Page 1 of 50ORDER NUMBER:
SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL ITEMS
OFFEROR TO COMPLETE BLOCKS 12, 17, 23, 24, & 30
1. REQUISITION NUMBER PAGE 1 OF
2. CONTRACT NO. 3. AWARD/EFFECTIVE
DATE
4. ORDER NUMBER 5. SOLICITATION NUMBER 6. SOLICITATION ISSUE
DATE
7. FOR SOLICITATION
INFORMATION CALL:
a. NAME b. TELEPHONE NUMBER (No collect calls)
8. OFFER DUE DATE/
LOCAL TIME
9. ISSUED BY
13b. RATING
14. METHOD OF SOLICITATION
CODE
15. DELIVER TO 16. ADMINISTERED BY CODE
18a. PAYMENT WILL BE MADE BY CODE17a. CONTRACTOR/
OFFEROR
CODE
FACILITY
CODE
CODE
TELEPHONE NO.
17b. CHECK IF REMITTANCE IS DIFFERENT AND PUT SUCH ADDRESS IN
OFFER
18b. SUBMIT INVOICES TO ADDRESS SHOWN IN BLOCK 18a UNLESS BLOCK
BELOW IS CHECKED
RFQ IFB RFP
SEE ADDENDUM
19.
ITEM NO.
20.
SCHEDULE OF SUPPLIES/SERVICES
21.
QUANTITY
22.
UNIT
23.
UNIT PRICE
24.
AMOUNT
(Use Reverse and/or Attach Additional Sheets as Necessary)
25. ACCOUNTING AND APPROPRIATION DATA 26. TOTAL AWARD AMOUNT (For Govt. Use Only)
28. CONTRACTOR IS REQUIRED TO SIGN THIS DOCUMENT AND RETURN
COPIES TO ISSUING OFFICE. CONTRACTOR AGREES TO FURNISH AND
DELIVER ALL ITEMS SET FORTH OR OTHERWISE IDENTIFIED ABOVE AND ON ANY
ADDITIONAL SHEETS SUBJECT TO THE TERMS AND CONDITIONS SPECIFIED
29. AWARD OF CONTRACT: REF. OFFER
DATED . . YOUR OFFER ON SOLICITATION
(BLOCK 5), INCLUDING ANY ADDITIONS OR CHANGES WHICH ARE
SET FORTH HEREIN, IS ACCEPTED AS TO ITEMS:
30a. SIGNATURE OF OFFEROR/CONTRACTOR
30b. NAME AND TITLE OF SIGNER (Type or print) 30c. DATE SIGNED
31a. UNITED STATES OF AMERICA (SIGNATURE OF CONTRACTING OFFICER)
31b. NAME OF CONTRACTING OFFICER (Type or print) 31c. DATE SIGNED
AUTHORIZED FOR LOCAL REPRODUCTION
PREVIOUS EDITION IS NOT USABLE
STANDARD FORM 1449 (REV. 2/2012)
Prescribed by GSA - FAR (48 CFR) 53.212
10. THIS ACQUISITION IS UNRESTRICTED OR
NAICS:
SIZE STANDARD:
13a. THIS CONTRACT IS A
RATED ORDER UNDER
DPAS (15 CFR 700)
SET ASIDE: % FOR:
11. DELIVERY FOR FOB DESTINA-
TION UNLESS BLOCK IS
MARKED
SEE SCHEDULE
12. DISCOUNT TERMS
ARE ARE NOT ATTACHED
ARE ARE NOT ATTACHED
27a. SOLICITATION INCORPORATES BY REFERENCE FAR 52.212-1, 52.212-4. FAR 52.212-3 AND 52.212-5 ARE ATTACHED. ADDENDA
27b. CONTRACT/PURCHASE ORDER INCORPORATES BY REFERENCE FAR 52.212-4. FAR 52.212-5 IS ATTACHED. ADDENDA
Coll. No.
8 (A)
EDWOSB
WOMEN-OWNED SMALL BUSINESS
(WOSB) ELIGIBLE UNDER THE WOMEN-OWNED
SMALL BUSINESS PROGRAM
SERVICE-DISABLED
VETERAN-OWNED
SMALL BUSINESS
HUBZONE SMALL
BUSINESS
SMALL BUSINESS
ISO196-22
Jason Morgan
COCO 100
COCO
321000101
Misc 400 First Street NW Washington DC 20534
UNICOR FPI CENTRAL ACCOUNTS PAYABLE
PO BOX 11849
LEXINGTON, KY 40578-1849
1620000056 See Section B
UNICOR FUNDS 15X4500 FUNDS SHALL BE OBLIGATED BY INDIVIDUAL DELIVERY ORDERS AND NOT BY THE CONTRACT ITSELF
Jason Morgan
X
236220
08/01/2022
11/14/2022
2:00 PM
COCO
UNICOR, FPI CENTRAL OFFICE
400 1ST ST NW
WASHINGTON DC 20534-0004
UNICOR, FPI CENTRAL OFFICE
400 1ST ST NW
WASHINGTON DC 20534-0004
08/01/2022
UNICOR, FPI CENTRAL OFFICE
400 1ST ST NW
WASHINGTON DC 20534-0004
10/14/2022
39.5 M Ann Rece
Page 2 of 50ORDER NUMBER:
Terms:
Section A: Optional Form 308 or SF33
Section B: Supplies or Services Pricing or Cost (Line Items)
1. The following information pertains to the SF1442, Solicitation, Offer, and Award:
OMB Clearance Number 1103-0018
Block 8: Emailed, Hand carried or Overnight Express to:
UNICOR, FPI
ATTN: Jason Morgan, UNICOR Contracting Officer<(>,<)>
3301 LEESTOWN RD<(>,<)>
LEXINGTON, KY 40511
859-255-6812 EXT 3002
Block 17: LUMP SUM (ENTER THE AMOUNT IN SECTION B.
Block 24, and 27, See Section H.
GENERAL INTENTION: It is the intent of this solicitation to result in a
Firm Fixed Price, Construction Type Contract for a project at the Naval
Service Warfare Center (NSWC Crane) Building 41-1st floor acquisition office renovation, 2nd and 3rd floor modifications as outlined in the attached Statement of Work.
The solicitation is 100% set aside for small business. The North
American Industrial Classification System (NAICS) Code applicable to this project is 236220, commercial and institutional buildings and related structure construction.
Contract Line Item: Offerors shall enter unit price and amount for contract line item.
QUESTIONS WILL ONLY be accepted in writing and WILL NOT BE ACCEPTED
AFTER 10/31/2022 at 10:00 AM EST. Responses to questions and site visit sign in sheet will be posted via www.sam.gov
Page 3 of 50ORDER NUMBER:
SITE VISIT IS MANDATORY FOR AWARD.
If you previously attended the site visit on 08/18/2022 and do not require an additional site visit, the 08/18/2022 visit will count for the mandatory site visit requirement.
SITE VISIT: A SITE VISIT WILL BE CONDUCTED ON 10/27/2022 at 12:00 PM
UPON REQUEST ONLY. Requests are due by 10/20/2022 at 10:00 AM. Please note that if no requests for a site visit are received prior to the cut-off date then the site visit will not commence and no prospective bidders shall show up on 10/27/2022.
If the site visit is requested by any prospective bidder, the attending participants will meet at Building 41 on the 1st floor Room 127B, 2nd floor Rooms 211<(>,<)> 212<(>,<)> 214<(>,<)> 215 and 3rd floor room 355 for located at the Naval Surface Warfare Center (NSWC Crane)<(>,<)> JXY.
The Contractor shall inspect the site where services are to be performed. This site review shall satisfy the Contractor's need to identify all general and local conditions that may affect the cost of the contract. Failure to inspect the site will not constitute grounds for claims after contract award. Up to two (2) people per company may attend.
Company Name, Name of attendees, and phone number for attendees must be submitted with completed SECNAV Form for Base Access to
Jason.Morgan2@USDOJ.GOV by 10/20/2022, at 10:00 AM EST.
NOTE: If you have clearance to access the base - you are still required to submit your names for the site visit by the deadline of 10/20/2022, at 10:00 AM EST. in order to attend the site visit.
Physical access to the Government’s facility at Naval Support Activity
(NSA), Crane shall be through the use of the Defense Biometric
Identification System (DBIDS) and associated data processing/information services for purposes of protecting U.S./Coalition/allied government/national security areas of responsibility and information.
The contractor shall obtain employee personal identity verification credentialing (badge) by submitting to the NSA Crane Visitor Center, 103
Furlong St, Crane, IN 47522, form SECNAV 5512/1 (APR 2014), for each
Page 4 of 50ORDER NUMBER:
SECTION B
SUPPLIES OR SERVICES AND PRICES/COSTS
Item No. SUPPLIES OR SERVICE Quantity U/M UNIT PRICE AMOUNT IN US$ Delivery Date contractor employee. Upon Base Registrar authorization of form 5512/1 the contractor shall submit form NSA Crane 5512/47 DBIDS Badge
Application Record to the NSWC Crane Security Division (812)-854-1213.
The Contractor shall retrieve badges of employed personnel upon separation. A background check will be conducted as part of the process and two forms of identification are required. A visitor's pass will be provided if the background check is cleared. Please allow an significant time (1-2 hours) for the entire process.
PROJECT MUST BE COMPLETED BY 03/31/2023
THE FOLLOWING INFORMATION IS REQUIRED TO BE COMPLETED BY THE OFFEROR:
VENDOR'S Unique Entity Identifier:___________________________
VENDOR'S POINT OF CONTACT: _____________________________________
VENDOR'S TELEPHONE & FAX NUMBER: ______________________________
VENDOR'S EMAIL ADDRESS: ________________________________________
VENDOR'S BUSINESS SIZE (i.e. SMALL,LARGE,ETC.): ________________
By submission of an offer, the offeror acknowledges the requirement that a prospective awardee shall be registered in the SAM database (System
Award Management) prior to award, during performance and through final payment of any contract resulting from this solicitation.
_______________________________________________ signature
00001 ICSG-0001 1 EA 03/31/2023
Demo:
Page 5 of 50ORDER NUMBER:
To include removal and disposal of asbestos containing material, carpeting, and vinyl tile floor.
00002 ICSG-0001 1 EA 03/31/2023
Construction:
To include patching and painting walls, install epoxy flooring, adding a telecommunication room, breakroom and HVAC modifications.
00003 ICSG-0001 1 EA 03/31/2023
Utilities:
To include disconnecting NMCI, RDT<(>&<)>E, phone, and electrical connections, adding a new power panel, circuits and power drops, make power poles connections, install new NMCI / RDT<(>&<)>E drops, new phone drops
00004 ICSG-0001 1 EA 03/31/2023
Other Direct Costs:
To include general, administrative, management and incidentals
1.0 SCOPE
The scope of this project is to renovate Building 41 on 1st floor Room
127 B, 2nd floor Rooms 211, 212, 214, 215 and 3rd floor Room 355 for
Naval Surface Warfare Center (NSWC Crane), JXY. Project consists of removal and disposal of asbestos containing material, patch and paint walls, remove and replace carpets and cove base, remove vinyl tile
Page 6 of 50ORDER NUMBER:
floor, scarify existing floor, apply new epoxy flooring, disconnect
NMCI, RDT<(>&<)>E, phone and electrical from all existing cubicles, add new power panel, circuits and power drops, power poles connections, install new NMCI / RDT<(>&<)>E drops, new phone drops, build new enclosed telecommunication room, new breakroom and HVAC modifications.
These renovations are required to improve the workspace area and building conditions.
2.0,,Acronym Table
Acronym Table
SOW,,Statement of Work,, HVAC<(>&<)>R,,Heating, Ventilation, Air-Conditioning, & Refrigeration
CFR,,Code of Federal Regulations,, ODS,,Ozone Depleting Substance
ASHRAE,,American Society of Heating, Refrigerating and Air-Conditioning
Engineers,, RTA,,Requiring Technical Activity
ASNRDA,,Assistant Secretary of the Navy for Research and Development
Acquisition,, HPSB,,High Performance and Sustainable Building
DoD,,Department of Defense,, SOP,,Standard Operating Procedure
DoDD,,Department of Defense Directive,, PPE,,Personal Protective Equipment
DoDI,,Department of Defense Instruction,, OSHA,,Occupational Safety and Health Administration
HDBK,,Handbook,, NSWC,,Naval Surface Warfare Center
NSA,,Naval Surface Activity,, QASP,,Quality Assurance Surveillance Plan
POV,,Privately Owned Vehicle,, Vols.,,Volumes
SOH,,Safety and Occupational Health,, UFGS,,Unified Facilities Guide Specification
UFC,,Unified Facilities Criteria,, USC,,United States Code
DON,,Department of the Navy,,DBIDS,, Page 7 of 50ORDER NUMBER:
Defense Biometric Identification System
SECNAV,,Secretary of the Navy,, DFOW,,Definable Feature of Work
AHA,,Activity Hazard Analysis,, PAK,,Post Award Kickoff
SLP,,Standard Lift Plan,, COR,,Contracting Officer Representative
APP,,Accident Prevention Plan,, SDS,,Safety Data Sheet
ACM,,Asbestos Containing Material,, ACBM,,Asbestos Containing Building Material
VOC,,Volatile Organic Compound,, FF<(>&<)>E,, Furniture, Fixtures & Equipment
3.0,,APPLICABLE DOCUMENTS
The following documents of the revision or issue in effect at the date of award, form a part of this SOW for reference. In the event of conflict between the documents referenced herein and the contents of this SOW, the contents of this SOW shall prevail.
ASN (RDA) MEMO,,DoN Policy on Digital Product/Technical Data w/Attachment "Guidance on Acquisition and Conversion of Product /
Technical Data to Digital Form"
40 CFR 300,,National Oil and Hazardous Substances Pollution Contingency
Plan (NCP) https://www.ecfr.gov/current/title-40/chapter-I/subchapter-J/part-300
40 CFR 355,,Emergency Planning and Notification https://www.ecfr.gov/current/title-40/chapter-I/subchapter-J/part-355
DODD 4140.1 ,,Supply Chain Materiel Management Policy https://www.esd.w hs.mil/Portals/54/Documents/DD/issuances/dodi/414001p.pdf
DODD 5000.01,,The Defense Acquisition System https://www.esd.whs.mil/Por tals/54/Documents/DD/issuances/dodd/500001p.pdf
DODI 5000.02,,Operation of the Defense Acquisition System https://www.es d.whs.mil/Portals/54/Documents/DD/issuances/dodi/500002p.pdf
DOD 5000.04-M-1,,Cost and Software Data Reporting Manual, Cost Analysis
Improvement Group (CAIG) https://www.esd.whs.mil/Portals/54/Documents/DD
/issuances/dodm/500004p.pdf?ver=YIkjr3yVS9cwqKYLMfcv8Q%3D%3D
Page 8 of 50ORDER NUMBER:
EM385-1-1,,U.S. Army Corps of Engineers Safety and Health Requirements
Manual https://www.publications.usace.army.mil/portals/76/publications
/engineermanuals/em_385-1-1.pdf
FC 1-300-09N,,Navy And Marine Corps Design Procedures https://www.wbdg.
org/ffc/dod/unified-facilities-criteria-ufc/fc-1-300-09n
MIL-STD-461F,,DoD Interface Standard- Requirements for the Control of
Electromagnetic Interference Characteristics of Subsystems and Equipment http://everyspec.com/MIL-STD/MIL-STD-0300-0499/MIL-STD-461F_19035/
NSACRANEINST 08020.1E,,Explosive Safety Program At NSA Crane
NSACRANEINST 08020.1E CH-2,,Explosive Safety Program Chapter 2 Safety
Requirement in Explosive Areas
NSACRANEINST 08020.1E CH-4,,Explosive Safety Program Chapter 4 Parking of POV in Explosive Magazine Areas
NSACRANEINST 08020.1E CH-5,,Explosive Safety Program Chapter 5 Wildfire
Prevention & Control
NSACRANEINST 08020.1E CH-11,,Explosive Safety Program Chapter 11 HERO
Program
NSACRANEINST 08020.4B,,Hazards of Electromagnetic Radiation to Ordnance
Emission Control Bill
NSACRANEINST 11262.1A,,Management of Weight Handling Equipment
NSACRANEINST 5530.1,,Visitor / Guest Access Control
NSWCCRANEINST 05090.2C,,Hazardous Waste Management Plan
NSWCCRANEINST 05100.7,,Hazardous Material Control and Management Program
NSWCCRANEINST 12735.1A,,Workplace Violence Prevention
NSWCCRANEINST 12792.2,,Drug-Free Workplace Program
NSWCCRANEINST 5100.1A,,Occupational Safety and Health Program
NSWCCRANEINST 5500.1A,,Portable Electronic Devices, Photography, and
Audio Visual Recording
OPNAVINST 1500.76,,Naval Training System Requirements, Acquisition, and
Management
OPNAVINST 5100.19E,,Vols. I, II, and III: Navy Safety and Occupational
Health (SOH) Program Manuel for Forces Afloat
OPNAVINST 5100.23G CH-1,,Navy Safety and Occupational Health (SOH)
Program Manual
OPNAVINST 5102.1,,Navy and Marine Corps Mishap and Safety Investigation, Reporting, and Record Keeping
Page 9 of 50ORDER NUMBER:
UFGS 01 45 35.05 10,,Special Inspections for Design-Bid-Build https://ww w.wbdg.org/ffc/dod/unified-facilities-guide-specifications-ufgs/ufgs-01-
45-35
UFGS 01 45 35.05 20,,Special Inspections for Design-Build https://www.wb dg.org/ffc/dod/unified-facilities-guide-specifications-ufgs/ufgs-01-45-3
UFGS 01 74 19,,Construction and Demolition Waste Management https://www.
wbdg.org/ffc/dod/unified-facilities-guide-specifications-ufgs/ufgs-01-74
-19
USC 40 CFR part 763.99,,Environmental Protection Agency ASBESTOS https:/
/www.ecfr.gov/current/title-40/chapter-I/subchapter-R/part-763/subpart-E
/section-763.99
USC 42, Chapter 55 ,,National Environmental Policy; Section 4321-4370d https://uscode.house.gov/view.xhtml?path=/prelim@title42/chapter55
<(>&<)>edition=prelim
USC TITLE 40,,Code of Federal Regulations https://www.govinfo.gov/conten t/pkg/USCODE-2001-title40/html/USCODE-2001-title40-chap10-subchapII-sec4
86.htm
UFGS 02 82 00 ,,Asbestos Remediation
UFC 3- 580- 1,,Telecommunications Interior Infrastructure Planning and Design
4.0 PERFORMANCE REQUIREMENTS
The Contractor shall furnish the required material, equipment and labor to renovate Building 41 on 1st floor Room 127 B, 2nd floor Rooms 211, 212, 214, 215 and 3rd floor Room 355. The Contractor shall utilize new material; no postconsumer or recovered material will be authorized for use. The Contractor shall adhere to all State and Federal building codes.
4.1 REQUIREMENTS
The scope of this project will be performed on first, second and third floors of B-41.
4.1.1 Room 127B
A) Demolition: There is an approximated 150 linear feet (LF) of existing
Page 10 of 50ORDER NUMBER:
cove base and 599 square feet (SF) of existing carpet that shall be removed and discarded. There is no asbestos containing material identified.
B) Electrical: The Contractor shall disconnect electrical connections from the existing cubicles. The Contractor shall provide all electrical components required to supply power for the new cubicle and printer station. Power pole (1EA) and 20A, 120V circuit breakers (1EA) shall be installed.
C) Flooring: New 24”x 24” tufted nylon carpet tiles (approximately 67
SY) shall be installed. Transition strips shall be installed in the doorways as appropriate (2 EA). Flooring shall be prepared as per manufacturers requirements prior to the new carpet installation. The
Contractor shall install new 4” vinyl base cove (approximately 150 LF).
The Contractor shall provide carpet tile, cove base and transition strips samples (neutral colors, blues and greys) for selection after award. (CDRL A016)
D) Walls: All holes within the walls of Room 127B shall be patched or filled. The Contractor shall apply 2 coats
(rolled) of new high quality paint (approximately 1,350 SF). New paint color shall be “Rising Tide”, Valspar, 4008-
3A. Reference Rooms 356 & 357 for the paint color. Contractor shall provide paint color samples for selection after award. (CDRL A016)
E) NMCI/ RDT<(>&<)>E and Phone: All NMCI, RDT<(>&<)>E and phone connections shall be disconnected from the existing cubicles, pulled back to the communication room and removed from the patch panel (approximately 6 EA). The
Contractor shall install new drops for NMCI (1EA), RDT<(>&<)>E
Cat 6 (1EA) and Phone (1EA) for the new cubicle.
The new drops shall be installed and punched down back in the appropriate communication room.
F) See Figure #1 and Figure #4.
Page 11 of 50ORDER NUMBER:
4.1.2 Rooms 211, 212, 214 and 215
A) Demolition: Existing cove base (approximately 1,000 LF) and existing
VCT (approximately 8,404 SF) in Rooms 211, 212 and 215 shall be removed and discarded. All floors in Rooms 211, 212 and 215 shall be scarified
(approximately 8,404 SF). There is no asbestos containing material identified.
B) Electrical: The Contractor shall provide all electrical components required to supply power for the new cubicles, new kiosks, existing cubicles, existing kiosks, new modular collaboration room, new modular conference room, new break room area and new person call/meeting office added to the space in Room 211, Room 212 and Room 215.The Contractor shall disconnect existing cubicle and kiosk power poles (approximately
12 EA) and connect new cubicle and kiosk power poles (approximately 14
EA). The Contractor shall install 1-pole, 20A,120V circuit breakers
(approximately 4 EA) , #12 AWG THHN/THWN solid copper conductor
(approximately 500c), ¾” EMT hangers (approximately 15 EA), ¾” EMT SS insulated connectors (approximately 10 EA), 3/4” EMT SS couplings
(approximately 10 EA), ¾” EMT conduit (approximately 100 LF) and receptacle 15A duplex w/accessories and branch circuit (approximately 12
EA),
A new power feed 120VAC, 20A (1EA) shall be installed to serve a
120VAC-24VDC transformer to serve the VAV controller in the New Modular
Collaboration Room (Room 212).
C) HVAC: The Contractor shall provide HVAC improvements to exceed cooling and airflow available in the New Modular Collaboration Room
(Room 212). New VAV box 600 CFM (1 EA) including HW coils, damper, actuator and thermostat shall be installed to supply the room. VAV box shall be located above the ceiling on the third floor due to the ceiling space above the second floor being too tight.
Use round duct, steel, galvanized, 10” diameter, 26 ga from VAV box to diffuser branches (approximately 25 LF). Fire dampers shall be used where ducts pass through the floors (2 EA). Duct access doors are needed to allow fire dampers inspection and maintenance (2
EA). DDC Programming shall be installed with at least four points each
VAV (Space temp, VAV discharge temp, VAV flow rate and HW valve
Page 12 of 50ORDER NUMBER:
position). Install controls wiring for the DDC Controller. Install a temperature sensor (1EA). Install a ball valve with actuator (1EA).
Install a TAB for air (VAV box, supply diffusers, return grilles) (1EA) and a TAB for water side (HW coils) (1EA). Install HW piping extended from the existing HW loop (approximately 10 LF). All HW piping shall have insulation (approximately 10 LF). Diffuser, 4 way cone, 24” x 24”, shall be installed at ceiling level (1EA). Install round duct, steel, galvanized, 8” diameter, 26 ga for diffuser branches (approximately 13
LF). Use insulated (1” thick) flexible duct 14” diameter for diffuser runouts (approximately 10 LF). Return grill, eggcrate, 24” x 24” shall be installed at ceiling level (1EA). Install round duct, steel, galvanized, 8” diameter, 26 ga from return grill back to plenum
(approximately 12 LF). All ductwork shall have insulation (approximately
50 SF).
D) Flooring: The Contractor shall apply new epoxy flooring of Seal Krete
1000, Rust-Oleum in Rooms 211, 212 and 215 (approximately 8,404 SF).
Flooring shall be prepared as per manufacturers requirements prior to apply new epoxy flooring. Transition strips shall be installed in the doorways as appropriate (approximately 10 EA). New 4” vinyl base cove
(approximately 1,000 LF) shall be installed in Rooms 211, 212 and 215.
The Contractor shall provide samples for colors and style of cove base, new epoxy color and flake broadcast and transition strips (neutral colors, blues and greys) for selection after award. (CDRL A016)
E) Walls: All holes within the walls of Rooms 211, 212, 214 and
215 and surrounding hallways shall be patched or filled (approximately 12,000 SF). The Contractor shall apply 3 coats (rolled) of new high quality paint in Rooms 211<(>,<)>
212, 214 and 215 and surrounding hallways (approximately 12,000
SF). New paint color shall be “Rising Tide”<(>,<)>
Valspar, 4008-3A. Reference Rooms 356 & 357 for the paint color.
Contractor shall provide paint color samples for selection after award. (CDRL A016)
F) NMCI, RDT<(>&<)>E and Phone: All NMCI, RDT<(>&<)>E and Phone connections shall be disconnected from the existing cubicles and kiosks, pulled back to the communication room and removed from the patch panel (approximately 62
Page 13 of 50ORDER NUMBER:
EA). The Contractor shall install new drops for NMCI
(approximately 83 EA), RDT<(>&<)>E Cat 6 (approximately 83 EA) and Phone drops (approximately 77 EA) to accommodate 21 net seats in Rooms 211, 212 and 215. Kiosks will not require phone drops. The Contractor shall install new NMCI, RDT
<(>&<)>E and Phone wall jacks CAT 6 on the Modular
Collaboration Room (1 EA), Modular Conference Room (1 EA) and
Person Call/Meeting Office (1 EA).
The new drops shall be installed and punched down back in the appropriate communication room.
G) Breakroom: 13’-2” of new base cabinets with Formica countertop and cabinet door and drawer pulls shall be provided and installed. 5’ of new upper wall cabinets shall be provided and installed to include 1 microwave shelve, cabinet doors and drawer pulls. Figure #5 and Figure #6.
Contractor shall provide cabinet and Formica countertop samples for selection after award. (CDRL A016)
H) Cabinetry for Storage Area: 9’-6” of new base cabinets with
Formica countertop and cabinet door and drawer pulls shall be provided and installed. Figure #5 and Figure #7.
Contractor shall provide cabinet and Formica countertop samples for selection after award. (CDRL A016)
I) See Figure #2, Figure #5, Figure #6 and Figure #7.
4.1.3 Room 355
A) Demolition: Existing cove base (approximately 700 LF) and existing carpet (approximately 12,086 SF) in Room 355 shall be removed and discarded. The Contractor shall remove and dispose approximated 12,086
SF of asbestos containing material identified on tan carpet mastic with black mastic under the existing carpet. The carpet shall also be abated since it is considered contaminated with asbestos floor mastic (floor mastic is partially adhered to the carpet).
B) Electrical: The Contractor shall provide all electrical components
Page 14 of 50ORDER NUMBER:
required to supply power for the new cubicles, new kiosks, existing cubicles, existing kiosks, new modular collaboration room, new modular conference room, new break room area and new person call/meeting office added to the space in Room 355A and to serve HVAC system in the New
Modular Conference Room. The Contractor shall disconnect approximately
25 EA of existing cubicle power poles and connect approximately 25 EA new cubicle power poles. The Contractor shall install 1-pole, 20A,120V circuit breakers (approximately 56 EA), 3-pole, 90A. 480V circuit breaker (1 EA), 225A main breaker 120/208V 3P-4W panel board (1 EA), 3-phase 480V pri-120/208V Sec 75 KVA dry-type transformer (1EA), 3-pole, 480 V, 100A enclosed circuit breaker (1 EA), 2-1/2” EMT conduit ( approximately 150 LF), 2-1/2” EMT SS coupling ( approximately 15 EA), 3”
EMT SS insulated connector (approximately 2 EA), 2-1/2” EMT 90 elbow
(approximately 3 EA), 2-1/2” EMT hanger (approximately 23 EA), #4/0 AWG
THHN/THWN stranded copper conductor (approximately 680
C), ), #3 AWG THHN/THWN stranded copper conductor (approximately 170 C), ¾” EMT conduit (approximately 675 LF), ¾” EMT SS coupling (approximately
68 EA), ¾” EMT SS Insulated connector (approximately 80 EA), ¾” EMT hanger (approximately 75 EA), #12 AWG THHN/THWN solid copper conductor
(approximately 3,000 C) and Receptacle 15A duplex w/accessories and branch circuits (approximately 25 EA) . The Contractor shall utilize as many of the existing circuits as possible to feed the new cubicles.
Contractor shall rewire new cubicles and workstations to 3 cubicles per circuit. New power for cubicle area shall be fed from new power poles from the suspended ceiling. All new circuits shall be ran above the suspended ceiling.
A new power feed 120VAC, 20A (1EA) shall be installed to serve a
120VAC-24VDC transformer to serve the VAV controller in the New Modular
Conference Room.
A 225A main breaker 120/208V 3P-4W panel board and its components to supply power to the new cubicles and kiosks shall be located in a wall of the new enclosed telecommunication room face outward into the open office area. This panel board shall supply power to the mini-split HVAC unit for the new enclosed telecommunication room. All wiring shall ran from indoor mini-split HVAC unit to outdoor unit and wiring to outdoor unit from the new panel board.
Page 15 of 50ORDER NUMBER:
C) HVAC: The Contractor shall provide HVAC improvements to exceed cooling and airflow available in the New Modular Conference Room. VAV box 1250 CFM (1 EA) including HW coils, damper, actuator and thermostat shall be installed to supply the room. Use round duct, steel, galvanized, 16” diameter, 24 ga from VAV box to diffuser branches
(approximately 25 LF). DDC Programming shall be installed with at least four points each VAV (Space temp, VAV discharge temp, VAV flow rate and
HW valve position). Install controls wiring for the DDC Controller.
Install a temperature sensor (1EA). Install a ball valve with actuator
(1EA). Install a TAB for air (VAV box, supply diffusers, return grilles) (1EA) and a TAB for water side (HW coils) (1EA). Install HW piping extended from the existing HW loop (approximately 10 LF). All HW piping shall have insulation (approximately 10 LF). Diffusers, 4 way cone, 24” x 24”, shall be installed at ceiling level (2 EA). Install round duct, steel, galvanized, 12” diameter, 26 ga for diffuser branches
(approximately 13 LF). Use insulated (1” thick) flexible duct 14” diameter for diffuser runouts (approximately 10 LF). Return grill, eggcrate, 24” x 24” shall be installed at ceiling level (1EA). Install round duct, steel, galvanized, 12” diameter, 26 ga from return grill back to plenum (approximately 12 LF). All ductwork shall have insulation
(approximately 50 SF).
D) Flooring: New 24”x 24” tufted nylon carpet tiles (approximately 1,343
SY) shall be installed. Flooring shall be prepared as per manufacturers requirements prior to the new carpet installation. Transition strips shall be installed in the doorways as appropriate (approximately 18 EA).
The Contractor shall install new 4” vinyl cove base (approximately 700
LF). The Contractor shall provide carpet tile, cove base and transition strips samples (neutral colors, blues and greys) for selection after award. (CDRL A016)
E) NMCI/ RDT<(>&<)>E and Phone: All NMCI, RDT<(>&<)>E and phone connections shall be disconnected from the existing cubicles, pulled back to the communication room and removed from the patch panel
(approximately 127 EA). The Contractor shall install new drops for NMCI
(approximately 146 EA), RDT<(>&<)>E Cat6
Page 16 of 50ORDER NUMBER:
(approximately 146 EA) and Phone (approximately 146 EA) to accommodate
19 net seats in Room 355A. Kiosks will not require phone and RDT<(>&<)>E drops. The Contractor shall install new NMCI (approximately 4 EA), RDT
<(>&<)>E Cat 6 (approximately 4EA) and Phone (approximately 4 EA) on
Conference Rooms (approximately 4 EA) and Person Call/Meeting Office (1
EA). The new drops shall be installed and punched down back in the new enclosed telecommunication room.
F) Enclosed Telecommunication Room:
Part II
Section I Clauses:
52.203-3 Gratuities (APR 1984)
52.203-5 Covenant Against Contingent Fees (MAY 2014
52.203-7 Anti-Kickback Procedures (JUN 2020)
52.203-8 Cancellation, Rescission, and Recovery of Funds for illegal or
Improper Activity (MAY 2014)
52.203-10 Price or Fee Adjustment for Illegal or Improper Activity (MAY
2014)
52.203-12 Limitation on Payments to Influence Certain Federal
Transactions (JUN 2020)
52.203-16 Preventing Personal Conflicts of Interest (JUN 2020)
52.203-17 Contractor Employee Whistleblower Rights and Requirement to inform Employees of Whistleblower Rights(JUN 2020)
52.204-4 Printed or Copied Double-Sided on Postconsumer Fiber Content
Paper. (MAY 2011)
52.204-9 Personal Identity Verification of Contractor Personnel. (JAN
Page 17 of 50ORDER NUMBER:
2011)
52.204-10 Reporting Executive Compensation and First Tier Subcontract
Awards. (JUN 2020)
52.204-12 Unique Entity Identifier Maintenance. (OCT 2016)
52.204-13 System for Award Management Maintenance. (OCT 2018)
52.204-14 Service Contract Reporting Requirements. (OCT 2016)
52.204-21 Basic Safeguarding of Covered Contractor Information Systems
(NOV 2021)
52.209-6 Protecting the Government’s Interest When Subcontracting with
Contractors Debarred, Suspended, or Proposed for Debarment. (NOV 2021)
52.209-9 Updates of Publicly Available Information Regarding
Responsibility Matters. (OCT 2018)
52.209-10 Prohibition on Contracting with Inverted Domestic
Corporations. (NOV 2015)
52.211-10 Commencement, Prosecution, and Completion of Work.(Apr 1984)
Alternate I (Apr1984)
52.215-2 Audit and Records – Negotiations (JUN 2020)
2.215-8 Order of Precedence—Uniform Contract Format.(Oct 1997)
52.215-14 Integrity of Unit Prices.(NOV 2021)
52.215-23 Limitations on Pass-Through Charges. (JUN 2020)
52.219-6 Notice of Total Small Business Set-Aside.(NOV 2020)
52.219-8 Utilization of Small Business Concerns.(OCT 2018)
Page 18 of 50ORDER NUMBER:
52.219-14 Limitations on Subcontracting.(SEP 2021)
52.219-28 Post-Award Small Business Program Representation. (SEP 2021)
52.222-3 Convict Labor.(June 2003)
52.222-4 Contract Work Hours and Safety Standards Act—Overtime
Compensation. (MAR 2018)
52.222-6 Construction Wage Rate Requirements (AUG 2018)
52.222-7 Withholding of Funds. (MAY 2014)
52.222-8 Payrolls and Basic Records. (JUL 2021)
52.222-9 Apprentices and Trainees. (July 2005)
52.222-10 Compliance with Copeland Act Requirements. (Feb 1988)
52.222-11 Subcontracts (Labor Standards). (MAY 2014)
52.222-12 Contract Termination—Debarment. (MAY 2014)
52.222-13 Compliance with Davis-Bacon and Related Act Regulations. (MAY
2014)
52.222-14 Disputes Concerning Labor Standards. (Feb 1988)
52.222-15 Certification of Eligibility. (MAY 2014)
52.222-20 Contracts for Materials, Supplies, Articles, and Equipment
Exceeding $15,000 (JUN 2020)
52.222-21 Prohibition of Segregated Facilities. (APR 2015)
52.222-26 Equal Opportunity. (SEP 2016)
Page 19 of 50ORDER NUMBER:
52.222-27 Affirmative Action Compliance Requirements for Construction.
(APR 2015)
52.222-34 Project Labor Agreement (May 2010)
52.222-35 Equal Opportunity for Veterans. (JUN 2020)
52.222-36 Equal Opportunity for Workers with Disabilities (JUN 2020)
52.222-35 Equal Opportunity for Veterans. (JUN 2020)
(i) Work is performed outside the United States by employees recruited outside the United States
(a) Definitions. As used in this clause—
“Active duty wartime or campaign badge veteran,” “Armed Forces service medal veteran,” “disabled veteran,” “protected veteran,” “qualified disabled veteran,” and “recently separated veteran” have the meanings given at FAR 22.1301.
(b) Equal opportunity clause. The Contractor shall abide by the requirements of the equal opportunity clause at 41 CFR 60-300.5(a), as of March 24, 2014. This clause prohibits discrimination against qualified protected veterans, and requires affirmative action by the
Contractor to employ and advance in employment qualified protected veterans.
(c) Subcontracts. The Contractor shall insert the terms of this clause in subcontracts of $150,000 or more unless exempted by rules, regulations, or orders of the Secretary of Labor. The Contractor shall act as specified by the Director, Office of Federal Contract Compliance
Programs, to enforce the terms, including action for noncompliance. Such necessary changes in language may be made as shall be appropriate to identify properly the parties and their undertakings.
Alternate I (JUL 2014).
(ii) The Director, Office of Federal Contract Compliance Programs, has waived, in accordance with 22.1305(a) or the head of the agency has
Page 20 of 50ORDER NUMBER:
waived, in accordance with 22.1305(b) all of the terms of the clause.
52.222-40 Notification of Employee Rights Under the National Labor
Relations Act. (Dec 2010)
52.222-50 Combating Trafficking in Persons. (NOV 2021)
52.222-54 Employment Eligibility Verification. (MAY 2022)
52.222-55 Minimum Wage Under Executive Order 13658. (JAN 2022)
52.223-2 Affirmative Procurement of Biobased Products Under Service and
Construction Contracts (Sept 2013)
52.223-3 Hazardous Material Identification and Material Safety Data.(FEB
2021)Alternate I (July 1995)
52.223-5 Pollution Prevention and Right-to-Know Information. (May 2011)
52.223-6 Drug-Free Workplace. (May 2001)
52.223-11 Ozone-Depleting Substances and High Global Warming Potential
Hydrofluorocarbons (Jun 2016)
52.223-12 Maintenance, Service, Repair, or Disposal of Refrigeration
Equipment and Air Conditioners. (Jun 2016)
52.223-15 Energy Efficiency in Energy-Consuming Products.(MAY 2020)
52.223-17 Affirmative Procurement of EPA-designated Items in Service and
Construction Contracts.(AUG 2018)
52.223-18 Encouraging Contractor Policies to Ban Text Messaging While
Driving.(JUN 2020)
52.223-19 Compliance with Environmental Management Systems. (May 2011)
52.223-20 Aerosols.(Jun 2016)
Page 21 of 50ORDER NUMBER:
52.223-21 Foams.(Jun 2016)
52.224-1 Privacy Act Notification. (Apr 1984)
52.224-2 Privacy Act.(Apr 1984)
52.225-9 Buy American—Construction Materials (NOV 2021) When using funds other than those appropriated under the American Recovery and
Reinvestment Act of 2009 (Pub. L. 111-5) (Recovery Act), in solicitations and contracts for construction that is performed in the
United States valued at less than $7,358,000.
(a) Definitions. As used in this clause—
Commercially available off-the-shelf (COTS) item—
(1) Means any item of supply (including construction material) that is–
(i) A commercial item (as defined in paragraph (1) of the definition at Federal Acquisition Regulation (FAR) 2.101);
(ii) Sold in substantial quantities in the commercial marketplace; and
(iii) Offered to the Government, under a contract or subcontract at any tier, without modification, in the same form in which it is sold in the commercial marketplace; and
(2) Does not include bulk cargo, as defined in 46 U.S.C.
40102(4), such as agricultural products and petroleum products.
"Construction material" means an article, material, or supply brought to the construction site by the Contractor or a subcontractor for incorporation into the building or work. The term also includes an item brought to the site preassembled from articles, materials, or supplies. However, emergency life safety systems, such as emergency lighting, fire alarm, and audio evacuation systems, that are discrete systems incorporated into a public building or work and that are produced as complete systems, are evaluated as a single and distinct construction material regardless of when or how the individual parts or components of those systems are delivered to the construction site.
Materials purchased directly by the Government are supplies, not
Page 22 of 50ORDER NUMBER:
construction material.
Cost of components means—
(1) For components purchased by the Contractor, the acquisition cost, including transportation costs to the place of incorporation into the construction material (whether or not such costs are paid to a domestic firm), and any applicable duty (whether or not a duty-free entry certificate is issued); or
(2) For components manufactured by the Contractor, all costs associated with the manufacture of the component, including transportation costs as described in paragraph (1) of this definition, plus allocable overhead costs, but excluding profit. Cost of components does not include any costs associated with the manufacture of the construction material.
Domestic construction material means—
(1) For construction material that does not consist wholly or predominantly of iron or steel or a combination of both-
(i) An unmanufactured construction material mined or produced in the United States; or
(ii) A construction material manufactured in the United
States, if–
(A) The cost of its components mined, produced, or manufactured in the United States exceeds 55 percent of the cost of all its components. Components of foreign origin of the same class or kind for which non-availability determinations have been made are treated as domestic. Components of unknown origin are treated as foreign; or
(B) The construction material is a COTS item; or
(2) For construction material that consists wholly or predominantly of iron or steel or a combination of both, a construction material manufactured in the United States if the cost of foreign iron and steel constitutes less than 5 percent of the cost of all components used in such construction material. The cost of foreign iron and steel includes but is not limited to the cost of foreign iron or steel mill products
(such as bar, billet, slab, wire, plate, or sheet), castings, or forgings utilized in the manufacture of the construction material and a good faith estimate of the cost of all foreign iron or steel components excluding COTS fasteners. Iron or steel components of unknown origin are treated as foreign. If the construction material contains multiple components, the cost of all the materials used in such construction
Page 23 of 50ORDER NUMBER:
material is calculated in accordance with the definition of "cost of components".
Fastener means a hardware device that mechanically joins or affixes two or more objects together. Examples of fasteners are nuts, bolts, pins, rivets, nails, clips, and screws.
Foreign construction material means a construction material other than a domestic construction material.
Foreign iron and steel means iron or steel products not produced in the United States. Produced in the United States means that all manufacturing processes of the iron or steel must take place in the
United States, from the initial melting stage through the application of coatings, except metallurgical processes involving refinement of steel additives. The origin of the elements of the iron or steel is not relevant to the determination of whether it is domestic or foreign.
Predominantly of iron or steel or a combination of both means that the cost of the iron and steel content exceeds 50 percent of the total cost of all its components. The cost of iron and steel is the cost of the iron or steel mill products (such as bar, billet, slab, wire, plate, or sheet), castings, or forgings utilized in the manufacture of the product and a good faith estimate of the cost of iron or steel components excluding COTS fasteners.
Steel means an alloy that includes at least 50 percent iron, between 0.02 and 2 percent carbon, and may include other elements.
"United States" means the 50 States, the District of Columbia, and outlying areas.
(b) Domestic preference.
(1) This clause implements 41 U.S.C.chapter 83, Buy American, by providing a preference for domestic construction material. In accordance with 41 U.S.C. 1907, the domestic content test of the Buy American statute is waived for construction material that is a COTS item, except that for construction material that consists wholly or predominantly of iron or steel or a combination of both, the domestic content test is applied only to the iron and steel content of the construction materials, excluding COTS fasteners. (See FAR 12.505(a)(2)). The
Contractor shall use only domestic construction material in performing this contract, except as provided in paragraphs (b)(2) and (b)(3) of this clause.
Page 24 of 50ORDER NUMBER:
(2) This requirement does not apply to information technology that is a commercial item or to the construction materials or components listed by the Government as follows:
_______"NONE"_________________________________________[Contra cting Officer to list applicable excepted materials or indicate "none"]
(3) The Contracting Officer may add other foreign construction material to the list in paragraph (b)(2) of this clause if the Government determines that-
(i) The cost of domestic construction material would be unreasonable. The cost of a particular domestic construction material subject to the requirements of the Buy American statute is unreasonable when the cost of such material exceeds the cost of foreign material by more than 20 percent;
(ii) The application of the restriction of the Buy
American statute to a particular construction material would be impracticable or inconsistent with the public interest; or
(iii) The construction material is not mined, produced, or manufactured in the United States in sufficient and reasonably available commercial quantities of a satisfactory quality.
(c) Request for determination of inapplicability of the Buy
American statute.
(1)
(i) Any Contractor request to use foreign construction material in accordance with paragraph (b)(3) of this clause shall include adequate information for Government evaluation of the request, including-
(A) A description of the foreign and domestic construction materials;
(B) Unit of measure;
(C) Quantity;
(D) Price;
(E) Time of delivery or availability;
(F) Location of the construction project;
(G) Name and address of the proposed supplier; and
(H) A detailed justification of the reason for use of foreign construction materials cited in accordance with paragraph
(b)(3) of this clause.
Page 25 of 50ORDER NUMBER:
(ii) A request based on unreasonable cost shall include a reasonable survey of the market and a completed price comparison table in the format in paragraph (d) of this clause.
(iii) The price of construction material shall include all delivery costs to the construction site and any applicable duty
(whether or not a duty-free certificate may be issued).
(iv) Any Contractor request for a determination submitted after contract award shall explain why the Contractor could not reasonably foresee the need for such determination and could not have requested the determination before contract award. If the
Contractor does not submit a satisfactory explanation, the Contracting
Officer need not make a determination.
(2) If the Government determines after contract award that an exception to the Buy American statute applies and the Contracting
Officer and the Contractor negotiate adequate consideration, the
Contracting Officer will modify the contract to allow use of the foreign construction material. However, when the basis for the exception is the unreasonable price of a domestic construction material, adequate consideration is not less than the differential established in paragraph
(b)(3)(i) of this clause.
(3) Unless the Government determines that an exception to the Buy
American statute applies, use of foreign construction material is noncompliant with the Buy American statute.
(d) Data. To permit evaluation of requests under paragraph (c) of this clause based on unreasonable cost, the Contractor shall include the following information and any applicable supporting data based on the survey of suppliers:
,,Foreign and Domestic Construction Materials Price Comparison,, ,,Construction Material Description,,Unit of Measure,,Quantity,,Price
(dollars)*,, ,,Item1:,,,,,,,, ,,Foreign construction material,,_______,,_______,,_______,, ,,Domestic construction material,,_______,,_______,,_______,, ,,Item2:,,_______,,_______,,_______,, ,,Foreign construction material,,_______,,_______,,_______,, ,,Domestic construction material,,,,,,,, [* Include all delivery costs to the construction site and any
Page 26 of 50ORDER NUMBER:
applicable duty (whether or not a duty-free entry certificate is issued)].
[List name, address, telephone number, and contact for suppliers surveyed. Attach copy of response; if oral, attach summary.]
[Include other applicable supporting information.]
(End of clause)
52.225-13 Restrictions on Certain Foreign Purchases (FEB 2021)
52.228-1 Bid Guarantee. (Sept 1996)
52.228-2 Additional Bond Security. (Oct 1997)
52.228-3 Workers’ Compensation Insurance (Defense Base Act). (JUL 2014)
52.228-5 Insurance—Work on a Government Installation. (Jan 1997)
52.228-11 Pledges of Assets. (FEB 2021)
52.228-15 Performance and Payment Bonds—Construction. (JUN 2020)
52.229-3 Federal, State, and Local Taxes. (Feb 2013)
52.229-4 Federal, State, and Local Taxes (State and Local Adjustments).
(Feb 2013)
52.232 –5 Payments under Fixed Price Construction Contracts (MAY 2014)
52.232-16 Progress Payments. (NOV 2021)
Alternate I
52.232-17 Interest. (MAY 2014)
52.232-23 Assignment of Claims. (MAY 2014)
52.232-27 Prompt Payment for Construction Contracts (Jan 2017)
52.232-33 Payment by Electronic Funds Transfer-System for Award
Page 27 of 50ORDER NUMBER:
Management.(OCT 2018)
52.232-39 Unenforceability of Unauthorized Obligations (JUN 2013)
52.232-40 Providing Accelerated Payments to Small Business
Subcontractors.(NOV 2021)
52.233-1 Disputes.(MAY 2014)
52.233-3 Protest after Award.(AUG 1996)
52.233-4 Applicable Law for Breach of Contract Claim (OCT 2004)
52.236-2 Differing Site Conditions.(Apr 1984)
52.236-3 Site Investigation and Conditions Affecting the Work. (Apr
1984)
52.236-5 Material and Workmanship.(Apr 1984)
52.236-6 Superintendence by the Contractor.(Apr 1984)
52.236-7 Permits and Responsibilities.(Nov 1991)
52.236-8 Other Contracts.(Apr 1984)
52.236-9 Protection of Existing Vegetation, Structures, Equipment, Utilities, and Improvements.(Apr 1984)
52.236-10 Operations and Storage Areas.(Apr 1984)
52.236-11 Use and Possession Prior to Completion.(Apr 1984
52.236-12 Cleaning Up.(Apr 1984)
52.236-13 Accident Prevention.(Nov 1991)
Alternate I (Nov 1991).
Page 28 of 50ORDER NUMBER:
52.236-14 Availability and Use of Utility Services.(Apr 1984)
52.236-15 Schedules for Construction Contracts.(Apr 1984)
52.236-17 Layout of Work. (Apr 1984)
52.236-21 Specifications and Drawings for Construction.(Feb 1997)
Alternate I (Apr 1984).
52.236-26 Preconstruction Conference. (Feb 1995)
52.242-13 Bankruptcy.(July 1995)
52.242-14 Suspension of Work.(APR 1984)
52.243-4 Changes.(June 2007)
52.243-5 Changes and Changed Conditions.(Apr 1984)
52.244-6 Subcontracts for Commercial Items.(JAN 2022)
52.246-12 Inspection of Construction.(Aug 1996)
52.246-21 Warranty of Construction.(MAR 1994)
52.249-10 Default (Fixed-Price Construction).(Apr 1984)
52.251-1 Government Supply Sources. (Apr 2012)
52.252-2 Clauses Incorporated by Reference. (Feb 1998)
This contract incorporates one or more clauses by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. Also, the
Page 29 of 50ORDER NUMBER:
full text of a clause may be accessed electronically at this/these address(es):
__________WWW.ACQUISITION.GOV__________
[Insert one or more Internet addresses]
(End of clause)
52.253-1 Computer Generated Forms. (Jan 1991)
PART III: List of Documents, Exhibits, and Other Attachments
Section J List of Attachments
FORM SF-24 BID BOND
FORM SF-25 PERFORMANCE BOND
FORM SF-25A PAYMENT BOND
PAST PERFORMANCE QUESTIONNAIRE
Acronym Table Refer to Attachment 01
APPLICABLE DOCUMENTS Refer to Attachment 02
DJU1620000056-FIGURES 1-8
BLDG 41 combined CDRL'S
Attachment 03- 5.0 TECHNICAL DATA DELIVERABLES
NSACRANEINST 5100.13A
Visitor Pass-SECNAV_5512_1_BLANK
NSACRANEINST 11262.1A
OPNAVINST 5100.19E Volume I Part I
NSACRANEINST 8020.1E- Explosives Safety Program at NSA Crane
PART IV: Representations & Instructions
Section K Representations, certifications, and other statements of offerors or respondents
52.203-11 Certification and Disclosure Regarding Payments to Influence
Page 30 of 50ORDER NUMBER:
Certain Federal Transactions (SEP 2007)
52.204-3 Taxpayer Identification (OCT 1998)
(a) Definitions.
“Common parent,” as used in this provision, means that corporate entity that owns or controls an affiliated group of corporations that files its
Federal income tax returns on a consolidated basis, and of which the offeror is a member.
“Taxpayer Identification Number (TIN),” as used in this provision, means the number required by the Internal Revenue Service (IRS) to be used by the offeror in reporting income tax and other returns. The TIN may be either a Social Security Number or an Employer Identification Number.
(b) All offerors must submit the information required in paragraphs (d) through (f) of this provision to comply with debt collection requirements of 31 U.S.C. 7701(c) and 3325(d), reporting requirements of
26 U.S.C. 6041, 6041A, and 6050M, and implementing regulations issued by the IRS. If the resulting contract is subject to the payment reporting requirements described in Federal Acquisition Regulation (FAR) 4.904, the failure or refusal by the offeror to furnish the information may result in a 31 percent reduction of payments otherwise due under the contract.