DID D002 - TSE RMA Metrics.pdf
PDF 151 KB Posted
- Solicitation number
- 70T04020R9DAP2037
About this file
This solicitation requests proposals for explosives trace detection units and related warranty and maintenance support services. The Transportation Security Administration seeks to acquire ETD units and five years of maintenance under a single contract. Offerors must propose qualified ETD systems and demonstrate delivery and past performance capabilities. Price, qualification status, delivery approach, and performance history will be evaluated. Proposals are due by September 25, 2020 and award is expected to occur on that same date. The North American Industry Classification System code for this opportunity is 334511 and applicable product service codes include 6350 and J058.
View the file
Other files
Show all 25
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
DATA ITEM DESCRIPTION
1. TITLE 2. IDENTIFICATION NUMBER
TSE RMA Metrics Report D002
3. DESCRIPTION/PURPOSE
3.1. The Transportation Security Equipment (TSE) Reliability, Maintainability, & Availability (RMA) Metrics Report documents the status of contract efforts towards achieving contract maintenance objectives. It is used by TSA to monitor TSE and Contractor performance.
4. APPROVAL DATE (YYMMDD) 5. OFFICE OF PRIMARY RESPONSIBILITY (OPR) 6a. DTC APPLICABLE 6b. GIDEP APPLICABLE
APM
7. APPLICATION/INTERRELATIONSHIP
7.1. This Data Item Description (DID) contains the format and content preparation instructions for the maintenance metrics report.
8. APPROVAL LIMITATION 9a. REFERENCES 9b. AMSC NUMBER
10. Preparation Instructions
10.1. FORMAT. The monthly TSE RMA Metrics Report may be in Contractor format. It shall contain the data and information specified in the following monthly metric report subparagraphs. The contractor shall change the report format when requested by TSA.
10.2. CONTENT. The data delivered in accordance with this DID shall contain sufficient information to allow the low level and high level metrics to be independently recomputed by TSA.
10.2.1. IDENTIFICATION. The submittal will contain the information listed below:
a. Preparing activity and name/title of Contractor official certifying accuracy of the report
b. Sensitive Security Information (SSI) statement applied when required
10.2.2. Low Level Metrics (M-Values). Provide a list of all work order numbers, criticality, relevancy, and low level metrics (M-Values) making appropriate adjustments as required for high level metrics submitted as identified in this DID. This work order information should correlate with the M-Values derived for the same work order number as documented in the TSE Database, adjusted as required for metrics calculations. Metrics calculation information is included in Attachment 3, TSE Metrics Terms and Definitions and RMA Metrics, of Part D; and Attachment 7, TSA Integrated Logistics Support Service Level Agreement Performance Metrics, of Part D. The following M-Values will be reported for each maintenance activity, as applicable, as specified for a TSE or Contractor performance metric:
a. M1 – Initial Call Center Interaction Time
b. M2 – Technician Dispatch Time
c. M3 – Technician Diagnosis Time
d. M4 – Part(s) Request Time
e. M5 – Part(s) Fulfillment Time
f. M6 – Local Logistics Time
g. M7 – Technician Repair Time
h. M8 – Technician Testing Time
i. M9 – TSA Signoff Time
j. M10 – Time to Repair
k. M11 – Depot Turnaround Time
l. M12 – Uncrate/Setup at Location Time
m. M13 – Telephone Customer Support
DATA ITEM DESCRIPTION APM-ILS-018
10. Preparation Instructions (Continued)
10.2.3. RMA Metrics. RMA metrics submitted on the RMA Metrics Report will be used to evaluate the operational performance of deployed TSE as specified in the contract in C.8.10, Reliability, Maintainability, Availability Metrics, of Part C. The metrics will be calculated monthly by airport and by technology, or as specified in C.8.10, of Part C.
Definitions and calculation of RMA metrics can be found in Attachment 3, of Part D. The maintenance activities and maintenance action M-Values should be counted as specified in Attachment 3, of Part D. The following are the RMA metrics identified in Attachment 3:
• Mean Time Between Critical Failures (MTBCF)
• Mean Up Time (MUT)
• Mean Downtime (MDT)
• Mean Time to Repair (MTTR)
• Operational Availability(Ao)
10.2.4. Service Level Agreement (SLA) Performance Metrics. TSA will use Contractor performance metrics in the contract to evaluate maintenance service performance against the SLA requirements specified in C.8.10, CLS Service Level Agreement (SLA) Performance requirements, of Part C. These metrics focus on the Contractor’s responsiveness in returning TSE to full operational capability and the effectiveness of their logistics support structure. The Contractor must calculate all the SLA performance metrics as specified in Attachment 7, ILS SLA Performance Metrics, of Part D and report these metrics in the TSE RMA Metrics Report. These metrics will include the same supporting data as specified in paragraph 10.2.2.
10.2.5. Contract Disincentives. TSA uses disincentives in the contract to ensure a Contractor meets the SLA performance requirements as specified in C.8.10, of Part C. The Contractor must calculate all these metrics as specified in Attachment 7, of Part D, to ensure accurate development of invoices for the contract. These metrics will be reported in the TSE RMA Metrics Report as required and will include the same supporting data as specified in paragraph 10.2.2.
10.2.6. Units Counted. The report will include a list of all TSE serial numbers and locations on the Contract that are used to calculate the reporting period’s metrics. If a unit was added to or deleted from the Contract during the reporting period, the list will include the date on which that action occurred.
10.2.7. Appendices. Appendices, where applicable, for tables, references, charts, or other descriptive material. Each appendix will be identified and referenced in the appropriate area of the report.
11. DISTRIBUTION STATEMENT
DISTRIBUTION STATEMENT A: Approved for public release; distribution is unlimited.
| DATA ITEM DESCRIPTION |
| 1. TITLE |
| 2. IDENTIFICATION NUMBER |
| 3. DESCRIPTION/PURPOSE |
| 4. APPROVAL DATE (YYMMDD) |
| 5. OFFICE OF PRIMARY RESPONSIBILITY (OPR) |
| 6a. DTC APPLICABLE |
| 6b. GIDEP APPLICABLE |
| 7. APPLICATION/INTERRELATIONSHIP |
| 8. APPROVAL LIMITATION |
| 9a. REFERENCES |
| 9b. AMSC NUMBER |
| 11. DISTRIBUTION STATEMENT |
File details come from the government source that posted it. Updated .