DID_81995A_CDM.pdf

PDF 193 KB Posted

Attached to
TF33 1st Stage Compressor Blade Repair Federal contract opportunity
Solicitation number
FA812125R0036
Issued by
Department of the Air Force Materiel Command Air Force Sustainment Center

About this file

This is a Data Item Description (DID) for the Contract Depot Maintenance (CDM) Monthly Production Report, document number DI-PSSS-81995A, approved November 30, 2020. The DID establishes the mandatory format, content, and reporting requirements for monthly maintenance production data that contractors must submit to the Government on any depot-level maintenance contract. Reports are due within 10 business days of the previous month's last calendar date.

The CDM Monthly Production Report must include Part I identification information provided by the Production Management Specialist (PMS), containing the PMS contact details, contractor information (name, DoDAAC, CAGE code, contact information), contract number, program/weapon system supported, and government item manager or technical point of contact name. Part I also requires detailed production data across 15 blocks (A through O) tracking item identification (FSC and NIIN), delivery/call order numbers, contract line item numbers, quantities on contract, reparables received (monthly and cumulative), miscellaneous assets received, reparables on hand awaiting induction, reparables currently inducted into work, reparables awaiting parts, quantity produced (monthly and cumulative), serviceables on hand, serviceables shipped (monthly and cumulative), reparables condemned (monthly and cumulative), miscellaneous assets shipped/condemned (monthly and cumulative), and next month's production forecast. Part II requires a Production Summary only when the previous month's forecast was not shipped, current forecast does not equal contract scheduled quantity, or production problems are anticipated. This DID supersedes the prior version DI-PSSS-81995 and applies to all depot-level maintenance contracts.

View the file

Other files for this federal contract opportunity

Other files attached to TF33 1st Stage Compressor Blade Repair, newest first.
File Type Posted
GFP.pdf PDF
DID_80503_ship_pack.pdf PDF
DID_81535B_ASDPDR.pdf PDF
DID_81634C_CAVAF.pdf PDF
CDRL_REPORT.pdf PDF
DID_80969_Surge.pdf PDF
FA812125R0036.pdf PDF
Final_Ordering_Procedures.pdf PDF
4224291_PWS.docx DOCX document
4224855_PKGRQMT_REPORT.pdf PDF
4224856_TRNSPDATA_REPORT.pdf PDF
DID_82256A_SCRM.pdf PDF
DID_80441D_GPIP.pdf PDF
DID_81832_counterfietPP.pdf PDF
Show all 14

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

DATA ITEM DESCRIPTION

Title: CONTRACT DEPOT MAINTENANCE (CDM) MONTHLY PRODUCTION REPORT Number: DI-PSSS-81995A Approved Date: 20201130 AMSC Number: F10209 Limitation: N/A DTIC Applicable: No GIDEP Applicable: No Preparing Activity: 70 (419 SCMS/GUBA) Project Number: PSSS-2020-012 Applicable Forms: N/A Use/Relationship: The Contract Depot Maintenance (CDM) Monthly Production Report provides the Government with monthly maintenance production figures, status and accountability of assets at the contractor facility, performance to schedule, anticipated production for the next month, and a summary of unresolved problems at the end of the report period.

This Data Item Description (DID) contains the format, content, and intended use information for the data deliverable resulting from the work task described in the contract.

a. This DID may be used on any depot level maintenance contract.

b. This DID supersedes DI-PSSS-81995.

Requirements:

1. Reference documents. None.

2. Format. The CDM Monthly Production Report shall be in the Table I format below.

3. Content. The CDM Monthly Production Report shall include the following data, provided by the Production Management Specialist (PMS) and the Contractor, through the end of the month:

3.1 Part I: Blocks 1 through 4 of the report shall contain the following information provided by the PMS:

a. As of date: The day, month, and year (DDMMMYYYY) applicable to the report. Data shall be through the end of the month.

b. Block 1: PMS’s name, PMS’s code, PMS’s email address, and PMS’s phone number.

c. Block 2: Contractor name, the Department of Defense Activity Address Code (DoDAAC) assigned to the contractor for shipment of material, the contractor’s Commercial and Government Entity (CAGE) code, the contractor’s email address, and the contractor’s phone number.

d. Block 3: Contract number and Program (PRGM) or Weapon System (WS) supported.

e. Block 4: Government item manager’s or technical Point of Contact’s (PoC’s) name.

3.2 Blocks A through O of the report shall contain the following information:

a. Block A: Item identification, which shall include the Federal Supply Class (FSC) under

A-1, and the National Item Identification Number (NIIN) of the item being reported under A-2.

b. Block B: Delivery/Call Order number. When the awarded contract is a delivery/call order type, this is the applicable order number. When an item is awarded on more than one order, the order number is repeated for each order until completed. If the current report completes the call, the word “completed” shall be added.

c. Block C: The contract line item number (CLIN), which shall be the CLIN assigned to the National Stock Number (NSN) in the contract.

Source: http://assist.dla.mil -- Downloaded: 2024-12-03T17:02Z Check the source to verify that this is the current version before use.

DI-PSSS-81995A

d. Block D: Quantity on contract or delivery order (DO)/call

e. Block E: Reparables received, which shall be the number of reparable items received for repair, and shall include the quantity of reparables received during the report month under E-1 and the cumulative quantity of reparables received from the start of the contract through the report month under E-2.

f. Block F: Miscellaneous (Misc.) assets received that are not part of the contract, in various condition codes, which shall include the quantity received during the report month under F-1 and the cumulative total received from the start of the contract through the report month under F-2.

g. Block G: Reparables (REPS) on hand, which shall be the number of reparables on hand waiting for induction into repair.

h. Block H: Total number of reparables currently inducted (IND) into work.

i. Block I: Quantity of reparables awaiting parts (AWP).

j. Block J: Quantity (QTY) produced (PROD), which shall include the quantity that completed repair and was produced during the report month under J-1 and the cumulative total that completed repair and was produced from the start of the contract through the report month under J-2.

k. Block K: Serviceables (SERV) on hand, which shall be the quantity of serviceables on hand awaiting shipping action.

l. Block L: Serviceables shipped, which shall be the number of serviceables shipped from the repair facility, and shall include the number of serviceables shipped during the report month under L-1 and the cumulative number of serviceables shipped from the start of the contract under L-2.

m. Block M: QTY condemned, which shall include the quantity of reparables condemned during the report month under M-1 and the cumulative quantity of reparables condemned from the start of the contract under M-2.

n. Block N: Misc. Shipped/Condemned Shipped, which shall include the misc. assets received in Block F that are not part of the contract, in various condition codes or condemned assets shipped during the report month under N-1 and the misc. or condemned assets shipped from the start of the contract through the report month under N-2.

o. Block O: Next Month Forecast PROD, which shall be the quantity of items scheduled to be produced next month.

3.3 Part II, Production Summary. A Production Summary shall be included only if:

a. The previously reported production forecast was not shipped,

b. The current production forecast does not equal the contract scheduled quantity, or

c. The Contractor anticipates a problem with production in the near future.

DI-PSSS-81995A

End of DI-PSSS-81995A. 3

This Mo

To Date

This Mo

To Date

This Mo

To Date

This Mo

To Date

This Mo

To Date

This Mo

To Date

FSC NIIN

1 2 2 1 2

H.

QTY IND

TO

WORK

i.

AWP

G.

REPS ON

HAND

(Not

Inducted)

DURING REPORTING PERIOD

K.

SERV ON

HAND

(Not

Shipped)

N.

MISC.

SHIPPED/

CONDEMNED

SHIPPED

4. GOVERNMENT ITEM MANAGER OR

TECHNICAL POC

2. CONTRACTOR/DODAAC/CAGE CODE/EMAIL/PHONE # 3. CONTRACT NUMBER/WS/PRGM

Part II, Production Summary

E.

REPARABLES

RECEIVED

1 1 2 1

L.

SERVICEABLES

SHIPPED

M.

QTY

CONDEMNED

A.

ITEM

IDENTIFICATION

B.

DELIVERY/

CALL ORDER

NUMBER

TABLE I. Format of (CDM) Monthly Production Report Due Date:

Within 10 business days of the previous month's last calendar date

Part I

F.

MISC.

RECEIVED

1 2

J.

QTY

PROD

O.

NEXT

MONTH

FORECAST

PROD

CONTRACT DEPOT MAINTENANCE (CDM) MONTHLY PRODUCTION REPORT

Month and As-Of

Date

(DDMMMYYYY)

1. PMS/PMS CODE/EMAIL/PHONE #

C.

CONTRACT

LINE ITEM

NUMBER

(CLIN)

D.

QTY ON

CONTRACT

OR

DO/CALL

File details come from the government source that posted it. Updated .