Design Build Advertisement R10-17).pdf
PDF 94 KB Posted
- Solicitation number
- RFQ 171 190000000639 3
- Issued by
- Baraga County, Michigan
About this file
This is a Design Build Project Advertisement issued by the Department of Technology, Management and Budget (DTMB), State Facilities Administration, Design & Construction Division for the State of Michigan. The project involves restoration of the propane plant at Baraga Correctional Facility located at 13924 Wadaga Road, Baraga, Michigan 49908, with work focused on repairing the backup fuel system blender. Scope of work includes replacement of the propane blending system components such as vaporizers and mixers, replacement of gas piping and electrical connections with grounding, and trial operation of terminal equipment to confirm system functionality. The project was advertised on August 8, 2019, with a mandatory walk-through inspection scheduled for September 4, 2019 at 11:00 AM Eastern Time at the Administration Building. Bids are due on September 25, 2019 at 2:00 p.m. local time, and questions will be accepted until 10 days prior to the bid date. The project is classified under NIGP codes 90692, 92596, 91356, 91389, 90977, 90624, 91036, and 90625.
A 5% bid security is required for submission. The project must comply with all applicable federal codes and standards administered by EPA, OSHA, and DOT, as well as state agencies including DCH, DEQ, DNR, and MIOSHA, and all local regulations. All contractors and vendor representatives attending the mandatory pre-bid walk-through must submit a Vendor/Contractor LEIN Request form five business days prior to the meeting. Permits and approvals must be obtained from the State of Michigan DLARA Bureau of Construction Codes and Bureau of Fire Services for plan reviews and site inspections. Project Directors are Robert A. Adams and Jeff Barsch, reachable at 517-242-1088, with questions directed to adamsb1@michigan.gov or barschj@michigan.gov. Documents and bid results are available through https://sigma.michigan.gov/webapp/PRDVSS2X1/AltSelfService.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 472_19087.RAA Addendum 1.pdf | ||
| LEIN Request REV 04-2018.pdf | ||
| Propane Standby Inspection Report.pdf | ||
| Site Photos.pdf | ||
| Ely Energy Vaporizer.pdf | ||
| Design Build Spec Final.pdf | ||
| LPG Equipment Layout.pdf | ||
| Ely Energy Mixer.pdf | ||
| Gas Distribution-Shts.I--6.pdf | ||
| 472_19087.RAA Addendum 2.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
DTMB-0415 (R 10/17)
DESIGN BUILD PROJECT ADVERTISEMENT
DEPARTMENT OF TECHNOLOGY, MANAGEMENT AND BUDGET
STATE FACILITIES ADMINISTRATION
DESIGN & CONSTRUCTION DIVISION
This form is required for the advertisement of all construction projects. (1984 PA 431)
TO:
DESIGN & CONSTRUCTION DIVISION
DATE
August 8, 2019
FROM:
MDOC/MDTMB
PROJECT MANAGER
Robert A. Adams/Jeff Barsch
DTMB FILE NUMBER
472/19087.RAA
INDEX NUMBER
472AMFMaintProj
ADVERTISEMENT DATE
August 8, 2019
BID DUE DATE
September 25,2019 @ 2:00 p.m. local time
PROJECT NAME AND LOCATION (INCLUDE STREET ADDRESS)
Baraga Correctional AMF 13924 Wadaga Rd.
Baraga, MI. 49908
Propane Plant /Repair of the backup fuel system blender
WALK-THROUGH INSPECTION DATE, TIME, AND LOCATION
MANDATORY – September 4, 2019 11:00AM Eastern Time (local Time)
Administration Building Baraga Correctional AMF 13924 Wadaga Rd.
Baraga, MI. 49908
Mandatory: Yes x LEIN CHECK (Dept. of Corrections ONLY) All contractor/vender representatives attending a Pre-Bid Walk Through Meeting must submit a Vender/Contractor LEIN Request five business days prior to the meeting date, (See the attached Vender/Contractor LEIN Request form). Send the LEIN Request form, filled out and signed, by email to Tracy Falor at email address: FalorT@michigan.gov. The email “Subject” must include (Facility Name, Project Name, Date & Time of Pre-Bid Walk Through Meeting).
NOTE: An individual is only permitted to represent one bidder at a mandatory walk-through.
DESCRIPTION OF WORK:
To restore the existing propane plant to be fully functional, including at a minimum, replacement of the propane blending system (vaporizer, mixer, etc.);
replacement of gas piping and electrical connections and grounding as required for safety and current code compliance; and trial operation of terminal equipment to confirm system functionality for acceptance. Comply with all applicable codes and provide permits and obtain approvals from the State of Michigan DLARA Bureau of Construction Codes and Bureau of Fire Services for plan reviews and site inspections.
5% Bid Security:
Required
NIGP CODES: 90692,92596, 91356,91389,90977, 90924, 91036, 90625
ACCEPTING QUESTIONS UNTIL: 10 Days prior to Bid Date
REFERENCE STANDARDS: This project will comply with all codes, standards, regulations, and workers’ safety rules that are administered by federal agencies (EPA, OSHA and DOT), state agencies (DCH, DEQ, DNR, and MIOSHA), and any other local regulations and standards that may apply.
Documents & Bid Results may be obtained from:
https://sigma.michigan.gov/webapp/PRDVSS2X1/AltSelfService
Project Director: Robert A. Adams/Jeff Barsch
Address:
Phone: 517 242 1088 Email: adamsb1@michigan.gov //// barschj@michigan.gov
Fax:
Approved by:
mailto:FalorT@michigan.gov https://sigma.michigan.gov/webapp/PRDVSS2X1/AltSelfService mailto:adamsb1@michigan.gov
File details come from the government source that posted it. Updated .