472_19087.RAA Addendum 2.pdf

PDF 233 KB Posted

Attached to
File No. 472/19087. RAA-Baraga CF-Propane Plant Upgrades
Solicitation number
RFQ 171 190000000639 3
Issued by
Baraga County, Michigan

About this file

This is a Construction Bid Addendum No. 2 issued by the Michigan Department of Technology, Management and Budget (DTMB), State Facilities Administration Design and Construction Division for the Baraga Correctional Facility Replace and Repair Back Up Fuel System Blender project. The addendum, issued on September 18, 2019, provides clarifications and modifications to the bidding documents for a design-build project with a bid opening date of September 25, 2019. Key clarifications include confirmation that 480V 3-phase electrical service is available at the site and that the current pumps operate on 480Volt 3-phase power. The natural gas supply pressure on the prison side of the gas meter is specified as 5 PSI. The design-build contractor is responsible for reviewing the fence enclosure to ensure setbacks and egress meet current code requirements and must design the project accordingly. The addendum does not revise the original bid date, and all bidders must acknowledge receipt of this addendum in their bid submissions, as failure to do so may result in bid rejection.

The addendum includes 12 months of natural gas usage history for Baraga Correctional Facility showing consumption data from October 2017 through September 2018 and October 2018 through September 2019. The normalized average consumption is 30,883 MCF annually with a peak day usage of 197 DTH. Project Director Jeff Barsch approved the addendum on September 18, 2019, and all addenda will become part of the contract documents. No pricing terms, set-asides, or funding information are specified in this addendum document.

View the file

Other files

File Type Posted
472_19087.RAA Addendum 1.pdf PDF
LEIN Request REV 04-2018.pdf PDF
Propane Standby Inspection Report.pdf PDF
Design Build Advertisement R10-17).pdf PDF
Site Photos.pdf PDF
Ely Energy Vaporizer.pdf PDF
Design Build Spec Final.pdf PDF
LPG Equipment Layout.pdf PDF
Ely Energy Mixer.pdf PDF
Gas Distribution-Shts.I--6.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

DTMB-0414 (Rev 12/17)

DEPARTMENT OF TECHNOLOGY, MANAGEMENT AND BUDGET

State Facilities Administration Design and Construction Division

CONSTRUCTION BID ADDENDUM NO. 2

This form identifies an Addendum to Bidding Documents, and incorporates interpretations or clarifications, modifications, acceptance of proposed “or equal” materials, and other information into the Bidding Documents. Addenda will be numbered by the Professional and distributed through www.michigan.gov/SIGMAVSS as an attachment.

TO:

ALL BIDDERS

DATE ISSUED

9/18/2019

PROJECT NAME

Baraga Correctional Facility Replace and Repair Back Up Fuel System Blender

FILE NUMBER

472/19087.RAA

PROFESSIONAL

Design Build A/E TBD

PROJECT DIRECTOR

Jeff Barsch

BID OPENING DATE:

9/25/2019

ADDENDUM ITEMS: (attach additional sheets and drawings if required)

Item 1-The natural gas load over the last 12 months is attached

Item 2-480V 3 Phase service is available at the site

Item 3-The voltage and phase of the current pumps are 480Volt 3 Phase

Item 4-The Natural Gas supply pressure on the prison side of the gas meter is 5 PSI

Item 5-The Design Build Contractor will be responsible to review the Fence Enclosure to determine if setbacks and egress meet code and design the project to meet the current code requirements.

Item 6-This addendum does not revise the bid date

End of Addendum No. 2

ACKNOWLEDGEMENT: This Addendum must be acknowledged by the Bidder in the space provided in the Bid Summary and Bid Form. Failing to acknowledge Addenda may be cause for the Bid to be rejected. Addenda will become part of the Contract Documents.

PROFESSIONAL: N/A DATE: Click to enter date

APPROVED BY:

PROJECT DIRECTOR: Jeff Barsch DATE: 9/18/2019 http://www.michigan.gov/SIGMAVSS

C U

ST

O

M

ER

R

AT

E

LP

, L P

Ea st

O ct

-1

N ov

-1

D ec

-1

Ja n-

Fe b-

M ar

-1

Ap r-1

M ay -1

Ju n-

Ju l-1

Au g-

Se p-

To ta l

N or m al iz ed

Av er ag e

M C

F C

LA

SS

U P, U P

Ea st

D

TH

D

TH

D

TH

D

TH

D

TH

D

TH

D

TH

D

TH

D

TH

D

TH

D

TH

D

TH

D

TH

To ta l D

TH

D ai ly D

TH

Pe ak D ay Ba ra ga

C or re ct io na l

TR

-1 U

P 1, 3, 4, 4, 4, 3, 3, 1, ,3

,8

O ct

-1

N ov

-1

D ec

-1

Ja n-

Fe b-

M ar

-1

Ap r-1

M ay -1

Ju n-

Ju l-1

Au g-

Se p-

To ta l

D

TH

D

TH

D

TH

D

TH

D

TH

D

TH

D

TH

D

TH

D

TH

D

TH

D

TH

D

TH

D

TH

9/

9/

/1

- 9 /1

/1

- 9 /1

/1

- 9 /1

/1

- 9 /1

/1

- 9 /1

/1

- 9 /1

/1

- 9 /1

/0

- 0 9/

/0

- 9 /0

/0

- 9 /0

/0

- 9 /0

PR

IO

R P

EA

K

D

AY

M C

F U

SA

G

E

Baraga Correctional Nat. Gas Usage History.pdf
Sheet1

File details come from the government source that posted it. Updated .