About this file

This document contains a Contract Data Requirements List (CDRL) and details of a related federal contract opportunity.

The CDRL outlines reporting requirements for a contract to develop an Automated IV Pressure Infuser, including delivery of final reports within 15 working days of completing base and option periods summarizing all work performed. Reports will be reviewed by the government for compliance with the statement of work. The contractor has 10 working days to respond to comments and resubmit.

The related federal contract opportunity is seeking proposals to develop the Automated IV Pressure Infuser to increase automation in the Army's use of pressure infusion bags. Proposals must include a statement of work outlining all activities for design, development, testing, approval, production, training and fielding to achieve a Technology Readiness Level of 8. The Warfighter Health, Performance and Evacuation Project Management Office will perform audits and reserves the right to pursue contractual remedies. The required delivery date and place of performance are not specified.

View the file

Other files

Show all 15

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

G. PREPARED BY

CONTRACT DATA REQUIREMENTS LIST

(1 Data Item)

16. REMARKS

C. CATEGORY:

TDP ________ TM _______ OTHER _________________________

Form Approved OMB No. 0704-0188

15. TOTAL

PREVIOUS EDITION MAY BE USED.DD FORM 1423-1, AUG 96 (EG) Page ____ of ____ Pages

A. CONTRACT LINE ITEM NO. B. EXHIBIT

D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR

1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE

4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE

7. DD 250 REQ

8. APP CODE

9. DIST STATEMENT

REQUIRED

10. FREQUENCY

11. AS OF DATE

12. DATE OF FIRST SUBMISSION

13. DATE OF SUBSEQUENT

SUBMISSION

14. DISTRIBUTION

a. ADDRESSEE

b. COPIES

Draft Final

Reg Repro

17. PRICE GROUP

18. ESTIMATED

TOTAL PRICE

H. DATE J. DATEI. APPROVED BY

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports (0701-0188), 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302. Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please DO NOT RETURN your form to the above address. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

Designed using Perform Pro, WHS/DIOR, Aug 96

B EXHIBIT: A
TDP:
TM:
OTHER: N/A
E CONTRACTPR NO: W81XWH-20-R-TBD
F CONTRACTOR: TBD
2 TITLE OF DATA ITEM: Final Report(s)
3 SUBTITLE: N/A
6 REQUIRING OFFICE: USAMMDA-WHPE
9 DIST STATEMENT REQUIRED: N/A
11 AS OF DATE: SEE BLK 16
H DATE:
a ADDRESSEERow1: USAMMDA-WHPE
DraftRow1: 0
RegRow1: 1
ReproRow1: 0
a ADDRESSEERow2: PCO
DraftRow2:
RegRow2: 1
ReproRow2:
a ADDRESSEERow3: ACO
DraftRow3:
RegRow3: 1
ReproRow3:
a ADDRESSEERow4:
DraftRow4:
RegRow4:
ReproRow4:
a ADDRESSEERow5:
DraftRow5:
RegRow5:
ReproRow5:
a ADDRESSEERow6:
DraftRow6:
RegRow6:
ReproRow6:
a ADDRESSEERow7:
DraftRow7:
RegRow7:
ReproRow7:
a ADDRESSEERow8:
DraftRow8:
RegRow8:
ReproRow8:
a ADDRESSEERow9:
DraftRow9:
RegRow9:
ReproRow9:
a ADDRESSEERow10:
DraftRow10:
RegRow10:
ReproRow10:
a ADDRESSEERow11:
DraftRow11:
RegRow11:
ReproRow11:
a ADDRESSEERow12:
DraftRow12:
RegRow12:
ReproRow12:
a ADDRESSEERow13:
DraftRow13:
RegRow13:
ReproRow13:
a ADDRESSEERow14:
DraftRow14:
RegRow14:
ReproRow14:
a ADDRESSEERow15:
DraftRow15:
RegRow15:
ReproRow15:
a ADDRESSEERow16:
DraftRow16:
RegRow16:
ReproRow16:
a ADDRESSEERow17:
DraftRow17:
RegRow17:
ReproRow17:
a ADDRESSEERow18:
DraftRow18:
RegRow18:
ReproRow18:
a ADDRESSEERow19:
DraftRow19:
RegRow19:
ReproRow19:
a ADDRESSEERow20:
DraftRow20:
RegRow20:
ReproRow20:
a ADDRESSEERow21:
DraftRow21:
RegRow21:
ReproRow21:
a ADDRESSEERow22:
DraftRow22:
RegRow22:
ReproRow22:
a ADDRESSEERow23:
DraftRow23:
RegRow23:
ReproRow23:
a ADDRESSEERow24:
DraftRow24:
RegRow24:
ReproRow24:
a ADDRESSEERow25:
DraftRow25:
RegRow25:
ReproRow25:
a ADDRESSEERow26:
DraftRow26:
RegRow26:
ReproRow26:
a ADDRESSEERow27:
DraftRow27:
RegRow27:
ReproRow27:
a ADDRESSEERow28:
DraftRow28:
RegRow28:
ReproRow28:
a ADDRESSEERow29:
DraftRow29:
RegRow29:
ReproRow29:
a ADDRESSEERow30:
DraftRow30:
RegRow30:
ReproRow30:
a ADDRESSEERow31:
DraftRow31:
RegRow31:
ReproRow31:
a ADDRESSEERow32:
DraftRow32:
RegRow32:
ReproRow32:
a ADDRESSEERow33:
DraftRow33:
RegRow33:
ReproRow33:
a ADDRESSEERow34:
DraftRow34:
RegRow34:
ReproRow34:
a ADDRESSEERow35:
DraftRow35:
RegRow35:
ReproRow35:
a ADDRESSEERow36:
DraftRow36:
RegRow36:
ReproRow36:
a ADDRESSEERow37:
DraftRow37:
RegRow37:
ReproRow37:
a ADDRESSEERow38:
DraftRow38:
RegRow38:
ReproRow38:
Draft15 TOTAL: 0
Reg15 TOTAL: 3
Repro15 TOTAL: 0
J DATE: 23 SEP 2019
17 PRICE GROUP:
18 ESTIMATED TOTAL PRICE: INSERT IN SECT. B
Text1: CLINS
Text2: Automated IV Pressure Infuser
Text3: A005
5 CONTRACT REFERENCE: N/A
Text 4: DI-MGMT-80227
Text5: A Final Report shall be delivered no later than (NLT) 15 Working days after completion of base and each contract option. This Final Report shall include description of all work performed during that option period and may include work referenced in the Progress, Status, and Management (PSM) report and the Technical data Package (CDRL A006) for the option period.

This report shall include a complete scientific description of all work performed and may include any data referenced in the above paragraph.

Government will review submissions for compliance with the Statement of Work. Contractor has 10 working days to respond and resubmit upon receipt of Government final comments and will provide the final document within 10 working days after approval of changes is received.

2019-08-27T16:05:15-0400
WANG.JAY.YUAN.1379211905
2019-09-23T23:26:17-0400
MILANO.MAUREEN.COSTA.1229254070
Text8: 1
Text9: 1
Combo Box3:
0:
0: [LT]
Combo Box4: [A]
Combo Box5: [Once]
Combo Box6: [SEE BLK 16]
Combo Box7: [SEE BLK 16]

File details come from the government source that posted it. Updated .