, Ruud, and Tappan.

Ten are 5 ton units. One is a 2 ton unit.

The warehouse area has electric unit heaters.

Comments:

Comments:

HVAC

Heat1.

Packaged Heat Pump (Air

Source)

Electric Resistance

Single Duct

Unit Heater

None

None

Electronic

Electric

Mechanical

Natural

None

None

Entire Building

Storage

Ventilation2.

System Type

Air Distribution

Piping System

Control System

Fresh Air Intake

Energy Conservation

Measure

Area Served

Water Distribution1.

Sanitary Distribution2.

Fixtures3.

Fuel Distribution4.

Page: 10 of 43

Building: 0002 - VOCATIONAL BUILDING

None None ABC Type Fire Extinguisher

Comments: This building has two services. One service comes from two 25 kVA pole-mounted transformers across from Buchanan Street and terminates in a 600A switchboard located in the warehouse on the second floor. The other service comes from two 75 kVA pole-mounted transformers on Third Street and terminates in a 600A switchboard located in the electrical room on the first floor. This switchboard also sub-feeds Classroom/Reading Building 15. Separate metering is installed at the switchboard for each of the services. The pole-mounted transformers on Third Street also serve Annex II Building 7 and Recreational Hall Building 8.

FIRE ALARM

Comments: The building fire alarm control/annunciator panel is a SafeTech 3000. It is located in the vocational education office on the first floor. The fire alarm panel in this building additionally serves devices in Building 15. However, at the time of November 2010 Facility Survey, center was in process of replacing centerwide fire alarm system.

Service Entrance Electrical Characteristics Distribution Equipment Wiring Devices

Audible Alarm Control/Annunciator Panel Heat Detector Manual Pull Station Smoke Detector Visual Alarm

Comments: Recorded footcandle levels include natural light contribution.

High Intensity Discharge (HID)

Comments: Exterior building-mounted light fixtures are controlled by timeclock and photocell.

T8 - Fluorescent

T8 - Fluorescent

T12 - Fluorescent

T8 - Fluorescent

Compact Fluorescent

T8 - Fluorescent

Offices

Classrooms

Storage Rooms

Equipment Rooms (Elec/Mech)

Toilets

Corridors & Stairs

Area Recommended Level

Recorded Level Light Type

Battery Backup Battery Backup

Switchboard 120/208V, 3-Phase, 4 Wire Panelboard Receptacles, GFCI, Switches

Sprinkler System Stand Pipe System Fire Suppression

Emergency Exit

FIRE PROTECTION

ELECTRICAL SERVICES Number of Deficiencies = 1

Exterior Lighting1.

Interior Lighting2. Number of Deficiencies = 2

Emergency /Exit Lighting3.

Page: 11 of 43

Building: 0002 - VOCATIONAL BUILDING

Comments: The classrooms are equipped with TV-VCR and computer work stations.

Connected to Main System None Connected to Main System None

Telephone Security Public Address Television

GENERAL BUILDING CONDITION

Rating X Good

Fair Poor

COMMUNICATION

The facility condition is not impacting the functional use of the facility.

The facility condition IS impacting the functional use of the facility.

The facility condition IS SIGNIFICANTLY impacting the functional use of the facility.

Electric Water Gas Yes N/ANo

Structure: Good Exterior: Good Interior: Good Mechanical: Good Electrical: Good

BUILDING 7 - ANNEX II - MULTIPURPOSE/HR

Page: 12 of 43

Building: 0007 - ANNEX II - MULTIPURPOSE/HR

BUILDING ENVELOPE

Foundation RoofBuilding

Concrete Loadbearing Masonry Wood

The floor construction is concrete.

Brick Masonry Stucco

Wall Roof Batt Batt

Storefront - Metal Frame Wood Unit - Metal Frame

AccessibilityFeature

GSF NSF Year Built Use Group Historic Ownership#Floors

Business/Assembly 4,800 4,097 1 Owned 1978 Unevaluated

Comments: The building has two sections. The Phoenix room located at the south does not have accessible restrooms. The north section of the building has two accessible entries. The common corridor linking those two entries is not accessible. The restroom of the north section is not accessible.

REAL ESTATE

Access to Building

Ramps

Entrance

2nd Egress

Visual Alarm

Corridor/Aisle

Rooms

Stairs

Elevator

Restrooms

Drinking Fountain

Telephone

Yes

Yes

Yes

Yes

Yes

No

Yes

N/A

N/A

No

Yes

N/A

ACCESSIBILITY

Structural Systems1.

Exterior Walls2.

Insulation4.

Exterior Doors5.

Material Drainage Year Life

Remaining Type Area Served

Asphalt Shingles Surface Run-off 2001 11 Gable Entire Building

3. Roof

Entire Building

Page: 13 of 43

Building: 0007 - ANNEX II - MULTIPURPOSE/HR

INTERIOR FINISH

Carpet Ceramic Tile Vinyl Tile

CMU Ceramic Tile Drywall

Wood Units - Wood Frame

Mechanical Restroom

Ventilation Area Served

VERTICAL CIRCULATION

None

Sliding - Aluminum Frame; Single Glazing;

Acoustical Tile Exposed Structure Gypsum Board

Exhaust Ventilation

Windows6.

Floors1. Number of Deficiencies = 1

Interior Walls2.

3.

Interior Doors4.

Heat Source

Heat Distribution

Piping System

Control System

Fresh Air Intake

Energy Conservation

Measure

Area Served

There are two Ducane 5 ton units and one Ducane 4 ton unit, all mounted on the roof.Comments:

HVAC

Heat1.

Packaged Heat Pump (Air

Source)

Single Duct None Electronic Mechanical None Entire Building

Ventilation2.

Page: 14 of 43

Building: 0007 - ANNEX II - MULTIPURPOSE/HR

Domestic hot water is provided by a 40 gallon electric water heater.Comments:

Cast-Iron None None

Electric Bottled Water Cooler Hose Bibb Lavatory Water Closet (Flush Valve) Water Closet (Tank)

None

Wet None ABC Type Fire Extinguisher

Comments: Service is brought from two pole-mounted transformers on Third Street to a 400A main disconnect switch and meter installed on the building's exterior southwest wall. The transformers also serve Vocational Building 2 and Recreational Hall Building 8.

Copper Copper Electric None No

Hot Water Cold Water Water Heater Water Treatment HW Storage Tank

Grease InterceptorWaste / Vent Interior Storm

Service Entrance Electrical Characteristics Distribution Equipment Wiring Devices

Packaged Heat Pump (Air

Source)

Single Duct None Electronic Mechanical None Entire Building

High Intensity Discharge (HID)

Comments: Exterior building-mounted and surrounding area pole-mounted light fixtures are controlled by time clock and photocells.

Main Disconnect Switch 120/208V, 3-Phase, 4 Wire Panelboard Receptacles, GFCI, Switches

Sprinkler System Stand Pipe System Fire Suppression

PLUMBING

There are two Ducane 5 ton units and one Ducane 4 ton unit, all mounted on the roof.Comments:

System Type

Air Distribution

Piping System

Control System

Fresh Air Intake

Energy Conservation

Measure

Area Served

Water Distribution1.

Sanitary Distribution2.

Fixtures3.

Fuel Distribution4.

FIRE PROTECTION

ELECTRICAL SERVICES

Exterior Lighting1.

Page: 15 of 43

Building: 0007 - ANNEX II - MULTIPURPOSE/HR

FIRE ALARM

Comments: The building fire alarm control/annunciator panel is a SafeTech 3000. However, at the time of November 2010 Facility Survey, center was in process of replacing centerwide fire alarm system.

Audible Alarm Control/Annunciator Panel Flow Switch Manual Pull Station Smoke Detector Tamper Switch Visual Alarm

Connected to Main System None None TV with VCR

Telephone Security Public Address Television

Comments: Recorded footcandle levels include natural light contribution. There are recessed incandescent lights in the recreational space.

T8 - Fluorescent

T8 - Fluorescent

T12 - Fluorescent

Incandescent

Incandescent

Offices

Recreation

Equipment Rooms (Elec/Mech)

Toilets

Reception

Area Recommended Level

Recorded Level Light Type

Battery Backup Battery Backup

Emergency Exit

GENERAL BUILDING CONDITION

Rating X Good

Fair Poor

Interior Lighting2. Number of Deficiencies = 1

Emergency /Exit Lighting3.

COMMUNICATION

The facility condition is not impacting the functional use of the facility.

The facility condition IS impacting the functional use of the facility.

The facility condition IS SIGNIFICANTLY impacting the functional use of the facility.

Electric Water Gas Yes N/AYes

BUILDING 8 - RECREATION HALL/ADMINISTRATION

Page: 16 of 43

Building: 0008 - RECREATION HALL/ADMINISTRATION

BUILDING ENVELOPE

Foundation RoofBuilding

Concrete Loadbearing Masonry Wood

The floor construction is concrete.

Stucco

AccessibilityFeature

GSF NSF Year Built Use Group Historic Ownership#Floors

Assembly 10,050 7,758 1 Owned 1978 Unevaluated

REAL ESTATE

Access to Building

Ramps

Entrance

2nd Egress

Visual Alarm

Corridor/Aisle

Rooms

Stairs

Elevator

Restrooms

Drinking Fountain

Telephone

Yes

N/A

Yes

Yes

Yes

N/A

Yes

N/A

N/A

Yes

No

Yes

ACCESSIBILITY

Structural Systems1.

Exterior Walls2.

Material

The building has three sections. The original building (Canteen) has a gable roof with asphalt shingles.

The east addition (Admin) has a rolled asphalt flat roof. The west addition (SIA Tech) has a rolled asphalt shed roof.

Roof condition assessment is based on visual observation during the Facility Survey.

Drainage Year Life

Remaining Type Area Served

Asphalt Shingles

Rolled Asphalt

Rolled Asphalt

Surface Run-off

Surface Run-off

Surface Run-off

Gable

Flat

Shed

Original Building

East Building Addition

West Building Addition

Number of Deficiencies = 1

Comments:

Comments:

3. Roof

Entire Building

Page: 17 of 43

Building: 0008 - RECREATION HALL/ADMINISTRATION

Wall Roof Batt Batt

INTERIOR FINISH

Carpet Ceramic Tile Concrete Vinyl Tile

CMU Ceramic Tile Drywall

Wood Units - Wood Frame

VERTICAL CIRCULATION

None

Metal Units - Metal Frame

Sliding - Aluminum Frame; Single Glazing;

Acoustical Tile Exposed Structure Gypsum Board

Insulation4.

Exterior Doors5.

Windows6.

Floors1.

Interior Walls2.

3.

Interior Doors4.

Heat Source

Heat Distribution

Piping System

Control System

Fresh Air Intake

Energy Conservation

Measure

Area Served

Heating and cooling are provided by four Arco Air 5 ton rooftop units.Comments:

HVAC

Heat1.

Packaged Heat Pump (Air

Source)

Single Duct None Electronic Mechanical None Entire Building

Page: 18 of 43

Building: 0008 - RECREATION HALL/ADMINISTRATION

Mechanical Restroom

Domestic hot water is provided by a 50 gallon electric water heater. The water heater is GE model GE50M06AAG with input of 4500W, and was manufactured in 06/2009.

Comments:

Cast-Iron None None

Electric Water Cooler Hose Bibb Lavatory Sink Water Closet (Flush Valve)

None

None None ABC Type Fire Extinguisher

Ventilation Area Served

Copper Copper Electric None No

Hot Water Cold Water Water Heater Water Treatment HW Storage Tank

Grease InterceptorWaste / Vent Interior Storm

Packaged Heat Pump (Air

Source)

Single Duct None Electronic Mechanical None Entire Building

Sprinkler System Stand Pipe System Fire Suppression

PLUMBING

Exhaust Ventilation

Heating and cooling are provided by four Arco Air 5 ton rooftop units.Comments:

Ventilation2.

System Type

Air Distribution

Piping System

Control System

Fresh Air Intake

Energy Conservation

Measure

Area Served

Water Distribution1.

Sanitary Distribution2.

Fixtures3.

Fuel Distribution4.

FIRE PROTECTION

Page: 19 of 43

Building: 0008 - RECREATION HALL/ADMINISTRATION

Comments: Service is brought from two pole-mounted transformers on Third Street to a 200A panel inside the building. A meter is installed on the building's exterior wall. The transformers also serve Vocational Building 2 and Annex II Building 7.

FIRE ALARM

Comments: The building fire alarm system components are connected to the central fire alarm control/annunciator panel in the security office in Building 1. However, at the time of November 2010 Facility Survey, center was in process of replacing centerwide fire alarm system.

Comments: A pay phone is provided on the exterior wall near the building's main entrance for student use.

Service Entrance Electrical Characteristics Distribution Equipment Wiring Devices

Audible Alarm Manual Pull Station Smoke Detector Visual Alarm

Connected to Main System None None Satellite Dish

Telephone Security Public Address Television

Comments: The recorded footcandle levels include natural light contribution.

High Intensity Discharge (HID)

Comments: Exterior building-mounted light fixtures are controlled by timeclock and photocell.

T8 - Fluorescent

T8 - Fluorescent

T8 - Fluorescent

T8 - Fluorescent

Recreation

Study Room

Offices

Toilets

Area Recommended Level

Recorded Level Light Type

Selected Lighting w/ Battery Battery Backup

Main Distribution Panel 120/208V, 3-Phase, 4-Wire Panelboard Receptacles, GFCI, Switches

Emergency Exit

ELECTRICAL SERVICES Number of Deficiencies = 1

Exterior Lighting1.

Interior Lighting2.

Emergency /Exit Lighting3.

COMMUNICATION

Electric Water Gas Yes N/AYes

Page: 20 of 43

Building: 0008 - RECREATION HALL/ADMINISTRATION

GENERAL BUILDING CONDITION

Rating X Good

Fair Poor

The facility condition is not impacting the functional use of the facility.

The facility condition IS impacting the functional use of the facility.

BUILDING 10 - DORMITORY

Page: 21 of 43

Building: 0010 - DORMITORY

BUILDING ENVELOPE

Foundation RoofBuilding

Concrete Structural Steel, CMU Steel

Stucco

Wall Roof Rigid Batt

Comments: The mechanical room has sliding metal doors with louvers.

Metal Units - Metal Frame

AccessibilityFeature

GSF NSF Year Built Use Group Historic Ownership#Floors

Residential 34,690 21,647 2 Owned 1991 Unevaluated

REAL ESTATE

Access to Building

Ramps

Entrance

2nd Egress

Visual Alarm

Corridor/Aisle

Rooms

Stairs

Elevator

Restrooms

Drinking Fountain

Telephone

Yes

N/A

Yes

Yes

Yes

Yes

Yes

Yes

N/A

Yes

Yes

Yes

ACCESSIBILITY

Structural Systems1.

Exterior Walls2. Number of Deficiencies = 2

Insulation4.

Exterior Doors5.

Material Drainage Year Life

Remaining Type Area Served

Metal Gutters and Downspouts 1991 20 Gable Entire Building

3. Roof

Entire Building

Page: 22 of 43

Building: 0010 - DORMITORY

INTERIOR FINISH

Carpet Ceramic Tile Vinyl Tile

CMU Ceramic Tile Plaster

Wood Units - Metal Frame

Mechanical Toilet/Shower

Ventilation Area Served

VERTICAL CIRCULATION

Concrete Stairs Metal Stairs

Casement - Aluminum Frame; Double Glazing;

Acoustical Tile Exposed Structure Gypsum Board

Exhaust Ventilation

Number of Deficiencies = 1

Windows6.

Floors1. Number of Deficiencies = 1

Interior Walls2.

3.

Interior Doors4. Number of Deficiencies = 1

Heat Source

Heat Distribution

Piping System

Control System

Fresh Air Intake

Energy Conservation

Measure

Area Served

Heating and cooling is accomplished by a system of 43 water source heat pumps ranging in capacity from 2 to 4 tons.

This is the start of the file's text. The full file is on GovTribe.

Other files

Show all 14

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

File details come from the government source that posted it. Updated .