ATTACHMENT 02 - 4.0 TECHNICAL DATA DELIVERABLES.pdf

PDF 627 KB Posted

Attached to
BUILDING 41-1ST FLOOR ACQUISTION OFFICE RENOVATION, 2ND AND 3RD FLOOR MODIFICATIONS AS OUTLINED IN THE ATTACHED STATEMENT OF WORK
Solicitation number
ISO-196-23
Issued by

View the file

Other files

Show all 23

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

CDRL DID Number DID Title Applicable

SOW

Paragraph

Deliverable Schedule

A001 DI-MGMT-81834 Contractor’s Personnel Roster 5.14 Post Award Kickoff

A002 DI-SAFT-81841 Operating, Support, Health, & Safety (OSH&S) Hazard Analysis Report

3.4.1 5 Days prior to the start of field work

A003 DI-MISC-80508B Accident Prevention Plan 3.4.3 5 Days prior to the start of field work

A004 DI-MISC-80508B Severe Hazard Exposure 3.5 ASREQ

A005 DI-SAFT-81563 Accident/Incident Report 3.4.4, 5.7 ASREQ

A006 DI-MISC-80508B Damage Reporting 3.4.4, 5.9 ASREQ

A007 DI-MISC-80508B Quality Control Plan 3.3.1 Post Award Kickoff

A008 DI-MISC-80508B Production Report / Schedule / Checklist

3.3.1, 3.3.2 Post Award Kickoff/ Weekly/

ASREQ

A009 DI-MISC-80508B Waste Management Plan 3.5 5 Days after Award

A010 DI-MISC-80508B Hazardous Material Clean-Up 3.5 ASREQ

A011 DI-MISC-80508B Waste Management Report 3.6 5 Days prior to Pre-Final Inspection

A012 DI-MISC-80508B Warranty Management Plan 3.9 10 days prior to pre-warranty conference

A013 DI-MGMT-81994 Bill of Materials (BOM) 3.3.1 ASREQ

A014 DI-MISC-80508B Build Drawings 3.0 At post-award kick off meeting

A015 DI-MISC-80508B Asbestos Containing Building Material Report

3.7.1 ASREQ

ATTACHMENT 02 - 4.0 TECHNICAL DATA DELIVERABLES

A016 DI-MISC-81489B Real Property Facilities As-Built Drawings

3.8 5 days prior to

BOD

ATTACHMENT 02 - 4.0 TECHNICAL DATA DELIVERABLES

File details come from the government source that posted it. Updated .