Page 1 of 50ORDER NUMBER:

SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL ITEMS

OFFEROR TO COMPLETE BLOCKS 12, 17, 23, 24, & 30

1. REQUISITION NUMBER PAGE 1 OF

2. CONTRACT NO. 3. AWARD/EFFECTIVE

DATE

4. ORDER NUMBER 5. SOLICITATION NUMBER 6. SOLICITATION ISSUE

DATE

7. FOR SOLICITATION

INFORMATION CALL:

a. NAME b. TELEPHONE NUMBER (No collect calls)

8. OFFER DUE DATE/

LOCAL TIME

9. ISSUED BY

13b. RATING

14. METHOD OF SOLICITATION

CODE

15. DELIVER TO 16. ADMINISTERED BY CODE

18a. PAYMENT WILL BE MADE BY CODE17a. CONTRACTOR/

OFFEROR

CODE

FACILITY

CODE

CODE

TELEPHONE NO.

17b. CHECK IF REMITTANCE IS DIFFERENT AND PUT SUCH ADDRESS IN

OFFER

18b. SUBMIT INVOICES TO ADDRESS SHOWN IN BLOCK 18a UNLESS BLOCK

BELOW IS CHECKED

RFQ IFB RFP

SEE ADDENDUM

19.

ITEM NO.

20.

SCHEDULE OF SUPPLIES/SERVICES

21.

QUANTITY

22.

UNIT

23.

UNIT PRICE

24.

AMOUNT

(Use Reverse and/or Attach Additional Sheets as Necessary)

25. ACCOUNTING AND APPROPRIATION DATA 26. TOTAL AWARD AMOUNT (For Govt. Use Only)

28. CONTRACTOR IS REQUIRED TO SIGN THIS DOCUMENT AND RETURN

COPIES TO ISSUING OFFICE. CONTRACTOR AGREES TO FURNISH AND

DELIVER ALL ITEMS SET FORTH OR OTHERWISE IDENTIFIED ABOVE AND ON ANY

ADDITIONAL SHEETS SUBJECT TO THE TERMS AND CONDITIONS SPECIFIED

29. AWARD OF CONTRACT: REF. OFFER

DATED . . YOUR OFFER ON SOLICITATION

(BLOCK 5), INCLUDING ANY ADDITIONS OR CHANGES WHICH ARE

SET FORTH HEREIN, IS ACCEPTED AS TO ITEMS:

30a. SIGNATURE OF OFFEROR/CONTRACTOR

30b. NAME AND TITLE OF SIGNER (Type or print) 30c. DATE SIGNED

31a. UNITED STATES OF AMERICA (SIGNATURE OF CONTRACTING OFFICER)

31b. NAME OF CONTRACTING OFFICER (Type or print) 31c. DATE SIGNED

AUTHORIZED FOR LOCAL REPRODUCTION

PREVIOUS EDITION IS NOT USABLE

STANDARD FORM 1449 (REV. 2/2012)

Prescribed by GSA - FAR (48 CFR) 53.212

10. THIS ACQUISITION IS UNRESTRICTED OR

NAICS:

SIZE STANDARD:

13a. THIS CONTRACT IS A

RATED ORDER UNDER

DPAS (15 CFR 700)

SET ASIDE: % FOR:

11. DELIVERY FOR FOB DESTINA-

TION UNLESS BLOCK IS

MARKED

SEE SCHEDULE

12. DISCOUNT TERMS

ARE ARE NOT ATTACHED

ARE ARE NOT ATTACHED

27a. SOLICITATION INCORPORATES BY REFERENCE FAR 52.212-1, 52.212-4. FAR 52.212-3 AND 52.212-5 ARE ATTACHED. ADDENDA

27b. CONTRACT/PURCHASE ORDER INCORPORATES BY REFERENCE FAR 52.212-4. FAR 52.212-5 IS ATTACHED. ADDENDA

Coll. No.

8 (A)

EDWOSB

WOMEN-OWNED SMALL BUSINESS

(WOSB) ELIGIBLE UNDER THE WOMEN-OWNED

SMALL BUSINESS PROGRAM

SERVICE-DISABLED

VETERAN-OWNED

SMALL BUSINESS

HUBZONE SMALL

BUSINESS

SMALL BUSINESS

ISO196-22

Jason Morgan

COCO 100

COCO

321000101

Misc 400 First Street NW Washington DC 20534

UNICOR FPI CENTRAL ACCOUNTS PAYABLE

PO BOX 11849

LEXINGTON, KY 40578-1849

1620000056 See Section B

UNICOR FUNDS 15X4500 FUNDS SHALL BE OBLIGATED BY INDIVIDUAL DELIVERY ORDERS AND NOT BY THE CONTRACT ITSELF

Jason Morgan

X

236220

08/01/2022

11/14/2022

2:00 PM

COCO

UNICOR, FPI CENTRAL OFFICE

400 1ST ST NW

WASHINGTON DC 20534-0004

UNICOR, FPI CENTRAL OFFICE

400 1ST ST NW

WASHINGTON DC 20534-0004

08/01/2022

UNICOR, FPI CENTRAL OFFICE

400 1ST ST NW

WASHINGTON DC 20534-0004

10/14/2022

39.5 M Ann Rece

Page 2 of 50ORDER NUMBER:

Terms:

Section A: Optional Form 308 or SF33

Section B: Supplies or Services Pricing or Cost (Line Items)

1. The following information pertains to the SF1442, Solicitation, Offer, and Award:

OMB Clearance Number 1103-0018

Block 8: Emailed, Hand carried or Overnight Express to:

UNICOR, FPI

ATTN: Jason Morgan, UNICOR Contracting Officer<(>,<)>

3301 LEESTOWN RD<(>,<)>

LEXINGTON, KY 40511

859-255-6812 EXT 3002

Block 17: LUMP SUM (ENTER THE AMOUNT IN SECTION B.

Block 24, and 27, See Section H.

GENERAL INTENTION: It is the intent of this solicitation to result in a

Firm Fixed Price, Construction Type Contract for a project at the Naval

Service Warfare Center (NSWC Crane) Building 41-1st floor acquisition office renovation, 2nd and 3rd floor modifications as outlined in the attached Statement of Work.

The solicitation is 100% set aside for small business. The North

American Industrial Classification System (NAICS) Code applicable to this project is 236220, commercial and institutional buildings and related structure construction.

Contract Line Item: Offerors shall enter unit price and amount for contract line item.

QUESTIONS WILL ONLY be accepted in writing and WILL NOT BE ACCEPTED

AFTER 10/31/2022 at 10:00 AM EST. Responses to questions and site visit sign in sheet will be posted via www.sam.gov

Page 3 of 50ORDER NUMBER:

SITE VISIT IS MANDATORY FOR AWARD.

If you previously attended the site visit on 08/18/2022 and do not require an additional site visit, the 08/18/2022 visit will count for the mandatory site visit requirement.

SITE VISIT: A SITE VISIT WILL BE CONDUCTED ON 10/27/2022 at 12:00 PM

UPON REQUEST ONLY. Requests are due by 10/20/2022 at 10:00 AM. Please note that if no requests for a site visit are received prior to the cut-off date then the site visit will not commence and no prospective bidders shall show up on 10/27/2022.

If the site visit is requested by any prospective bidder, the attending participants will meet at Building 41 on the 1st floor Room 127B, 2nd floor Rooms 211<(>,<)> 212<(>,<)> 214<(>,<)> 215 and 3rd floor room 355 for located at the Naval Surface Warfare Center (NSWC Crane)<(>,<)> JXY.

The Contractor shall inspect the site where services are to be performed. This site review shall satisfy the Contractor's need to identify all general and local conditions that may affect the cost of the contract. Failure to inspect the site will not constitute grounds for claims after contract award. Up to two (2) people per company may attend.

Company Name, Name of attendees, and phone number for attendees must be submitted with completed SECNAV Form for Base Access to

Jason.Morgan2@USDOJ.GOV by 10/20/2022, at 10:00 AM EST.

NOTE: If you have clearance to access the base - you are still required to submit your names for the site visit by the deadline of 10/20/2022, at 10:00 AM EST. in order to attend the site visit.

Physical access to the Government’s facility at Naval Support Activity

(NSA), Crane shall be through the use of the Defense Biometric

Identification System (DBIDS) and associated data processing/information services for purposes of protecting U.S./Coalition/allied government/national security areas of responsibility and information.

The contractor shall obtain employee personal identity verification credentialing (badge) by submitting to the NSA Crane Visitor Center, 103

Furlong St, Crane, IN 47522, form SECNAV 5512/1 (APR 2014), for each

Page 4 of 50ORDER NUMBER:

SECTION B

SUPPLIES OR SERVICES AND PRICES/COSTS

Item No. SUPPLIES OR SERVICE Quantity U/M UNIT PRICE AMOUNT IN US$ Delivery Date contractor employee. Upon Base Registrar authorization of form 5512/1 the contractor shall submit form NSA Crane 5512/47 DBIDS Badge

Application Record to the NSWC Crane Security Division (812)-854-1213.

The Contractor shall retrieve badges of employed personnel upon separation. A background check will be conducted as part of the process and two forms of identification are required. A visitor's pass will be provided if the background check is cleared. Please allow an significant time (1-2 hours) for the entire process.

PROJECT MUST BE COMPLETED BY 03/31/2023

THE FOLLOWING INFORMATION IS REQUIRED TO BE COMPLETED BY THE OFFEROR:

VENDOR'S Unique Entity Identifier:___________________________

VENDOR'S POINT OF CONTACT: _____________________________________

VENDOR'S TELEPHONE & FAX NUMBER: ______________________________

VENDOR'S EMAIL ADDRESS: ________________________________________

VENDOR'S BUSINESS SIZE (i.e. SMALL,LARGE,ETC.): ________________

By submission of an offer, the offeror acknowledges the requirement that a prospective awardee shall be registered in the SAM database (System

Award Management) prior to award, during performance and through final payment of any contract resulting from this solicitation.

_______________________________________________ signature

00001 ICSG-0001 1 EA 03/31/2023

Demo:

Page 5 of 50ORDER NUMBER:

To include removal and disposal of asbestos containing material, carpeting, and vinyl tile floor.

00002 ICSG-0001 1 EA 03/31/2023

Construction:

To include patching and painting walls, install epoxy flooring, adding a telecommunication room, breakroom and HVAC modifications.

00003 ICSG-0001 1 EA 03/31/2023

Utilities:

To include disconnecting NMCI, RDT<(>&<)>E, phone, and electrical connections, adding a new power panel, circuits and power drops, make power poles connections, install new NMCI / RDT<(>&<)>E drops, new phone drops

00004 ICSG-0001 1 EA 03/31/2023

Other Direct Costs:

To include general, administrative, management and incidentals

1.0 SCOPE

The scope of this project is to renovate Building 41 on 1st floor Room

127 B, 2nd floor Rooms 211, 212, 214, 215 and 3rd floor Room 355 for

Naval Surface Warfare Center (NSWC Crane), JXY. Project consists of removal and disposal of asbestos containing material, patch and paint walls, remove and replace carpets and cove base, remove vinyl tile

Page 6 of 50ORDER NUMBER:

floor, scarify existing floor, apply new epoxy flooring, disconnect

NMCI, RDT<(>&<)>E, phone and electrical from all existing cubicles, add new power panel, circuits and power drops, power poles connections, install new NMCI / RDT<(>&<)>E drops, new phone drops, build new enclosed telecommunication room, new breakroom and HVAC modifications.

These renovations are required to improve the workspace area and building conditions.

2.0,,Acronym Table

Acronym Table

SOW,,Statement of Work,, HVAC<(>&<)>R,,Heating, Ventilation, Air-Conditioning, & Refrigeration

CFR,,Code of Federal Regulations,, ODS,,Ozone Depleting Substance

ASHRAE,,American Society of Heating, Refrigerating and Air-Conditioning

Engineers,, RTA,,Requiring Technical Activity

ASNRDA,,Assistant Secretary of the Navy for Research and Development

Acquisition,, HPSB,,High Performance and Sustainable Building

DoD,,Department of Defense,, SOP,,Standard Operating Procedure

DoDD,,Department of Defense Directive,, PPE,,Personal Protective Equipment

DoDI,,Department of Defense Instruction,, OSHA,,Occupational Safety and Health Administration

HDBK,,Handbook,, NSWC,,Naval Surface Warfare Center

NSA,,Naval Surface Activity,, QASP,,Quality Assurance Surveillance Plan

POV,,Privately Owned Vehicle,, Vols.,,Volumes

SOH,,Safety and Occupational Health,, UFGS,,Unified Facilities Guide Specification

UFC,,Unified Facilities Criteria,, USC,,United States Code

DON,,Department of the Navy,,DBIDS,, Page 7 of 50ORDER NUMBER:

Defense Biometric Identification System

SECNAV,,Secretary of the Navy,, DFOW,,Definable Feature of Work

AHA,,Activity Hazard Analysis,, PAK,,Post Award Kickoff

SLP,,Standard Lift Plan,, COR,,Contracting Officer Representative

APP,,Accident Prevention Plan,, SDS,,Safety Data Sheet

ACM,,Asbestos Containing Material,, ACBM,,Asbestos Containing Building Material

VOC,,Volatile Organic Compound,, FF<(>&<)>E,, Furniture, Fixtures & Equipment

3.0,,APPLICABLE DOCUMENTS

The following documents of the revision or issue in effect at the date of award, form a part of this SOW for reference. In the event of conflict between the documents referenced herein and the contents of this SOW, the contents of this SOW shall prevail.

ASN (RDA) MEMO,,DoN Policy on Digital Product/Technical Data w/Attachment "Guidance on Acquisition and Conversion of Product /

Technical Data to Digital Form"

40 CFR 300,,National Oil and Hazardous Substances Pollution Contingency

Plan (NCP) https://www.ecfr.gov/current/title-40/chapter-I/subchapter-J/part-300

40 CFR 355,,Emergency Planning and Notification https://www.ecfr.gov/current/title-40/chapter-I/subchapter-J/part-355

DODD 4140.1 ,,Supply Chain Materiel Management Policy https://www.esd.w hs.mil/Portals/54/Documents/DD/issuances/dodi/414001p.pdf

DODD 5000.01,,The Defense Acquisition System https://www.esd.whs.mil/Por tals/54/Documents/DD/issuances/dodd/500001p.pdf

DODI 5000.02,,Operation of the Defense Acquisition System https://www.es d.whs.mil/Portals/54/Documents/DD/issuances/dodi/500002p.pdf

DOD 5000.04-M-1,,Cost and Software Data Reporting Manual, Cost Analysis

Improvement Group (CAIG) https://www.esd.whs.mil/Portals/54/Documents/DD

/issuances/dodm/500004p.pdf?ver=YIkjr3yVS9cwqKYLMfcv8Q%3D%3D

Page 8 of 50ORDER NUMBER:

EM385-1-1,,U.S. Army Corps of Engineers Safety and Health Requirements

Manual https://www.publications.usace.army.mil/portals/76/publications

/engineermanuals/em_385-1-1.pdf

FC 1-300-09N,,Navy And Marine Corps Design Procedures https://www.wbdg.

org/ffc/dod/unified-facilities-criteria-ufc/fc-1-300-09n

MIL-STD-461F,,DoD Interface Standard- Requirements for the Control of

Electromagnetic Interference Characteristics of Subsystems and Equipment http://everyspec.com/MIL-STD/MIL-STD-0300-0499/MIL-STD-461F_19035/

NSACRANEINST 08020.1E,,Explosive Safety Program At NSA Crane

NSACRANEINST 08020.1E CH-2,,Explosive Safety Program Chapter 2 Safety

Requirement in Explosive Areas

NSACRANEINST 08020.1E CH-4,,Explosive Safety Program Chapter 4 Parking of POV in Explosive Magazine Areas

NSACRANEINST 08020.1E CH-5,,Explosive Safety Program Chapter 5 Wildfire

Prevention & Control

NSACRANEINST 08020.1E CH-11,,Explosive Safety Program Chapter 11 HERO

Program

NSACRANEINST 08020.4B,,Hazards of Electromagnetic Radiation to Ordnance

Emission Control Bill

NSACRANEINST 11262.1A,,Management of Weight Handling Equipment

NSACRANEINST 5530.1,,Visitor / Guest Access Control

NSWCCRANEINST 05090.2C,,Hazardous Waste Management Plan

NSWCCRANEINST 05100.7,,Hazardous Material Control and Management Program

NSWCCRANEINST 12735.1A,,Workplace Violence Prevention

NSWCCRANEINST 12792.2,,Drug-Free Workplace Program

NSWCCRANEINST 5100.1A,,Occupational Safety and Health Program

NSWCCRANEINST 5500.1A,,Portable Electronic Devices, Photography, and

Audio Visual Recording

OPNAVINST 1500.76,,Naval Training System Requirements, Acquisition, and

Management

OPNAVINST 5100.19E,,Vols. I, II, and III: Navy Safety and Occupational

Health (SOH) Program Manuel for Forces Afloat

OPNAVINST 5100.23G CH-1,,Navy Safety and Occupational Health (SOH)

Program Manual

OPNAVINST 5102.1,,Navy and Marine Corps Mishap and Safety Investigation, Reporting, and Record Keeping

Page 9 of 50ORDER NUMBER:

UFGS 01 45 35.05 10,,Special Inspections for Design-Bid-Build https://ww w.wbdg.org/ffc/dod/unified-facilities-guide-specifications-ufgs/ufgs-01-

45-35

UFGS 01 45 35.05 20,,Special Inspections for Design-Build https://www.wb dg.org/ffc/dod/unified-facilities-guide-specifications-ufgs/ufgs-01-45-3

UFGS 01 74 19,,Construction and Demolition Waste Management https://www.

wbdg.org/ffc/dod/unified-facilities-guide-specifications-ufgs/ufgs-01-74

-19

USC 40 CFR part 763.99,,Environmental Protection Agency ASBESTOS https:/

/www.ecfr.gov/current/title-40/chapter-I/subchapter-R/part-763/subpart-E

/section-763.99

USC 42, Chapter 55 ,,National Environmental Policy; Section 4321-4370d https://uscode.house.gov/view.xhtml?path=/prelim@title42/chapter55

<(>&<)>edition=prelim

USC TITLE 40,,Code of Federal Regulations https://www.govinfo.gov/conten t/pkg/USCODE-2001-title40/html/USCODE-2001-title40-chap10-subchapII-sec4

86.htm

UFGS 02 82 00 ,,Asbestos Remediation

UFC 3- 580- 1,,Telecommunications Interior Infrastructure Planning and Design

4.0 PERFORMANCE REQUIREMENTS

The Contractor shall furnish the required material, equipment and labor to renovate Building 41 on 1st floor Room 127 B, 2nd floor Rooms 211, 212, 214, 215 and 3rd floor Room 355. The Contractor shall utilize new material; no postconsumer or recovered material will be authorized for use. The Contractor shall adhere to all State and Federal building codes.

4.1 REQUIREMENTS

The scope of this project will be performed on first, second and third floors of B-41.

4.1.1 Room 127B

A) Demolition: There is an approximated 150 linear feet (LF) of existing

Page 10 of 50ORDER NUMBER:

cove base and 599 square feet (SF) of existing carpet that shall be removed and discarded. There is no asbestos containing material identified.

B) Electrical: The Contractor shall disconnect electrical connections from the existing cubicles. The Contractor shall provide all electrical components required to supply power for the new cubicle and printer station. Power pole (1EA) and 20A, 120V circuit breakers (1EA) shall be installed.

C) Flooring: New 24”x 24” tufted nylon carpet tiles (approximately 67

SY) shall be installed. Transition strips shall be installed in the doorways as appropriate (2 EA). Flooring shall be prepared as per manufacturers requirements prior to the new carpet installation. The

Contractor shall install new 4” vinyl base cove (approximately 150 LF).

The Contractor shall provide carpet tile, cove base and transition strips samples (neutral colors, blues and greys) for selection after award. (CDRL A016)

D) Walls: All holes within the walls of Room 127B shall be patched or filled. The Contractor shall apply 2 coats

(rolled) of new high quality paint (approximately 1,350 SF). New paint color shall be “Rising Tide”, Valspar, 4008-

3A. Reference Rooms 356 & 357 for the paint color. Contractor shall provide paint color samples for selection after award. (CDRL A016)

E) NMCI/ RDT<(>&<)>E and Phone: All NMCI, RDT<(>&<)>E and phone connections shall be disconnected from the existing cubicles, pulled back to the communication room and removed from the patch panel (approximately 6 EA). The

Contractor shall install new drops for NMCI (1EA), RDT<(>&<)>E

Cat 6 (1EA) and Phone (1EA) for the new cubicle.

The new drops shall be installed and punched down back in the appropriate communication room.

F) See Figure #1 and Figure #4.

Page 11 of 50ORDER NUMBER:

4.1.2 Rooms 211, 212, 214 and 215

A) Demolition: Existing cove base (approximately 1,000 LF) and existing

VCT (approximately 8,404 SF) in Rooms 211, 212 and 215 shall be removed and discarded. All floors in Rooms 211, 212 and 215 shall be scarified

(approximately 8,404 SF). There is no asbestos containing material identified.

B) Electrical: The Contractor shall provide all electrical components required to supply power for the new cubicles, new kiosks, existing cubicles, existing kiosks, new modular collaboration room, new modular conference room, new break room area and new person call/meeting office added to the space in Room 211, Room 212 and Room 215.The Contractor shall disconnect existing cubicle and kiosk power poles (approximately

12 EA) and connect new cubicle and kiosk power poles (approximately 14

EA). The Contractor shall install 1-pole, 20A,120V circuit breakers

(approximately 4 EA) , #12 AWG THHN/THWN solid copper conductor

(approximately 500c), ¾” EMT hangers (approximately 15 EA), ¾” EMT SS insulated connectors (approximately 10 EA), 3/4” EMT SS couplings

(approximately 10 EA), ¾” EMT conduit (approximately 100 LF) and receptacle 15A duplex w/accessories and branch circuit (approximately 12

EA),

A new power feed 120VAC, 20A (1EA) shall be installed to serve a

120VAC-24VDC transformer to serve the VAV controller in the New Modular

Collaboration Room (Room 212).

C) HVAC: The Contractor shall provide HVAC improvements to exceed cooling and airflow available in the New Modular Collaboration Room

(Room 212). New VAV box 600 CFM (1 EA) including HW coils, damper, actuator and thermostat shall be installed to supply the room. VAV box shall be located above the ceiling on the third floor due to the ceiling space above the second floor being too tight.

Use round duct, steel, galvanized, 10” diameter, 26 ga from VAV box to diffuser branches (approximately 25 LF). Fire dampers shall be used where ducts pass through the floors (2 EA). Duct access doors are needed to allow fire dampers inspection and maintenance (2

EA). DDC Programming shall be installed with at least four points each

VAV (Space temp, VAV discharge temp, VAV flow rate and HW valve

Page 12 of 50ORDER NUMBER:

position). Install controls wiring for the DDC Controller. Install a temperature sensor (1EA). Install a ball valve with actuator (1EA).

Install a TAB for air (VAV box, supply diffusers, return grilles) (1EA) and a TAB for water side (HW coils) (1EA). Install HW piping extended from the existing HW loop (approximately 10 LF). All HW piping shall have insulation (approximately 10 LF). Diffuser, 4 way cone, 24” x 24”, shall be installed at ceiling level (1EA). Install round duct, steel, galvanized, 8” diameter, 26 ga for diffuser branches (approximately 13

LF). Use insulated (1” thick) flexible duct 14” diameter for diffuser runouts (approximately 10 LF). Return grill, eggcrate, 24” x 24” shall be installed at ceiling level (1EA). Install round duct, steel, galvanized, 8” diameter, 26 ga from return grill back to plenum

(approximately 12 LF). All ductwork shall have insulation (approximately

50 SF).

D) Flooring: The Contractor shall apply new epoxy flooring of Seal Krete

1000, Rust-Oleum in Rooms 211, 212 and 215 (approximately 8,404 SF).

Flooring shall be prepared as per manufacturers requirements prior to apply new epoxy flooring. Transition strips shall be installed in the doorways as appropriate (approximately 10 EA). New 4” vinyl base cove

(approximately 1,000 LF) shall be installed in Rooms 211, 212 and 215.

The Contractor shall provide samples for colors and style of cove base, new epoxy color and flake broadcast and transition strips (neutral colors, blues and greys) for selection after award. (CDRL A016)

E) Walls: All holes within the walls of Rooms 211, 212, 214 and

215 and surrounding hallways shall be patched or filled (approximately 12,000 SF). The Contractor shall apply 3 coats (rolled) of new high quality paint in Rooms 211<(>,<)>

212, 214 and 215 and surrounding hallways (approximately 12,000

SF). New paint color shall be “Rising Tide”<(>,<)>

Valspar, 4008-3A. Reference Rooms 356 & 357 for the paint color.

Contractor shall provide paint color samples for selection after award. (CDRL A016)

F) NMCI, RDT<(>&<)>E and Phone: All NMCI, RDT<(>&<)>E and Phone connections shall be disconnected from the existing cubicles and kiosks, pulled back to the communication room and removed from the patch panel (approximately 62

Page 13 of 50ORDER NUMBER:

EA). The Contractor shall install new drops for NMCI

(approximately 83 EA), RDT<(>&<)>E Cat 6 (approximately 83 EA) and Phone drops (approximately 77 EA) to accommodate 21 net seats in Rooms 211, 212 and 215. Kiosks will not require phone drops. The Contractor shall install new NMCI, RDT

<(>&<)>E and Phone wall jacks CAT 6 on the Modular

Collaboration Room (1 EA), Modular Conference Room (1 EA) and

Person Call/Meeting Office (1 EA).

The new drops shall be installed and punched down back in the appropriate communication room.

G) Breakroom: 13’-2” of new base cabinets with Formica countertop and cabinet door and drawer pulls shall be provided and installed. 5’ of new upper wall cabinets shall be provided and installed to include 1 microwave shelve, cabinet doors and drawer pulls. Figure #5 and Figure #6.

Contractor shall provide cabinet and Formica countertop samples for selection after award. (CDRL A016)

H) Cabinetry for Storage Area: 9’-6” of new base cabinets with

Formica countertop and cabinet door and drawer pulls shall be provided and installed. Figure #5 and Figure #7.

Contractor shall provide cabinet and Formica countertop samples for selection after award. (CDRL A016)

I) See Figure #2, Figure #5, Figure #6 and Figure #7.

4.1.3 Room 355

A) Demolition: Existing cove base (approximately 700 LF) and existing carpet (approximately 12,086 SF) in Room 355 shall be removed and discarded. The Contractor shall remove and dispose approximated 12,086

SF of asbestos containing material identified on tan carpet mastic with black mastic under the existing carpet. The carpet shall also be abated since it is considered contaminated with asbestos floor mastic (floor mastic is partially adhered to the carpet).

B) Electrical: The Contractor shall provide all electrical components

Page 14 of 50ORDER NUMBER:

required to supply power for the new cubicles, new kiosks, existing cubicles, existing kiosks, new modular collaboration room, new modular conference room, new break room area and new person call/meeting office added to the space in Room 355A and to serve HVAC system in the New

Modular Conference Room. The Contractor shall disconnect approximately

25 EA of existing cubicle power poles and connect approximately 25 EA new cubicle power poles. The Contractor shall install 1-pole, 20A,120V circuit breakers (approximately 56 EA), 3-pole, 90A. 480V circuit breaker (1 EA), 225A main breaker 120/208V 3P-4W panel board (1 EA), 3-phase 480V pri-120/208V Sec 75 KVA dry-type transformer (1EA), 3-pole, 480 V, 100A enclosed circuit breaker (1 EA), 2-1/2” EMT conduit ( approximately 150 LF), 2-1/2” EMT SS coupling ( approximately 15 EA), 3”

EMT SS insulated connector (approximately 2 EA), 2-1/2” EMT 90 elbow

(approximately 3 EA), 2-1/2” EMT hanger (approximately 23 EA), #4/0 AWG

THHN/THWN stranded copper conductor (approximately 680

C), ), #3 AWG THHN/THWN stranded copper conductor (approximately 170 C), ¾” EMT conduit (approximately 675 LF), ¾” EMT SS coupling (approximately

68 EA), ¾” EMT SS Insulated connector (approximately 80 EA), ¾” EMT hanger (approximately 75 EA), #12 AWG THHN/THWN solid copper conductor

(approximately 3,000 C) and Receptacle 15A duplex w/accessories and branch circuits (approximately 25 EA) . The Contractor shall utilize as many of the existing circuits as possible to feed the new cubicles.

Contractor shall rewire new cubicles and workstations to 3 cubicles per circuit. New power for cubicle area shall be fed from new power poles from the suspended ceiling. All new circuits shall be ran above the suspended ceiling.

A new power feed 120VAC, 20A (1EA) shall be installed to serve a

120VAC-24VDC transformer to serve the VAV controller in the New Modular

Conference Room.

A 225A main breaker 120/208V 3P-4W panel board and its components to supply power to the new cubicles and kiosks shall be located in a wall of the new enclosed telecommunication room face outward into the open office area. This panel board shall supply power to the mini-split HVAC unit for the new enclosed telecommunication room. All wiring shall ran from indoor mini-split HVAC unit to outdoor unit and wiring to outdoor unit from the new panel board.

Page 15 of 50ORDER NUMBER:

C) HVAC: The Contractor shall provide HVAC improvements to exceed cooling and airflow available in the New Modular Conference Room. VAV box 1250 CFM (1 EA) including HW coils, damper, actuator and thermostat shall be installed to supply the room. Use round duct, steel, galvanized, 16” diameter, 24 ga from VAV box to diffuser branches

(approximately 25 LF). DDC Programming shall be installed with at least four points each VAV (Space temp, VAV discharge temp, VAV flow rate and

HW valve position). Install controls wiring for the DDC Controller.

Install a temperature sensor (1EA). Install a ball valve with actuator

(1EA). Install a TAB for air (VAV box, supply diffusers, return grilles) (1EA) and a TAB for water side (HW coils) (1EA). Install HW piping extended from the existing HW loop (approximately 10 LF). All HW piping shall have insulation (approximately 10 LF). Diffusers, 4 way cone, 24” x 24”, shall be installed at ceiling level (2 EA). Install round duct, steel, galvanized, 12” diameter, 26 ga for diffuser branches

(approximately 13 LF). Use insulated (1” thick) flexible duct 14” diameter for diffuser runouts (approximately 10 LF). Return grill, eggcrate, 24” x 24” shall be installed at ceiling level (1EA). Install round duct, steel, galvanized, 12” diameter, 26 ga from return grill back to plenum (approximately 12 LF). All ductwork shall have insulation

(approximately 50 SF).

D) Flooring: New 24”x 24” tufted nylon carpet tiles (approximately 1,343

SY) shall be installed. Flooring shall be prepared as per manufacturers requirements prior to the new carpet installation. Transition strips shall be installed in the doorways as appropriate (approximately 18 EA).

The Contractor shall install new 4” vinyl cove base (approximately 700

LF). The Contractor shall provide carpet tile, cove base and transition strips samples (neutral colors, blues and greys) for selection after award. (CDRL A016)

E) NMCI/ RDT<(>&<)>E and Phone: All NMCI, RDT<(>&<)>E and phone connections shall be disconnected from the existing cubicles, pulled back to the communication room and removed from the patch panel

(approximately 127 EA). The Contractor shall install new drops for NMCI

(approximately 146 EA), RDT<(>&<)>E Cat6

Page 16 of 50ORDER NUMBER:

(approximately 146 EA) and Phone (approximately 146 EA) to accommodate

19 net seats in Room 355A. Kiosks will not require phone and RDT<(>&<)>E drops. The Contractor shall install new NMCI (approximately 4 EA), RDT

<(>&<)>E Cat 6 (approximately 4EA) and Phone (approximately 4 EA) on

Conference Rooms (approximately 4 EA) and Person Call/Meeting Office (1

EA). The new drops shall be installed and punched down back in the new enclosed telecommunication room.

F) Enclosed Telecommunication Room:

Part II

Section I Clauses:

52.203-3 Gratuities (APR 1984)

52.203-5 Covenant Against Contingent Fees (MAY 2014

52.203-7 Anti-Kickback Procedures (JUN 2020)

52.203-8 Cancellation, Rescission, and Recovery of Funds for illegal or

Improper Activity (MAY 2014)

52.203-10 Price or Fee Adjustment for Illegal or Improper Activity (MAY

2014)

52.203-12 Limitation on Payments to Influence Certain Federal

Transactions (JUN 2020)

52.203-16 Preventing Personal Conflicts of Interest (JUN 2020)

52.203-17 Contractor Employee Whistleblower Rights and Requirement to inform Employees of Whistleblower Rights(JUN 2020)

52.204-4 Printed or Copied Double-Sided on Postconsumer Fiber Content

Paper. (MAY 2011)

52.204-9 Personal Identity Verification of Contractor Personnel. (JAN

Page 17 of 50ORDER NUMBER:

2011)

52.204-10 Reporting Executive Compensation and First Tier Subcontract

Awards. (JUN 2020)

52.204-12 Unique Entity Identifier Maintenance. (OCT 2016)

52.204-13 System for Award Management Maintenance. (OCT 2018)

52.204-14 Service Contract Reporting Requirements. (OCT 2016)

52.204-21 Basic Safeguarding of Covered Contractor Information Systems

(NOV 2021)

52.209-6 Protecting the Government’s Interest When Subcontracting with

Contractors Debarred, Suspended, or Proposed for Debarment. (NOV 2021)

52.209-9 Updates of Publicly Available Information Regarding

Responsibility Matters. (OCT 2018)

52.209-10 Prohibition on Contracting with Inverted Domestic

Corporations. (NOV 2015)

52.211-10 Commencement, Prosecution, and Completion of Work.(Apr 1984)

Alternate I (Apr1984)

52.215-2 Audit and Records – Negotiations (JUN 2020)

2.215-8 Order of Precedence—Uniform Contract Format.(Oct 1997)

52.215-14 Integrity of Unit Prices.(NOV 2021)

52.215-23 Limitations on Pass-Through Charges. (JUN 2020)

52.219-6 Notice of Total Small Business Set-Aside.(NOV 2020)

52.219-8 Utilization of Small Business Concerns.(OCT 2018)

Page 18 of 50ORDER NUMBER:

52.219-14 Limitations on Subcontracting.(SEP 2021)

52.219-28 Post-Award Small Business Program Representation. (SEP 2021)

52.222-3 Convict Labor.(June 2003)

52.222-4 Contract Work Hours and Safety Standards Act—Overtime

Compensation. (MAR 2018)

52.222-6 Construction Wage Rate Requirements (AUG 2018)

52.222-7 Withholding of Funds. (MAY 2014)

52.222-8 Payrolls and Basic Records. (JUL 2021)

52.222-9 Apprentices and Trainees. (July 2005)

52.222-10 Compliance with Copeland Act Requirements. (Feb 1988)

52.222-11 Subcontracts (Labor Standards). (MAY 2014)

52.222-12 Contract Termination—Debarment. (MAY 2014)

52.222-13 Compliance with Davis-Bacon and Related Act Regulations. (MAY

2014)

52.222-14 Disputes Concerning Labor Standards. (Feb 1988)

52.222-15 Certification of Eligibility. (MAY 2014)

52.222-20 Contracts for Materials, Supplies, Articles, and Equipment

Exceeding $15,000 (JUN 2020)

52.222-21 Prohibition of Segregated Facilities. (APR 2015)

52.222-26 Equal Opportunity. (SEP 2016)

Page 19 of 50ORDER NUMBER:

52.222-27 Affirmative Action Compliance Requirements for Construction.

(APR 2015)

52.222-34 Project Labor Agreement (May 2010)

52.222-35 Equal Opportunity for Veterans. (JUN 2020)

52.222-36 Equal Opportunity for Workers with Disabilities (JUN 2020)

52.222-35 Equal Opportunity for Veterans. (JUN 2020)

(i) Work is performed outside the United States by employees recruited outside the United States

(a) Definitions. As used in this clause—

“Active duty wartime or campaign badge veteran,” “Armed Forces service medal veteran,” “disabled veteran,” “protected veteran,” “qualified disabled veteran,” and “recently separated veteran” have the meanings given at FAR 22.1301.

(b) Equal opportunity clause. The Contractor shall abide by the requirements of the equal opportunity clause at 41 CFR 60-300.5(a), as of March 24, 2014. This clause prohibits discrimination against qualified protected veterans, and requires affirmative action by the

Contractor to employ and advance in employment qualified protected veterans.

(c) Subcontracts. The Contractor shall insert the terms of this clause in subcontracts of $150,000 or more unless exempted by rules, regulations, or orders of the Secretary of Labor. The Contractor shall act as specified by the Director, Office of Federal Contract Compliance

Programs, to enforce the terms, including action for noncompliance. Such necessary changes in language may be made as shall be appropriate to identify properly the parties and their undertakings.

Alternate I (JUL 2014).

(ii) The Director, Office of Federal Contract Compliance Programs, has waived, in accordance with 22.1305(a) or the head of the agency has

Page 20 of 50ORDER NUMBER:

waived, in accordance with 22.1305(b) all of the terms of the clause.

52.222-40 Notification of Employee Rights Under the National Labor

Relations Act. (Dec 2010)

52.222-50 Combating Trafficking in Persons. (NOV 2021)

52.222-54 Employment Eligibility Verification. (MAY 2022)

52.222-55 Minimum Wage Under Executive Order 13658. (JAN 2022)

52.223-2 Affirmative Procurement of Biobased Products Under Service and

Construction Contracts (Sept 2013)

52.223-3 Hazardous Material Identification and Material Safety Data.(FEB

2021)Alternate I (July 1995)

52.223-5 Pollution Prevention and Right-to-Know Information. (May 2011)

52.223-6 Drug-Free Workplace. (May 2001)

52.223-11 Ozone-Depleting Substances and High Global Warming Potential

Hydrofluorocarbons (Jun 2016)

52.223-12 Maintenance, Service, Repair, or Disposal of Refrigeration

Equipment and Air Conditioners. (Jun 2016)

52.223-15 Energy Efficiency in Energy-Consuming Products.(MAY 2020)

52.223-17 Affirmative Procurement of EPA-designated Items in Service and

Construction Contracts.(AUG 2018)

52.223-18 Encouraging Contractor Policies to Ban Text Messaging While

Driving.(JUN 2020)

52.223-19 Compliance with Environmental Management Systems. (May 2011)

52.223-20 Aerosols.(Jun 2016)

Page 21 of 50ORDER NUMBER:

52.223-21 Foams.(Jun 2016)

52.224-1 Privacy Act Notification. (Apr 1984)

52.224-2 Privacy Act.(Apr 1984)

52.225-9 Buy American—Construction Materials (NOV 2021) When using funds other than those appropriated under the American Recovery and

Reinvestment Act of 2009 (Pub. L. 111-5) (Recovery Act), in solicitations and contracts for construction that is performed in the

United States valued at less than $7,358,000.

(a) Definitions. As used in this clause—

Commercially available off-the-shelf (COTS) item—

(1) Means any item of supply (including construction material) that is–

(i) A commercial item (as defined in paragraph (1) of the definition at Federal Acquisition Regulation (FAR) 2.101);

(ii) Sold in substantial quantities in the commercial marketplace; and

(iii) Offered to the Government, under a contract or subcontract at any tier, without modification, in the same form in which it is sold in the commercial marketplace; and

(2) Does not include bulk cargo, as defined in 46 U.S.C.

40102(4), such as agricultural products and petroleum products.

"Construction material" means an article, material, or supply brought to the construction site by the Contractor or a subcontractor for incorporation into the building or work. The term also includes an item brought to the site preassembled from articles, materials, or supplies. However, emergency life safety systems, such as emergency lighting, fire alarm, and audio evacuation systems, that are discrete systems incorporated into a public building or work and that are produced as complete systems, are evaluated as a single and distinct construction material regardless of when or how the individual parts or components of those systems are delivered to the construction site.

Materials purchased directly by the Government are supplies, not

Page 22 of 50ORDER NUMBER:

construction material.

Cost of components means—

(1) For components purchased by the Contractor, the acquisition cost, including transportation costs to the place of incorporation into the construction material (whether or not such costs are paid to a domestic firm), and any applicable duty (whether or not a duty-free entry certificate is issued); or

(2) For components manufactured by the Contractor, all costs associated with the manufacture of the component, including transportation costs as described in paragraph (1) of this definition, plus allocable overhead costs, but excluding profit. Cost of components does not include any costs associated with the manufacture of the construction material.

Domestic construction material means—

(1) For construction material that does not consist wholly or predominantly of iron or steel or a combination of both-

(i) An unmanufactured construction material mined or produced in the United States; or

(ii) A construction material manufactured in the United

States, if–

(A) The cost of its components mined, produced, or manufactured in the United States exceeds 55 percent of the cost of all its components. Components of foreign origin of the same class or kind for which non-availability determinations have been made are treated as domestic. Components of unknown origin are treated as foreign; or

(B) The construction material is a COTS item; or

(2) For construction material that consists wholly or predominantly of iron or steel or a combination of both, a construction material manufactured in the United States if the cost of foreign iron and steel constitutes less than 5 percent of the cost of all components used in such construction material. The cost of foreign iron and steel includes but is not limited to the cost of foreign iron or steel mill products

(such as bar, billet, slab, wire, plate, or sheet), castings, or forgings utilized in the manufacture of the construction material and a good faith estimate of the cost of all foreign iron or steel components excluding COTS fasteners. Iron or steel components of unknown origin are treated as foreign. If the construction material contains multiple components, the cost of all the materials used in such construction

Page 23 of 50ORDER NUMBER:

material is calculated in accordance with the definition of "cost of components".

Fastener means a hardware device that mechanically joins or affixes two or more objects together. Examples of fasteners are nuts, bolts, pins, rivets, nails, clips, and screws.

Foreign construction material means a construction material other than a domestic construction material.

Foreign iron and steel means iron or steel products not produced in the United States. Produced in the United States means that all manufacturing processes of the iron or steel must take place in the

United States, from the initial melting stage through the application of coatings, except metallurgical processes involving refinement of steel additives. The origin of the elements of the iron or steel is not relevant to the determination of whether it is domestic or foreign.

Predominantly of iron or steel or a combination of both means that the cost of the iron and steel content exceeds 50 percent of the total cost of all its components. The cost of iron and steel is the cost of the iron or steel mill products (such as bar, billet, slab, wire, plate, or sheet), castings, or forgings utilized in the manufacture of the product and a good faith estimate of the cost of iron or steel components excluding COTS fasteners.

Steel means an alloy that includes at least 50 percent iron, between 0.02 and 2 percent carbon, and may include other elements.

"United States" means the 50 States, the District of Columbia, and outlying areas.

(b) Domestic preference.

(1) This clause implements 41 U.S.C.chapter 83, Buy American, by providing a preference for domestic construction material. In accordance with 41 U.S.C. 1907, the domestic content test of the Buy American statute is waived for construction material that is a COTS item, except that for construction material that consists wholly or predominantly of iron or steel or a combination of both, the domestic content test is applied only to the iron and steel content of the construction materials, excluding COTS fasteners. (See FAR 12.505(a)(2)). The

Contractor shall use only domestic construction material in performing this contract, except as provided in paragraphs (b)(2) and (b)(3) of this clause.

Page 24 of 50ORDER NUMBER:

(2) This requirement does not apply to information technology that is a commercial item or to the construction materials or components listed by the Government as follows:

_______"NONE"_________________________________________[Contra cting Officer to list applicable excepted materials or indicate "none"]

(3) The Contracting Officer may add other foreign construction material to the list in paragraph (b)(2) of this clause if the Government determines that-

(i) The cost of domestic construction material would be unreasonable. The cost of a particular domestic construction material subject to the requirements of the Buy American statute is unreasonable when the cost of such material exceeds the cost of foreign material by more than 20 percent;

(ii) The application of the restriction of the Buy

American statute to a particular construction material would be impracticable or inconsistent with the public interest; or

(iii) The construction material is not mined, produced, or manufactured in the United States in sufficient and reasonably available commercial quantities of a satisfactory quality.

(c) Request for determination of inapplicability of the Buy

American statute.

(1)

(i) Any Contractor request to use foreign construction material in accordance with paragraph (b)(3) of this clause shall include adequate information for Government evaluation of the request, including-

(A) A description of the foreign and domestic construction materials;

(B) Unit of measure;

(C) Quantity;

(D) Price;

(E) Time of delivery or availability;

(F) Location of the construction project;

(G) Name and address of the proposed supplier; and

(H) A detailed justification of the reason for use of foreign construction materials cited in accordance with paragraph

(b)(3) of this clause.

Page 25 of 50ORDER NUMBER:

(ii) A request based on unreasonable cost shall include a reasonable survey of the market and a completed price comparison table in the format in paragraph (d) of this clause.

(iii) The price of construction material shall include all delivery costs to the construction site and any applicable duty

(whether or not a duty-free certificate may be issued).

(iv) Any Contractor request for a determination submitted after contract award shall explain why the Contractor could not reasonably foresee the need for such determination and could not have requested the determination before contract award. If the

Contractor does not submit a satisfactory explanation, the Contracting

Officer need not make a determination.

(2) If the Government determines after contract award that an exception to the Buy American statute applies and the Contracting

Officer and the Contractor negotiate adequate consideration, the

Contracting Officer will modify the contract to allow use of the foreign construction material. However, when the basis for the exception is the unreasonable price of a domestic construction material, adequate consideration is not less than the differential established in paragraph

(b)(3)(i) of this clause.

(3) Unless the Government determines that an exception to the Buy

American statute applies, use of foreign construction material is noncompliant with the Buy American statute.

(d) Data. To permit evaluation of requests under paragraph (c) of this clause based on unreasonable cost, the Contractor shall include the following information and any applicable supporting data based on the survey of suppliers:

,,Foreign and Domestic Construction Materials Price Comparison,, ,,Construction Material Description,,Unit of Measure,,Quantity,,Price

(dollars)*,, ,,Item1:,,,,,,,, ,,Foreign construction material,,_______,,_______,,_______,, ,,Domestic construction material,,_______,,_______,,_______,, ,,Item2:,,_______,,_______,,_______,, ,,Foreign construction material,,_______,,_______,,_______,, ,,Domestic construction material,,,,,,,, [* Include all delivery costs to the construction site and any

Page 26 of 50ORDER NUMBER:

applicable duty (whether or not a duty-free entry certificate is issued)].

[List name, address, telephone number, and contact for suppliers surveyed. Attach copy of response; if oral, attach summary.]

[Include other applicable supporting information.]

(End of clause)

52.225-13 Restrictions on Certain Foreign Purchases (FEB 2021)

52.228-1 Bid Guarantee. (Sept 1996)

52.228-2 Additional Bond Security. (Oct 1997)

52.228-3 Workers’ Compensation Insurance (Defense Base Act). (JUL 2014)

52.228-5 Insurance—Work on a Government Installation. (Jan 1997)

52.228-11 Pledges of Assets. (FEB 2021)

52.228-15 Performance and Payment Bonds—Construction. (JUN 2020)

52.229-3 Federal, State, and Local Taxes. (Feb 2013)

52.229-4 Federal, State, and Local Taxes (State and Local Adjustments).

(Feb 2013)

52.232 –5 Payments under Fixed Price Construction Contracts (MAY 2014)

52.232-16 Progress Payments. (NOV 2021)

Alternate I

52.232-17 Interest. (MAY 2014)

52.232-23 Assignment of Claims. (MAY 2014)

52.232-27 Prompt Payment for Construction Contracts (Jan 2017)

52.232-33 Payment by Electronic Funds Transfer-System for Award

Page 27 of 50ORDER NUMBER:

Management.(OCT 2018)

52.232-39 Unenforceability of Unauthorized Obligations (JUN 2013)

52.232-40 Providing Accelerated Payments to Small Business

Subcontractors.(NOV 2021)

52.233-1 Disputes.(MAY 2014)

52.233-3 Protest after Award.(AUG 1996)

52.233-4 Applicable Law for Breach of Contract Claim (OCT 2004)

52.236-2 Differing Site Conditions.(Apr 1984)

52.236-3 Site Investigation and Conditions Affecting the Work. (Apr

1984)

52.236-5 Material and Workmanship.(Apr 1984)

52.236-6 Superintendence by the Contractor.(Apr 1984)

52.236-7 Permits and Responsibilities.(Nov 1991)

52.236-8 Other Contracts.(Apr 1984)

52.236-9 Protection of Existing Vegetation, Structures, Equipment, Utilities, and Improvements.(Apr 1984)

52.236-10 Operations and Storage Areas.(Apr 1984)

52.236-11 Use and Possession Prior to Completion.(Apr 1984

52.236-12 Cleaning Up.(Apr 1984)

52.236-13 Accident Prevention.(Nov 1991)

Alternate I (Nov 1991).

Page 28 of 50ORDER NUMBER:

52.236-14 Availability and Use of Utility Services.(Apr 1984)

52.236-15 Schedules for Construction Contracts.(Apr 1984)

52.236-17 Layout of Work. (Apr 1984)

52.236-21 Specifications and Drawings for Construction.(Feb 1997)

Alternate I (Apr 1984).

52.236-26 Preconstruction Conference. (Feb 1995)

52.242-13 Bankruptcy.(July 1995)

52.242-14 Suspension of Work.(APR 1984)

52.243-4 Changes.(June 2007)

52.243-5 Changes and Changed Conditions.(Apr 1984)

52.244-6 Subcontracts for Commercial Items.(JAN 2022)

52.246-12 Inspection of Construction.(Aug 1996)

52.246-21 Warranty of Construction.(MAR 1994)

52.249-10 Default (Fixed-Price Construction).(Apr 1984)

52.251-1 Government Supply Sources. (Apr 2012)

52.252-2 Clauses Incorporated by Reference. (Feb 1998)

This contract incorporates one or more clauses by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. Also, the

Page 29 of 50ORDER NUMBER:

full text of a clause may be accessed electronically at this/these address(es):

__________WWW.ACQUISITION.GOV__________

[Insert one or more Internet addresses]

(End of clause)

52.253-1 Computer Generated Forms. (Jan 1991)

PART III: List of Documents, Exhibits, and Other Attachments

Section J List of Attachments

FORM SF-24 BID BOND

FORM SF-25 PERFORMANCE BOND

FORM SF-25A PAYMENT BOND

PAST PERFORMANCE QUESTIONNAIRE

Acronym Table Refer to Attachment 01

APPLICABLE DOCUMENTS Refer to Attachment 02

DJU1620000056-FIGURES 1-8

BLDG 41 combined CDRL'S

Attachment 03- 5.0 TECHNICAL DATA DELIVERABLES

NSACRANEINST 5100.13A

Visitor Pass-SECNAV_5512_1_BLANK

NSACRANEINST 11262.1A

OPNAVINST 5100.19E Volume I Part I

NSACRANEINST 8020.1E- Explosives Safety Program at NSA Crane

PART IV: Representations & Instructions

Section K Representations, certifications, and other statements of offerors or respondents

52.203-11 Certification and Disclosure Regarding Payments to Influence

Page 30 of 50ORDER NUMBER:

Certain Federal Transactions (SEP 2007)

52.204-3 Taxpayer Identification (OCT 1998)

(a) Definitions.

“Common parent,” as used in this provision, means that corporate entity that owns or controls an affiliated group of corporations that files its

Federal income tax returns on a consolidated basis, and of which the offeror is a member.

“Taxpayer Identification Number (TIN),” as used in this provision, means the number required by the Internal Revenue Service (IRS) to be used by the offeror in reporting income tax and other returns. The TIN may be either a Social Security Number or an Employer Identification Number.

(b) All offerors must submit the information required in paragraphs (d) through (f) of this provision to comply with debt collection requirements of 31 U.S.C. 7701(c) and 3325(d), reporting requirements of

26 U.S.C. 6041, 6041A, and 6050M, and implementing regulations issued by the IRS. If the resulting contract is subject to the payment reporting requirements described in Federal Acquisition Regulation (FAR) 4.904, the failure or refusal by the offeror to furnish the information may result in a 31 percent reduction of payments otherwise due under the contract.