combined CDRL.pdf
PDF 4 MB Posted
- Solicitation number
- ISO-196-23
View the file
Other files
Show all 23
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
41 1st floor Acquisition office renovation
BLK 16- Contract shall disregard the Social Security Number, Date and Place of Birth, and Clearance Status.
Contractor shall add any certification employee holds
B41 – 1st floor Acquisition office renovation ten 10 PAK meeting
4 .3
(10) after PAK meeting
PAK meeting
4.1.1, 4 .4 6
4 4 6
DD FORM 1423-1, FEB 2001
CONTRACT DATA REQUIREMENTS LIST
(1 Data Item)
PREVIOUS EDITION MAY BE USED.
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:
TDP ________ TM _______ OTHER
D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR
1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE
4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE
7. DD 250 REQ
8. APP CODE
9. DIST STATEMENT
REQUIRED
10. FREQUENCY
11. AS OF DATE
12. DATE OF FIRST SUBMISSION
13. DATE OF SUBSEQUENT
SUBMISSION
14. DISTRIBUTION
a. ADDRESSEE
b. COPIES
Draft Final
Reg Repro
15. TOTAL
16. REMARKS
17. PRICE GROUP
18. ESTIMATED
TOTAL PRICE
G. PREPARED BY H. DATE I. APPROVED BY J. DATE
Page of Pages
TBD A MISC
B41 – 1st floor Acquisition office renovation TBD TBD
A012 Real Property Facilities As-Built Drawings
DI-MISC-81489B SOW Para. 4.0, 4.7 1022
LT
N/A B
ASREQ
ASREQ
See BLK 16
ASREQ
COR 1
1102 1
0 1 1
BLK 12 - Due 5 days prior to beneficial occupancy date.
BLK 14 - The Contractor shall submit the report electronically via e-mail. The Contractor shall ensure all attachments are compatible with Microsoft Office 2007 or later software.
N/A
Adobe Professional 8.0
(1 Data Item)
PREVIOUS EDITION MAY BE USED.
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:
TDP ________ TM _______ OTHER
D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR
1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE
4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE
7. DD 250 REQ
8. APP CODE
9. DIST STATEMENT
REQUIRED
10. FREQUENCY
11. AS OF DATE
12. DATE OF FIRST SUBMISSION
13. DATE OF SUBSEQUENT
SUBMISSION
14. DISTRIBUTION
a. ADDRESSEE
b. COPIES
Draft Final
Reg Repro
15. TOTAL
16. REMARKS
17. PRICE GROUP
18. ESTIMATED
TOTAL PRICE
G. PREPARED BY H. DATE I. APPROVED BY J. DATE
Page of Pages
TBD A MISC
B41 – 1st floor Acquisition office renovation TBD TBD
A013 Technical Report - Study/Services Lift Plan
DI-MISC-80508B SOW Para. 4.4.2 1022
LT
N/A B
ASREQ
ASREQ
See BLK 16
ASREQ
COR 1
1102 1
0 1 1
BLK 4 - Use format in accordance with EM 385-1-1.
BLK 12 - 5 days prior to lift on site.
BLK 14 - The Contractor shall submit the report electronically via e-mail. The Contractor shall ensure all attachments are compatible with Microsoft Office 2007 or later software.
(1 Data Item)
PREVIOUS EDITION MAY BE USED.
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:
TDP ________ TM _______ OTHER
D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR
1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE
4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE
7. DD 250 REQ
8. APP CODE
9. DIST STATEMENT
REQUIRED
10. FREQUENCY
11. AS OF DATE
12. DATE OF FIRST SUBMISSION
13. DATE OF SUBSEQUENT
SUBMISSION
14. DISTRIBUTION
a. ADDRESSEE
b. COPIES
Draft Final
Reg Repro
15. TOTAL
16. REMARKS
17. PRICE GROUP
18. ESTIMATED
TOTAL PRICE
G. PREPARED BY H. DATE I. APPROVED BY J. DATE
Page of Pages
TBD A MISC
B41 – 1st floor Acquisition office renovation TBD TBD
A015 Technical Report - Study/Services Uniform Hazardous Waste Manifests
DI-MISC-80508B SOW Para. 4.1.3, 6.4 1022
LT
N/A B
ASREQ
ASREQ
See BLK 16
ASREQ
COR 1
1102 1
0 1 1
BLK 4 - Contractor format acceptable.
BLK 12 - At Post Award Kickoff.
BLK 14 - The Contractor shall submit the report electronically via e-mail. The Contractor shall ensure all attachments are compatible with Microsoft Office 2007 or later software.
(1 Data Item)
PREVIOUS EDITION MAY BE USED.
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:
TDP ________ TM _______ OTHER
D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR
1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE
4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE
7. DD 250 REQ
8. APP CODE
9. DIST STATEMENT
REQUIRED
10. FREQUENCY
11. AS OF DATE
12. DATE OF FIRST SUBMISSION
13. DATE OF SUBSEQUENT
SUBMISSION
14. DISTRIBUTION
a. ADDRESSEE
b. COPIES
Draft Final
Reg Repro
15. TOTAL
16. REMARKS
17. PRICE GROUP
18. ESTIMATED
TOTAL PRICE
G. PREPARED BY H. DATE I. APPROVED BY J. DATE
Page of Pages
TBD A MGMT
B41 – 1st floor Acquisition office renovation TBD TBD
A016 Priced Bill of Materials Bill of Materials
DI-MGMT-81994 SOW Para. 4.1, 4.1.1,4.1.2, 4.1.3 1022
LT
N/A B
ASREQ
ASREQ
See BLK 16
ASREQ
COR 1
1022 1
0 1 1
BLK 4 - Contractor shall provide part specifications on all materials.
Contractor Format is acceptable
BLK 12- Before contractor orders material
BLK 14 - The Contractor shall submit the report electronically via e-mail. The Contractor shall ensure all attachments are compatible with Microsoft Office 2007 or later software.
| DD1423-1_A001_ContractorPersonnelRoster |
| DD1423-1_A002_OSH&S |
| DD1423-1_A003_Accident Prevention Plan |
| DD1423-1_A004_Quality Control Plan |
| DD1423-1_A005_Waste Management Plan |
| DD1423-1_A006_Production Report.Schedule.Checklist |
| DD1423-1_A007_Warranty Management Plan-WLCRAN124016 |
| DD1423-1_A008_Hazardous Material Clean-Up Report |
| DD1423-1_A009_Severe Hazard Exposure |
| DD1423-1_A010_Accident Incident Report |
| DD1423-1_A011_Damage Reporting |
| DD1423-1_A012_Real Property Facilities As-Built Drawings |
| DD1423-1_A013_Lift Plan |
| DD1423-1_A014_Abestos Containing-WLCRAN124016 |
| DD1423-1_A015_Asbestos Abatement Plan-WLCRAN124016 |
| DD1423-1_A016_Bill of Material-WLCRAN124016 |
File details come from the government source that posted it. Updated .